L00 07.05.2014 For Approval CK MOS
REV. DATE REASON FOR ISSUE PREP. CHECKED APPROVED
FOSTER WHEELER BİMAŞ DOCUMENT NUMBER
ED0733A-50A10_1
DRS-00-VBR-TR-FWB-002 TYPE
A 07.05.14
Rev. Qua. Sheet No
Doc.
Sign Date
DERWEZE
SIMPLE CYCLE POWER PLANT
APPROVED
SECTION / AREA
Stage Sheet No Total Sheet No
CHECKED - 1 5
PREPARED GENERAL REQUIREMENTS
FOR PIPE MATERIAL
FOSTER WHEELER
BİMAŞ
GENERAL NOTES AND VENDOR
DOCUMENTS FOR VESSELS,
TRAYS AND AUXILIARIES
ÇALIK Doc. No. : DRS-00-VBR-TR-FWB-002
Page : 2 of 5
Date : 07.05.2014
ÇALIK Revision : A
FWB Doc. No. : ED0733A-50A_1
FWB Rev. No. : L00FOSTER WHEELER BİMAŞ
CONTENTS
I. SCOPE
II. CODE
III. PIPES TECHNICAL REQUIREMENTS
IV. COLOR CODING AND P.M.I.
V. WELDING PROCEDURES FOR WELDED PIPES
VI. PRINT QUANTITIES
VII BID QUOTATION MANDATORY REQUIREMENTS
TABLE “A” – BULK MATERIAL
GENERAL NOTES AND VENDOR
DOCUMENTS FOR VESSELS,
TRAYS AND AUXILIARIES
ÇALIK Doc. No. : DRS-00-VBR-TR-FWB-002
Page : 3 of 5
Date : 07.05.2014
ÇALIK Revision : A
FWB Doc. No. : ED0733A-50A_1
FWB Rev. No. : L00FOSTER WHEELER BİMAŞ
I. SCOPE
This Standard covers general requirements for pipe material.
II. CODE
All materials shall comply with material specification/norm specified in Material
Requisition.
III. PIPES TECHNICAL REQUIREMENTS
A. Carbon steel and low alloy steel pipes shall be delivered in double random length. Where
the ordered quantity is shorter than double random length, single random length shall be
delivered. Pipes in sizes up to 1½ shall be delivered in single random length.
Stainless steel pipes shall be delivered in single random length.
B. Pipe shall have no joints.
C. Marking:
The marking shall be in accordance with the ASTM A106, A335, A312 or other standard
stated on each Material Requisition.
Pipes in sizes 1½" and smaller may be supplied in bundles and the marking may be
legibly marked on a durable tag securely attached to each bundle.
D. A signed Manufacturer's inspection certificate shall include the following:
- Name of Manufacturer
- Purchase order number, date and item number
- Material specification and grade
- Diameter, schedule number, length quantity
- Heat number or charge number
- Inspection or test number
- Chemical composition
- Hydrostatic test results
- Surface and dimension checks
- Heat treatment information
- Welding procedure approvals
- Welder/welding operator approvals
- Non destructive testing operator qualifications
- Non destructive testing reports
GENERAL NOTES AND VENDOR
DOCUMENTS FOR VESSELS,
TRAYS AND AUXILIARIES
ÇALIK Doc. No. : DRS-00-VBR-TR-FWB-002
Page : 4 of 5
Date : 07.05.2014
ÇALIK Revision : A
FWB Doc. No. : ED0733A-50A_1
FWB Rev. No. : L00FOSTER WHEELER BİMAŞ
- Mechanical data, certified by the Quality Control department of the pipe
Manufacturer, which shall be independent from the production line. Where an
independent quality control does not exist, the above mentioned tests are to be
witnessed by an independent inspection authority.
- Statement that “material supplied is in full accordance to purchase order
requirements”.
- Where “threaded and coupled 3000lbs (NPT per ASME B1.20.1)” is indicated on the
Material Requisition of galvanized pipes, EN 10204-3.1 certification is also required
for the threaded galvanized couplings supplied together with galvanized pipes.
E. Longitudinally welded pipes are not acceptable in lieu of seamless pipes unless
specifically accepted by Purchaser.
F. Peaking for all longitudinally welded pipe shall be limited to 1/8 in. (3mm) maximum, as
measured by a template technique approved by the Purchaser.
G. Inside protective coatings like enamel “Japanese Black” are not allowed.
H. Carbon steel shall have a maximum Carbon Equivalent of 0,43 , calculated using the
formula: C.E.= C% + Mn%/6 + (Cr%+Mo%+V%)/5 + (Ni%+Cu%)/15
IV. COLOR CODING AND P.M.I.
Pipe supplier must classify and mark alloy pipes for material colour coding and is
responsible for the correct application of colour bands before shipping said materials to
shop fabricator or fields.
V. WELDING PROCEDURES FOR WELDED PIPES
Where welded pipes are supplied, pipe manufacturer shall provide welding procedures
and welding qualifications according to the timelines.
FWI can issue comments on these documents if deviation from Code, contractual
documents, good engineering practice are found or receive them from information only. In
any case Vendor shall inform FW of any deviation to Codes or other contractual
documents.
The supply, fabrication and erection of all pipe work shall comply with the
requirements of ANSI B31.1. All butt welds shall be full penetration welds with complete
fusion between weld runs and base metal. The following tests shall be carried out on
welds (both shop and Site):
- 100 per cent visual examination of all welds to the requirements of the application
standard.
- At least 10 per cent ultrasonic or radiographic and surface flow examination on
all pipe butt welds and branch welds to the acceptance criteria of the applicable
standard.
- At least 10 per cent magnetic particle examination of all fillet welds.
- Hydrostatic test to the requirements of the applicable code.
GENERAL NOTES AND VENDOR
DOCUMENTS FOR VESSELS,
TRAYS AND AUXILIARIES
ÇALIK Doc. No. : DRS-00-VBR-TR-FWB-002
Page : 5 of 5
Date : 07.05.2014
ÇALIK Revision : A
FWB Doc. No. : ED0733A-50A_1
FWB Rev. No. : L00FOSTER WHEELER BİMAŞ
Weld defect acceptance levels shall be in accordance with the applicable standard except
that lack of root fusion or incomplete root penetrant will not be permitted.
VI. PRINT QUANTITIES
Required number of copies, for all type of Vendor documents, are defined in the attached
Table “A”.
TABLE “A” – BULK MATERIAL
TYPE OF PRELIMINARY FINAL
DRAWING No. of
copies
When Due No. of
copies
When Due
WELDING PROCEDURE
(WPS) AND PROCEDURE
QUALIF. (PQR)
2 4 weeks
after P.O.
- -
CHEMICAL AND
PHYSICAL PROPERTIES
CERTIFICATES
REFER TO FWI APPLICABLE JOB SPEC
VII. BID QUOTATION MANDATORY REQUIREMENTS
A. All pipes shall comply with the requirements quoted on the relevant requisition together
with any additional requirements of this Eng. Standard. In case of inconsistency between
the M.R. and this Eng. Standard, the requirements of the M.R. will govern.
B. It shall be unquestionably assumed by FWI/Purchaser that, unless Vendor makes specific
exceptions in his quotation, all components supplied shall comply exactly with the
requirements specified in the Material Requisition and Specifications attached thereto.
C. Vendor must clearly state in his quotation (in a dedicated paragraph headed “Technical
Deviation List”) all instances in which the components offered deviates from the Material
Requisition and/or Eng. Std’s; including, but not limited to, all differences in duty,
mechanical design, codes of fabrication or design, materials of construction and extent of
supply.

Contenu connexe

Tendances

What does cold stretching mean
What does cold stretching meanWhat does cold stretching mean
What does cold stretching meanJiun Fa ,Lai
 
Cqi 11 plating system assessment process table a - zinc - zinc alloy plating
Cqi 11 plating system assessment process table a - zinc - zinc alloy platingCqi 11 plating system assessment process table a - zinc - zinc alloy plating
Cqi 11 plating system assessment process table a - zinc - zinc alloy platingPaco Miró
 
WPS-PQR (welding-pengelasan)
WPS-PQR (welding-pengelasan)WPS-PQR (welding-pengelasan)
WPS-PQR (welding-pengelasan)Abrianto Akuan
 
20170922231916 120
20170922231916 12020170922231916 120
20170922231916 120qczoomen
 
BGAS Training | CSWIP Training | API, NDT And ISO Training | WPS/WPQR Trainin...
BGAS Training | CSWIP Training | API, NDT And ISO Training | WPS/WPQR Trainin...BGAS Training | CSWIP Training | API, NDT And ISO Training | WPS/WPQR Trainin...
BGAS Training | CSWIP Training | API, NDT And ISO Training | WPS/WPQR Trainin...Blastline Institute
 
Piping inspector questions 1
Piping inspector questions  1 Piping inspector questions  1
Piping inspector questions 1 MOHAMMAD ATIF ALI
 
Copy of potato export to russia 990 (catalog)
Copy of potato export to russia 990 (catalog)Copy of potato export to russia 990 (catalog)
Copy of potato export to russia 990 (catalog)Lewis Gray
 
Ball valve suppliers in usa
Ball valve suppliers in usa Ball valve suppliers in usa
Ball valve suppliers in usa A.K.Industries
 

Tendances (16)

What does cold stretching mean
What does cold stretching meanWhat does cold stretching mean
What does cold stretching mean
 
Cqi 11 plating system assessment process table a - zinc - zinc alloy plating
Cqi 11 plating system assessment process table a - zinc - zinc alloy platingCqi 11 plating system assessment process table a - zinc - zinc alloy plating
Cqi 11 plating system assessment process table a - zinc - zinc alloy plating
 
WPS-PQR (welding-pengelasan)
WPS-PQR (welding-pengelasan)WPS-PQR (welding-pengelasan)
WPS-PQR (welding-pengelasan)
 
20170922231916 120
20170922231916 12020170922231916 120
20170922231916 120
 
BGAS Training | CSWIP Training | API, NDT And ISO Training | WPS/WPQR Trainin...
BGAS Training | CSWIP Training | API, NDT And ISO Training | WPS/WPQR Trainin...BGAS Training | CSWIP Training | API, NDT And ISO Training | WPS/WPQR Trainin...
BGAS Training | CSWIP Training | API, NDT And ISO Training | WPS/WPQR Trainin...
 
2015 API 510 PRESSURE VESSEL INSPECTOR CERTIFICATION PREPARATION COURSE
2015 API 510 PRESSURE VESSEL INSPECTOR CERTIFICATION PREPARATION COURSE2015 API 510 PRESSURE VESSEL INSPECTOR CERTIFICATION PREPARATION COURSE
2015 API 510 PRESSURE VESSEL INSPECTOR CERTIFICATION PREPARATION COURSE
 
Pqr0
Pqr0Pqr0
Pqr0
 
Piping inspector questions 1
Piping inspector questions  1 Piping inspector questions  1
Piping inspector questions 1
 
Rg 2719
Rg 2719Rg 2719
Rg 2719
 
Copy of potato export to russia 990 (catalog)
Copy of potato export to russia 990 (catalog)Copy of potato export to russia 990 (catalog)
Copy of potato export to russia 990 (catalog)
 
Asme wps-demo
Asme wps-demoAsme wps-demo
Asme wps-demo
 
Ball valve suppliers in usa
Ball valve suppliers in usa Ball valve suppliers in usa
Ball valve suppliers in usa
 
Rg 447
Rg 447Rg 447
Rg 447
 
Grilletes y tensores gunnebo
Grilletes y tensores gunneboGrilletes y tensores gunnebo
Grilletes y tensores gunnebo
 
Welder parameter sheet
Welder parameter sheetWelder parameter sheet
Welder parameter sheet
 
cswip-3-1-new-book
 cswip-3-1-new-book cswip-3-1-new-book
cswip-3-1-new-book
 

En vedette

Ed0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_a
Ed0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_aEd0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_a
Ed0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_addmozsubasi
 
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-aEd0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-addmozsubasi
 
Ed0733 a 50a10-5 - drs-00-vbr-tr-fwb-006_a
Ed0733 a 50a10-5 - drs-00-vbr-tr-fwb-006_aEd0733 a 50a10-5 - drs-00-vbr-tr-fwb-006_a
Ed0733 a 50a10-5 - drs-00-vbr-tr-fwb-006_addmozsubasi
 
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-aEd0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-addmozsubasi
 
Introduction to AmecFW Presentation
Introduction to AmecFW PresentationIntroduction to AmecFW Presentation
Introduction to AmecFW PresentationVince Lee
 
Ed0733 a 50a10-4 - drs-00-vbr-tr-fwb-005_a
Ed0733 a 50a10-4 - drs-00-vbr-tr-fwb-005_aEd0733 a 50a10-4 - drs-00-vbr-tr-fwb-005_a
Ed0733 a 50a10-4 - drs-00-vbr-tr-fwb-005_addmozsubasi
 
AMEC Training & Development Services - for a competent, confident, and safe w...
AMEC Training & Development Services - for a competent, confident, and safe w...AMEC Training & Development Services - for a competent, confident, and safe w...
AMEC Training & Development Services - for a competent, confident, and safe w...Sistema FIEB
 
Gas Liquid Engineering - Presentation Brazil
Gas Liquid Engineering - Presentation BrazilGas Liquid Engineering - Presentation Brazil
Gas Liquid Engineering - Presentation BrazilSistema FIEB
 
Apresentação SEFAZ - Nilson Moscon Ribeiro
Apresentação SEFAZ - Nilson Moscon RibeiroApresentação SEFAZ - Nilson Moscon Ribeiro
Apresentação SEFAZ - Nilson Moscon RibeiroSistema FIEB
 
CO2 capture within refining: case studies - Rosa Maria Domenichini, Foster Wh...
CO2 capture within refining: case studies - Rosa Maria Domenichini, Foster Wh...CO2 capture within refining: case studies - Rosa Maria Domenichini, Foster Wh...
CO2 capture within refining: case studies - Rosa Maria Domenichini, Foster Wh...Global CCS Institute
 
Technological Innovation Creating Opportunities for Development
Technological Innovation  Creating Opportunities for DevelopmentTechnological Innovation  Creating Opportunities for Development
Technological Innovation Creating Opportunities for DevelopmentSistema FIEB
 
Modularisation – The Next Step - Presentation by Bill Meyer, Foster Wheeler U...
Modularisation – The Next Step - Presentation by Bill Meyer, Foster Wheeler U...Modularisation – The Next Step - Presentation by Bill Meyer, Foster Wheeler U...
Modularisation – The Next Step - Presentation by Bill Meyer, Foster Wheeler U...IQPC Australia
 
How Farming Can Help You Frame the Solution
How Farming Can Help You Frame the SolutionHow Farming Can Help You Frame the Solution
How Farming Can Help You Frame the SolutionLeslie Bradshaw
 
Embraer - Innovation and Technology
Embraer - Innovation and TechnologyEmbraer - Innovation and Technology
Embraer - Innovation and TechnologySistema FIEB
 
Innovation and Advanced Technology - High Speed Train – Hitachi Brasil Ltda
Innovation and Advanced Technology  - High Speed Train – Hitachi Brasil LtdaInnovation and Advanced Technology  - High Speed Train – Hitachi Brasil Ltda
Innovation and Advanced Technology - High Speed Train – Hitachi Brasil LtdaSistema FIEB
 
meaning of life and faith
meaning of life and faithmeaning of life and faith
meaning of life and faithshabeel pn
 
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...Global CCS Institute
 
Boiler commissioning procedure
Boiler commissioning procedureBoiler commissioning procedure
Boiler commissioning procedureABVSAI
 

En vedette (20)

Ed0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_a
Ed0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_aEd0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_a
Ed0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_a
 
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-aEd0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
 
Ed0733 a 50a10-5 - drs-00-vbr-tr-fwb-006_a
Ed0733 a 50a10-5 - drs-00-vbr-tr-fwb-006_aEd0733 a 50a10-5 - drs-00-vbr-tr-fwb-006_a
Ed0733 a 50a10-5 - drs-00-vbr-tr-fwb-006_a
 
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-aEd0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
 
India capability web
India capability webIndia capability web
India capability web
 
Introduction to AmecFW Presentation
Introduction to AmecFW PresentationIntroduction to AmecFW Presentation
Introduction to AmecFW Presentation
 
Ed0733 a 50a10-4 - drs-00-vbr-tr-fwb-005_a
Ed0733 a 50a10-4 - drs-00-vbr-tr-fwb-005_aEd0733 a 50a10-4 - drs-00-vbr-tr-fwb-005_a
Ed0733 a 50a10-4 - drs-00-vbr-tr-fwb-005_a
 
AMEC Training & Development Services - for a competent, confident, and safe w...
AMEC Training & Development Services - for a competent, confident, and safe w...AMEC Training & Development Services - for a competent, confident, and safe w...
AMEC Training & Development Services - for a competent, confident, and safe w...
 
Gas Liquid Engineering - Presentation Brazil
Gas Liquid Engineering - Presentation BrazilGas Liquid Engineering - Presentation Brazil
Gas Liquid Engineering - Presentation Brazil
 
Apresentação SEFAZ - Nilson Moscon Ribeiro
Apresentação SEFAZ - Nilson Moscon RibeiroApresentação SEFAZ - Nilson Moscon Ribeiro
Apresentação SEFAZ - Nilson Moscon Ribeiro
 
CO2 capture within refining: case studies - Rosa Maria Domenichini, Foster Wh...
CO2 capture within refining: case studies - Rosa Maria Domenichini, Foster Wh...CO2 capture within refining: case studies - Rosa Maria Domenichini, Foster Wh...
CO2 capture within refining: case studies - Rosa Maria Domenichini, Foster Wh...
 
Technological Innovation Creating Opportunities for Development
Technological Innovation  Creating Opportunities for DevelopmentTechnological Innovation  Creating Opportunities for Development
Technological Innovation Creating Opportunities for Development
 
Modularisation – The Next Step - Presentation by Bill Meyer, Foster Wheeler U...
Modularisation – The Next Step - Presentation by Bill Meyer, Foster Wheeler U...Modularisation – The Next Step - Presentation by Bill Meyer, Foster Wheeler U...
Modularisation – The Next Step - Presentation by Bill Meyer, Foster Wheeler U...
 
How Farming Can Help You Frame the Solution
How Farming Can Help You Frame the SolutionHow Farming Can Help You Frame the Solution
How Farming Can Help You Frame the Solution
 
Embraer - Innovation and Technology
Embraer - Innovation and TechnologyEmbraer - Innovation and Technology
Embraer - Innovation and Technology
 
Innovation and Advanced Technology - High Speed Train – Hitachi Brasil Ltda
Innovation and Advanced Technology  - High Speed Train – Hitachi Brasil LtdaInnovation and Advanced Technology  - High Speed Train – Hitachi Brasil Ltda
Innovation and Advanced Technology - High Speed Train – Hitachi Brasil Ltda
 
meaning of life and faith
meaning of life and faithmeaning of life and faith
meaning of life and faith
 
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
 
Boiler commissioning procedure
Boiler commissioning procedureBoiler commissioning procedure
Boiler commissioning procedure
 
isolation
isolationisolation
isolation
 

Similaire à Ed0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_a

0140.10 general welding fabrication and testing
0140.10   general welding fabrication and testing0140.10   general welding fabrication and testing
0140.10 general welding fabrication and testingRamamoorthy Madhan
 
Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------Pratap Biswas
 
vdocuments.net_norsok-piping-standard.pdf
vdocuments.net_norsok-piping-standard.pdfvdocuments.net_norsok-piping-standard.pdf
vdocuments.net_norsok-piping-standard.pdfHadiSwts
 
Aramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeAramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeRobin Parayil
 
Cswip 3.2 spec converted
Cswip 3.2 spec convertedCswip 3.2 spec converted
Cswip 3.2 spec convertedR SIVAKUMAR
 
Procedure qualification
Procedure qualificationProcedure qualification
Procedure qualificationvaasuBandaru
 
Saes w-011-welding on plot ( process ) piping
Saes w-011-welding on plot ( process ) pipingSaes w-011-welding on plot ( process ) piping
Saes w-011-welding on plot ( process ) pipingabhi10apr
 
PSI-130-30-0002-RC-R1_Agitators.pdf
PSI-130-30-0002-RC-R1_Agitators.pdfPSI-130-30-0002-RC-R1_Agitators.pdf
PSI-130-30-0002-RC-R1_Agitators.pdfromuloac
 
ARAVINTH(CV Aramco Approved)
ARAVINTH(CV Aramco Approved)ARAVINTH(CV Aramco Approved)
ARAVINTH(CV Aramco Approved)Aravinth Jai
 
Saes w-016-welding special corrosion materials
Saes w-016-welding special corrosion materialsSaes w-016-welding special corrosion materials
Saes w-016-welding special corrosion materialsabhi10apr
 
Inspection Resume, Robert Jones, 15 May 15
Inspection Resume, Robert Jones, 15 May 15Inspection Resume, Robert Jones, 15 May 15
Inspection Resume, Robert Jones, 15 May 15Robert Jones
 
Christopher Cobain - The WeldNet - CV 2015 Rev 0
Christopher Cobain - The WeldNet - CV 2015 Rev 0Christopher Cobain - The WeldNet - CV 2015 Rev 0
Christopher Cobain - The WeldNet - CV 2015 Rev 0Chris Cobain
 
Wps report
Wps reportWps report
Wps reportsohirooy
 
86177188-Wps-Pqr-Guide.ppt
86177188-Wps-Pqr-Guide.ppt86177188-Wps-Pqr-Guide.ppt
86177188-Wps-Pqr-Guide.pptpeter770054
 

Similaire à Ed0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_a (20)

0140.10 general welding fabrication and testing
0140.10   general welding fabrication and testing0140.10   general welding fabrication and testing
0140.10 general welding fabrication and testing
 
03c-eil-mr-3002-dd1059.pdf
03c-eil-mr-3002-dd1059.pdf03c-eil-mr-3002-dd1059.pdf
03c-eil-mr-3002-dd1059.pdf
 
Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------
 
vdocuments.net_norsok-piping-standard.pdf
vdocuments.net_norsok-piping-standard.pdfvdocuments.net_norsok-piping-standard.pdf
vdocuments.net_norsok-piping-standard.pdf
 
Aramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeAramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector Resume
 
Cswip 3.2 spec converted
Cswip 3.2 spec convertedCswip 3.2 spec converted
Cswip 3.2 spec converted
 
Procedure qualification
Procedure qualificationProcedure qualification
Procedure qualification
 
Saes w-011-welding on plot ( process ) piping
Saes w-011-welding on plot ( process ) pipingSaes w-011-welding on plot ( process ) piping
Saes w-011-welding on plot ( process ) piping
 
PSI-130-30-0002-RC-R1_Agitators.pdf
PSI-130-30-0002-RC-R1_Agitators.pdfPSI-130-30-0002-RC-R1_Agitators.pdf
PSI-130-30-0002-RC-R1_Agitators.pdf
 
ARAVINTH(CV Aramco Approved)
ARAVINTH(CV Aramco Approved)ARAVINTH(CV Aramco Approved)
ARAVINTH(CV Aramco Approved)
 
18rf 31170-ts-002 (flange)
18rf 31170-ts-002 (flange)18rf 31170-ts-002 (flange)
18rf 31170-ts-002 (flange)
 
Saes w-016-welding special corrosion materials
Saes w-016-welding special corrosion materialsSaes w-016-welding special corrosion materials
Saes w-016-welding special corrosion materials
 
Inspection Resume, Robert Jones, 15 May 15
Inspection Resume, Robert Jones, 15 May 15Inspection Resume, Robert Jones, 15 May 15
Inspection Resume, Robert Jones, 15 May 15
 
Christopher Cobain - The WeldNet - CV 2015 Rev 0
Christopher Cobain - The WeldNet - CV 2015 Rev 0Christopher Cobain - The WeldNet - CV 2015 Rev 0
Christopher Cobain - The WeldNet - CV 2015 Rev 0
 
AGP-13-R
AGP-13-RAGP-13-R
AGP-13-R
 
WPS & WPQ
WPS & WPQWPS & WPQ
WPS & WPQ
 
Wps report
Wps reportWps report
Wps report
 
86177188-Wps-Pqr-Guide.ppt
86177188-Wps-Pqr-Guide.ppt86177188-Wps-Pqr-Guide.ppt
86177188-Wps-Pqr-Guide.ppt
 
Module 5
Module 5Module 5
Module 5
 
T.rajakumar.cv
T.rajakumar.cvT.rajakumar.cv
T.rajakumar.cv
 

Dernier

Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Sheetaleventcompany
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceDamini Dixit
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture conceptP&CO
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...allensay1
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...amitlee9823
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...daisycvs
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noidadlhescort
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 

Dernier (20)

Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 

Ed0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_a

  • 1. L00 07.05.2014 For Approval CK MOS REV. DATE REASON FOR ISSUE PREP. CHECKED APPROVED FOSTER WHEELER BİMAŞ DOCUMENT NUMBER ED0733A-50A10_1 DRS-00-VBR-TR-FWB-002 TYPE A 07.05.14 Rev. Qua. Sheet No Doc. Sign Date DERWEZE SIMPLE CYCLE POWER PLANT APPROVED SECTION / AREA Stage Sheet No Total Sheet No CHECKED - 1 5 PREPARED GENERAL REQUIREMENTS FOR PIPE MATERIAL FOSTER WHEELER BİMAŞ
  • 2. GENERAL NOTES AND VENDOR DOCUMENTS FOR VESSELS, TRAYS AND AUXILIARIES ÇALIK Doc. No. : DRS-00-VBR-TR-FWB-002 Page : 2 of 5 Date : 07.05.2014 ÇALIK Revision : A FWB Doc. No. : ED0733A-50A_1 FWB Rev. No. : L00FOSTER WHEELER BİMAŞ CONTENTS I. SCOPE II. CODE III. PIPES TECHNICAL REQUIREMENTS IV. COLOR CODING AND P.M.I. V. WELDING PROCEDURES FOR WELDED PIPES VI. PRINT QUANTITIES VII BID QUOTATION MANDATORY REQUIREMENTS TABLE “A” – BULK MATERIAL
  • 3. GENERAL NOTES AND VENDOR DOCUMENTS FOR VESSELS, TRAYS AND AUXILIARIES ÇALIK Doc. No. : DRS-00-VBR-TR-FWB-002 Page : 3 of 5 Date : 07.05.2014 ÇALIK Revision : A FWB Doc. No. : ED0733A-50A_1 FWB Rev. No. : L00FOSTER WHEELER BİMAŞ I. SCOPE This Standard covers general requirements for pipe material. II. CODE All materials shall comply with material specification/norm specified in Material Requisition. III. PIPES TECHNICAL REQUIREMENTS A. Carbon steel and low alloy steel pipes shall be delivered in double random length. Where the ordered quantity is shorter than double random length, single random length shall be delivered. Pipes in sizes up to 1½ shall be delivered in single random length. Stainless steel pipes shall be delivered in single random length. B. Pipe shall have no joints. C. Marking: The marking shall be in accordance with the ASTM A106, A335, A312 or other standard stated on each Material Requisition. Pipes in sizes 1½" and smaller may be supplied in bundles and the marking may be legibly marked on a durable tag securely attached to each bundle. D. A signed Manufacturer's inspection certificate shall include the following: - Name of Manufacturer - Purchase order number, date and item number - Material specification and grade - Diameter, schedule number, length quantity - Heat number or charge number - Inspection or test number - Chemical composition - Hydrostatic test results - Surface and dimension checks - Heat treatment information - Welding procedure approvals - Welder/welding operator approvals - Non destructive testing operator qualifications - Non destructive testing reports
  • 4. GENERAL NOTES AND VENDOR DOCUMENTS FOR VESSELS, TRAYS AND AUXILIARIES ÇALIK Doc. No. : DRS-00-VBR-TR-FWB-002 Page : 4 of 5 Date : 07.05.2014 ÇALIK Revision : A FWB Doc. No. : ED0733A-50A_1 FWB Rev. No. : L00FOSTER WHEELER BİMAŞ - Mechanical data, certified by the Quality Control department of the pipe Manufacturer, which shall be independent from the production line. Where an independent quality control does not exist, the above mentioned tests are to be witnessed by an independent inspection authority. - Statement that “material supplied is in full accordance to purchase order requirements”. - Where “threaded and coupled 3000lbs (NPT per ASME B1.20.1)” is indicated on the Material Requisition of galvanized pipes, EN 10204-3.1 certification is also required for the threaded galvanized couplings supplied together with galvanized pipes. E. Longitudinally welded pipes are not acceptable in lieu of seamless pipes unless specifically accepted by Purchaser. F. Peaking for all longitudinally welded pipe shall be limited to 1/8 in. (3mm) maximum, as measured by a template technique approved by the Purchaser. G. Inside protective coatings like enamel “Japanese Black” are not allowed. H. Carbon steel shall have a maximum Carbon Equivalent of 0,43 , calculated using the formula: C.E.= C% + Mn%/6 + (Cr%+Mo%+V%)/5 + (Ni%+Cu%)/15 IV. COLOR CODING AND P.M.I. Pipe supplier must classify and mark alloy pipes for material colour coding and is responsible for the correct application of colour bands before shipping said materials to shop fabricator or fields. V. WELDING PROCEDURES FOR WELDED PIPES Where welded pipes are supplied, pipe manufacturer shall provide welding procedures and welding qualifications according to the timelines. FWI can issue comments on these documents if deviation from Code, contractual documents, good engineering practice are found or receive them from information only. In any case Vendor shall inform FW of any deviation to Codes or other contractual documents. The supply, fabrication and erection of all pipe work shall comply with the requirements of ANSI B31.1. All butt welds shall be full penetration welds with complete fusion between weld runs and base metal. The following tests shall be carried out on welds (both shop and Site): - 100 per cent visual examination of all welds to the requirements of the application standard. - At least 10 per cent ultrasonic or radiographic and surface flow examination on all pipe butt welds and branch welds to the acceptance criteria of the applicable standard. - At least 10 per cent magnetic particle examination of all fillet welds. - Hydrostatic test to the requirements of the applicable code.
  • 5. GENERAL NOTES AND VENDOR DOCUMENTS FOR VESSELS, TRAYS AND AUXILIARIES ÇALIK Doc. No. : DRS-00-VBR-TR-FWB-002 Page : 5 of 5 Date : 07.05.2014 ÇALIK Revision : A FWB Doc. No. : ED0733A-50A_1 FWB Rev. No. : L00FOSTER WHEELER BİMAŞ Weld defect acceptance levels shall be in accordance with the applicable standard except that lack of root fusion or incomplete root penetrant will not be permitted. VI. PRINT QUANTITIES Required number of copies, for all type of Vendor documents, are defined in the attached Table “A”. TABLE “A” – BULK MATERIAL TYPE OF PRELIMINARY FINAL DRAWING No. of copies When Due No. of copies When Due WELDING PROCEDURE (WPS) AND PROCEDURE QUALIF. (PQR) 2 4 weeks after P.O. - - CHEMICAL AND PHYSICAL PROPERTIES CERTIFICATES REFER TO FWI APPLICABLE JOB SPEC VII. BID QUOTATION MANDATORY REQUIREMENTS A. All pipes shall comply with the requirements quoted on the relevant requisition together with any additional requirements of this Eng. Standard. In case of inconsistency between the M.R. and this Eng. Standard, the requirements of the M.R. will govern. B. It shall be unquestionably assumed by FWI/Purchaser that, unless Vendor makes specific exceptions in his quotation, all components supplied shall comply exactly with the requirements specified in the Material Requisition and Specifications attached thereto. C. Vendor must clearly state in his quotation (in a dedicated paragraph headed “Technical Deviation List”) all instances in which the components offered deviates from the Material Requisition and/or Eng. Std’s; including, but not limited to, all differences in duty, mechanical design, codes of fabrication or design, materials of construction and extent of supply.