SlideShare une entreprise Scribd logo
1  sur  14
Pollution Prevention Code
Overview of Pollution Prevention Code
Company’s
1
Commitment of
Reductions of
Waste & Releases

Establish
2
Inventory Record
for Releases &
Wastes
Generated

Evaluate the
3
Potential Impacts
of Releases &
Wastes on
Environment

Program to
13
Resolve
Environmental
problems Caused
by Past Operation

Implement
12
Contractor
Selection Based
on Sound Waste
Practices

Review
11
Periodically Site
Waste
Management
Practices

13 Management
Practices
Share Site’s
4
Environmental
Information with
Employees &
Neighbors

Establish Priority 5
Goals & Pollution
Prevention Plans
for Releases &
Wastes

Carry Out
6
Ongoing
Reductions of
Wastes and
Releases

Promote &
10
Support Wastes
& releases
Reduction by
Others

Policy on
9
Prevention of
Wastes &
Releases in New
Facilities

Dialogue with 8
Employees &
Neighbors on
Progress of PP
Programs

Measure
Progress in
Reduction of
Releases &
Wastes

7
Pollution Prevention Code
Management Practice

Implementation Guidelines

KAP’s Practices

Status

1
Policy statement
Targets
Allocate Resources

Company’s
Commitment of
Reductions of Waste
& Releases

Policy statement – Environment
Environmental Objectives (with
Targets)
ISO 14001 certification
Resources –tight

Practice in
Place

Quantitative Records of
Wastes& Releases

Inventory Records of Solid and
Liquid Wastes
Air Emission Test Report
Air Quality Assessment
Noise levels

Practice in
Place

Above test Results evaluated –
legal compliance
Control Procedures of Trade
Effluent Release
V-605 Vent size increased

Practice in
Place

2
Establish Inventory
Record for Releases &
Wastes Generated

3
Evaluate the Potential
Impacts of Releases &
Wastes on
Environment

Evaluate Environmental
Impact
Control Procedures
Set Priorities for Reduction
of Wastes & Releases
Pollution Prevention Code
Management Practice

Implementation Guidelines

KAP’s Practices

Status

4
Dialogue with Employees,
Neighbors & Community

Share Site’s
Environmental
Information with
Employees & Neighbors
5
Establish Priority Goals
& Pollution Prevention
Plans for Releases &
Wastes

Summary of Legal
Compliance
Waste & Release Reduction
List
Time-line

6
Carry Out Ongoing
Reductions of Wastes
and Releases

Execution of Plans
Accountable persons
Data to support waste
reduction

Communication Sessions
Charts (KPI) on Notice Boards
Attend SICA Meeting

Environmental Objectives
Annual Environmental
Performance Report
Environmental projects
Mid-term Plan ??

Various Environmental
Performance Indicators
Utilities Yields report
Environmental projects
carried out as part of
investment project
e.g V-605 Vent size increased
Dust collectors projects

Practice in
Place

Evaluating
Company
Practices

Evaluating
Company
Practices
Pollution Prevention Code
Management Practice
7
Measure Progress in
Reduction of Releases &
Wastes

8
Dialogue with
Employees & Neighbors
on Progress of PP
Programs

9
Policy on Prevention of
Wastes & Releases in
New Facilities

Implementation Guidelines

KAP’s Practices

Status

KPI Vs Planned
Compare past performance
Identify area of
improvement

Environmental Performance
Report (KPI’s)
Management review

Practice in
Place

Ongoing dialogue with
employees, contractors &
neighbor

Communication sessions
HSEQ meetings
SICA meetings
SORT meetings
HSEQ Patrol / Work Requests

Practice in
Place

Management of change
(MOC)
Hazop study

Practice in
Place

Recommendation for
improvement

Management of change
Hazop study
Pollution Prevention Code
Management Practice

Implementation Guidelines

KAP’s Practices

Status

10
Company’s newsletter
Participation in industry
committees

Promote & Support
Wastes & releases
Reduction by Others

Environmental Performance
Report published on notice
boards
SCIC members

Practice in
Place

11
Review Periodically
Waste Management
Practices at facilities

Records of dialogues
Review and evaluate
environmental practices

HSEQ meetings / HSEQ
patrol (feedback)
Environmental audit by
3rd party

Practice in
Place

12
Implement Contractor
Selection Based on
Sound Waste
Practices

Contractors assessment
Selection – awareness
of environmental
requirements

Annual Assessment for inhouse Contractors
Waste management criteria ?

Evaluating
Company
Practices

Assessment of past
contamination at site
Managing past
contamination

Environmental baseline
study by 3rd party

Not Applicable

13
Program to Resolve
Environmental
problems Caused by
Past Operation
End of Presentation
What Others Do

List of Key Environmental Parameters

Parameters

Indicator

Specification / Target

Monitoring
Frequency

Responsibility

1

Source emission test at
boiler’s exhaust stack

Gm/m3

Particulates <100mg/Nm3
NOX : 700mg/Nm3
CO : 625 mg/Nm3

Yearly

Maintenance
Technician

2

Waste water quality

Mg/l

Trade effluent discharge limit =
600 for COD
400 for total suspended solids
6-9 for PH / 60 for oil & grease

Monthly and
yearly for 3rd
party testing

HSE Officer

3

Waste chemical
disposal qty & cost

Kg / $

Kept to minimum

Quarterly review

HSE Officer

4

Slop oil qty Cost

Kg / $

< 4 kg / MT sales

Quarterly review

HSE Officer

5

Diesel consumption

Litre / $

< 11 litres / MT sales

Monthly report

Purchasing
Officer

6

Noise monitoring boundary

dBA

< 75 dBA average

Every 3 years

HSE Officer

7

Factory noise
monitoring

dBA

< 85 dBA average

Every 3 years

HSE Officer

8

Electricity consumption

Kwh / $

Overall < 28 kwh / MT sales
Plant < 16 kwh / MT sales
Office < 12 kwh / MT sales

Monthly report

Maintenance
Technician

9

Paper consumption &
recycling

Kg / $

To recycle >60% of paper
purchased

Monthly report

HSE Officer

Source : Lubrizol SEA
Fuel Conservation
Objective

Target

KPI

Programmes

By Who ?

Reduce diesel
consumption

< 10.8 Litres/
MT od sales

Total volume
(litres)
consumed /
MT sales

Depending on the daily operation activities, shut
down of boiler at 1500 hrs whenever possible

Maintenance
Supervisor

Use blend tanks as staging tanks to minimize
repeated heating

Maintenance
Supervisor

To recover > 80% of steam condensate from
heating process.

Senior Ops
Engineer

To conduct steam trap efficiency check

Maintenance
Supervisor

Reduce furnace operation by consolidating
blending of 4 batches VIM products into 2 days

Maintenance
Supervisor

Source : Lubrizol SEA
What Others Do

Source : Lubrizol SEA
What Others Do

Source : Lubrizol SEA
Source : Lubrizol SEA
Source : Lubrizol SEA

Contenu connexe

Tendances

Environmental Management Systems - ISO 14001
Environmental Management Systems - ISO 14001Environmental Management Systems - ISO 14001
Environmental Management Systems - ISO 14001
Hector Rodriguez
 

Tendances (20)

Hazardous chemicals handling
Hazardous chemicals handlingHazardous chemicals handling
Hazardous chemicals handling
 
Consulting MSDS
Consulting MSDSConsulting MSDS
Consulting MSDS
 
14 Tips for Process Safety Management
14 Tips for Process Safety Management14 Tips for Process Safety Management
14 Tips for Process Safety Management
 
Presentation hazop introduction
Presentation hazop introductionPresentation hazop introduction
Presentation hazop introduction
 
Cement industries EHS consideration
Cement industries EHS considerationCement industries EHS consideration
Cement industries EHS consideration
 
Safety in chlorine ppt
Safety in chlorine pptSafety in chlorine ppt
Safety in chlorine ppt
 
AI & HIRA TRAINING.ppt
AI & HIRA TRAINING.pptAI & HIRA TRAINING.ppt
AI & HIRA TRAINING.ppt
 
Chemicals Safety Presentation
Chemicals Safety PresentationChemicals Safety Presentation
Chemicals Safety Presentation
 
Environmental Management Systems - ISO 14001
Environmental Management Systems - ISO 14001Environmental Management Systems - ISO 14001
Environmental Management Systems - ISO 14001
 
Ohsas in brief
Ohsas in briefOhsas in brief
Ohsas in brief
 
Occupational health and safety implementation
Occupational health and safety implementationOccupational health and safety implementation
Occupational health and safety implementation
 
Environmental aspects and impacts
Environmental aspects and impactsEnvironmental aspects and impacts
Environmental aspects and impacts
 
Hazop analysis
Hazop analysisHazop analysis
Hazop analysis
 
Role of chemical engineer in environment
Role of chemical engineer in environmentRole of chemical engineer in environment
Role of chemical engineer in environment
 
Samical: Unit Process and Unit Operations
Samical:  Unit Process and Unit OperationsSamical:  Unit Process and Unit Operations
Samical: Unit Process and Unit Operations
 
Hazard analysis
Hazard analysisHazard analysis
Hazard analysis
 
ISO 14001:2015 Documentation ppt
ISO 14001:2015 Documentation pptISO 14001:2015 Documentation ppt
ISO 14001:2015 Documentation ppt
 
ISO 14001 Leadership & Planning Elements
ISO 14001 Leadership & Planning  ElementsISO 14001 Leadership & Planning  Elements
ISO 14001 Leadership & Planning Elements
 
Cl2safehandling
Cl2safehandlingCl2safehandling
Cl2safehandling
 
Hazop Study
Hazop StudyHazop Study
Hazop Study
 

Similaire à Pollution Prevention Code

Final Presentation
Final PresentationFinal Presentation
Final Presentation
jimmy91826
 
Paint Manufacturing Industry Waste Minimization
Paint Manufacturing Industry Waste MinimizationPaint Manufacturing Industry Waste Minimization
Paint Manufacturing Industry Waste Minimization
Shahzad Khan
 
Sustainability Elements of a Responsible Request for Proposal
Sustainability Elements of a Responsible Request for ProposalSustainability Elements of a Responsible Request for Proposal
Sustainability Elements of a Responsible Request for Proposal
Vivastream
 
environmentalmsyatem-150812165556-lva1-app6891 (2).pdf
environmentalmsyatem-150812165556-lva1-app6891 (2).pdfenvironmentalmsyatem-150812165556-lva1-app6891 (2).pdf
environmentalmsyatem-150812165556-lva1-app6891 (2).pdf
16AbhishekPandey
 
Carbon footprint web application v5 kpacket
Carbon footprint web application v5 kpacketCarbon footprint web application v5 kpacket
Carbon footprint web application v5 kpacket
APEX Global
 
Managerstraining 12675884284189-phpapp01 (1)
Managerstraining 12675884284189-phpapp01 (1)Managerstraining 12675884284189-phpapp01 (1)
Managerstraining 12675884284189-phpapp01 (1)
Alan Crabtree
 
BIFM case study presentation slides
BIFM case study presentation slidesBIFM case study presentation slides
BIFM case study presentation slides
Mike Foy
 

Similaire à Pollution Prevention Code (20)

Sustainability & Green Chemistry in Pharma
Sustainability & Green Chemistry in PharmaSustainability & Green Chemistry in Pharma
Sustainability & Green Chemistry in Pharma
 
Final Presentation
Final PresentationFinal Presentation
Final Presentation
 
Fmi plenaryv4
Fmi plenaryv4Fmi plenaryv4
Fmi plenaryv4
 
Enviromental precaion ,regulation, and iniciatives and
Enviromental precaion ,regulation, and iniciatives andEnviromental precaion ,regulation, and iniciatives and
Enviromental precaion ,regulation, and iniciatives and
 
Paint Manufacturing Industry Waste Minimization
Paint Manufacturing Industry Waste MinimizationPaint Manufacturing Industry Waste Minimization
Paint Manufacturing Industry Waste Minimization
 
Sustainability Elements of a Responsible Request for Proposal
Sustainability Elements of a Responsible Request for ProposalSustainability Elements of a Responsible Request for Proposal
Sustainability Elements of a Responsible Request for Proposal
 
environmentalmsyatem-150812165556-lva1-app6891 (2).pdf
environmentalmsyatem-150812165556-lva1-app6891 (2).pdfenvironmentalmsyatem-150812165556-lva1-app6891 (2).pdf
environmentalmsyatem-150812165556-lva1-app6891 (2).pdf
 
Environmental Management System
Environmental Management SystemEnvironmental Management System
Environmental Management System
 
Itnesh -Low carbon supply chain management
Itnesh -Low carbon supply chain managementItnesh -Low carbon supply chain management
Itnesh -Low carbon supply chain management
 
Carbon Footprint
Carbon FootprintCarbon Footprint
Carbon Footprint
 
Carbon footprint web application v5 kpacket
Carbon footprint web application v5 kpacketCarbon footprint web application v5 kpacket
Carbon footprint web application v5 kpacket
 
Life cycle assessment
Life cycle assessmentLife cycle assessment
Life cycle assessment
 
Iso 14001 consulting by Netpeckers Consulting India
Iso 14001 consulting by Netpeckers Consulting IndiaIso 14001 consulting by Netpeckers Consulting India
Iso 14001 consulting by Netpeckers Consulting India
 
How Sustainability management and the GRI structure can benefit your company
How Sustainability management and the GRI structure can benefit your companyHow Sustainability management and the GRI structure can benefit your company
How Sustainability management and the GRI structure can benefit your company
 
Greening your Business: Free Support from Envirowise
Greening your Business: Free Support from EnvirowiseGreening your Business: Free Support from Envirowise
Greening your Business: Free Support from Envirowise
 
Cleaner production ingles
Cleaner production inglesCleaner production ingles
Cleaner production ingles
 
Managerstraining 12675884284189-phpapp01 (1)
Managerstraining 12675884284189-phpapp01 (1)Managerstraining 12675884284189-phpapp01 (1)
Managerstraining 12675884284189-phpapp01 (1)
 
Artisitic Millinersssmain
Artisitic MillinersssmainArtisitic Millinersssmain
Artisitic Millinersssmain
 
BIFM case study presentation slides
BIFM case study presentation slidesBIFM case study presentation slides
BIFM case study presentation slides
 
Pieter de bruyn
Pieter de bruynPieter de bruyn
Pieter de bruyn
 

Pollution Prevention Code

  • 2. Overview of Pollution Prevention Code Company’s 1 Commitment of Reductions of Waste & Releases Establish 2 Inventory Record for Releases & Wastes Generated Evaluate the 3 Potential Impacts of Releases & Wastes on Environment Program to 13 Resolve Environmental problems Caused by Past Operation Implement 12 Contractor Selection Based on Sound Waste Practices Review 11 Periodically Site Waste Management Practices 13 Management Practices Share Site’s 4 Environmental Information with Employees & Neighbors Establish Priority 5 Goals & Pollution Prevention Plans for Releases & Wastes Carry Out 6 Ongoing Reductions of Wastes and Releases Promote & 10 Support Wastes & releases Reduction by Others Policy on 9 Prevention of Wastes & Releases in New Facilities Dialogue with 8 Employees & Neighbors on Progress of PP Programs Measure Progress in Reduction of Releases & Wastes 7
  • 3. Pollution Prevention Code Management Practice Implementation Guidelines KAP’s Practices Status 1 Policy statement Targets Allocate Resources Company’s Commitment of Reductions of Waste & Releases Policy statement – Environment Environmental Objectives (with Targets) ISO 14001 certification Resources –tight Practice in Place Quantitative Records of Wastes& Releases Inventory Records of Solid and Liquid Wastes Air Emission Test Report Air Quality Assessment Noise levels Practice in Place Above test Results evaluated – legal compliance Control Procedures of Trade Effluent Release V-605 Vent size increased Practice in Place 2 Establish Inventory Record for Releases & Wastes Generated 3 Evaluate the Potential Impacts of Releases & Wastes on Environment Evaluate Environmental Impact Control Procedures Set Priorities for Reduction of Wastes & Releases
  • 4. Pollution Prevention Code Management Practice Implementation Guidelines KAP’s Practices Status 4 Dialogue with Employees, Neighbors & Community Share Site’s Environmental Information with Employees & Neighbors 5 Establish Priority Goals & Pollution Prevention Plans for Releases & Wastes Summary of Legal Compliance Waste & Release Reduction List Time-line 6 Carry Out Ongoing Reductions of Wastes and Releases Execution of Plans Accountable persons Data to support waste reduction Communication Sessions Charts (KPI) on Notice Boards Attend SICA Meeting Environmental Objectives Annual Environmental Performance Report Environmental projects Mid-term Plan ?? Various Environmental Performance Indicators Utilities Yields report Environmental projects carried out as part of investment project e.g V-605 Vent size increased Dust collectors projects Practice in Place Evaluating Company Practices Evaluating Company Practices
  • 5. Pollution Prevention Code Management Practice 7 Measure Progress in Reduction of Releases & Wastes 8 Dialogue with Employees & Neighbors on Progress of PP Programs 9 Policy on Prevention of Wastes & Releases in New Facilities Implementation Guidelines KAP’s Practices Status KPI Vs Planned Compare past performance Identify area of improvement Environmental Performance Report (KPI’s) Management review Practice in Place Ongoing dialogue with employees, contractors & neighbor Communication sessions HSEQ meetings SICA meetings SORT meetings HSEQ Patrol / Work Requests Practice in Place Management of change (MOC) Hazop study Practice in Place Recommendation for improvement Management of change Hazop study
  • 6. Pollution Prevention Code Management Practice Implementation Guidelines KAP’s Practices Status 10 Company’s newsletter Participation in industry committees Promote & Support Wastes & releases Reduction by Others Environmental Performance Report published on notice boards SCIC members Practice in Place 11 Review Periodically Waste Management Practices at facilities Records of dialogues Review and evaluate environmental practices HSEQ meetings / HSEQ patrol (feedback) Environmental audit by 3rd party Practice in Place 12 Implement Contractor Selection Based on Sound Waste Practices Contractors assessment Selection – awareness of environmental requirements Annual Assessment for inhouse Contractors Waste management criteria ? Evaluating Company Practices Assessment of past contamination at site Managing past contamination Environmental baseline study by 3rd party Not Applicable 13 Program to Resolve Environmental problems Caused by Past Operation
  • 8. What Others Do List of Key Environmental Parameters Parameters Indicator Specification / Target Monitoring Frequency Responsibility 1 Source emission test at boiler’s exhaust stack Gm/m3 Particulates <100mg/Nm3 NOX : 700mg/Nm3 CO : 625 mg/Nm3 Yearly Maintenance Technician 2 Waste water quality Mg/l Trade effluent discharge limit = 600 for COD 400 for total suspended solids 6-9 for PH / 60 for oil & grease Monthly and yearly for 3rd party testing HSE Officer 3 Waste chemical disposal qty & cost Kg / $ Kept to minimum Quarterly review HSE Officer 4 Slop oil qty Cost Kg / $ < 4 kg / MT sales Quarterly review HSE Officer 5 Diesel consumption Litre / $ < 11 litres / MT sales Monthly report Purchasing Officer 6 Noise monitoring boundary dBA < 75 dBA average Every 3 years HSE Officer 7 Factory noise monitoring dBA < 85 dBA average Every 3 years HSE Officer 8 Electricity consumption Kwh / $ Overall < 28 kwh / MT sales Plant < 16 kwh / MT sales Office < 12 kwh / MT sales Monthly report Maintenance Technician 9 Paper consumption & recycling Kg / $ To recycle >60% of paper purchased Monthly report HSE Officer Source : Lubrizol SEA
  • 9. Fuel Conservation Objective Target KPI Programmes By Who ? Reduce diesel consumption < 10.8 Litres/ MT od sales Total volume (litres) consumed / MT sales Depending on the daily operation activities, shut down of boiler at 1500 hrs whenever possible Maintenance Supervisor Use blend tanks as staging tanks to minimize repeated heating Maintenance Supervisor To recover > 80% of steam condensate from heating process. Senior Ops Engineer To conduct steam trap efficiency check Maintenance Supervisor Reduce furnace operation by consolidating blending of 4 batches VIM products into 2 days Maintenance Supervisor Source : Lubrizol SEA
  • 10. What Others Do Source : Lubrizol SEA
  • 11. What Others Do Source : Lubrizol SEA
  • 12.