SlideShare une entreprise Scribd logo
1  sur  1
Télécharger pour lire hors ligne
Proposed Building Addition FAQs

Q. Why are you proposing an addition?
A. The library has long had a need for additional computers, and our patrons have repeatedly asked for
computer classes. This addition will give us the space we need for a minimum of 6 public computers, and
will enable us to hold computer classes and tutorials. In addition, staff will be able to engage in group
learning activities, which can only help us serve you better!
   Additionally, we desperately need another public restroom; one that is not in the children’s room. A
conveniently located, handicapped accessible restroom is one of the planned changes.

Q. Anything else?
A. The west side of the library is the oldest part of the building. If you look at the many ells and
indentations, you will see they incorporate numerous roof angles and drainages. Over the years these
have become problematic and tend to cause leaking at times of heavy rain. The roof would need to be
extensively repaired anyway. Why not realign it over a new substructure to prevent future problems and
solve our space needs all at the same time?

Q. What else will we see?
A. We are very excited about our plans to include landscaping that will incorporate outdoor
performance, programming and story time areas, perennial gardens and benches for reading and
reflection. Our intention is to increase the amount of outdoor programs, and we hope to be able to host
concerts “in the garden” on summer evenings.

Q. Why do it now?
A. Interest rates are at an all time low, and building costs have dropped. Our Caithness PILOT money
(see budget FAQs) is not infinite. It made a lot of sense to our Board of Trustees and our financial
advisors to use Caithness funds toward a permanent benefit for the library and our patrons; one that
will remain long after the PILOTs have come to an end. A ten year mortgage will be paid off shortly
before the PILOTs stop. We will not have to have a large budgetary increase at that time if we use it for
this valuable, but finite, purpose.

Q. How much will it cost?
A. We have estimated the budget for this project at $500,000.00. At prevailing rates we estimate paying
$57,000 annually for 10 years in principal and interest, coincidentally, almost the exact amount of our
annual income from Caithness.

Q. What does that mean for me, the individual taxpayer?
A. This year’s budgetary increase amounts to an additional $5.50 for the average homeowner, or a total
annual library tax of $147.00. That is $12.25 per month; or $2.82 per week for your entire household!
Books, movies, programs, computers, homework help, friends, fun and more! Something for everyone
at the Brookhaven Free Library.

Contenu connexe

Similaire à Building fa qs (1)

Cip presentation 8.2010
Cip presentation 8.2010Cip presentation 8.2010
Cip presentation 8.2010librarygrl3
 
1331 l street transition (new)
1331 l street transition (new)1331 l street transition (new)
1331 l street transition (new)cfgomez1
 
1331 l street transition (new)
1331 l street transition (new)1331 l street transition (new)
1331 l street transition (new)cfgomez1
 
Presentation tobudgetconference -tosend
Presentation tobudgetconference -tosendPresentation tobudgetconference -tosend
Presentation tobudgetconference -tosendPublicFinanceTV
 
GPOW East London 24.9.13
GPOW East London 24.9.13GPOW East London 24.9.13
GPOW East London 24.9.13SarahOdell
 
Facility RentalAfter visitation of the grounds and reviewing t.docx
Facility RentalAfter visitation of the grounds and reviewing t.docxFacility RentalAfter visitation of the grounds and reviewing t.docx
Facility RentalAfter visitation of the grounds and reviewing t.docxlmelaine
 
1331 l street transition (new)
1331 l street transition (new)1331 l street transition (new)
1331 l street transition (new)cfgomez1
 
House Transformation Proposal PowerPoint Presentation Slides
House Transformation Proposal PowerPoint Presentation SlidesHouse Transformation Proposal PowerPoint Presentation Slides
House Transformation Proposal PowerPoint Presentation SlidesSlideTeam
 
1331 l street transition (new)
1331 l street transition (new)1331 l street transition (new)
1331 l street transition (new)cfgomez1
 
Brian D. Voss - Keep Your Money in Your Mission - Overview of Kuali Foundatio...
Brian D. Voss - Keep Your Money in Your Mission - Overview of Kuali Foundatio...Brian D. Voss - Keep Your Money in Your Mission - Overview of Kuali Foundatio...
Brian D. Voss - Keep Your Money in Your Mission - Overview of Kuali Foundatio...Kuali Days UK
 
The way forward together
The way forward togetherThe way forward together
The way forward togetherJisc
 
Assignment – Overview & Instructions Learning OutcomesThis a.docx
Assignment – Overview & Instructions Learning OutcomesThis a.docxAssignment – Overview & Instructions Learning OutcomesThis a.docx
Assignment – Overview & Instructions Learning OutcomesThis a.docxedmondpburgess27164
 
House Revamp Proposal PowerPoint Presentation Slides
House Revamp Proposal PowerPoint Presentation SlidesHouse Revamp Proposal PowerPoint Presentation Slides
House Revamp Proposal PowerPoint Presentation SlidesSlideTeam
 
TDC Case Studies - Web Interface
TDC Case Studies - Web InterfaceTDC Case Studies - Web Interface
TDC Case Studies - Web InterfacePat Hayes Kaufman
 

Similaire à Building fa qs (1) (20)

Cip presentation 8.2010
Cip presentation 8.2010Cip presentation 8.2010
Cip presentation 8.2010
 
Cip presentation 8.2010
Cip presentation 8.2010Cip presentation 8.2010
Cip presentation 8.2010
 
Ameri corps center pointe-2068
Ameri corps center pointe-2068Ameri corps center pointe-2068
Ameri corps center pointe-2068
 
Ameri corps center pointe-2588
Ameri corps center pointe-2588Ameri corps center pointe-2588
Ameri corps center pointe-2588
 
1331 l street transition (new)
1331 l street transition (new)1331 l street transition (new)
1331 l street transition (new)
 
1331 l street transition (new)
1331 l street transition (new)1331 l street transition (new)
1331 l street transition (new)
 
Presentation tobudgetconference -tosend
Presentation tobudgetconference -tosendPresentation tobudgetconference -tosend
Presentation tobudgetconference -tosend
 
GPOW East London 24.9.13
GPOW East London 24.9.13GPOW East London 24.9.13
GPOW East London 24.9.13
 
Facility RentalAfter visitation of the grounds and reviewing t.docx
Facility RentalAfter visitation of the grounds and reviewing t.docxFacility RentalAfter visitation of the grounds and reviewing t.docx
Facility RentalAfter visitation of the grounds and reviewing t.docx
 
Proposal Final
Proposal FinalProposal Final
Proposal Final
 
1331 l street transition (new)
1331 l street transition (new)1331 l street transition (new)
1331 l street transition (new)
 
House Transformation Proposal PowerPoint Presentation Slides
House Transformation Proposal PowerPoint Presentation SlidesHouse Transformation Proposal PowerPoint Presentation Slides
House Transformation Proposal PowerPoint Presentation Slides
 
1331 l street transition (new)
1331 l street transition (new)1331 l street transition (new)
1331 l street transition (new)
 
Brian D. Voss - Keep Your Money in Your Mission - Overview of Kuali Foundatio...
Brian D. Voss - Keep Your Money in Your Mission - Overview of Kuali Foundatio...Brian D. Voss - Keep Your Money in Your Mission - Overview of Kuali Foundatio...
Brian D. Voss - Keep Your Money in Your Mission - Overview of Kuali Foundatio...
 
The way forward together
The way forward togetherThe way forward together
The way forward together
 
Assignment – Overview & Instructions Learning OutcomesThis a.docx
Assignment – Overview & Instructions Learning OutcomesThis a.docxAssignment – Overview & Instructions Learning OutcomesThis a.docx
Assignment – Overview & Instructions Learning OutcomesThis a.docx
 
House Revamp Proposal PowerPoint Presentation Slides
House Revamp Proposal PowerPoint Presentation SlidesHouse Revamp Proposal PowerPoint Presentation Slides
House Revamp Proposal PowerPoint Presentation Slides
 
2007 google annual report
2007 google annual report2007 google annual report
2007 google annual report
 
TDC Case Studies - Web Interface
TDC Case Studies - Web InterfaceTDC Case Studies - Web Interface
TDC Case Studies - Web Interface
 
LESSON 12.pptx
LESSON 12.pptxLESSON 12.pptx
LESSON 12.pptx
 

Plus de ddomingo56

Books your child should hear before kindergarten reading list
Books your child should hear before kindergarten reading listBooks your child should hear before kindergarten reading list
Books your child should hear before kindergarten reading listddomingo56
 
Books your-child-should-hear-before-kindgergarten
Books your-child-should-hear-before-kindgergartenBooks your-child-should-hear-before-kindgergarten
Books your-child-should-hear-before-kindgergartenddomingo56
 
Library Card Registration Policy
Library Card Registration PolicyLibrary Card Registration Policy
Library Card Registration Policyddomingo56
 
Bulletinboardpol
BulletinboardpolBulletinboardpol
Bulletinboardpolddomingo56
 
Adultprogrampol
AdultprogrampolAdultprogrampol
Adultprogrampolddomingo56
 
Adultcomputerpol
AdultcomputerpolAdultcomputerpol
Adultcomputerpolddomingo56
 
Local Cemetaries
Local CemetariesLocal Cemetaries
Local Cemetariesddomingo56
 
Fp literary clubfinal
Fp literary clubfinalFp literary clubfinal
Fp literary clubfinalddomingo56
 
Carmans River History
Carmans River HistoryCarmans River History
Carmans River Historyddomingo56
 

Plus de ddomingo56 (12)

Books your child should hear before kindergarten reading list
Books your child should hear before kindergarten reading listBooks your child should hear before kindergarten reading list
Books your child should hear before kindergarten reading list
 
Books your-child-should-hear-before-kindgergarten
Books your-child-should-hear-before-kindgergartenBooks your-child-should-hear-before-kindgergarten
Books your-child-should-hear-before-kindgergarten
 
Building FAQs
Building FAQsBuilding FAQs
Building FAQs
 
Library Card Registration Policy
Library Card Registration PolicyLibrary Card Registration Policy
Library Card Registration Policy
 
Bustrippol
BustrippolBustrippol
Bustrippol
 
Bulletinboardpol
BulletinboardpolBulletinboardpol
Bulletinboardpol
 
Adultprogrampol
AdultprogrampolAdultprogrampol
Adultprogrampol
 
Adultcomputerpol
AdultcomputerpolAdultcomputerpol
Adultcomputerpol
 
Local Cemetaries
Local CemetariesLocal Cemetaries
Local Cemetaries
 
Bfl news
Bfl newsBfl news
Bfl news
 
Fp literary clubfinal
Fp literary clubfinalFp literary clubfinal
Fp literary clubfinal
 
Carmans River History
Carmans River HistoryCarmans River History
Carmans River History
 

Building fa qs (1)

  • 1. Proposed Building Addition FAQs Q. Why are you proposing an addition? A. The library has long had a need for additional computers, and our patrons have repeatedly asked for computer classes. This addition will give us the space we need for a minimum of 6 public computers, and will enable us to hold computer classes and tutorials. In addition, staff will be able to engage in group learning activities, which can only help us serve you better! Additionally, we desperately need another public restroom; one that is not in the children’s room. A conveniently located, handicapped accessible restroom is one of the planned changes. Q. Anything else? A. The west side of the library is the oldest part of the building. If you look at the many ells and indentations, you will see they incorporate numerous roof angles and drainages. Over the years these have become problematic and tend to cause leaking at times of heavy rain. The roof would need to be extensively repaired anyway. Why not realign it over a new substructure to prevent future problems and solve our space needs all at the same time? Q. What else will we see? A. We are very excited about our plans to include landscaping that will incorporate outdoor performance, programming and story time areas, perennial gardens and benches for reading and reflection. Our intention is to increase the amount of outdoor programs, and we hope to be able to host concerts “in the garden” on summer evenings. Q. Why do it now? A. Interest rates are at an all time low, and building costs have dropped. Our Caithness PILOT money (see budget FAQs) is not infinite. It made a lot of sense to our Board of Trustees and our financial advisors to use Caithness funds toward a permanent benefit for the library and our patrons; one that will remain long after the PILOTs have come to an end. A ten year mortgage will be paid off shortly before the PILOTs stop. We will not have to have a large budgetary increase at that time if we use it for this valuable, but finite, purpose. Q. How much will it cost? A. We have estimated the budget for this project at $500,000.00. At prevailing rates we estimate paying $57,000 annually for 10 years in principal and interest, coincidentally, almost the exact amount of our annual income from Caithness. Q. What does that mean for me, the individual taxpayer? A. This year’s budgetary increase amounts to an additional $5.50 for the average homeowner, or a total annual library tax of $147.00. That is $12.25 per month; or $2.82 per week for your entire household! Books, movies, programs, computers, homework help, friends, fun and more! Something for everyone at the Brookhaven Free Library.