Attila Debreczeni, Senior Consultant Finpro CSE & ME, 5 November, 2010 Hungarian Energy Market
Contents Pages Key Energy Market Data					3 Energy Policy						4-5 		Strategy & Key Priorities Upcoming Regulatory Changes & Planned Actions Power Generation					6-9 		RES (forestry, agri) potential & usage Electricity Generation 					10-12 Feeding tariffs					 	Distribution Heat Generation						13-16 District Heating	 Housing – as “Panel program” Appendixes: Major players in energy market	17-25
Key Energy Market Data © Finpro 3 Source: BMI energy report 2010; Short,-Middle,-Long-term capacity balance on supply side in Hungarian electricity system (Mavir,2009)
Energy Policy 1/2 © Finpro 4 Strategy:  The only official strategy document is the Parliament Order /40/2008. (IV. 17.)/ on Energy policy in 2008-2020; There is no Hungarian Parliament certified Energy Strategy, however Hungarian Energy Policy until 2030 as strategy paper is under preparation and to be accepted by Parliament at the end of 2010; The Renewable Energy Action Plan until 2020 is under preparation which had to be submitted to EU even June 2010 (still in delay); Key Priorities:  ,[object Object],Energy saving 1% annually in 2008-2016 (total: 9%) Share of renewable energy in primer energy usage: 13% from total  136 – 186 PJ 20 % improving of energy efficiency Modified emission trading system from 2013. Less grant, more auction.
Energy Policy 2/2 © Finpro 5 Upcoming Regulation: ,[object Object]
Growing share of RES within power & heat generation;
RE heat generation in the Hungarian district heating systems;
Changes in feeding tariffs: CHP less support and subsidies shifted toward RES;
Implementation modes & selected technology of the new 1 or 2 blocks at Paks Nuclear PP;
The current experiences and role of the newly launched (20/7/2010) the HUPX Hungarian Power Exchange – www.hupx.huPlanned Actions ,[object Object],[object Object]
© Finpro 7  Power Generation (>50 MW, 2009)2/2 Mátrai Power Plant  www.mert.hu Location: Visonta Type: CHP Installed capacity: 841 MW Efficiency: 31.8% Expected to stop operation: 2026- 2030 AES Borsodi Energetikai  PP www.aes.hu/intro.html Location: Kazincbarcika Type: CHP Installed capacity: 288 MW Efficiency: 34.2% Expected to stop operation: 2013- 2016 Dunamenti Power Plant  www.electrabel.hu Location: Százhalombatta Type: CHP Installed capacity: 1,673 MW Efficiency: 39.6% Expected to stop operation: 2011- 2023 Alpiq Csepeli Erőmű www.csepel.alpiq.hu Location: Csepel (Budapest) Type: CHP Installed capacity: 386 MW Efficiency: 50.6%  Expected to stop operation: 2025- 2026 Tisza II. Power Plant www.aes.hu/intro.html Location: Tiszaújváros Type: Electricity only Installed capacity: 860 MW Efficiency: 36% Expected to stop operation: 2016- 2018 Vértesi Power Plants www.vert.hu Location: Oroszlány Type: CHP Installed capacity: 224 MW Efficiency: 27.7% Expected to stop operation: 2013- 2014 MVM GTER Lőrinci www.gter.hu Location: Lőrinci Type: Electricity only Installed capacity: 407 MW Efficiency: 30% Expected to stop operation: 2026- 2027 Bakonyi Power Plants  http://www.mvm.hu/engine.aspx?page=bvmt_fooldal Location: Ajka Type: CHP Installed capacity: 88 MW Efficiency: 45.8% Expected to stop operation: 2014- 2016 Debrecen KCE Power Plant Location: Debrecen Type: CHP Installed capacity: 93 MW Efficiency: 69.7% Expected to stop operation: 2026- 2028 Budapesti Power Plants www.budapestieromu.hu Location: Budapest Type: CHP  Installed capacity: 399 MW Efficiency: 69.1% Expected to stop operation: 2026- 2027 Paksi Nuclear Power Plant www.atomeromu.hu Location: Paks Type: Electricity only Installed capacity: 1,940 MW Efficiency: 31.4% Expected to stop operation: 2032- 2037 Pannon Power Plant www.pannonpower.hu Location: Pécs Type: CHP Installed capacity: 122 MW Efficiency: 68.9% Expected to stop operation: 2014- 2016 ISD Power www.isdpower.hu Location: Dunaújváros Type: CHP Installed capacity: 58 MW Efficiency: 67.6% Expected to stop operation: 2017- 2019
© Finpro 8 RES potential: Fire woods & residues 1/2 Annual Cutting: 6 - 7 mill. m3 Import: 1 – 1.1 mill. m3 Export: 0.25 – 0.3 mill. m3 Annually available wood:  6.75 – 7.8 mill m3 Stolen woods : 0.2 – 0.3 mill. m3 Residue : 1 - 1.4 mill. m3 Fire-wood: 2.5 – 2.8 mill. m3 Industrial wood: 2.7 – 3.1 mill m3 Households  collections: 0.3 -0.4 mill. m3 Power Plants: 1 – 1.3 mill. m3 Smaller players: 1.2 - 1.5 mill. m3 Households: 1 -1.5 mill. m3 Major players (3): 1.8 – 2  mill. m3 Forestry potential in Hungary 1.09  mill m3 0.73  mill m3 0.48  mill m3 0.73  mill m3 1.22  mill m3 0.73 mill m3 1.28  mill m3 Source: Ministry of Rural Development, 2009 &  Finpro research
© Finpro 9 RES potential: Agri-fuel 2/2 Agro-biomass potential in Hungary 5.2 mill. Tons I. 1.5 mill. tons 2 mill. Tons 0.8 mill. tons 2.5 mill. tons 4.5 mill. Tons III. 4.9 mill. Tons II. Annual total: 21,4 Source: EnergyCenter, Energy Club, 2008 9
Electricity Generation © Finpro 10 Source: BMI energy report 2010
© Finpro 11 Feeding tariff system Current Incentives
© Finpro 12 ELMŰ ÉMÁSZ TITÁSZ ÉDÁSZ DÉDÁSZ DÉMÁSZ Electricity Distribution ,[object Object]
Electricity service providers/distributors:
Six distribution area were created, including Budapest the capital and its suburb area (ELMÜ);
German & French energy companies are the owners;
In 2008 total domestic electricity use was 43,928 GWh, exceeding volume in 2007
(43,904 GWh) by (0,1%). Net consumption (37,398 GWh) grew by 0,4 % compared to 2007 (37,247 GWh). The peak load of the Hungarian electricity system in 2008 occurred on January 09 at 17:00 and was 6,388 MW.,[object Object]
© Finpro 14 District Heating 1/2
© Finpro 15 District heating market 2/2 Budapest DH www.fotav.hu No. of heated units: 240.958 Avg. total cost of end-users: EUR 637 DunaújvárosDH  www.dvcsh.hu No. of heated units: 19,181 Avg. total cost of end-users: EUR 708 Miskolc DH www.miho.hu No. of heated units: 31,487 Avg. total cost of end-users: EUR 623 Győr DH www.gyorho.hu No. of heated units: 23,841 Avg. total cost of end-users: EUR 544 Nyíregyháza DH www.nyirtavho.hu No. of heated units: 15,649 + 413 Avg. total cost of end-users: EUR 603 TatabányaDH www.tata.hu No. of heated units: 22,636 Avg. total cost of end-users: EUR 704 Székesfehérvár DH www.szepho.hu No. of heated units: 20,550 Avg. total cost of end-users: EUR 598 Debrecen DH www.dhrt.hu No. of heated units: 30,895 Avg. total cost of end-users: EUR 618 Szeged DH  No. of heated units: 27,249 Avg. total cost of end-users: EUR 708 PécsDH www.petav.hu No. of heated units: 31,160 Avg. total cost of end-users: EUR 545
16 Housing  - as“Panel program” A significant part of the Hungarian housing stock is in need of rehabilitation because of both material and social challenges. The degree, focus and quality of the necessary rehabilitation differ from region to region.  A constant expansion of the panel program has taken place in the last few years and its beneficiaries are not only the housing estates, but every tenant community occupying a building constructed with pre-fabricated technologies. Around 750,000 panel housing units and until 2008, the 25% of this stock have been renovated to some degree, generating on average investments per unit as 700th HUF (~2,600 EUR). However, until 2010 the number of renovated buildings grew up to 1/3 of the total stock.  The degree of renovation is very basic and comprises mainly  Building isolation; Changing the joinery (windows, doors, etc.); Measuring (adjusting) units for the regulation of the temperature, however, the whole system (old Russian style panel blocks) has not been changed. Sources: Expert`s interviews, European Commission, Housing  Needs in Hungary (Varoskutatas Kft) © Finpro
© Finpro 17 Appendix 1/9

Contenu connexe

Tendances

European Power Generation Strategy Power Project Financing Summit Prague 1 De...
European Power Generation Strategy Power Project Financing Summit Prague 1 De...European Power Generation Strategy Power Project Financing Summit Prague 1 De...
European Power Generation Strategy Power Project Financing Summit Prague 1 De...weerokoster
 
Opportunities in the Hungarian Wind Energy Market
Opportunities in the Hungarian Wind Energy MarketOpportunities in the Hungarian Wind Energy Market
Opportunities in the Hungarian Wind Energy MarketEnerjimiz Güneş
 
Macro-economic study on hydropower in Europe
Macro-economic study on hydropower in EuropeMacro-economic study on hydropower in Europe
Macro-economic study on hydropower in EuropeStatkraft
 
SUSTAINABLE ENERGY SYSTEMS IN MUNICIPAL AUTHORITIES. Zoltán Magyar
SUSTAINABLE ENERGY SYSTEMS IN MUNICIPAL AUTHORITIES. Zoltán MagyarSUSTAINABLE ENERGY SYSTEMS IN MUNICIPAL AUTHORITIES. Zoltán Magyar
SUSTAINABLE ENERGY SYSTEMS IN MUNICIPAL AUTHORITIES. Zoltán MagyarStep Interreg Ivc
 
Poland, going through an economic and energy transition
Poland, going through an economic and energy transitionPoland, going through an economic and energy transition
Poland, going through an economic and energy transitionLeonardo ENERGY
 
Feed-in tariffs: The legislative challenges for promoting sustainable inves...
Feed-in tariffs: The legislative challenges for promoting sustainable inves...Feed-in tariffs: The legislative challenges for promoting sustainable inves...
Feed-in tariffs: The legislative challenges for promoting sustainable inves...Atanas Georgiev
 
Carbon Emission Factor for Ukrainian Electricity Grid
Carbon Emission Factor for Ukrainian Electricity GridCarbon Emission Factor for Ukrainian Electricity Grid
Carbon Emission Factor for Ukrainian Electricity GridMykola Shlapak
 
CONTESTI DB 48 MW PV PLANT
CONTESTI DB 48 MW PV PLANTCONTESTI DB 48 MW PV PLANT
CONTESTI DB 48 MW PV PLANTRenato Borra
 
European Coal Policy
European Coal PolicyEuropean Coal Policy
European Coal PolicyNigel Yaxley
 
Second Ukrainian NDC to the Paris Agreement: Modelling Approach and Results
Second Ukrainian NDC to the Paris Agreement: Modelling Approach and ResultsSecond Ukrainian NDC to the Paris Agreement: Modelling Approach and Results
Second Ukrainian NDC to the Paris Agreement: Modelling Approach and ResultsIEA-ETSAP
 
electricity generation in sugar factories
electricity generation in sugar factorieselectricity generation in sugar factories
electricity generation in sugar factoriesRKapitonov
 

Tendances (20)

EU Energy Policy to 2050 - Achieving 80-95% emissions reductions
EU Energy Policy to 2050 - Achieving 80-95% emissions reductionsEU Energy Policy to 2050 - Achieving 80-95% emissions reductions
EU Energy Policy to 2050 - Achieving 80-95% emissions reductions
 
European Power Generation Strategy Power Project Financing Summit Prague 1 De...
European Power Generation Strategy Power Project Financing Summit Prague 1 De...European Power Generation Strategy Power Project Financing Summit Prague 1 De...
European Power Generation Strategy Power Project Financing Summit Prague 1 De...
 
Slovakia
SlovakiaSlovakia
Slovakia
 
Opportunities in the Hungarian Wind Energy Market
Opportunities in the Hungarian Wind Energy MarketOpportunities in the Hungarian Wind Energy Market
Opportunities in the Hungarian Wind Energy Market
 
9
99
9
 
1 Nalbantov Ecofund
1 Nalbantov Ecofund1 Nalbantov Ecofund
1 Nalbantov Ecofund
 
Task 24 The Swiss Energy Story
Task 24 The Swiss Energy StoryTask 24 The Swiss Energy Story
Task 24 The Swiss Energy Story
 
Macro-economic study on hydropower in Europe
Macro-economic study on hydropower in EuropeMacro-economic study on hydropower in Europe
Macro-economic study on hydropower in Europe
 
SUSTAINABLE ENERGY SYSTEMS IN MUNICIPAL AUTHORITIES. Zoltán Magyar
SUSTAINABLE ENERGY SYSTEMS IN MUNICIPAL AUTHORITIES. Zoltán MagyarSUSTAINABLE ENERGY SYSTEMS IN MUNICIPAL AUTHORITIES. Zoltán Magyar
SUSTAINABLE ENERGY SYSTEMS IN MUNICIPAL AUTHORITIES. Zoltán Magyar
 
New Swiss Energy Strategy 2050: A brief introduction
New Swiss Energy Strategy 2050: A brief introduction New Swiss Energy Strategy 2050: A brief introduction
New Swiss Energy Strategy 2050: A brief introduction
 
European electricity markets_2015
European electricity markets_2015European electricity markets_2015
European electricity markets_2015
 
Romania
RomaniaRomania
Romania
 
Poland, going through an economic and energy transition
Poland, going through an economic and energy transitionPoland, going through an economic and energy transition
Poland, going through an economic and energy transition
 
Feed-in tariffs: The legislative challenges for promoting sustainable inves...
Feed-in tariffs: The legislative challenges for promoting sustainable inves...Feed-in tariffs: The legislative challenges for promoting sustainable inves...
Feed-in tariffs: The legislative challenges for promoting sustainable inves...
 
Carbon Emission Factor for Ukrainian Electricity Grid
Carbon Emission Factor for Ukrainian Electricity GridCarbon Emission Factor for Ukrainian Electricity Grid
Carbon Emission Factor for Ukrainian Electricity Grid
 
CONTESTI DB 48 MW PV PLANT
CONTESTI DB 48 MW PV PLANTCONTESTI DB 48 MW PV PLANT
CONTESTI DB 48 MW PV PLANT
 
European Coal Policy
European Coal PolicyEuropean Coal Policy
European Coal Policy
 
Second Ukrainian NDC to the Paris Agreement: Modelling Approach and Results
Second Ukrainian NDC to the Paris Agreement: Modelling Approach and ResultsSecond Ukrainian NDC to the Paris Agreement: Modelling Approach and Results
Second Ukrainian NDC to the Paris Agreement: Modelling Approach and Results
 
electricity generation in sugar factories
electricity generation in sugar factorieselectricity generation in sugar factories
electricity generation in sugar factories
 
Alberto Pototschnig, Director de ACER
Alberto Pototschnig, Director de ACERAlberto Pototschnig, Director de ACER
Alberto Pototschnig, Director de ACER
 

En vedette

En vedette (6)

Empower Employee to Work Anyplace, Amytime
Empower Employee to Work Anyplace, AmytimeEmpower Employee to Work Anyplace, Amytime
Empower Employee to Work Anyplace, Amytime
 
Nuclear discourse in Hungary_ Gabor Sarlos
Nuclear discourse in Hungary_ Gabor SarlosNuclear discourse in Hungary_ Gabor Sarlos
Nuclear discourse in Hungary_ Gabor Sarlos
 
Dickens Solution Event: Ghost of BYOD Future
Dickens Solution Event: Ghost of BYOD FutureDickens Solution Event: Ghost of BYOD Future
Dickens Solution Event: Ghost of BYOD Future
 
S N A A P Facebook Final
S N A A P  Facebook FinalS N A A P  Facebook Final
S N A A P Facebook Final
 
Crm Part 1 & 2
Crm Part 1 & 2Crm Part 1 & 2
Crm Part 1 & 2
 
Social Media Strategy
Social Media StrategySocial Media Strategy
Social Media Strategy
 

Similaire à R cleantech finland bd to hungary - hungarian energy market by finpro debreczeni - november 8 2010

Energy Transition in Belgium – Choices and Costs
Energy Transition in Belgium – Choices and CostsEnergy Transition in Belgium – Choices and Costs
Energy Transition in Belgium – Choices and CostsIEA-ETSAP
 
presentations_res_forum_speakers.pdf
presentations_res_forum_speakers.pdfpresentations_res_forum_speakers.pdf
presentations_res_forum_speakers.pdfGlennBerry13
 
Bente Hagem: presentation on the European Climate agenda and the grid operato...
Bente Hagem: presentation on the European Climate agenda and the grid operato...Bente Hagem: presentation on the European Climate agenda and the grid operato...
Bente Hagem: presentation on the European Climate agenda and the grid operato...Marina Cubedo Vicén
 
Albania toward large and sustainable energy developments by lorenc gordani
Albania toward large and sustainable energy developments by lorenc gordaniAlbania toward large and sustainable energy developments by lorenc gordani
Albania toward large and sustainable energy developments by lorenc gordaniLorenc Gordani
 
European Nuclear Industry’s role towards a low carbon future
European Nuclear Industry’s role towards a low carbon futureEuropean Nuclear Industry’s role towards a low carbon future
European Nuclear Industry’s role towards a low carbon futureНАЕК «Енергоатом»
 
European Nuclear Industry’s role towards a low carbon future
European Nuclear Industry’s role towards a low carbon futureEuropean Nuclear Industry’s role towards a low carbon future
European Nuclear Industry’s role towards a low carbon futureUkrainian Nuclear Society
 
District Heating & Cooling - A vision towards 2020 - 2030 - 2050
District Heating & Cooling - A vision towards 2020 - 2030 - 2050District Heating & Cooling - A vision towards 2020 - 2030 - 2050
District Heating & Cooling - A vision towards 2020 - 2030 - 2050Pôle Réseaux de Chaleur - Cerema
 
Energy efficiency trends in buildings in the EU (update)
Energy efficiency trends in buildings in the EU (update)Energy efficiency trends in buildings in the EU (update)
Energy efficiency trends in buildings in the EU (update)Leonardo ENERGY
 
Carsten Rolle, Executive Director WEC Germany
Carsten Rolle, Executive Director WEC Germany Carsten Rolle, Executive Director WEC Germany
Carsten Rolle, Executive Director WEC Germany WEC Italia
 
Energy efficiency trends in buildings in the EU
Energy efficiency trends in buildings in the EUEnergy efficiency trends in buildings in the EU
Energy efficiency trends in buildings in the EULeonardo ENERGY
 
Modernising the european lignite triangle
Modernising the european lignite triangleModernising the european lignite triangle
Modernising the european lignite triangleForum Energii
 
Intelligent battery cluster as part of an local power self-supply
Intelligent battery cluster as part of an local power self-supplyIntelligent battery cluster as part of an local power self-supply
Intelligent battery cluster as part of an local power self-supplyFrank Alexander Reusch
 
Schiffer 4.13.16 Briefing.ppt
Schiffer 4.13.16 Briefing.pptSchiffer 4.13.16 Briefing.ppt
Schiffer 4.13.16 Briefing.pptYuvrajSaigal
 
Janez Kopac, Director of the Energy Community Secretariat
Janez Kopac, Director of the Energy Community SecretariatJanez Kopac, Director of the Energy Community Secretariat
Janez Kopac, Director of the Energy Community SecretariatWEC Italia
 

Similaire à R cleantech finland bd to hungary - hungarian energy market by finpro debreczeni - november 8 2010 (20)

Energy Transition in Belgium – Choices and Costs
Energy Transition in Belgium – Choices and CostsEnergy Transition in Belgium – Choices and Costs
Energy Transition in Belgium – Choices and Costs
 
Net Zero Emissions in EU? NGO Round Table on Decarbonisation Scenarios
  Net Zero Emissions in EU? NGO Round Table on Decarbonisation Scenarios  Net Zero Emissions in EU? NGO Round Table on Decarbonisation Scenarios
Net Zero Emissions in EU? NGO Round Table on Decarbonisation Scenarios
 
presentations_res_forum_speakers.pdf
presentations_res_forum_speakers.pdfpresentations_res_forum_speakers.pdf
presentations_res_forum_speakers.pdf
 
Bente Hagem: presentation on the European Climate agenda and the grid operato...
Bente Hagem: presentation on the European Climate agenda and the grid operato...Bente Hagem: presentation on the European Climate agenda and the grid operato...
Bente Hagem: presentation on the European Climate agenda and the grid operato...
 
Albania toward large and sustainable energy developments by lorenc gordani
Albania toward large and sustainable energy developments by lorenc gordaniAlbania toward large and sustainable energy developments by lorenc gordani
Albania toward large and sustainable energy developments by lorenc gordani
 
European Nuclear Industry’s role towards a low carbon future
European Nuclear Industry’s role towards a low carbon futureEuropean Nuclear Industry’s role towards a low carbon future
European Nuclear Industry’s role towards a low carbon future
 
European Nuclear Industry’s role towards a low carbon future
European Nuclear Industry’s role towards a low carbon futureEuropean Nuclear Industry’s role towards a low carbon future
European Nuclear Industry’s role towards a low carbon future
 
District Heating & Cooling - A vision towards 2020 - 2030 - 2050
District Heating & Cooling - A vision towards 2020 - 2030 - 2050District Heating & Cooling - A vision towards 2020 - 2030 - 2050
District Heating & Cooling - A vision towards 2020 - 2030 - 2050
 
Towards a decarbonised heating and cooling sector in Europe – Unlocking the p...
Towards a decarbonised heating and cooling sector in Europe – Unlocking the p...Towards a decarbonised heating and cooling sector in Europe – Unlocking the p...
Towards a decarbonised heating and cooling sector in Europe – Unlocking the p...
 
Energy efficiency trends in buildings in the EU (update)
Energy efficiency trends in buildings in the EU (update)Energy efficiency trends in buildings in the EU (update)
Energy efficiency trends in buildings in the EU (update)
 
Towards a decarbonised heating and cooling sector in Europe – Unlocking the ...
 Towards a decarbonised heating and cooling sector in Europe – Unlocking the ... Towards a decarbonised heating and cooling sector in Europe – Unlocking the ...
Towards a decarbonised heating and cooling sector in Europe – Unlocking the ...
 
Harry Lehmann a Coenercat, sessió de Barcelona (25.11.2013)
Harry Lehmann a Coenercat, sessió de Barcelona (25.11.2013)Harry Lehmann a Coenercat, sessió de Barcelona (25.11.2013)
Harry Lehmann a Coenercat, sessió de Barcelona (25.11.2013)
 
Carsten Rolle, Executive Director WEC Germany
Carsten Rolle, Executive Director WEC Germany Carsten Rolle, Executive Director WEC Germany
Carsten Rolle, Executive Director WEC Germany
 
Ana Quelhas, Directora de Planificación Energética del Grupo EDP
Ana Quelhas, Directora de Planificación Energética del Grupo EDPAna Quelhas, Directora de Planificación Energética del Grupo EDP
Ana Quelhas, Directora de Planificación Energética del Grupo EDP
 
Energy efficiency trends in buildings in the EU
Energy efficiency trends in buildings in the EUEnergy efficiency trends in buildings in the EU
Energy efficiency trends in buildings in the EU
 
Modernising the european lignite triangle
Modernising the european lignite triangleModernising the european lignite triangle
Modernising the european lignite triangle
 
100% Renewable Smart Energy Systems - Dubrovnik
100% Renewable Smart Energy Systems - Dubrovnik100% Renewable Smart Energy Systems - Dubrovnik
100% Renewable Smart Energy Systems - Dubrovnik
 
Intelligent battery cluster as part of an local power self-supply
Intelligent battery cluster as part of an local power self-supplyIntelligent battery cluster as part of an local power self-supply
Intelligent battery cluster as part of an local power self-supply
 
Schiffer 4.13.16 Briefing.ppt
Schiffer 4.13.16 Briefing.pptSchiffer 4.13.16 Briefing.ppt
Schiffer 4.13.16 Briefing.ppt
 
Janez Kopac, Director of the Energy Community Secretariat
Janez Kopac, Director of the Energy Community SecretariatJanez Kopac, Director of the Energy Community Secretariat
Janez Kopac, Director of the Energy Community Secretariat
 

Dernier

VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girladitipandeya
 
Malad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls ServiceMalad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls ServicePooja Nehwal
 
Corporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdfCorporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdfProbe Gold
 
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual serviceanilsa9823
 
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escortssonatiwari757
 
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our EscortsCall Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escortsindian call girls near you
 
Q3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call PresentationQ3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call PresentationSysco_Investors
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024CollectiveMining1
 
Teck Investor Presentation, April 24, 2024
Teck Investor Presentation, April 24, 2024Teck Investor Presentation, April 24, 2024
Teck Investor Presentation, April 24, 2024TeckResourcesLtd
 
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rishra 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Roomdivyansh0kumar0
 
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In AmritsarCall Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsaronly4webmaster01
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024CollectiveMining1
 

Dernier (20)

VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
 
Malad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls ServiceMalad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls Service
 
Corporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdfCorporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdf
 
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Fazullaganj Lucknow best sexual service
 
Call Girls In South Delhi 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In South Delhi 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICECall Girls In South Delhi 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In South Delhi 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
 
Vip Call Girls Hauz Khas ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls Hauz Khas ➡️ Delhi ➡️ 9999965857 No Advance 24HRS LiveVip Call Girls Hauz Khas ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls Hauz Khas ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
 
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...
 
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
 
Call Girls 🫤 East Of Kailash ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ...
Call Girls 🫤 East Of Kailash ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ...Call Girls 🫤 East Of Kailash ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ...
Call Girls 🫤 East Of Kailash ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ...
 
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our EscortsCall Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
 
Q3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call PresentationQ3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call Presentation
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
 
Teck Investor Presentation, April 24, 2024
Teck Investor Presentation, April 24, 2024Teck Investor Presentation, April 24, 2024
Teck Investor Presentation, April 24, 2024
 
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rishra 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
 
Call Girls Service Green Park @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
Call Girls Service Green Park @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICECall Girls Service Green Park @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICE
Call Girls Service Green Park @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
 
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In AmritsarCall Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 
Sensual Moments: +91 9999965857 Independent Call Girls Noida Delhi {{ Monika}...
Sensual Moments: +91 9999965857 Independent Call Girls Noida Delhi {{ Monika}...Sensual Moments: +91 9999965857 Independent Call Girls Noida Delhi {{ Monika}...
Sensual Moments: +91 9999965857 Independent Call Girls Noida Delhi {{ Monika}...
 
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
 

R cleantech finland bd to hungary - hungarian energy market by finpro debreczeni - november 8 2010

  • 1. Attila Debreczeni, Senior Consultant Finpro CSE & ME, 5 November, 2010 Hungarian Energy Market
  • 2. Contents Pages Key Energy Market Data 3 Energy Policy 4-5 Strategy & Key Priorities Upcoming Regulatory Changes & Planned Actions Power Generation 6-9 RES (forestry, agri) potential & usage Electricity Generation 10-12 Feeding tariffs Distribution Heat Generation 13-16 District Heating Housing – as “Panel program” Appendixes: Major players in energy market 17-25
  • 3. Key Energy Market Data © Finpro 3 Source: BMI energy report 2010; Short,-Middle,-Long-term capacity balance on supply side in Hungarian electricity system (Mavir,2009)
  • 4.
  • 5.
  • 6. Growing share of RES within power & heat generation;
  • 7. RE heat generation in the Hungarian district heating systems;
  • 8. Changes in feeding tariffs: CHP less support and subsidies shifted toward RES;
  • 9. Implementation modes & selected technology of the new 1 or 2 blocks at Paks Nuclear PP;
  • 10.
  • 11. © Finpro 7 Power Generation (>50 MW, 2009)2/2 Mátrai Power Plant www.mert.hu Location: Visonta Type: CHP Installed capacity: 841 MW Efficiency: 31.8% Expected to stop operation: 2026- 2030 AES Borsodi Energetikai PP www.aes.hu/intro.html Location: Kazincbarcika Type: CHP Installed capacity: 288 MW Efficiency: 34.2% Expected to stop operation: 2013- 2016 Dunamenti Power Plant www.electrabel.hu Location: Százhalombatta Type: CHP Installed capacity: 1,673 MW Efficiency: 39.6% Expected to stop operation: 2011- 2023 Alpiq Csepeli Erőmű www.csepel.alpiq.hu Location: Csepel (Budapest) Type: CHP Installed capacity: 386 MW Efficiency: 50.6% Expected to stop operation: 2025- 2026 Tisza II. Power Plant www.aes.hu/intro.html Location: Tiszaújváros Type: Electricity only Installed capacity: 860 MW Efficiency: 36% Expected to stop operation: 2016- 2018 Vértesi Power Plants www.vert.hu Location: Oroszlány Type: CHP Installed capacity: 224 MW Efficiency: 27.7% Expected to stop operation: 2013- 2014 MVM GTER Lőrinci www.gter.hu Location: Lőrinci Type: Electricity only Installed capacity: 407 MW Efficiency: 30% Expected to stop operation: 2026- 2027 Bakonyi Power Plants http://www.mvm.hu/engine.aspx?page=bvmt_fooldal Location: Ajka Type: CHP Installed capacity: 88 MW Efficiency: 45.8% Expected to stop operation: 2014- 2016 Debrecen KCE Power Plant Location: Debrecen Type: CHP Installed capacity: 93 MW Efficiency: 69.7% Expected to stop operation: 2026- 2028 Budapesti Power Plants www.budapestieromu.hu Location: Budapest Type: CHP Installed capacity: 399 MW Efficiency: 69.1% Expected to stop operation: 2026- 2027 Paksi Nuclear Power Plant www.atomeromu.hu Location: Paks Type: Electricity only Installed capacity: 1,940 MW Efficiency: 31.4% Expected to stop operation: 2032- 2037 Pannon Power Plant www.pannonpower.hu Location: Pécs Type: CHP Installed capacity: 122 MW Efficiency: 68.9% Expected to stop operation: 2014- 2016 ISD Power www.isdpower.hu Location: Dunaújváros Type: CHP Installed capacity: 58 MW Efficiency: 67.6% Expected to stop operation: 2017- 2019
  • 12. © Finpro 8 RES potential: Fire woods & residues 1/2 Annual Cutting: 6 - 7 mill. m3 Import: 1 – 1.1 mill. m3 Export: 0.25 – 0.3 mill. m3 Annually available wood: 6.75 – 7.8 mill m3 Stolen woods : 0.2 – 0.3 mill. m3 Residue : 1 - 1.4 mill. m3 Fire-wood: 2.5 – 2.8 mill. m3 Industrial wood: 2.7 – 3.1 mill m3 Households collections: 0.3 -0.4 mill. m3 Power Plants: 1 – 1.3 mill. m3 Smaller players: 1.2 - 1.5 mill. m3 Households: 1 -1.5 mill. m3 Major players (3): 1.8 – 2 mill. m3 Forestry potential in Hungary 1.09 mill m3 0.73 mill m3 0.48 mill m3 0.73 mill m3 1.22 mill m3 0.73 mill m3 1.28 mill m3 Source: Ministry of Rural Development, 2009 & Finpro research
  • 13. © Finpro 9 RES potential: Agri-fuel 2/2 Agro-biomass potential in Hungary 5.2 mill. Tons I. 1.5 mill. tons 2 mill. Tons 0.8 mill. tons 2.5 mill. tons 4.5 mill. Tons III. 4.9 mill. Tons II. Annual total: 21,4 Source: EnergyCenter, Energy Club, 2008 9
  • 14. Electricity Generation © Finpro 10 Source: BMI energy report 2010
  • 15. © Finpro 11 Feeding tariff system Current Incentives
  • 16.
  • 18. Six distribution area were created, including Budapest the capital and its suburb area (ELMÜ);
  • 19. German & French energy companies are the owners;
  • 20. In 2008 total domestic electricity use was 43,928 GWh, exceeding volume in 2007
  • 21.
  • 22. © Finpro 14 District Heating 1/2
  • 23. © Finpro 15 District heating market 2/2 Budapest DH www.fotav.hu No. of heated units: 240.958 Avg. total cost of end-users: EUR 637 DunaújvárosDH www.dvcsh.hu No. of heated units: 19,181 Avg. total cost of end-users: EUR 708 Miskolc DH www.miho.hu No. of heated units: 31,487 Avg. total cost of end-users: EUR 623 Győr DH www.gyorho.hu No. of heated units: 23,841 Avg. total cost of end-users: EUR 544 Nyíregyháza DH www.nyirtavho.hu No. of heated units: 15,649 + 413 Avg. total cost of end-users: EUR 603 TatabányaDH www.tata.hu No. of heated units: 22,636 Avg. total cost of end-users: EUR 704 Székesfehérvár DH www.szepho.hu No. of heated units: 20,550 Avg. total cost of end-users: EUR 598 Debrecen DH www.dhrt.hu No. of heated units: 30,895 Avg. total cost of end-users: EUR 618 Szeged DH No. of heated units: 27,249 Avg. total cost of end-users: EUR 708 PécsDH www.petav.hu No. of heated units: 31,160 Avg. total cost of end-users: EUR 545
  • 24. 16 Housing - as“Panel program” A significant part of the Hungarian housing stock is in need of rehabilitation because of both material and social challenges. The degree, focus and quality of the necessary rehabilitation differ from region to region. A constant expansion of the panel program has taken place in the last few years and its beneficiaries are not only the housing estates, but every tenant community occupying a building constructed with pre-fabricated technologies. Around 750,000 panel housing units and until 2008, the 25% of this stock have been renovated to some degree, generating on average investments per unit as 700th HUF (~2,600 EUR). However, until 2010 the number of renovated buildings grew up to 1/3 of the total stock. The degree of renovation is very basic and comprises mainly Building isolation; Changing the joinery (windows, doors, etc.); Measuring (adjusting) units for the regulation of the temperature, however, the whole system (old Russian style panel blocks) has not been changed. Sources: Expert`s interviews, European Commission, Housing Needs in Hungary (Varoskutatas Kft) © Finpro
  • 25. © Finpro 17 Appendix 1/9
  • 26. © Finpro 18 Appendix 2/9
  • 27. © Finpro 19 Appendix3/9
  • 28. © Finpro 20 Appendix 4/9
  • 29. © Finpro 21 Appendix 5/9
  • 30. © Finpro 22 Appendix 6/9
  • 31. © Finpro 23 Appendix 7/9
  • 32. © Finpro 24 Appendix 8/9
  • 33. © Finpro 25 Appendix 9/9