MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
vkbZ ,l vks : 9001-2008
ISO: 9001-2008
CIN-U40109MP2001SGC014880, Email-mdtransco.nic.in
STATE LOAD DESPATCH CENTRE, Nayagaon, Rampur, Jabalpur
Telephone: (0761) 2970089 Fax: (0761) 2664343 e-mail sldcmpjbp@gmail.com
No.07-05/REG-201/W&S-DSM/154-A/2212 Jabalpur, dtd:- 22.08.2019
As Per Distibrution List
Sub: DSM Account of Wind and Solar Pooling Stations for the month of March, 2019 on the basis of MPERC (Forecasting,
Scheduling, Deviation Settlement Mechanism and related matters of Wind and Solar Generating Stations)
Regulations, 2018.
In pursuance to MPERC (Forecasting, Scheduling, Deviation Settlement Mechanism and related matters of Wind
and Solar Generating Stations) Regulations, 2018, SLDC has prepared the DSM Account of Wind Pooling Stations having
combined installed capacity of 10MW and above and Solar Pooling Stations with an installed capacity of 5MW and above
including Wind and Solar Pooling Stations selling InterState and having combined installed capcity less than 10MW and 5
MW.
The ABT meter data of the following Pooling Stations has not been received by SLDC neither through AMR nor
through mail from concerned Discoms, despite repeated persuance. As such, the actual generation was replaced with
scheduled generation and accordingly the Deviation Charges of the Pooling Stations are computed by SLDC during the
period of partially missing data.
i. 14.97MW UJAAS-I Rajgarh Biora (1rd
to 31th
March 2019).
ii. 14.97MW UJAAS-II Rajgarh Biora (1rd
to 31th
March 2019).
The Generators / Developers / QCA of the following Pooling stations have not furnished the Forecasting and
Availability data for the month of March 2019 to the SLDC. As such, SLDC has computed the Deviation Charges of these
Pooling Stations considering the Availability and Schedules as “Zero”.
i. 11.95MW Wincon Jaora.
The Generators of the following Pooling stations have not appoitment QCA, therefore the DSM account is issued to
the Developers / Generators for settlement of deviaton charges –
i. 50MW NTPC Ltd. Rajgarh.
ii. 250MW Mandhsaur Solar PV Power Project (Gujarkhedi).
iii. 11.95MW Wincon Jaroa.
The ABT meters installed at the following Solar Generating Stations are recording 15 minutes block wise data on
sliding window principal instead of load survey, thus, blockwise data does not match with midnight data recorded by the
meters. The midnight values are correct; this has been confirmed by M/s Secure Meters Ltd. As such, the monthly
midnight data has been distributed in 15 minutes time block as per injection pattern of solar generation and accordingly
the Deviation Charges have been computed.
i. 12MW Avenger solar pvt Ltd. connected at 132KV S/s Suwasara.
ii. 5.1MW Porwal Auto Component connected at 132KV S/s Makdon.
iii. 27.3MW AVP Power Infra Pvt. Ltd. connected at 132KV S/s Sonkatchh.
iv. 29.4MW Badoni Power Pvt. Ltd. connected at 132KV S/s Maxi.
v. 25.2MW Suzlon Gujrat wind Park Pvt. Ltd. Barod connected at 220KV S/s Barod.
vi. 4MW Ramesh Steel connected at 220KV S/s Ganjbasoda.
The availability and schedule in some block of following pooling station has been considered as Zero due to
shutdown in following pooling station –
i. 15MW M/s Simcon Feeder- I (From 30th
March 2019 to 31st
March 2019, 16Hrs and 58Minutes).
ii. 11MW M/s Simcon Feeder-II (On 31st
March 2019 from 11:00Hrs to 16Hrs and 45 Minutes)
- 1 -
As per Clause 9.0 of MPERC (Forecasting, Scheduling, Deviation Settlement Mechanism and related matters of Wind
and Solar Generating Stations) Regulations, 2018, payment to the DSM Account shall be made within 10 days from the date
of issue of this statement. DSM Payments are to be made on the basis of this account only and no further invoicing is
required by SLDC. Payment received after 12 days shall attract simple interest @ 0.04% for each day of delay. SLDC shall
pay to the entities entitled to receive payment on account of Deviation Charges within 2 working days of receipt of the
payments in the “State Deviation Pool Account”. The settlement of Deviation Charges shall be done through State Pool
Account maintained by SLDC. The bank account details are as under:
1. Name of the Bank - BANK OF INDIA
2. Branch - CIVIL LINES BRANCH JABALPUR.
3. Title of the Account - MPPTCL SLDC DSM A/C
4. Bank account No - 940220110000263
5. IFS Code - BKID0009402
6. Branch Code - 9402
7. Type of Account - Current Account.
All QCA’s / Generators are requested to pay the Deviation Charges to the above State Pool Account maintained by
SLDC.
The signed copy of the above DSM account alongwith block-wise details are being sent through email. The DSM
account shall be also be made available on SLDC website www.sldcmpindia.com shortly for downloading by QCA. The
verification, if required, can be done at SLDC.
All the QCA’s / Generators are requested to check and verify the State DSM Account and intimate the
discrepancies observed if any within a period of 15 days.
Chief Engineer (LD)
SLDC MPPTCL, Jabalpur
- 2 -
- 3 -
Distribution List
1. The Chief General Manager (Comml-3), Regional Office, MPPMCL, E-4, Arera Colony, Prakash Parisar, Near
Bhojpur Club, Bhopal-462016, M.P. Jabalpur. Email – rajeevkeskar@gmail.com
2. The Chief General Manager (Comml.), MPMKVVCL, Govindpura, Bhopal, Email-ce.commercial@mpmkvvc.com,
3. The Chief Engineer (Comml.), MPPaKVVCL, GPH Compound, Polo Ground, Indore, Email- cecomwz@gmail.com,
4. The Chief Financial Officer, MPPTCL, Jabalpur.
5. The Suptdg Engineer (MT-1), Corporate Office, M.P. Pashchim Kshetra Vidyut Vitaran Co. Ltd., GPH Compound,
Polo Ground, Indore. Email-achal.jain@mpwz.co.in
6. The General Manager (Comml.-III), O/o MD (CZ) MPMKVVCL, Nistha Parisar., MPMKVVCL, Govindpura, Bhopal,
Email-khanooja@gmail.com, mpczc3@gmail.com
7. M/s Malwa Solar Power Generation Pvt Ltd. 4th Floor, Dr. Gopaldas Bhawan, 28, Barakhamba Road, Cannaught
Place, New Delhi – 110001, Fax: 0124-4716120. India. Email:keshav.prasad@ilfsindia.com,
pradeep.chauhan@ilfsindia.com.
8. M/s WAANPEEP Solar Pvt. Ltd., 602, Western Edge-I, Western Express Highway, Borivali (E), Mumbai-400066,
Fax: 022-66444400, Email- kamalmarwah@waaneep.com
9. M/s Focal Renewable Energy Two India Pvt Ltd., 308, third Floor, Rectangle One Building D-4, Commercial
Complex, Saket, New Delhi -110017, Fax -011-41704901, Email – kvikas@focal_energy.com
10. M/s Solar EnrgyCorroration Of India, D-3, First Floor , Wing-a, ReligareBuliding, Distrcit Centre , Saket, New Delhi
110017,Fax-011-71989244, Email – corporate@seci.gov.in
11. M/s Manikaran Analytics Ltd., 2nd Floor, D21, Corporate Park, Sector-21, Dwarika, New Delhi – 110075 , Email –
contactus@manikarananalytics.in,rakesh@manikarananalytics.in, bd.mp@manikarananalytics.in
12. M/s Reconnect Energy Pvt. Ltd. C-301,Nirvana Courtyard, Nirvana Country Sector 50, Gurgaon 122018 H ,Email –
info@reconnectenergy.com, mithun.dubey@reconnectenergy.com,piyush.joshi@reconnectenergy.com
13. M/s Statkraft Markets Private Ltd., 403, 4th Floor, SalconRasvilas Building, Saket District Centre, New Delhi –
110017, Email – anwar.alam@statkraft.com
14. M/s ACME Solar Energy (MP) Private Ltd., Plot No.152, Sector-44, Gurgaon-122002(Haryana), Email –
planthead.khilchipur.solar@acme.in
15. M/s Alfa Infraprop Pvt Ltd., NamanMidtown,’A’ Wing, 21st Floor, Senapati Bapat Marg, Elephinstone Road West,
Mumbai-400013, Email –Sanjay.Shah@alfainfraprop.com
16. M/s Regent Climate Connect Knowledge Solutions Pvt Ltd., Appt. 215, Green Tower Society, Plot 7 C, Sector-23,
Dwarka, New Delhi-110075Email - info@climate-connect.com, Pranav.vohra@climate-connect.com
17. M/s NTPC Ltd., E-1/72, Arera Colony, Bhopal – 462016, M.P. EMAIL:- pbvenkatesh@ntpc.co.in
18. M/s Mandsaur Solar Power Project village Gujjarkhedi Runija Teh Suwasara, District – Mandsaur(M.P.)
458888.Email-mandsaursolarpv@gmail.com
19. M/s M.P. WIND FARM NAGDA HILL, ENERGY TOWER, 64, B-Sector, Kasturba Nagar,Bhopal-462023,
Email-info@cecl.in, windpoweindia@gmail.com,mpwlindia@gmail.com
20. M/s PoineerWincomTamaraiTechpark, 7th Floor, S.P. Plot No. 16-20 and 20A, Thiru Vi Ka Industrial
Etate,Enerring Road, Guindy, Chainai -600032 ,Email-mp@poineerwincom.com
21. M/s Designco Manufacturer & Exporter, LakriFazalpur, Delhi Road, Moradabad-244001, Email:
info@designco-india.com, vivekasthana.79@gmail.com
22. M/s Mittal Processor Pvt. Ltd, 1002-1004, Antriksh Bhawan, 22K. G. Marg, Cannought Place, New Delhi
-110001, email – Mayank.gupta@kreatenergy.com, controlroom@mittalgroup.com – (On behalf of M/s
Ramesh Steels).
23. M/s Vedenjay Power Pvt Ltd., Plot No.4/F/53, Above BOI-Bank, Nai Sadak, Scheme No.78, B Road, Indore-
452010, Email – vedanjaypower@gmail.com
24. M/s Focal Energy Solar One India Pvt. Ltd. Unit No. 601 & 602, 6
th
Floor, Tower B, Emaar Digital Greens
Sector 61, Golf Course Ext. Road , Gurgaon 122002
25. M/s Kreate Technologies LLP 1003,10th Floor Anthriksh Bhavan, 22- KG Marg, New Delhi 110001 Email-
mithilesh.yadav@kreatetechnologies.com
………
All Figures in `
INTRA STATE
DEVIATION CHARGES
PAYABLE PAYABLE RECEIVABLE
FOCAL ENERGY SOLAR ONE INDIA Pvt. Ltd. 52,956 274,935 327,891
40MW_MALWA (IL&FS_Solar) (20,430) (20,430)
MANIKARAN ANALYTICS LTD. 7,538,367 (2,572,074) 4,966,293
ACME SOLAR ENERGY PVT. LTD. 40,407 40,407
ALFA INFRAPROP PVT LTD 2,332 2,332
MANDSAUR_SOLAR_POWER_SOLAR_220_GUJARKHEDI 253,011 253,011
NTPC_RAJGARH 31,791 31,791
WINCON_W_JAORA_11.95MW 67,219 67,219
RECONNECT ENERGY SOLUTIONS PVT LTD. 32,617,568 32,617,568
REGENT CLIMATE CONNECT KNOWLEDGE SOLUTIONS
PVT. LTD
14,080 14,080
STATKRAFT MARKETS PVT LTD. 2,391,254 2,391,254
KREATE TECHNOLOGIES LLP 12,487 (106,110) (93,623)
VEDANJAY POWER 119,308 119,308
TOTAL 43,140,780 274,935 (2,698,614) 40,717,101
() RECEIVABLE
Assistant Engineer(LD) Executive Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY
QCA / DEVELOPERS / GENERATOR
NET DSM
RECEIVABLE/PAYABLE
INTER STATE DEVIATION CHARGES
STATE LOAD DESPATCH CENTRE - JABALPUR
QCA WISE SUMMERY REPORT OF DEVIATION CHARGES OF WIND & SOLAR POOLING STATIONS FOR MARCH-2019
DATE SCHEDULE in KWH ACTUAL in KWH
DEVIATION CHARGES in
`
01/03/2019 61,021 67,028 -33,026
02/03/2019 49,221 43,113 41,790
03/03/2019 49,014 50,171 -6,341
04/03/2019 52,651 51,794 4,868
05/03/2019 58,950 59,702 -4,028
06/03/2019 60,302 63,995 -20,273
07/03/2019 63,196 63,408 -1,155
08/03/2019 61,197 61,667 -2,571
09/03/2019 60,993 65,130 -22,746
10/03/2019 61,780 60,654 6,208
11/03/2019 58,418 62,813 -24,157
12/03/2019 58,343 64,355 -33,047
13/03/2019 55,243 59,409 -22,780
14/03/2019 57,584 62,449 -26,744
15/03/2019 57,939 63,563 -30,918
16/03/2019 57,795 59,784 -10,432
17/03/2019 53,284 55,173 -9,674
18/03/2019 57,760 61,850 -22,484
19/03/2019 60,769 61,190 -2,303
20/03/2019 56,673 61,190 -24,833
21/03/2019 58,789 65,608 -37,427
22/03/2019 60,030 59,998 185
23/03/2019 58,857 61,032 -11,950
24/03/2019 56,574 59,634 -16,818
25/03/2019 57,162 57,137 195
26/03/2019 56,813 62,490 -31,210
27/03/2019 56,528 62,024 -30,216
28/03/2019 58,099 60,192 -11,498
29/03/2019 58,132 60,411 -12,522
30/03/2019 56,626 60,653 -22,135
31/03/2019 56,624 60,721 -22,484
TOTAL 1,786,367 1,868,338 -440,526
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
NAME OF POOLING STATION :- M/s FOCAL RENEWABLE ENERGY TWO INDIA PVT. LTD.
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :-MANIKARAN
DATE SCHEDULE in KWH ACTUAL in KWH
DEVIATION CHARGES in
`
01/03/2019 119,201 123,463 -23,430
02/03/2019 80,893 83,458 18,855
03/03/2019 95,340 98,277 -16,144
04/03/2019 113,502 104,177 51,700
05/03/2019 116,262 117,348 -5,323
06/03/2019 123,004 122,029 5,445
07/03/2019 126,713 121,217 30,236
08/03/2019 122,552 117,887 25,668
09/03/2019 121,391 124,629 -17,795
10/03/2019 124,171 116,642 41,420
11/03/2019 119,968 121,232 -6,940
12/03/2019 122,508 123,237 -3,995
13/03/2019 122,647 117,054 31,341
14/03/2019 122,562 120,841 9,476
15/03/2019 123,947 122,013 10,648
16/03/2019 122,942 116,026 38,999
17/03/2019 119,640 108,552 63,647
18/03/2019 119,660 120,400 -4,056
19/03/2019 120,064 119,538 2,904
20/03/2019 118,556 119,088 -2,706
21/03/2019 118,391 128,950 -58,063
22/03/2019 125,698 117,837 43,246
23/03/2019 124,506 121,054 18,996
24/03/2019 122,645 118,497 22,824
25/03/2019 117,591 115,627 10,851
26/03/2019 116,953 125,705 -48,124
27/03/2019 124,857 125,626 -4,216
28/03/2019 126,685 123,721 16,313
29/03/2019 126,639 125,162 8,140
30/03/2019 125,936 126,647 -3,901
31/03/2019 128,817 125,403 18,919
TOTAL 3,714,241 3,671,337 274,935
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
NAME OF POOLING STATION :- M/s FOCAL ENERGY SOLAR ONE INDIA PVT. LTD.
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :-FOCAL ENERGY SOLAR ONE INDIA PVT. LTD.
DATE SCHEDULE in KWH ACTUAL in KWH
DEVIATION CHARGES in
`
01/03/2019 262,910 291,946 -159,687
02/03/2019 216,408 195,072 165,386
03/03/2019 256,389 238,458 100,032
04/03/2019 244,464 218,270 151,609
05/03/2019 255,637 257,848 -9,916
06/03/2019 257,003 283,632 -146,449
07/03/2019 259,287 275,342 -88,292
08/03/2019 259,864 273,846 -76,889
09/03/2019 259,819 291,122 -172,155
10/03/2019 265,103 272,188 -38,954
11/03/2019 266,636 273,998 -40,478
12/03/2019 266,636 285,986 -106,412
13/03/2019 272,455 271,814 4,370
14/03/2019 272,455 275,896 -18,915
15/03/2019 272,455 284,574 -66,644
16/03/2019 273,944 271,122 16,786
17/03/2019 248,398 220,486 177,592
18/03/2019 273,944 282,594 -47,564
19/03/2019 273,944 275,896 -10,725
20/03/2019 272,402 271,214 6,970
21/03/2019 278,230 295,276 -93,742
22/03/2019 278,230 277,414 4,499
23/03/2019 278,230 280,216 -10,912
24/03/2019 291,115 275,568 86,046
25/03/2019 295,280 267,402 156,377
26/03/2019 291,482 285,392 33,505
27/03/2019 291,482 286,904 25,308
28/03/2019 291,482 276,706 81,447
29/03/2019 291,632 276,478 83,357
30/03/2019 278,349 276,196 12,783
31/03/2019 271,368 278,552 -38,763
TOTAL 8,367,033 8,387,408 -20,430
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
NAME OF POOLING STATION :- M/s Malwa Solar Power Generation Ltd.(IL and FS)
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- NOT QCA APPOINTMENT
DATE SCHEDULE in KWH ACTUAL in KWH
DEVIATION CHARGES in
`
01/03/2019 323,992 344,720 -113,992
02/03/2019 319,142 293,420 143,541
03/03/2019 241,689 244,910 -11,514
04/03/2019 280,076 272,920 44,308
05/03/2019 315,892 328,080 -67,026
06/03/2019 313,634 337,390 -130,646
07/03/2019 309,429 323,370 -76,666
08/03/2019 294,172 318,600 -134,339
09/03/2019 297,364 334,090 -201,983
10/03/2019 297,595 314,990 -95,662
11/03/2019 290,521 290,660 -621
12/03/2019 29,974 0 176,325
13/03/2019 271,636 301,120 -161,300
14/03/2019 243,097 227,020 97,852
15/03/2019 287,100 306,300 -105,587
16/03/2019 292,056 320,130 -154,395
17/03/2019 269,975 244,900 147,905
18/03/2019 284,215 320,150 -197,633
19/03/2019 308,164 314,530 -34,998
20/03/2019 287,818 288,610 -2,417
21/03/2019 312,946 328,510 -85,589
22/03/2019 294,969 311,220 -89,368
23/03/2019 282,859 313,200 -166,862
24/03/2019 280,894 310,470 -162,655
25/03/2019 277,401 293,590 -89,027
26/03/2019 280,166 317,470 -205,159
27/03/2019 290,948 317,340 -145,131
28/03/2019 294,381 312,980 -102,284
29/03/2019 288,678 303,250 -80,135
30/03/2019 128,316 120,390 47,140
31/03/2019 115,911 152,230 -173,630
TOTAL 8,405,010 8,806,560 -2,131,548
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
NAME OF POOLING STATION :- M/s WAANEEP Solar Pvt. Ltd
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :-MANIKARAN
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 58,690 58,804 1,707
02/03/2019 62,074 45,302 1,558
03/03/2019 44,999 28,632 678
04/03/2019 68,131 58,583 2,792
05/03/2019 49,346 28,845 1,175
06/03/2019 43,770 3,135 0
07/03/2019 41,097 1,596 24
08/03/2019 48,932 36,910 1,201
09/03/2019 65,950 56,721 2,842
10/03/2019 46,811 6,617 0
11/03/2019 68,071 59,062 1,669
12/03/2019 51,349 34,347 2,377
13/03/2019 34,389 4,768 0
14/03/2019 44,738 30,664 827
15/03/2019 67,034 72,900 2,433
16/03/2019 78,939 93,029 6,141
17/03/2019 60,547 38,100 632
18/03/2019 41,329 15,349 83
19/03/2019 39,825 8,496 0
20/03/2019 61,776 37,412 1,819
21/03/2019 51,939 32,330 1,059
22/03/2019 47,145 38,983 2,433
23/03/2019 44,771 13,857 839
24/03/2019 43,358 8,023 0
25/03/2019 52,878 54,233 1,347
26/03/2019 52,247 45,325 2,004
27/03/2019 42,614 21,383 29
28/03/2019 43,092 1,960 0
29/03/2019 53,607 35,472 1,486
30/03/2019 84,811 80,591 1,162
43555 75,916 50,072 1,756
TOTAL 1,670,175 1,101,501 40,073
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- SUZLON_IV_W_JAORA_13.5MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 73,290 79,674 0
02/03/2019 73,395 67,706 40
03/03/2019 63,884 55,204 1,440
04/03/2019 66,545 61,676 203
05/03/2019 74,066 74,088 549
06/03/2019 73,290 78,294 0
07/03/2019 75,360 75,408 0
08/03/2019 74,778 73,378 0
09/03/2019 73,592 76,548 174
10/03/2019 75,628 73,374 0
11/03/2019 68,701 66,518 50
12/03/2019 73,286 72,592 0
13/03/2019 65,603 70,390 0
14/03/2019 63,017 52,534 1,219
15/03/2019 68,203 70,306 0
16/03/2019 68,966 73,076 373
17/03/2019 66,802 62,290 165
18/03/2019 69,041 74,634 0
19/03/2019 70,602 72,320 0
20/03/2019 66,015 65,662 20
21/03/2019 68,981 75,314 302
22/03/2019 72,446 72,426 0
23/03/2019 69,953 73,090 367
24/03/2019 65,861 67,636 0
25/03/2019 66,738 68,310 0
26/03/2019 64,840 74,522 0
27/03/2019 69,970 75,512 0
28/03/2019 72,010 73,308 0
29/03/2019 70,572 71,780 0
30/03/2019 66,926 71,848 0
43555 66,926 74,996 0
T O T A L 2 1 5 9 2 8 7 2 1 9 4 4 1 4 4 9 0 2
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- M&B_ICHHAWAR-II
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 46,082 38,567 793
02/03/2019 47,324 52,357 4,018
03/03/2019 51,222 53,931 440
04/03/2019 62,907 79,613 8,453
05/03/2019 47,154 41,103 1,514
06/03/2019 30,476 17,654 37
07/03/2019 33,446 21,922 359
08/03/2019 42,312 47,072 4,046
09/03/2019 64,250 72,486 6,124
10/03/2019 33,542 10,650 2
11/03/2019 39,849 42,431 7,258
12/03/2019 53,649 54,299 5,771
13/03/2019 37,033 22,435 0
14/03/2019 48,332 37,796 1,452
15/03/2019 59,806 72,856 4,328
16/03/2019 69,746 71,763 1,281
17/03/2019 60,064 54,777 1,278
18/03/2019 40,623 26,819 343
19/03/2019 38,179 6,323 0
20/03/2019 64,622 52,925 2,059
21/03/2019 62,412 54,759 3,767
22/03/2019 41,243 24,366 1,860
23/03/2019 45,746 31,905 63
24/03/2019 40,516 15,796 0
25/03/2019 48,595 43,873 1,493
26/03/2019 49,186 44,292 4,902
27/03/2019 45,934 34,071 181
28/03/2019 40,684 10,889 0
29/03/2019 51,872 53,925 5,568
30/03/2019 104,979 124,555 6,500
43555 88,565 92,185 5,056
TOTAL 1,590,350 1,408,395 78,946
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- WIND WORLD AGAR-I
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 56,379 69,230 5,357
02/03/2019 58,204 52,025 1,570
03/03/2019 44,241 33,072 542
04/03/2019 65,142 64,497 2,060
05/03/2019 49,684 35,939 5,457
06/03/2019 42,497 4,189 366
07/03/2019 35,822 1,585 0
08/03/2019 49,683 37,429 876
09/03/2019 70,029 54,642 349
10/03/2019 41,894 7,152 0
11/03/2019 66,799 63,666 1,566
12/03/2019 51,084 36,165 3,912
13/03/2019 32,301 4,382 0
14/03/2019 42,510 31,113 415
15/03/2019 68,517 73,267 1,982
16/03/2019 81,238 94,880 5,539
17/03/2019 55,038 41,754 1,954
18/03/2019 39,621 15,999 115
19/03/2019 39,054 13,503 176
20/03/2019 58,439 10,196 13,413
21/03/2019 51,563 27,555 4,031
22/03/2019 45,334 41,046 3,589
23/03/2019 42,218 16,903 1,316
24/03/2019 40,074 12,049 32
25/03/2019 58,797 49,546 1,941
26/03/2019 52,316 50,771 6,773
27/03/2019 41,083 26,116 3
28/03/2019 38,185 3,710 0
29/03/2019 52,942 40,626 2,942
30/03/2019 82,778 83,954 1,525
43555 66,700 47,275 981
TOTAL 1,620,166 1,144,236 68,782
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- SUZLON_V_W_JAORA_12MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 329,991 371,340 0
02/03/2019 334,343 328,270 0
03/03/2019 316,587 305,320 9,583
04/03/2019 306,978 299,950 1,150
05/03/2019 338,067 370,590 0
06/03/2019 333,980 363,850 0
07/03/2019 341,847 370,470 0
08/03/2019 339,174 351,170 0
09/03/2019 341,880 337,900 7,792
10/03/2019 340,737 368,090 0
11/03/2019 332,873 348,080 529
12/03/2019 340,644 360,370 0
13/03/2019 323,999 323,140 2,890
14/03/2019 322,356 307,600 4,740
15/03/2019 324,057 326,750 1,066
16/03/2019 332,001 354,020 0
17/03/2019 320,692 326,220 3,613
18/03/2019 328,013 366,010 0
19/03/2019 348,797 369,260 0
20/03/2019 337,243 357,890 0
21/03/2019 347,616 377,550 0
22/03/2019 347,112 389,050 0
23/03/2019 338,727 376,150 0
24/03/2019 347,067 370,090 0
25/03/2019 348,048 361,390 0
26/03/2019 348,590 382,890 0
27/03/2019 348,887 387,460 0
28/03/2019 349,956 375,330 0
29/03/2019 354,783 375,960 0
30/03/2019 340,629 369,860 0
43555 347,842 372,160 0
TOTAL 10,453,516 11,044,180 31,363
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- SKY_POWER_SOLAR_132_CHHEGAON
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 238,506 264,694 3,703
02/03/2019 307,844 263,566 548
03/03/2019 228,114 214,270 904
04/03/2019 297,357 333,869 8,521
05/03/2019 271,686 224,434 1,640
06/03/2019 218,232 97,589 0
07/03/2019 209,274 79,224 0
08/03/2019 221,690 165,007 567
09/03/2019 367,347 414,706 2,247
10/03/2019 210,693 40,368 2
11/03/2019 252,725 243,364 2,268
12/03/2019 198,848 189,906 11,894
13/03/2019 196,602 99,971 0
14/03/2019 207,789 137,746 2
15/03/2019 210,688 198,376 790
16/03/2019 356,533 377,359 10,125
17/03/2019 258,295 243,889 3,342
18/03/2019 259,881 226,394 5,328
19/03/2019 187,476 82,628 136
20/03/2019 229,362 172,301 5,541
21/03/2019 295,884 321,848 24,507
22/03/2019 250,304 182,714 4,347
23/03/2019 305,707 237,927 1,905
24/03/2019 189,958 115,956 0
25/03/2019 199,567 164,408 5,161
26/03/2019 199,133 165,195 0
27/03/2019 249,250 185,888 4,209
28/03/2019 221,783 128,008 1,728
29/03/2019 197,093 83,665 0
30/03/2019 346,274 423,782 16,831
43555 541,199 610,547 44,217
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- WIND_WORLD_III_WIND_132_CHAPDA
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 208,662 229,360 35,300
02/03/2019 265,336 295,850 25,558
03/03/2019 184,423 196,537 16,133
04/03/2019 198,577 212,786 28,921
05/03/2019 185,915 166,021 12,869
06/03/2019 105,424 62,975 3,075
07/03/2019 115,127 99,981 25,394
08/03/2019 214,173 262,724 19,837
09/03/2019 226,153 220,880 5,180
10/03/2019 108,016 55,331 9,354
11/03/2019 177,916 187,694 12,403
12/03/2019 192,305 172,293 4,903
13/03/2019 102,867 73,712 1,953
14/03/2019 121,726 81,595 10,469
15/03/2019 213,016 283,619 55,183
16/03/2019 282,119 296,200 32,265
17/03/2019 229,579 234,969 22,705
18/03/2019 152,080 135,134 6,477
19/03/2019 93,232 26,688 230
20/03/2019 199,326 172,627 14,531
21/03/2019 204,113 154,906 1,294
22/03/2019 97,922 98,794 15,933
23/03/2019 180,139 158,703 2,225
24/03/2019 108,929 45,676 3,120
25/03/2019 179,570 145,132 18,451
26/03/2019 186,804 166,529 63,609
27/03/2019 162,935 154,098 4,984
28/03/2019 102,770 44,225 0
29/03/2019 127,212 141,855 28,940
30/03/2019 265,179 285,880 19,774
43555 227,114 194,793 25,000
TOTAL 5,418,659 5,057,567 526,070
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- SUZLON_GUJRAT_WIND_33_BADOD
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 346,231 391,550 0
02/03/2019 292,943 218,700 35,274
03/03/2019 231,105 222,320 13,026
04/03/2019 278,547 270,680 4,594
05/03/2019 291,910 316,400 3,344
06/03/2019 356,265 374,170 0
07/03/2019 355,716 373,300 0
08/03/2019 350,803 362,440 0
09/03/2019 354,398 373,950 0
10/03/2019 355,049 360,890 0
11/03/2019 333,392 348,010 0
12/03/2019 352,198 380,460 0
13/03/2019 345,422 353,720 0
14/03/2019 330,955 299,850 6,799
15/03/2019 337,930 373,590 353
16/03/2019 323,057 354,510 1,586
17/03/2019 325,850 329,610 2,539
18/03/2019 350,122 391,430 0
19/03/2019 346,518 381,870 0
20/03/2019 348,874 360,140 4,809
21/03/2019 353,674 397,330 0
22/03/2019 351,734 376,350 0
23/03/2019 360,046 389,980 0
24/03/2019 361,604 383,390 0
25/03/2019 351,616 359,050 0
26/03/2019 361,508 389,890 0
27/03/2019 361,657 392,780 183
28/03/2019 361,625 386,130 0
29/03/2019 362,851 389,920 0
30/03/2019 363,036 386,290 0
43555 363,200 387,890 0
TOTAL 10,559,836 11,076,590 72,507
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- RENEW_CLEAN_SOLAR_132_KOTHIYA
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 32,504 35,091 0
02/03/2019 29,189 29,184 1,009
03/03/2019 26,300 25,149 695
04/03/2019 28,711 28,551 378
05/03/2019 30,871 33,515 45
06/03/2019 32,504 34,164 0
07/03/2019 33,274 33,552 0
08/03/2019 31,614 32,245 0
09/03/2019 31,096 34,164 35
10/03/2019 31,810 31,835 0
11/03/2019 29,801 29,017 456
12/03/2019 31,825 32,587 12
13/03/2019 32,296 31,213 0
14/03/2019 28,219 25,265 634
15/03/2019 30,261 32,515 41
16/03/2019 31,349 32,815 0
17/03/2019 27,747 27,868 416
18/03/2019 30,041 32,614 9
19/03/2019 28,939 31,725 42
20/03/2019 29,120 28,134 909
21/03/2019 31,010 33,437 0
22/03/2019 31,178 31,954 0
23/03/2019 30,353 32,048 0
24/03/2019 29,704 31,632 0
25/03/2019 29,217 29,861 47
26/03/2019 29,661 32,496 0
27/03/2019 29,962 33,225 29
28/03/2019 30,982 32,562 0
29/03/2019 29,389 31,958 0
30/03/2019 30,430 31,824 192
43555 30,430 33,433 7
TOTAL 939,787 975,633 4,956
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- DESIGNCO_MANF_EXP_1_S_ARNIYAKALA_5MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 69,329 74,745 0
02/03/2019 55,476 50,311 5,015
03/03/2019 64,622 61,749 96
04/03/2019 63,197 62,910 199
05/03/2019 67,833 66,882 431
06/03/2019 69,329 72,332 0
07/03/2019 70,964 70,961 0
08/03/2019 68,264 69,304 0
09/03/2019 67,140 74,119 0
10/03/2019 68,812 69,028 0
11/03/2019 63,276 68,920 0
12/03/2019 70,266 72,158 0
13/03/2019 70,710 67,910 176
14/03/2019 67,168 69,671 0
15/03/2019 67,797 72,267 0
16/03/2019 66,208 68,894 145
17/03/2019 58,975 58,562 1,259
18/03/2019 66,327 70,206 0
19/03/2019 65,791 69,096 0
20/03/2019 66,564 68,033 0
21/03/2019 66,771 66,801 50
22/03/2019 69,281 67,200 0
23/03/2019 68,212 67,746 0
24/03/2019 64,765 66,715 0
25/03/2019 64,422 64,381 8
26/03/2019 66,891 69,479 0
27/03/2019 62,706 70,187 0
28/03/2019 67,623 67,171 0
29/03/2019 61,787 67,869 0
30/03/2019 61,292 67,973 0
43555 62,899 69,633 0
TOTAL 2,044,697 2,103,213 7,379
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- M&B_BAROD_II
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 30,000 35,374 0
02/03/2019 30,000 29,700 29
03/03/2019 30,000 30,688 0
04/03/2019 30,000 29,475 159
05/03/2019 30,000 32,372 58
06/03/2019 30,000 33,977 0
07/03/2019 30,000 33,469 0
08/03/2019 30,000 32,649 0
09/03/2019 30,000 35,313 0
10/03/2019 30,000 32,397 0
11/03/2019 30,000 31,678 0
12/03/2019 30,000 34,246 0
13/03/2019 30,000 33,166 0
14/03/2019 30,000 32,522 0
15/03/2019 30,000 34,514 0
16/03/2019 30,000 33,984 0
17/03/2019 30,000 31,311 10
18/03/2019 30,000 33,738 0
19/03/2019 30,000 32,909 0
20/03/2019 30,000 31,553 79
21/03/2019 30,000 35,833 20
22/03/2019 30,000 33,588 0
23/03/2019 30,000 33,594 0
24/03/2019 30,000 32,870 0
25/03/2019 30,000 31,454 62
26/03/2019 30,000 34,292 0
27/03/2019 30,000 34,616 24
28/03/2019 30,000 33,894 12
29/03/2019 30,000 32,905 3
30/03/2019 30,000 19,466 5,703
43555 30,000 33,709 3
TOTAL 930,000 1,011,256 6,162
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- PORWAL_AUTO_MAKDON
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 63,932 67,832 0
02/03/2019 46,554 43,205 11,718
03/03/2019 47,004 50,782 166
04/03/2019 59,422 52,696 866
05/03/2019 60,164 61,095 244
06/03/2019 62,653 64,777 0
07/03/2019 62,756 64,384 0
08/03/2019 62,063 62,047 0
09/03/2019 60,645 65,885 0
10/03/2019 62,136 61,437 0
11/03/2019 62,352 63,507 0
12/03/2019 64,398 64,879 0
13/03/2019 62,109 60,391 230
14/03/2019 63,922 63,553 0
15/03/2019 61,485 64,342 0
16/03/2019 64,266 60,684 1,055
17/03/2019 52,786 55,742 961
18/03/2019 57,760 62,806 0
19/03/2019 61,102 62,078 0
20/03/2019 63,107 61,698 80
21/03/2019 63,283 66,652 0
22/03/2019 62,880 60,802 0
23/03/2019 63,214 61,465 0
24/03/2019 60,224 60,048 0
25/03/2019 58,290 58,034 0
26/03/2019 59,216 63,331 0
27/03/2019 62,774 62,724 6
28/03/2019 60,957 60,753 0
29/03/2019 60,737 60,458 0
30/03/2019 58,698 60,908 0
43555 57,524 60,633 9
TOTAL 1,868,413 1,889,628 15,335
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- FOCAL_PHOTOVOLTAIC_10MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 106,118 79,880 4,357
02/03/2019 106,085 25,711 38,318
03/03/2019 79,484 56,982 4,637
04/03/2019 103,322 68,421 7,539
05/03/2019 52,244 47,418 4,581
06/03/2019 56,593 11,492 5,833
07/03/2019 53,227 15,918 1,604
08/03/2019 51,454 39,137 479
09/03/2019 135,008 97,109 16,915
10/03/2019 46,559 6,467 1,563
11/03/2019 86,891 54,205 18,312
12/03/2019 82,526 34,937 7,097
13/03/2019 41,886 9,523 12
14/03/2019 66,518 32,651 2,924
15/03/2019 85,766 47,931 6,396
16/03/2019 99,863 75,153 1,780
17/03/2019 88,778 45,377 7,083
18/03/2019 103,901 49,653 13,113
19/03/2019 35,186 12,697 703
20/03/2019 69,612 44,531 1,990
21/03/2019 84,581 63,963 819
22/03/2019 56,076 28,931 3,963
23/03/2019 95,543 51,593 6,265
24/03/2019 59,753 27,635 415
25/03/2019 67,054 29,820 8,385
26/03/2019 54,369 30,909 4,242
27/03/2019 77,995 36,081 3,393
28/03/2019 46,008 16,264 0
29/03/2019 48,850 21,144 404
30/03/2019 110,455 93,607 731
43555 117,625 124,456 8,354
TOTAL 2,369,330 1,379,596 182,207
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- MP_WIND_FARM_NAGDA_HILL_WIND_33_DEWAS
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 106,773 114,695 0
02/03/2019 85,008 72,651 11,217
03/03/2019 94,470 89,656 0
04/03/2019 97,975 94,936 108
05/03/2019 99,298 98,077 18
06/03/2019 106,773 109,286 0
07/03/2019 108,070 106,786 0
08/03/2019 98,673 104,502 0
09/03/2019 99,645 112,024 0
10/03/2019 101,838 103,688 0
11/03/2019 102,766 105,027 0
12/03/2019 104,403 109,223 0
13/03/2019 104,798 103,003 0
14/03/2019 99,657 105,099 0
15/03/2019 101,752 108,379 0
16/03/2019 98,702 102,236 1
17/03/2019 86,084 89,120 1,137
18/03/2019 98,676 106,077 0
19/03/2019 94,828 104,679 0
20/03/2019 101,977 103,673 0
21/03/2019 102,497 113,574 0
22/03/2019 101,752 105,571 0
23/03/2019 101,590 106,518 0
24/03/2019 100,386 104,171 0
25/03/2019 99,859 100,103 7
26/03/2019 100,092 107,745 0
27/03/2019 100,397 108,453 0
28/03/2019 101,283 101,855 161
29/03/2019 99,224 103,960 0
30/03/2019 96,214 104,050 0
43555 96,214 105,324 0
TOTAL 3,091,674 3,204,141 12,649
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- TODAY_CLEAN_SOLAR_33KV_BAROD
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 326,700 356,290 612
02/03/2019 261,202 214,140 46,195
03/03/2019 263,478 263,680 531
04/03/2019 288,127 287,020 810
05/03/2019 307,223 329,160 837
06/03/2019 317,183 339,540 553
07/03/2019 341,638 340,410 101
08/03/2019 317,486 331,400 0
09/03/2019 330,288 353,700 312
10/03/2019 336,640 330,160 0
11/03/2019 328,597 345,480 0
12/03/2019 337,775 352,710 458
13/03/2019 332,924 325,090 6,085
14/03/2019 330,354 348,790 0
15/03/2019 330,908 350,790 138
16/03/2019 331,718 328,040 7,114
17/03/2019 280,022 296,200 5,400
18/03/2019 335,349 349,170 410
19/03/2019 333,339 346,760 0
20/03/2019 337,121 356,330 292
21/03/2019 343,171 376,200 723
22/03/2019 347,640 346,140 172
23/03/2019 342,147 350,660 0
24/03/2019 337,450 346,500 75
25/03/2019 324,859 330,550 1,961
26/03/2019 333,805 363,690 55
27/03/2019 357,000 363,380 153
28/03/2019 342,105 355,410 75
29/03/2019 321,783 356,820 53
30/03/2019 329,711 360,270 62
43555 333,168 358,760 744
TOTAL 10,080,911 10,453,240 73,921
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- SEIL_SITARA_SITAMAU_50MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 49,271 55,758 1,142
02/03/2019 72,401 79,467 3,661
03/03/2019 60,811 61,798 224
04/03/2019 60,137 76,654 6,090
05/03/2019 60,623 45,202 2,087
06/03/2019 49,927 22,294 0
07/03/2019 50,110 30,832 783
08/03/2019 68,675 67,911 504
09/03/2019 75,177 83,863 2,731
10/03/2019 49,133 16,005 0
11/03/2019 75,995 71,393 3,518
12/03/2019 73,179 56,661 2,126
13/03/2019 42,224 22,019 0
14/03/2019 51,892 44,106 2,511
15/03/2019 64,344 72,414 1,437
16/03/2019 56,739 60,002 937
17/03/2019 47,659 45,055 733
18/03/2019 36,418 28,553 0
19/03/2019 26,184 5,658 56
20/03/2019 64,556 57,228 4,986
21/03/2019 65,098 45,001 612
22/03/2019 52,982 30,341 206
23/03/2019 49,825 36,063 0
24/03/2019 34,352 14,270 0
25/03/2019 38,670 32,905 1,038
26/03/2019 50,650 34,643 2,299
27/03/2019 34,864 33,699 3
28/03/2019 30,165 11,986 2
29/03/2019 41,928 43,679 1,230
30/03/2019 96,974 114,985 3,672
43555 90,568 84,570 1,818
TOTAL 1,721,531 1,485,015 44,406
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- WIND_WORLD-II_33_AGAR_15.2MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 45,645 45,645 0
02/03/2019 37,225 37,225 0
03/03/2019 36,179 36,179 0
04/03/2019 40,606 40,606 0
05/03/2019 43,203 43,203 0
06/03/2019 43,364 43,364 0
07/03/2019 47,299 47,299 0
08/03/2019 44,939 44,939 0
09/03/2019 45,044 45,044 0
10/03/2019 45,771 45,771 0
11/03/2019 42,091 42,091 0
12/03/2019 45,360 45,360 0
13/03/2019 41,816 41,816 0
14/03/2019 40,993 40,993 0
15/03/2019 44,086 44,086 0
16/03/2019 46,311 46,311 0
17/03/2019 42,512 42,512 0
18/03/2019 45,497 45,497 0
19/03/2019 44,761 44,761 0
20/03/2019 44,512 44,512 0
21/03/2019 45,498 45,498 0
22/03/2019 46,311 46,311 0
23/03/2019 44,006 44,006 0
24/03/2019 44,942 44,942 0
25/03/2019 44,239 44,239 0
26/03/2019 44,610 44,610 0
27/03/2019 46,787 46,787 0
28/03/2019 45,481 45,481 0
29/03/2019 42,704 42,704 0
30/03/2019 43,786 43,786 0
43555 44,253 44,253 0
TOTAL 1,359,831 1,359,831 0
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- UJAAS_II_S_RAJGARH_BIORA_15MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 83,479 88,648 0
02/03/2019 82,182 75,494 165
03/03/2019 67,237 61,820 1,516
04/03/2019 69,984 68,600 151
05/03/2019 79,763 85,416 0
06/03/2019 83,479 87,028 0
07/03/2019 83,963 84,966 0
08/03/2019 83,420 83,158 0
09/03/2019 82,272 85,074 0
10/03/2019 84,144 81,904 0
11/03/2019 72,872 75,288 310
12/03/2019 82,035 81,600 152
13/03/2019 73,676 79,192 0
14/03/2019 69,475 59,074 1,547
15/03/2019 75,108 78,486 0
16/03/2019 77,488 83,468 0
17/03/2019 76,799 69,840 479
18/03/2019 77,658 83,258 0
19/03/2019 75,921 81,444 0
20/03/2019 74,126 72,598 0
21/03/2019 77,592 85,284 0
22/03/2019 76,030 80,888 0
23/03/2019 78,563 81,498 0
24/03/2019 74,485 80,880 0
25/03/2019 74,516 74,178 427
26/03/2019 73,038 83,592 0
27/03/2019 78,612 84,702 0
28/03/2019 80,889 81,806 0
29/03/2019 73,534 79,212 0
30/03/2019 73,395 79,494 0
43555 73,395 81,870 0
TOTAL 2,389,130 2,459,760 4,747
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- M&B_ICHHAWAR-I
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 46,899 50,281 866
02/03/2019 71,146 71,365 2,765
03/03/2019 55,362 58,913 844
04/03/2019 66,525 70,902 5,141
05/03/2019 59,144 48,384 2,211
06/03/2019 50,360 21,130 0
07/03/2019 48,898 30,180 857
08/03/2019 61,212 65,869 577
09/03/2019 78,289 83,400 2,707
10/03/2019 50,430 14,578 0
11/03/2019 75,677 65,967 3,832
12/03/2019 72,630 59,377 2,175
13/03/2019 40,060 20,784 0
14/03/2019 49,870 41,197 2,295
15/03/2019 61,653 75,013 1,308
16/03/2019 59,732 64,732 274
17/03/2019 48,927 49,267 1,440
18/03/2019 35,159 27,668 132
19/03/2019 25,502 6,117 17
20/03/2019 66,346 54,175 3,346
21/03/2019 64,090 49,221 460
22/03/2019 50,333 30,529 289
23/03/2019 48,992 34,471 0
24/03/2019 30,655 14,024 50
25/03/2019 37,082 35,651 1,413
26/03/2019 47,502 38,105 4,152
27/03/2019 33,528 31,062 34
28/03/2019 27,537 11,528 60
29/03/2019 34,987 36,683 945
30/03/2019 87,555 104,869 2,935
43555 88,268 84,976 553
TOTAL 1,674,350 1,450,418 41,678
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- WIND_WORLD-III_33_AGAR_14.4MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 61,906 68,954 0
02/03/2019 61,829 60,973 0
03/03/2019 43,477 45,222 2,972
04/03/2019 58,366 59,216 0
05/03/2019 61,961 64,458 0
06/03/2019 61,906 65,255 0
07/03/2019 64,863 67,104 0
08/03/2019 63,022 64,863 0
09/03/2019 60,640 64,536 0
10/03/2019 63,068 64,891 0
11/03/2019 59,353 61,905 54
12/03/2019 62,921 63,466 0
13/03/2019 61,688 57,534 1,507
14/03/2019 43,857 36,550 4,024
15/03/2019 51,754 49,404 2,056
16/03/2019 59,241 61,528 7
17/03/2019 51,812 52,735 53
18/03/2019 59,645 62,647 0
19/03/2019 60,917 63,390 0
20/03/2019 54,928 52,464 4,860
21/03/2019 59,050 63,313 0
22/03/2019 60,554 64,197 0
23/03/2019 60,554 63,758 0
24/03/2019 59,165 63,540 0
25/03/2019 56,370 60,258 0
26/03/2019 57,021 62,134 0
27/03/2019 60,794 65,598 0
28/03/2019 59,950 62,654 0
29/03/2019 59,226 60,954 0
30/03/2019 55,848 58,651 0
43555 55,286 57,302 0
TOTAL 1,810,972 1,869,454 15,533
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- BHARAT_ELECTRONICS_LTD_OFI_S_ITARSI_10MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 1,285,219 1,821,110 329,980
02/03/2019 1,751,843 1,663,530 38,915
03/03/2019 1,062,159 1,149,830 36,627
04/03/2019 1,094,588 1,295,450 150,827
05/03/2019 1,058,287 827,900 92,243
06/03/2019 599,789 84,590 8,969
07/03/2019 579,376 69,020 3,549
08/03/2019 691,390 485,960 0
09/03/2019 1,062,189 817,780 33,257
10/03/2019 562,705 193,960 2,594
11/03/2019 1,147,159 1,205,970 59,382
12/03/2019 877,772 739,180 10,699
13/03/2019 525,025 133,180 3,933
14/03/2019 667,385 427,890 79,296
15/03/2019 1,379,609 1,661,470 317,641
16/03/2019 1,821,008 2,118,290 266,025
17/03/2019 1,568,864 1,432,430 107,094
18/03/2019 855,082 546,090 19,400
19/03/2019 628,485 367,510 15,754
20/03/2019 999,475 833,170 40,486
21/03/2019 863,770 545,860 13,619
22/03/2019 784,892 750,600 27,688
23/03/2019 1,082,592 709,940 27,995
24/03/2019 595,584 398,170 8,873
25/03/2019 912,481 984,580 30,918
26/03/2019 1,046,154 907,570 215,729
27/03/2019 880,586 605,710 23,513
28/03/2019 550,580 244,460 10,282
29/03/2019 764,058 619,770 1,444
30/03/2019 1,316,509 1,093,560 31,450
43555 1,247,794 997,670 175,753
TOTAL 30,262,409 25,732,200 2,183,935
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- KSHEMA_295.3MW_AMBA
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 73,972 78,379 0
02/03/2019 59,480 53,006 4,898
03/03/2019 66,102 67,863 0
04/03/2019 67,507 68,274 123
05/03/2019 72,334 74,239 120
06/03/2019 73,972 78,791 0
07/03/2019 77,079 77,203 0
08/03/2019 73,453 75,048 0
09/03/2019 72,773 78,734 516
10/03/2019 74,452 74,682 0
11/03/2019 68,730 75,183 0
12/03/2019 74,286 78,453 0
13/03/2019 73,877 73,883 150
14/03/2019 72,823 75,751 0
15/03/2019 72,743 78,576 0
16/03/2019 70,864 75,261 130
17/03/2019 65,024 63,004 991
18/03/2019 71,342 75,885 0
19/03/2019 71,571 74,674 0
20/03/2019 71,619 74,566 0
21/03/2019 74,700 80,390 0
22/03/2019 75,754 75,282 0
23/03/2019 75,319 75,899 0
24/03/2019 71,727 73,759 0
25/03/2019 68,851 68,833 0
26/03/2019 70,584 75,791 0
27/03/2019 70,452 77,375 0
28/03/2019 73,327 74,231 0
29/03/2019 67,548 74,656 0
30/03/2019 67,694 74,833 0
43555 70,948 76,520 0
TOTAL 2,210,907 2,299,024 6,928
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- M&B_BAROD
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 1,174,715 1,225,950 137,194
02/03/2019 1,350,838 1,204,560 90,188
03/03/2019 976,044 661,570 59,296
04/03/2019 970,220 1,121,920 116,542
05/03/2019 1,037,564 890,790 76,736
06/03/2019 688,353 324,380 4,782
07/03/2019 723,130 430,580 30,938
08/03/2019 861,198 700,540 8,423
09/03/2019 1,408,904 1,556,100 132,740
10/03/2019 584,979 30,070 36,724
11/03/2019 953,717 777,330 90,733
12/03/2019 854,298 766,320 36,637
13/03/2019 520,961 252,170 919
14/03/2019 766,076 549,240 35,081
15/03/2019 637,037 741,410 76,515
16/03/2019 968,202 1,141,480 123,819
17/03/2019 1,092,506 1,092,090 31,605
18/03/2019 875,317 720,370 18,645
19/03/2019 574,160 193,260 12,517
20/03/2019 792,762 680,320 18,734
21/03/2019 1,336,083 1,257,330 146,360
22/03/2019 665,876 517,860 156,404
23/03/2019 1,005,249 719,370 21,292
24/03/2019 642,966 347,100 1,631
25/03/2019 599,241 501,180 14,196
26/03/2019 619,579 654,950 109,580
27/03/2019 863,157 636,650 23,907
28/03/2019 570,885 296,320 0
29/03/2019 544,082 400,920 104,549
30/03/2019 1,455,735 1,456,560 73,852
43555 1,647,200 1,662,150 118,117
TOTAL 27,761,034 23,510,840 1,908,656
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- GAMESHA_SHAJAPUR
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 47,861 61,301 2,508
02/03/2019 71,481 81,866 1,751
03/03/2019 59,654 63,117 3,294
04/03/2019 67,488 71,462 1,307
05/03/2019 56,407 55,431 531
06/03/2019 50,013 21,945 0
07/03/2019 48,907 21,040 0
08/03/2019 63,427 77,610 1,284
09/03/2019 73,144 92,195 1,763
10/03/2019 53,271 17,963 242
11/03/2019 73,530 57,074 2,383
12/03/2019 60,137 66,017 1,461
13/03/2019 39,027 29,861 38
14/03/2019 48,388 38,762 1,403
15/03/2019 60,289 64,115 674
16/03/2019 74,944 87,368 5,540
17/03/2019 72,307 65,505 2,227
18/03/2019 49,451 47,892 1,061
19/03/2019 40,273 16,964 326
20/03/2019 64,182 42,182 1,299
21/03/2019 63,883 63,524 1,991
22/03/2019 50,365 25,637 1,955
23/03/2019 49,315 37,267 67
24/03/2019 45,353 17,881 69
25/03/2019 53,413 44,108 1,402
26/03/2019 52,792 50,978 6,983
27/03/2019 46,117 40,387 0
28/03/2019 43,882 13,705 0
29/03/2019 54,663 47,469 95
30/03/2019 58,089 73,123 9,934
43555 68,154 54,640 2,028
TOTAL 1,760,207 1,548,389 53,616
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- WIND_WORLD-IV_33_SUSNER_14.4MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 81,317 88,053 0
02/03/2019 70,709 71,406 655
03/03/2019 66,527 70,016 217
04/03/2019 68,867 67,105 976
05/03/2019 81,314 83,570 0
06/03/2019 81,314 85,688 0
07/03/2019 81,961 84,107 0
08/03/2019 76,520 82,089 0
09/03/2019 76,491 88,011 0
10/03/2019 77,480 81,312 0
11/03/2019 73,501 73,851 305
12/03/2019 78,278 84,942 0
13/03/2019 78,870 81,122 0
14/03/2019 74,498 78,549 0
15/03/2019 78,158 85,006 0
16/03/2019 78,580 84,965 0
17/03/2019 71,810 74,765 312
18/03/2019 76,311 84,612 0
19/03/2019 77,546 82,846 0
20/03/2019 79,561 70,557 3,808
21/03/2019 80,396 88,692 0
22/03/2019 80,945 81,921 1,338
23/03/2019 80,963 82,992 0
24/03/2019 80,251 82,477 0
25/03/2019 76,840 77,095 0
26/03/2019 78,327 85,726 0
27/03/2019 82,791 86,986 0
28/03/2019 82,196 84,680 0
29/03/2019 76,257 82,264 0
30/03/2019 76,978 73,371 1,801
43555 77,744 86,353 0
TOTAL 2,403,301 2,515,129 9,412
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- UJAAS_33KV_BERCHA
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 1,250,166 1,421,910 117,324
02/03/2019 1,612,912 1,792,510 201,921
03/03/2019 1,150,287 932,620 47,112
04/03/2019 1,277,256 1,258,330 45,835
05/03/2019 1,305,251 1,046,930 27,523
06/03/2019 785,522 487,340 44,056
07/03/2019 804,687 568,970 36,792
08/03/2019 1,149,846 1,301,730 84,577
09/03/2019 1,744,658 1,732,360 92,242
10/03/2019 654,976 101,020 6,421
11/03/2019 1,293,150 1,118,690 43,819
12/03/2019 1,287,897 1,206,710 61,417
13/03/2019 684,778 329,940 79
14/03/2019 1,008,292 673,380 20,646
15/03/2019 996,211 1,036,930 96,411
16/03/2019 1,320,831 1,578,390 165,770
17/03/2019 1,400,340 1,427,980 86,840
18/03/2019 1,118,195 888,910 20,546
19/03/2019 702,834 201,240 11,935
20/03/2019 1,050,584 953,600 19,022
21/03/2019 1,429,371 1,365,180 17,350
22/03/2019 766,958 673,050 121,573
23/03/2019 1,192,265 838,190 161,988
24/03/2019 883,312 378,940 12,024
25/03/2019 851,853 732,080 36,480
26/03/2019 936,121 818,260 180,396
27/03/2019 939,114 863,970 22,843
28/03/2019 751,202 343,020 127
29/03/2019 671,233 511,790 25,421
30/03/2019 1,395,123 1,500,920 47,976
43555 1,650,751 1,604,560 43,173
TOTAL 34,065,976 29,689,450 1,899,639
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- INOX_200MW_SHAJAPUR
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 81,966 81,966 0
02/03/2019 68,238 68,238 0
03/03/2019 65,844 65,844 0
04/03/2019 67,514 67,514 0
05/03/2019 75,565 75,565 0
06/03/2019 81,966 81,966 0
07/03/2019 83,279 83,279 0
08/03/2019 78,507 78,507 0
09/03/2019 77,696 77,696 0
10/03/2019 80,316 80,316 0
11/03/2019 73,814 73,814 0
12/03/2019 78,363 78,363 0
13/03/2019 71,262 71,262 0
14/03/2019 68,991 68,991 0
15/03/2019 73,056 73,056 0
16/03/2019 76,588 76,588 0
17/03/2019 69,581 69,581 0
18/03/2019 74,598 74,598 0
19/03/2019 72,102 72,102 0
20/03/2019 72,138 72,138 0
21/03/2019 74,587 74,587 0
22/03/2019 76,588 76,588 0
23/03/2019 72,775 72,775 0
24/03/2019 73,244 73,244 0
25/03/2019 71,987 71,987 0
26/03/2019 72,796 72,796 0
27/03/2019 76,523 76,523 0
28/03/2019 74,420 74,420 0
29/03/2019 73,156 73,156 0
30/03/2019 70,589 70,589 0
43555 73,391 73,391 0
TOTAL 2,301,440 2,301,440 0
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- UJAAS_I_S_RAJGARH_BIORA_15MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 59,331 80,419 1,775
02/03/2019 78,615 90,587 4,818
03/03/2019 57,472 56,435 425
04/03/2019 76,355 94,523 4,768
05/03/2019 69,516 53,592 1,453
06/03/2019 39,564 23,865 0
07/03/2019 30,876 19,369 26
08/03/2019 47,396 40,959 0
09/03/2019 93,834 102,481 794
10/03/2019 28,346 10,168 105
11/03/2019 51,983 56,870 4,125
12/03/2019 53,745 45,288 528
13/03/2019 31,658 25,151 0
14/03/2019 39,809 31,389 69
15/03/2019 50,119 50,118 294
16/03/2019 82,314 98,955 2,640
17/03/2019 66,887 54,462 66
18/03/2019 68,190 60,557 2,209
19/03/2019 34,975 25,741 0
20/03/2019 41,919 55,144 1,448
21/03/2019 92,954 77,229 14,984
22/03/2019 46,734 42,691 241
23/03/2019 73,413 55,487 2,390
24/03/2019 40,998 31,705 0
25/03/2019 44,373 40,305 7,532
26/03/2019 49,431 36,139 4
27/03/2019 51,903 45,167 901
28/03/2019 43,409 31,628 9
29/03/2019 29,774 21,650 0
30/03/2019 85,482 103,751 2,301
31/03/2019 134,947 154,856 30,197
TOTAL 1,796,322 1,716,681 84,102
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- NOT QCA APPOINTMENT
NAME OF POOLING STATION :- WIND_WORLD_II_WIND_33_CHAPDA
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF MARCH - 2019
NAME OF QCA :-KREATE TECHNOLOGIES LLP
NAME OF POOLING STATION :-SIMCON FEEDER -2
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-03-2019 19090 26390 -23511
02-03-2019 22519 20483 7697
03-03-2019 25929 18974 25556
04-03-2019 20752 20383 1647
05-03-2019 20752 23320 -8601
06-03-2019 21066 24735 -12349
07-03-2019 23376 23326 193
08-03-2019 22530 23417 -2791
09-03-2019 23333 24594 -4004
10-03-2019 23333 22968 1627
11-03-2019 22730 21484 4842
12-03-2019 23383 20746 10707
13-03-2019 23410 20833 9723
14-03-2019 23142 17157 22747
15-03-2019 59249 56529 11682
16-03-2019 51667 61003 -30656
17-03-2019 51955 45606 25897
18-03-2019 50993 62596 -37738
19-03-2019 50187 62423 -40199
20-03-2019 53078 51654 5955
21-03-2019 61377 65674 -14303
22-03-2019 53666 61785 -27409
23-03-2019 62244 69428 -24291
24-03-2019 61659 67568 -19787
25-03-2019 63882 63599 1485
26-03-2019 65188 67984 -7968
27-03-2019 64030 70547 -21119
28-03-2019 64930 66476 -3799
29-03-2019 66883 62757 14712
30-03-2019 67316 65736 7193
31-03-2019 26520 20996 20752
TOTAL 1290169 1331171 -106110
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF MARCH - 2019
NAME OF QCA :-ACME SOLAR ENERGY PVT. LTD.
NAME OF POOLING STATION :-ACME SOLAR ENERGY PVT. LTD
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-03-2019 154582 178916 0
02-03-2019 110292 112981 7509
03-03-2019 134765 136062 2944
04-03-2019 146522 144517 1270
05-03-2019 146107 154295 2885
06-03-2019 148681 173043 0
07-03-2019 110239 84725 3827
08-03-2019 127204 117041 1403
09-03-2019 125217 121152 1443
10-03-2019 143992 116290 3574
11-03-2019 135126 112687 8114
12-03-2019 131596 123328 1035
13-03-2019 130444 120314 628
14-03-2019 122266 114006 142
15-03-2019 147401 157094 298
16-03-2019 150311 166192 202
17-03-2019 135052 135958 2548
18-03-2019 147145 168492 115
19-03-2019 147769 168049 134
20-03-2019 136483 155832 612
21-03-2019 156045 179439 0
22-03-2019 147347 155649 1400
23-03-2019 154310 170942 0
24-03-2019 148168 168703 0
25-03-2019 150060 159371 324
26-03-2019 154036 172588 0
27-03-2019 154241 172786 0
28-03-2019 152652 167126 0
29-03-2019 153442 167834 0
30-03-2019 154302 167562 0
31-03-2019 155353 168432 0
TOTAL 4411150 4611406 40407
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF MARCH - 2019
NAME OF QCA :-ALFA INFRAPROP PVT LTD
NAME OF POOLING STATION :-ALFA INFRAPROP PVT LTD. (20MW) KUKSHI
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-03-2019 111072 128834 0
02-03-2019 111072 112863 131
03-03-2019 111072 119777 0
04-03-2019 97251 100462 1766
05-03-2019 111072 124825 0
06-03-2019 111072 128202 0
07-03-2019 111072 128093 0
08-03-2019 111072 118581 0
09-03-2019 111072 129475 0
10-03-2019 111072 122336 0
11-03-2019 111072 120648 0
12-03-2019 111072 125946 0
13-03-2019 111072 126013 0
14-03-2019 111072 124092 392
15-03-2019 111980 130061 0
16-03-2019 112121 122860 0
17-03-2019 112121 122728 0
18-03-2019 112121 126628 0
19-03-2019 112121 123521 0
20-03-2019 112121 124172 0
21-03-2019 112121 128569 0
22-03-2019 112121 128055 0
23-03-2019 123210 123450 0
24-03-2019 125835 124245 0
25-03-2019 125835 121388 0
26-03-2019 125835 127650 0
27-03-2019 125835 124740 43
28-03-2019 125835 123760 0
29-03-2019 125835 122852 0
30-03-2019 125835 120009 0
31-03-2019 125835 131218 0
TOTAL 3567904 3836053 2332
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF MARCH - 2019
NAME OF QCA :-FOCAL ENERGY SOLAR ONE INDIA PVT. LTD.
NAME OF POOLING STATION :-GLOBUS STEEL_N_ POWER PVT LTD
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-03-2019 127029 133303 0
02-03-2019 67721 95575 38786
03-03-2019 101947 102287 205
04-03-2019 126250 102998 5126
05-03-2019 127821 125385 370
06-03-2019 128763 129914 0
07-03-2019 136633 127063 250
08-03-2019 131966 124907 0
09-03-2019 131248 130614 0
10-03-2019 131266 123811 0
11-03-2019 127884 128569 0
12-03-2019 130913 130981 0
13-03-2019 131044 113598 3374
14-03-2019 132346 129628 0
15-03-2019 132063 131861 0
16-03-2019 131791 122636 1449
17-03-2019 131315 118850 2045
18-03-2019 130361 129683 0
19-03-2019 131528 128800 0
20-03-2019 131881 129929 0
21-03-2019 131682 137961 0
22-03-2019 138074 127805 200
23-03-2019 134336 130554 0
24-03-2019 133128 128380 0
25-03-2019 129814 123090 325
26-03-2019 128897 134133 0
27-03-2019 133325 132729 18
28-03-2019 132677 128388 64
29-03-2019 132696 129497 0
30-03-2019 133104 129637 0
31-03-2019 132255 128852 744
TOTAL 3981758 3891418 52956
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF MARCH - 2019
NAME OF QCA :-KREATE TECHNOLOGIES LLP
NAME OF POOLING STATION :-SIMCON FEEDER -1
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-03-2019 94449 96160 0
02-03-2019 76831 75090 646
03-03-2019 70223 69829 703
04-03-2019 80907 75862 650
05-03-2019 71911 85958 922
06-03-2019 92525 92278 0
07-03-2019 94490 87945 1818
08-03-2019 83419 89141 0
09-03-2019 93310 93844 0
10-03-2019 91063 88684 0
11-03-2019 81646 82902 88
12-03-2019 93596 89686 70
13-03-2019 88999 86090 0
14-03-2019 71917 64625 700
15-03-2019 91536 85971 12
16-03-2019 95412 90397 0
17-03-2019 78856 68117 1834
18-03-2019 96072 88768 0
19-03-2019 96623 77171 318
20-03-2019 75554 66435 2483
21-03-2019 85964 83448 0
22-03-2019 82485 79781 0
23-03-2019 81580 81285 0
24-03-2019 78012 79225 0
25-03-2019 74573 73544 0
26-03-2019 76870 79200 0
27-03-2019 78606 82428 0
28-03-2019 77142 77954 100
29-03-2019 77637 73891 2059
30-03-2019 0 0 0
31-03-2019 2543 969 84
TOTAL 2434751 2366678 12487
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF MARCH - 2019
NAME OF QCA :-NA
NAME OF POOLING STATION :-MANDSAUR SOLAR PV POWER PROJECT (NTPC LTD.)
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-03-2019 1329774 1422386 0
02-03-2019 1146970 930012 125713
03-03-2019 1253068 1097128 23463
04-03-2019 1410782 1052158 58306
05-03-2019 1382209 1237122 3159
06-03-2019 1399171 1333679 0
07-03-2019 1410599 1312981 0
08-03-2019 1343990 1288760 332
09-03-2019 1349353 1363410 0
10-03-2019 1284800 1280621 0
11-03-2019 1363530 1290754 674
12-03-2019 1280200 1349761 0
13-03-2019 1287980 1197757 116
14-03-2019 1257040 1166738 3421
15-03-2019 1314549 1250686 0
16-03-2019 1292778 1242900 3322
17-03-2019 1267035 1014579 29937
18-03-2019 1298057 1312933 0
19-03-2019 1308677 1286499 0
20-03-2019 1312553 1266678 0
21-03-2019 1288010 1381512 0
22-03-2019 1282893 1262526 0
23-03-2019 1381160 1297171 0
24-03-2019 1260748 1269609 0
25-03-2019 1296310 1241520 0
26-03-2019 1296310 1309643 0
27-03-2019 1278812 1311213 0
28-03-2019 1309243 1283494 0
29-03-2019 1312270 1273412 0
30-03-2019 1293066 1261309 3435
31-03-2019 1273040 1256789 1133
TOTAL 40564977 38845740 253011
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 58,690 58,804 1,707
02/03/2019 62,074 45,302 1,558
03/03/2019 44,999 28,632 678
04/03/2019 68,131 58,583 2,792
05/03/2019 49,346 28,845 1,175
06/03/2019 43,770 3,135 0
07/03/2019 41,097 1,596 24
08/03/2019 48,932 36,910 1,201
09/03/2019 65,950 56,721 2,842
10/03/2019 46,811 6,617 0
11/03/2019 68,071 59,062 1,669
12/03/2019 51,349 34,347 2,377
13/03/2019 34,389 4,768 0
14/03/2019 44,738 30,664 827
15/03/2019 67,034 72,900 2,433
16/03/2019 78,939 93,029 6,141
17/03/2019 60,547 38,100 632
18/03/2019 41,329 15,349 83
19/03/2019 39,825 8,496 0
20/03/2019 61,776 37,412 1,819
21/03/2019 51,939 32,330 1,059
22/03/2019 47,145 38,983 2,433
23/03/2019 44,771 13,857 839
24/03/2019 43,358 8,023 0
25/03/2019 52,878 54,233 1,347
26/03/2019 52,247 45,325 2,004
27/03/2019 42,614 21,383 29
28/03/2019 43,092 1,960 0
29/03/2019 53,607 35,472 1,486
30/03/2019 84,811 80,591 1,162
31/03/2019 75,916 50,072 1,756
TOTAL 1,670,175 1,101,501 40,073
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- SUZLON_IV_W_JAORA_13.5MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 73,290 79,674 0
02/03/2019 73,395 67,706 40
03/03/2019 63,884 55,204 1,440
04/03/2019 66,545 61,676 203
05/03/2019 74,066 74,088 549
06/03/2019 73,290 78,294 0
07/03/2019 75,360 75,408 0
08/03/2019 74,778 73,378 0
09/03/2019 73,592 76,548 174
10/03/2019 75,628 73,374 0
11/03/2019 68,701 66,518 50
12/03/2019 73,286 72,592 0
13/03/2019 65,603 70,390 0
14/03/2019 63,017 52,534 1,219
15/03/2019 68,203 70,306 0
16/03/2019 68,966 73,076 373
17/03/2019 66,802 62,290 165
18/03/2019 69,041 74,634 0
19/03/2019 70,602 72,320 0
20/03/2019 66,015 65,662 20
21/03/2019 68,981 75,314 302
22/03/2019 72,446 72,426 0
23/03/2019 69,953 73,090 367
24/03/2019 65,861 67,636 0
25/03/2019 66,738 68,310 0
26/03/2019 64,840 74,522 0
27/03/2019 69,970 75,512 0
28/03/2019 72,010 73,308 0
29/03/2019 70,572 71,780 0
30/03/2019 66,926 71,848 0
31/03/2019 66,926 74,996 0
T O T A L 2 1 5 9 2 8 7 2 1 9 4 4 1 4 4 9 0 2
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- M&B_ICHHAWAR-II
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 46,082 38,567 793
02/03/2019 47,324 52,357 4,018
03/03/2019 51,222 53,931 440
04/03/2019 62,907 79,613 8,453
05/03/2019 47,154 41,103 1,514
06/03/2019 30,476 17,654 37
07/03/2019 33,446 21,922 359
08/03/2019 42,312 47,072 4,046
09/03/2019 64,250 72,486 6,124
10/03/2019 33,542 10,650 2
11/03/2019 39,849 42,431 7,258
12/03/2019 53,649 54,299 5,771
13/03/2019 37,033 22,435 0
14/03/2019 48,332 37,796 1,452
15/03/2019 59,806 72,856 4,328
16/03/2019 69,746 71,763 1,281
17/03/2019 60,064 54,777 1,278
18/03/2019 40,623 26,819 343
19/03/2019 38,179 6,323 0
20/03/2019 64,622 52,925 2,059
21/03/2019 62,412 54,759 3,767
22/03/2019 41,243 24,366 1,860
23/03/2019 45,746 31,905 63
24/03/2019 40,516 15,796 0
25/03/2019 48,595 43,873 1,493
26/03/2019 49,186 44,292 4,902
27/03/2019 45,934 34,071 181
28/03/2019 40,684 10,889 0
29/03/2019 51,872 53,925 5,568
30/03/2019 104,979 124,555 6,500
31/03/2019 88,565 92,185 5,056
TOTAL 1,590,350 1,408,395 78,946
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- WIND WORLD AGAR-I
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 56,379 69,230 5,357
02/03/2019 58,204 52,025 1,570
03/03/2019 44,241 33,072 542
04/03/2019 65,142 64,497 2,060
05/03/2019 49,684 35,939 5,457
06/03/2019 42,497 4,189 366
07/03/2019 35,822 1,585 0
08/03/2019 49,683 37,429 876
09/03/2019 70,029 54,642 349
10/03/2019 41,894 7,152 0
11/03/2019 66,799 63,666 1,566
12/03/2019 51,084 36,165 3,912
13/03/2019 32,301 4,382 0
14/03/2019 42,510 31,113 415
15/03/2019 68,517 73,267 1,982
16/03/2019 81,238 94,880 5,539
17/03/2019 55,038 41,754 1,954
18/03/2019 39,621 15,999 115
19/03/2019 39,054 13,503 176
20/03/2019 58,439 10,196 13,413
21/03/2019 51,563 27,555 4,031
22/03/2019 45,334 41,046 3,589
23/03/2019 42,218 16,903 1,316
24/03/2019 40,074 12,049 32
25/03/2019 58,797 49,546 1,941
26/03/2019 52,316 50,771 6,773
27/03/2019 41,083 26,116 3
28/03/2019 38,185 3,710 0
29/03/2019 52,942 40,626 2,942
30/03/2019 82,778 83,954 1,525
31/03/2019 66,700 47,275 981
TOTAL 1,620,166 1,144,236 68,782
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- SUZLON_V_W_JAORA_12MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 329,991 371,340 0
02/03/2019 334,343 328,270 0
03/03/2019 316,587 305,320 9,583
04/03/2019 306,978 299,950 1,150
05/03/2019 338,067 370,590 0
06/03/2019 333,980 363,850 0
07/03/2019 341,847 370,470 0
08/03/2019 339,174 351,170 0
09/03/2019 341,880 337,900 7,792
10/03/2019 340,737 368,090 0
11/03/2019 332,873 348,080 529
12/03/2019 340,644 360,370 0
13/03/2019 323,999 323,140 2,890
14/03/2019 322,356 307,600 4,740
15/03/2019 324,057 326,750 1,066
16/03/2019 332,001 354,020 0
17/03/2019 320,692 326,220 3,613
18/03/2019 328,013 366,010 0
19/03/2019 348,797 369,260 0
20/03/2019 337,243 357,890 0
21/03/2019 347,616 377,550 0
22/03/2019 347,112 389,050 0
23/03/2019 338,727 376,150 0
24/03/2019 347,067 370,090 0
25/03/2019 348,048 361,390 0
26/03/2019 348,590 382,890 0
27/03/2019 348,887 387,460 0
28/03/2019 349,956 375,330 0
29/03/2019 354,783 375,960 0
30/03/2019 340,629 369,860 0
31/03/2019 347,842 372,160 0
TOTAL 10,453,516 11,044,180 31,363
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- SKY_POWER_SOLAR_132_CHHEGAON
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 238,506 264,694 3,703
02/03/2019 307,844 263,566 548
03/03/2019 228,114 214,270 904
04/03/2019 297,357 333,869 8,521
05/03/2019 271,686 224,434 1,640
06/03/2019 218,232 97,589 0
07/03/2019 209,274 79,224 0
08/03/2019 221,690 165,007 567
09/03/2019 367,347 414,706 2,247
10/03/2019 210,693 40,368 2
11/03/2019 252,725 243,364 2,268
12/03/2019 198,848 189,906 11,894
13/03/2019 196,602 99,971 0
14/03/2019 207,789 137,746 2
15/03/2019 210,688 198,376 790
16/03/2019 356,533 377,359 10,125
17/03/2019 258,295 243,889 3,342
18/03/2019 259,881 226,394 5,328
19/03/2019 187,476 82,628 136
20/03/2019 229,362 172,301 5,541
21/03/2019 295,884 321,848 24,507
22/03/2019 250,304 182,714 4,347
23/03/2019 305,707 237,927 1,905
24/03/2019 189,958 115,956 0
25/03/2019 199,567 164,408 5,161
26/03/2019 199,133 165,195 0
27/03/2019 249,250 185,888 4,209
28/03/2019 221,783 128,008 1,728
29/03/2019 197,093 83,665 0
30/03/2019 346,274 423,782 16,831
31/03/2019 541,199 610,547 44,217
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- WIND_WORLD_III_WIND_132_CHAPDA
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 208,662 229,360 35,300
02/03/2019 265,336 295,850 25,558
03/03/2019 184,423 196,537 16,133
04/03/2019 198,577 212,786 28,921
05/03/2019 185,915 166,021 12,869
06/03/2019 105,424 62,975 3,075
07/03/2019 115,127 99,981 25,394
08/03/2019 214,173 262,724 19,837
09/03/2019 226,153 220,880 5,180
10/03/2019 108,016 55,331 9,354
11/03/2019 177,916 187,694 12,403
12/03/2019 192,305 172,293 4,903
13/03/2019 102,867 73,712 1,953
14/03/2019 121,726 81,595 10,469
15/03/2019 213,016 283,619 55,183
16/03/2019 282,119 296,200 32,265
17/03/2019 229,579 234,969 22,705
18/03/2019 152,080 135,134 6,477
19/03/2019 93,232 26,688 230
20/03/2019 199,326 172,627 14,531
21/03/2019 204,113 154,906 1,294
22/03/2019 97,922 98,794 15,933
23/03/2019 180,139 158,703 2,225
24/03/2019 108,929 45,676 3,120
25/03/2019 179,570 145,132 18,451
26/03/2019 186,804 166,529 63,609
27/03/2019 162,935 154,098 4,984
28/03/2019 102,770 44,225 0
29/03/2019 127,212 141,855 28,940
30/03/2019 265,179 285,880 19,774
31/03/2019 227,114 194,793 25,000
TOTAL 5,418,659 5,057,567 526,070
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- SUZLON_GUJRAT_WIND_33_BADOD
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 346,231 391,550 0
02/03/2019 292,943 218,700 35,274
03/03/2019 231,105 222,320 13,026
04/03/2019 278,547 270,680 4,594
05/03/2019 291,910 316,400 3,344
06/03/2019 356,265 374,170 0
07/03/2019 355,716 373,300 0
08/03/2019 350,803 362,440 0
09/03/2019 354,398 373,950 0
10/03/2019 355,049 360,890 0
11/03/2019 333,392 348,010 0
12/03/2019 352,198 380,460 0
13/03/2019 345,422 353,720 0
14/03/2019 330,955 299,850 6,799
15/03/2019 337,930 373,590 353
16/03/2019 323,057 354,510 1,586
17/03/2019 325,850 329,610 2,539
18/03/2019 350,122 391,430 0
19/03/2019 346,518 381,870 0
20/03/2019 348,874 360,140 4,809
21/03/2019 353,674 397,330 0
22/03/2019 351,734 376,350 0
23/03/2019 360,046 389,980 0
24/03/2019 361,604 383,390 0
25/03/2019 351,616 359,050 0
26/03/2019 361,508 389,890 0
27/03/2019 361,657 392,780 183
28/03/2019 361,625 386,130 0
29/03/2019 362,851 389,920 0
30/03/2019 363,036 386,290 0
31/03/2019 363,200 387,890 0
TOTAL 10,559,836 11,076,590 72,507
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- RENEW_CLEAN_SOLAR_132_KOTHIYA
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 32,504 35,091 0
02/03/2019 29,189 29,184 1,009
03/03/2019 26,300 25,149 695
04/03/2019 28,711 28,551 378
05/03/2019 30,871 33,515 45
06/03/2019 32,504 34,164 0
07/03/2019 33,274 33,552 0
08/03/2019 31,614 32,245 0
09/03/2019 31,096 34,164 35
10/03/2019 31,810 31,835 0
11/03/2019 29,801 29,017 456
12/03/2019 31,825 32,587 12
13/03/2019 32,296 31,213 0
14/03/2019 28,219 25,265 634
15/03/2019 30,261 32,515 41
16/03/2019 31,349 32,815 0
17/03/2019 27,747 27,868 416
18/03/2019 30,041 32,614 9
19/03/2019 28,939 31,725 42
20/03/2019 29,120 28,134 909
21/03/2019 31,010 33,437 0
22/03/2019 31,178 31,954 0
23/03/2019 30,353 32,048 0
24/03/2019 29,704 31,632 0
25/03/2019 29,217 29,861 47
26/03/2019 29,661 32,496 0
27/03/2019 29,962 33,225 29
28/03/2019 30,982 32,562 0
29/03/2019 29,389 31,958 0
30/03/2019 30,430 31,824 192
31/03/2019 30,430 33,433 7
TOTAL 939,787 975,633 4,956
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- DESIGNCO_MANF_EXP_1_S_ARNIYAKALA_5MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 69,329 74,745 0
02/03/2019 55,476 50,311 5,015
03/03/2019 64,622 61,749 96
04/03/2019 63,197 62,910 199
05/03/2019 67,833 66,882 431
06/03/2019 69,329 72,332 0
07/03/2019 70,964 70,961 0
08/03/2019 68,264 69,304 0
09/03/2019 67,140 74,119 0
10/03/2019 68,812 69,028 0
11/03/2019 63,276 68,920 0
12/03/2019 70,266 72,158 0
13/03/2019 70,710 67,910 176
14/03/2019 67,168 69,671 0
15/03/2019 67,797 72,267 0
16/03/2019 66,208 68,894 145
17/03/2019 58,975 58,562 1,259
18/03/2019 66,327 70,206 0
19/03/2019 65,791 69,096 0
20/03/2019 66,564 68,033 0
21/03/2019 66,771 66,801 50
22/03/2019 69,281 67,200 0
23/03/2019 68,212 67,746 0
24/03/2019 64,765 66,715 0
25/03/2019 64,422 64,381 8
26/03/2019 66,891 69,479 0
27/03/2019 62,706 70,187 0
28/03/2019 67,623 67,171 0
29/03/2019 61,787 67,869 0
30/03/2019 61,292 67,973 0
31/03/2019 62,899 69,633 0
TOTAL 2,044,697 2,103,213 7,379
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- M&B_BAROD_II
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 30,000 35,374 0
02/03/2019 30,000 29,700 29
03/03/2019 30,000 30,688 0
04/03/2019 30,000 29,475 159
05/03/2019 30,000 32,372 58
06/03/2019 30,000 33,977 0
07/03/2019 30,000 33,469 0
08/03/2019 30,000 32,649 0
09/03/2019 30,000 35,313 0
10/03/2019 30,000 32,397 0
11/03/2019 30,000 31,678 0
12/03/2019 30,000 34,246 0
13/03/2019 30,000 33,166 0
14/03/2019 30,000 32,522 0
15/03/2019 30,000 34,514 0
16/03/2019 30,000 33,984 0
17/03/2019 30,000 31,311 10
18/03/2019 30,000 33,738 0
19/03/2019 30,000 32,909 0
20/03/2019 30,000 31,553 79
21/03/2019 30,000 35,833 20
22/03/2019 30,000 33,588 0
23/03/2019 30,000 33,594 0
24/03/2019 30,000 32,870 0
25/03/2019 30,000 31,454 62
26/03/2019 30,000 34,292 0
27/03/2019 30,000 34,616 24
28/03/2019 30,000 33,894 12
29/03/2019 30,000 32,905 3
30/03/2019 30,000 19,466 5,703
31/03/2019 30,000 33,709 3
TOTAL 930,000 1,011,256 6,162
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- PORWAL_AUTO_MAKDON
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 63,932 67,832 0
02/03/2019 46,554 43,205 11,718
03/03/2019 47,004 50,782 166
04/03/2019 59,422 52,696 866
05/03/2019 60,164 61,095 244
06/03/2019 62,653 64,777 0
07/03/2019 62,756 64,384 0
08/03/2019 62,063 62,047 0
09/03/2019 60,645 65,885 0
10/03/2019 62,136 61,437 0
11/03/2019 62,352 63,507 0
12/03/2019 64,398 64,879 0
13/03/2019 62,109 60,391 230
14/03/2019 63,922 63,553 0
15/03/2019 61,485 64,342 0
16/03/2019 64,266 60,684 1,055
17/03/2019 52,786 55,742 961
18/03/2019 57,760 62,806 0
19/03/2019 61,102 62,078 0
20/03/2019 63,107 61,698 80
21/03/2019 63,283 66,652 0
22/03/2019 62,880 60,802 0
23/03/2019 63,214 61,465 0
24/03/2019 60,224 60,048 0
25/03/2019 58,290 58,034 0
26/03/2019 59,216 63,331 0
27/03/2019 62,774 62,724 6
28/03/2019 60,957 60,753 0
29/03/2019 60,737 60,458 0
30/03/2019 58,698 60,908 0
31/03/2019 57,524 60,633 9
TOTAL 1,868,413 1,889,628 15,335
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- FOCAL_PHOTOVOLTAIC_10MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 106,118 79,880 4,357
02/03/2019 106,085 25,711 38,318
03/03/2019 79,484 56,982 4,637
04/03/2019 103,322 68,421 7,539
05/03/2019 52,244 47,418 4,581
06/03/2019 56,593 11,492 5,833
07/03/2019 53,227 15,918 1,604
08/03/2019 51,454 39,137 479
09/03/2019 135,008 97,109 16,915
10/03/2019 46,559 6,467 1,563
11/03/2019 86,891 54,205 18,312
12/03/2019 82,526 34,937 7,097
13/03/2019 41,886 9,523 12
14/03/2019 66,518 32,651 2,924
15/03/2019 85,766 47,931 6,396
16/03/2019 99,863 75,153 1,780
17/03/2019 88,778 45,377 7,083
18/03/2019 103,901 49,653 13,113
19/03/2019 35,186 12,697 703
20/03/2019 69,612 44,531 1,990
21/03/2019 84,581 63,963 819
22/03/2019 56,076 28,931 3,963
23/03/2019 95,543 51,593 6,265
24/03/2019 59,753 27,635 415
25/03/2019 67,054 29,820 8,385
26/03/2019 54,369 30,909 4,242
27/03/2019 77,995 36,081 3,393
28/03/2019 46,008 16,264 0
29/03/2019 48,850 21,144 404
30/03/2019 110,455 93,607 731
31/03/2019 117,625 124,456 8,354
TOTAL 2,369,330 1,379,596 182,207
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- MP_WIND_FARM_NAGDA_HILL_WIND_33_DEWAS
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 106,773 114,695 0
02/03/2019 85,008 72,651 11,217
03/03/2019 94,470 89,656 0
04/03/2019 97,975 94,936 108
05/03/2019 99,298 98,077 18
06/03/2019 106,773 109,286 0
07/03/2019 108,070 106,786 0
08/03/2019 98,673 104,502 0
09/03/2019 99,645 112,024 0
10/03/2019 101,838 103,688 0
11/03/2019 102,766 105,027 0
12/03/2019 104,403 109,223 0
13/03/2019 104,798 103,003 0
14/03/2019 99,657 105,099 0
15/03/2019 101,752 108,379 0
16/03/2019 98,702 102,236 1
17/03/2019 86,084 89,120 1,137
18/03/2019 98,676 106,077 0
19/03/2019 94,828 104,679 0
20/03/2019 101,977 103,673 0
21/03/2019 102,497 113,574 0
22/03/2019 101,752 105,571 0
23/03/2019 101,590 106,518 0
24/03/2019 100,386 104,171 0
25/03/2019 99,859 100,103 7
26/03/2019 100,092 107,745 0
27/03/2019 100,397 108,453 0
28/03/2019 101,283 101,855 161
29/03/2019 99,224 103,960 0
30/03/2019 96,214 104,050 0
31/03/2019 96,214 105,324 0
TOTAL 3,091,674 3,204,141 12,649
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- TODAY_CLEAN_SOLAR_33KV_BAROD
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 326,700 356,290 612
02/03/2019 261,202 214,140 46,195
03/03/2019 263,478 263,680 531
04/03/2019 288,127 287,020 810
05/03/2019 307,223 329,160 837
06/03/2019 317,183 339,540 553
07/03/2019 341,638 340,410 101
08/03/2019 317,486 331,400 0
09/03/2019 330,288 353,700 312
10/03/2019 336,640 330,160 0
11/03/2019 328,597 345,480 0
12/03/2019 337,775 352,710 458
13/03/2019 332,924 325,090 6,085
14/03/2019 330,354 348,790 0
15/03/2019 330,908 350,790 138
16/03/2019 331,718 328,040 7,114
17/03/2019 280,022 296,200 5,400
18/03/2019 335,349 349,170 410
19/03/2019 333,339 346,760 0
20/03/2019 337,121 356,330 292
21/03/2019 343,171 376,200 723
22/03/2019 347,640 346,140 172
23/03/2019 342,147 350,660 0
24/03/2019 337,450 346,500 75
25/03/2019 324,859 330,550 1,961
26/03/2019 333,805 363,690 55
27/03/2019 357,000 363,380 153
28/03/2019 342,105 355,410 75
29/03/2019 321,783 356,820 53
30/03/2019 329,711 360,270 62
31/03/2019 333,168 358,760 744
TOTAL 10,080,911 10,453,240 73,921
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- SEIL_SITARA_SITAMAU_50MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 49,271 55,758 1,142
02/03/2019 72,401 79,467 3,661
03/03/2019 60,811 61,798 224
04/03/2019 60,137 76,654 6,090
05/03/2019 60,623 45,202 2,087
06/03/2019 49,927 22,294 0
07/03/2019 50,110 30,832 783
08/03/2019 68,675 67,911 504
09/03/2019 75,177 83,863 2,731
10/03/2019 49,133 16,005 0
11/03/2019 75,995 71,393 3,518
12/03/2019 73,179 56,661 2,126
13/03/2019 42,224 22,019 0
14/03/2019 51,892 44,106 2,511
15/03/2019 64,344 72,414 1,437
16/03/2019 56,739 60,002 937
17/03/2019 47,659 45,055 733
18/03/2019 36,418 28,553 0
19/03/2019 26,184 5,658 56
20/03/2019 64,556 57,228 4,986
21/03/2019 65,098 45,001 612
22/03/2019 52,982 30,341 206
23/03/2019 49,825 36,063 0
24/03/2019 34,352 14,270 0
25/03/2019 38,670 32,905 1,038
26/03/2019 50,650 34,643 2,299
27/03/2019 34,864 33,699 3
28/03/2019 30,165 11,986 2
29/03/2019 41,928 43,679 1,230
30/03/2019 96,974 114,985 3,672
31/03/2019 90,568 84,570 1,818
TOTAL 1,721,531 1,485,015 44,406
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- WIND_WORLD-II_33_AGAR_15.2MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 45,645 45,645 0
02/03/2019 37,225 37,225 0
03/03/2019 36,179 36,179 0
04/03/2019 40,606 40,606 0
05/03/2019 43,203 43,203 0
06/03/2019 43,364 43,364 0
07/03/2019 47,299 47,299 0
08/03/2019 44,939 44,939 0
09/03/2019 45,044 45,044 0
10/03/2019 45,771 45,771 0
11/03/2019 42,091 42,091 0
12/03/2019 45,360 45,360 0
13/03/2019 41,816 41,816 0
14/03/2019 40,993 40,993 0
15/03/2019 44,086 44,086 0
16/03/2019 46,311 46,311 0
17/03/2019 42,512 42,512 0
18/03/2019 45,497 45,497 0
19/03/2019 44,761 44,761 0
20/03/2019 44,512 44,512 0
21/03/2019 45,498 45,498 0
22/03/2019 46,311 46,311 0
23/03/2019 44,006 44,006 0
24/03/2019 44,942 44,942 0
25/03/2019 44,239 44,239 0
26/03/2019 44,610 44,610 0
27/03/2019 46,787 46,787 0
28/03/2019 45,481 45,481 0
29/03/2019 42,704 42,704 0
30/03/2019 43,786 43,786 0
31/03/2019 44,253 44,253 0
TOTAL 1,359,831 1,359,831 0
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- UJAAS_II_S_RAJGARH_BIORA_15MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 83,479 88,648 0
02/03/2019 82,182 75,494 165
03/03/2019 67,237 61,820 1,516
04/03/2019 69,984 68,600 151
05/03/2019 79,763 85,416 0
06/03/2019 83,479 87,028 0
07/03/2019 83,963 84,966 0
08/03/2019 83,420 83,158 0
09/03/2019 82,272 85,074 0
10/03/2019 84,144 81,904 0
11/03/2019 72,872 75,288 310
12/03/2019 82,035 81,600 152
13/03/2019 73,676 79,192 0
14/03/2019 69,475 59,074 1,547
15/03/2019 75,108 78,486 0
16/03/2019 77,488 83,468 0
17/03/2019 76,799 69,840 479
18/03/2019 77,658 83,258 0
19/03/2019 75,921 81,444 0
20/03/2019 74,126 72,598 0
21/03/2019 77,592 85,284 0
22/03/2019 76,030 80,888 0
23/03/2019 78,563 81,498 0
24/03/2019 74,485 80,880 0
25/03/2019 74,516 74,178 427
26/03/2019 73,038 83,592 0
27/03/2019 78,612 84,702 0
28/03/2019 80,889 81,806 0
29/03/2019 73,534 79,212 0
30/03/2019 73,395 79,494 0
31/03/2019 73,395 81,870 0
TOTAL 2,389,130 2,459,760 4,747
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- M&B_ICHHAWAR-I
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 46,899 50,281 866
02/03/2019 71,146 71,365 2,765
03/03/2019 55,362 58,913 844
04/03/2019 66,525 70,902 5,141
05/03/2019 59,144 48,384 2,211
06/03/2019 50,360 21,130 0
07/03/2019 48,898 30,180 857
08/03/2019 61,212 65,869 577
09/03/2019 78,289 83,400 2,707
10/03/2019 50,430 14,578 0
11/03/2019 75,677 65,967 3,832
12/03/2019 72,630 59,377 2,175
13/03/2019 40,060 20,784 0
14/03/2019 49,870 41,197 2,295
15/03/2019 61,653 75,013 1,308
16/03/2019 59,732 64,732 274
17/03/2019 48,927 49,267 1,440
18/03/2019 35,159 27,668 132
19/03/2019 25,502 6,117 17
20/03/2019 66,346 54,175 3,346
21/03/2019 64,090 49,221 460
22/03/2019 50,333 30,529 289
23/03/2019 48,992 34,471 0
24/03/2019 30,655 14,024 50
25/03/2019 37,082 35,651 1,413
26/03/2019 47,502 38,105 4,152
27/03/2019 33,528 31,062 34
28/03/2019 27,537 11,528 60
29/03/2019 34,987 36,683 945
30/03/2019 87,555 104,869 2,935
31/03/2019 88,268 84,976 553
TOTAL 1,674,350 1,450,418 41,678
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- WIND_WORLD-III_33_AGAR_14.4MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 61,906 68,954 0
02/03/2019 61,829 60,973 0
03/03/2019 43,477 45,222 2,972
04/03/2019 58,366 59,216 0
05/03/2019 61,961 64,458 0
06/03/2019 61,906 65,255 0
07/03/2019 64,863 67,104 0
08/03/2019 63,022 64,863 0
09/03/2019 60,640 64,536 0
10/03/2019 63,068 64,891 0
11/03/2019 59,353 61,905 54
12/03/2019 62,921 63,466 0
13/03/2019 61,688 57,534 1,507
14/03/2019 43,857 36,550 4,024
15/03/2019 51,754 49,404 2,056
16/03/2019 59,241 61,528 7
17/03/2019 51,812 52,735 53
18/03/2019 59,645 62,647 0
19/03/2019 60,917 63,390 0
20/03/2019 54,928 52,464 4,860
21/03/2019 59,050 63,313 0
22/03/2019 60,554 64,197 0
23/03/2019 60,554 63,758 0
24/03/2019 59,165 63,540 0
25/03/2019 56,370 60,258 0
26/03/2019 57,021 62,134 0
27/03/2019 60,794 65,598 0
28/03/2019 59,950 62,654 0
29/03/2019 59,226 60,954 0
30/03/2019 55,848 58,651 0
31/03/2019 55,286 57,302 0
TOTAL 1,810,972 1,869,454 15,533
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- BHARAT_ELECTRONICS_LTD_OFI_S_ITARSI_10MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 1,285,219 1,821,110 329,980
02/03/2019 1,751,843 1,663,530 38,915
03/03/2019 1,062,159 1,149,830 36,627
04/03/2019 1,094,588 1,295,450 150,827
05/03/2019 1,058,287 827,900 92,243
06/03/2019 599,789 84,590 8,969
07/03/2019 579,376 69,020 3,549
08/03/2019 691,390 485,960 0
09/03/2019 1,062,189 817,780 33,257
10/03/2019 562,705 193,960 2,594
11/03/2019 1,147,159 1,205,970 59,382
12/03/2019 877,772 739,180 10,699
13/03/2019 525,025 133,180 3,933
14/03/2019 667,385 427,890 79,296
15/03/2019 1,379,609 1,661,470 317,641
16/03/2019 1,821,008 2,118,290 266,025
17/03/2019 1,568,864 1,432,430 107,094
18/03/2019 855,082 546,090 19,400
19/03/2019 628,485 367,510 15,754
20/03/2019 999,475 833,170 40,486
21/03/2019 863,770 545,860 13,619
22/03/2019 784,892 750,600 27,688
23/03/2019 1,082,592 709,940 27,995
24/03/2019 595,584 398,170 8,873
25/03/2019 912,481 984,580 30,918
26/03/2019 1,046,154 907,570 215,729
27/03/2019 880,586 605,710 23,513
28/03/2019 550,580 244,460 10,282
29/03/2019 764,058 619,770 1,444
30/03/2019 1,316,509 1,093,560 31,450
31/03/2019 1,247,794 997,670 175,753
TOTAL 30,262,409 25,732,200 2,183,935
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- KSHEMA_295.3MW_AMBA
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 73,972 78,379 0
02/03/2019 59,480 53,006 4,898
03/03/2019 66,102 67,863 0
04/03/2019 67,507 68,274 123
05/03/2019 72,334 74,239 120
06/03/2019 73,972 78,791 0
07/03/2019 77,079 77,203 0
08/03/2019 73,453 75,048 0
09/03/2019 72,773 78,734 516
10/03/2019 74,452 74,682 0
11/03/2019 68,730 75,183 0
12/03/2019 74,286 78,453 0
13/03/2019 73,877 73,883 150
14/03/2019 72,823 75,751 0
15/03/2019 72,743 78,576 0
16/03/2019 70,864 75,261 130
17/03/2019 65,024 63,004 991
18/03/2019 71,342 75,885 0
19/03/2019 71,571 74,674 0
20/03/2019 71,619 74,566 0
21/03/2019 74,700 80,390 0
22/03/2019 75,754 75,282 0
23/03/2019 75,319 75,899 0
24/03/2019 71,727 73,759 0
25/03/2019 68,851 68,833 0
26/03/2019 70,584 75,791 0
27/03/2019 70,452 77,375 0
28/03/2019 73,327 74,231 0
29/03/2019 67,548 74,656 0
30/03/2019 67,694 74,833 0
31/03/2019 70,948 76,520 0
TOTAL 2,210,907 2,299,024 6,928
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- M&B_BAROD
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 1,174,715 1,225,950 137,194
02/03/2019 1,350,838 1,204,560 90,188
03/03/2019 976,044 661,570 59,296
04/03/2019 970,220 1,121,920 116,542
05/03/2019 1,037,564 890,790 76,736
06/03/2019 688,353 324,380 4,782
07/03/2019 723,130 430,580 30,938
08/03/2019 861,198 700,540 8,423
09/03/2019 1,408,904 1,556,100 132,740
10/03/2019 584,979 30,070 36,724
11/03/2019 953,717 777,330 90,733
12/03/2019 854,298 766,320 36,637
13/03/2019 520,961 252,170 919
14/03/2019 766,076 549,240 35,081
15/03/2019 637,037 741,410 76,515
16/03/2019 968,202 1,141,480 123,819
17/03/2019 1,092,506 1,092,090 31,605
18/03/2019 875,317 720,370 18,645
19/03/2019 574,160 193,260 12,517
20/03/2019 792,762 680,320 18,734
21/03/2019 1,336,083 1,257,330 146,360
22/03/2019 665,876 517,860 156,404
23/03/2019 1,005,249 719,370 21,292
24/03/2019 642,966 347,100 1,631
25/03/2019 599,241 501,180 14,196
26/03/2019 619,579 654,950 109,580
27/03/2019 863,157 636,650 23,907
28/03/2019 570,885 296,320 0
29/03/2019 544,082 400,920 104,549
30/03/2019 1,455,735 1,456,560 73,852
31/03/2019 1,647,200 1,662,150 118,117
TOTAL 27,761,034 23,510,840 1,908,656
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- GAMESHA_SHAJAPUR
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 47,861 61,301 2,508
02/03/2019 71,481 81,866 1,751
03/03/2019 59,654 63,117 3,294
04/03/2019 67,488 71,462 1,307
05/03/2019 56,407 55,431 531
06/03/2019 50,013 21,945 0
07/03/2019 48,907 21,040 0
08/03/2019 63,427 77,610 1,284
09/03/2019 73,144 92,195 1,763
10/03/2019 53,271 17,963 242
11/03/2019 73,530 57,074 2,383
12/03/2019 60,137 66,017 1,461
13/03/2019 39,027 29,861 38
14/03/2019 48,388 38,762 1,403
15/03/2019 60,289 64,115 674
16/03/2019 74,944 87,368 5,540
17/03/2019 72,307 65,505 2,227
18/03/2019 49,451 47,892 1,061
19/03/2019 40,273 16,964 326
20/03/2019 64,182 42,182 1,299
21/03/2019 63,883 63,524 1,991
22/03/2019 50,365 25,637 1,955
23/03/2019 49,315 37,267 67
24/03/2019 45,353 17,881 69
25/03/2019 53,413 44,108 1,402
26/03/2019 52,792 50,978 6,983
27/03/2019 46,117 40,387 0
28/03/2019 43,882 13,705 0
29/03/2019 54,663 47,469 95
30/03/2019 58,089 73,123 9,934
31/03/2019 68,154 54,640 2,028
TOTAL 1,760,207 1,548,389 53,616
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- WIND_WORLD-IV_33_SUSNER_14.4MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 81,317 88,053 0
02/03/2019 70,709 71,406 655
03/03/2019 66,527 70,016 217
04/03/2019 68,867 67,105 976
05/03/2019 81,314 83,570 0
06/03/2019 81,314 85,688 0
07/03/2019 81,961 84,107 0
08/03/2019 76,520 82,089 0
09/03/2019 76,491 88,011 0
10/03/2019 77,480 81,312 0
11/03/2019 73,501 73,851 305
12/03/2019 78,278 84,942 0
13/03/2019 78,870 81,122 0
14/03/2019 74,498 78,549 0
15/03/2019 78,158 85,006 0
16/03/2019 78,580 84,965 0
17/03/2019 71,810 74,765 312
18/03/2019 76,311 84,612 0
19/03/2019 77,546 82,846 0
20/03/2019 79,561 70,557 3,808
21/03/2019 80,396 88,692 0
22/03/2019 80,945 81,921 1,338
23/03/2019 80,963 82,992 0
24/03/2019 80,251 82,477 0
25/03/2019 76,840 77,095 0
26/03/2019 78,327 85,726 0
27/03/2019 82,791 86,986 0
28/03/2019 82,196 84,680 0
29/03/2019 76,257 82,264 0
30/03/2019 76,978 73,371 1,801
31/03/2019 77,744 86,353 0
TOTAL 2,403,301 2,515,129 9,412
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- UJAAS_33KV_BERCHA
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 1,250,166 1,421,910 117,324
02/03/2019 1,612,912 1,792,510 201,921
03/03/2019 1,150,287 932,620 47,112
04/03/2019 1,277,256 1,258,330 45,835
05/03/2019 1,305,251 1,046,930 27,523
06/03/2019 785,522 487,340 44,056
07/03/2019 804,687 568,970 36,792
08/03/2019 1,149,846 1,301,730 84,577
09/03/2019 1,744,658 1,732,360 92,242
10/03/2019 654,976 101,020 6,421
11/03/2019 1,293,150 1,118,690 43,819
12/03/2019 1,287,897 1,206,710 61,417
13/03/2019 684,778 329,940 79
14/03/2019 1,008,292 673,380 20,646
15/03/2019 996,211 1,036,930 96,411
16/03/2019 1,320,831 1,578,390 165,770
17/03/2019 1,400,340 1,427,980 86,840
18/03/2019 1,118,195 888,910 20,546
19/03/2019 702,834 201,240 11,935
20/03/2019 1,050,584 953,600 19,022
21/03/2019 1,429,371 1,365,180 17,350
22/03/2019 766,958 673,050 121,573
23/03/2019 1,192,265 838,190 161,988
24/03/2019 883,312 378,940 12,024
25/03/2019 851,853 732,080 36,480
26/03/2019 936,121 818,260 180,396
27/03/2019 939,114 863,970 22,843
28/03/2019 751,202 343,020 127
29/03/2019 671,233 511,790 25,421
30/03/2019 1,395,123 1,500,920 47,976
31/03/2019 1,650,751 1,604,560 43,173
TOTAL 34,065,976 29,689,450 1,899,639
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- INOX_200MW_SHAJAPUR
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 81,966 81,966 0
02/03/2019 68,238 68,238 0
03/03/2019 65,844 65,844 0
04/03/2019 67,514 67,514 0
05/03/2019 75,565 75,565 0
06/03/2019 81,966 81,966 0
07/03/2019 83,279 83,279 0
08/03/2019 78,507 78,507 0
09/03/2019 77,696 77,696 0
10/03/2019 80,316 80,316 0
11/03/2019 73,814 73,814 0
12/03/2019 78,363 78,363 0
13/03/2019 71,262 71,262 0
14/03/2019 68,991 68,991 0
15/03/2019 73,056 73,056 0
16/03/2019 76,588 76,588 0
17/03/2019 69,581 69,581 0
18/03/2019 74,598 74,598 0
19/03/2019 72,102 72,102 0
20/03/2019 72,138 72,138 0
21/03/2019 74,587 74,587 0
22/03/2019 76,588 76,588 0
23/03/2019 72,775 72,775 0
24/03/2019 73,244 73,244 0
25/03/2019 71,987 71,987 0
26/03/2019 72,796 72,796 0
27/03/2019 76,523 76,523 0
28/03/2019 74,420 74,420 0
29/03/2019 73,156 73,156 0
30/03/2019 70,589 70,589 0
31/03/2019 73,391 73,391 0
TOTAL 2,301,440 2,301,440 0
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- UJAAS_I_S_RAJGARH_BIORA_15MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
01/03/2019 59,331 80,419 1,775
02/03/2019 78,615 90,587 4,818
03/03/2019 57,472 56,435 425
04/03/2019 76,355 94,523 4,768
05/03/2019 69,516 53,592 1,453
06/03/2019 39,564 23,865 0
07/03/2019 30,876 19,369 26
08/03/2019 47,396 40,959 0
09/03/2019 93,834 102,481 794
10/03/2019 28,346 10,168 105
11/03/2019 51,983 56,870 4,125
12/03/2019 53,745 45,288 528
13/03/2019 31,658 25,151 0
14/03/2019 39,809 31,389 69
15/03/2019 50,119 50,118 294
16/03/2019 82,314 98,955 2,640
17/03/2019 66,887 54,462 66
18/03/2019 68,190 60,557 2,209
19/03/2019 34,975 25,741 0
20/03/2019 41,919 55,144 1,448
21/03/2019 92,954 77,229 14,984
22/03/2019 46,734 42,691 241
23/03/2019 73,413 55,487 2,390
24/03/2019 40,998 31,705 0
25/03/2019 44,373 40,305 7,532
26/03/2019 49,431 36,139 4
27/03/2019 51,903 45,167 901
28/03/2019 43,409 31,628 9
29/03/2019 29,774 21,650 0
30/03/2019 85,482 103,751 2,301
31/03/2019 134,947 154,856 30,197
TOTAL 1,796,322 1,716,681 84,102
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019
NAME OF QCA :- MANIKARAN
NAME OF POOLING STATION :- WIND_WORLD_II_WIND_33_CHAPDA
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF MARCH - 2019
NAME OF QCA :-NA
NAME OF POOLING STATION :-NTPC LIMITED, RAJGARH (PROJECT UNDER JNSM)
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-03-2019 260500 293635 174
02-03-2019 169250 194198 12227
03-03-2019 213750 218560 5141
04-03-2019 213500 230766 1282
05-03-2019 232750 242129 2697
06-03-2019 248000 280622 230
07-03-2019 254250 279598 210
08-03-2019 245000 269567 186
09-03-2019 254750 290279 8
10-03-2019 234750 265761 87
11-03-2019 213500 250393 2304
12-03-2019 249500 277682 16
13-03-2019 246250 262397 8
14-03-2019 246250 259159 20
15-03-2019 246250 276419 12
16-03-2019 246250 276044 0
17-03-2019 230250 223419 3627
18-03-2019 246250 274484 32
19-03-2019 246250 273747 40
20-03-2019 234750 239001 1999
21-03-2019 246250 286246 61
22-03-2019 246250 261029 69
23-03-2019 246250 271826 76
24-03-2019 246250 266208 93
25-03-2019 246250 247624 229
26-03-2019 246250 272845 154
27-03-2019 246250 272779 235
28-03-2019 246250 261021 68
29-03-2019 246250 264262 150
30-03-2019 246250 266611 194
31-03-2019 246250 270839 162
TOTAL 7440750 8119150 31791
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019
MP-DSM Account of Wind and Solar Pooling Stations for March, 2019

Contenu connexe

Similaire à MP-DSM Account of Wind and Solar Pooling Stations for March, 2019

Presentation MMEPL Business Plan V1 26 07 2016
Presentation MMEPL Business Plan V1 26 07 2016Presentation MMEPL Business Plan V1 26 07 2016
Presentation MMEPL Business Plan V1 26 07 2016
glsomani
 
Andhra Pradesh solar power policy 2012
Andhra Pradesh solar power policy  2012Andhra Pradesh solar power policy  2012
Andhra Pradesh solar power policy 2012
Bakul Haria
 
Intership report akhil joseph
Intership report  akhil josephIntership report  akhil joseph
Intership report akhil joseph
Vinay Vashisht
 

Similaire à MP-DSM Account of Wind and Solar Pooling Stations for March, 2019 (20)

MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
 
New grid connected solar photo voltaic power projects 500 mw capacity under...
New grid connected solar photo voltaic power projects 500   mw capacity under...New grid connected solar photo voltaic power projects 500   mw capacity under...
New grid connected solar photo voltaic power projects 500 mw capacity under...
 
Company profile
Company profileCompany profile
Company profile
 
RFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in PunjabRFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in Punjab
 
Presentation MMEPL Business Plan V1 26 07 2016
Presentation MMEPL Business Plan V1 26 07 2016Presentation MMEPL Business Plan V1 26 07 2016
Presentation MMEPL Business Plan V1 26 07 2016
 
Optimization towards cost effective solar mini grids in bangladesh
Optimization towards cost effective solar mini grids in bangladeshOptimization towards cost effective solar mini grids in bangladesh
Optimization towards cost effective solar mini grids in bangladesh
 
Msedcl aar 2018-19
Msedcl aar 2018-19Msedcl aar 2018-19
Msedcl aar 2018-19
 
Andhra Pradesh solar power policy 2012
Andhra Pradesh solar power policy  2012Andhra Pradesh solar power policy  2012
Andhra Pradesh solar power policy 2012
 
Gujarat SLDC - STATE DEVIATION SETTLEMENT ACCOUNT FOR THE WEEK 29-Jul-2019 ...
Gujarat SLDC - STATE DEVIATION SETTLEMENT ACCOUNT  FOR THE WEEK  29-Jul-2019 ...Gujarat SLDC - STATE DEVIATION SETTLEMENT ACCOUNT  FOR THE WEEK  29-Jul-2019 ...
Gujarat SLDC - STATE DEVIATION SETTLEMENT ACCOUNT FOR THE WEEK 29-Jul-2019 ...
 
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
 
ramakant_23.9.2016 (1)
ramakant_23.9.2016 (1)ramakant_23.9.2016 (1)
ramakant_23.9.2016 (1)
 
Intership report akhil joseph
Intership report  akhil josephIntership report  akhil joseph
Intership report akhil joseph
 
Kpcl notification
Kpcl notificationKpcl notification
Kpcl notification
 
Dc-Dc boost converter topologies and MPPT techniques for Grid connected PV sy...
Dc-Dc boost converter topologies and MPPT techniques for Grid connected PV sy...Dc-Dc boost converter topologies and MPPT techniques for Grid connected PV sy...
Dc-Dc boost converter topologies and MPPT techniques for Grid connected PV sy...
 
Internship Presentation.pptx
Internship Presentation.pptxInternship Presentation.pptx
Internship Presentation.pptx
 
Electrical and Electronics Engineering (EEE Internship presentation
Electrical and Electronics Engineering (EEE Internship presentationElectrical and Electronics Engineering (EEE Internship presentation
Electrical and Electronics Engineering (EEE Internship presentation
 
Solar Presentation
Solar PresentationSolar Presentation
Solar Presentation
 
CURRICULAM VITAE MAHAVIRSINH
CURRICULAM VITAE MAHAVIRSINHCURRICULAM VITAE MAHAVIRSINH
CURRICULAM VITAE MAHAVIRSINH
 
VINEETA MBA PROJECT.docx
VINEETA MBA PROJECT.docxVINEETA MBA PROJECT.docx
VINEETA MBA PROJECT.docx
 
MNRE_Conclave-CP-ppt-Final.pptx
MNRE_Conclave-CP-ppt-Final.pptxMNRE_Conclave-CP-ppt-Final.pptx
MNRE_Conclave-CP-ppt-Final.pptx
 

Plus de Das A. K.

Plus de Das A. K. (20)

Rajasthan SLDC - RE DSM Statement -Jan 2020
Rajasthan SLDC - RE DSM Statement -Jan 2020Rajasthan SLDC - RE DSM Statement -Jan 2020
Rajasthan SLDC - RE DSM Statement -Jan 2020
 
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
 
Rajasthan SLDC - RE DSM Statement -July 2019
Rajasthan SLDC - RE DSM Statement -July 2019Rajasthan SLDC - RE DSM Statement -July 2019
Rajasthan SLDC - RE DSM Statement -July 2019
 
Rajasthan DSM April 2019
Rajasthan DSM April 2019Rajasthan DSM April 2019
Rajasthan DSM April 2019
 
Rajasthan DSM May 2019
Rajasthan DSM May 2019Rajasthan DSM May 2019
Rajasthan DSM May 2019
 
Rajasthan DSM June 2019
Rajasthan DSM June 2019Rajasthan DSM June 2019
Rajasthan DSM June 2019
 
Actual Penalty and Deviation Settlement Mechanism (DSM) Penalty in Interstate...
Actual Penalty and Deviation Settlement Mechanism (DSM) Penalty in Interstate...Actual Penalty and Deviation Settlement Mechanism (DSM) Penalty in Interstate...
Actual Penalty and Deviation Settlement Mechanism (DSM) Penalty in Interstate...
 
Statement Showing the RE DSM (Rajasthan SLDC) for the month of November-2019 ...
Statement Showing the RE DSM (Rajasthan SLDC) for the month of November-2019 ...Statement Showing the RE DSM (Rajasthan SLDC) for the month of November-2019 ...
Statement Showing the RE DSM (Rajasthan SLDC) for the month of November-2019 ...
 
Draft - Rajasthan - SLDC - Deviation Settlement Account (DSM) statement Octob...
Draft - Rajasthan - SLDC - Deviation Settlement Account (DSM) statement Octob...Draft - Rajasthan - SLDC - Deviation Settlement Account (DSM) statement Octob...
Draft - Rajasthan - SLDC - Deviation Settlement Account (DSM) statement Octob...
 
Adjudication of dispute regarding RERC (Forecasting, Scheduling, Deviation Se...
Adjudication of dispute regarding RERC (Forecasting, Scheduling, Deviation Se...Adjudication of dispute regarding RERC (Forecasting, Scheduling, Deviation Se...
Adjudication of dispute regarding RERC (Forecasting, Scheduling, Deviation Se...
 
Rajasthan SLDC - Statement Showing the RE DSM for the month of October-2018 Q...
Rajasthan SLDC - Statement Showing the RE DSM for the month of October-2018 Q...Rajasthan SLDC - Statement Showing the RE DSM for the month of October-2018 Q...
Rajasthan SLDC - Statement Showing the RE DSM for the month of October-2018 Q...
 
Rajasthan SLDC - Statement Showing the RE DSM for the month of November-2018 ...
Rajasthan SLDC - Statement Showing the RE DSM for the month of November-2018 ...Rajasthan SLDC - Statement Showing the RE DSM for the month of November-2018 ...
Rajasthan SLDC - Statement Showing the RE DSM for the month of November-2018 ...
 
Rajasthan SLDC - Statement Showing the RE DSM for the month of December-2018 ...
Rajasthan SLDC - Statement Showing the RE DSM for the month of December-2018 ...Rajasthan SLDC - Statement Showing the RE DSM for the month of December-2018 ...
Rajasthan SLDC - Statement Showing the RE DSM for the month of December-2018 ...
 
Reply to reconnect's defamation notice - One can love it or hate it, but we r...
Reply to reconnect's defamation notice - One can love it or hate it, but we r...Reply to reconnect's defamation notice - One can love it or hate it, but we r...
Reply to reconnect's defamation notice - One can love it or hate it, but we r...
 
normalized parametric model for wind turbine power curve
normalized parametric model for wind turbine power curvenormalized parametric model for wind turbine power curve
normalized parametric model for wind turbine power curve
 
CW / 18587 / 2018 INDIAN WIND POWER ASSOCIATION (RAJASTHAN STATE COUNCIL) Vs....
CW / 18587 / 2018 INDIAN WIND POWER ASSOCIATION (RAJASTHAN STATE COUNCIL) Vs....CW / 18587 / 2018 INDIAN WIND POWER ASSOCIATION (RAJASTHAN STATE COUNCIL) Vs....
CW / 18587 / 2018 INDIAN WIND POWER ASSOCIATION (RAJASTHAN STATE COUNCIL) Vs....
 
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges) 11 m...
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges) 11 m...Mock RE - Gujarat State Deviation Settlement Account (Deviation charges) 11 m...
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges) 11 m...
 
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)
 
Revised Rajasthan DSM Penalty for September 2018 (uploaded on 1st May 2019)
Revised Rajasthan DSM Penalty for September 2018 (uploaded on 1st May 2019)Revised Rajasthan DSM Penalty for September 2018 (uploaded on 1st May 2019)
Revised Rajasthan DSM Penalty for September 2018 (uploaded on 1st May 2019)
 
Revised Rajasthan DSM Penalty for June 2018 (uploaded on 1st May 2019)
Revised Rajasthan DSM Penalty for June 2018 (uploaded on 1st May 2019)Revised Rajasthan DSM Penalty for June 2018 (uploaded on 1st May 2019)
Revised Rajasthan DSM Penalty for June 2018 (uploaded on 1st May 2019)
 

Dernier

FESE Capital Markets Fact Sheet 2024 Q1.pdf
FESE Capital Markets Fact Sheet 2024 Q1.pdfFESE Capital Markets Fact Sheet 2024 Q1.pdf
FESE Capital Markets Fact Sheet 2024 Q1.pdf
MarinCaroMartnezBerg
 
Abortion pills in Doha Qatar (+966572737505 ! Get Cytotec
Abortion pills in Doha Qatar (+966572737505 ! Get CytotecAbortion pills in Doha Qatar (+966572737505 ! Get Cytotec
Abortion pills in Doha Qatar (+966572737505 ! Get Cytotec
Abortion pills in Riyadh +966572737505 get cytotec
 
Junnasandra Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Junnasandra Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Junnasandra Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Junnasandra Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
amitlee9823
 
Call Girls In Shalimar Bagh ( Delhi) 9953330565 Escorts Service
Call Girls In Shalimar Bagh ( Delhi) 9953330565 Escorts ServiceCall Girls In Shalimar Bagh ( Delhi) 9953330565 Escorts Service
Call Girls In Shalimar Bagh ( Delhi) 9953330565 Escorts Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Vip Mumbai Call Girls Marol Naka Call On 9920725232 With Body to body massage...
Vip Mumbai Call Girls Marol Naka Call On 9920725232 With Body to body massage...Vip Mumbai Call Girls Marol Naka Call On 9920725232 With Body to body massage...
Vip Mumbai Call Girls Marol Naka Call On 9920725232 With Body to body massage...
amitlee9823
 
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al Barsha
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al BarshaAl Barsha Escorts $#$ O565212860 $#$ Escort Service In Al Barsha
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al Barsha
AroojKhan71
 
CHEAP Call Girls in Saket (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in Saket (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICECHEAP Call Girls in Saket (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in Saket (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Probability Grade 10 Third Quarter Lessons
Probability Grade 10 Third Quarter LessonsProbability Grade 10 Third Quarter Lessons
Probability Grade 10 Third Quarter Lessons
JoseMangaJr1
 
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 

Dernier (20)

Midocean dropshipping via API with DroFx
Midocean dropshipping via API with DroFxMidocean dropshipping via API with DroFx
Midocean dropshipping via API with DroFx
 
Sampling (random) method and Non random.ppt
Sampling (random) method and Non random.pptSampling (random) method and Non random.ppt
Sampling (random) method and Non random.ppt
 
Call Girls in Sarai Kale Khan Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts S...
Call Girls in Sarai Kale Khan Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts S...Call Girls in Sarai Kale Khan Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts S...
Call Girls in Sarai Kale Khan Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts S...
 
FESE Capital Markets Fact Sheet 2024 Q1.pdf
FESE Capital Markets Fact Sheet 2024 Q1.pdfFESE Capital Markets Fact Sheet 2024 Q1.pdf
FESE Capital Markets Fact Sheet 2024 Q1.pdf
 
April 2024 - Crypto Market Report's Analysis
April 2024 - Crypto Market Report's AnalysisApril 2024 - Crypto Market Report's Analysis
April 2024 - Crypto Market Report's Analysis
 
Abortion pills in Doha Qatar (+966572737505 ! Get Cytotec
Abortion pills in Doha Qatar (+966572737505 ! Get CytotecAbortion pills in Doha Qatar (+966572737505 ! Get Cytotec
Abortion pills in Doha Qatar (+966572737505 ! Get Cytotec
 
Junnasandra Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Junnasandra Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Junnasandra Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Junnasandra Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
Call Girls In Shalimar Bagh ( Delhi) 9953330565 Escorts Service
Call Girls In Shalimar Bagh ( Delhi) 9953330565 Escorts ServiceCall Girls In Shalimar Bagh ( Delhi) 9953330565 Escorts Service
Call Girls In Shalimar Bagh ( Delhi) 9953330565 Escorts Service
 
Vip Mumbai Call Girls Marol Naka Call On 9920725232 With Body to body massage...
Vip Mumbai Call Girls Marol Naka Call On 9920725232 With Body to body massage...Vip Mumbai Call Girls Marol Naka Call On 9920725232 With Body to body massage...
Vip Mumbai Call Girls Marol Naka Call On 9920725232 With Body to body massage...
 
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al Barsha
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al BarshaAl Barsha Escorts $#$ O565212860 $#$ Escort Service In Al Barsha
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al Barsha
 
ALSO dropshipping via API with DroFx.pptx
ALSO dropshipping via API with DroFx.pptxALSO dropshipping via API with DroFx.pptx
ALSO dropshipping via API with DroFx.pptx
 
CebaBaby dropshipping via API with DroFX.pptx
CebaBaby dropshipping via API with DroFX.pptxCebaBaby dropshipping via API with DroFX.pptx
CebaBaby dropshipping via API with DroFX.pptx
 
BabyOno dropshipping via API with DroFx.pptx
BabyOno dropshipping via API with DroFx.pptxBabyOno dropshipping via API with DroFx.pptx
BabyOno dropshipping via API with DroFx.pptx
 
Discover Why Less is More in B2B Research
Discover Why Less is More in B2B ResearchDiscover Why Less is More in B2B Research
Discover Why Less is More in B2B Research
 
Mature dropshipping via API with DroFx.pptx
Mature dropshipping via API with DroFx.pptxMature dropshipping via API with DroFx.pptx
Mature dropshipping via API with DroFx.pptx
 
CHEAP Call Girls in Saket (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in Saket (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICECHEAP Call Girls in Saket (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in Saket (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
 
Probability Grade 10 Third Quarter Lessons
Probability Grade 10 Third Quarter LessonsProbability Grade 10 Third Quarter Lessons
Probability Grade 10 Third Quarter Lessons
 
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Week-01-2.ppt BBB human Computer interaction
Week-01-2.ppt BBB human Computer interactionWeek-01-2.ppt BBB human Computer interaction
Week-01-2.ppt BBB human Computer interaction
 
Predicting Loan Approval: A Data Science Project
Predicting Loan Approval: A Data Science ProjectPredicting Loan Approval: A Data Science Project
Predicting Loan Approval: A Data Science Project
 

MP-DSM Account of Wind and Solar Pooling Stations for March, 2019

  • 1. MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED vkbZ ,l vks : 9001-2008 ISO: 9001-2008 CIN-U40109MP2001SGC014880, Email-mdtransco.nic.in STATE LOAD DESPATCH CENTRE, Nayagaon, Rampur, Jabalpur Telephone: (0761) 2970089 Fax: (0761) 2664343 e-mail sldcmpjbp@gmail.com No.07-05/REG-201/W&S-DSM/154-A/2212 Jabalpur, dtd:- 22.08.2019 As Per Distibrution List Sub: DSM Account of Wind and Solar Pooling Stations for the month of March, 2019 on the basis of MPERC (Forecasting, Scheduling, Deviation Settlement Mechanism and related matters of Wind and Solar Generating Stations) Regulations, 2018. In pursuance to MPERC (Forecasting, Scheduling, Deviation Settlement Mechanism and related matters of Wind and Solar Generating Stations) Regulations, 2018, SLDC has prepared the DSM Account of Wind Pooling Stations having combined installed capacity of 10MW and above and Solar Pooling Stations with an installed capacity of 5MW and above including Wind and Solar Pooling Stations selling InterState and having combined installed capcity less than 10MW and 5 MW. The ABT meter data of the following Pooling Stations has not been received by SLDC neither through AMR nor through mail from concerned Discoms, despite repeated persuance. As such, the actual generation was replaced with scheduled generation and accordingly the Deviation Charges of the Pooling Stations are computed by SLDC during the period of partially missing data. i. 14.97MW UJAAS-I Rajgarh Biora (1rd to 31th March 2019). ii. 14.97MW UJAAS-II Rajgarh Biora (1rd to 31th March 2019). The Generators / Developers / QCA of the following Pooling stations have not furnished the Forecasting and Availability data for the month of March 2019 to the SLDC. As such, SLDC has computed the Deviation Charges of these Pooling Stations considering the Availability and Schedules as “Zero”. i. 11.95MW Wincon Jaora. The Generators of the following Pooling stations have not appoitment QCA, therefore the DSM account is issued to the Developers / Generators for settlement of deviaton charges – i. 50MW NTPC Ltd. Rajgarh. ii. 250MW Mandhsaur Solar PV Power Project (Gujarkhedi). iii. 11.95MW Wincon Jaroa. The ABT meters installed at the following Solar Generating Stations are recording 15 minutes block wise data on sliding window principal instead of load survey, thus, blockwise data does not match with midnight data recorded by the meters. The midnight values are correct; this has been confirmed by M/s Secure Meters Ltd. As such, the monthly midnight data has been distributed in 15 minutes time block as per injection pattern of solar generation and accordingly the Deviation Charges have been computed. i. 12MW Avenger solar pvt Ltd. connected at 132KV S/s Suwasara. ii. 5.1MW Porwal Auto Component connected at 132KV S/s Makdon. iii. 27.3MW AVP Power Infra Pvt. Ltd. connected at 132KV S/s Sonkatchh. iv. 29.4MW Badoni Power Pvt. Ltd. connected at 132KV S/s Maxi. v. 25.2MW Suzlon Gujrat wind Park Pvt. Ltd. Barod connected at 220KV S/s Barod. vi. 4MW Ramesh Steel connected at 220KV S/s Ganjbasoda. The availability and schedule in some block of following pooling station has been considered as Zero due to shutdown in following pooling station – i. 15MW M/s Simcon Feeder- I (From 30th March 2019 to 31st March 2019, 16Hrs and 58Minutes). ii. 11MW M/s Simcon Feeder-II (On 31st March 2019 from 11:00Hrs to 16Hrs and 45 Minutes) - 1 -
  • 2. As per Clause 9.0 of MPERC (Forecasting, Scheduling, Deviation Settlement Mechanism and related matters of Wind and Solar Generating Stations) Regulations, 2018, payment to the DSM Account shall be made within 10 days from the date of issue of this statement. DSM Payments are to be made on the basis of this account only and no further invoicing is required by SLDC. Payment received after 12 days shall attract simple interest @ 0.04% for each day of delay. SLDC shall pay to the entities entitled to receive payment on account of Deviation Charges within 2 working days of receipt of the payments in the “State Deviation Pool Account”. The settlement of Deviation Charges shall be done through State Pool Account maintained by SLDC. The bank account details are as under: 1. Name of the Bank - BANK OF INDIA 2. Branch - CIVIL LINES BRANCH JABALPUR. 3. Title of the Account - MPPTCL SLDC DSM A/C 4. Bank account No - 940220110000263 5. IFS Code - BKID0009402 6. Branch Code - 9402 7. Type of Account - Current Account. All QCA’s / Generators are requested to pay the Deviation Charges to the above State Pool Account maintained by SLDC. The signed copy of the above DSM account alongwith block-wise details are being sent through email. The DSM account shall be also be made available on SLDC website www.sldcmpindia.com shortly for downloading by QCA. The verification, if required, can be done at SLDC. All the QCA’s / Generators are requested to check and verify the State DSM Account and intimate the discrepancies observed if any within a period of 15 days. Chief Engineer (LD) SLDC MPPTCL, Jabalpur - 2 -
  • 3. - 3 - Distribution List 1. The Chief General Manager (Comml-3), Regional Office, MPPMCL, E-4, Arera Colony, Prakash Parisar, Near Bhojpur Club, Bhopal-462016, M.P. Jabalpur. Email – rajeevkeskar@gmail.com 2. The Chief General Manager (Comml.), MPMKVVCL, Govindpura, Bhopal, Email-ce.commercial@mpmkvvc.com, 3. The Chief Engineer (Comml.), MPPaKVVCL, GPH Compound, Polo Ground, Indore, Email- cecomwz@gmail.com, 4. The Chief Financial Officer, MPPTCL, Jabalpur. 5. The Suptdg Engineer (MT-1), Corporate Office, M.P. Pashchim Kshetra Vidyut Vitaran Co. Ltd., GPH Compound, Polo Ground, Indore. Email-achal.jain@mpwz.co.in 6. The General Manager (Comml.-III), O/o MD (CZ) MPMKVVCL, Nistha Parisar., MPMKVVCL, Govindpura, Bhopal, Email-khanooja@gmail.com, mpczc3@gmail.com 7. M/s Malwa Solar Power Generation Pvt Ltd. 4th Floor, Dr. Gopaldas Bhawan, 28, Barakhamba Road, Cannaught Place, New Delhi – 110001, Fax: 0124-4716120. India. Email:keshav.prasad@ilfsindia.com, pradeep.chauhan@ilfsindia.com. 8. M/s WAANPEEP Solar Pvt. Ltd., 602, Western Edge-I, Western Express Highway, Borivali (E), Mumbai-400066, Fax: 022-66444400, Email- kamalmarwah@waaneep.com 9. M/s Focal Renewable Energy Two India Pvt Ltd., 308, third Floor, Rectangle One Building D-4, Commercial Complex, Saket, New Delhi -110017, Fax -011-41704901, Email – kvikas@focal_energy.com 10. M/s Solar EnrgyCorroration Of India, D-3, First Floor , Wing-a, ReligareBuliding, Distrcit Centre , Saket, New Delhi 110017,Fax-011-71989244, Email – corporate@seci.gov.in 11. M/s Manikaran Analytics Ltd., 2nd Floor, D21, Corporate Park, Sector-21, Dwarika, New Delhi – 110075 , Email – contactus@manikarananalytics.in,rakesh@manikarananalytics.in, bd.mp@manikarananalytics.in 12. M/s Reconnect Energy Pvt. Ltd. C-301,Nirvana Courtyard, Nirvana Country Sector 50, Gurgaon 122018 H ,Email – info@reconnectenergy.com, mithun.dubey@reconnectenergy.com,piyush.joshi@reconnectenergy.com 13. M/s Statkraft Markets Private Ltd., 403, 4th Floor, SalconRasvilas Building, Saket District Centre, New Delhi – 110017, Email – anwar.alam@statkraft.com 14. M/s ACME Solar Energy (MP) Private Ltd., Plot No.152, Sector-44, Gurgaon-122002(Haryana), Email – planthead.khilchipur.solar@acme.in 15. M/s Alfa Infraprop Pvt Ltd., NamanMidtown,’A’ Wing, 21st Floor, Senapati Bapat Marg, Elephinstone Road West, Mumbai-400013, Email –Sanjay.Shah@alfainfraprop.com 16. M/s Regent Climate Connect Knowledge Solutions Pvt Ltd., Appt. 215, Green Tower Society, Plot 7 C, Sector-23, Dwarka, New Delhi-110075Email - info@climate-connect.com, Pranav.vohra@climate-connect.com 17. M/s NTPC Ltd., E-1/72, Arera Colony, Bhopal – 462016, M.P. EMAIL:- pbvenkatesh@ntpc.co.in 18. M/s Mandsaur Solar Power Project village Gujjarkhedi Runija Teh Suwasara, District – Mandsaur(M.P.) 458888.Email-mandsaursolarpv@gmail.com 19. M/s M.P. WIND FARM NAGDA HILL, ENERGY TOWER, 64, B-Sector, Kasturba Nagar,Bhopal-462023, Email-info@cecl.in, windpoweindia@gmail.com,mpwlindia@gmail.com 20. M/s PoineerWincomTamaraiTechpark, 7th Floor, S.P. Plot No. 16-20 and 20A, Thiru Vi Ka Industrial Etate,Enerring Road, Guindy, Chainai -600032 ,Email-mp@poineerwincom.com 21. M/s Designco Manufacturer & Exporter, LakriFazalpur, Delhi Road, Moradabad-244001, Email: info@designco-india.com, vivekasthana.79@gmail.com 22. M/s Mittal Processor Pvt. Ltd, 1002-1004, Antriksh Bhawan, 22K. G. Marg, Cannought Place, New Delhi -110001, email – Mayank.gupta@kreatenergy.com, controlroom@mittalgroup.com – (On behalf of M/s Ramesh Steels). 23. M/s Vedenjay Power Pvt Ltd., Plot No.4/F/53, Above BOI-Bank, Nai Sadak, Scheme No.78, B Road, Indore- 452010, Email – vedanjaypower@gmail.com 24. M/s Focal Energy Solar One India Pvt. Ltd. Unit No. 601 & 602, 6 th Floor, Tower B, Emaar Digital Greens Sector 61, Golf Course Ext. Road , Gurgaon 122002 25. M/s Kreate Technologies LLP 1003,10th Floor Anthriksh Bhavan, 22- KG Marg, New Delhi 110001 Email- mithilesh.yadav@kreatetechnologies.com ………
  • 4. All Figures in ` INTRA STATE DEVIATION CHARGES PAYABLE PAYABLE RECEIVABLE FOCAL ENERGY SOLAR ONE INDIA Pvt. Ltd. 52,956 274,935 327,891 40MW_MALWA (IL&FS_Solar) (20,430) (20,430) MANIKARAN ANALYTICS LTD. 7,538,367 (2,572,074) 4,966,293 ACME SOLAR ENERGY PVT. LTD. 40,407 40,407 ALFA INFRAPROP PVT LTD 2,332 2,332 MANDSAUR_SOLAR_POWER_SOLAR_220_GUJARKHEDI 253,011 253,011 NTPC_RAJGARH 31,791 31,791 WINCON_W_JAORA_11.95MW 67,219 67,219 RECONNECT ENERGY SOLUTIONS PVT LTD. 32,617,568 32,617,568 REGENT CLIMATE CONNECT KNOWLEDGE SOLUTIONS PVT. LTD 14,080 14,080 STATKRAFT MARKETS PVT LTD. 2,391,254 2,391,254 KREATE TECHNOLOGIES LLP 12,487 (106,110) (93,623) VEDANJAY POWER 119,308 119,308 TOTAL 43,140,780 274,935 (2,698,614) 40,717,101 () RECEIVABLE Assistant Engineer(LD) Executive Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY QCA / DEVELOPERS / GENERATOR NET DSM RECEIVABLE/PAYABLE INTER STATE DEVIATION CHARGES STATE LOAD DESPATCH CENTRE - JABALPUR QCA WISE SUMMERY REPORT OF DEVIATION CHARGES OF WIND & SOLAR POOLING STATIONS FOR MARCH-2019
  • 5. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 61,021 67,028 -33,026 02/03/2019 49,221 43,113 41,790 03/03/2019 49,014 50,171 -6,341 04/03/2019 52,651 51,794 4,868 05/03/2019 58,950 59,702 -4,028 06/03/2019 60,302 63,995 -20,273 07/03/2019 63,196 63,408 -1,155 08/03/2019 61,197 61,667 -2,571 09/03/2019 60,993 65,130 -22,746 10/03/2019 61,780 60,654 6,208 11/03/2019 58,418 62,813 -24,157 12/03/2019 58,343 64,355 -33,047 13/03/2019 55,243 59,409 -22,780 14/03/2019 57,584 62,449 -26,744 15/03/2019 57,939 63,563 -30,918 16/03/2019 57,795 59,784 -10,432 17/03/2019 53,284 55,173 -9,674 18/03/2019 57,760 61,850 -22,484 19/03/2019 60,769 61,190 -2,303 20/03/2019 56,673 61,190 -24,833 21/03/2019 58,789 65,608 -37,427 22/03/2019 60,030 59,998 185 23/03/2019 58,857 61,032 -11,950 24/03/2019 56,574 59,634 -16,818 25/03/2019 57,162 57,137 195 26/03/2019 56,813 62,490 -31,210 27/03/2019 56,528 62,024 -30,216 28/03/2019 58,099 60,192 -11,498 29/03/2019 58,132 60,411 -12,522 30/03/2019 56,626 60,653 -22,135 31/03/2019 56,624 60,721 -22,484 TOTAL 1,786,367 1,868,338 -440,526 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur NAME OF POOLING STATION :- M/s FOCAL RENEWABLE ENERGY TWO INDIA PVT. LTD. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :-MANIKARAN
  • 6. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 119,201 123,463 -23,430 02/03/2019 80,893 83,458 18,855 03/03/2019 95,340 98,277 -16,144 04/03/2019 113,502 104,177 51,700 05/03/2019 116,262 117,348 -5,323 06/03/2019 123,004 122,029 5,445 07/03/2019 126,713 121,217 30,236 08/03/2019 122,552 117,887 25,668 09/03/2019 121,391 124,629 -17,795 10/03/2019 124,171 116,642 41,420 11/03/2019 119,968 121,232 -6,940 12/03/2019 122,508 123,237 -3,995 13/03/2019 122,647 117,054 31,341 14/03/2019 122,562 120,841 9,476 15/03/2019 123,947 122,013 10,648 16/03/2019 122,942 116,026 38,999 17/03/2019 119,640 108,552 63,647 18/03/2019 119,660 120,400 -4,056 19/03/2019 120,064 119,538 2,904 20/03/2019 118,556 119,088 -2,706 21/03/2019 118,391 128,950 -58,063 22/03/2019 125,698 117,837 43,246 23/03/2019 124,506 121,054 18,996 24/03/2019 122,645 118,497 22,824 25/03/2019 117,591 115,627 10,851 26/03/2019 116,953 125,705 -48,124 27/03/2019 124,857 125,626 -4,216 28/03/2019 126,685 123,721 16,313 29/03/2019 126,639 125,162 8,140 30/03/2019 125,936 126,647 -3,901 31/03/2019 128,817 125,403 18,919 TOTAL 3,714,241 3,671,337 274,935 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur NAME OF POOLING STATION :- M/s FOCAL ENERGY SOLAR ONE INDIA PVT. LTD. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :-FOCAL ENERGY SOLAR ONE INDIA PVT. LTD.
  • 7. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 262,910 291,946 -159,687 02/03/2019 216,408 195,072 165,386 03/03/2019 256,389 238,458 100,032 04/03/2019 244,464 218,270 151,609 05/03/2019 255,637 257,848 -9,916 06/03/2019 257,003 283,632 -146,449 07/03/2019 259,287 275,342 -88,292 08/03/2019 259,864 273,846 -76,889 09/03/2019 259,819 291,122 -172,155 10/03/2019 265,103 272,188 -38,954 11/03/2019 266,636 273,998 -40,478 12/03/2019 266,636 285,986 -106,412 13/03/2019 272,455 271,814 4,370 14/03/2019 272,455 275,896 -18,915 15/03/2019 272,455 284,574 -66,644 16/03/2019 273,944 271,122 16,786 17/03/2019 248,398 220,486 177,592 18/03/2019 273,944 282,594 -47,564 19/03/2019 273,944 275,896 -10,725 20/03/2019 272,402 271,214 6,970 21/03/2019 278,230 295,276 -93,742 22/03/2019 278,230 277,414 4,499 23/03/2019 278,230 280,216 -10,912 24/03/2019 291,115 275,568 86,046 25/03/2019 295,280 267,402 156,377 26/03/2019 291,482 285,392 33,505 27/03/2019 291,482 286,904 25,308 28/03/2019 291,482 276,706 81,447 29/03/2019 291,632 276,478 83,357 30/03/2019 278,349 276,196 12,783 31/03/2019 271,368 278,552 -38,763 TOTAL 8,367,033 8,387,408 -20,430 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur NAME OF POOLING STATION :- M/s Malwa Solar Power Generation Ltd.(IL and FS) STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- NOT QCA APPOINTMENT
  • 8. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 323,992 344,720 -113,992 02/03/2019 319,142 293,420 143,541 03/03/2019 241,689 244,910 -11,514 04/03/2019 280,076 272,920 44,308 05/03/2019 315,892 328,080 -67,026 06/03/2019 313,634 337,390 -130,646 07/03/2019 309,429 323,370 -76,666 08/03/2019 294,172 318,600 -134,339 09/03/2019 297,364 334,090 -201,983 10/03/2019 297,595 314,990 -95,662 11/03/2019 290,521 290,660 -621 12/03/2019 29,974 0 176,325 13/03/2019 271,636 301,120 -161,300 14/03/2019 243,097 227,020 97,852 15/03/2019 287,100 306,300 -105,587 16/03/2019 292,056 320,130 -154,395 17/03/2019 269,975 244,900 147,905 18/03/2019 284,215 320,150 -197,633 19/03/2019 308,164 314,530 -34,998 20/03/2019 287,818 288,610 -2,417 21/03/2019 312,946 328,510 -85,589 22/03/2019 294,969 311,220 -89,368 23/03/2019 282,859 313,200 -166,862 24/03/2019 280,894 310,470 -162,655 25/03/2019 277,401 293,590 -89,027 26/03/2019 280,166 317,470 -205,159 27/03/2019 290,948 317,340 -145,131 28/03/2019 294,381 312,980 -102,284 29/03/2019 288,678 303,250 -80,135 30/03/2019 128,316 120,390 47,140 31/03/2019 115,911 152,230 -173,630 TOTAL 8,405,010 8,806,560 -2,131,548 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur NAME OF POOLING STATION :- M/s WAANEEP Solar Pvt. Ltd STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :-MANIKARAN
  • 9. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 58,690 58,804 1,707 02/03/2019 62,074 45,302 1,558 03/03/2019 44,999 28,632 678 04/03/2019 68,131 58,583 2,792 05/03/2019 49,346 28,845 1,175 06/03/2019 43,770 3,135 0 07/03/2019 41,097 1,596 24 08/03/2019 48,932 36,910 1,201 09/03/2019 65,950 56,721 2,842 10/03/2019 46,811 6,617 0 11/03/2019 68,071 59,062 1,669 12/03/2019 51,349 34,347 2,377 13/03/2019 34,389 4,768 0 14/03/2019 44,738 30,664 827 15/03/2019 67,034 72,900 2,433 16/03/2019 78,939 93,029 6,141 17/03/2019 60,547 38,100 632 18/03/2019 41,329 15,349 83 19/03/2019 39,825 8,496 0 20/03/2019 61,776 37,412 1,819 21/03/2019 51,939 32,330 1,059 22/03/2019 47,145 38,983 2,433 23/03/2019 44,771 13,857 839 24/03/2019 43,358 8,023 0 25/03/2019 52,878 54,233 1,347 26/03/2019 52,247 45,325 2,004 27/03/2019 42,614 21,383 29 28/03/2019 43,092 1,960 0 29/03/2019 53,607 35,472 1,486 30/03/2019 84,811 80,591 1,162 43555 75,916 50,072 1,756 TOTAL 1,670,175 1,101,501 40,073 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- SUZLON_IV_W_JAORA_13.5MW
  • 10. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 73,290 79,674 0 02/03/2019 73,395 67,706 40 03/03/2019 63,884 55,204 1,440 04/03/2019 66,545 61,676 203 05/03/2019 74,066 74,088 549 06/03/2019 73,290 78,294 0 07/03/2019 75,360 75,408 0 08/03/2019 74,778 73,378 0 09/03/2019 73,592 76,548 174 10/03/2019 75,628 73,374 0 11/03/2019 68,701 66,518 50 12/03/2019 73,286 72,592 0 13/03/2019 65,603 70,390 0 14/03/2019 63,017 52,534 1,219 15/03/2019 68,203 70,306 0 16/03/2019 68,966 73,076 373 17/03/2019 66,802 62,290 165 18/03/2019 69,041 74,634 0 19/03/2019 70,602 72,320 0 20/03/2019 66,015 65,662 20 21/03/2019 68,981 75,314 302 22/03/2019 72,446 72,426 0 23/03/2019 69,953 73,090 367 24/03/2019 65,861 67,636 0 25/03/2019 66,738 68,310 0 26/03/2019 64,840 74,522 0 27/03/2019 69,970 75,512 0 28/03/2019 72,010 73,308 0 29/03/2019 70,572 71,780 0 30/03/2019 66,926 71,848 0 43555 66,926 74,996 0 T O T A L 2 1 5 9 2 8 7 2 1 9 4 4 1 4 4 9 0 2 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- M&B_ICHHAWAR-II
  • 11. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 46,082 38,567 793 02/03/2019 47,324 52,357 4,018 03/03/2019 51,222 53,931 440 04/03/2019 62,907 79,613 8,453 05/03/2019 47,154 41,103 1,514 06/03/2019 30,476 17,654 37 07/03/2019 33,446 21,922 359 08/03/2019 42,312 47,072 4,046 09/03/2019 64,250 72,486 6,124 10/03/2019 33,542 10,650 2 11/03/2019 39,849 42,431 7,258 12/03/2019 53,649 54,299 5,771 13/03/2019 37,033 22,435 0 14/03/2019 48,332 37,796 1,452 15/03/2019 59,806 72,856 4,328 16/03/2019 69,746 71,763 1,281 17/03/2019 60,064 54,777 1,278 18/03/2019 40,623 26,819 343 19/03/2019 38,179 6,323 0 20/03/2019 64,622 52,925 2,059 21/03/2019 62,412 54,759 3,767 22/03/2019 41,243 24,366 1,860 23/03/2019 45,746 31,905 63 24/03/2019 40,516 15,796 0 25/03/2019 48,595 43,873 1,493 26/03/2019 49,186 44,292 4,902 27/03/2019 45,934 34,071 181 28/03/2019 40,684 10,889 0 29/03/2019 51,872 53,925 5,568 30/03/2019 104,979 124,555 6,500 43555 88,565 92,185 5,056 TOTAL 1,590,350 1,408,395 78,946 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- WIND WORLD AGAR-I
  • 12. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 56,379 69,230 5,357 02/03/2019 58,204 52,025 1,570 03/03/2019 44,241 33,072 542 04/03/2019 65,142 64,497 2,060 05/03/2019 49,684 35,939 5,457 06/03/2019 42,497 4,189 366 07/03/2019 35,822 1,585 0 08/03/2019 49,683 37,429 876 09/03/2019 70,029 54,642 349 10/03/2019 41,894 7,152 0 11/03/2019 66,799 63,666 1,566 12/03/2019 51,084 36,165 3,912 13/03/2019 32,301 4,382 0 14/03/2019 42,510 31,113 415 15/03/2019 68,517 73,267 1,982 16/03/2019 81,238 94,880 5,539 17/03/2019 55,038 41,754 1,954 18/03/2019 39,621 15,999 115 19/03/2019 39,054 13,503 176 20/03/2019 58,439 10,196 13,413 21/03/2019 51,563 27,555 4,031 22/03/2019 45,334 41,046 3,589 23/03/2019 42,218 16,903 1,316 24/03/2019 40,074 12,049 32 25/03/2019 58,797 49,546 1,941 26/03/2019 52,316 50,771 6,773 27/03/2019 41,083 26,116 3 28/03/2019 38,185 3,710 0 29/03/2019 52,942 40,626 2,942 30/03/2019 82,778 83,954 1,525 43555 66,700 47,275 981 TOTAL 1,620,166 1,144,236 68,782 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- SUZLON_V_W_JAORA_12MW
  • 13. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 329,991 371,340 0 02/03/2019 334,343 328,270 0 03/03/2019 316,587 305,320 9,583 04/03/2019 306,978 299,950 1,150 05/03/2019 338,067 370,590 0 06/03/2019 333,980 363,850 0 07/03/2019 341,847 370,470 0 08/03/2019 339,174 351,170 0 09/03/2019 341,880 337,900 7,792 10/03/2019 340,737 368,090 0 11/03/2019 332,873 348,080 529 12/03/2019 340,644 360,370 0 13/03/2019 323,999 323,140 2,890 14/03/2019 322,356 307,600 4,740 15/03/2019 324,057 326,750 1,066 16/03/2019 332,001 354,020 0 17/03/2019 320,692 326,220 3,613 18/03/2019 328,013 366,010 0 19/03/2019 348,797 369,260 0 20/03/2019 337,243 357,890 0 21/03/2019 347,616 377,550 0 22/03/2019 347,112 389,050 0 23/03/2019 338,727 376,150 0 24/03/2019 347,067 370,090 0 25/03/2019 348,048 361,390 0 26/03/2019 348,590 382,890 0 27/03/2019 348,887 387,460 0 28/03/2019 349,956 375,330 0 29/03/2019 354,783 375,960 0 30/03/2019 340,629 369,860 0 43555 347,842 372,160 0 TOTAL 10,453,516 11,044,180 31,363 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- SKY_POWER_SOLAR_132_CHHEGAON
  • 14. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 238,506 264,694 3,703 02/03/2019 307,844 263,566 548 03/03/2019 228,114 214,270 904 04/03/2019 297,357 333,869 8,521 05/03/2019 271,686 224,434 1,640 06/03/2019 218,232 97,589 0 07/03/2019 209,274 79,224 0 08/03/2019 221,690 165,007 567 09/03/2019 367,347 414,706 2,247 10/03/2019 210,693 40,368 2 11/03/2019 252,725 243,364 2,268 12/03/2019 198,848 189,906 11,894 13/03/2019 196,602 99,971 0 14/03/2019 207,789 137,746 2 15/03/2019 210,688 198,376 790 16/03/2019 356,533 377,359 10,125 17/03/2019 258,295 243,889 3,342 18/03/2019 259,881 226,394 5,328 19/03/2019 187,476 82,628 136 20/03/2019 229,362 172,301 5,541 21/03/2019 295,884 321,848 24,507 22/03/2019 250,304 182,714 4,347 23/03/2019 305,707 237,927 1,905 24/03/2019 189,958 115,956 0 25/03/2019 199,567 164,408 5,161 26/03/2019 199,133 165,195 0 27/03/2019 249,250 185,888 4,209 28/03/2019 221,783 128,008 1,728 29/03/2019 197,093 83,665 0 30/03/2019 346,274 423,782 16,831 43555 541,199 610,547 44,217 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- WIND_WORLD_III_WIND_132_CHAPDA
  • 15. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 208,662 229,360 35,300 02/03/2019 265,336 295,850 25,558 03/03/2019 184,423 196,537 16,133 04/03/2019 198,577 212,786 28,921 05/03/2019 185,915 166,021 12,869 06/03/2019 105,424 62,975 3,075 07/03/2019 115,127 99,981 25,394 08/03/2019 214,173 262,724 19,837 09/03/2019 226,153 220,880 5,180 10/03/2019 108,016 55,331 9,354 11/03/2019 177,916 187,694 12,403 12/03/2019 192,305 172,293 4,903 13/03/2019 102,867 73,712 1,953 14/03/2019 121,726 81,595 10,469 15/03/2019 213,016 283,619 55,183 16/03/2019 282,119 296,200 32,265 17/03/2019 229,579 234,969 22,705 18/03/2019 152,080 135,134 6,477 19/03/2019 93,232 26,688 230 20/03/2019 199,326 172,627 14,531 21/03/2019 204,113 154,906 1,294 22/03/2019 97,922 98,794 15,933 23/03/2019 180,139 158,703 2,225 24/03/2019 108,929 45,676 3,120 25/03/2019 179,570 145,132 18,451 26/03/2019 186,804 166,529 63,609 27/03/2019 162,935 154,098 4,984 28/03/2019 102,770 44,225 0 29/03/2019 127,212 141,855 28,940 30/03/2019 265,179 285,880 19,774 43555 227,114 194,793 25,000 TOTAL 5,418,659 5,057,567 526,070 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- SUZLON_GUJRAT_WIND_33_BADOD
  • 16. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 346,231 391,550 0 02/03/2019 292,943 218,700 35,274 03/03/2019 231,105 222,320 13,026 04/03/2019 278,547 270,680 4,594 05/03/2019 291,910 316,400 3,344 06/03/2019 356,265 374,170 0 07/03/2019 355,716 373,300 0 08/03/2019 350,803 362,440 0 09/03/2019 354,398 373,950 0 10/03/2019 355,049 360,890 0 11/03/2019 333,392 348,010 0 12/03/2019 352,198 380,460 0 13/03/2019 345,422 353,720 0 14/03/2019 330,955 299,850 6,799 15/03/2019 337,930 373,590 353 16/03/2019 323,057 354,510 1,586 17/03/2019 325,850 329,610 2,539 18/03/2019 350,122 391,430 0 19/03/2019 346,518 381,870 0 20/03/2019 348,874 360,140 4,809 21/03/2019 353,674 397,330 0 22/03/2019 351,734 376,350 0 23/03/2019 360,046 389,980 0 24/03/2019 361,604 383,390 0 25/03/2019 351,616 359,050 0 26/03/2019 361,508 389,890 0 27/03/2019 361,657 392,780 183 28/03/2019 361,625 386,130 0 29/03/2019 362,851 389,920 0 30/03/2019 363,036 386,290 0 43555 363,200 387,890 0 TOTAL 10,559,836 11,076,590 72,507 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- RENEW_CLEAN_SOLAR_132_KOTHIYA
  • 17. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 32,504 35,091 0 02/03/2019 29,189 29,184 1,009 03/03/2019 26,300 25,149 695 04/03/2019 28,711 28,551 378 05/03/2019 30,871 33,515 45 06/03/2019 32,504 34,164 0 07/03/2019 33,274 33,552 0 08/03/2019 31,614 32,245 0 09/03/2019 31,096 34,164 35 10/03/2019 31,810 31,835 0 11/03/2019 29,801 29,017 456 12/03/2019 31,825 32,587 12 13/03/2019 32,296 31,213 0 14/03/2019 28,219 25,265 634 15/03/2019 30,261 32,515 41 16/03/2019 31,349 32,815 0 17/03/2019 27,747 27,868 416 18/03/2019 30,041 32,614 9 19/03/2019 28,939 31,725 42 20/03/2019 29,120 28,134 909 21/03/2019 31,010 33,437 0 22/03/2019 31,178 31,954 0 23/03/2019 30,353 32,048 0 24/03/2019 29,704 31,632 0 25/03/2019 29,217 29,861 47 26/03/2019 29,661 32,496 0 27/03/2019 29,962 33,225 29 28/03/2019 30,982 32,562 0 29/03/2019 29,389 31,958 0 30/03/2019 30,430 31,824 192 43555 30,430 33,433 7 TOTAL 939,787 975,633 4,956 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- DESIGNCO_MANF_EXP_1_S_ARNIYAKALA_5MW
  • 18. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 69,329 74,745 0 02/03/2019 55,476 50,311 5,015 03/03/2019 64,622 61,749 96 04/03/2019 63,197 62,910 199 05/03/2019 67,833 66,882 431 06/03/2019 69,329 72,332 0 07/03/2019 70,964 70,961 0 08/03/2019 68,264 69,304 0 09/03/2019 67,140 74,119 0 10/03/2019 68,812 69,028 0 11/03/2019 63,276 68,920 0 12/03/2019 70,266 72,158 0 13/03/2019 70,710 67,910 176 14/03/2019 67,168 69,671 0 15/03/2019 67,797 72,267 0 16/03/2019 66,208 68,894 145 17/03/2019 58,975 58,562 1,259 18/03/2019 66,327 70,206 0 19/03/2019 65,791 69,096 0 20/03/2019 66,564 68,033 0 21/03/2019 66,771 66,801 50 22/03/2019 69,281 67,200 0 23/03/2019 68,212 67,746 0 24/03/2019 64,765 66,715 0 25/03/2019 64,422 64,381 8 26/03/2019 66,891 69,479 0 27/03/2019 62,706 70,187 0 28/03/2019 67,623 67,171 0 29/03/2019 61,787 67,869 0 30/03/2019 61,292 67,973 0 43555 62,899 69,633 0 TOTAL 2,044,697 2,103,213 7,379 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- M&B_BAROD_II
  • 19. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 30,000 35,374 0 02/03/2019 30,000 29,700 29 03/03/2019 30,000 30,688 0 04/03/2019 30,000 29,475 159 05/03/2019 30,000 32,372 58 06/03/2019 30,000 33,977 0 07/03/2019 30,000 33,469 0 08/03/2019 30,000 32,649 0 09/03/2019 30,000 35,313 0 10/03/2019 30,000 32,397 0 11/03/2019 30,000 31,678 0 12/03/2019 30,000 34,246 0 13/03/2019 30,000 33,166 0 14/03/2019 30,000 32,522 0 15/03/2019 30,000 34,514 0 16/03/2019 30,000 33,984 0 17/03/2019 30,000 31,311 10 18/03/2019 30,000 33,738 0 19/03/2019 30,000 32,909 0 20/03/2019 30,000 31,553 79 21/03/2019 30,000 35,833 20 22/03/2019 30,000 33,588 0 23/03/2019 30,000 33,594 0 24/03/2019 30,000 32,870 0 25/03/2019 30,000 31,454 62 26/03/2019 30,000 34,292 0 27/03/2019 30,000 34,616 24 28/03/2019 30,000 33,894 12 29/03/2019 30,000 32,905 3 30/03/2019 30,000 19,466 5,703 43555 30,000 33,709 3 TOTAL 930,000 1,011,256 6,162 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- PORWAL_AUTO_MAKDON
  • 20. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 63,932 67,832 0 02/03/2019 46,554 43,205 11,718 03/03/2019 47,004 50,782 166 04/03/2019 59,422 52,696 866 05/03/2019 60,164 61,095 244 06/03/2019 62,653 64,777 0 07/03/2019 62,756 64,384 0 08/03/2019 62,063 62,047 0 09/03/2019 60,645 65,885 0 10/03/2019 62,136 61,437 0 11/03/2019 62,352 63,507 0 12/03/2019 64,398 64,879 0 13/03/2019 62,109 60,391 230 14/03/2019 63,922 63,553 0 15/03/2019 61,485 64,342 0 16/03/2019 64,266 60,684 1,055 17/03/2019 52,786 55,742 961 18/03/2019 57,760 62,806 0 19/03/2019 61,102 62,078 0 20/03/2019 63,107 61,698 80 21/03/2019 63,283 66,652 0 22/03/2019 62,880 60,802 0 23/03/2019 63,214 61,465 0 24/03/2019 60,224 60,048 0 25/03/2019 58,290 58,034 0 26/03/2019 59,216 63,331 0 27/03/2019 62,774 62,724 6 28/03/2019 60,957 60,753 0 29/03/2019 60,737 60,458 0 30/03/2019 58,698 60,908 0 43555 57,524 60,633 9 TOTAL 1,868,413 1,889,628 15,335 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- FOCAL_PHOTOVOLTAIC_10MW
  • 21. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 106,118 79,880 4,357 02/03/2019 106,085 25,711 38,318 03/03/2019 79,484 56,982 4,637 04/03/2019 103,322 68,421 7,539 05/03/2019 52,244 47,418 4,581 06/03/2019 56,593 11,492 5,833 07/03/2019 53,227 15,918 1,604 08/03/2019 51,454 39,137 479 09/03/2019 135,008 97,109 16,915 10/03/2019 46,559 6,467 1,563 11/03/2019 86,891 54,205 18,312 12/03/2019 82,526 34,937 7,097 13/03/2019 41,886 9,523 12 14/03/2019 66,518 32,651 2,924 15/03/2019 85,766 47,931 6,396 16/03/2019 99,863 75,153 1,780 17/03/2019 88,778 45,377 7,083 18/03/2019 103,901 49,653 13,113 19/03/2019 35,186 12,697 703 20/03/2019 69,612 44,531 1,990 21/03/2019 84,581 63,963 819 22/03/2019 56,076 28,931 3,963 23/03/2019 95,543 51,593 6,265 24/03/2019 59,753 27,635 415 25/03/2019 67,054 29,820 8,385 26/03/2019 54,369 30,909 4,242 27/03/2019 77,995 36,081 3,393 28/03/2019 46,008 16,264 0 29/03/2019 48,850 21,144 404 30/03/2019 110,455 93,607 731 43555 117,625 124,456 8,354 TOTAL 2,369,330 1,379,596 182,207 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- MP_WIND_FARM_NAGDA_HILL_WIND_33_DEWAS
  • 22. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 106,773 114,695 0 02/03/2019 85,008 72,651 11,217 03/03/2019 94,470 89,656 0 04/03/2019 97,975 94,936 108 05/03/2019 99,298 98,077 18 06/03/2019 106,773 109,286 0 07/03/2019 108,070 106,786 0 08/03/2019 98,673 104,502 0 09/03/2019 99,645 112,024 0 10/03/2019 101,838 103,688 0 11/03/2019 102,766 105,027 0 12/03/2019 104,403 109,223 0 13/03/2019 104,798 103,003 0 14/03/2019 99,657 105,099 0 15/03/2019 101,752 108,379 0 16/03/2019 98,702 102,236 1 17/03/2019 86,084 89,120 1,137 18/03/2019 98,676 106,077 0 19/03/2019 94,828 104,679 0 20/03/2019 101,977 103,673 0 21/03/2019 102,497 113,574 0 22/03/2019 101,752 105,571 0 23/03/2019 101,590 106,518 0 24/03/2019 100,386 104,171 0 25/03/2019 99,859 100,103 7 26/03/2019 100,092 107,745 0 27/03/2019 100,397 108,453 0 28/03/2019 101,283 101,855 161 29/03/2019 99,224 103,960 0 30/03/2019 96,214 104,050 0 43555 96,214 105,324 0 TOTAL 3,091,674 3,204,141 12,649 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- TODAY_CLEAN_SOLAR_33KV_BAROD
  • 23. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 326,700 356,290 612 02/03/2019 261,202 214,140 46,195 03/03/2019 263,478 263,680 531 04/03/2019 288,127 287,020 810 05/03/2019 307,223 329,160 837 06/03/2019 317,183 339,540 553 07/03/2019 341,638 340,410 101 08/03/2019 317,486 331,400 0 09/03/2019 330,288 353,700 312 10/03/2019 336,640 330,160 0 11/03/2019 328,597 345,480 0 12/03/2019 337,775 352,710 458 13/03/2019 332,924 325,090 6,085 14/03/2019 330,354 348,790 0 15/03/2019 330,908 350,790 138 16/03/2019 331,718 328,040 7,114 17/03/2019 280,022 296,200 5,400 18/03/2019 335,349 349,170 410 19/03/2019 333,339 346,760 0 20/03/2019 337,121 356,330 292 21/03/2019 343,171 376,200 723 22/03/2019 347,640 346,140 172 23/03/2019 342,147 350,660 0 24/03/2019 337,450 346,500 75 25/03/2019 324,859 330,550 1,961 26/03/2019 333,805 363,690 55 27/03/2019 357,000 363,380 153 28/03/2019 342,105 355,410 75 29/03/2019 321,783 356,820 53 30/03/2019 329,711 360,270 62 43555 333,168 358,760 744 TOTAL 10,080,911 10,453,240 73,921 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- SEIL_SITARA_SITAMAU_50MW
  • 24. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 49,271 55,758 1,142 02/03/2019 72,401 79,467 3,661 03/03/2019 60,811 61,798 224 04/03/2019 60,137 76,654 6,090 05/03/2019 60,623 45,202 2,087 06/03/2019 49,927 22,294 0 07/03/2019 50,110 30,832 783 08/03/2019 68,675 67,911 504 09/03/2019 75,177 83,863 2,731 10/03/2019 49,133 16,005 0 11/03/2019 75,995 71,393 3,518 12/03/2019 73,179 56,661 2,126 13/03/2019 42,224 22,019 0 14/03/2019 51,892 44,106 2,511 15/03/2019 64,344 72,414 1,437 16/03/2019 56,739 60,002 937 17/03/2019 47,659 45,055 733 18/03/2019 36,418 28,553 0 19/03/2019 26,184 5,658 56 20/03/2019 64,556 57,228 4,986 21/03/2019 65,098 45,001 612 22/03/2019 52,982 30,341 206 23/03/2019 49,825 36,063 0 24/03/2019 34,352 14,270 0 25/03/2019 38,670 32,905 1,038 26/03/2019 50,650 34,643 2,299 27/03/2019 34,864 33,699 3 28/03/2019 30,165 11,986 2 29/03/2019 41,928 43,679 1,230 30/03/2019 96,974 114,985 3,672 43555 90,568 84,570 1,818 TOTAL 1,721,531 1,485,015 44,406 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- WIND_WORLD-II_33_AGAR_15.2MW
  • 25. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 45,645 45,645 0 02/03/2019 37,225 37,225 0 03/03/2019 36,179 36,179 0 04/03/2019 40,606 40,606 0 05/03/2019 43,203 43,203 0 06/03/2019 43,364 43,364 0 07/03/2019 47,299 47,299 0 08/03/2019 44,939 44,939 0 09/03/2019 45,044 45,044 0 10/03/2019 45,771 45,771 0 11/03/2019 42,091 42,091 0 12/03/2019 45,360 45,360 0 13/03/2019 41,816 41,816 0 14/03/2019 40,993 40,993 0 15/03/2019 44,086 44,086 0 16/03/2019 46,311 46,311 0 17/03/2019 42,512 42,512 0 18/03/2019 45,497 45,497 0 19/03/2019 44,761 44,761 0 20/03/2019 44,512 44,512 0 21/03/2019 45,498 45,498 0 22/03/2019 46,311 46,311 0 23/03/2019 44,006 44,006 0 24/03/2019 44,942 44,942 0 25/03/2019 44,239 44,239 0 26/03/2019 44,610 44,610 0 27/03/2019 46,787 46,787 0 28/03/2019 45,481 45,481 0 29/03/2019 42,704 42,704 0 30/03/2019 43,786 43,786 0 43555 44,253 44,253 0 TOTAL 1,359,831 1,359,831 0 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- UJAAS_II_S_RAJGARH_BIORA_15MW
  • 26. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 83,479 88,648 0 02/03/2019 82,182 75,494 165 03/03/2019 67,237 61,820 1,516 04/03/2019 69,984 68,600 151 05/03/2019 79,763 85,416 0 06/03/2019 83,479 87,028 0 07/03/2019 83,963 84,966 0 08/03/2019 83,420 83,158 0 09/03/2019 82,272 85,074 0 10/03/2019 84,144 81,904 0 11/03/2019 72,872 75,288 310 12/03/2019 82,035 81,600 152 13/03/2019 73,676 79,192 0 14/03/2019 69,475 59,074 1,547 15/03/2019 75,108 78,486 0 16/03/2019 77,488 83,468 0 17/03/2019 76,799 69,840 479 18/03/2019 77,658 83,258 0 19/03/2019 75,921 81,444 0 20/03/2019 74,126 72,598 0 21/03/2019 77,592 85,284 0 22/03/2019 76,030 80,888 0 23/03/2019 78,563 81,498 0 24/03/2019 74,485 80,880 0 25/03/2019 74,516 74,178 427 26/03/2019 73,038 83,592 0 27/03/2019 78,612 84,702 0 28/03/2019 80,889 81,806 0 29/03/2019 73,534 79,212 0 30/03/2019 73,395 79,494 0 43555 73,395 81,870 0 TOTAL 2,389,130 2,459,760 4,747 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- M&B_ICHHAWAR-I
  • 27. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 46,899 50,281 866 02/03/2019 71,146 71,365 2,765 03/03/2019 55,362 58,913 844 04/03/2019 66,525 70,902 5,141 05/03/2019 59,144 48,384 2,211 06/03/2019 50,360 21,130 0 07/03/2019 48,898 30,180 857 08/03/2019 61,212 65,869 577 09/03/2019 78,289 83,400 2,707 10/03/2019 50,430 14,578 0 11/03/2019 75,677 65,967 3,832 12/03/2019 72,630 59,377 2,175 13/03/2019 40,060 20,784 0 14/03/2019 49,870 41,197 2,295 15/03/2019 61,653 75,013 1,308 16/03/2019 59,732 64,732 274 17/03/2019 48,927 49,267 1,440 18/03/2019 35,159 27,668 132 19/03/2019 25,502 6,117 17 20/03/2019 66,346 54,175 3,346 21/03/2019 64,090 49,221 460 22/03/2019 50,333 30,529 289 23/03/2019 48,992 34,471 0 24/03/2019 30,655 14,024 50 25/03/2019 37,082 35,651 1,413 26/03/2019 47,502 38,105 4,152 27/03/2019 33,528 31,062 34 28/03/2019 27,537 11,528 60 29/03/2019 34,987 36,683 945 30/03/2019 87,555 104,869 2,935 43555 88,268 84,976 553 TOTAL 1,674,350 1,450,418 41,678 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- WIND_WORLD-III_33_AGAR_14.4MW
  • 28. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 61,906 68,954 0 02/03/2019 61,829 60,973 0 03/03/2019 43,477 45,222 2,972 04/03/2019 58,366 59,216 0 05/03/2019 61,961 64,458 0 06/03/2019 61,906 65,255 0 07/03/2019 64,863 67,104 0 08/03/2019 63,022 64,863 0 09/03/2019 60,640 64,536 0 10/03/2019 63,068 64,891 0 11/03/2019 59,353 61,905 54 12/03/2019 62,921 63,466 0 13/03/2019 61,688 57,534 1,507 14/03/2019 43,857 36,550 4,024 15/03/2019 51,754 49,404 2,056 16/03/2019 59,241 61,528 7 17/03/2019 51,812 52,735 53 18/03/2019 59,645 62,647 0 19/03/2019 60,917 63,390 0 20/03/2019 54,928 52,464 4,860 21/03/2019 59,050 63,313 0 22/03/2019 60,554 64,197 0 23/03/2019 60,554 63,758 0 24/03/2019 59,165 63,540 0 25/03/2019 56,370 60,258 0 26/03/2019 57,021 62,134 0 27/03/2019 60,794 65,598 0 28/03/2019 59,950 62,654 0 29/03/2019 59,226 60,954 0 30/03/2019 55,848 58,651 0 43555 55,286 57,302 0 TOTAL 1,810,972 1,869,454 15,533 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- BHARAT_ELECTRONICS_LTD_OFI_S_ITARSI_10MW
  • 29. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 1,285,219 1,821,110 329,980 02/03/2019 1,751,843 1,663,530 38,915 03/03/2019 1,062,159 1,149,830 36,627 04/03/2019 1,094,588 1,295,450 150,827 05/03/2019 1,058,287 827,900 92,243 06/03/2019 599,789 84,590 8,969 07/03/2019 579,376 69,020 3,549 08/03/2019 691,390 485,960 0 09/03/2019 1,062,189 817,780 33,257 10/03/2019 562,705 193,960 2,594 11/03/2019 1,147,159 1,205,970 59,382 12/03/2019 877,772 739,180 10,699 13/03/2019 525,025 133,180 3,933 14/03/2019 667,385 427,890 79,296 15/03/2019 1,379,609 1,661,470 317,641 16/03/2019 1,821,008 2,118,290 266,025 17/03/2019 1,568,864 1,432,430 107,094 18/03/2019 855,082 546,090 19,400 19/03/2019 628,485 367,510 15,754 20/03/2019 999,475 833,170 40,486 21/03/2019 863,770 545,860 13,619 22/03/2019 784,892 750,600 27,688 23/03/2019 1,082,592 709,940 27,995 24/03/2019 595,584 398,170 8,873 25/03/2019 912,481 984,580 30,918 26/03/2019 1,046,154 907,570 215,729 27/03/2019 880,586 605,710 23,513 28/03/2019 550,580 244,460 10,282 29/03/2019 764,058 619,770 1,444 30/03/2019 1,316,509 1,093,560 31,450 43555 1,247,794 997,670 175,753 TOTAL 30,262,409 25,732,200 2,183,935 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- KSHEMA_295.3MW_AMBA
  • 30. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 73,972 78,379 0 02/03/2019 59,480 53,006 4,898 03/03/2019 66,102 67,863 0 04/03/2019 67,507 68,274 123 05/03/2019 72,334 74,239 120 06/03/2019 73,972 78,791 0 07/03/2019 77,079 77,203 0 08/03/2019 73,453 75,048 0 09/03/2019 72,773 78,734 516 10/03/2019 74,452 74,682 0 11/03/2019 68,730 75,183 0 12/03/2019 74,286 78,453 0 13/03/2019 73,877 73,883 150 14/03/2019 72,823 75,751 0 15/03/2019 72,743 78,576 0 16/03/2019 70,864 75,261 130 17/03/2019 65,024 63,004 991 18/03/2019 71,342 75,885 0 19/03/2019 71,571 74,674 0 20/03/2019 71,619 74,566 0 21/03/2019 74,700 80,390 0 22/03/2019 75,754 75,282 0 23/03/2019 75,319 75,899 0 24/03/2019 71,727 73,759 0 25/03/2019 68,851 68,833 0 26/03/2019 70,584 75,791 0 27/03/2019 70,452 77,375 0 28/03/2019 73,327 74,231 0 29/03/2019 67,548 74,656 0 30/03/2019 67,694 74,833 0 43555 70,948 76,520 0 TOTAL 2,210,907 2,299,024 6,928 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- M&B_BAROD
  • 31. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 1,174,715 1,225,950 137,194 02/03/2019 1,350,838 1,204,560 90,188 03/03/2019 976,044 661,570 59,296 04/03/2019 970,220 1,121,920 116,542 05/03/2019 1,037,564 890,790 76,736 06/03/2019 688,353 324,380 4,782 07/03/2019 723,130 430,580 30,938 08/03/2019 861,198 700,540 8,423 09/03/2019 1,408,904 1,556,100 132,740 10/03/2019 584,979 30,070 36,724 11/03/2019 953,717 777,330 90,733 12/03/2019 854,298 766,320 36,637 13/03/2019 520,961 252,170 919 14/03/2019 766,076 549,240 35,081 15/03/2019 637,037 741,410 76,515 16/03/2019 968,202 1,141,480 123,819 17/03/2019 1,092,506 1,092,090 31,605 18/03/2019 875,317 720,370 18,645 19/03/2019 574,160 193,260 12,517 20/03/2019 792,762 680,320 18,734 21/03/2019 1,336,083 1,257,330 146,360 22/03/2019 665,876 517,860 156,404 23/03/2019 1,005,249 719,370 21,292 24/03/2019 642,966 347,100 1,631 25/03/2019 599,241 501,180 14,196 26/03/2019 619,579 654,950 109,580 27/03/2019 863,157 636,650 23,907 28/03/2019 570,885 296,320 0 29/03/2019 544,082 400,920 104,549 30/03/2019 1,455,735 1,456,560 73,852 43555 1,647,200 1,662,150 118,117 TOTAL 27,761,034 23,510,840 1,908,656 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- GAMESHA_SHAJAPUR
  • 32. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 47,861 61,301 2,508 02/03/2019 71,481 81,866 1,751 03/03/2019 59,654 63,117 3,294 04/03/2019 67,488 71,462 1,307 05/03/2019 56,407 55,431 531 06/03/2019 50,013 21,945 0 07/03/2019 48,907 21,040 0 08/03/2019 63,427 77,610 1,284 09/03/2019 73,144 92,195 1,763 10/03/2019 53,271 17,963 242 11/03/2019 73,530 57,074 2,383 12/03/2019 60,137 66,017 1,461 13/03/2019 39,027 29,861 38 14/03/2019 48,388 38,762 1,403 15/03/2019 60,289 64,115 674 16/03/2019 74,944 87,368 5,540 17/03/2019 72,307 65,505 2,227 18/03/2019 49,451 47,892 1,061 19/03/2019 40,273 16,964 326 20/03/2019 64,182 42,182 1,299 21/03/2019 63,883 63,524 1,991 22/03/2019 50,365 25,637 1,955 23/03/2019 49,315 37,267 67 24/03/2019 45,353 17,881 69 25/03/2019 53,413 44,108 1,402 26/03/2019 52,792 50,978 6,983 27/03/2019 46,117 40,387 0 28/03/2019 43,882 13,705 0 29/03/2019 54,663 47,469 95 30/03/2019 58,089 73,123 9,934 43555 68,154 54,640 2,028 TOTAL 1,760,207 1,548,389 53,616 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- WIND_WORLD-IV_33_SUSNER_14.4MW
  • 33. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 81,317 88,053 0 02/03/2019 70,709 71,406 655 03/03/2019 66,527 70,016 217 04/03/2019 68,867 67,105 976 05/03/2019 81,314 83,570 0 06/03/2019 81,314 85,688 0 07/03/2019 81,961 84,107 0 08/03/2019 76,520 82,089 0 09/03/2019 76,491 88,011 0 10/03/2019 77,480 81,312 0 11/03/2019 73,501 73,851 305 12/03/2019 78,278 84,942 0 13/03/2019 78,870 81,122 0 14/03/2019 74,498 78,549 0 15/03/2019 78,158 85,006 0 16/03/2019 78,580 84,965 0 17/03/2019 71,810 74,765 312 18/03/2019 76,311 84,612 0 19/03/2019 77,546 82,846 0 20/03/2019 79,561 70,557 3,808 21/03/2019 80,396 88,692 0 22/03/2019 80,945 81,921 1,338 23/03/2019 80,963 82,992 0 24/03/2019 80,251 82,477 0 25/03/2019 76,840 77,095 0 26/03/2019 78,327 85,726 0 27/03/2019 82,791 86,986 0 28/03/2019 82,196 84,680 0 29/03/2019 76,257 82,264 0 30/03/2019 76,978 73,371 1,801 43555 77,744 86,353 0 TOTAL 2,403,301 2,515,129 9,412 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- UJAAS_33KV_BERCHA
  • 34. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 1,250,166 1,421,910 117,324 02/03/2019 1,612,912 1,792,510 201,921 03/03/2019 1,150,287 932,620 47,112 04/03/2019 1,277,256 1,258,330 45,835 05/03/2019 1,305,251 1,046,930 27,523 06/03/2019 785,522 487,340 44,056 07/03/2019 804,687 568,970 36,792 08/03/2019 1,149,846 1,301,730 84,577 09/03/2019 1,744,658 1,732,360 92,242 10/03/2019 654,976 101,020 6,421 11/03/2019 1,293,150 1,118,690 43,819 12/03/2019 1,287,897 1,206,710 61,417 13/03/2019 684,778 329,940 79 14/03/2019 1,008,292 673,380 20,646 15/03/2019 996,211 1,036,930 96,411 16/03/2019 1,320,831 1,578,390 165,770 17/03/2019 1,400,340 1,427,980 86,840 18/03/2019 1,118,195 888,910 20,546 19/03/2019 702,834 201,240 11,935 20/03/2019 1,050,584 953,600 19,022 21/03/2019 1,429,371 1,365,180 17,350 22/03/2019 766,958 673,050 121,573 23/03/2019 1,192,265 838,190 161,988 24/03/2019 883,312 378,940 12,024 25/03/2019 851,853 732,080 36,480 26/03/2019 936,121 818,260 180,396 27/03/2019 939,114 863,970 22,843 28/03/2019 751,202 343,020 127 29/03/2019 671,233 511,790 25,421 30/03/2019 1,395,123 1,500,920 47,976 43555 1,650,751 1,604,560 43,173 TOTAL 34,065,976 29,689,450 1,899,639 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- INOX_200MW_SHAJAPUR
  • 35. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 81,966 81,966 0 02/03/2019 68,238 68,238 0 03/03/2019 65,844 65,844 0 04/03/2019 67,514 67,514 0 05/03/2019 75,565 75,565 0 06/03/2019 81,966 81,966 0 07/03/2019 83,279 83,279 0 08/03/2019 78,507 78,507 0 09/03/2019 77,696 77,696 0 10/03/2019 80,316 80,316 0 11/03/2019 73,814 73,814 0 12/03/2019 78,363 78,363 0 13/03/2019 71,262 71,262 0 14/03/2019 68,991 68,991 0 15/03/2019 73,056 73,056 0 16/03/2019 76,588 76,588 0 17/03/2019 69,581 69,581 0 18/03/2019 74,598 74,598 0 19/03/2019 72,102 72,102 0 20/03/2019 72,138 72,138 0 21/03/2019 74,587 74,587 0 22/03/2019 76,588 76,588 0 23/03/2019 72,775 72,775 0 24/03/2019 73,244 73,244 0 25/03/2019 71,987 71,987 0 26/03/2019 72,796 72,796 0 27/03/2019 76,523 76,523 0 28/03/2019 74,420 74,420 0 29/03/2019 73,156 73,156 0 30/03/2019 70,589 70,589 0 43555 73,391 73,391 0 TOTAL 2,301,440 2,301,440 0 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- UJAAS_I_S_RAJGARH_BIORA_15MW
  • 36. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 59,331 80,419 1,775 02/03/2019 78,615 90,587 4,818 03/03/2019 57,472 56,435 425 04/03/2019 76,355 94,523 4,768 05/03/2019 69,516 53,592 1,453 06/03/2019 39,564 23,865 0 07/03/2019 30,876 19,369 26 08/03/2019 47,396 40,959 0 09/03/2019 93,834 102,481 794 10/03/2019 28,346 10,168 105 11/03/2019 51,983 56,870 4,125 12/03/2019 53,745 45,288 528 13/03/2019 31,658 25,151 0 14/03/2019 39,809 31,389 69 15/03/2019 50,119 50,118 294 16/03/2019 82,314 98,955 2,640 17/03/2019 66,887 54,462 66 18/03/2019 68,190 60,557 2,209 19/03/2019 34,975 25,741 0 20/03/2019 41,919 55,144 1,448 21/03/2019 92,954 77,229 14,984 22/03/2019 46,734 42,691 241 23/03/2019 73,413 55,487 2,390 24/03/2019 40,998 31,705 0 25/03/2019 44,373 40,305 7,532 26/03/2019 49,431 36,139 4 27/03/2019 51,903 45,167 901 28/03/2019 43,409 31,628 9 29/03/2019 29,774 21,650 0 30/03/2019 85,482 103,751 2,301 31/03/2019 134,947 154,856 30,197 TOTAL 1,796,322 1,716,681 84,102 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- NOT QCA APPOINTMENT NAME OF POOLING STATION :- WIND_WORLD_II_WIND_33_CHAPDA
  • 37. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF MARCH - 2019 NAME OF QCA :-KREATE TECHNOLOGIES LLP NAME OF POOLING STATION :-SIMCON FEEDER -2 DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-03-2019 19090 26390 -23511 02-03-2019 22519 20483 7697 03-03-2019 25929 18974 25556 04-03-2019 20752 20383 1647 05-03-2019 20752 23320 -8601 06-03-2019 21066 24735 -12349 07-03-2019 23376 23326 193 08-03-2019 22530 23417 -2791 09-03-2019 23333 24594 -4004 10-03-2019 23333 22968 1627 11-03-2019 22730 21484 4842 12-03-2019 23383 20746 10707 13-03-2019 23410 20833 9723 14-03-2019 23142 17157 22747 15-03-2019 59249 56529 11682 16-03-2019 51667 61003 -30656 17-03-2019 51955 45606 25897 18-03-2019 50993 62596 -37738 19-03-2019 50187 62423 -40199 20-03-2019 53078 51654 5955 21-03-2019 61377 65674 -14303 22-03-2019 53666 61785 -27409 23-03-2019 62244 69428 -24291 24-03-2019 61659 67568 -19787 25-03-2019 63882 63599 1485 26-03-2019 65188 67984 -7968 27-03-2019 64030 70547 -21119 28-03-2019 64930 66476 -3799 29-03-2019 66883 62757 14712 30-03-2019 67316 65736 7193 31-03-2019 26520 20996 20752 TOTAL 1290169 1331171 -106110 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 38. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF MARCH - 2019 NAME OF QCA :-ACME SOLAR ENERGY PVT. LTD. NAME OF POOLING STATION :-ACME SOLAR ENERGY PVT. LTD DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-03-2019 154582 178916 0 02-03-2019 110292 112981 7509 03-03-2019 134765 136062 2944 04-03-2019 146522 144517 1270 05-03-2019 146107 154295 2885 06-03-2019 148681 173043 0 07-03-2019 110239 84725 3827 08-03-2019 127204 117041 1403 09-03-2019 125217 121152 1443 10-03-2019 143992 116290 3574 11-03-2019 135126 112687 8114 12-03-2019 131596 123328 1035 13-03-2019 130444 120314 628 14-03-2019 122266 114006 142 15-03-2019 147401 157094 298 16-03-2019 150311 166192 202 17-03-2019 135052 135958 2548 18-03-2019 147145 168492 115 19-03-2019 147769 168049 134 20-03-2019 136483 155832 612 21-03-2019 156045 179439 0 22-03-2019 147347 155649 1400 23-03-2019 154310 170942 0 24-03-2019 148168 168703 0 25-03-2019 150060 159371 324 26-03-2019 154036 172588 0 27-03-2019 154241 172786 0 28-03-2019 152652 167126 0 29-03-2019 153442 167834 0 30-03-2019 154302 167562 0 31-03-2019 155353 168432 0 TOTAL 4411150 4611406 40407 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 39. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF MARCH - 2019 NAME OF QCA :-ALFA INFRAPROP PVT LTD NAME OF POOLING STATION :-ALFA INFRAPROP PVT LTD. (20MW) KUKSHI DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-03-2019 111072 128834 0 02-03-2019 111072 112863 131 03-03-2019 111072 119777 0 04-03-2019 97251 100462 1766 05-03-2019 111072 124825 0 06-03-2019 111072 128202 0 07-03-2019 111072 128093 0 08-03-2019 111072 118581 0 09-03-2019 111072 129475 0 10-03-2019 111072 122336 0 11-03-2019 111072 120648 0 12-03-2019 111072 125946 0 13-03-2019 111072 126013 0 14-03-2019 111072 124092 392 15-03-2019 111980 130061 0 16-03-2019 112121 122860 0 17-03-2019 112121 122728 0 18-03-2019 112121 126628 0 19-03-2019 112121 123521 0 20-03-2019 112121 124172 0 21-03-2019 112121 128569 0 22-03-2019 112121 128055 0 23-03-2019 123210 123450 0 24-03-2019 125835 124245 0 25-03-2019 125835 121388 0 26-03-2019 125835 127650 0 27-03-2019 125835 124740 43 28-03-2019 125835 123760 0 29-03-2019 125835 122852 0 30-03-2019 125835 120009 0 31-03-2019 125835 131218 0 TOTAL 3567904 3836053 2332 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 40. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF MARCH - 2019 NAME OF QCA :-FOCAL ENERGY SOLAR ONE INDIA PVT. LTD. NAME OF POOLING STATION :-GLOBUS STEEL_N_ POWER PVT LTD DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-03-2019 127029 133303 0 02-03-2019 67721 95575 38786 03-03-2019 101947 102287 205 04-03-2019 126250 102998 5126 05-03-2019 127821 125385 370 06-03-2019 128763 129914 0 07-03-2019 136633 127063 250 08-03-2019 131966 124907 0 09-03-2019 131248 130614 0 10-03-2019 131266 123811 0 11-03-2019 127884 128569 0 12-03-2019 130913 130981 0 13-03-2019 131044 113598 3374 14-03-2019 132346 129628 0 15-03-2019 132063 131861 0 16-03-2019 131791 122636 1449 17-03-2019 131315 118850 2045 18-03-2019 130361 129683 0 19-03-2019 131528 128800 0 20-03-2019 131881 129929 0 21-03-2019 131682 137961 0 22-03-2019 138074 127805 200 23-03-2019 134336 130554 0 24-03-2019 133128 128380 0 25-03-2019 129814 123090 325 26-03-2019 128897 134133 0 27-03-2019 133325 132729 18 28-03-2019 132677 128388 64 29-03-2019 132696 129497 0 30-03-2019 133104 129637 0 31-03-2019 132255 128852 744 TOTAL 3981758 3891418 52956 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 41. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF MARCH - 2019 NAME OF QCA :-KREATE TECHNOLOGIES LLP NAME OF POOLING STATION :-SIMCON FEEDER -1 DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-03-2019 94449 96160 0 02-03-2019 76831 75090 646 03-03-2019 70223 69829 703 04-03-2019 80907 75862 650 05-03-2019 71911 85958 922 06-03-2019 92525 92278 0 07-03-2019 94490 87945 1818 08-03-2019 83419 89141 0 09-03-2019 93310 93844 0 10-03-2019 91063 88684 0 11-03-2019 81646 82902 88 12-03-2019 93596 89686 70 13-03-2019 88999 86090 0 14-03-2019 71917 64625 700 15-03-2019 91536 85971 12 16-03-2019 95412 90397 0 17-03-2019 78856 68117 1834 18-03-2019 96072 88768 0 19-03-2019 96623 77171 318 20-03-2019 75554 66435 2483 21-03-2019 85964 83448 0 22-03-2019 82485 79781 0 23-03-2019 81580 81285 0 24-03-2019 78012 79225 0 25-03-2019 74573 73544 0 26-03-2019 76870 79200 0 27-03-2019 78606 82428 0 28-03-2019 77142 77954 100 29-03-2019 77637 73891 2059 30-03-2019 0 0 0 31-03-2019 2543 969 84 TOTAL 2434751 2366678 12487 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 42. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF MARCH - 2019 NAME OF QCA :-NA NAME OF POOLING STATION :-MANDSAUR SOLAR PV POWER PROJECT (NTPC LTD.) DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-03-2019 1329774 1422386 0 02-03-2019 1146970 930012 125713 03-03-2019 1253068 1097128 23463 04-03-2019 1410782 1052158 58306 05-03-2019 1382209 1237122 3159 06-03-2019 1399171 1333679 0 07-03-2019 1410599 1312981 0 08-03-2019 1343990 1288760 332 09-03-2019 1349353 1363410 0 10-03-2019 1284800 1280621 0 11-03-2019 1363530 1290754 674 12-03-2019 1280200 1349761 0 13-03-2019 1287980 1197757 116 14-03-2019 1257040 1166738 3421 15-03-2019 1314549 1250686 0 16-03-2019 1292778 1242900 3322 17-03-2019 1267035 1014579 29937 18-03-2019 1298057 1312933 0 19-03-2019 1308677 1286499 0 20-03-2019 1312553 1266678 0 21-03-2019 1288010 1381512 0 22-03-2019 1282893 1262526 0 23-03-2019 1381160 1297171 0 24-03-2019 1260748 1269609 0 25-03-2019 1296310 1241520 0 26-03-2019 1296310 1309643 0 27-03-2019 1278812 1311213 0 28-03-2019 1309243 1283494 0 29-03-2019 1312270 1273412 0 30-03-2019 1293066 1261309 3435 31-03-2019 1273040 1256789 1133 TOTAL 40564977 38845740 253011 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 43. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 58,690 58,804 1,707 02/03/2019 62,074 45,302 1,558 03/03/2019 44,999 28,632 678 04/03/2019 68,131 58,583 2,792 05/03/2019 49,346 28,845 1,175 06/03/2019 43,770 3,135 0 07/03/2019 41,097 1,596 24 08/03/2019 48,932 36,910 1,201 09/03/2019 65,950 56,721 2,842 10/03/2019 46,811 6,617 0 11/03/2019 68,071 59,062 1,669 12/03/2019 51,349 34,347 2,377 13/03/2019 34,389 4,768 0 14/03/2019 44,738 30,664 827 15/03/2019 67,034 72,900 2,433 16/03/2019 78,939 93,029 6,141 17/03/2019 60,547 38,100 632 18/03/2019 41,329 15,349 83 19/03/2019 39,825 8,496 0 20/03/2019 61,776 37,412 1,819 21/03/2019 51,939 32,330 1,059 22/03/2019 47,145 38,983 2,433 23/03/2019 44,771 13,857 839 24/03/2019 43,358 8,023 0 25/03/2019 52,878 54,233 1,347 26/03/2019 52,247 45,325 2,004 27/03/2019 42,614 21,383 29 28/03/2019 43,092 1,960 0 29/03/2019 53,607 35,472 1,486 30/03/2019 84,811 80,591 1,162 31/03/2019 75,916 50,072 1,756 TOTAL 1,670,175 1,101,501 40,073 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- SUZLON_IV_W_JAORA_13.5MW
  • 44. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 73,290 79,674 0 02/03/2019 73,395 67,706 40 03/03/2019 63,884 55,204 1,440 04/03/2019 66,545 61,676 203 05/03/2019 74,066 74,088 549 06/03/2019 73,290 78,294 0 07/03/2019 75,360 75,408 0 08/03/2019 74,778 73,378 0 09/03/2019 73,592 76,548 174 10/03/2019 75,628 73,374 0 11/03/2019 68,701 66,518 50 12/03/2019 73,286 72,592 0 13/03/2019 65,603 70,390 0 14/03/2019 63,017 52,534 1,219 15/03/2019 68,203 70,306 0 16/03/2019 68,966 73,076 373 17/03/2019 66,802 62,290 165 18/03/2019 69,041 74,634 0 19/03/2019 70,602 72,320 0 20/03/2019 66,015 65,662 20 21/03/2019 68,981 75,314 302 22/03/2019 72,446 72,426 0 23/03/2019 69,953 73,090 367 24/03/2019 65,861 67,636 0 25/03/2019 66,738 68,310 0 26/03/2019 64,840 74,522 0 27/03/2019 69,970 75,512 0 28/03/2019 72,010 73,308 0 29/03/2019 70,572 71,780 0 30/03/2019 66,926 71,848 0 31/03/2019 66,926 74,996 0 T O T A L 2 1 5 9 2 8 7 2 1 9 4 4 1 4 4 9 0 2 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- M&B_ICHHAWAR-II
  • 45. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 46,082 38,567 793 02/03/2019 47,324 52,357 4,018 03/03/2019 51,222 53,931 440 04/03/2019 62,907 79,613 8,453 05/03/2019 47,154 41,103 1,514 06/03/2019 30,476 17,654 37 07/03/2019 33,446 21,922 359 08/03/2019 42,312 47,072 4,046 09/03/2019 64,250 72,486 6,124 10/03/2019 33,542 10,650 2 11/03/2019 39,849 42,431 7,258 12/03/2019 53,649 54,299 5,771 13/03/2019 37,033 22,435 0 14/03/2019 48,332 37,796 1,452 15/03/2019 59,806 72,856 4,328 16/03/2019 69,746 71,763 1,281 17/03/2019 60,064 54,777 1,278 18/03/2019 40,623 26,819 343 19/03/2019 38,179 6,323 0 20/03/2019 64,622 52,925 2,059 21/03/2019 62,412 54,759 3,767 22/03/2019 41,243 24,366 1,860 23/03/2019 45,746 31,905 63 24/03/2019 40,516 15,796 0 25/03/2019 48,595 43,873 1,493 26/03/2019 49,186 44,292 4,902 27/03/2019 45,934 34,071 181 28/03/2019 40,684 10,889 0 29/03/2019 51,872 53,925 5,568 30/03/2019 104,979 124,555 6,500 31/03/2019 88,565 92,185 5,056 TOTAL 1,590,350 1,408,395 78,946 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- WIND WORLD AGAR-I
  • 46. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 56,379 69,230 5,357 02/03/2019 58,204 52,025 1,570 03/03/2019 44,241 33,072 542 04/03/2019 65,142 64,497 2,060 05/03/2019 49,684 35,939 5,457 06/03/2019 42,497 4,189 366 07/03/2019 35,822 1,585 0 08/03/2019 49,683 37,429 876 09/03/2019 70,029 54,642 349 10/03/2019 41,894 7,152 0 11/03/2019 66,799 63,666 1,566 12/03/2019 51,084 36,165 3,912 13/03/2019 32,301 4,382 0 14/03/2019 42,510 31,113 415 15/03/2019 68,517 73,267 1,982 16/03/2019 81,238 94,880 5,539 17/03/2019 55,038 41,754 1,954 18/03/2019 39,621 15,999 115 19/03/2019 39,054 13,503 176 20/03/2019 58,439 10,196 13,413 21/03/2019 51,563 27,555 4,031 22/03/2019 45,334 41,046 3,589 23/03/2019 42,218 16,903 1,316 24/03/2019 40,074 12,049 32 25/03/2019 58,797 49,546 1,941 26/03/2019 52,316 50,771 6,773 27/03/2019 41,083 26,116 3 28/03/2019 38,185 3,710 0 29/03/2019 52,942 40,626 2,942 30/03/2019 82,778 83,954 1,525 31/03/2019 66,700 47,275 981 TOTAL 1,620,166 1,144,236 68,782 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- SUZLON_V_W_JAORA_12MW
  • 47. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 329,991 371,340 0 02/03/2019 334,343 328,270 0 03/03/2019 316,587 305,320 9,583 04/03/2019 306,978 299,950 1,150 05/03/2019 338,067 370,590 0 06/03/2019 333,980 363,850 0 07/03/2019 341,847 370,470 0 08/03/2019 339,174 351,170 0 09/03/2019 341,880 337,900 7,792 10/03/2019 340,737 368,090 0 11/03/2019 332,873 348,080 529 12/03/2019 340,644 360,370 0 13/03/2019 323,999 323,140 2,890 14/03/2019 322,356 307,600 4,740 15/03/2019 324,057 326,750 1,066 16/03/2019 332,001 354,020 0 17/03/2019 320,692 326,220 3,613 18/03/2019 328,013 366,010 0 19/03/2019 348,797 369,260 0 20/03/2019 337,243 357,890 0 21/03/2019 347,616 377,550 0 22/03/2019 347,112 389,050 0 23/03/2019 338,727 376,150 0 24/03/2019 347,067 370,090 0 25/03/2019 348,048 361,390 0 26/03/2019 348,590 382,890 0 27/03/2019 348,887 387,460 0 28/03/2019 349,956 375,330 0 29/03/2019 354,783 375,960 0 30/03/2019 340,629 369,860 0 31/03/2019 347,842 372,160 0 TOTAL 10,453,516 11,044,180 31,363 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- SKY_POWER_SOLAR_132_CHHEGAON
  • 48. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 238,506 264,694 3,703 02/03/2019 307,844 263,566 548 03/03/2019 228,114 214,270 904 04/03/2019 297,357 333,869 8,521 05/03/2019 271,686 224,434 1,640 06/03/2019 218,232 97,589 0 07/03/2019 209,274 79,224 0 08/03/2019 221,690 165,007 567 09/03/2019 367,347 414,706 2,247 10/03/2019 210,693 40,368 2 11/03/2019 252,725 243,364 2,268 12/03/2019 198,848 189,906 11,894 13/03/2019 196,602 99,971 0 14/03/2019 207,789 137,746 2 15/03/2019 210,688 198,376 790 16/03/2019 356,533 377,359 10,125 17/03/2019 258,295 243,889 3,342 18/03/2019 259,881 226,394 5,328 19/03/2019 187,476 82,628 136 20/03/2019 229,362 172,301 5,541 21/03/2019 295,884 321,848 24,507 22/03/2019 250,304 182,714 4,347 23/03/2019 305,707 237,927 1,905 24/03/2019 189,958 115,956 0 25/03/2019 199,567 164,408 5,161 26/03/2019 199,133 165,195 0 27/03/2019 249,250 185,888 4,209 28/03/2019 221,783 128,008 1,728 29/03/2019 197,093 83,665 0 30/03/2019 346,274 423,782 16,831 31/03/2019 541,199 610,547 44,217 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- WIND_WORLD_III_WIND_132_CHAPDA
  • 49. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 208,662 229,360 35,300 02/03/2019 265,336 295,850 25,558 03/03/2019 184,423 196,537 16,133 04/03/2019 198,577 212,786 28,921 05/03/2019 185,915 166,021 12,869 06/03/2019 105,424 62,975 3,075 07/03/2019 115,127 99,981 25,394 08/03/2019 214,173 262,724 19,837 09/03/2019 226,153 220,880 5,180 10/03/2019 108,016 55,331 9,354 11/03/2019 177,916 187,694 12,403 12/03/2019 192,305 172,293 4,903 13/03/2019 102,867 73,712 1,953 14/03/2019 121,726 81,595 10,469 15/03/2019 213,016 283,619 55,183 16/03/2019 282,119 296,200 32,265 17/03/2019 229,579 234,969 22,705 18/03/2019 152,080 135,134 6,477 19/03/2019 93,232 26,688 230 20/03/2019 199,326 172,627 14,531 21/03/2019 204,113 154,906 1,294 22/03/2019 97,922 98,794 15,933 23/03/2019 180,139 158,703 2,225 24/03/2019 108,929 45,676 3,120 25/03/2019 179,570 145,132 18,451 26/03/2019 186,804 166,529 63,609 27/03/2019 162,935 154,098 4,984 28/03/2019 102,770 44,225 0 29/03/2019 127,212 141,855 28,940 30/03/2019 265,179 285,880 19,774 31/03/2019 227,114 194,793 25,000 TOTAL 5,418,659 5,057,567 526,070 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- SUZLON_GUJRAT_WIND_33_BADOD
  • 50. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 346,231 391,550 0 02/03/2019 292,943 218,700 35,274 03/03/2019 231,105 222,320 13,026 04/03/2019 278,547 270,680 4,594 05/03/2019 291,910 316,400 3,344 06/03/2019 356,265 374,170 0 07/03/2019 355,716 373,300 0 08/03/2019 350,803 362,440 0 09/03/2019 354,398 373,950 0 10/03/2019 355,049 360,890 0 11/03/2019 333,392 348,010 0 12/03/2019 352,198 380,460 0 13/03/2019 345,422 353,720 0 14/03/2019 330,955 299,850 6,799 15/03/2019 337,930 373,590 353 16/03/2019 323,057 354,510 1,586 17/03/2019 325,850 329,610 2,539 18/03/2019 350,122 391,430 0 19/03/2019 346,518 381,870 0 20/03/2019 348,874 360,140 4,809 21/03/2019 353,674 397,330 0 22/03/2019 351,734 376,350 0 23/03/2019 360,046 389,980 0 24/03/2019 361,604 383,390 0 25/03/2019 351,616 359,050 0 26/03/2019 361,508 389,890 0 27/03/2019 361,657 392,780 183 28/03/2019 361,625 386,130 0 29/03/2019 362,851 389,920 0 30/03/2019 363,036 386,290 0 31/03/2019 363,200 387,890 0 TOTAL 10,559,836 11,076,590 72,507 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- RENEW_CLEAN_SOLAR_132_KOTHIYA
  • 51. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 32,504 35,091 0 02/03/2019 29,189 29,184 1,009 03/03/2019 26,300 25,149 695 04/03/2019 28,711 28,551 378 05/03/2019 30,871 33,515 45 06/03/2019 32,504 34,164 0 07/03/2019 33,274 33,552 0 08/03/2019 31,614 32,245 0 09/03/2019 31,096 34,164 35 10/03/2019 31,810 31,835 0 11/03/2019 29,801 29,017 456 12/03/2019 31,825 32,587 12 13/03/2019 32,296 31,213 0 14/03/2019 28,219 25,265 634 15/03/2019 30,261 32,515 41 16/03/2019 31,349 32,815 0 17/03/2019 27,747 27,868 416 18/03/2019 30,041 32,614 9 19/03/2019 28,939 31,725 42 20/03/2019 29,120 28,134 909 21/03/2019 31,010 33,437 0 22/03/2019 31,178 31,954 0 23/03/2019 30,353 32,048 0 24/03/2019 29,704 31,632 0 25/03/2019 29,217 29,861 47 26/03/2019 29,661 32,496 0 27/03/2019 29,962 33,225 29 28/03/2019 30,982 32,562 0 29/03/2019 29,389 31,958 0 30/03/2019 30,430 31,824 192 31/03/2019 30,430 33,433 7 TOTAL 939,787 975,633 4,956 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- DESIGNCO_MANF_EXP_1_S_ARNIYAKALA_5MW
  • 52. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 69,329 74,745 0 02/03/2019 55,476 50,311 5,015 03/03/2019 64,622 61,749 96 04/03/2019 63,197 62,910 199 05/03/2019 67,833 66,882 431 06/03/2019 69,329 72,332 0 07/03/2019 70,964 70,961 0 08/03/2019 68,264 69,304 0 09/03/2019 67,140 74,119 0 10/03/2019 68,812 69,028 0 11/03/2019 63,276 68,920 0 12/03/2019 70,266 72,158 0 13/03/2019 70,710 67,910 176 14/03/2019 67,168 69,671 0 15/03/2019 67,797 72,267 0 16/03/2019 66,208 68,894 145 17/03/2019 58,975 58,562 1,259 18/03/2019 66,327 70,206 0 19/03/2019 65,791 69,096 0 20/03/2019 66,564 68,033 0 21/03/2019 66,771 66,801 50 22/03/2019 69,281 67,200 0 23/03/2019 68,212 67,746 0 24/03/2019 64,765 66,715 0 25/03/2019 64,422 64,381 8 26/03/2019 66,891 69,479 0 27/03/2019 62,706 70,187 0 28/03/2019 67,623 67,171 0 29/03/2019 61,787 67,869 0 30/03/2019 61,292 67,973 0 31/03/2019 62,899 69,633 0 TOTAL 2,044,697 2,103,213 7,379 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- M&B_BAROD_II
  • 53. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 30,000 35,374 0 02/03/2019 30,000 29,700 29 03/03/2019 30,000 30,688 0 04/03/2019 30,000 29,475 159 05/03/2019 30,000 32,372 58 06/03/2019 30,000 33,977 0 07/03/2019 30,000 33,469 0 08/03/2019 30,000 32,649 0 09/03/2019 30,000 35,313 0 10/03/2019 30,000 32,397 0 11/03/2019 30,000 31,678 0 12/03/2019 30,000 34,246 0 13/03/2019 30,000 33,166 0 14/03/2019 30,000 32,522 0 15/03/2019 30,000 34,514 0 16/03/2019 30,000 33,984 0 17/03/2019 30,000 31,311 10 18/03/2019 30,000 33,738 0 19/03/2019 30,000 32,909 0 20/03/2019 30,000 31,553 79 21/03/2019 30,000 35,833 20 22/03/2019 30,000 33,588 0 23/03/2019 30,000 33,594 0 24/03/2019 30,000 32,870 0 25/03/2019 30,000 31,454 62 26/03/2019 30,000 34,292 0 27/03/2019 30,000 34,616 24 28/03/2019 30,000 33,894 12 29/03/2019 30,000 32,905 3 30/03/2019 30,000 19,466 5,703 31/03/2019 30,000 33,709 3 TOTAL 930,000 1,011,256 6,162 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- PORWAL_AUTO_MAKDON
  • 54. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 63,932 67,832 0 02/03/2019 46,554 43,205 11,718 03/03/2019 47,004 50,782 166 04/03/2019 59,422 52,696 866 05/03/2019 60,164 61,095 244 06/03/2019 62,653 64,777 0 07/03/2019 62,756 64,384 0 08/03/2019 62,063 62,047 0 09/03/2019 60,645 65,885 0 10/03/2019 62,136 61,437 0 11/03/2019 62,352 63,507 0 12/03/2019 64,398 64,879 0 13/03/2019 62,109 60,391 230 14/03/2019 63,922 63,553 0 15/03/2019 61,485 64,342 0 16/03/2019 64,266 60,684 1,055 17/03/2019 52,786 55,742 961 18/03/2019 57,760 62,806 0 19/03/2019 61,102 62,078 0 20/03/2019 63,107 61,698 80 21/03/2019 63,283 66,652 0 22/03/2019 62,880 60,802 0 23/03/2019 63,214 61,465 0 24/03/2019 60,224 60,048 0 25/03/2019 58,290 58,034 0 26/03/2019 59,216 63,331 0 27/03/2019 62,774 62,724 6 28/03/2019 60,957 60,753 0 29/03/2019 60,737 60,458 0 30/03/2019 58,698 60,908 0 31/03/2019 57,524 60,633 9 TOTAL 1,868,413 1,889,628 15,335 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- FOCAL_PHOTOVOLTAIC_10MW
  • 55. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 106,118 79,880 4,357 02/03/2019 106,085 25,711 38,318 03/03/2019 79,484 56,982 4,637 04/03/2019 103,322 68,421 7,539 05/03/2019 52,244 47,418 4,581 06/03/2019 56,593 11,492 5,833 07/03/2019 53,227 15,918 1,604 08/03/2019 51,454 39,137 479 09/03/2019 135,008 97,109 16,915 10/03/2019 46,559 6,467 1,563 11/03/2019 86,891 54,205 18,312 12/03/2019 82,526 34,937 7,097 13/03/2019 41,886 9,523 12 14/03/2019 66,518 32,651 2,924 15/03/2019 85,766 47,931 6,396 16/03/2019 99,863 75,153 1,780 17/03/2019 88,778 45,377 7,083 18/03/2019 103,901 49,653 13,113 19/03/2019 35,186 12,697 703 20/03/2019 69,612 44,531 1,990 21/03/2019 84,581 63,963 819 22/03/2019 56,076 28,931 3,963 23/03/2019 95,543 51,593 6,265 24/03/2019 59,753 27,635 415 25/03/2019 67,054 29,820 8,385 26/03/2019 54,369 30,909 4,242 27/03/2019 77,995 36,081 3,393 28/03/2019 46,008 16,264 0 29/03/2019 48,850 21,144 404 30/03/2019 110,455 93,607 731 31/03/2019 117,625 124,456 8,354 TOTAL 2,369,330 1,379,596 182,207 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- MP_WIND_FARM_NAGDA_HILL_WIND_33_DEWAS
  • 56. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 106,773 114,695 0 02/03/2019 85,008 72,651 11,217 03/03/2019 94,470 89,656 0 04/03/2019 97,975 94,936 108 05/03/2019 99,298 98,077 18 06/03/2019 106,773 109,286 0 07/03/2019 108,070 106,786 0 08/03/2019 98,673 104,502 0 09/03/2019 99,645 112,024 0 10/03/2019 101,838 103,688 0 11/03/2019 102,766 105,027 0 12/03/2019 104,403 109,223 0 13/03/2019 104,798 103,003 0 14/03/2019 99,657 105,099 0 15/03/2019 101,752 108,379 0 16/03/2019 98,702 102,236 1 17/03/2019 86,084 89,120 1,137 18/03/2019 98,676 106,077 0 19/03/2019 94,828 104,679 0 20/03/2019 101,977 103,673 0 21/03/2019 102,497 113,574 0 22/03/2019 101,752 105,571 0 23/03/2019 101,590 106,518 0 24/03/2019 100,386 104,171 0 25/03/2019 99,859 100,103 7 26/03/2019 100,092 107,745 0 27/03/2019 100,397 108,453 0 28/03/2019 101,283 101,855 161 29/03/2019 99,224 103,960 0 30/03/2019 96,214 104,050 0 31/03/2019 96,214 105,324 0 TOTAL 3,091,674 3,204,141 12,649 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- TODAY_CLEAN_SOLAR_33KV_BAROD
  • 57. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 326,700 356,290 612 02/03/2019 261,202 214,140 46,195 03/03/2019 263,478 263,680 531 04/03/2019 288,127 287,020 810 05/03/2019 307,223 329,160 837 06/03/2019 317,183 339,540 553 07/03/2019 341,638 340,410 101 08/03/2019 317,486 331,400 0 09/03/2019 330,288 353,700 312 10/03/2019 336,640 330,160 0 11/03/2019 328,597 345,480 0 12/03/2019 337,775 352,710 458 13/03/2019 332,924 325,090 6,085 14/03/2019 330,354 348,790 0 15/03/2019 330,908 350,790 138 16/03/2019 331,718 328,040 7,114 17/03/2019 280,022 296,200 5,400 18/03/2019 335,349 349,170 410 19/03/2019 333,339 346,760 0 20/03/2019 337,121 356,330 292 21/03/2019 343,171 376,200 723 22/03/2019 347,640 346,140 172 23/03/2019 342,147 350,660 0 24/03/2019 337,450 346,500 75 25/03/2019 324,859 330,550 1,961 26/03/2019 333,805 363,690 55 27/03/2019 357,000 363,380 153 28/03/2019 342,105 355,410 75 29/03/2019 321,783 356,820 53 30/03/2019 329,711 360,270 62 31/03/2019 333,168 358,760 744 TOTAL 10,080,911 10,453,240 73,921 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- SEIL_SITARA_SITAMAU_50MW
  • 58. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 49,271 55,758 1,142 02/03/2019 72,401 79,467 3,661 03/03/2019 60,811 61,798 224 04/03/2019 60,137 76,654 6,090 05/03/2019 60,623 45,202 2,087 06/03/2019 49,927 22,294 0 07/03/2019 50,110 30,832 783 08/03/2019 68,675 67,911 504 09/03/2019 75,177 83,863 2,731 10/03/2019 49,133 16,005 0 11/03/2019 75,995 71,393 3,518 12/03/2019 73,179 56,661 2,126 13/03/2019 42,224 22,019 0 14/03/2019 51,892 44,106 2,511 15/03/2019 64,344 72,414 1,437 16/03/2019 56,739 60,002 937 17/03/2019 47,659 45,055 733 18/03/2019 36,418 28,553 0 19/03/2019 26,184 5,658 56 20/03/2019 64,556 57,228 4,986 21/03/2019 65,098 45,001 612 22/03/2019 52,982 30,341 206 23/03/2019 49,825 36,063 0 24/03/2019 34,352 14,270 0 25/03/2019 38,670 32,905 1,038 26/03/2019 50,650 34,643 2,299 27/03/2019 34,864 33,699 3 28/03/2019 30,165 11,986 2 29/03/2019 41,928 43,679 1,230 30/03/2019 96,974 114,985 3,672 31/03/2019 90,568 84,570 1,818 TOTAL 1,721,531 1,485,015 44,406 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- WIND_WORLD-II_33_AGAR_15.2MW
  • 59. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 45,645 45,645 0 02/03/2019 37,225 37,225 0 03/03/2019 36,179 36,179 0 04/03/2019 40,606 40,606 0 05/03/2019 43,203 43,203 0 06/03/2019 43,364 43,364 0 07/03/2019 47,299 47,299 0 08/03/2019 44,939 44,939 0 09/03/2019 45,044 45,044 0 10/03/2019 45,771 45,771 0 11/03/2019 42,091 42,091 0 12/03/2019 45,360 45,360 0 13/03/2019 41,816 41,816 0 14/03/2019 40,993 40,993 0 15/03/2019 44,086 44,086 0 16/03/2019 46,311 46,311 0 17/03/2019 42,512 42,512 0 18/03/2019 45,497 45,497 0 19/03/2019 44,761 44,761 0 20/03/2019 44,512 44,512 0 21/03/2019 45,498 45,498 0 22/03/2019 46,311 46,311 0 23/03/2019 44,006 44,006 0 24/03/2019 44,942 44,942 0 25/03/2019 44,239 44,239 0 26/03/2019 44,610 44,610 0 27/03/2019 46,787 46,787 0 28/03/2019 45,481 45,481 0 29/03/2019 42,704 42,704 0 30/03/2019 43,786 43,786 0 31/03/2019 44,253 44,253 0 TOTAL 1,359,831 1,359,831 0 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- UJAAS_II_S_RAJGARH_BIORA_15MW
  • 60. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 83,479 88,648 0 02/03/2019 82,182 75,494 165 03/03/2019 67,237 61,820 1,516 04/03/2019 69,984 68,600 151 05/03/2019 79,763 85,416 0 06/03/2019 83,479 87,028 0 07/03/2019 83,963 84,966 0 08/03/2019 83,420 83,158 0 09/03/2019 82,272 85,074 0 10/03/2019 84,144 81,904 0 11/03/2019 72,872 75,288 310 12/03/2019 82,035 81,600 152 13/03/2019 73,676 79,192 0 14/03/2019 69,475 59,074 1,547 15/03/2019 75,108 78,486 0 16/03/2019 77,488 83,468 0 17/03/2019 76,799 69,840 479 18/03/2019 77,658 83,258 0 19/03/2019 75,921 81,444 0 20/03/2019 74,126 72,598 0 21/03/2019 77,592 85,284 0 22/03/2019 76,030 80,888 0 23/03/2019 78,563 81,498 0 24/03/2019 74,485 80,880 0 25/03/2019 74,516 74,178 427 26/03/2019 73,038 83,592 0 27/03/2019 78,612 84,702 0 28/03/2019 80,889 81,806 0 29/03/2019 73,534 79,212 0 30/03/2019 73,395 79,494 0 31/03/2019 73,395 81,870 0 TOTAL 2,389,130 2,459,760 4,747 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- M&B_ICHHAWAR-I
  • 61. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 46,899 50,281 866 02/03/2019 71,146 71,365 2,765 03/03/2019 55,362 58,913 844 04/03/2019 66,525 70,902 5,141 05/03/2019 59,144 48,384 2,211 06/03/2019 50,360 21,130 0 07/03/2019 48,898 30,180 857 08/03/2019 61,212 65,869 577 09/03/2019 78,289 83,400 2,707 10/03/2019 50,430 14,578 0 11/03/2019 75,677 65,967 3,832 12/03/2019 72,630 59,377 2,175 13/03/2019 40,060 20,784 0 14/03/2019 49,870 41,197 2,295 15/03/2019 61,653 75,013 1,308 16/03/2019 59,732 64,732 274 17/03/2019 48,927 49,267 1,440 18/03/2019 35,159 27,668 132 19/03/2019 25,502 6,117 17 20/03/2019 66,346 54,175 3,346 21/03/2019 64,090 49,221 460 22/03/2019 50,333 30,529 289 23/03/2019 48,992 34,471 0 24/03/2019 30,655 14,024 50 25/03/2019 37,082 35,651 1,413 26/03/2019 47,502 38,105 4,152 27/03/2019 33,528 31,062 34 28/03/2019 27,537 11,528 60 29/03/2019 34,987 36,683 945 30/03/2019 87,555 104,869 2,935 31/03/2019 88,268 84,976 553 TOTAL 1,674,350 1,450,418 41,678 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- WIND_WORLD-III_33_AGAR_14.4MW
  • 62. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 61,906 68,954 0 02/03/2019 61,829 60,973 0 03/03/2019 43,477 45,222 2,972 04/03/2019 58,366 59,216 0 05/03/2019 61,961 64,458 0 06/03/2019 61,906 65,255 0 07/03/2019 64,863 67,104 0 08/03/2019 63,022 64,863 0 09/03/2019 60,640 64,536 0 10/03/2019 63,068 64,891 0 11/03/2019 59,353 61,905 54 12/03/2019 62,921 63,466 0 13/03/2019 61,688 57,534 1,507 14/03/2019 43,857 36,550 4,024 15/03/2019 51,754 49,404 2,056 16/03/2019 59,241 61,528 7 17/03/2019 51,812 52,735 53 18/03/2019 59,645 62,647 0 19/03/2019 60,917 63,390 0 20/03/2019 54,928 52,464 4,860 21/03/2019 59,050 63,313 0 22/03/2019 60,554 64,197 0 23/03/2019 60,554 63,758 0 24/03/2019 59,165 63,540 0 25/03/2019 56,370 60,258 0 26/03/2019 57,021 62,134 0 27/03/2019 60,794 65,598 0 28/03/2019 59,950 62,654 0 29/03/2019 59,226 60,954 0 30/03/2019 55,848 58,651 0 31/03/2019 55,286 57,302 0 TOTAL 1,810,972 1,869,454 15,533 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- BHARAT_ELECTRONICS_LTD_OFI_S_ITARSI_10MW
  • 63. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 1,285,219 1,821,110 329,980 02/03/2019 1,751,843 1,663,530 38,915 03/03/2019 1,062,159 1,149,830 36,627 04/03/2019 1,094,588 1,295,450 150,827 05/03/2019 1,058,287 827,900 92,243 06/03/2019 599,789 84,590 8,969 07/03/2019 579,376 69,020 3,549 08/03/2019 691,390 485,960 0 09/03/2019 1,062,189 817,780 33,257 10/03/2019 562,705 193,960 2,594 11/03/2019 1,147,159 1,205,970 59,382 12/03/2019 877,772 739,180 10,699 13/03/2019 525,025 133,180 3,933 14/03/2019 667,385 427,890 79,296 15/03/2019 1,379,609 1,661,470 317,641 16/03/2019 1,821,008 2,118,290 266,025 17/03/2019 1,568,864 1,432,430 107,094 18/03/2019 855,082 546,090 19,400 19/03/2019 628,485 367,510 15,754 20/03/2019 999,475 833,170 40,486 21/03/2019 863,770 545,860 13,619 22/03/2019 784,892 750,600 27,688 23/03/2019 1,082,592 709,940 27,995 24/03/2019 595,584 398,170 8,873 25/03/2019 912,481 984,580 30,918 26/03/2019 1,046,154 907,570 215,729 27/03/2019 880,586 605,710 23,513 28/03/2019 550,580 244,460 10,282 29/03/2019 764,058 619,770 1,444 30/03/2019 1,316,509 1,093,560 31,450 31/03/2019 1,247,794 997,670 175,753 TOTAL 30,262,409 25,732,200 2,183,935 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- KSHEMA_295.3MW_AMBA
  • 64. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 73,972 78,379 0 02/03/2019 59,480 53,006 4,898 03/03/2019 66,102 67,863 0 04/03/2019 67,507 68,274 123 05/03/2019 72,334 74,239 120 06/03/2019 73,972 78,791 0 07/03/2019 77,079 77,203 0 08/03/2019 73,453 75,048 0 09/03/2019 72,773 78,734 516 10/03/2019 74,452 74,682 0 11/03/2019 68,730 75,183 0 12/03/2019 74,286 78,453 0 13/03/2019 73,877 73,883 150 14/03/2019 72,823 75,751 0 15/03/2019 72,743 78,576 0 16/03/2019 70,864 75,261 130 17/03/2019 65,024 63,004 991 18/03/2019 71,342 75,885 0 19/03/2019 71,571 74,674 0 20/03/2019 71,619 74,566 0 21/03/2019 74,700 80,390 0 22/03/2019 75,754 75,282 0 23/03/2019 75,319 75,899 0 24/03/2019 71,727 73,759 0 25/03/2019 68,851 68,833 0 26/03/2019 70,584 75,791 0 27/03/2019 70,452 77,375 0 28/03/2019 73,327 74,231 0 29/03/2019 67,548 74,656 0 30/03/2019 67,694 74,833 0 31/03/2019 70,948 76,520 0 TOTAL 2,210,907 2,299,024 6,928 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- M&B_BAROD
  • 65. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 1,174,715 1,225,950 137,194 02/03/2019 1,350,838 1,204,560 90,188 03/03/2019 976,044 661,570 59,296 04/03/2019 970,220 1,121,920 116,542 05/03/2019 1,037,564 890,790 76,736 06/03/2019 688,353 324,380 4,782 07/03/2019 723,130 430,580 30,938 08/03/2019 861,198 700,540 8,423 09/03/2019 1,408,904 1,556,100 132,740 10/03/2019 584,979 30,070 36,724 11/03/2019 953,717 777,330 90,733 12/03/2019 854,298 766,320 36,637 13/03/2019 520,961 252,170 919 14/03/2019 766,076 549,240 35,081 15/03/2019 637,037 741,410 76,515 16/03/2019 968,202 1,141,480 123,819 17/03/2019 1,092,506 1,092,090 31,605 18/03/2019 875,317 720,370 18,645 19/03/2019 574,160 193,260 12,517 20/03/2019 792,762 680,320 18,734 21/03/2019 1,336,083 1,257,330 146,360 22/03/2019 665,876 517,860 156,404 23/03/2019 1,005,249 719,370 21,292 24/03/2019 642,966 347,100 1,631 25/03/2019 599,241 501,180 14,196 26/03/2019 619,579 654,950 109,580 27/03/2019 863,157 636,650 23,907 28/03/2019 570,885 296,320 0 29/03/2019 544,082 400,920 104,549 30/03/2019 1,455,735 1,456,560 73,852 31/03/2019 1,647,200 1,662,150 118,117 TOTAL 27,761,034 23,510,840 1,908,656 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- GAMESHA_SHAJAPUR
  • 66. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 47,861 61,301 2,508 02/03/2019 71,481 81,866 1,751 03/03/2019 59,654 63,117 3,294 04/03/2019 67,488 71,462 1,307 05/03/2019 56,407 55,431 531 06/03/2019 50,013 21,945 0 07/03/2019 48,907 21,040 0 08/03/2019 63,427 77,610 1,284 09/03/2019 73,144 92,195 1,763 10/03/2019 53,271 17,963 242 11/03/2019 73,530 57,074 2,383 12/03/2019 60,137 66,017 1,461 13/03/2019 39,027 29,861 38 14/03/2019 48,388 38,762 1,403 15/03/2019 60,289 64,115 674 16/03/2019 74,944 87,368 5,540 17/03/2019 72,307 65,505 2,227 18/03/2019 49,451 47,892 1,061 19/03/2019 40,273 16,964 326 20/03/2019 64,182 42,182 1,299 21/03/2019 63,883 63,524 1,991 22/03/2019 50,365 25,637 1,955 23/03/2019 49,315 37,267 67 24/03/2019 45,353 17,881 69 25/03/2019 53,413 44,108 1,402 26/03/2019 52,792 50,978 6,983 27/03/2019 46,117 40,387 0 28/03/2019 43,882 13,705 0 29/03/2019 54,663 47,469 95 30/03/2019 58,089 73,123 9,934 31/03/2019 68,154 54,640 2,028 TOTAL 1,760,207 1,548,389 53,616 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- WIND_WORLD-IV_33_SUSNER_14.4MW
  • 67. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 81,317 88,053 0 02/03/2019 70,709 71,406 655 03/03/2019 66,527 70,016 217 04/03/2019 68,867 67,105 976 05/03/2019 81,314 83,570 0 06/03/2019 81,314 85,688 0 07/03/2019 81,961 84,107 0 08/03/2019 76,520 82,089 0 09/03/2019 76,491 88,011 0 10/03/2019 77,480 81,312 0 11/03/2019 73,501 73,851 305 12/03/2019 78,278 84,942 0 13/03/2019 78,870 81,122 0 14/03/2019 74,498 78,549 0 15/03/2019 78,158 85,006 0 16/03/2019 78,580 84,965 0 17/03/2019 71,810 74,765 312 18/03/2019 76,311 84,612 0 19/03/2019 77,546 82,846 0 20/03/2019 79,561 70,557 3,808 21/03/2019 80,396 88,692 0 22/03/2019 80,945 81,921 1,338 23/03/2019 80,963 82,992 0 24/03/2019 80,251 82,477 0 25/03/2019 76,840 77,095 0 26/03/2019 78,327 85,726 0 27/03/2019 82,791 86,986 0 28/03/2019 82,196 84,680 0 29/03/2019 76,257 82,264 0 30/03/2019 76,978 73,371 1,801 31/03/2019 77,744 86,353 0 TOTAL 2,403,301 2,515,129 9,412 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- UJAAS_33KV_BERCHA
  • 68. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 1,250,166 1,421,910 117,324 02/03/2019 1,612,912 1,792,510 201,921 03/03/2019 1,150,287 932,620 47,112 04/03/2019 1,277,256 1,258,330 45,835 05/03/2019 1,305,251 1,046,930 27,523 06/03/2019 785,522 487,340 44,056 07/03/2019 804,687 568,970 36,792 08/03/2019 1,149,846 1,301,730 84,577 09/03/2019 1,744,658 1,732,360 92,242 10/03/2019 654,976 101,020 6,421 11/03/2019 1,293,150 1,118,690 43,819 12/03/2019 1,287,897 1,206,710 61,417 13/03/2019 684,778 329,940 79 14/03/2019 1,008,292 673,380 20,646 15/03/2019 996,211 1,036,930 96,411 16/03/2019 1,320,831 1,578,390 165,770 17/03/2019 1,400,340 1,427,980 86,840 18/03/2019 1,118,195 888,910 20,546 19/03/2019 702,834 201,240 11,935 20/03/2019 1,050,584 953,600 19,022 21/03/2019 1,429,371 1,365,180 17,350 22/03/2019 766,958 673,050 121,573 23/03/2019 1,192,265 838,190 161,988 24/03/2019 883,312 378,940 12,024 25/03/2019 851,853 732,080 36,480 26/03/2019 936,121 818,260 180,396 27/03/2019 939,114 863,970 22,843 28/03/2019 751,202 343,020 127 29/03/2019 671,233 511,790 25,421 30/03/2019 1,395,123 1,500,920 47,976 31/03/2019 1,650,751 1,604,560 43,173 TOTAL 34,065,976 29,689,450 1,899,639 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- INOX_200MW_SHAJAPUR
  • 69. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 81,966 81,966 0 02/03/2019 68,238 68,238 0 03/03/2019 65,844 65,844 0 04/03/2019 67,514 67,514 0 05/03/2019 75,565 75,565 0 06/03/2019 81,966 81,966 0 07/03/2019 83,279 83,279 0 08/03/2019 78,507 78,507 0 09/03/2019 77,696 77,696 0 10/03/2019 80,316 80,316 0 11/03/2019 73,814 73,814 0 12/03/2019 78,363 78,363 0 13/03/2019 71,262 71,262 0 14/03/2019 68,991 68,991 0 15/03/2019 73,056 73,056 0 16/03/2019 76,588 76,588 0 17/03/2019 69,581 69,581 0 18/03/2019 74,598 74,598 0 19/03/2019 72,102 72,102 0 20/03/2019 72,138 72,138 0 21/03/2019 74,587 74,587 0 22/03/2019 76,588 76,588 0 23/03/2019 72,775 72,775 0 24/03/2019 73,244 73,244 0 25/03/2019 71,987 71,987 0 26/03/2019 72,796 72,796 0 27/03/2019 76,523 76,523 0 28/03/2019 74,420 74,420 0 29/03/2019 73,156 73,156 0 30/03/2019 70,589 70,589 0 31/03/2019 73,391 73,391 0 TOTAL 2,301,440 2,301,440 0 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- UJAAS_I_S_RAJGARH_BIORA_15MW
  • 70. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/03/2019 59,331 80,419 1,775 02/03/2019 78,615 90,587 4,818 03/03/2019 57,472 56,435 425 04/03/2019 76,355 94,523 4,768 05/03/2019 69,516 53,592 1,453 06/03/2019 39,564 23,865 0 07/03/2019 30,876 19,369 26 08/03/2019 47,396 40,959 0 09/03/2019 93,834 102,481 794 10/03/2019 28,346 10,168 105 11/03/2019 51,983 56,870 4,125 12/03/2019 53,745 45,288 528 13/03/2019 31,658 25,151 0 14/03/2019 39,809 31,389 69 15/03/2019 50,119 50,118 294 16/03/2019 82,314 98,955 2,640 17/03/2019 66,887 54,462 66 18/03/2019 68,190 60,557 2,209 19/03/2019 34,975 25,741 0 20/03/2019 41,919 55,144 1,448 21/03/2019 92,954 77,229 14,984 22/03/2019 46,734 42,691 241 23/03/2019 73,413 55,487 2,390 24/03/2019 40,998 31,705 0 25/03/2019 44,373 40,305 7,532 26/03/2019 49,431 36,139 4 27/03/2019 51,903 45,167 901 28/03/2019 43,409 31,628 9 29/03/2019 29,774 21,650 0 30/03/2019 85,482 103,751 2,301 31/03/2019 134,947 154,856 30,197 TOTAL 1,796,322 1,716,681 84,102 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF March-2019 NAME OF QCA :- MANIKARAN NAME OF POOLING STATION :- WIND_WORLD_II_WIND_33_CHAPDA
  • 71. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF MARCH - 2019 NAME OF QCA :-NA NAME OF POOLING STATION :-NTPC LIMITED, RAJGARH (PROJECT UNDER JNSM) DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-03-2019 260500 293635 174 02-03-2019 169250 194198 12227 03-03-2019 213750 218560 5141 04-03-2019 213500 230766 1282 05-03-2019 232750 242129 2697 06-03-2019 248000 280622 230 07-03-2019 254250 279598 210 08-03-2019 245000 269567 186 09-03-2019 254750 290279 8 10-03-2019 234750 265761 87 11-03-2019 213500 250393 2304 12-03-2019 249500 277682 16 13-03-2019 246250 262397 8 14-03-2019 246250 259159 20 15-03-2019 246250 276419 12 16-03-2019 246250 276044 0 17-03-2019 230250 223419 3627 18-03-2019 246250 274484 32 19-03-2019 246250 273747 40 20-03-2019 234750 239001 1999 21-03-2019 246250 286246 61 22-03-2019 246250 261029 69 23-03-2019 246250 271826 76 24-03-2019 246250 266208 93 25-03-2019 246250 247624 229 26-03-2019 246250 272845 154 27-03-2019 246250 272779 235 28-03-2019 246250 261021 68 29-03-2019 246250 264262 150 30-03-2019 246250 266611 194 31-03-2019 246250 270839 162 TOTAL 7440750 8119150 31791 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur