Mar Co. uses a predetermined annual overhead rate under job order costing. In January 2012, Mar incurred $125,000 in manufacturing overhead but applied $113,000 to work in process using the rate. With no beginning or ending work in process, and $590,000 in direct materials, $58,000 in indirect materials, and $107,000 in direct labor, the total cost of jobs completed was $318,000.