INTRODUCTION
 In power generation our main aim is to generate the
  required amount of power with minimum cost.
 Economic load dispatch means that the generator’s
  real and reactive power are allowed to vary within
  certain limits so as to meet a particular load demand
  with minimum fuel cost
 This allocation of loads are based on some
  constraints.
DIFFERENT CONSTRAINTS IN
     ECONOMIC LOAD DISPATCH
 INEQUALITY CONSTRAINTS
    Voltage constraints
        Vmin ≤ V ≤ Vmax ,
        δmin ≤ δ ≤ δmax
    Generator constraints
      KVA loading of generator should not exceed prescribed
     value
        Pmin ≤ P ≤ Pmax
        Qmin ≤ Q ≤ Qmax
 Running spare capacity constraints
  This constraints are needed to meet forced outage of
  one or more alternators in the system and also
  unexpected load on the system
 Transmission line constraints
    flow of power through transmission line should less
  than its thermal capacity
 Transformer tap set

for autotransformer tap t should between 0 & 1
For two winding transformer – between 0& k
 Equality constraints
    Real power
         Pp= Vp Σ Ypq Vq cos(θpq-(δp+δq))
    Reactive power
        Qp= Vp Σ Ypq Vq sin(θpq-(δp+δq))
OPERATING COST OF THERMAL
            PLANT
 The factors influencing power generation at minimum
  cost are operating efficiencies of generators, fuel
  cost, and transmission losses.
 The most efficient generator in the system does not
  guarantee minimum cost as it may be located in an
  area where fuel cost is high.
 If the plant is located far from the load
  center, transmission losses may be considerably higher
  and hence the plant may be overly uneconomical.
 The input to the thermal plant is generally measured
  in Btu/h, and the output is measured in MW
 In all practical cases, the fuel cost of generator can be
  represented as a quadratic function of real power
  generation




    a) Heat rate curve             b) Fuel cost curve
Incremental fuel-cost curve
 • By plotting the derivative of the fuel-cost curve versus
 the real power we get the incremental fuel-cost curve




  The incremental fuel-cost curve is a measure of how
  costly it will be to produce the next increment of
  power.
ECONOMIC DISPATCH NEGLECTING
             LOSSES




 It is the simplest economic dispatch problem
 Assume that the system is only one bus with all
  generation and loads connected to it
 A cost function Ci is assumed to be known for each
  plant
 The problem is to find the real power generation for
 each plant such that the objective function (i.e., total
 production cost) as defined by the equation




   Is minimum ,subjected to the constraints
 when losses are neglected with no generator limits, for
  most economic operation. all plants must operate at
  equal incremental production cost
 Production from each plant can be found by



   This equation is known as the coordination equation
   For analytic solution we can find λ by
 In an iterative technique, starting with a value of λ and
  the process is continued until ∆Pi is within a specified
  accuracy
 Corresponding to this λ ,

  is calculated, and the power mismatch is calculated by



 Update value of λ by
EXAMPLE
 Above three eqn represent the eqn for straight line on
 plotting this line we will get
ECONOMIC DISPATCH INCLUDING
           LOSSES
 When     power is transmitted over long distances
  transmission losses are a major factor that affect the
  optimum dispatch of generation
 One common practice for including the effect of
  transmission losses is to express the total transmission loss
  as a quadratic function of the generator power outputs. The
  simplest quadratic form is
Using the langrange multiplier




Minimum of this function is fount at the points where the
partials of the function to it’s variables are zero
Itration method

Initially assume a λ value. Then find out the generation
from each plant using the equation




Calculate the power mismatch



 calculate
Update value of λ




 Repeat the procedure with new value of λ until the
 power mismatch is within the limit
EXAMPLE
SOLUTION
REFERENCES
 Power System Analysis - Hadi Saadat
 power system analysis by nagrath and kothari
THANKS

Contenu connexe

Tendances

Gcsc gto thyristor controlled series capacitor
Gcsc   gto thyristor controlled series capacitorGcsc   gto thyristor controlled series capacitor
Gcsc gto thyristor controlled series capacitor
LEOPAUL23
 
Project on economic load dispatch
Project on economic load dispatchProject on economic load dispatch
Project on economic load dispatch
ayantudu
 
Single area load frequency control by using pi,fuzzy logic control1
Single area load frequency control by using pi,fuzzy logic control1Single area load frequency control by using pi,fuzzy logic control1
Single area load frequency control by using pi,fuzzy logic control1
SAI SREE
 

Tendances (20)

Economic load dispatch
Economic load  dispatchEconomic load  dispatch
Economic load dispatch
 
Unit commitment
Unit commitmentUnit commitment
Unit commitment
 
Load Forecasting
Load ForecastingLoad Forecasting
Load Forecasting
 
Hydrothermal scheduling
Hydrothermal schedulingHydrothermal scheduling
Hydrothermal scheduling
 
INTERLINE FLOW CONTROLLER
INTERLINE FLOW CONTROLLERINTERLINE FLOW CONTROLLER
INTERLINE FLOW CONTROLLER
 
input output characteristics of thermal plant
input output characteristics of thermal plantinput output characteristics of thermal plant
input output characteristics of thermal plant
 
WIDE AREA MONITORING SYSTEMS(WAMS)
WIDE AREA MONITORING SYSTEMS(WAMS)WIDE AREA MONITORING SYSTEMS(WAMS)
WIDE AREA MONITORING SYSTEMS(WAMS)
 
Gcsc gto thyristor controlled series capacitor
Gcsc   gto thyristor controlled series capacitorGcsc   gto thyristor controlled series capacitor
Gcsc gto thyristor controlled series capacitor
 
Two area system
Two area systemTwo area system
Two area system
 
Facts devices
Facts devicesFacts devices
Facts devices
 
Unit 4 Automatic Generation Control
Unit 4 Automatic Generation ControlUnit 4 Automatic Generation Control
Unit 4 Automatic Generation Control
 
Restructuring
RestructuringRestructuring
Restructuring
 
Comparision of svc and statcom
Comparision of svc and statcomComparision of svc and statcom
Comparision of svc and statcom
 
Reactive power compensation
Reactive power compensationReactive power compensation
Reactive power compensation
 
Unit 5 Economic Load Dispatch and Unit Commitment
Unit 5 Economic Load Dispatch and Unit CommitmentUnit 5 Economic Load Dispatch and Unit Commitment
Unit 5 Economic Load Dispatch and Unit Commitment
 
Project on economic load dispatch
Project on economic load dispatchProject on economic load dispatch
Project on economic load dispatch
 
Wide Area Monitoring System WAMS & Applications
Wide Area Monitoring System WAMS & ApplicationsWide Area Monitoring System WAMS & Applications
Wide Area Monitoring System WAMS & Applications
 
Single area load frequency control by using pi,fuzzy logic control1
Single area load frequency control by using pi,fuzzy logic control1Single area load frequency control by using pi,fuzzy logic control1
Single area load frequency control by using pi,fuzzy logic control1
 
Series & shunt compensation and FACTs Devices
Series & shunt compensation and FACTs DevicesSeries & shunt compensation and FACTs Devices
Series & shunt compensation and FACTs Devices
 
Economic load dispatch
Economic load dispatchEconomic load dispatch
Economic load dispatch
 

Similaire à Economic load dispatch

Economic Load Dispatch for Multi-Generator Systems with Units Having Nonlinea...
Economic Load Dispatch for Multi-Generator Systems with Units Having Nonlinea...Economic Load Dispatch for Multi-Generator Systems with Units Having Nonlinea...
Economic Load Dispatch for Multi-Generator Systems with Units Having Nonlinea...
IJAPEJOURNAL
 
211658558-Chapter-4-Economic-Dispatch.pdf
211658558-Chapter-4-Economic-Dispatch.pdf211658558-Chapter-4-Economic-Dispatch.pdf
211658558-Chapter-4-Economic-Dispatch.pdf
yoziscijunior
 
Energy Efficiency in Electrical Systems.pptx
Energy  Efficiency in Electrical Systems.pptxEnergy  Efficiency in Electrical Systems.pptx
Energy Efficiency in Electrical Systems.pptx
PoojaAnupGarg
 

Similaire à Economic load dispatch (20)

Economicloaddispatch 111213025406-phpapp01
Economicloaddispatch 111213025406-phpapp01Economicloaddispatch 111213025406-phpapp01
Economicloaddispatch 111213025406-phpapp01
 
Economic load dispatch
Economic load dispatchEconomic load dispatch
Economic load dispatch
 
Unit 5.pptx
Unit 5.pptxUnit 5.pptx
Unit 5.pptx
 
Economic Load Dispatch for Multi-Generator Systems with Units Having Nonlinea...
Economic Load Dispatch for Multi-Generator Systems with Units Having Nonlinea...Economic Load Dispatch for Multi-Generator Systems with Units Having Nonlinea...
Economic Load Dispatch for Multi-Generator Systems with Units Having Nonlinea...
 
Optimal load scheduling
Optimal load schedulingOptimal load scheduling
Optimal load scheduling
 
UNIT-4-PPT.ppt
UNIT-4-PPT.pptUNIT-4-PPT.ppt
UNIT-4-PPT.ppt
 
Computer Application in Power system: Chapter six - optimization and security
Computer Application in Power system: Chapter six - optimization and securityComputer Application in Power system: Chapter six - optimization and security
Computer Application in Power system: Chapter six - optimization and security
 
frequency regulation of deregulated power system having grc integrated with r...
frequency regulation of deregulated power system having grc integrated with r...frequency regulation of deregulated power system having grc integrated with r...
frequency regulation of deregulated power system having grc integrated with r...
 
A presentation on economic load dispatch
A presentation on economic load dispatchA presentation on economic load dispatch
A presentation on economic load dispatch
 
Economic dipatch
Economic dipatch Economic dipatch
Economic dipatch
 
economic load dispatch and unit commitment power_system_operation.pdf
economic load dispatch and unit commitment power_system_operation.pdfeconomic load dispatch and unit commitment power_system_operation.pdf
economic load dispatch and unit commitment power_system_operation.pdf
 
Economic Dispatch of Generated Power Using Modified Lambda-Iteration Method
Economic Dispatch of Generated Power Using Modified Lambda-Iteration MethodEconomic Dispatch of Generated Power Using Modified Lambda-Iteration Method
Economic Dispatch of Generated Power Using Modified Lambda-Iteration Method
 
211658558-Chapter-4-Economic-Dispatch.pdf
211658558-Chapter-4-Economic-Dispatch.pdf211658558-Chapter-4-Economic-Dispatch.pdf
211658558-Chapter-4-Economic-Dispatch.pdf
 
1.3
1.31.3
1.3
 
Mr. Bakar Presentation for group discussion.docx
Mr. Bakar Presentation for group discussion.docxMr. Bakar Presentation for group discussion.docx
Mr. Bakar Presentation for group discussion.docx
 
Mughees mehmood.docx
Mughees mehmood.docxMughees mehmood.docx
Mughees mehmood.docx
 
Energy Efficiency in Electrical Systems.pptx
Energy  Efficiency in Electrical Systems.pptxEnergy  Efficiency in Electrical Systems.pptx
Energy Efficiency in Electrical Systems.pptx
 
Cis eo dte_power_factor_138474_7
Cis eo dte_power_factor_138474_7Cis eo dte_power_factor_138474_7
Cis eo dte_power_factor_138474_7
 
Gs3511851192
Gs3511851192Gs3511851192
Gs3511851192
 
Optimal Unit Commitment Based on Economic Dispatch Using Improved Particle Sw...
Optimal Unit Commitment Based on Economic Dispatch Using Improved Particle Sw...Optimal Unit Commitment Based on Economic Dispatch Using Improved Particle Sw...
Optimal Unit Commitment Based on Economic Dispatch Using Improved Particle Sw...
 

Dernier

Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Victor Rentea
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 

Dernier (20)

Cyberprint. Dark Pink Apt Group [EN].pdf
Cyberprint. Dark Pink Apt Group [EN].pdfCyberprint. Dark Pink Apt Group [EN].pdf
Cyberprint. Dark Pink Apt Group [EN].pdf
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 

Economic load dispatch

  • 1. PRESENTED BY DEEPAK JOHN S1 M. Tech POWER SYSTEM
  • 2. CONTENTS  INTRODUCTION  DIFFERENT CONSTRAINTS IN ECONOMIC LOAD DISPATCH  OPERATING COST OF THERMAL PLANT  ECONOMIC DISPATCH NEGLECTING LOSSES  ECONOMIC DISPATCH INCLUDING LOSSES  REFERENCES
  • 3. INTRODUCTION  In power generation our main aim is to generate the required amount of power with minimum cost.  Economic load dispatch means that the generator’s real and reactive power are allowed to vary within certain limits so as to meet a particular load demand with minimum fuel cost  This allocation of loads are based on some constraints.
  • 4. DIFFERENT CONSTRAINTS IN ECONOMIC LOAD DISPATCH  INEQUALITY CONSTRAINTS  Voltage constraints Vmin ≤ V ≤ Vmax , δmin ≤ δ ≤ δmax  Generator constraints KVA loading of generator should not exceed prescribed value Pmin ≤ P ≤ Pmax Qmin ≤ Q ≤ Qmax
  • 5.  Running spare capacity constraints This constraints are needed to meet forced outage of one or more alternators in the system and also unexpected load on the system  Transmission line constraints flow of power through transmission line should less than its thermal capacity  Transformer tap set for autotransformer tap t should between 0 & 1 For two winding transformer – between 0& k
  • 6.  Equality constraints  Real power Pp= Vp Σ Ypq Vq cos(θpq-(δp+δq))  Reactive power Qp= Vp Σ Ypq Vq sin(θpq-(δp+δq))
  • 7. OPERATING COST OF THERMAL PLANT  The factors influencing power generation at minimum cost are operating efficiencies of generators, fuel cost, and transmission losses.  The most efficient generator in the system does not guarantee minimum cost as it may be located in an area where fuel cost is high.  If the plant is located far from the load center, transmission losses may be considerably higher and hence the plant may be overly uneconomical.
  • 8.  The input to the thermal plant is generally measured in Btu/h, and the output is measured in MW  In all practical cases, the fuel cost of generator can be represented as a quadratic function of real power generation a) Heat rate curve b) Fuel cost curve
  • 9. Incremental fuel-cost curve • By plotting the derivative of the fuel-cost curve versus the real power we get the incremental fuel-cost curve The incremental fuel-cost curve is a measure of how costly it will be to produce the next increment of power.
  • 10. ECONOMIC DISPATCH NEGLECTING LOSSES  It is the simplest economic dispatch problem  Assume that the system is only one bus with all generation and loads connected to it  A cost function Ci is assumed to be known for each plant
  • 11.  The problem is to find the real power generation for each plant such that the objective function (i.e., total production cost) as defined by the equation Is minimum ,subjected to the constraints
  • 12.
  • 13.
  • 14.  when losses are neglected with no generator limits, for most economic operation. all plants must operate at equal incremental production cost  Production from each plant can be found by This equation is known as the coordination equation For analytic solution we can find λ by
  • 15.  In an iterative technique, starting with a value of λ and the process is continued until ∆Pi is within a specified accuracy  Corresponding to this λ , is calculated, and the power mismatch is calculated by Update value of λ by
  • 17.
  • 18.  Above three eqn represent the eqn for straight line on plotting this line we will get
  • 19.
  • 20.
  • 21. ECONOMIC DISPATCH INCLUDING LOSSES  When power is transmitted over long distances transmission losses are a major factor that affect the optimum dispatch of generation  One common practice for including the effect of transmission losses is to express the total transmission loss as a quadratic function of the generator power outputs. The simplest quadratic form is
  • 22.
  • 23. Using the langrange multiplier Minimum of this function is fount at the points where the partials of the function to it’s variables are zero
  • 24.
  • 25. Itration method Initially assume a λ value. Then find out the generation from each plant using the equation Calculate the power mismatch calculate
  • 26. Update value of λ Repeat the procedure with new value of λ until the power mismatch is within the limit
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35. REFERENCES  Power System Analysis - Hadi Saadat  power system analysis by nagrath and kothari