MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
vkbZ ,l vks : 9001-2008
ISO: 9001-2008
CIN-U40109MP2001SGC014880, Email-mdtransco.nic.in
STATE LOAD DESPATCH CENTRE, Nayagaon, Rampur, Jabalpur
Telephone: (0761) 2970089 Fax: (0761) 2664343 e-mail sldcmpjbp@gmail.com
No.07-05/REG-201/W&S-DSM/154-A/2851 Jabalpur, dtd: - 24.10.2019
As Per Distibrution List
Sub: DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019 on the basis of MPERC
(Forecasting, Scheduling, Deviation Settlement Mechanism and related matters of Wind and Solar Generating
Stations) Regulations, 2018.
In pursuance to MPERC (Forecasting, Scheduling, Deviation Settlement Mechanism and related matters of Wind
and Solar Generating Stations) Regulations, 2018, SLDC has prepared the DSM Account of Wind Pooling Stations having
combined installed capacity of 10MW and above and Solar Pooling Stations with an installed capacity of 5MW and above
including Wind and Solar Pooling Stations selling InterState and having combined installed capcity less than 10MW and 5
MW.
The Generators of the following Pooling stations have not appointed the QCA and also not furnished the
Forecasting and Availability data for the month of AUGUST 2019 to the SLDC. As such, SLDC has computed the Deviation
Charges of these Pooling Stations considering the Availability and Schedules as “Zero” and DSM Account is issued to
Developer.
i. 11.95MW Wincon Jaora.
The ABT meters installed at the following Generating Stations are recording 15 minutes block wise data on sliding
window principal instead of load survey, thus, blockwise data does not match with midnight data recorded by the meters.
The midnight values are correct; this has been confirmed by M/s Secure Meters Ltd. As such, the monthly midnight data has
been distributed in 15 minutes’ time block as per injection pattern of generation and accordingly the Deviation Charges have
been computed.
i. 12MW Avenger solar pvt Ltd. connected at 132KV S/s Suwasara.
ii. 5.1MW Porwal Auto Component connected at 132KV S/s Makdon.
iii. 27.3MW AVP Power Infra Pvt. Ltd. connected at 132KV S/s Sonkatchh.
iv. 25.2MW Suzlon Gujrat wind Park Pvt. Ltd. Barod connected at 220KV S/s Barod.
v. 15MW M.P. Wind Farm Nagda Hill connected at 220KV S/s Dewas.
vi. 14.4MW Suzlon I Ratlam connected at 132KV S/s Jaora.
vii. 13.5MW Suzlon IV Ratlam connected at 132KV S/s Jaora.
viii. 12MW Suzlon V Ratlam connected at 132KV S/s Jaora.
ix. 14.4MW Suzlon I Sailana connected at 132KV S/s Sailana.
x. 15MW Suzlon II Sailana connected at 132KV S/s Sailana.
xi. 14.1MW Suzlon III Sailana connected at 132KV S/s Sailana.
xii. 15MW Suzlon I (Susner I) connected at 132KV S/s Susner.
xiii. 15MW Suzlon II (Susner II) connected at 132KV S/s Susner.
xiv. 15MW Suzlon III (Agar I) connected at 132KV S/s Agar.
xv. 15MW Suzlon IV (Agar II) connected at 132KV S/s Agar.
xvi. 15MW Suzlon V (Susner III) connected at 132KV S/s Susner.
xvii. 14.7MW Suzlon Behapur Daloda- I connected at 220KV Daloda.
xviii. 15 MW Suzlon Behapur Daloda- I connected at 220KV Daloda.
xix. 8.5MW Friend salt Works & Allied Industries connected at 132KV S/s Susner.
xx. 14.4MW Ujaas- I Barod connected at 220KV S/s Barod.
xxi. 12.63MW Ujaas- II Barod connected at 220KV S/s Barod.
xxii. 15MW Ujaas –I Rajgarh (Biora) connected at 220KV S/s Rajgarh.
xxiii. 13.75MW Suzlon Dev. I Pvt. Ltd. connected at 220KV S/s Dewas.
The availability and schedule in some block of following pooling station has been considered as Zero due to shutdown in
following pooling station –
- 1 -
i. 11MW M/s Simcon Feeder-II (On 20th
AUGUST 2019 from 14:45Hr to 15:15Hr)
As per Clause 9.0 of MPERC (Forecasting, Scheduling, Deviation Settlement Mechanism and related matters of Wind
and Solar Generating Stations) Regulations, 2018, payment to the DSM Account shall be made within 10 days from the date
of issue of this statement. DSM Payments are to be made on the basis of this account only and no further invoicing is
required by SLDC. Payment received after 12 days shall attract simple interest @ 0.04% for each day of delay. SLDC shall
pay to the entities entitled to receive payment on account of Deviation Charges within 2 working days of receipt of the
payments in the “State Deviation Pool Account”. The settlement of Deviation Charges shall be done through State Pool
Account maintained by SLDC. The bank account details are as under:
1. Name of the Bank - BANK OF INDIA
2. Branch - CIVIL LINES BRANCH JABALPUR.
3. Title of the Account - MPPTCL SLDC DSM A/C
4. Bank account No - 940220110000263
5. IFS Code - BKID0009402
6. Branch Code - 9402
7. Type of Account - Current Account.
All QCA’s / Generators are requested to pay the Deviation Charges to the above State Pool Account maintained by
SLDC.
The signed copy of the above DSM account alongwith block-wise details are being sent through email. The DSM
account shall be also be made available on SLDC website www.sldcmpindia.com shortly for downloading by QCA. The
verification, if required, can be done at SLDC.
All the QCA’s / Generators are requested to check and verify the State DSM Account and intimate the
discrepancies observed if any within a period of 15 days.
Chief Engineer (LD)
SLDC MPPTCL, Jabalpur
……
- 2 -
- 3 -
Distribution List
1. The Chief General Manager (Comml-3), Regional Office, MPPMCL, E-4, Arera Colony, Prakash Parisar, Near
Bhojpur Club, Bhopal-462016, M.P. Jabalpur. Email – rajeevkeskar@gmail.com
2. The Chief General Manager (Comml.), MPMKVVCL, Govindpura, Bhopal, Email-ce.commercial@mpmkvvc.com,
3. The Chief Engineer (Comml.), MPPaKVVCL, GPH Compound, Polo Ground, Indore, Email- cecomwz@gmail.com,
4. The Chief Financial Officer, MPPTCL, Jabalpur.
5. The Suptdg Engineer (MT-1), Corporate Office, M.P. Pashchim Kshetra Vidyut Vitaran Co. Ltd., GPH Compound,
Polo Ground, Indore. Email-achal.jain@mpwz.co.in
6. The General Manager (Comml.-III), O/o MD (CZ) MPMKVVCL, Nistha Parisar., MPMKVVCL, Govindpura, Bhopal,
Email-khanooja@gmail.com, mpczc3@gmail.com
7. The ED (Operation) M.P. Paschim Kshetra Vidyut Vitran Co. Ltd., Indore GPH Compound Pologround Indore
452003
8. M/s Malwa Solar Power Generation Pvt Ltd. 4th Floor, Dr. Gopaldas Bhawan, 28, Barakhamba Road, Cannaught
Place, New Delhi – 110001, Fax: 0124-4716120. India. Email:keshav.prasad@ilfsindia.com,
pradeep.chauhan@ilfsindia.com.
9. M/s WAANPEEP Solar Pvt. Ltd., 602, Western Edge-I, Western Express Highway, Borivali (E), Mumbai-400066,
Fax: 022-66444400, Email- kamalmarwah@waaneep.com
10. M/s Focal Renewable Energy Two India Pvt Ltd., 308, third Floor, Rectangle One Building D-4, Commercial
Complex, Saket, New Delhi -110017, Fax -011-41704901, Email – kvikas@focal_energy.com
11. M/s Solar EnrgyCorroration Of India, D-3, First Floor , Wing-a, ReligareBuliding, Distrcit Centre , Saket, New Delhi
110017,Fax-011-71989244, Email – corporate@seci.gov.in
12. M/s Manikaran Analytics Ltd., 2nd Floor, D21, Corporate Park, Sector-21, Dwarika, New Delhi – 110075 , Email –
contactus@manikarananalytics.in,rakesh@manikarananalytics.in, bd.mp@manikarananalytics.in
13. M/s Reconnect Energy Pvt. Ltd. C-301,Nirvana Courtyard, Nirvana Country Sector 50, Gurgaon 122018 H ,Email –
info@reconnectenergy.com, mithun.dubey@reconnectenergy.com,piyush.joshi@reconnectenergy.com
14. M/s Statkraft Markets Private Ltd., 403, 4th Floor, SalconRasvilas Building, Saket District Centre, New Delhi –
110017, Email – anwar.alam@statkraft.com
15. M/s ACME Solar Energy (MP) Private Ltd., Plot No.152, Sector-44, Gurgaon-122002(Haryana), Email –
planthead.khilchipur.solar@acme.in
16. M/s Alfa Infraprop Pvt Ltd., NamanMidtown,’A’ Wing, 21st Floor, Senapati Bapat Marg, Elephinstone Road West,
Mumbai-400013, Email –Sanjay.Shah@alfainfraprop.com
17. M/s Regent Climate Connect Knowledge Solutions Pvt Ltd., Appt. 215, Green Tower Society, Plot 7 C, Sector-23,
Dwarka, New Delhi-110075Email - info@climate-connect.com, Pranav.vohra@climate-connect.com
18. M/s NTPC Ltd., E-1/72, Arera Colony, Bhopal – 462016, M.P. EMAIL:- pbvenkatesh@ntpc.co.in
19. M/s Mandsaur Solar Power Project village Gujjarkhedi Runija Teh Suwasara, District – Mandsaur(M.P.)
458888.Email-mandsaursolarpv@gmail.com
19. M/s M.P. WIND FARM NAGDA HILL, ENERGY TOWER, 64, B-Sector, Kasturba Nagar,Bhopal-462023,
Email-info@cecl.in, windpoweindia@gmail.com,mpwlindia@gmail.com
20. M/s Pioneer Wincon Energy Systems Pvt. Ltd. Upmanyu house Ambika City homes Near Narsingh Home
Hospital Piploda Road Jaora – 457226. boobalakrishnank@pioneerwincon.com
21. M/s Designco Manufacturer & Exporter, LakriFazalpur, Delhi Road, Moradabad-244001, Email:
info@designco-india.com, vivekasthana.79@gmail.com
22. M/s Mittal Processor Pvt. Ltd, 1002-1004, Antriksh Bhawan, 22K. G. Marg, Cannought Place, New Delhi
-110001, email – Mayank.gupta@kreatenergy.com, controlroom@mittalgroup.com – (On behalf of M/s
Ramesh Steels).
23. M/s Vedenjay Power Pvt Ltd., Plot No.4/F/53, Above BOI-Bank, Nai Sadak, Scheme No.78, B Road, Indore-
452010, Email – vedanjaypower@gmail.com
24. M/s Focal Energy Solar One India Pvt. Ltd. Unit No. 601 & 602, 6th
Floor, Tower B, Emaar Digital Greens
Sector 61, Golf Course Ext. Road , Gurgaon 122002
25. M/s Kreate Technologies LLP 1003,10th Floor Anthriksh Bhavan, 22- KG Marg, New Delhi 110001 Email-
mithilesh.yadav@kreatetechnologies.com
………
All Figures in Rs.
INTRA STATE DEVIATION
CHARGES
PAYABLE PAYABLE RECEIVABLE
FOCAL ENERGY SOLAR ONE INDIA Pvt. Ltd. 159,134 332,758 491,892
40MW_MALWA (IL&FS_Solar) (999,827) (999,827)
MANIKARAN ANALYTICS LTD. 9,714,098 1,048,297 10,762,395
ACME SOLAR ENERGY PVT. LTD. 228,879 228,879
ALFA INFRAPROP PVT LTD 120,188 (3,044,189) (2,924,001)
MANDSAUR_SOLAR_POWER_SOLAR_220_GUJARKHEDI 1,177,716 1,177,716
NTPC_RAJGARH 92,823 92,823
WINCON_W_JAORA_11.95MW 213,717 213,717
RECONNECT ENERGY SOLUTIONS PVT LTD. 27,907,079 27,907,079
REGENT CLIMATE CONNECT KNOWLEDGE SOLUTIONS
PVT. LTD
115,995 115,995
STATKRAFT MARKETS PVT LTD. 2,942,637 2,942,637
KREATE TECHNOLOGIES LLP 70,655 (313,678) (243,023)
VEDANJAY POWER 65,593 65,593
TOTAL 42,808,514 1,381,055 (4,357,694) 39,831,875
-RECEIVABLE
Assistant Engineer(LD) Executive Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MADHYA PRADESH POWER TRANSMISSION COMPANY
QCA / DEVELOPERS / GENERATOR
NET DSM
RECEIVABLE/PAYABLE
INTER STATE DEVIATION CHARGES
STATE LOAD DESPATCH CENTRE - JABALPUR
QCA WISE SUMMERY REPORT OF DEVIATION CHARGES OF WIND & SOLAR POOLING STATIONS FOR AUGUST-2019
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in `
0 1 - 0 8 - 2 0 1 9 2 8 8 7 4 3 7 2 1 4 - 3 4 1 0 2
0 2 - 0 8 - 2 0 1 9 2 8 2 7 3 3 1 6 6 8 - 1 7 4 1 9
0 3 - 0 8 - 2 0 1 9 3 0 1 9 2 4 0 3 8 8 - 5 0 8 5 7
0 4 - 0 8 - 2 0 1 9 3 9 1 5 3 4 3 3 7 8 - 2 0 7 5 5
0 5 - 0 8 - 2 0 1 9 2 5 5 6 9 3 7 7 9 0 - 5 2 2 7 7
0 6 - 0 8 - 2 0 1 9 3 7 0 2 9 4 3 6 7 6 - 3 5 1 0 3
0 7 - 0 8 - 2 0 1 9 2 2 2 3 1 1 5 2 9 6 4 3 1 9 0
0 8 - 0 8 - 2 0 1 9 1 8 2 5 7 1 5 2 0 8 2 2 0 0 6
0 9 - 0 8 - 2 0 1 9 2 2 8 1 6 1 1 4 0 0 6 5 4 2 0
1 0 - 0 8 - 2 0 1 9 2 9 7 1 9 3 5 6 0 0 - 3 1 2 1 6
1 1 - 0 8 - 2 0 1 9 4 0 9 9 8 3 6 0 0 5 2 9 6 9 8
1 2 - 0 8 - 2 0 1 9 4 1 2 1 4 4 2 1 3 3 - 4 8 3 0
1 3 - 0 8 - 2 0 1 9 4 4 0 2 8 3 7 9 7 6 3 5 2 0 5
1 4 - 0 8 - 2 0 1 9 3 0 4 9 8 1 2 8 9 5 1 0 5 6 7 9
1 5 - 0 8 - 2 0 1 9 1 3 8 2 0 3 7 2 9 5 5 5 1 6
1 6 - 0 8 - 2 0 1 9 3 1 4 5 5 2 8 3 0 7 1 9 2 7 8
1 7 - 0 8 - 2 0 1 9 3 1 0 7 5 3 3 3 6 0 - 7 2 0 7
1 8 - 0 8 - 2 0 1 9 2 9 6 3 2 1 7 7 5 2 6 9 0 8 9
1 9 - 0 8 - 2 0 1 9 3 6 4 1 8 4 8 4 4 5 - 6 1 0 0 2
2 0 - 0 8 - 2 0 1 9 4 4 6 4 9 4 9 3 5 3 - 2 2 7 5 3
2 1 - 0 8 - 2 0 1 9 5 0 8 5 4 5 2 1 0 4 - 2 4 4 8
2 2 - 0 8 - 2 0 1 9 5 0 9 2 1 5 0 7 6 6 1 8 6 1
2 3 - 0 8 - 2 0 1 9 5 3 7 4 0 5 5 6 0 9 - 9 5 3 7
2 4 - 0 8 - 2 0 1 9 4 4 2 6 6 3 0 5 3 7 7 8 0 0 3
2 5 - 0 8 - 2 0 1 9 1 7 7 3 3 1 4 7 6 5 1 6 8 0 5
2 6 - 0 8 - 2 0 1 9 2 0 9 0 4 2 2 0 1 6 - 5 5 0 0
2 7 - 0 8 - 2 0 1 9 3 8 0 2 0 3 5 6 2 6 1 5 2 4 1
2 8 - 0 8 - 2 0 1 9 3 0 0 2 7 2 8 6 3 1 8 3 2 1
2 9 - 0 8 - 2 0 1 9 3 9 8 7 9 3 2 5 0 3 4 5 6 1 9
3 0 - 0 8 - 2 0 1 9 3 1 5 3 6 4 0 0 2 8 - 4 3 2 2 3
3 1 - 0 8 - 2 0 1 9 4 3 6 1 6 4 3 8 8 6 5 3 1
T O T A L 1 0 4 7 3 9 6 1 0 2 8 0 4 4 2 1 3 2 3 3
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
NAME OF POOLING STATION :- M/s FOCAL RENEWABLE ENERGY TWO INDIA PVT. LTD.
NAME OF QCA :-MANIKARAN
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF August-19
DATE SCHEDULE in KWH ACTUAL in KWH
DEVIATION CHARGES in
`
0 1 - 0 8 - 2 0 1 9
71,300 72,940 10,824
0 2 - 0 8 - 2 0 1 9
69,236 60,191 58,492
0 3 - 0 8 - 2 0 1 9
62,099 73,620 -55,451
0 4 - 0 8 - 2 0 1 9
66,794 83,260 -80,300
0 5 - 0 8 - 2 0 1 9
46,396 72,831 -117,495
0 6 - 0 8 - 2 0 1 9
92,245 82,412 55,110
0 7 - 0 8 - 2 0 1 9
61,425 27,309 194,418
0 8 - 0 8 - 2 0 1 9
38,712 24,505 93,425
0 9 - 0 8 - 2 0 1 9
26,846 17,766 51,268
1 0 - 0 8 - 2 0 1 9
36,074 69,453 -176,118
1 1 - 0 8 - 2 0 1 9
73,815 68,181 32,270
1 2 - 0 8 - 2 0 1 9
76,743 79,689 -12,829
1 3 - 0 8 - 2 0 1 9
67,260 56,270 73,840
1 4 - 0 8 - 2 0 1 9
56,503 21,871 198,181
1 5 - 0 8 - 2 0 1 9
16,204 5,747 57,521
1 6 - 0 8 - 2 0 1 9
46,006 56,186 -53,660
1 7 - 0 8 - 2 0 1 9
53,581 66,755 -68,421
1 8 - 0 8 - 2 0 1 9
53,103 32,304 116,951
1 9 - 0 8 - 2 0 1 9
63,133 89,544 -135,604
2 0 - 0 8 - 2 0 1 9
97,510 90,344 43,809
2 1 - 0 8 - 2 0 1 9
98,725 93,582 36,895
2 2 - 0 8 - 2 0 1 9
95,731 102,868 -38,223
2 3 - 0 8 - 2 0 1 9
103,023 95,149 47,540
2 4 - 0 8 - 2 0 1 9
79,104 59,563 111,425
2 5 - 0 8 - 2 0 1 9
32,294 26,220 36,928
2 6 - 0 8 - 2 0 1 9
34,451 40,040 -27,347
2 7 - 0 8 - 2 0 1 9
60,261 69,150 -33,438
2 8 - 0 8 - 2 0 1 9
52,393 55,799 -9,889
2 9 - 0 8 - 2 0 1 9
63,529 65,702 -5,958
3 0 - 0 8 - 2 0 1 9
60,113 82,111 -112,924
3 1 - 0 8 - 2 0 1 9
90,074 84,332 41,518
TOTAL 1,944,683 1,925,694 332,758
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
NAME OF POOLING STATION :- FOCAL ENERGY SOLAR ONE INDIA PVT. LTD.
NAME OF QCA :-M/s FOCAL ENERGY SOLAR ONE INDIA PVT. LTD.
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF August-19
DATE SCHEDULE in KWH ACTUAL in KWH
DEVIATION CHARGES in
`
0 1 - 0 8 - 2 0 1 9
106,732 103,850 16,440
0 2 - 0 8 - 2 0 1 9
79,640 102,770 -120,501
0 3 - 0 8 - 2 0 1 9
96,652 109,230 -63,294
0 4 - 0 8 - 2 0 1 9
156,482 214,120 -282,059
0 5 - 0 8 - 2 0 1 9
151,289 164,830 -67,450
0 6 - 0 8 - 2 0 1 9
102,023 110,030 -42,687
0 7 - 0 8 - 2 0 1 9
105,406 92,330 86,979
0 8 - 0 8 - 2 0 1 9
115,999 113,540 26,319
0 9 - 0 8 - 2 0 1 9
88,807 115,330 -122,334
1 0 - 0 8 - 2 0 1 9
184,170 230,480 -205,962
1 1 - 0 8 - 2 0 1 9
172,030 210,000 -198,529
1 2 - 0 8 - 2 0 1 9
175,231 166,930 57,231
1 3 - 0 8 - 2 0 1 9
138,165 123,320 85,292
1 4 - 0 8 - 2 0 1 9
99,277 40,760 323,956
1 5 - 0 8 - 2 0 1 9
82,838 58,890 131,730
1 6 - 0 8 - 2 0 1 9
193,100 160,910 184,709
1 7 - 0 8 - 2 0 1 9
200,166 206,920 -30,873
1 8 - 0 8 - 2 0 1 9
154,944 99,450 314,271
1 9 - 0 8 - 2 0 1 9
198,392 257,580 -314,463
2 0 - 0 8 - 2 0 1 9
198,022 172,430 161,653
2 1 - 0 8 - 2 0 1 9
215,506 218,240 -11,314
2 2 - 0 8 - 2 0 1 9
239,714 227,740 70,725
2 3 - 0 8 - 2 0 1 9
237,919 228,260 55,134
2 4 - 0 8 - 2 0 1 9
108,672 64,960 244,726
2 5 - 0 8 - 2 0 1 9
93,033 54,350 213,232
2 6 - 0 8 - 2 0 1 9
96,435 95,050 18,493
2 7 - 0 8 - 2 0 1 9
162,217 192,720 -145,117
2 8 - 0 8 - 2 0 1 9
172,970 101,430 410,846
2 9 - 0 8 - 2 0 1 9
160,983 201,570 -204,070
3 0 - 0 8 - 2 0 1 9
165,507 150,560 100,778
3 1 - 0 8 - 2 0 1 9
200,847 178,570 141,203
TOTAL 4,653,168 4,567,150 835,064
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
NAME OF QCA :-MANIKARAN
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF August-19
NAME OF POOLING STATION :- M/s WAANEEP Solar Pvt. Ltd
DATE SCHEDULE in KWH ACTUAL in KWH
DEVIATION CHARGES in
`
01/08/2019
1 1 7 7 7 7 1 3 2 8 8 6 - 3 8 4 7 0
02/08/2019
9 2 6 1 9 1 2 7 6 3 6 - 1 7 9 2 5 1
03/08/2019
1 1 0 4 6 1 1 3 8 2 9 8 - 1 3 4 3 4 4
04/08/2019
1 2 9 5 4 8 1 7 8 7 8 0 - 2 3 7 9 9 4
05/08/2019
1 3 3 0 3 1 2 0 6 2 5 4 - 3 6 5 8 3 4
06/08/2019
1 3 3 0 3 1 1 2 3 3 8 0 5 4 4 4 0
07/08/2019
9 0 8 3 3 3 6 0 0 2 3 1 2 4 2 7
08/08/2019
7 8 0 2 2 1 0 5 5 8 8 - 1 2 6 8 7 3
09/08/2019
8 6 8 9 4 6 4 0 2 2 1 2 9 9 3 7
10/08/2019
1 5 4 5 8 2 1 6 5 1 2 2 - 5 3 1 9 3
11/08/2019
1 3 3 0 3 1 1 1 9 7 7 6 7 9 4 4 4
12/08/2019
1 3 3 0 3 1 1 6 9 0 8 6 - 1 9 6 1 9 5
13/08/2019
1 0 6 8 0 1 1 7 7 0 5 0 - 3 5 0 1 3 4
14/08/2019
1 0 6 8 0 1 4 5 0 6 2 3 4 9 5 6 5
15/08/2019
6 5 0 9 9 1 2 9 2 6 2 9 3 8 8 9
16/08/2019
9 7 5 5 0 9 8 4 1 8 9 2 1 1
17/08/2019
1 1 8 4 8 0 1 3 0 0 9 6 - 5 9 0 2 5
18/08/2019
9 7 5 1 9 6 6 2 7 6 1 7 3 4 3 2
19/08/2019
1 2 7 6 1 6 1 9 8 4 8 4 - 3 5 9 2 1 5
20/08/2019
1 3 5 6 7 9 1 7 0 7 6 0 - 1 7 0 6 8 1
21/08/2019
1 7 6 0 1 4 2 2 5 3 5 4 - 2 4 7 8 4 9
22/08/2019
1 7 3 7 0 5 2 1 0 8 2 8 - 1 9 1 4 0 2
23/08/2019
1 5 2 2 1 8 1 2 2 1 0 0 1 8 3 4 0 3
24/08/2019
1 1 0 1 7 9 7 5 0 9 4 1 9 5 9 8 5
25/08/2019
7 7 0 8 8 6 4 6 2 8 7 0 0 4 1
26/08/2019
7 7 0 8 8 5 5 6 3 8 1 1 9 0 3 6
27/08/2019
1 1 4 4 7 5 1 4 6 1 5 0 - 1 5 7 4 0 1
28/08/2019
1 2 4 2 4 5 1 1 9 2 5 0 2 8 5 2 3
29/08/2019
1 4 5 4 1 0 1 7 3 8 5 4 - 1 3 4 9 6 4
30/08/2019
1 5 0 0 2 4 1 3 1 5 5 6 1 3 2 1 0 4
3 1 - 0 8 - 2 0 1 9 1 6 4 8 0 0 1 9 1 1 4 8 - 1 2 8 4 3 9
TOTAL 3,713,651 3,981,502 -999,827
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
NAME OF QCA :- NOT QCA APPOINTMENT
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
STATE LOAD DESPATCH CENTRE - JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF August-19
NAME OF POOLING STATION :- M/s Malwa Solar Power Generation Ltd.(IL and FS)
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-KREATE TECHNOLOGIES LLP
NAME OF POOLING STATION :-SIMCON FEEDER -1
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 29244 14595 172
02-08-2019 39647 32491 284
03-08-2019 44405 44041 353
04-08-2019 39573 51417 2287
05-08-2019 50805 63982 4633
06-08-2019 29164 38670 238
07-08-2019 38615 33960 229
08-08-2019 25353 34883 3839
09-08-2019 37511 38259 1935
10-08-2019 28301 63999 14336
11-08-2019 59630 66603 2039
12-08-2019 44458 39900 596
13-08-2019 21114 3786 183
14-08-2019 23471 48 225
15-08-2019 3861 1 1
16-08-2019 0 4 4
17-08-2019 43193 58260 8512
18-08-2019 4393 3474 745
19-08-2019 59752 58719 324
20-08-2019 58808 61254 4067
21-08-2019 54790 41666 0
22-08-2019 59080 65819 396
23-08-2019 42757 35923 656
24-08-2019 34683 16433 6022
25-08-2019 26703 23607 1533
26-08-2019 43827 43532 4136
27-08-2019 61225 65095 1353
28-08-2019 51450 52253 2952
29-08-2019 64107 68792 1408
30-08-2019 54539 56532 2378
31-08-2019 42618 51725 4819
TOTAL 1217077 1229723 70655
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-KREATE TECHNOLOGIES LLP
NAME OF POOLING STATION :-SIMCON FEEDER -2
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 33321 10474 88004
02-08-2019 29121 23119 22627
03-08-2019 19103 31072 -38224
04-08-2019 19071 33697 -47524
05-08-2019 26471 42477 -51385
06-08-2019 25555 25276 1352
07-08-2019 35489 22909 51527
08-08-2019 28105 22937 22545
09-08-2019 23759 23167 2660
10-08-2019 21027 38738 -57689
11-08-2019 20220 43032 -72698
12-08-2019 26572 26968 -588
13-08-2019 33102 2899 118656
14-08-2019 26803 5 103018
15-08-2019 15965 0 58572
16-08-2019 11029 2367 31810
17-08-2019 8468 36276 -89967
18-08-2019 0 2353 0
19-08-2019 19880 37964 -59406
20-08-2019 18774 38677 -63169
21-08-2019 22858 26982 -13533
22-08-2019 22949 43028 -66807
23-08-2019 18897 25878 -23148
24-08-2019 22993 11356 44499
25-08-2019 23094 16540 24036
26-08-2019 17505 29531 -36529
27-08-2019 15946 42824 -87059
28-08-2019 20270 34330 -46219
29-08-2019 24573 45295 -68683
30-08-2019 27063 38085 -34922
31-08-2019 26787 34607 -25434
TOTAL 684770 812863 -313678
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-ACME SOLAR ENERGY PVT. LTD.
NAME OF POOLING STATION :-ACME SOLAR ENERGY PVT. LTD
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 60705 54352 7035
02-08-2019 46775 57633 4233
03-08-2019 76665 105672 14446
04-08-2019 75941 104532 5473
05-08-2019 74373 85226 4559
06-08-2019 60747 68084 15832
07-08-2019 45438 40237 1752
08-08-2019 50925 86570 14027
09-08-2019 47429 60702 7228
10-08-2019 92604 121667 4083
11-08-2019 88665 96558 11606
12-08-2019 99714 111860 1820
13-08-2019 95959 58727 5350
14-08-2019 46684 22867 3515
15-08-2019 50698 8082 7729
16-08-2019 45617 56708 1924
17-08-2019 73395 85706 7537
18-08-2019 48074 20934 1504
19-08-2019 123751 125564 6825
20-08-2019 96490 110879 1322
21-08-2019 113019 101077 10764
22-08-2019 94085 105190 18799
23-08-2019 70438 85108 17579
24-08-2019 58070 29862 10322
25-08-2019 56314 55140 5194
26-08-2019 51133 49972 2763
27-08-2019 95666 94566 5745
28-08-2019 71745 55015 14575
29-08-2019 100604 114213 8868
30-08-2019 75585 90937 1962
31-08-2019 113129 118977 4508
TOTAL 2300437 2382617 228879
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-ALFA INFRAPROP PVT LTD
NAME OF POOLING STATION :-ALFA INFRAPROP PVT LTD. (20MW) KUKSHI
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 44382 40178 444
02-08-2019 69257 67090 4448
03-08-2019 56864 52119 1684
04-08-2019 43589 41722 2356
05-08-2019 46797 35955 4073
06-08-2019 79613 78389 7022
07-08-2019 52587 31856 1351
08-08-2019 35056 10332 1116
09-08-2019 39215 12820 3663
10-08-2019 69853 72015 6465
11-08-2019 48895 46336 3883
12-08-2019 78646 91485 6680
13-08-2019 102702 101231 1193
14-08-2019 58275 45803 784
15-08-2019 39642 27703 866
16-08-2019 58429 70520 4305
17-08-2019 87159 95638 3705
18-08-2019 62841 82486 17632
19-08-2019 77631 67770 6216
20-08-2019 75871 92440 4976
21-08-2019 79117 80155 8734
22-08-2019 101536 106763 4265
23-08-2019 113838 110534 748
24-08-2019 88877 69076 5641
25-08-2019 54217 30944 1174
26-08-2019 32916 8062 66
27-08-2019 36726 26553 1447
28-08-2019 63065 47166 1961
29-08-2019 98204 94935 3482
30-08-2019 102310 104779 6834
31-08-2019 91525 88582 2974
TOTAL 2089635 1931437 120188
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-ALFA INFRAPROP PVT LTD
NAME OF POOLING STATION :-SUN PHARMACEUTICAL INDUSTRIES LTD
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 33383 70510 -104219
02-08-2019 42354 106212 -206025
03-08-2019 51277 109827 -196686
04-08-2019 60564 81728 -74143
05-08-2019 78199 99437 -67000
06-08-2019 55616 135833 -262545
07-08-2019 63394 42498 80582
08-08-2019 79425 59841 72095
09-08-2019 51293 31330 72582
10-08-2019 44730 125467 -265892
11-08-2019 45891 97911 -175609
12-08-2019 78395 132092 -142630
13-08-2019 59776 93510 -116935
14-08-2019 59464 25748 126335
15-08-2019 42472 13262 105508
16-08-2019 59776 94016 -115727
17-08-2019 39427 116300 -252887
18-08-2019 46005 68733 -80570
19-08-2019 84242 152198 -227018
20-08-2019 68911 110517 -138118
21-08-2019 96824 167131 -233753
22-08-2019 78335 162809 -278642
23-08-2019 84242 70074 59138
24-08-2019 99054 50126 187744
25-08-2019 43088 51000 -27048
26-08-2019 43214 53661 -33740
27-08-2019 45488 98553 -166125
28-08-2019 51319 78796 -93891
29-08-2019 68392 130814 -205990
30-08-2019 68264 96807 -94064
31-08-2019 71704 127903 -188916
TOTAL 1894518 2854644 -3044189
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-Regent Climate Connect Knowledge Solutions Pvt Ltd
NAME OF POOLING STATION :-AVENGERS SOLAR PVT LTD
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 45136 43274 5863
02-08-2019 34657 39351 1506
03-08-2019 40769 51585 7341
04-08-2019 51912 53739 6378
05-08-2019 47823 67374 8174
06-08-2019 52328 53003 6099
07-08-2019 23534 15724 309
08-08-2019 33284 25140 15781
09-08-2019 26330 17112 1282
10-08-2019 45512 45621 5057
11-08-2019 40809 43695 1839
12-08-2019 48045 52892 1052
13-08-2019 52770 54106 2850
14-08-2019 19835 12478 0
15-08-2019 18283 3170 0
16-08-2019 33764 26689 1900
17-08-2019 49920 46455 7281
18-08-2019 24860 17696 32
19-08-2019 58278 71461 2953
20-08-2019 66371 56457 5044
21-08-2019 71395 69793 1763
22-08-2019 77901 73963 2488
23-08-2019 60252 53964 6251
24-08-2019 35282 31098 1482
25-08-2019 21448 22486 3487
26-08-2019 28660 24121 1961
27-08-2019 51801 49341 3194
28-08-2019 39439 43974 4430
29-08-2019 48904 55778 2628
30-08-2019 59317 53393 3431
31-08-2019 64663 63846 4139
TOTAL 1373282 1338779 115995
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-FOCAL ENERGY SOLAR ONE INDIA PVT. LTD.
NAME OF POOLING STATION :-GLOBUS STEEL_N_ POWER PVT LTD
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 69756 64886 2161
02-08-2019 66388 59153 4426
03-08-2019 59502 76514 9953
04-08-2019 73984 80888 5485
05-08-2019 50464 66574 18883
06-08-2019 88394 85778 160
07-08-2019 53653 28350 9488
08-08-2019 33331 24452 6739
09-08-2019 27008 19088 217
10-08-2019 34750 62576 3475
11-08-2019 65654 61603 524
12-08-2019 64886 80421 6746
13-08-2019 69524 69252 3617
14-08-2019 58343 21596 5606
15-08-2019 17555 4098 0
16-08-2019 44417 43329 1497
17-08-2019 51095 62021 2598
18-08-2019 35455 36863 747
19-08-2019 67322 103189 7915
20-08-2019 107730 98408 1632
21-08-2019 103778 108860 7655
22-08-2019 103680 113780 2226
23-08-2019 105004 116151 6152
24-08-2019 90022 65163 3527
25-08-2019 33965 29006 2178
26-08-2019 34245 44092 3898
27-08-2019 65122 69420 6210
28-08-2019 46638 60734 14349
29-08-2019 61896 72804 4842
30-08-2019 59969 78083 12708
31-08-2019 82706 89863 3520
TOTAL 1926236 1996995 159134
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-NA
NAME OF POOLING STATION :-MANDSAUR SOLAR PV POWER PROJECT (NTPC LTD.)
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 510325 652060 257393
02-08-2019 578662 587952 24188
03-08-2019 1053829 916270 3600
04-08-2019 1019810 930695 25459
05-08-2019 1176075 998702 11854
06-08-2019 1011398 813324 14168
07-08-2019 623667 231669 56742
08-08-2019 614792 385727 135609
09-08-2019 523925 297862 5794
10-08-2019 901889 910606 20332
11-08-2019 921567 700853 25505
12-08-2019 1013267 911992 14291
13-08-2019 900325 916481 18961
14-08-2019 452365 166916 19225
15-08-2019 441854 49004 8911
16-08-2019 525068 458482 6968
17-08-2019 729581 729809 49233
18-08-2019 602031 281192 9406
19-08-2019 903128 1094664 24908
20-08-2019 1078370 965155 5288
21-08-2019 1123341 1118022 7541
22-08-2019 1170371 1164911 2753
23-08-2019 811105 806126 50964
24-08-2019 589230 422761 17833
25-08-2019 537543 391504 43313
26-08-2019 493539 396216 16378
27-08-2019 733767 760062 41871
28-08-2019 687223 741480 19133
29-08-2019 917330 943256 14014
30-08-2019 874852 878066 1682
31-08-2019 723342 855794 224399
TOTAL 24243571 21477613 1177716
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-MANIKARAN ANALYTICS LTD.
NAME OF POOLING STATION :-BHARAT ELECTRONICS LTD OFI
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 16770 17301 857
02-08-2019 18687 20554 754
03-08-2019 17857 18473 247
04-08-2019 40075 40827 8913
05-08-2019 29445 33090 1778
06-08-2019 11623 11848 332
07-08-2019 18123 17411 1122
08-08-2019 21562 16166 7955
09-08-2019 20410 19717 2059
10-08-2019 36510 42660 8337
11-08-2019 46742 42967 2345
12-08-2019 37583 37330 1791
13-08-2019 23942 16794 1955
14-08-2019 14332 10771 727
15-08-2019 21379 20595 1375
16-08-2019 48458 50717 2762
17-08-2019 46826 51165 1016
18-08-2019 35232 32697 1854
19-08-2019 37424 43110 3847
20-08-2019 32185 32431 6527
21-08-2019 42349 37191 5154
22-08-2019 34965 29431 9186
23-08-2019 23841 28135 2611
24-08-2019 12027 9098 131
25-08-2019 11803 11752 377
26-08-2019 13534 14754 225
27-08-2019 20733 22736 3106
28-08-2019 25523 27084 3405
29-08-2019 36305 44371 4776
30-08-2019 25708 27625 7800
31-08-2019 31150 27617 4311
TOTAL 853103 856418 97635
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-MANIKARAN ANALYTICS LTD.
NAME OF POOLING STATION :-DESIGNCO MANUFACTURER & EXPORTER-1
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 11705 11857 842
02-08-2019 10064 9482 790
03-08-2019 11055 15623 1866
04-08-2019 19911 22009 352
05-08-2019 20391 16129 3528
06-08-2019 13308 12784 740
07-08-2019 13142 7305 3756
08-08-2019 10324 11415 2888
09-08-2019 10982 9858 782
10-08-2019 20948 21512 2424
11-08-2019 22814 19728 1975
12-08-2019 17594 18176 2209
13-08-2019 13980 13103 752
14-08-2019 5996 3354 163
15-08-2019 5764 4262 10
16-08-2019 13216 15491 1828
17-08-2019 16082 20607 2080
18-08-2019 11822 7764 584
19-08-2019 21894 25898 1748
20-08-2019 17130 17419 1133
21-08-2019 23174 21894 1293
22-08-2019 21786 20777 1468
23-08-2019 20056 17592 5363
24-08-2019 9859 6771 1026
25-08-2019 9288 5815 242
26-08-2019 12106 9277 1406
27-08-2019 21622 22406 2728
28-08-2019 14068 13183 835
29-08-2019 19927 22199 1777
30-08-2019 20740 16717 1593
31-08-2019 21727 20672 3916
TOTAL 482475 461079 52097
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-MANIKARAN ANALYTICS LTD.
NAME OF POOLING STATION :-ENERCON (I) LTD.II RATEDI HILL,BAGLI
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 133541 134738 1630
02-08-2019 102149 70557 2552
03-08-2019 59888 39201 285
04-08-2019 68970 24288 5727
05-08-2019 68234 41131 1638
06-08-2019 93229 82053 28
07-08-2019 119456 98046 3365
08-08-2019 93592 58667 1978
09-08-2019 104719 83456 11480
10-08-2019 107436 69167 5788
11-08-2019 77013 64589 1228
12-08-2019 92337 63762 858
13-08-2019 100214 65178 2724
14-08-2019 138453 112211 5191
15-08-2019 238985 156319 46971
16-08-2019 152324 144799 11828
17-08-2019 93906 70809 3720
18-08-2019 63108 40564 1627
19-08-2019 73312 49882 3131
20-08-2019 81545 54819 525
21-08-2019 110967 87166 1989
22-08-2019 111158 79452 4896
23-08-2019 97177 54894 2460
24-08-2019 103301 74772 2322
25-08-2019 96467 100885 7115
26-08-2019 83855 60471 7586
27-08-2019 61952 54814 322
28-08-2019 56450 34149 0
29-08-2019 47736 9233 104
30-08-2019 52736 33691 0
31-08-2019 52318 31837 0
TOTAL 2936528 2145600 139068
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-MANIKARAN ANALYTICS LTD.
NAME OF POOLING STATION :-FOCAL PHOTOVOLTAIC INDIA P. LTD
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 29648 39043 8872
02-08-2019 27181 32108 1178
03-08-2019 30907 40054 7697
04-08-2019 41385 43371 2383
05-08-2019 27215 36866 9275
06-08-2019 34878 43349 1521
07-08-2019 23953 15806 10104
08-08-2019 19869 15380 4349
09-08-2019 16275 11775 961
10-08-2019 30319 36412 1474
11-08-2019 40215 36714 1216
12-08-2019 42834 42168 1883
13-08-2019 40137 38147 2702
14-08-2019 21313 13022 1480
15-08-2019 11331 3913 0
16-08-2019 28948 29771 6199
17-08-2019 30325 33251 1574
18-08-2019 25191 18137 1030
19-08-2019 37342 43791 1406
20-08-2019 49966 51471 3534
21-08-2019 49702 48452 3551
22-08-2019 53695 58690 733
23-08-2019 48008 53160 752
24-08-2019 49331 32166 4412
25-08-2019 17044 15635 310
26-08-2019 21215 23025 1159
27-08-2019 40087 40465 2209
28-08-2019 30438 29465 1328
29-08-2019 30213 33161 1629
30-08-2019 33940 44765 6803
31-08-2019 42621 43831 2769
TOTAL 1025526 1047364 94493
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-MANIKARAN ANALYTICS LTD.
NAME OF POOLING STATION :-GAMESHA WIND TURBINE P.LTD.
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 1785629 1701680 49451
02-08-2019 1360627 1020860 22863
03-08-2019 798823 502130 25339
04-08-2019 661634 358600 34076
05-08-2019 854146 716020 6932
06-08-2019 1257956 1278710 9174
07-08-2019 1363486 1318260 140165
08-08-2019 993069 733070 4278
09-08-2019 1235932 1229520 91166
10-08-2019 1556378 1539930 64218
11-08-2019 967028 882110 94439
12-08-2019 1310288 1185060 14198
13-08-2019 1176554 1005800 50436
14-08-2019 1861800 1909090 166769
15-08-2019 2954770 3071090 23872
16-08-2019 2387500 2237180 18992
17-08-2019 1414014 1191100 96170
18-08-2019 1087560 918680 69428
19-08-2019 839610 809090 5129
20-08-2019 1155668 1121690 49995
21-08-2019 1352547 1346200 22487
22-08-2019 1172573 1100160 81763
23-08-2019 1142012 1074470 54311
24-08-2019 1234778 1292200 29572
25-08-2019 1122838 930580 26824
26-08-2019 736507 379970 24663
27-08-2019 623399 296240 5752
28-08-2019 579485 391910 1590
29-08-2019 598721 134270 6832
30-08-2019 573178 390710 2397
31-08-2019 489666 274660 349
TOTAL 36648176 32341040 1293630
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-MANIKARAN ANALYTICS LTD.
NAME OF POOLING STATION :-INOX WIND INFRA. SER. LTD.,SHAJAPUR
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 1673997 1455250 85018
02-08-2019 1480373 1211910 17751
03-08-2019 953970 574720 9181
04-08-2019 754211 457720 80108
05-08-2019 949023 954420 5185
06-08-2019 1551345 1533880 20807
07-08-2019 1505308 1322670 59704
08-08-2019 960108 665470 16787
09-08-2019 1419025 1409710 49535
10-08-2019 2050959 2195000 49771
11-08-2019 1230150 1235700 8033
12-08-2019 1399611 1272420 1671
13-08-2019 1221855 1130280 12125
14-08-2019 2227484 2278710 101000
15-08-2019 3260641 2767880 63987
16-08-2019 3243713 2721880 78975
17-08-2019 1785133 1574080 26956
18-08-2019 1345496 1252910 53707
19-08-2019 994099 965820 19855
20-08-2019 1288772 1321060 9234
21-08-2019 1565764 1473760 46301
22-08-2019 1640834 1269600 252355
23-08-2019 1147605 1109420 42718
24-08-2019 1421146 1400500 19692
25-08-2019 1233299 948160 23498
26-08-2019 777924 387120 7306
27-08-2019 606424 194470 0
28-08-2019 698373 509710 0
29-08-2019 644964 151460 2779
30-08-2019 728503 503520 0
31-08-2019 589971 222520 0
TOTAL 42350080 36471730 1164039
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-MANIKARAN ANALYTICS LTD.
NAME OF POOLING STATION :-KSHEMA POWER & INFRA PVT LTD (AMBA)
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 1909988 1851930 54942
02-08-2019 1331022 1164970 37568
03-08-2019 864543 363330 36087
04-08-2019 706811 563560 53101
05-08-2019 1585831 1680530 78204
06-08-2019 1955436 2151290 91580
07-08-2019 2335450 2509790 43205
08-08-2019 1716576 1509950 41091
09-08-2019 1203970 1388000 365121
10-08-2019 3258024 3334370 30059
11-08-2019 2242597 2131560 91670
12-08-2019 1539510 1388040 13774
13-08-2019 1537300 1392230 18197
14-08-2019 2101020 2090460 64608
15-08-2019 3082983 3318970 170114
16-08-2019 3231229 3392370 31185
17-08-2019 2442995 2443220 147200
18-08-2019 2044968 1746810 36772
19-08-2019 1232037 1249260 19851
20-08-2019 1494934 1279100 27050
21-08-2019 1905709 1828940 39929
22-08-2019 1691660 1448060 51090
23-08-2019 1278541 1353810 33902
24-08-2019 1575407 1604210 12381
25-08-2019 1417174 1428330 134751
26-08-2019 1086624 778140 43199
27-08-2019 1062465 886900 17716
28-08-2019 892579 687760 26012
29-08-2019 770206 345040 11811
30-08-2019 662513 424450 2747
31-08-2019 639308 358310 987
TOTAL 50799410 48093690 1825904
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-MANIKARAN ANALYTICS LTD.
NAME OF POOLING STATION :-M.P.WIND FARM NAGDA HILL
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 75177 72438 43
02-08-2019 59984 36839 411
03-08-2019 45594 19971 4
04-08-2019 42118 13220 441
05-08-2019 43452 30570 0
06-08-2019 50116 56240 0
07-08-2019 69780 70046 0
08-08-2019 50369 37270 20
09-08-2019 64759 53173 98
10-08-2019 86483 79834 0
11-08-2019 61832 42009 2530
12-08-2019 55217 49300 0
13-08-2019 57996 42862 445
14-08-2019 70035 67971 1190
15-08-2019 96941 107073 217
16-08-2019 95571 86012 278
17-08-2019 56334 44344 209
18-08-2019 44413 33388 34
19-08-2019 42851 30425 0
20-08-2019 46878 37946 96
21-08-2019 54429 47530 364
22-08-2019 60058 50599 359
23-08-2019 59664 37267 0
24-08-2019 56094 47792 0
25-08-2019 52044 42204 574
26-08-2019 42455 24007 0
27-08-2019 40591 23141 0
28-08-2019 43177 17294 0
29-08-2019 39345 3934 223
30-08-2019 40470 14589 0
31-08-2019 34680 10167 0
TOTAL 1738907 1329455 7536
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-MANIKARAN ANALYTICS LTD.
NAME OF POOLING STATION :-PORWAL AUTO COMPONENTS LTD
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 12280 17126 2622
02-08-2019 12280 16314 2468
03-08-2019 12220 8076 2259
04-08-2019 12356 0 0
05-08-2019 0 0 0
06-08-2019 0 0 0
07-08-2019 12356 5415 1151
08-08-2019 12356 12546 1002
09-08-2019 13603 10543 179
10-08-2019 13603 23468 2578
11-08-2019 13603 18504 592
12-08-2019 13603 23409 3496
13-08-2019 13603 19173 809
14-08-2019 12229 6426 1314
15-08-2019 12229 3656 875
16-08-2019 10734 22763 3814
17-08-2019 12229 22273 3592
18-08-2019 18832 10815 988
19-08-2019 18832 27495 2624
20-08-2019 13568 23347 3019
21-08-2019 13568 30175 9244
22-08-2019 24133 26389 865
23-08-2019 19312 12214 2281
24-08-2019 19312 9541 2386
25-08-2019 11001 9999 12
26-08-2019 9567 11344 1435
27-08-2019 9567 20629 7477
28-08-2019 16596 15585 165
29-08-2019 16596 24166 2270
30-08-2019 16596 19941 2844
31-08-2019 18252 25663 1695
TOTAL 415016 476995 64056
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-MANIKARAN ANALYTICS LTD.
NAME OF POOLING STATION :-RENEW CLEAN ENERGY P L 51 MW
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 220558 211130 39083
02-08-2019 183039 167480 2685
03-08-2019 237589 243590 53358
04-08-2019 220542 111570 58833
05-08-2019 234549 225240 27832
06-08-2019 207857 241390 34003
07-08-2019 153838 143880 28816
08-08-2019 231387 203290 27844
09-08-2019 205994 161510 13397
10-08-2019 225554 227190 21323
11-08-2019 284704 289880 13562
12-08-2019 246927 209240 22667
13-08-2019 195839 89120 58207
14-08-2019 239576 141850 53013
15-08-2019 131077 36920 39627
16-08-2019 193514 137630 12547
17-08-2019 193277 196600 13825
18-08-2019 178420 110980 28671
19-08-2019 185803 254370 50865
20-08-2019 313358 318190 17148
21-08-2019 271712 263770 11473
22-08-2019 272907 302140 7110
23-08-2019 301875 262440 55185
24-08-2019 213018 62090 105612
25-08-2019 192042 166340 19734
26-08-2019 253454 232870 16276
27-08-2019 247310 211620 9250
28-08-2019 246425 218810 30849
29-08-2019 279349 246610 22148
30-08-2019 253780 259070 34073
31-08-2019 254971 255970 12125
TOTAL 7070245 6202780 941141
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-MANIKARAN ANALYTICS LTD.
NAME OF POOLING STATION :-RENEW SOLAR ENERGY (TN) PVT. LTD.
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 197814 264710 25014
02-08-2019 255963 211950 17153
03-08-2019 251523 146060 51123
04-08-2019 276516 173860 74741
05-08-2019 259308 232160 21292
06-08-2019 102866 145580 8698
07-08-2019 173696 194000 16565
08-08-2019 289330 265170 18213
09-08-2019 226670 104200 79747
10-08-2019 219277 279510 79202
11-08-2019 282832 229690 20724
12-08-2019 257566 280240 4050
13-08-2019 197468 105980 18845
14-08-2019 233612 195390 15196
15-08-2019 115460 123040 5082
16-08-2019 80445 125720 19501
17-08-2019 180234 90260 27006
18-08-2019 201162 40260 91704
19-08-2019 247735 284670 6182
20-08-2019 287840 333940 6764
21-08-2019 284686 319560 3368
22-08-2019 204015 211110 12827
23-08-2019 238336 239160 27561
24-08-2019 223203 198500 7097
25-08-2019 129160 155900 16238
26-08-2019 204875 210280 8316
27-08-2019 202026 151990 29036
28-08-2019 239940 144570 43431
29-08-2019 221187 231870 3833
30-08-2019 255542 271480 9048
31-08-2019 273456 254340 35600
TOTAL 6813743 6215150 803157
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-MANIKARAN ANALYTICS LTD.
NAME OF POOLING STATION :-SEIL VOLTA AND SITARA
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 161540 182190 24240
02-08-2019 134320 161480 6460
03-08-2019 183920 196440 17041
04-08-2019 192308 220390 26364
05-08-2019 132154 165440 14702
06-08-2019 180075 224560 17730
07-08-2019 113753 84280 21989
08-08-2019 95830 74420 21408
09-08-2019 83957 68280 4909
10-08-2019 144664 181030 13827
11-08-2019 203326 170670 17645
12-08-2019 190843 224490 6508
13-08-2019 167753 175890 5358
14-08-2019 82905 56270 1216
15-08-2019 57439 21680 0
16-08-2019 131220 144500 1378
17-08-2019 150469 154060 16975
18-08-2019 108189 72500 1617
19-08-2019 192211 271470 21052
20-08-2019 246961 264270 29127
21-08-2019 248987 295770 1602
22-08-2019 314198 344370 5748
23-08-2019 281522 276140 8723
24-08-2019 205770 155470 7243
25-08-2019 93631 74600 1843
26-08-2019 92212 107400 10296
27-08-2019 232441 203830 19639
28-08-2019 159728 153550 6785
29-08-2019 162431 168430 7687
30-08-2019 194789 195860 16297
31-08-2019 210568 215530 13431
TOTAL 5150114 5305260 368840
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-MANIKARAN ANALYTICS LTD.
NAME OF POOLING STATION :-SKY POWER SOLAR INDIA PVT LTD
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 124080 132290 6883
02-08-2019 153357 225870 29784
03-08-2019 118765 123380 6701
04-08-2019 177835 156660 20027
05-08-2019 123010 123630 8592
06-08-2019 136564 121430 330
07-08-2019 93429 68300 3150
08-08-2019 90579 44250 1414
09-08-2019 92823 84390 1018
10-08-2019 258935 300410 55677
11-08-2019 259814 249840 17149
12-08-2019 257750 261570 6817
13-08-2019 185402 187820 9377
14-08-2019 99655 73240 0
15-08-2019 123931 130130 1329
16-08-2019 288302 289880 21782
17-08-2019 270074 278320 12721
18-08-2019 241379 232950 9462
19-08-2019 184262 190700 11270
20-08-2019 228789 188870 9751
21-08-2019 216076 236720 6156
22-08-2019 276777 280630 9974
23-08-2019 223757 185910 6067
24-08-2019 121403 90440 1269
25-08-2019 68094 47340 224
26-08-2019 67138 34640 272
27-08-2019 120718 95130 1145
28-08-2019 109386 113160 2131
29-08-2019 150568 187000 9608
30-08-2019 251946 231240 28642
31-08-2019 163541 182580 25153
TOTAL 5278139 5148720 323875
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-MANIKARAN ANALYTICS LTD.
NAME OF POOLING STATION :-SUZLON GUJRAT WIND PARK PVT LTD BAROD
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 146397 153429 11066
02-08-2019 185149 162159 1263
03-08-2019 111648 71734 4859
04-08-2019 108041 47520 3994
05-08-2019 111336 121810 8821
06-08-2019 191499 216336 3540
07-08-2019 178261 143483 11311
08-08-2019 110845 85851 1767
09-08-2019 142005 172182 30987
10-08-2019 341526 376972 12076
11-08-2019 195582 230164 26588
12-08-2019 158419 218104 6877
13-08-2019 167296 123384 7111
14-08-2019 152648 298837 76946
15-08-2019 294217 496809 168294
16-08-2019 323290 444904 49322
17-08-2019 265629 224702 11051
18-08-2019 174379 208324 13584
19-08-2019 149785 147825 1654
20-08-2019 144489 159049 8020
21-08-2019 207164 209429 16100
22-08-2019 203315 175183 19367
23-08-2019 172556 162618 7726
24-08-2019 183371 165075 3401
25-08-2019 138965 119529 14553
26-08-2019 92021 62740 1127
27-08-2019 68320 2671 0
28-08-2019 93086 84832 1237
29-08-2019 102715 49556 475
30-08-2019 127671 104566 5770
31-08-2019 82522 32430 0
TOTAL 5124147 5272207 528887
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-MANIKARAN ANALYTICS LTD.
NAME OF POOLING STATION :-SUZLON IV RATLAM
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 67105 61023 1813
02-08-2019 58979 37676 351
03-08-2019 53624 12914 1511
04-08-2019 53138 21062 5683
05-08-2019 62584 55776 3528
06-08-2019 82865 92361 186
07-08-2019 83573 87158 5017
08-08-2019 69035 54005 3049
09-08-2019 51620 44146 9440
10-08-2019 94196 112164 8861
11-08-2019 79129 77175 4263
12-08-2019 57503 44797 268
13-08-2019 50896 16264 1695
14-08-2019 65965 81401 9709
15-08-2019 159934 163680 19181
16-08-2019 166461 172014 17174
17-08-2019 131557 75535 39892
18-08-2019 77131 56395 4678
19-08-2019 67468 43728 7839
20-08-2019 65741 51571 132
21-08-2019 82165 83834 2592
22-08-2019 70109 56995 1023
23-08-2019 60858 44805 1159
24-08-2019 81215 74531 1776
25-08-2019 84904 60518 13975
26-08-2019 52693 27231 1509
27-08-2019 48066 14886 578
28-08-2019 46713 12319 0
29-08-2019 42711 5962 148
30-08-2019 43582 9053 2
31-08-2019 42346 8195 0
TOTAL 2253866 1759174 167032
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-MANIKARAN ANALYTICS LTD.
NAME OF POOLING STATION :-SUZLON V RATLAM
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 58649 57340 2005
02-08-2019 57316 38879 415
03-08-2019 52700 12069 5979
04-08-2019 42029 18700 667
05-08-2019 51693 50696 2938
06-08-2019 78410 83252 285
07-08-2019 78819 88163 5945
08-08-2019 62285 53485 2472
09-08-2019 48257 46555 9788
10-08-2019 109200 124123 7218
11-08-2019 77303 79526 4568
12-08-2019 56612 51330 177
13-08-2019 49259 50823 530
14-08-2019 60379 46545 4583
15-08-2019 138755 151480 27129
16-08-2019 164314 180670 10007
17-08-2019 125013 81086 24378
18-08-2019 73045 46897 4651
19-08-2019 61958 34247 8428
20-08-2019 44930 41163 219
21-08-2019 74438 64206 1777
22-08-2019 64631 53101 3110
23-08-2019 57334 42928 3000
24-08-2019 68511 52371 2351
25-08-2019 65095 50100 7203
26-08-2019 45867 28974 1145
27-08-2019 40601 18511 156
28-08-2019 38700 14250 0
29-08-2019 39642 8211 0
30-08-2019 38722 12463 0
31-08-2019 40072 13278 0
TOTAL 2064539 1695422 141124
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-MANIKARAN ANALYTICS LTD.
NAME OF POOLING STATION :-TODAY CLEAN ENERGY PVT LTD
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 44255 46932 7647
02-08-2019 39612 45951 1999
03-08-2019 42459 63484 6180
04-08-2019 62667 83127 5238
05-08-2019 69746 74049 5685
06-08-2019 53673 65182 2539
07-08-2019 24265 13410 0
08-08-2019 33402 47830 12720
09-08-2019 29351 23878 138
10-08-2019 50306 63261 941
11-08-2019 50422 47661 873
12-08-2019 50422 66634 1311
13-08-2019 39066 65851 7412
14-08-2019 28517 18310 207
15-08-2019 20927 5425 0
16-08-2019 61463 42988 2908
17-08-2019 64079 54592 4332
18-08-2019 41001 24797 678
19-08-2019 80651 78144 1052
20-08-2019 86772 63494 4447
21-08-2019 84201 81516 1020
22-08-2019 99964 81652 1039
23-08-2019 81227 62872 8639
24-08-2019 79430 33573 21224
25-08-2019 31496 27027 1643
26-08-2019 37057 20451 464
27-08-2019 65328 62364 1553
28-08-2019 60737 51828 682
29-08-2019 73371 65163 4312
30-08-2019 67211 46324 3520
31-08-2019 64281 73798 2288
TOTAL 1717359 1601568 112691
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-MANIKARAN ANALYTICS LTD.
NAME OF POOLING STATION :-UJAAS-1 BAROD
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 33484 32399 1996
02-08-2019 24203 31228 1145
03-08-2019 28662 37157 1941
04-08-2019 35068 52135 1517
05-08-2019 43944 53518 1048
06-08-2019 34547 45821 2043
07-08-2019 18249 8882 71
08-08-2019 20317 27600 2499
09-08-2019 19411 17570 1102
10-08-2019 41383 42784 1086
11-08-2019 50000 34856 6599
12-08-2019 40083 46541 1431
13-08-2019 42084 44156 382
14-08-2019 22797 12878 369
15-08-2019 18502 3521 0
16-08-2019 35373 29114 331
17-08-2019 40010 37869 1649
18-08-2019 23873 16667 135
19-08-2019 46960 56867 432
20-08-2019 45492 41791 966
21-08-2019 43590 58294 2645
22-08-2019 69172 53221 724
23-08-2019 39932 31479 1946
24-08-2019 38862 21684 3677
25-08-2019 16461 18354 227
26-08-2019 18235 17153 596
27-08-2019 38396 37763 300
28-08-2019 28609 31374 506
29-08-2019 35532 46566 1695
30-08-2019 37185 35608 764
31-08-2019 34532 48612 760
TOTAL 1064948 1073462 40582
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-MANIKARAN ANALYTICS LTD.
NAME OF POOLING STATION :-UJAAS-1 BERCHHA
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 25189 26702 205
02-08-2019 27171 36726 963
03-08-2019 30755 36852 1062
04-08-2019 40889 47292 2125
05-08-2019 40489 37905 7054
06-08-2019 23814 39796 2844
07-08-2019 23078 17143 1168
08-08-2019 22973 30423 7283
09-08-2019 22539 16385 50
10-08-2019 51992 48662 2182
11-08-2019 53867 33527 4171
12-08-2019 37450 46856 2837
13-08-2019 36720 30123 1052
14-08-2019 25989 8679 390
15-08-2019 21647 7490 0
16-08-2019 25570 42769 3195
17-08-2019 37533 47244 2667
18-08-2019 27973 17525 454
19-08-2019 42677 51300 1047
20-08-2019 41546 41375 961
21-08-2019 46462 57695 1733
22-08-2019 57844 64696 159
23-08-2019 31691 24705 1878
24-08-2019 31324 19914 356
25-08-2019 32205 17615 947
26-08-2019 22910 24903 533
27-08-2019 30198 42015 3690
28-08-2019 27586 26438 1
29-08-2019 42249 52439 3657
30-08-2019 44102 53677 8788
31-08-2019 51352 63529 26186
TOTAL 1077784 1112400 89638
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-MANIKARAN ANALYTICS LTD.
NAME OF POOLING STATION :-UJAAS-1 ICHHAWAR
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 20717 21606 3
02-08-2019 21912 23976 3
03-08-2019 21367 22878 54
04-08-2019 32694 46832 2396
05-08-2019 25931 26812 1525
06-08-2019 21707 20964 7
07-08-2019 27946 20332 806
08-08-2019 20479 27214 3494
09-08-2019 20307 22612 467
10-08-2019 46069 49840 2654
11-08-2019 46181 52224 356
12-08-2019 22648 39272 2813
13-08-2019 20633 29224 998
14-08-2019 19337 8872 0
15-08-2019 19595 13578 0
16-08-2019 53161 39734 1674
17-08-2019 72514 48058 8245
18-08-2019 34102 25010 689
19-08-2019 55899 62816 3166
20-08-2019 38180 40866 15288
21-08-2019 65690 54248 390
22-08-2019 65882 42700 2901
23-08-2019 44604 57326 1347
24-08-2019 20525 13270 303
25-08-2019 30216 10218 2539
26-08-2019 30888 21284 142
27-08-2019 34428 41398 2452
28-08-2019 44520 27618 6590
29-08-2019 36585 43136 2077
30-08-2019 53563 37052 6821
31-08-2019 51931 41192 2785
TOTAL 1120211 1032162 72985
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-MANIKARAN ANALYTICS LTD.
NAME OF POOLING STATION :-UJAAS-1 RAJGARH (BIORA)
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 25867 28069 3450
02-08-2019 24543 22739 730
03-08-2019 29257 45738 4837
04-08-2019 30796 49802 7085
05-08-2019 35007 43748 571
06-08-2019 29216 36018 2461
07-08-2019 17956 16709 0
08-08-2019 29979 39770 2472
09-08-2019 19144 28521 1836
10-08-2019 35209 51561 2514
11-08-2019 31964 44465 1730
12-08-2019 31964 46307 2406
13-08-2019 25867 26154 1020
14-08-2019 23708 11307 540
15-08-2019 9458 5678 0
16-08-2019 47521 38192 1054
17-08-2019 51972 46902 1850
18-08-2019 26198 10446 1358
19-08-2019 58990 60139 1252
20-08-2019 66354 50302 3612
21-08-2019 52112 46109 2622
22-08-2019 54688 51380 1705
23-08-2019 51291 37968 2609
24-08-2019 51584 17149 8147
25-08-2019 34650 21106 1731
26-08-2019 45915 29620 2615
27-08-2019 53459 45212 4885
28-08-2019 59628 29369 10185
29-08-2019 40564 47827 2764
30-08-2019 41467 37352 2033
31-08-2019 54800 53317 322
TOTAL 1191128 1118976 80396
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-MANIKARAN ANALYTICS LTD.
NAME OF POOLING STATION :-UJAAS-2 BAROD
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 32556 30780 2588
02-08-2019 24573 30797 828
03-08-2019 27361 37939 2780
04-08-2019 35245 49584 1531
05-08-2019 42157 52411 1355
06-08-2019 29885 40292 2420
07-08-2019 15390 9131 44
08-08-2019 17576 27320 3459
09-08-2019 17366 17287 866
10-08-2019 39725 41125 1545
11-08-2019 46261 33839 3744
12-08-2019 39858 44152 687
13-08-2019 37265 42001 758
14-08-2019 24332 12998 602
15-08-2019 15455 3602 0
16-08-2019 33153 28505 217
17-08-2019 39860 37011 2253
18-08-2019 24205 16727 396
19-08-2019 45473 54873 434
20-08-2019 46306 41435 1698
21-08-2019 42957 54671 1631
22-08-2019 63616 48792 650
23-08-2019 39533 30989 3672
24-08-2019 40919 21775 5703
25-08-2019 15675 18238 325
26-08-2019 20559 16760 474
27-08-2019 35276 36695 455
28-08-2019 27780 30209 516
29-08-2019 34946 43607 1582
30-08-2019 37393 34866 703
31-08-2019 37393 45267 754
TOTAL 1030049 1033678 44670
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-MANIKARAN ANALYTICS LTD.
NAME OF POOLING STATION :-UJAAS-2 ICHHAWAR
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 20098 21376 38
02-08-2019 21032 23134 0
03-08-2019 19659 21726 10
04-08-2019 32064 44222 1409
05-08-2019 27751 27292 879
06-08-2019 21189 21628 26
07-08-2019 26746 20228 1427
08-08-2019 21788 26436 3030
09-08-2019 24629 20418 263
10-08-2019 45397 47482 1923
11-08-2019 46077 49082 403
12-08-2019 23054 38166 2695
13-08-2019 20984 27948 669
14-08-2019 21140 9422 0
15-08-2019 21023 13566 0
16-08-2019 51388 36790 1015
17-08-2019 72395 44440 9920
18-08-2019 33328 23878 677
19-08-2019 51202 57510 2071
20-08-2019 37286 39156 13551
21-08-2019 63093 51008 773
22-08-2019 63031 40514 3006
23-08-2019 43251 55756 1172
24-08-2019 19755 12918 177
25-08-2019 28534 10350 1894
26-08-2019 30826 19816 309
27-08-2019 34343 38476 775
28-08-2019 43782 26222 6208
29-08-2019 33671 39352 1092
30-08-2019 53529 33234 7771
31-08-2019 47734 32964 2304
TOTAL 1099779 974510 65487
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-MANIKARAN ANALYTICS LTD.
NAME OF POOLING STATION :-UJAAS-2 RAJGARH (BIORA)
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 14686 15820 3435
02-08-2019 12939 12080 740
03-08-2019 16870 24900 2955
04-08-2019 17745 26480 5403
05-08-2019 19617 24130 761
06-08-2019 18679 20010 2226
07-08-2019 9615 9450 41
08-08-2019 16595 21200 1870
09-08-2019 8969 16310 2641
10-08-2019 19445 29440 2846
11-08-2019 17698 25900 2202
12-08-2019 17698 27380 2928
13-08-2019 14586 15970 779
14-08-2019 12460 5930 487
15-08-2019 4361 3370 0
16-08-2019 22186 20800 1247
17-08-2019 26038 28110 2160
18-08-2019 12835 6360 320
19-08-2019 28459 38010 4157
20-08-2019 39633 30400 2969
21-08-2019 31321 27610 2718
22-08-2019 32671 32370 1991
23-08-2019 30903 22320 3057
24-08-2019 31075 10470 8117
25-08-2019 20420 12690 1869
26-08-2019 25227 17170 1810
27-08-2019 29372 26850 4857
28-08-2019 32762 17540 6301
29-08-2019 25146 29580 2666
30-08-2019 22695 23260 2549
31-08-2019 31607 32410 744
TOTAL 664313 654320 76846
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-MANIKARAN ANALYTICS LTD.
NAME OF POOLING STATION :-WIND WORLD (INDIA) LTD., RATADIA HILL AT BAGDI III
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 726474 702323 10692
02-08-2019 475870 367636 5812
03-08-2019 257080 176690 2955
04-08-2019 239057 111332 425
05-08-2019 259041 268161 0
06-08-2019 436749 498560 4094
07-08-2019 546793 624754 17277
08-08-2019 327182 347968 900
09-08-2019 353120 486321 66263
10-08-2019 404307 435141 10040
11-08-2019 312360 354619 24765
12-08-2019 292836 388051 8694
13-08-2019 377388 389673 18763
14-08-2019 534308 669976 68482
15-08-2019 1026556 964313 97535
16-08-2019 577561 639069 45165
17-08-2019 369579 307289 2172
18-08-2019 287265 269434 4150
19-08-2019 287234 275557 3163
20-08-2019 380890 384669 6868
21-08-2019 444114 454355 9654
22-08-2019 466101 452023 17667
23-08-2019 391311 373548 3925
24-08-2019 426730 466860 8379
25-08-2019 409745 433366 32302
26-08-2019 306113 208810 12164
27-08-2019 255832 226768 4808
28-08-2019 213337 156027 0
29-08-2019 191353 50627 0
30-08-2019 209552 138615 7
31-08-2019 203313 136669 0
TOTAL 11989151 11759204 487121
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-MANIKARAN ANALYTICS LTD.
NAME OF POOLING STATION :-WIND WORLD-I SUSNER
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 78367 78280 13605
02-08-2019 71834 68112 2355
03-08-2019 50729 32666 531
04-08-2019 54996 25104 5044
05-08-2019 45212 56309 2558
06-08-2019 84829 92076 3744
07-08-2019 64413 65281 2734
08-08-2019 52031 37931 1377
09-08-2019 42432 58438 20488
10-08-2019 64958 113807 16911
11-08-2019 52474 67421 2766
12-08-2019 54494 76147 2415
13-08-2019 78909 63716 4149
14-08-2019 89589 123575 14619
15-08-2019 230907 250791 5185
16-08-2019 149206 173342 22177
17-08-2019 103491 76538 10387
18-08-2019 81850 92678 1594
19-08-2019 72310 70632 2874
20-08-2019 77350 82128 882
21-08-2019 107526 114424 4002
22-08-2019 81985 77710 22586
23-08-2019 75710 67194 1789
24-08-2019 88717 91913 6649
25-08-2019 73911 61011 4438
26-08-2019 45437 23812 0
27-08-2019 37102 9226 38
28-08-2019 40525 25717 0
29-08-2019 39040 19741 0
30-08-2019 45919 39898 56
31-08-2019 39591 16253 11
TOTAL 2275844 2251871 175964
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-MANIKARAN ANALYTICS LTD.
NAME OF POOLING STATION :-WIND WORLD-II AGAR
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 76621 72500 8070
02-08-2019 72335 64576 869
03-08-2019 53490 28410 150
04-08-2019 65341 24254 3996
05-08-2019 46297 47073 1180
06-08-2019 83184 84916 1383
07-08-2019 67364 55308 1682
08-08-2019 52653 31152 782
09-08-2019 43705 62718 18765
10-08-2019 62638 140072 29666
11-08-2019 56306 70690 1980
12-08-2019 56500 81679 2316
13-08-2019 81287 56189 1781
14-08-2019 82669 116780 14078
15-08-2019 248027 277439 17034
16-08-2019 154779 199834 31655
17-08-2019 107519 88853 2710
18-08-2019 84517 95167 657
19-08-2019 72659 58930 913
20-08-2019 66343 56841 24
21-08-2019 86613 92474 2111
22-08-2019 71339 53146 2850
23-08-2019 66584 50634 627
24-08-2019 81800 69706 1732
25-08-2019 63034 45677 281
26-08-2019 44561 19019 0
27-08-2019 42776 8129 0
28-08-2019 47341 28762 0
29-08-2019 37136 19877 0
30-08-2019 45922 26817 0
31-08-2019 41943 13224 0
TOTAL 2263283 2140846 147292
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-MANIKARAN ANALYTICS LTD.
NAME OF POOLING STATION :-WIND WORLD-III AGAR
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 73876 67202 7333
02-08-2019 69050 62057 1039
03-08-2019 53810 31108 1667
04-08-2019 61399 23175 2926
05-08-2019 43869 42234 1728
06-08-2019 73193 74082 383
07-08-2019 67855 56479 1638
08-08-2019 49510 35950 485
09-08-2019 43266 63531 22529
10-08-2019 58670 125655 21672
11-08-2019 53381 74823 1794
12-08-2019 56669 78741 1898
13-08-2019 69748 52163 791
14-08-2019 81645 116651 17001
15-08-2019 239279 262182 17457
16-08-2019 147884 194669 29749
17-08-2019 109231 94568 3672
18-08-2019 78032 90036 732
19-08-2019 70391 61447 818
20-08-2019 66311 59236 348
21-08-2019 86130 97227 3925
22-08-2019 74415 57969 4388
23-08-2019 47545 31184 1213
24-08-2019 65622 58374 4756
25-08-2019 59975 47617 260
26-08-2019 41930 18921 0
27-08-2019 36870 8339 0
28-08-2019 46445 27123 0
29-08-2019 39514 18967 0
30-08-2019 44021 28107 0
31-08-2019 41380 12390 0
TOTAL 2150916 2072207 150202
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-MANIKARAN ANALYTICS LTD.
NAME OF POOLING STATION :-WIND WORLD-IV SUSNER
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 72554 60364 6508
02-08-2019 62049 55759 478
03-08-2019 51378 26181 312
04-08-2019 61592 19219 2937
05-08-2019 40890 39603 809
06-08-2019 70096 76550 658
07-08-2019 58800 42160 584
08-08-2019 41879 27828 492
09-08-2019 41306 64456 24427
10-08-2019 62737 141415 29554
11-08-2019 51957 75984 1533
12-08-2019 51824 72262 1263
13-08-2019 68980 51373 1342
14-08-2019 80422 106216 12053
15-08-2019 218594 243390 10090
16-08-2019 128835 176605 42483
17-08-2019 96130 85789 6940
18-08-2019 73930 81219 2934
19-08-2019 58211 40196 2779
20-08-2019 61651 43808 61
21-08-2019 78107 78999 2337
22-08-2019 64465 44533 3513
23-08-2019 63775 47870 268
24-08-2019 72055 54552 3355
25-08-2019 53522 38087 0
26-08-2019 39559 16545 0
27-08-2019 36560 6287 0
28-08-2019 46896 23934 0
29-08-2019 36386 15313 0
30-08-2019 43284 21502 0
31-08-2019 41724 8222 0
TOTAL 2030148 1886221 157710
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-NA
NAME OF POOLING STATION :-NTPC LIMITED, RAJGARH (PROJECT UNDER JNSM)
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 138250 137487 3941
02-08-2019 105500 85391 3074
03-08-2019 152750 164685 5156
04-08-2019 165500 187026 6919
05-08-2019 167750 163811 3292
06-08-2019 150000 135880 9047
07-08-2019 83250 65404 3124
08-08-2019 152750 136966 5162
09-08-2019 105000 102121 3182
10-08-2019 169750 184080 3703
11-08-2019 156500 164413 2300
12-08-2019 156750 176147 6284
13-08-2019 126750 103070 475
14-08-2019 65000 41039 0
15-08-2019 57750 18190 0
16-08-2019 133500 136374 8378
17-08-2019 183250 188354 1275
18-08-2019 83000 36376 63
19-08-2019 213000 239105 2063
20-08-2019 198250 201521 540
21-08-2019 194750 187160 4065
22-08-2019 191500 198787 2266
23-08-2019 121000 135699 3172
24-08-2019 87750 63347 729
25-08-2019 88750 77891 239
26-08-2019 115250 110420 810
27-08-2019 145000 168327 8788
28-08-2019 122000 112001 2133
29-08-2019 178750 188330 1125
30-08-2019 144375 137754 1380
31-08-2019 197500 191956 138
TOTAL 4350875 4239112 92823
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-NA
NAME OF POOLING STATION :-PIONEER WINCON
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 0 6685 7514
02-08-2019 0 5608 6305
03-08-2019 0 2283 2566
04-08-2019 0 1784 1996
05-08-2019 0 4869 5473
06-08-2019 0 9309 10467
07-08-2019 0 6578 7392
08-08-2019 0 5743 6454
09-08-2019 0 3876 4352
10-08-2019 0 13971 15716
11-08-2019 0 9748 10961
12-08-2019 0 5838 6568
13-08-2019 0 5092 5728
14-08-2019 0 6407 7207
15-08-2019 0 9841 11066
16-08-2019 0 19221 21620
17-08-2019 0 10320 11606
18-08-2019 0 7879 8857
19-08-2019 0 4186 4702
20-08-2019 0 5399 6070
21-08-2019 0 7380 8298
22-08-2019 0 6153 6919
23-08-2019 0 5019 5642
24-08-2019 0 7608 8559
25-08-2019 0 4886 5486
26-08-2019 0 3575 4011
27-08-2019 0 2845 3195
28-08-2019 0 2450 2751
29-08-2019 0 1684 1885
30-08-2019 0 2041 2295
31-08-2019 0 1832 2056
TOTAL 0 190110 213717
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD
NAME OF POOLING STATION :-AVP POWER INFRA PVT LTD (SONKATCHH)
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 416324 401597 15831
02-08-2019 300578 234680 5593
03-08-2019 169367 129108 9142
04-08-2019 115568 81250 17547
05-08-2019 171541 164117 144
06-08-2019 295242 321328 6185
07-08-2019 317779 322585 17729
08-08-2019 252170 226580 3044
09-08-2019 265206 237337 19592
10-08-2019 318909 302737 6583
11-08-2019 206145 183832 22526
12-08-2019 267840 271679 3299
13-08-2019 258922 251428 6207
14-08-2019 343623 352795 3869
15-08-2019 481699 537140 10663
16-08-2019 440682 450531 13427
17-08-2019 257189 228963 14804
18-08-2019 185439 238508 32653
19-08-2019 183508 198524 10009
20-08-2019 274858 284608 18032
21-08-2019 310381 317999 19889
22-08-2019 295590 296589 47784
23-08-2019 274832 292047 43661
24-08-2019 322815 319636 12085
25-08-2019 307100 290168 26348
26-08-2019 169274 123229 8365
27-08-2019 128055 84787 2952
28-08-2019 125666 99938 351
29-08-2019 69905 32251 21
30-08-2019 116293 110905 1764
31-08-2019 106367 79971 13285
TOTAL 7748867 7466847 413384
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD
NAME OF POOLING STATION :-BADONI POWER PVT LTD (MAXI)
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 413466 389614 12121
02-08-2019 298308 222320 7784
03-08-2019 185088 129038 8142
04-08-2019 134413 70364 8063
05-08-2019 205600 173937 3850
06-08-2019 288751 297102 4881
07-08-2019 278439 276922 30370
08-08-2019 228622 168164 6726
09-08-2019 284204 274661 9292
10-08-2019 406484 371764 11447
11-08-2019 289043 221598 53985
12-08-2019 236956 276542 4411
13-08-2019 230768 221476 10021
14-08-2019 330393 396008 72039
15-08-2019 561099 585156 11456
16-08-2019 483567 481519 5621
17-08-2019 425422 284145 63311
18-08-2019 295144 206097 21135
19-08-2019 167893 182448 10070
20-08-2019 197593 226984 11556
21-08-2019 292176 298747 22260
22-08-2019 294016 253066 44058
23-08-2019 248148 254591 27361
24-08-2019 296558 280270 9978
25-08-2019 268166 225528 15398
26-08-2019 198712 85598 29806
27-08-2019 128819 79408 7041
28-08-2019 129999 107153 941
29-08-2019 76480 39636 130
30-08-2019 104360 87159 95
31-08-2019 95921 56540 1783
TOTAL 8074608 7223555 525132
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD
NAME OF POOLING STATION :-BANCO 1
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 28640 34520 2881
02-08-2019 30034 38174 899
03-08-2019 49080 22564 13586
04-08-2019 54142 39889 7044
05-08-2019 59055 34778 13619
06-08-2019 56622 51412 2895
07-08-2019 17569 18160 966
08-08-2019 35659 26554 2110
09-08-2019 12645 23721 1056
10-08-2019 76914 52110 9609
11-08-2019 86125 41008 22570
12-08-2019 64555 49804 5070
13-08-2019 51048 34229 4871
14-08-2019 27094 11460 2963
15-08-2019 12004 8149 0
16-08-2019 53415 52024 1424
17-08-2019 70547 48641 7878
18-08-2019 67425 24611 22035
19-08-2019 73842 64586 1408
20-08-2019 69870 50299 6321
21-08-2019 88375 66712 3057
22-08-2019 91824 63178 7092
23-08-2019 83861 29251 37177
24-08-2019 57577 20993 20359
25-08-2019 11461 21328 0
26-08-2019 13304 25996 4285
27-08-2019 51980 45640 4745
28-08-2019 59305 38649 3356
29-08-2019 67435 57264 3558
30-08-2019 70010 48845 12865
31-08-2019 69925 65796 1019
TOTAL 1661342 1210345 226718
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD
NAME OF POOLING STATION :-BANCO 2
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 24349 37214 6702
02-08-2019 25437 35557 2106
03-08-2019 41508 19638 10724
04-08-2019 45852 42380 2242
05-08-2019 49974 35050 7158
06-08-2019 47878 48692 3564
07-08-2019 14944 13350 172
08-08-2019 30131 23306 841
09-08-2019 10693 20817 1676
10-08-2019 65037 45239 6817
11-08-2019 72735 36011 17706
12-08-2019 54561 50291 2874
13-08-2019 43145 41539 2663
14-08-2019 22944 12937 1995
15-08-2019 10178 6272 0
16-08-2019 45151 42676 1155
17-08-2019 59291 46490 4133
18-08-2019 57022 21336 16773
19-08-2019 62418 58741 359
20-08-2019 59068 48867 3951
21-08-2019 74843 64238 429
22-08-2019 77739 50393 6201
23-08-2019 70934 25359 27773
24-08-2019 48653 19986 15117
25-08-2019 9704 20251 292
26-08-2019 11363 23940 4678
27-08-2019 43982 42079 2727
28-08-2019 50125 34586 3467
29-08-2019 57039 45055 2318
30-08-2019 59192 38016 13054
31-08-2019 59126 55556 711
TOTAL 1405016 1105862 170378
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD
NAME OF POOLING STATION :-BANCO 3
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 25551 45090 13016
02-08-2019 26691 43562 4428
03-08-2019 43563 40622 1866
04-08-2019 48076 53720 6952
05-08-2019 52491 42625 7849
06-08-2019 50232 59225 6595
07-08-2019 15548 16222 528
08-08-2019 31623 28394 1482
09-08-2019 11222 24550 3130
10-08-2019 68254 53716 4706
11-08-2019 76310 43016 15084
12-08-2019 57234 62996 4682
13-08-2019 45299 49893 3348
14-08-2019 24038 15288 2641
15-08-2019 10650 6173 0
16-08-2019 47420 51237 1294
17-08-2019 62241 55483 3719
18-08-2019 59844 25204 15429
19-08-2019 65536 71841 644
20-08-2019 62030 59283 3464
21-08-2019 78430 73675 793
22-08-2019 81559 59579 5105
23-08-2019 74445 30443 25857
24-08-2019 51086 23857 14009
25-08-2019 10235 24615 557
26-08-2019 11890 28680 8116
27-08-2019 46124 37962 7475
28-08-2019 52599 40987 2818
29-08-2019 59870 54310 2159
30-08-2019 62128 45864 13806
31-08-2019 62000 68187 2821
TOTAL 1474219 1336299 184373
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD
NAME OF POOLING STATION :-BEHAPUR-1 (SUJLON-1)DALODA (MPC12456)
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 88544 55082 4675
02-08-2019 76799 48541 1269
03-08-2019 67599 3020 16952
04-08-2019 46496 14968 8302
05-08-2019 64973 48873 4546
06-08-2019 129597 110614 3120
07-08-2019 115143 88662 3684
08-08-2019 74876 32310 5877
09-08-2019 74276 53513 17471
10-08-2019 157198 130788 5033
11-08-2019 96026 80022 3493
12-08-2019 89851 65152 1921
13-08-2019 86633 63615 938
14-08-2019 103804 93040 10745
15-08-2019 157712 160033 4021
16-08-2019 216230 199423 5366
17-08-2019 179828 135308 12392
18-08-2019 90256 94638 6686
19-08-2019 67137 56598 4899
20-08-2019 61230 48504 1771
21-08-2019 90505 84138 1515
22-08-2019 74617 67754 2621
23-08-2019 65692 45477 4914
24-08-2019 72242 52933 135
25-08-2019 57734 37131 2923
26-08-2019 46081 13397 1059
27-08-2019 37168 11356 193
28-08-2019 31024 7746 0
29-08-2019 33050 8933 87
30-08-2019 38473 13565 872
31-08-2019 33606 9169 0
TOTAL 2624400 1934303 137480
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD
NAME OF POOLING STATION :-BEHAPUR-2 (SUJLON-2)DALODA (MPC12448)
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 127216 61190 21111
02-08-2019 83290 55898 1030
03-08-2019 89323 13129 28041
04-08-2019 57608 18500 19791
05-08-2019 60524 47334 2226
06-08-2019 113121 106326 396
07-08-2019 101531 80383 4623
08-08-2019 61377 24390 3765
09-08-2019 64680 55272 14876
10-08-2019 165149 127984 7739
11-08-2019 101116 81664 4566
12-08-2019 81160 67336 97
13-08-2019 80890 67116 461
14-08-2019 106045 90691 14105
15-08-2019 184676 9 142026
16-08-2019 243089 45062 171215
17-08-2019 214434 140136 27053
18-08-2019 106925 99382 5594
19-08-2019 75698 57370 7783
20-08-2019 61510 49613 377
21-08-2019 88318 81068 1788
22-08-2019 84654 70461 2154
23-08-2019 71255 52305 1242
24-08-2019 80933 65191 2689
25-08-2019 63785 35908 5360
26-08-2019 47119 13868 674
27-08-2019 42426 11718 159
28-08-2019 38046 7825 515
29-08-2019 33776 11081 30
30-08-2019 41887 18628 247
31-08-2019 34341 9722 0
TOTAL 2805902 1666560 491733
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD
NAME OF POOLING STATION :-BETUL WIND FARM
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 719521 738722 35522
02-08-2019 505616 655204 52262
03-08-2019 508001 342513 54188
04-08-2019 384553 132866 77269
05-08-2019 240110 320862 14694
06-08-2019 246604 609693 221715
07-08-2019 499022 840276 149868
08-08-2019 602455 771415 53099
09-08-2019 492749 713646 90066
10-08-2019 214165 326043 33337
11-08-2019 210332 375830 82675
12-08-2019 284244 695399 243221
13-08-2019 469245 863308 204884
14-08-2019 555917 823671 220236
15-08-2019 342427 652998 139428
16-08-2019 227239 543825 204354
17-08-2019 189131 405054 170213
18-08-2019 171228 463403 214379
19-08-2019 244263 564622 222386
20-08-2019 400583 849126 247400
21-08-2019 444265 715775 127720
22-08-2019 510843 870169 194612
23-08-2019 442761 931954 331900
24-08-2019 515540 858273 141959
25-08-2019 612292 825176 91609
26-08-2019 579024 467656 130188
27-08-2019 341187 355605 12642
28-08-2019 84520 179159 26922
29-08-2019 49337 232536 38688
30-08-2019 92856 315482 83580
31-08-2019 106509 245872 26233
TOTAL 11286539 17686133 3937249
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD
NAME OF POOLING STATION :-BHADRESH TRADING CORP. LTD.(10MW)
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 15345 30015 13482
02-08-2019 21294 22067 350
03-08-2019 24046 22694 3783
04-08-2019 40179 40432 2078
05-08-2019 35779 41458 2251
06-08-2019 31917 32474 1897
07-08-2019 10182 5780 89
08-08-2019 20558 16236 7126
09-08-2019 11838 18293 1614
10-08-2019 43728 42374 894
11-08-2019 50238 34193 6192
12-08-2019 46549 47563 1236
13-08-2019 38354 37378 106
14-08-2019 13934 11046 0
15-08-2019 4184 2593 0
16-08-2019 18425 28236 2396
17-08-2019 30135 35774 2371
18-08-2019 40684 15417 10197
19-08-2019 45823 50992 934
20-08-2019 45675 46059 1062
21-08-2019 53329 56037 1896
22-08-2019 55461 52354 1921
23-08-2019 54208 26789 15825
24-08-2019 42253 17678 15200
25-08-2019 9236 18065 394
26-08-2019 8469 14853 1397
27-08-2019 32608 31062 3627
28-08-2019 26395 28658 648
29-08-2019 38840 46903 1595
30-08-2019 45879 31662 2623
31-08-2019 37865 47470 2040
TOTAL 993410 952605 105224
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD
NAME OF POOLING STATION :-CHOKASI ENERGY & INFRA P L DODAR (MTR No.Y0056963)
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 87597 73814 1841
02-08-2019 95344 41340 20549
03-08-2019 44721 18489 704
04-08-2019 47403 26978 4943
05-08-2019 92116 32335 17463
06-08-2019 103687 99095 4334
07-08-2019 95387 110291 5304
08-08-2019 83234 57071 6625
09-08-2019 59276 44867 4035
10-08-2019 143333 118890 5643
11-08-2019 94015 61104 8448
12-08-2019 64827 56706 1544
13-08-2019 76314 66423 325
14-08-2019 115482 102278 9819
15-08-2019 219430 107631 104919
16-08-2019 209129 54390 138046
17-08-2019 186691 137235 25004
18-08-2019 88891 88467 1265
19-08-2019 57958 58734 982
20-08-2019 81775 64593 8666
21-08-2019 76648 106856 6138
22-08-2019 91212 55673 6014
23-08-2019 81142 51350 10889
24-08-2019 83402 82162 1993
25-08-2019 76177 54442 7915
26-08-2019 72236 53018 1222
27-08-2019 51927 15748 2462
28-08-2019 37979 21345 25
29-08-2019 38297 13900 500
30-08-2019 44368 25706 34
31-08-2019 43565 12225 2102
TOTAL 2743563 1913156 409753
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD
NAME OF POOLING STATION :-CHOKASI ENERGY & INFRA P L RINGDOD (MTR No..Y0056961)
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 101701 77464 5371
02-08-2019 82161 55855 2554
03-08-2019 47910 19671 347
04-08-2019 53598 28749 9735
05-08-2019 73520 54790 3305
06-08-2019 105766 121185 892
07-08-2019 103298 105512 4513
08-08-2019 91285 34980 27338
09-08-2019 56901 60080 9125
10-08-2019 133970 143501 3290
11-08-2019 87335 97328 5859
12-08-2019 65801 66645 2173
13-08-2019 76914 68817 437
14-08-2019 125502 74923 20542
15-08-2019 219960 197048 19711
16-08-2019 208677 165758 9222
17-08-2019 180064 139090 22027
18-08-2019 88777 88362 658
19-08-2019 59560 63415 2568
20-08-2019 89558 68528 20105
21-08-2019 78337 94400 5919
22-08-2019 92486 100643 269
23-08-2019 86372 59485 7728
24-08-2019 93180 81624 936
25-08-2019 89226 62187 9525
26-08-2019 78027 47701 2629
27-08-2019 49174 17397 1948
28-08-2019 37299 21300 34
29-08-2019 38744 13055 533
30-08-2019 39055 23383 13
31-08-2019 38978 11309 662
TOTAL 2773136 2264185 199968
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD
NAME OF POOLING STATION :-D J ENERGY & UTTAR URJA
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 1487016 1151390 60584
02-08-2019 1251863 926340 13554
03-08-2019 876651 382310 41716
04-08-2019 607619 378780 40679
05-08-2019 1056682 1040520 61384
06-08-2019 1637714 1800570 7071
07-08-2019 1610433 1676330 18795
08-08-2019 1081257 846140 26572
09-08-2019 927386 899700 165795
10-08-2019 1938313 1872530 36780
11-08-2019 1386651 1269250 33528
12-08-2019 986555 1015980 0
13-08-2019 1151967 1138520 1444
14-08-2019 1457184 1590640 154180
15-08-2019 2517051 2620010 61631
16-08-2019 2829546 3062790 23772
17-08-2019 2039222 1984730 38298
18-08-2019 1390163 1339330 46949
19-08-2019 992252 1029080 21455
20-08-2019 1089478 1017050 78
21-08-2019 1442218 1453640 44659
22-08-2019 1295296 1374300 69001
23-08-2019 1129603 1034940 71550
24-08-2019 1396087 1287420 32249
25-08-2019 1196705 983500 151975
26-08-2019 884988 600180 9483
27-08-2019 655365 356000 129
28-08-2019 486715 317710 0
29-08-2019 472627 276810 101
30-08-2019 475747 417520 0
31-08-2019 457421 351080 0
TOTAL 38207775 35495090 1233412
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD
NAME OF POOLING STATION :-DELIGENTIA 1
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 28533 65886 19829
02-08-2019 58368 64803 1469
03-08-2019 55678 73372 9842
04-08-2019 81759 72545 435
05-08-2019 66027 32956 8797
06-08-2019 46681 50243 1150
07-08-2019 19692 26866 325
08-08-2019 77442 58687 9862
09-08-2019 46283 27473 4410
10-08-2019 55501 69911 1438
11-08-2019 72781 58087 2898
12-08-2019 106594 70390 14906
13-08-2019 79978 107105 4115
14-08-2019 37564 23561 4739
15-08-2019 7018 12513 216
16-08-2019 31044 30018 0
17-08-2019 45507 55398 1041
18-08-2019 77880 79755 12309
19-08-2019 113929 118836 793
20-08-2019 118073 113484 5594
21-08-2019 118859 116478 4463
22-08-2019 119489 120777 5213
23-08-2019 116363 106521 8973
24-08-2019 82735 40758 17902
25-08-2019 26292 41402 750
26-08-2019 30332 44772 7834
27-08-2019 64966 73934 6879
28-08-2019 71334 64785 13651
29-08-2019 84345 82056 247
30-08-2019 81938 76308 3801
31-08-2019 84208 100855 6232
TOTAL 2107193 2080535 180113
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD
NAME OF POOLING STATION :-DHAR WIND POWER PROJECTS PVT LTD
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 190343 164276 4931
02-08-2019 94740 66049 393
03-08-2019 78023 42455 3916
04-08-2019 64091 40586 456
05-08-2019 81110 86315 847
06-08-2019 107677 107678 1402
07-08-2019 108605 115363 676
08-08-2019 145895 149488 14140
09-08-2019 185484 160252 11136
10-08-2019 199308 190884 3775
11-08-2019 118017 113000 6390
12-08-2019 83002 77462 540
13-08-2019 91687 79579 966
14-08-2019 109371 100105 773
15-08-2019 184084 177525 149
16-08-2019 185052 161289 5894
17-08-2019 156222 126304 10542
18-08-2019 94767 100696 8967
19-08-2019 62977 57105 1384
20-08-2019 90595 68709 2271
21-08-2019 98941 93894 900
22-08-2019 98009 89637 15
23-08-2019 92128 73326 1747
24-08-2019 115319 84993 4025
25-08-2019 106432 79251 2287
26-08-2019 128480 88372 8500
27-08-2019 101883 82652 927
28-08-2019 71596 62385 17
29-08-2019 41918 18948 0
30-08-2019 44784 23674 0
31-08-2019 38653 20919 24
TOTAL 3369193 2903171 97990
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD
NAME OF POOLING STATION :-ENERCON (I) LTD.-I RATEDI HILL,BAGLI
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 215233 122991 32654
02-08-2019 139595 65432 18570
03-08-2019 105705 32923 10827
04-08-2019 85553 25043 10572
05-08-2019 72442 44214 2001
06-08-2019 84723 82581 931
07-08-2019 121837 107033 5930
08-08-2019 141721 62437 37250
09-08-2019 185501 114509 26601
10-08-2019 202172 109869 32891
11-08-2019 91343 78246 1017
12-08-2019 89670 68042 411
13-08-2019 109098 72370 3788
14-08-2019 186505 119537 19338
15-08-2019 251578 175829 22287
16-08-2019 163935 132662 4341
17-08-2019 111024 62189 6639
18-08-2019 56495 46669 108
19-08-2019 78880 39990 8457
20-08-2019 105046 66859 2220
21-08-2019 106637 87014 289
22-08-2019 135961 81248 9784
23-08-2019 112437 66577 6259
24-08-2019 132244 80236 10072
25-08-2019 185825 76529 55540
26-08-2019 152336 41376 57727
27-08-2019 110204 43650 21603
28-08-2019 49684 27092 93
29-08-2019 21369 6863 0
30-08-2019 36541 25647 0
31-08-2019 32749 24332 0
TOTAL 3674043 2189989 408200
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD
NAME OF POOLING STATION :-FINSURYA SOLAR ENERGY (10MW)
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 17724 30581 3820
02-08-2019 21338 36726 6051
03-08-2019 22596 21477 486
04-08-2019 42540 39280 4468
05-08-2019 37854 29149 1032
06-08-2019 36607 44256 4015
07-08-2019 15527 15056 1252
08-08-2019 32973 22741 3568
09-08-2019 12538 16212 359
10-08-2019 53427 43236 5120
11-08-2019 56588 35287 7845
12-08-2019 48524 45663 2483
13-08-2019 37303 38815 1223
14-08-2019 15392 12982 745
15-08-2019 8293 7352 0
16-08-2019 40157 35054 3082
17-08-2019 44635 36241 4221
18-08-2019 47026 20952 11778
19-08-2019 51502 54365 561
20-08-2019 51096 38634 3001
21-08-2019 61300 63009 411
22-08-2019 61322 55011 2119
23-08-2019 59394 24024 23296
24-08-2019 37462 17532 7827
25-08-2019 11130 18722 199
26-08-2019 14673 19992 3304
27-08-2019 33507 35747 4791
28-08-2019 43155 25831 6403
29-08-2019 40685 50281 5335
30-08-2019 43679 39476 5492
31-08-2019 49487 53825 1934
TOTAL 1149434 1027509 126221
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD
NAME OF POOLING STATION :-Friends Salt Works & Allied Industries, Susner
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 2014 23315 12873
02-08-2019 2864 16445 2176
03-08-2019 3126 29441 14412
04-08-2019 3992 28476 12644
05-08-2019 3642 33634 17537
06-08-2019 3330 24372 9528
07-08-2019 1005 6557 31
08-08-2019 4057 13286 4492
09-08-2019 1225 13476 2243
10-08-2019 4977 31877 11080
11-08-2019 5136 22148 3018
12-08-2019 4066 33558 13741
13-08-2019 3523 25959 9089
14-08-2019 1644 7140 0
15-08-2019 423 766 0
16-08-2019 3634 11355 1722
17-08-2019 3362 26116 9532
18-08-2019 4501 12684 434
19-08-2019 5155 35991 17520
20-08-2019 4894 33371 17959
21-08-2019 5558 39812 22866
22-08-2019 5883 34670 19873
23-08-2019 5402 17392 2888
24-08-2019 3614 11041 162
25-08-2019 776 13034 1208
26-08-2019 1969 10208 1554
27-08-2019 3134 24708 11840
28-08-2019 4166 17344 2584
29-08-2019 4353 31286 13029
30-08-2019 4123 18800 5887
31-08-2019 4579 30404 12099
TOTAL 110127 678666 254021
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD
NAME OF POOLING STATION :-GAMESA RENEWABLE PVT LTD DEWAS
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 1460137 1367233 53455
02-08-2019 983052 728481 13249
03-08-2019 633378 408219 26046
04-08-2019 433298 278324 18960
05-08-2019 629045 539198 1303
06-08-2019 908207 966653 2054
07-08-2019 934298 933171 18700
08-08-2019 763700 595547 10028
09-08-2019 988421 1014528 78771
10-08-2019 1362911 1384069 25777
11-08-2019 874351 803818 109612
12-08-2019 884969 873607 12728
13-08-2019 771083 712847 19768
14-08-2019 1247879 1273626 69511
15-08-2019 2049225 2226837 8717
16-08-2019 1735565 1731217 39239
17-08-2019 1030150 930144 7353
18-08-2019 750691 717962 12180
19-08-2019 597770 548948 13846
20-08-2019 802365 712050 18672
21-08-2019 968451 917175 74136
22-08-2019 875178 826523 78492
23-08-2019 820510 815188 63358
24-08-2019 964312 914756 30206
25-08-2019 863846 749282 45369
26-08-2019 596639 402354 15585
27-08-2019 479368 313938 11960
28-08-2019 448943 371434 0
29-08-2019 309348 109867 9430
30-08-2019 355570 260039 389
31-08-2019 322363 201993 0
TOTAL 26845023 24629028 888894
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD
NAME OF POOLING STATION :-GIRIRAJ ENTERPRISES,AFJALPUR
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 105553 65783 8163
02-08-2019 104061 75225 6071
03-08-2019 57807 37927 926
04-08-2019 60920 18895 3219
05-08-2019 110082 59759 10995
06-08-2019 119445 129666 2438
07-08-2019 113471 33018 28168
08-08-2019 79201 62113 1334
09-08-2019 64245 48141 2819
10-08-2019 202902 94136 111888
11-08-2019 99086 99962 2058
12-08-2019 79187 82410 447
13-08-2019 98080 80549 9936
14-08-2019 130321 90527 33383
15-08-2019 261248 224849 18569
16-08-2019 220354 177280 13036
17-08-2019 177981 155913 24337
18-08-2019 85805 109085 7437
19-08-2019 72700 66381 302
20-08-2019 91087 86586 819
21-08-2019 104393 98304 6890
22-08-2019 122931 100276 15845
23-08-2019 89211 86703 3227
24-08-2019 101077 75200 17883
25-08-2019 117282 59542 15663
26-08-2019 98509 65257 8558
27-08-2019 65852 22784 8018
28-08-2019 55934 25993 1850
29-08-2019 35451 19695 77
30-08-2019 37303 36109 531
31-08-2019 39792 21690 63
TOTAL 3201271 2409758 364950
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD
NAME OF POOLING STATION :-GIRIRAJ ENTERPRISES,KUCHROD
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 118845 57292 21385
02-08-2019 83008 70463 2381
03-08-2019 63967 37656 2131
04-08-2019 49062 20772 1327
05-08-2019 74436 54090 4624
06-08-2019 112163 121693 2691
07-08-2019 111216 11009 37323
08-08-2019 61754 45838 2846
09-08-2019 64158 48550 3448
10-08-2019 156575 146523 18820
11-08-2019 103715 109814 2347
12-08-2019 84472 75052 208
13-08-2019 86546 78701 857
14-08-2019 115714 68499 11885
15-08-2019 233265 116578 72388
16-08-2019 227349 5554 200330
17-08-2019 160610 94556 45431
18-08-2019 89700 82806 4763
19-08-2019 66150 58304 241
20-08-2019 77956 79124 1770
21-08-2019 96837 100520 1280
22-08-2019 90348 100835 3365
23-08-2019 77906 82379 4186
24-08-2019 96699 86323 17487
25-08-2019 116762 56054 21470
26-08-2019 98340 69960 6844
27-08-2019 65093 21067 9408
28-08-2019 55691 24733 1577
29-08-2019 36336 12998 469
30-08-2019 36156 28681 44
31-08-2019 37418 19841 0
TOTAL 2948247 1986265 503326
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD
NAME OF POOLING STATION :-INOX WIND INFRA BETUL
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 461316 329861 129585
02-08-2019 363925 393133 17608
03-08-2019 187156 139923 18189
04-08-2019 131618 30691 20460
05-08-2019 174648 167168 21869
06-08-2019 365271 374593 43163
07-08-2019 518482 561005 7981
08-08-2019 426912 451035 31060
09-08-2019 360146 334716 58872
10-08-2019 231693 119430 49316
11-08-2019 202613 202535 51413
12-08-2019 406317 432257 20365
13-08-2019 495712 526233 8079
14-08-2019 460927 484890 26914
15-08-2019 378121 285668 40440
16-08-2019 286115 253440 32406
17-08-2019 247944 206781 24986
18-08-2019 281471 293649 32345
19-08-2019 329890 335644 26327
20-08-2019 493582 513267 3265
21-08-2019 455643 442371 16294
22-08-2019 504388 504710 11605
23-08-2019 527044 542812 13528
24-08-2019 506157 513228 4560
25-08-2019 497970 500883 7053
26-08-2019 342712 260775 19244
27-08-2019 226101 176365 15042
28-08-2019 133338 71612 6337
29-08-2019 138908 128677 2647
30-08-2019 195119 175694 11706
31-08-2019 173252 131878 3900
TOTAL 10504491 9884924 776559
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD
NAME OF POOLING STATION :-JAMGODRANI WIND FARMS PVT LTD DEWAS
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 464361 429408 6422
02-08-2019 351586 326220 20956
03-08-2019 257727 128874 40668
04-08-2019 148638 70812 5954
05-08-2019 203497 182790 795
06-08-2019 312025 352170 16543
07-08-2019 338619 313938 9444
08-08-2019 300135 252456 11755
09-08-2019 306476 219210 38243
10-08-2019 348162 227904 76822
11-08-2019 266911 219618 13931
12-08-2019 271013 279762 9435
13-08-2019 314443 274962 20170
14-08-2019 404653 368586 11787
15-08-2019 543421 362172 150868
16-08-2019 457347 371976 59424
17-08-2019 305894 288336 15080
18-08-2019 248394 239142 11586
19-08-2019 184336 173010 7291
20-08-2019 279357 288750 9915
21-08-2019 334529 352542 8625
22-08-2019 318454 296694 15047
23-08-2019 299522 301734 11871
24-08-2019 313881 332808 22358
25-08-2019 367783 291534 29507
26-08-2019 343119 169782 128604
27-08-2019 258228 102876 119322
28-08-2019 133130 133344 1286
29-08-2019 71789 39642 20
30-08-2019 142743 91110 6779
31-08-2019 173010 79386 29637
TOTAL 9063183 7561548 910145
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE - JABALPUR
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED
DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019
NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD
NAME OF POOLING STATION :-KSHEMA POWER & INFRA PVT LTD (BHERUGARH)
DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs.
01-08-2019 301685 221506 16594
02-08-2019 216039 142220 3812
03-08-2019 152903 75981 11744
04-08-2019 139512 50566 30543
05-08-2019 146529 120466 1224
06-08-2019 202945 198060 394
07-08-2019 286453 173452 34193
08-08-2019 229224 125509 39079
09-08-2019 293480 185345 74981
10-08-2019 412904 382691 4921
11-08-2019 227680 204324 11095
12-08-2019 222064 171955 1776
13-08-2019 170941 115671 1615
14-08-2019 276704 235090 21479
15-08-2019 431550 442078 25259
16-08-2019 417379 382662 14420
17-08-2019 290669 230699 14466
18-08-2019 161316 156438 2336
19-08-2019 118753 99149 453
20-08-2019 142641 122144 635
21-08-2019 212226 178213 7871
22-08-2019 207332 156688 11358
23-08-2019 183351 132987 6119
24-08-2019 181374 139412 212
25-08-2019 186216 129789 9547
26-08-2019 154824 101359 3254
27-08-2019 109341 61724 472
28-08-2019 103989 87345 571
29-08-2019 77386 36251 251
30-08-2019 100753 67127 3931
31-08-2019 81930 49717 205
TOTAL 6440093 4976618 354810
(+) Payable (-) Receivable
Junior Engineer(LD) Assistant Engineer(LD)
MPPTCL,Jabalpur MPPTCL,Jabalpur
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019
MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019

Contenu connexe

Similaire à MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019

Presentation MMEPL Business Plan V1 26 07 2016
Presentation MMEPL Business Plan V1 26 07 2016Presentation MMEPL Business Plan V1 26 07 2016
Presentation MMEPL Business Plan V1 26 07 2016
glsomani
 
Kaizen_ Electrical Unit saving fhgdgutfhfhgh
Kaizen_ Electrical Unit saving fhgdgutfhfhghKaizen_ Electrical Unit saving fhgdgutfhfhgh
Kaizen_ Electrical Unit saving fhgdgutfhfhgh
GaneshKulal4
 
VJ CV111 (2)
VJ CV111 (2)VJ CV111 (2)
VJ CV111 (2)
vilas J
 
Internship Report - Rao Saim Zafar
Internship Report - Rao Saim ZafarInternship Report - Rao Saim Zafar
Internship Report - Rao Saim Zafar
Rao Saim Zafar
 
Andhra Pradesh solar power policy 2012
Andhra Pradesh solar power policy  2012Andhra Pradesh solar power policy  2012
Andhra Pradesh solar power policy 2012
Bakul Haria
 
Solar policys in india and state comparison
Solar policys in india and state comparison Solar policys in india and state comparison
Solar policys in india and state comparison
Nilesh Dayalapwar
 

Similaire à MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019 (20)

CURRICULAM VITAE MAHAVIRSINH
CURRICULAM VITAE MAHAVIRSINHCURRICULAM VITAE MAHAVIRSINH
CURRICULAM VITAE MAHAVIRSINH
 
Company profile
Company profileCompany profile
Company profile
 
12 B .Storage CEA.pptx
12 B .Storage CEA.pptx12 B .Storage CEA.pptx
12 B .Storage CEA.pptx
 
RFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in PunjabRFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in Punjab
 
solar_sb.pdf
solar_sb.pdfsolar_sb.pdf
solar_sb.pdf
 
Presentation MMEPL Business Plan V1 26 07 2016
Presentation MMEPL Business Plan V1 26 07 2016Presentation MMEPL Business Plan V1 26 07 2016
Presentation MMEPL Business Plan V1 26 07 2016
 
National Transmission And Dispatch Company (NTDC)
National Transmission And Dispatch Company (NTDC)National Transmission And Dispatch Company (NTDC)
National Transmission And Dispatch Company (NTDC)
 
LPM of Safe Solar Power.pdf
LPM of Safe Solar Power.pdfLPM of Safe Solar Power.pdf
LPM of Safe Solar Power.pdf
 
Optimization towards cost effective solar mini grids in bangladesh
Optimization towards cost effective solar mini grids in bangladeshOptimization towards cost effective solar mini grids in bangladesh
Optimization towards cost effective solar mini grids in bangladesh
 
Growth of Solar Power Projects in MP S R Mohanty Additional Chief Secretary, ...
Growth of Solar Power Projects in MP S R Mohanty Additional Chief Secretary, ...Growth of Solar Power Projects in MP S R Mohanty Additional Chief Secretary, ...
Growth of Solar Power Projects in MP S R Mohanty Additional Chief Secretary, ...
 
Solar Energy Assessment Report for 100 kWp of Chandigarh, Punjab created by E...
Solar Energy Assessment Report for 100 kWp of Chandigarh, Punjab created by E...Solar Energy Assessment Report for 100 kWp of Chandigarh, Punjab created by E...
Solar Energy Assessment Report for 100 kWp of Chandigarh, Punjab created by E...
 
Kaizen_ Electrical Unit saving fhgdgutfhfhgh
Kaizen_ Electrical Unit saving fhgdgutfhfhghKaizen_ Electrical Unit saving fhgdgutfhfhgh
Kaizen_ Electrical Unit saving fhgdgutfhfhgh
 
RFP Documents for Solar Plant in Uttar Pradesh
RFP Documents for Solar Plant in Uttar PradeshRFP Documents for Solar Plant in Uttar Pradesh
RFP Documents for Solar Plant in Uttar Pradesh
 
VJ CV111 (2)
VJ CV111 (2)VJ CV111 (2)
VJ CV111 (2)
 
Internship Report - Rao Saim Zafar
Internship Report - Rao Saim ZafarInternship Report - Rao Saim Zafar
Internship Report - Rao Saim Zafar
 
Andhra Pradesh solar power policy 2012
Andhra Pradesh solar power policy  2012Andhra Pradesh solar power policy  2012
Andhra Pradesh solar power policy 2012
 
Bid document for Solar Plant at J&K
Bid document for Solar Plant at J&KBid document for Solar Plant at J&K
Bid document for Solar Plant at J&K
 
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHALVOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
 
Solar power plants in rajasthan
Solar power plants in rajasthanSolar power plants in rajasthan
Solar power plants in rajasthan
 
Solar policys in india and state comparison
Solar policys in india and state comparison Solar policys in india and state comparison
Solar policys in india and state comparison
 

Plus de Das A. K.

Plus de Das A. K. (20)

Rajasthan SLDC - RE DSM Statement -Jan 2020
Rajasthan SLDC - RE DSM Statement -Jan 2020Rajasthan SLDC - RE DSM Statement -Jan 2020
Rajasthan SLDC - RE DSM Statement -Jan 2020
 
Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019Rajasthan SLDC - RE DSM Statement -August 2019
Rajasthan SLDC - RE DSM Statement -August 2019
 
Rajasthan SLDC - RE DSM Statement -July 2019
Rajasthan SLDC - RE DSM Statement -July 2019Rajasthan SLDC - RE DSM Statement -July 2019
Rajasthan SLDC - RE DSM Statement -July 2019
 
Rajasthan DSM April 2019
Rajasthan DSM April 2019Rajasthan DSM April 2019
Rajasthan DSM April 2019
 
Rajasthan DSM May 2019
Rajasthan DSM May 2019Rajasthan DSM May 2019
Rajasthan DSM May 2019
 
Rajasthan DSM June 2019
Rajasthan DSM June 2019Rajasthan DSM June 2019
Rajasthan DSM June 2019
 
Actual Penalty and Deviation Settlement Mechanism (DSM) Penalty in Interstate...
Actual Penalty and Deviation Settlement Mechanism (DSM) Penalty in Interstate...Actual Penalty and Deviation Settlement Mechanism (DSM) Penalty in Interstate...
Actual Penalty and Deviation Settlement Mechanism (DSM) Penalty in Interstate...
 
Statement Showing the RE DSM (Rajasthan SLDC) for the month of November-2019 ...
Statement Showing the RE DSM (Rajasthan SLDC) for the month of November-2019 ...Statement Showing the RE DSM (Rajasthan SLDC) for the month of November-2019 ...
Statement Showing the RE DSM (Rajasthan SLDC) for the month of November-2019 ...
 
Draft - Rajasthan - SLDC - Deviation Settlement Account (DSM) statement Octob...
Draft - Rajasthan - SLDC - Deviation Settlement Account (DSM) statement Octob...Draft - Rajasthan - SLDC - Deviation Settlement Account (DSM) statement Octob...
Draft - Rajasthan - SLDC - Deviation Settlement Account (DSM) statement Octob...
 
Gujarat SLDC - STATE DEVIATION SETTLEMENT ACCOUNT FOR THE WEEK 29-Jul-2019 ...
Gujarat SLDC - STATE DEVIATION SETTLEMENT ACCOUNT  FOR THE WEEK  29-Jul-2019 ...Gujarat SLDC - STATE DEVIATION SETTLEMENT ACCOUNT  FOR THE WEEK  29-Jul-2019 ...
Gujarat SLDC - STATE DEVIATION SETTLEMENT ACCOUNT FOR THE WEEK 29-Jul-2019 ...
 
Adjudication of dispute regarding RERC (Forecasting, Scheduling, Deviation Se...
Adjudication of dispute regarding RERC (Forecasting, Scheduling, Deviation Se...Adjudication of dispute regarding RERC (Forecasting, Scheduling, Deviation Se...
Adjudication of dispute regarding RERC (Forecasting, Scheduling, Deviation Se...
 
Rajasthan SLDC - Statement Showing the RE DSM for the month of October-2018 Q...
Rajasthan SLDC - Statement Showing the RE DSM for the month of October-2018 Q...Rajasthan SLDC - Statement Showing the RE DSM for the month of October-2018 Q...
Rajasthan SLDC - Statement Showing the RE DSM for the month of October-2018 Q...
 
Rajasthan SLDC - Statement Showing the RE DSM for the month of November-2018 ...
Rajasthan SLDC - Statement Showing the RE DSM for the month of November-2018 ...Rajasthan SLDC - Statement Showing the RE DSM for the month of November-2018 ...
Rajasthan SLDC - Statement Showing the RE DSM for the month of November-2018 ...
 
Rajasthan SLDC - Statement Showing the RE DSM for the month of December-2018 ...
Rajasthan SLDC - Statement Showing the RE DSM for the month of December-2018 ...Rajasthan SLDC - Statement Showing the RE DSM for the month of December-2018 ...
Rajasthan SLDC - Statement Showing the RE DSM for the month of December-2018 ...
 
Reply to reconnect's defamation notice - One can love it or hate it, but we r...
Reply to reconnect's defamation notice - One can love it or hate it, but we r...Reply to reconnect's defamation notice - One can love it or hate it, but we r...
Reply to reconnect's defamation notice - One can love it or hate it, but we r...
 
normalized parametric model for wind turbine power curve
normalized parametric model for wind turbine power curvenormalized parametric model for wind turbine power curve
normalized parametric model for wind turbine power curve
 
CW / 18587 / 2018 INDIAN WIND POWER ASSOCIATION (RAJASTHAN STATE COUNCIL) Vs....
CW / 18587 / 2018 INDIAN WIND POWER ASSOCIATION (RAJASTHAN STATE COUNCIL) Vs....CW / 18587 / 2018 INDIAN WIND POWER ASSOCIATION (RAJASTHAN STATE COUNCIL) Vs....
CW / 18587 / 2018 INDIAN WIND POWER ASSOCIATION (RAJASTHAN STATE COUNCIL) Vs....
 
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges) 11 m...
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges) 11 m...Mock RE - Gujarat State Deviation Settlement Account (Deviation charges) 11 m...
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges) 11 m...
 
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)
Mock RE - Gujarat State Deviation Settlement Account (Deviation charges)
 
Revised Rajasthan DSM Penalty for September 2018 (uploaded on 1st May 2019)
Revised Rajasthan DSM Penalty for September 2018 (uploaded on 1st May 2019)Revised Rajasthan DSM Penalty for September 2018 (uploaded on 1st May 2019)
Revised Rajasthan DSM Penalty for September 2018 (uploaded on 1st May 2019)
 

Dernier

Top profile Call Girls In Latur [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Latur [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Latur [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Latur [ 7014168258 ] Call Me For Genuine Models We ...
gajnagarg
 
Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
nirzagarg
 
Top profile Call Girls In Vadodara [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Vadodara [ 7014168258 ] Call Me For Genuine Models ...Top profile Call Girls In Vadodara [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Vadodara [ 7014168258 ] Call Me For Genuine Models ...
gajnagarg
 
Reconciling Conflicting Data Curation Actions: Transparency Through Argument...
Reconciling Conflicting Data Curation Actions:  Transparency Through Argument...Reconciling Conflicting Data Curation Actions:  Transparency Through Argument...
Reconciling Conflicting Data Curation Actions: Transparency Through Argument...
Bertram Ludäscher
 
Lecture_2_Deep_Learning_Overview-newone1
Lecture_2_Deep_Learning_Overview-newone1Lecture_2_Deep_Learning_Overview-newone1
Lecture_2_Deep_Learning_Overview-newone1
ranjankumarbehera14
 
Gartner's Data Analytics Maturity Model.pptx
Gartner's Data Analytics Maturity Model.pptxGartner's Data Analytics Maturity Model.pptx
Gartner's Data Analytics Maturity Model.pptx
chadhar227
 
怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制
怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制
怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制
vexqp
 
Abortion pills in Jeddah | +966572737505 | Get Cytotec
Abortion pills in Jeddah | +966572737505 | Get CytotecAbortion pills in Jeddah | +966572737505 | Get Cytotec
Abortion pills in Jeddah | +966572737505 | Get Cytotec
Abortion pills in Riyadh +966572737505 get cytotec
 
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
nirzagarg
 
Jodhpur Park | Call Girls in Kolkata Phone No 8005736733 Elite Escort Service...
Jodhpur Park | Call Girls in Kolkata Phone No 8005736733 Elite Escort Service...Jodhpur Park | Call Girls in Kolkata Phone No 8005736733 Elite Escort Service...
Jodhpur Park | Call Girls in Kolkata Phone No 8005736733 Elite Escort Service...
HyderabadDolls
 
Top profile Call Girls In Indore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Indore [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Indore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Indore [ 7014168258 ] Call Me For Genuine Models We...
gajnagarg
 
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...
nirzagarg
 
Top profile Call Girls In bhavnagar [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In bhavnagar [ 7014168258 ] Call Me For Genuine Models...Top profile Call Girls In bhavnagar [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In bhavnagar [ 7014168258 ] Call Me For Genuine Models...
gajnagarg
 
Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...
Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...
Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...
Klinik kandungan
 

Dernier (20)

Top profile Call Girls In Latur [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Latur [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Latur [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Latur [ 7014168258 ] Call Me For Genuine Models We ...
 
Dubai Call Girls Peeing O525547819 Call Girls Dubai
Dubai Call Girls Peeing O525547819 Call Girls DubaiDubai Call Girls Peeing O525547819 Call Girls Dubai
Dubai Call Girls Peeing O525547819 Call Girls Dubai
 
High Profile Call Girls Service in Jalore { 9332606886 } VVIP NISHA Call Girl...
High Profile Call Girls Service in Jalore { 9332606886 } VVIP NISHA Call Girl...High Profile Call Girls Service in Jalore { 9332606886 } VVIP NISHA Call Girl...
High Profile Call Girls Service in Jalore { 9332606886 } VVIP NISHA Call Girl...
 
Gulbai Tekra * Cheap Call Girls In Ahmedabad Phone No 8005736733 Elite Escort...
Gulbai Tekra * Cheap Call Girls In Ahmedabad Phone No 8005736733 Elite Escort...Gulbai Tekra * Cheap Call Girls In Ahmedabad Phone No 8005736733 Elite Escort...
Gulbai Tekra * Cheap Call Girls In Ahmedabad Phone No 8005736733 Elite Escort...
 
Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
 
Digital Transformation Playbook by Graham Ware
Digital Transformation Playbook by Graham WareDigital Transformation Playbook by Graham Ware
Digital Transformation Playbook by Graham Ware
 
Top profile Call Girls In Vadodara [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Vadodara [ 7014168258 ] Call Me For Genuine Models ...Top profile Call Girls In Vadodara [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Vadodara [ 7014168258 ] Call Me For Genuine Models ...
 
Reconciling Conflicting Data Curation Actions: Transparency Through Argument...
Reconciling Conflicting Data Curation Actions:  Transparency Through Argument...Reconciling Conflicting Data Curation Actions:  Transparency Through Argument...
Reconciling Conflicting Data Curation Actions: Transparency Through Argument...
 
Lecture_2_Deep_Learning_Overview-newone1
Lecture_2_Deep_Learning_Overview-newone1Lecture_2_Deep_Learning_Overview-newone1
Lecture_2_Deep_Learning_Overview-newone1
 
Gartner's Data Analytics Maturity Model.pptx
Gartner's Data Analytics Maturity Model.pptxGartner's Data Analytics Maturity Model.pptx
Gartner's Data Analytics Maturity Model.pptx
 
Gomti Nagar & best call girls in Lucknow | 9548273370 Independent Escorts & D...
Gomti Nagar & best call girls in Lucknow | 9548273370 Independent Escorts & D...Gomti Nagar & best call girls in Lucknow | 9548273370 Independent Escorts & D...
Gomti Nagar & best call girls in Lucknow | 9548273370 Independent Escorts & D...
 
怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制
怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制
怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制
 
Abortion pills in Jeddah | +966572737505 | Get Cytotec
Abortion pills in Jeddah | +966572737505 | Get CytotecAbortion pills in Jeddah | +966572737505 | Get Cytotec
Abortion pills in Jeddah | +966572737505 | Get Cytotec
 
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
 
Jodhpur Park | Call Girls in Kolkata Phone No 8005736733 Elite Escort Service...
Jodhpur Park | Call Girls in Kolkata Phone No 8005736733 Elite Escort Service...Jodhpur Park | Call Girls in Kolkata Phone No 8005736733 Elite Escort Service...
Jodhpur Park | Call Girls in Kolkata Phone No 8005736733 Elite Escort Service...
 
Kings of Saudi Arabia, information about them
Kings of Saudi Arabia, information about themKings of Saudi Arabia, information about them
Kings of Saudi Arabia, information about them
 
Top profile Call Girls In Indore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Indore [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Indore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Indore [ 7014168258 ] Call Me For Genuine Models We...
 
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...
 
Top profile Call Girls In bhavnagar [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In bhavnagar [ 7014168258 ] Call Me For Genuine Models...Top profile Call Girls In bhavnagar [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In bhavnagar [ 7014168258 ] Call Me For Genuine Models...
 
Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...
Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...
Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...
 

MP-DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019

  • 1. MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED vkbZ ,l vks : 9001-2008 ISO: 9001-2008 CIN-U40109MP2001SGC014880, Email-mdtransco.nic.in STATE LOAD DESPATCH CENTRE, Nayagaon, Rampur, Jabalpur Telephone: (0761) 2970089 Fax: (0761) 2664343 e-mail sldcmpjbp@gmail.com No.07-05/REG-201/W&S-DSM/154-A/2851 Jabalpur, dtd: - 24.10.2019 As Per Distibrution List Sub: DSM Account of Wind and Solar Pooling Stations for the month of AUGUST, 2019 on the basis of MPERC (Forecasting, Scheduling, Deviation Settlement Mechanism and related matters of Wind and Solar Generating Stations) Regulations, 2018. In pursuance to MPERC (Forecasting, Scheduling, Deviation Settlement Mechanism and related matters of Wind and Solar Generating Stations) Regulations, 2018, SLDC has prepared the DSM Account of Wind Pooling Stations having combined installed capacity of 10MW and above and Solar Pooling Stations with an installed capacity of 5MW and above including Wind and Solar Pooling Stations selling InterState and having combined installed capcity less than 10MW and 5 MW. The Generators of the following Pooling stations have not appointed the QCA and also not furnished the Forecasting and Availability data for the month of AUGUST 2019 to the SLDC. As such, SLDC has computed the Deviation Charges of these Pooling Stations considering the Availability and Schedules as “Zero” and DSM Account is issued to Developer. i. 11.95MW Wincon Jaora. The ABT meters installed at the following Generating Stations are recording 15 minutes block wise data on sliding window principal instead of load survey, thus, blockwise data does not match with midnight data recorded by the meters. The midnight values are correct; this has been confirmed by M/s Secure Meters Ltd. As such, the monthly midnight data has been distributed in 15 minutes’ time block as per injection pattern of generation and accordingly the Deviation Charges have been computed. i. 12MW Avenger solar pvt Ltd. connected at 132KV S/s Suwasara. ii. 5.1MW Porwal Auto Component connected at 132KV S/s Makdon. iii. 27.3MW AVP Power Infra Pvt. Ltd. connected at 132KV S/s Sonkatchh. iv. 25.2MW Suzlon Gujrat wind Park Pvt. Ltd. Barod connected at 220KV S/s Barod. v. 15MW M.P. Wind Farm Nagda Hill connected at 220KV S/s Dewas. vi. 14.4MW Suzlon I Ratlam connected at 132KV S/s Jaora. vii. 13.5MW Suzlon IV Ratlam connected at 132KV S/s Jaora. viii. 12MW Suzlon V Ratlam connected at 132KV S/s Jaora. ix. 14.4MW Suzlon I Sailana connected at 132KV S/s Sailana. x. 15MW Suzlon II Sailana connected at 132KV S/s Sailana. xi. 14.1MW Suzlon III Sailana connected at 132KV S/s Sailana. xii. 15MW Suzlon I (Susner I) connected at 132KV S/s Susner. xiii. 15MW Suzlon II (Susner II) connected at 132KV S/s Susner. xiv. 15MW Suzlon III (Agar I) connected at 132KV S/s Agar. xv. 15MW Suzlon IV (Agar II) connected at 132KV S/s Agar. xvi. 15MW Suzlon V (Susner III) connected at 132KV S/s Susner. xvii. 14.7MW Suzlon Behapur Daloda- I connected at 220KV Daloda. xviii. 15 MW Suzlon Behapur Daloda- I connected at 220KV Daloda. xix. 8.5MW Friend salt Works & Allied Industries connected at 132KV S/s Susner. xx. 14.4MW Ujaas- I Barod connected at 220KV S/s Barod. xxi. 12.63MW Ujaas- II Barod connected at 220KV S/s Barod. xxii. 15MW Ujaas –I Rajgarh (Biora) connected at 220KV S/s Rajgarh. xxiii. 13.75MW Suzlon Dev. I Pvt. Ltd. connected at 220KV S/s Dewas. The availability and schedule in some block of following pooling station has been considered as Zero due to shutdown in following pooling station – - 1 -
  • 2. i. 11MW M/s Simcon Feeder-II (On 20th AUGUST 2019 from 14:45Hr to 15:15Hr) As per Clause 9.0 of MPERC (Forecasting, Scheduling, Deviation Settlement Mechanism and related matters of Wind and Solar Generating Stations) Regulations, 2018, payment to the DSM Account shall be made within 10 days from the date of issue of this statement. DSM Payments are to be made on the basis of this account only and no further invoicing is required by SLDC. Payment received after 12 days shall attract simple interest @ 0.04% for each day of delay. SLDC shall pay to the entities entitled to receive payment on account of Deviation Charges within 2 working days of receipt of the payments in the “State Deviation Pool Account”. The settlement of Deviation Charges shall be done through State Pool Account maintained by SLDC. The bank account details are as under: 1. Name of the Bank - BANK OF INDIA 2. Branch - CIVIL LINES BRANCH JABALPUR. 3. Title of the Account - MPPTCL SLDC DSM A/C 4. Bank account No - 940220110000263 5. IFS Code - BKID0009402 6. Branch Code - 9402 7. Type of Account - Current Account. All QCA’s / Generators are requested to pay the Deviation Charges to the above State Pool Account maintained by SLDC. The signed copy of the above DSM account alongwith block-wise details are being sent through email. The DSM account shall be also be made available on SLDC website www.sldcmpindia.com shortly for downloading by QCA. The verification, if required, can be done at SLDC. All the QCA’s / Generators are requested to check and verify the State DSM Account and intimate the discrepancies observed if any within a period of 15 days. Chief Engineer (LD) SLDC MPPTCL, Jabalpur …… - 2 -
  • 3. - 3 - Distribution List 1. The Chief General Manager (Comml-3), Regional Office, MPPMCL, E-4, Arera Colony, Prakash Parisar, Near Bhojpur Club, Bhopal-462016, M.P. Jabalpur. Email – rajeevkeskar@gmail.com 2. The Chief General Manager (Comml.), MPMKVVCL, Govindpura, Bhopal, Email-ce.commercial@mpmkvvc.com, 3. The Chief Engineer (Comml.), MPPaKVVCL, GPH Compound, Polo Ground, Indore, Email- cecomwz@gmail.com, 4. The Chief Financial Officer, MPPTCL, Jabalpur. 5. The Suptdg Engineer (MT-1), Corporate Office, M.P. Pashchim Kshetra Vidyut Vitaran Co. Ltd., GPH Compound, Polo Ground, Indore. Email-achal.jain@mpwz.co.in 6. The General Manager (Comml.-III), O/o MD (CZ) MPMKVVCL, Nistha Parisar., MPMKVVCL, Govindpura, Bhopal, Email-khanooja@gmail.com, mpczc3@gmail.com 7. The ED (Operation) M.P. Paschim Kshetra Vidyut Vitran Co. Ltd., Indore GPH Compound Pologround Indore 452003 8. M/s Malwa Solar Power Generation Pvt Ltd. 4th Floor, Dr. Gopaldas Bhawan, 28, Barakhamba Road, Cannaught Place, New Delhi – 110001, Fax: 0124-4716120. India. Email:keshav.prasad@ilfsindia.com, pradeep.chauhan@ilfsindia.com. 9. M/s WAANPEEP Solar Pvt. Ltd., 602, Western Edge-I, Western Express Highway, Borivali (E), Mumbai-400066, Fax: 022-66444400, Email- kamalmarwah@waaneep.com 10. M/s Focal Renewable Energy Two India Pvt Ltd., 308, third Floor, Rectangle One Building D-4, Commercial Complex, Saket, New Delhi -110017, Fax -011-41704901, Email – kvikas@focal_energy.com 11. M/s Solar EnrgyCorroration Of India, D-3, First Floor , Wing-a, ReligareBuliding, Distrcit Centre , Saket, New Delhi 110017,Fax-011-71989244, Email – corporate@seci.gov.in 12. M/s Manikaran Analytics Ltd., 2nd Floor, D21, Corporate Park, Sector-21, Dwarika, New Delhi – 110075 , Email – contactus@manikarananalytics.in,rakesh@manikarananalytics.in, bd.mp@manikarananalytics.in 13. M/s Reconnect Energy Pvt. Ltd. C-301,Nirvana Courtyard, Nirvana Country Sector 50, Gurgaon 122018 H ,Email – info@reconnectenergy.com, mithun.dubey@reconnectenergy.com,piyush.joshi@reconnectenergy.com 14. M/s Statkraft Markets Private Ltd., 403, 4th Floor, SalconRasvilas Building, Saket District Centre, New Delhi – 110017, Email – anwar.alam@statkraft.com 15. M/s ACME Solar Energy (MP) Private Ltd., Plot No.152, Sector-44, Gurgaon-122002(Haryana), Email – planthead.khilchipur.solar@acme.in 16. M/s Alfa Infraprop Pvt Ltd., NamanMidtown,’A’ Wing, 21st Floor, Senapati Bapat Marg, Elephinstone Road West, Mumbai-400013, Email –Sanjay.Shah@alfainfraprop.com 17. M/s Regent Climate Connect Knowledge Solutions Pvt Ltd., Appt. 215, Green Tower Society, Plot 7 C, Sector-23, Dwarka, New Delhi-110075Email - info@climate-connect.com, Pranav.vohra@climate-connect.com 18. M/s NTPC Ltd., E-1/72, Arera Colony, Bhopal – 462016, M.P. EMAIL:- pbvenkatesh@ntpc.co.in 19. M/s Mandsaur Solar Power Project village Gujjarkhedi Runija Teh Suwasara, District – Mandsaur(M.P.) 458888.Email-mandsaursolarpv@gmail.com 19. M/s M.P. WIND FARM NAGDA HILL, ENERGY TOWER, 64, B-Sector, Kasturba Nagar,Bhopal-462023, Email-info@cecl.in, windpoweindia@gmail.com,mpwlindia@gmail.com 20. M/s Pioneer Wincon Energy Systems Pvt. Ltd. Upmanyu house Ambika City homes Near Narsingh Home Hospital Piploda Road Jaora – 457226. boobalakrishnank@pioneerwincon.com 21. M/s Designco Manufacturer & Exporter, LakriFazalpur, Delhi Road, Moradabad-244001, Email: info@designco-india.com, vivekasthana.79@gmail.com 22. M/s Mittal Processor Pvt. Ltd, 1002-1004, Antriksh Bhawan, 22K. G. Marg, Cannought Place, New Delhi -110001, email – Mayank.gupta@kreatenergy.com, controlroom@mittalgroup.com – (On behalf of M/s Ramesh Steels). 23. M/s Vedenjay Power Pvt Ltd., Plot No.4/F/53, Above BOI-Bank, Nai Sadak, Scheme No.78, B Road, Indore- 452010, Email – vedanjaypower@gmail.com 24. M/s Focal Energy Solar One India Pvt. Ltd. Unit No. 601 & 602, 6th Floor, Tower B, Emaar Digital Greens Sector 61, Golf Course Ext. Road , Gurgaon 122002 25. M/s Kreate Technologies LLP 1003,10th Floor Anthriksh Bhavan, 22- KG Marg, New Delhi 110001 Email- mithilesh.yadav@kreatetechnologies.com ………
  • 4. All Figures in Rs. INTRA STATE DEVIATION CHARGES PAYABLE PAYABLE RECEIVABLE FOCAL ENERGY SOLAR ONE INDIA Pvt. Ltd. 159,134 332,758 491,892 40MW_MALWA (IL&FS_Solar) (999,827) (999,827) MANIKARAN ANALYTICS LTD. 9,714,098 1,048,297 10,762,395 ACME SOLAR ENERGY PVT. LTD. 228,879 228,879 ALFA INFRAPROP PVT LTD 120,188 (3,044,189) (2,924,001) MANDSAUR_SOLAR_POWER_SOLAR_220_GUJARKHEDI 1,177,716 1,177,716 NTPC_RAJGARH 92,823 92,823 WINCON_W_JAORA_11.95MW 213,717 213,717 RECONNECT ENERGY SOLUTIONS PVT LTD. 27,907,079 27,907,079 REGENT CLIMATE CONNECT KNOWLEDGE SOLUTIONS PVT. LTD 115,995 115,995 STATKRAFT MARKETS PVT LTD. 2,942,637 2,942,637 KREATE TECHNOLOGIES LLP 70,655 (313,678) (243,023) VEDANJAY POWER 65,593 65,593 TOTAL 42,808,514 1,381,055 (4,357,694) 39,831,875 -RECEIVABLE Assistant Engineer(LD) Executive Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur MADHYA PRADESH POWER TRANSMISSION COMPANY QCA / DEVELOPERS / GENERATOR NET DSM RECEIVABLE/PAYABLE INTER STATE DEVIATION CHARGES STATE LOAD DESPATCH CENTRE - JABALPUR QCA WISE SUMMERY REPORT OF DEVIATION CHARGES OF WIND & SOLAR POOLING STATIONS FOR AUGUST-2019
  • 5. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 0 1 - 0 8 - 2 0 1 9 2 8 8 7 4 3 7 2 1 4 - 3 4 1 0 2 0 2 - 0 8 - 2 0 1 9 2 8 2 7 3 3 1 6 6 8 - 1 7 4 1 9 0 3 - 0 8 - 2 0 1 9 3 0 1 9 2 4 0 3 8 8 - 5 0 8 5 7 0 4 - 0 8 - 2 0 1 9 3 9 1 5 3 4 3 3 7 8 - 2 0 7 5 5 0 5 - 0 8 - 2 0 1 9 2 5 5 6 9 3 7 7 9 0 - 5 2 2 7 7 0 6 - 0 8 - 2 0 1 9 3 7 0 2 9 4 3 6 7 6 - 3 5 1 0 3 0 7 - 0 8 - 2 0 1 9 2 2 2 3 1 1 5 2 9 6 4 3 1 9 0 0 8 - 0 8 - 2 0 1 9 1 8 2 5 7 1 5 2 0 8 2 2 0 0 6 0 9 - 0 8 - 2 0 1 9 2 2 8 1 6 1 1 4 0 0 6 5 4 2 0 1 0 - 0 8 - 2 0 1 9 2 9 7 1 9 3 5 6 0 0 - 3 1 2 1 6 1 1 - 0 8 - 2 0 1 9 4 0 9 9 8 3 6 0 0 5 2 9 6 9 8 1 2 - 0 8 - 2 0 1 9 4 1 2 1 4 4 2 1 3 3 - 4 8 3 0 1 3 - 0 8 - 2 0 1 9 4 4 0 2 8 3 7 9 7 6 3 5 2 0 5 1 4 - 0 8 - 2 0 1 9 3 0 4 9 8 1 2 8 9 5 1 0 5 6 7 9 1 5 - 0 8 - 2 0 1 9 1 3 8 2 0 3 7 2 9 5 5 5 1 6 1 6 - 0 8 - 2 0 1 9 3 1 4 5 5 2 8 3 0 7 1 9 2 7 8 1 7 - 0 8 - 2 0 1 9 3 1 0 7 5 3 3 3 6 0 - 7 2 0 7 1 8 - 0 8 - 2 0 1 9 2 9 6 3 2 1 7 7 5 2 6 9 0 8 9 1 9 - 0 8 - 2 0 1 9 3 6 4 1 8 4 8 4 4 5 - 6 1 0 0 2 2 0 - 0 8 - 2 0 1 9 4 4 6 4 9 4 9 3 5 3 - 2 2 7 5 3 2 1 - 0 8 - 2 0 1 9 5 0 8 5 4 5 2 1 0 4 - 2 4 4 8 2 2 - 0 8 - 2 0 1 9 5 0 9 2 1 5 0 7 6 6 1 8 6 1 2 3 - 0 8 - 2 0 1 9 5 3 7 4 0 5 5 6 0 9 - 9 5 3 7 2 4 - 0 8 - 2 0 1 9 4 4 2 6 6 3 0 5 3 7 7 8 0 0 3 2 5 - 0 8 - 2 0 1 9 1 7 7 3 3 1 4 7 6 5 1 6 8 0 5 2 6 - 0 8 - 2 0 1 9 2 0 9 0 4 2 2 0 1 6 - 5 5 0 0 2 7 - 0 8 - 2 0 1 9 3 8 0 2 0 3 5 6 2 6 1 5 2 4 1 2 8 - 0 8 - 2 0 1 9 3 0 0 2 7 2 8 6 3 1 8 3 2 1 2 9 - 0 8 - 2 0 1 9 3 9 8 7 9 3 2 5 0 3 4 5 6 1 9 3 0 - 0 8 - 2 0 1 9 3 1 5 3 6 4 0 0 2 8 - 4 3 2 2 3 3 1 - 0 8 - 2 0 1 9 4 3 6 1 6 4 3 8 8 6 5 3 1 T O T A L 1 0 4 7 3 9 6 1 0 2 8 0 4 4 2 1 3 2 3 3 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur NAME OF POOLING STATION :- M/s FOCAL RENEWABLE ENERGY TWO INDIA PVT. LTD. NAME OF QCA :-MANIKARAN MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF August-19
  • 6. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 0 1 - 0 8 - 2 0 1 9 71,300 72,940 10,824 0 2 - 0 8 - 2 0 1 9 69,236 60,191 58,492 0 3 - 0 8 - 2 0 1 9 62,099 73,620 -55,451 0 4 - 0 8 - 2 0 1 9 66,794 83,260 -80,300 0 5 - 0 8 - 2 0 1 9 46,396 72,831 -117,495 0 6 - 0 8 - 2 0 1 9 92,245 82,412 55,110 0 7 - 0 8 - 2 0 1 9 61,425 27,309 194,418 0 8 - 0 8 - 2 0 1 9 38,712 24,505 93,425 0 9 - 0 8 - 2 0 1 9 26,846 17,766 51,268 1 0 - 0 8 - 2 0 1 9 36,074 69,453 -176,118 1 1 - 0 8 - 2 0 1 9 73,815 68,181 32,270 1 2 - 0 8 - 2 0 1 9 76,743 79,689 -12,829 1 3 - 0 8 - 2 0 1 9 67,260 56,270 73,840 1 4 - 0 8 - 2 0 1 9 56,503 21,871 198,181 1 5 - 0 8 - 2 0 1 9 16,204 5,747 57,521 1 6 - 0 8 - 2 0 1 9 46,006 56,186 -53,660 1 7 - 0 8 - 2 0 1 9 53,581 66,755 -68,421 1 8 - 0 8 - 2 0 1 9 53,103 32,304 116,951 1 9 - 0 8 - 2 0 1 9 63,133 89,544 -135,604 2 0 - 0 8 - 2 0 1 9 97,510 90,344 43,809 2 1 - 0 8 - 2 0 1 9 98,725 93,582 36,895 2 2 - 0 8 - 2 0 1 9 95,731 102,868 -38,223 2 3 - 0 8 - 2 0 1 9 103,023 95,149 47,540 2 4 - 0 8 - 2 0 1 9 79,104 59,563 111,425 2 5 - 0 8 - 2 0 1 9 32,294 26,220 36,928 2 6 - 0 8 - 2 0 1 9 34,451 40,040 -27,347 2 7 - 0 8 - 2 0 1 9 60,261 69,150 -33,438 2 8 - 0 8 - 2 0 1 9 52,393 55,799 -9,889 2 9 - 0 8 - 2 0 1 9 63,529 65,702 -5,958 3 0 - 0 8 - 2 0 1 9 60,113 82,111 -112,924 3 1 - 0 8 - 2 0 1 9 90,074 84,332 41,518 TOTAL 1,944,683 1,925,694 332,758 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur NAME OF POOLING STATION :- FOCAL ENERGY SOLAR ONE INDIA PVT. LTD. NAME OF QCA :-M/s FOCAL ENERGY SOLAR ONE INDIA PVT. LTD. MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF August-19
  • 7. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 0 1 - 0 8 - 2 0 1 9 106,732 103,850 16,440 0 2 - 0 8 - 2 0 1 9 79,640 102,770 -120,501 0 3 - 0 8 - 2 0 1 9 96,652 109,230 -63,294 0 4 - 0 8 - 2 0 1 9 156,482 214,120 -282,059 0 5 - 0 8 - 2 0 1 9 151,289 164,830 -67,450 0 6 - 0 8 - 2 0 1 9 102,023 110,030 -42,687 0 7 - 0 8 - 2 0 1 9 105,406 92,330 86,979 0 8 - 0 8 - 2 0 1 9 115,999 113,540 26,319 0 9 - 0 8 - 2 0 1 9 88,807 115,330 -122,334 1 0 - 0 8 - 2 0 1 9 184,170 230,480 -205,962 1 1 - 0 8 - 2 0 1 9 172,030 210,000 -198,529 1 2 - 0 8 - 2 0 1 9 175,231 166,930 57,231 1 3 - 0 8 - 2 0 1 9 138,165 123,320 85,292 1 4 - 0 8 - 2 0 1 9 99,277 40,760 323,956 1 5 - 0 8 - 2 0 1 9 82,838 58,890 131,730 1 6 - 0 8 - 2 0 1 9 193,100 160,910 184,709 1 7 - 0 8 - 2 0 1 9 200,166 206,920 -30,873 1 8 - 0 8 - 2 0 1 9 154,944 99,450 314,271 1 9 - 0 8 - 2 0 1 9 198,392 257,580 -314,463 2 0 - 0 8 - 2 0 1 9 198,022 172,430 161,653 2 1 - 0 8 - 2 0 1 9 215,506 218,240 -11,314 2 2 - 0 8 - 2 0 1 9 239,714 227,740 70,725 2 3 - 0 8 - 2 0 1 9 237,919 228,260 55,134 2 4 - 0 8 - 2 0 1 9 108,672 64,960 244,726 2 5 - 0 8 - 2 0 1 9 93,033 54,350 213,232 2 6 - 0 8 - 2 0 1 9 96,435 95,050 18,493 2 7 - 0 8 - 2 0 1 9 162,217 192,720 -145,117 2 8 - 0 8 - 2 0 1 9 172,970 101,430 410,846 2 9 - 0 8 - 2 0 1 9 160,983 201,570 -204,070 3 0 - 0 8 - 2 0 1 9 165,507 150,560 100,778 3 1 - 0 8 - 2 0 1 9 200,847 178,570 141,203 TOTAL 4,653,168 4,567,150 835,064 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur NAME OF QCA :-MANIKARAN MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF August-19 NAME OF POOLING STATION :- M/s WAANEEP Solar Pvt. Ltd
  • 8. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in ` 01/08/2019 1 1 7 7 7 7 1 3 2 8 8 6 - 3 8 4 7 0 02/08/2019 9 2 6 1 9 1 2 7 6 3 6 - 1 7 9 2 5 1 03/08/2019 1 1 0 4 6 1 1 3 8 2 9 8 - 1 3 4 3 4 4 04/08/2019 1 2 9 5 4 8 1 7 8 7 8 0 - 2 3 7 9 9 4 05/08/2019 1 3 3 0 3 1 2 0 6 2 5 4 - 3 6 5 8 3 4 06/08/2019 1 3 3 0 3 1 1 2 3 3 8 0 5 4 4 4 0 07/08/2019 9 0 8 3 3 3 6 0 0 2 3 1 2 4 2 7 08/08/2019 7 8 0 2 2 1 0 5 5 8 8 - 1 2 6 8 7 3 09/08/2019 8 6 8 9 4 6 4 0 2 2 1 2 9 9 3 7 10/08/2019 1 5 4 5 8 2 1 6 5 1 2 2 - 5 3 1 9 3 11/08/2019 1 3 3 0 3 1 1 1 9 7 7 6 7 9 4 4 4 12/08/2019 1 3 3 0 3 1 1 6 9 0 8 6 - 1 9 6 1 9 5 13/08/2019 1 0 6 8 0 1 1 7 7 0 5 0 - 3 5 0 1 3 4 14/08/2019 1 0 6 8 0 1 4 5 0 6 2 3 4 9 5 6 5 15/08/2019 6 5 0 9 9 1 2 9 2 6 2 9 3 8 8 9 16/08/2019 9 7 5 5 0 9 8 4 1 8 9 2 1 1 17/08/2019 1 1 8 4 8 0 1 3 0 0 9 6 - 5 9 0 2 5 18/08/2019 9 7 5 1 9 6 6 2 7 6 1 7 3 4 3 2 19/08/2019 1 2 7 6 1 6 1 9 8 4 8 4 - 3 5 9 2 1 5 20/08/2019 1 3 5 6 7 9 1 7 0 7 6 0 - 1 7 0 6 8 1 21/08/2019 1 7 6 0 1 4 2 2 5 3 5 4 - 2 4 7 8 4 9 22/08/2019 1 7 3 7 0 5 2 1 0 8 2 8 - 1 9 1 4 0 2 23/08/2019 1 5 2 2 1 8 1 2 2 1 0 0 1 8 3 4 0 3 24/08/2019 1 1 0 1 7 9 7 5 0 9 4 1 9 5 9 8 5 25/08/2019 7 7 0 8 8 6 4 6 2 8 7 0 0 4 1 26/08/2019 7 7 0 8 8 5 5 6 3 8 1 1 9 0 3 6 27/08/2019 1 1 4 4 7 5 1 4 6 1 5 0 - 1 5 7 4 0 1 28/08/2019 1 2 4 2 4 5 1 1 9 2 5 0 2 8 5 2 3 29/08/2019 1 4 5 4 1 0 1 7 3 8 5 4 - 1 3 4 9 6 4 30/08/2019 1 5 0 0 2 4 1 3 1 5 5 6 1 3 2 1 0 4 3 1 - 0 8 - 2 0 1 9 1 6 4 8 0 0 1 9 1 1 4 8 - 1 2 8 4 3 9 TOTAL 3,713,651 3,981,502 -999,827 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur NAME OF QCA :- NOT QCA APPOINTMENT MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE - JABALPUR DATE WISE DEVIATION REPORT FOR THE MONTH OF August-19 NAME OF POOLING STATION :- M/s Malwa Solar Power Generation Ltd.(IL and FS)
  • 9. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-KREATE TECHNOLOGIES LLP NAME OF POOLING STATION :-SIMCON FEEDER -1 DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 29244 14595 172 02-08-2019 39647 32491 284 03-08-2019 44405 44041 353 04-08-2019 39573 51417 2287 05-08-2019 50805 63982 4633 06-08-2019 29164 38670 238 07-08-2019 38615 33960 229 08-08-2019 25353 34883 3839 09-08-2019 37511 38259 1935 10-08-2019 28301 63999 14336 11-08-2019 59630 66603 2039 12-08-2019 44458 39900 596 13-08-2019 21114 3786 183 14-08-2019 23471 48 225 15-08-2019 3861 1 1 16-08-2019 0 4 4 17-08-2019 43193 58260 8512 18-08-2019 4393 3474 745 19-08-2019 59752 58719 324 20-08-2019 58808 61254 4067 21-08-2019 54790 41666 0 22-08-2019 59080 65819 396 23-08-2019 42757 35923 656 24-08-2019 34683 16433 6022 25-08-2019 26703 23607 1533 26-08-2019 43827 43532 4136 27-08-2019 61225 65095 1353 28-08-2019 51450 52253 2952 29-08-2019 64107 68792 1408 30-08-2019 54539 56532 2378 31-08-2019 42618 51725 4819 TOTAL 1217077 1229723 70655 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 10. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-KREATE TECHNOLOGIES LLP NAME OF POOLING STATION :-SIMCON FEEDER -2 DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 33321 10474 88004 02-08-2019 29121 23119 22627 03-08-2019 19103 31072 -38224 04-08-2019 19071 33697 -47524 05-08-2019 26471 42477 -51385 06-08-2019 25555 25276 1352 07-08-2019 35489 22909 51527 08-08-2019 28105 22937 22545 09-08-2019 23759 23167 2660 10-08-2019 21027 38738 -57689 11-08-2019 20220 43032 -72698 12-08-2019 26572 26968 -588 13-08-2019 33102 2899 118656 14-08-2019 26803 5 103018 15-08-2019 15965 0 58572 16-08-2019 11029 2367 31810 17-08-2019 8468 36276 -89967 18-08-2019 0 2353 0 19-08-2019 19880 37964 -59406 20-08-2019 18774 38677 -63169 21-08-2019 22858 26982 -13533 22-08-2019 22949 43028 -66807 23-08-2019 18897 25878 -23148 24-08-2019 22993 11356 44499 25-08-2019 23094 16540 24036 26-08-2019 17505 29531 -36529 27-08-2019 15946 42824 -87059 28-08-2019 20270 34330 -46219 29-08-2019 24573 45295 -68683 30-08-2019 27063 38085 -34922 31-08-2019 26787 34607 -25434 TOTAL 684770 812863 -313678 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 11. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-ACME SOLAR ENERGY PVT. LTD. NAME OF POOLING STATION :-ACME SOLAR ENERGY PVT. LTD DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 60705 54352 7035 02-08-2019 46775 57633 4233 03-08-2019 76665 105672 14446 04-08-2019 75941 104532 5473 05-08-2019 74373 85226 4559 06-08-2019 60747 68084 15832 07-08-2019 45438 40237 1752 08-08-2019 50925 86570 14027 09-08-2019 47429 60702 7228 10-08-2019 92604 121667 4083 11-08-2019 88665 96558 11606 12-08-2019 99714 111860 1820 13-08-2019 95959 58727 5350 14-08-2019 46684 22867 3515 15-08-2019 50698 8082 7729 16-08-2019 45617 56708 1924 17-08-2019 73395 85706 7537 18-08-2019 48074 20934 1504 19-08-2019 123751 125564 6825 20-08-2019 96490 110879 1322 21-08-2019 113019 101077 10764 22-08-2019 94085 105190 18799 23-08-2019 70438 85108 17579 24-08-2019 58070 29862 10322 25-08-2019 56314 55140 5194 26-08-2019 51133 49972 2763 27-08-2019 95666 94566 5745 28-08-2019 71745 55015 14575 29-08-2019 100604 114213 8868 30-08-2019 75585 90937 1962 31-08-2019 113129 118977 4508 TOTAL 2300437 2382617 228879 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 12. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-ALFA INFRAPROP PVT LTD NAME OF POOLING STATION :-ALFA INFRAPROP PVT LTD. (20MW) KUKSHI DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 44382 40178 444 02-08-2019 69257 67090 4448 03-08-2019 56864 52119 1684 04-08-2019 43589 41722 2356 05-08-2019 46797 35955 4073 06-08-2019 79613 78389 7022 07-08-2019 52587 31856 1351 08-08-2019 35056 10332 1116 09-08-2019 39215 12820 3663 10-08-2019 69853 72015 6465 11-08-2019 48895 46336 3883 12-08-2019 78646 91485 6680 13-08-2019 102702 101231 1193 14-08-2019 58275 45803 784 15-08-2019 39642 27703 866 16-08-2019 58429 70520 4305 17-08-2019 87159 95638 3705 18-08-2019 62841 82486 17632 19-08-2019 77631 67770 6216 20-08-2019 75871 92440 4976 21-08-2019 79117 80155 8734 22-08-2019 101536 106763 4265 23-08-2019 113838 110534 748 24-08-2019 88877 69076 5641 25-08-2019 54217 30944 1174 26-08-2019 32916 8062 66 27-08-2019 36726 26553 1447 28-08-2019 63065 47166 1961 29-08-2019 98204 94935 3482 30-08-2019 102310 104779 6834 31-08-2019 91525 88582 2974 TOTAL 2089635 1931437 120188 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 13. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-ALFA INFRAPROP PVT LTD NAME OF POOLING STATION :-SUN PHARMACEUTICAL INDUSTRIES LTD DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 33383 70510 -104219 02-08-2019 42354 106212 -206025 03-08-2019 51277 109827 -196686 04-08-2019 60564 81728 -74143 05-08-2019 78199 99437 -67000 06-08-2019 55616 135833 -262545 07-08-2019 63394 42498 80582 08-08-2019 79425 59841 72095 09-08-2019 51293 31330 72582 10-08-2019 44730 125467 -265892 11-08-2019 45891 97911 -175609 12-08-2019 78395 132092 -142630 13-08-2019 59776 93510 -116935 14-08-2019 59464 25748 126335 15-08-2019 42472 13262 105508 16-08-2019 59776 94016 -115727 17-08-2019 39427 116300 -252887 18-08-2019 46005 68733 -80570 19-08-2019 84242 152198 -227018 20-08-2019 68911 110517 -138118 21-08-2019 96824 167131 -233753 22-08-2019 78335 162809 -278642 23-08-2019 84242 70074 59138 24-08-2019 99054 50126 187744 25-08-2019 43088 51000 -27048 26-08-2019 43214 53661 -33740 27-08-2019 45488 98553 -166125 28-08-2019 51319 78796 -93891 29-08-2019 68392 130814 -205990 30-08-2019 68264 96807 -94064 31-08-2019 71704 127903 -188916 TOTAL 1894518 2854644 -3044189 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 14. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-Regent Climate Connect Knowledge Solutions Pvt Ltd NAME OF POOLING STATION :-AVENGERS SOLAR PVT LTD DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 45136 43274 5863 02-08-2019 34657 39351 1506 03-08-2019 40769 51585 7341 04-08-2019 51912 53739 6378 05-08-2019 47823 67374 8174 06-08-2019 52328 53003 6099 07-08-2019 23534 15724 309 08-08-2019 33284 25140 15781 09-08-2019 26330 17112 1282 10-08-2019 45512 45621 5057 11-08-2019 40809 43695 1839 12-08-2019 48045 52892 1052 13-08-2019 52770 54106 2850 14-08-2019 19835 12478 0 15-08-2019 18283 3170 0 16-08-2019 33764 26689 1900 17-08-2019 49920 46455 7281 18-08-2019 24860 17696 32 19-08-2019 58278 71461 2953 20-08-2019 66371 56457 5044 21-08-2019 71395 69793 1763 22-08-2019 77901 73963 2488 23-08-2019 60252 53964 6251 24-08-2019 35282 31098 1482 25-08-2019 21448 22486 3487 26-08-2019 28660 24121 1961 27-08-2019 51801 49341 3194 28-08-2019 39439 43974 4430 29-08-2019 48904 55778 2628 30-08-2019 59317 53393 3431 31-08-2019 64663 63846 4139 TOTAL 1373282 1338779 115995 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 15. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-FOCAL ENERGY SOLAR ONE INDIA PVT. LTD. NAME OF POOLING STATION :-GLOBUS STEEL_N_ POWER PVT LTD DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 69756 64886 2161 02-08-2019 66388 59153 4426 03-08-2019 59502 76514 9953 04-08-2019 73984 80888 5485 05-08-2019 50464 66574 18883 06-08-2019 88394 85778 160 07-08-2019 53653 28350 9488 08-08-2019 33331 24452 6739 09-08-2019 27008 19088 217 10-08-2019 34750 62576 3475 11-08-2019 65654 61603 524 12-08-2019 64886 80421 6746 13-08-2019 69524 69252 3617 14-08-2019 58343 21596 5606 15-08-2019 17555 4098 0 16-08-2019 44417 43329 1497 17-08-2019 51095 62021 2598 18-08-2019 35455 36863 747 19-08-2019 67322 103189 7915 20-08-2019 107730 98408 1632 21-08-2019 103778 108860 7655 22-08-2019 103680 113780 2226 23-08-2019 105004 116151 6152 24-08-2019 90022 65163 3527 25-08-2019 33965 29006 2178 26-08-2019 34245 44092 3898 27-08-2019 65122 69420 6210 28-08-2019 46638 60734 14349 29-08-2019 61896 72804 4842 30-08-2019 59969 78083 12708 31-08-2019 82706 89863 3520 TOTAL 1926236 1996995 159134 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 16. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-NA NAME OF POOLING STATION :-MANDSAUR SOLAR PV POWER PROJECT (NTPC LTD.) DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 510325 652060 257393 02-08-2019 578662 587952 24188 03-08-2019 1053829 916270 3600 04-08-2019 1019810 930695 25459 05-08-2019 1176075 998702 11854 06-08-2019 1011398 813324 14168 07-08-2019 623667 231669 56742 08-08-2019 614792 385727 135609 09-08-2019 523925 297862 5794 10-08-2019 901889 910606 20332 11-08-2019 921567 700853 25505 12-08-2019 1013267 911992 14291 13-08-2019 900325 916481 18961 14-08-2019 452365 166916 19225 15-08-2019 441854 49004 8911 16-08-2019 525068 458482 6968 17-08-2019 729581 729809 49233 18-08-2019 602031 281192 9406 19-08-2019 903128 1094664 24908 20-08-2019 1078370 965155 5288 21-08-2019 1123341 1118022 7541 22-08-2019 1170371 1164911 2753 23-08-2019 811105 806126 50964 24-08-2019 589230 422761 17833 25-08-2019 537543 391504 43313 26-08-2019 493539 396216 16378 27-08-2019 733767 760062 41871 28-08-2019 687223 741480 19133 29-08-2019 917330 943256 14014 30-08-2019 874852 878066 1682 31-08-2019 723342 855794 224399 TOTAL 24243571 21477613 1177716 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 17. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-MANIKARAN ANALYTICS LTD. NAME OF POOLING STATION :-BHARAT ELECTRONICS LTD OFI DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 16770 17301 857 02-08-2019 18687 20554 754 03-08-2019 17857 18473 247 04-08-2019 40075 40827 8913 05-08-2019 29445 33090 1778 06-08-2019 11623 11848 332 07-08-2019 18123 17411 1122 08-08-2019 21562 16166 7955 09-08-2019 20410 19717 2059 10-08-2019 36510 42660 8337 11-08-2019 46742 42967 2345 12-08-2019 37583 37330 1791 13-08-2019 23942 16794 1955 14-08-2019 14332 10771 727 15-08-2019 21379 20595 1375 16-08-2019 48458 50717 2762 17-08-2019 46826 51165 1016 18-08-2019 35232 32697 1854 19-08-2019 37424 43110 3847 20-08-2019 32185 32431 6527 21-08-2019 42349 37191 5154 22-08-2019 34965 29431 9186 23-08-2019 23841 28135 2611 24-08-2019 12027 9098 131 25-08-2019 11803 11752 377 26-08-2019 13534 14754 225 27-08-2019 20733 22736 3106 28-08-2019 25523 27084 3405 29-08-2019 36305 44371 4776 30-08-2019 25708 27625 7800 31-08-2019 31150 27617 4311 TOTAL 853103 856418 97635 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 18. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-MANIKARAN ANALYTICS LTD. NAME OF POOLING STATION :-DESIGNCO MANUFACTURER & EXPORTER-1 DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 11705 11857 842 02-08-2019 10064 9482 790 03-08-2019 11055 15623 1866 04-08-2019 19911 22009 352 05-08-2019 20391 16129 3528 06-08-2019 13308 12784 740 07-08-2019 13142 7305 3756 08-08-2019 10324 11415 2888 09-08-2019 10982 9858 782 10-08-2019 20948 21512 2424 11-08-2019 22814 19728 1975 12-08-2019 17594 18176 2209 13-08-2019 13980 13103 752 14-08-2019 5996 3354 163 15-08-2019 5764 4262 10 16-08-2019 13216 15491 1828 17-08-2019 16082 20607 2080 18-08-2019 11822 7764 584 19-08-2019 21894 25898 1748 20-08-2019 17130 17419 1133 21-08-2019 23174 21894 1293 22-08-2019 21786 20777 1468 23-08-2019 20056 17592 5363 24-08-2019 9859 6771 1026 25-08-2019 9288 5815 242 26-08-2019 12106 9277 1406 27-08-2019 21622 22406 2728 28-08-2019 14068 13183 835 29-08-2019 19927 22199 1777 30-08-2019 20740 16717 1593 31-08-2019 21727 20672 3916 TOTAL 482475 461079 52097 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 19. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-MANIKARAN ANALYTICS LTD. NAME OF POOLING STATION :-ENERCON (I) LTD.II RATEDI HILL,BAGLI DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 133541 134738 1630 02-08-2019 102149 70557 2552 03-08-2019 59888 39201 285 04-08-2019 68970 24288 5727 05-08-2019 68234 41131 1638 06-08-2019 93229 82053 28 07-08-2019 119456 98046 3365 08-08-2019 93592 58667 1978 09-08-2019 104719 83456 11480 10-08-2019 107436 69167 5788 11-08-2019 77013 64589 1228 12-08-2019 92337 63762 858 13-08-2019 100214 65178 2724 14-08-2019 138453 112211 5191 15-08-2019 238985 156319 46971 16-08-2019 152324 144799 11828 17-08-2019 93906 70809 3720 18-08-2019 63108 40564 1627 19-08-2019 73312 49882 3131 20-08-2019 81545 54819 525 21-08-2019 110967 87166 1989 22-08-2019 111158 79452 4896 23-08-2019 97177 54894 2460 24-08-2019 103301 74772 2322 25-08-2019 96467 100885 7115 26-08-2019 83855 60471 7586 27-08-2019 61952 54814 322 28-08-2019 56450 34149 0 29-08-2019 47736 9233 104 30-08-2019 52736 33691 0 31-08-2019 52318 31837 0 TOTAL 2936528 2145600 139068 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 20. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-MANIKARAN ANALYTICS LTD. NAME OF POOLING STATION :-FOCAL PHOTOVOLTAIC INDIA P. LTD DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 29648 39043 8872 02-08-2019 27181 32108 1178 03-08-2019 30907 40054 7697 04-08-2019 41385 43371 2383 05-08-2019 27215 36866 9275 06-08-2019 34878 43349 1521 07-08-2019 23953 15806 10104 08-08-2019 19869 15380 4349 09-08-2019 16275 11775 961 10-08-2019 30319 36412 1474 11-08-2019 40215 36714 1216 12-08-2019 42834 42168 1883 13-08-2019 40137 38147 2702 14-08-2019 21313 13022 1480 15-08-2019 11331 3913 0 16-08-2019 28948 29771 6199 17-08-2019 30325 33251 1574 18-08-2019 25191 18137 1030 19-08-2019 37342 43791 1406 20-08-2019 49966 51471 3534 21-08-2019 49702 48452 3551 22-08-2019 53695 58690 733 23-08-2019 48008 53160 752 24-08-2019 49331 32166 4412 25-08-2019 17044 15635 310 26-08-2019 21215 23025 1159 27-08-2019 40087 40465 2209 28-08-2019 30438 29465 1328 29-08-2019 30213 33161 1629 30-08-2019 33940 44765 6803 31-08-2019 42621 43831 2769 TOTAL 1025526 1047364 94493 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 21. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-MANIKARAN ANALYTICS LTD. NAME OF POOLING STATION :-GAMESHA WIND TURBINE P.LTD. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 1785629 1701680 49451 02-08-2019 1360627 1020860 22863 03-08-2019 798823 502130 25339 04-08-2019 661634 358600 34076 05-08-2019 854146 716020 6932 06-08-2019 1257956 1278710 9174 07-08-2019 1363486 1318260 140165 08-08-2019 993069 733070 4278 09-08-2019 1235932 1229520 91166 10-08-2019 1556378 1539930 64218 11-08-2019 967028 882110 94439 12-08-2019 1310288 1185060 14198 13-08-2019 1176554 1005800 50436 14-08-2019 1861800 1909090 166769 15-08-2019 2954770 3071090 23872 16-08-2019 2387500 2237180 18992 17-08-2019 1414014 1191100 96170 18-08-2019 1087560 918680 69428 19-08-2019 839610 809090 5129 20-08-2019 1155668 1121690 49995 21-08-2019 1352547 1346200 22487 22-08-2019 1172573 1100160 81763 23-08-2019 1142012 1074470 54311 24-08-2019 1234778 1292200 29572 25-08-2019 1122838 930580 26824 26-08-2019 736507 379970 24663 27-08-2019 623399 296240 5752 28-08-2019 579485 391910 1590 29-08-2019 598721 134270 6832 30-08-2019 573178 390710 2397 31-08-2019 489666 274660 349 TOTAL 36648176 32341040 1293630 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 22. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-MANIKARAN ANALYTICS LTD. NAME OF POOLING STATION :-INOX WIND INFRA. SER. LTD.,SHAJAPUR DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 1673997 1455250 85018 02-08-2019 1480373 1211910 17751 03-08-2019 953970 574720 9181 04-08-2019 754211 457720 80108 05-08-2019 949023 954420 5185 06-08-2019 1551345 1533880 20807 07-08-2019 1505308 1322670 59704 08-08-2019 960108 665470 16787 09-08-2019 1419025 1409710 49535 10-08-2019 2050959 2195000 49771 11-08-2019 1230150 1235700 8033 12-08-2019 1399611 1272420 1671 13-08-2019 1221855 1130280 12125 14-08-2019 2227484 2278710 101000 15-08-2019 3260641 2767880 63987 16-08-2019 3243713 2721880 78975 17-08-2019 1785133 1574080 26956 18-08-2019 1345496 1252910 53707 19-08-2019 994099 965820 19855 20-08-2019 1288772 1321060 9234 21-08-2019 1565764 1473760 46301 22-08-2019 1640834 1269600 252355 23-08-2019 1147605 1109420 42718 24-08-2019 1421146 1400500 19692 25-08-2019 1233299 948160 23498 26-08-2019 777924 387120 7306 27-08-2019 606424 194470 0 28-08-2019 698373 509710 0 29-08-2019 644964 151460 2779 30-08-2019 728503 503520 0 31-08-2019 589971 222520 0 TOTAL 42350080 36471730 1164039 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 23. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-MANIKARAN ANALYTICS LTD. NAME OF POOLING STATION :-KSHEMA POWER & INFRA PVT LTD (AMBA) DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 1909988 1851930 54942 02-08-2019 1331022 1164970 37568 03-08-2019 864543 363330 36087 04-08-2019 706811 563560 53101 05-08-2019 1585831 1680530 78204 06-08-2019 1955436 2151290 91580 07-08-2019 2335450 2509790 43205 08-08-2019 1716576 1509950 41091 09-08-2019 1203970 1388000 365121 10-08-2019 3258024 3334370 30059 11-08-2019 2242597 2131560 91670 12-08-2019 1539510 1388040 13774 13-08-2019 1537300 1392230 18197 14-08-2019 2101020 2090460 64608 15-08-2019 3082983 3318970 170114 16-08-2019 3231229 3392370 31185 17-08-2019 2442995 2443220 147200 18-08-2019 2044968 1746810 36772 19-08-2019 1232037 1249260 19851 20-08-2019 1494934 1279100 27050 21-08-2019 1905709 1828940 39929 22-08-2019 1691660 1448060 51090 23-08-2019 1278541 1353810 33902 24-08-2019 1575407 1604210 12381 25-08-2019 1417174 1428330 134751 26-08-2019 1086624 778140 43199 27-08-2019 1062465 886900 17716 28-08-2019 892579 687760 26012 29-08-2019 770206 345040 11811 30-08-2019 662513 424450 2747 31-08-2019 639308 358310 987 TOTAL 50799410 48093690 1825904 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 24. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-MANIKARAN ANALYTICS LTD. NAME OF POOLING STATION :-M.P.WIND FARM NAGDA HILL DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 75177 72438 43 02-08-2019 59984 36839 411 03-08-2019 45594 19971 4 04-08-2019 42118 13220 441 05-08-2019 43452 30570 0 06-08-2019 50116 56240 0 07-08-2019 69780 70046 0 08-08-2019 50369 37270 20 09-08-2019 64759 53173 98 10-08-2019 86483 79834 0 11-08-2019 61832 42009 2530 12-08-2019 55217 49300 0 13-08-2019 57996 42862 445 14-08-2019 70035 67971 1190 15-08-2019 96941 107073 217 16-08-2019 95571 86012 278 17-08-2019 56334 44344 209 18-08-2019 44413 33388 34 19-08-2019 42851 30425 0 20-08-2019 46878 37946 96 21-08-2019 54429 47530 364 22-08-2019 60058 50599 359 23-08-2019 59664 37267 0 24-08-2019 56094 47792 0 25-08-2019 52044 42204 574 26-08-2019 42455 24007 0 27-08-2019 40591 23141 0 28-08-2019 43177 17294 0 29-08-2019 39345 3934 223 30-08-2019 40470 14589 0 31-08-2019 34680 10167 0 TOTAL 1738907 1329455 7536 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 25. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-MANIKARAN ANALYTICS LTD. NAME OF POOLING STATION :-PORWAL AUTO COMPONENTS LTD DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 12280 17126 2622 02-08-2019 12280 16314 2468 03-08-2019 12220 8076 2259 04-08-2019 12356 0 0 05-08-2019 0 0 0 06-08-2019 0 0 0 07-08-2019 12356 5415 1151 08-08-2019 12356 12546 1002 09-08-2019 13603 10543 179 10-08-2019 13603 23468 2578 11-08-2019 13603 18504 592 12-08-2019 13603 23409 3496 13-08-2019 13603 19173 809 14-08-2019 12229 6426 1314 15-08-2019 12229 3656 875 16-08-2019 10734 22763 3814 17-08-2019 12229 22273 3592 18-08-2019 18832 10815 988 19-08-2019 18832 27495 2624 20-08-2019 13568 23347 3019 21-08-2019 13568 30175 9244 22-08-2019 24133 26389 865 23-08-2019 19312 12214 2281 24-08-2019 19312 9541 2386 25-08-2019 11001 9999 12 26-08-2019 9567 11344 1435 27-08-2019 9567 20629 7477 28-08-2019 16596 15585 165 29-08-2019 16596 24166 2270 30-08-2019 16596 19941 2844 31-08-2019 18252 25663 1695 TOTAL 415016 476995 64056 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 26. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-MANIKARAN ANALYTICS LTD. NAME OF POOLING STATION :-RENEW CLEAN ENERGY P L 51 MW DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 220558 211130 39083 02-08-2019 183039 167480 2685 03-08-2019 237589 243590 53358 04-08-2019 220542 111570 58833 05-08-2019 234549 225240 27832 06-08-2019 207857 241390 34003 07-08-2019 153838 143880 28816 08-08-2019 231387 203290 27844 09-08-2019 205994 161510 13397 10-08-2019 225554 227190 21323 11-08-2019 284704 289880 13562 12-08-2019 246927 209240 22667 13-08-2019 195839 89120 58207 14-08-2019 239576 141850 53013 15-08-2019 131077 36920 39627 16-08-2019 193514 137630 12547 17-08-2019 193277 196600 13825 18-08-2019 178420 110980 28671 19-08-2019 185803 254370 50865 20-08-2019 313358 318190 17148 21-08-2019 271712 263770 11473 22-08-2019 272907 302140 7110 23-08-2019 301875 262440 55185 24-08-2019 213018 62090 105612 25-08-2019 192042 166340 19734 26-08-2019 253454 232870 16276 27-08-2019 247310 211620 9250 28-08-2019 246425 218810 30849 29-08-2019 279349 246610 22148 30-08-2019 253780 259070 34073 31-08-2019 254971 255970 12125 TOTAL 7070245 6202780 941141 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 27. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-MANIKARAN ANALYTICS LTD. NAME OF POOLING STATION :-RENEW SOLAR ENERGY (TN) PVT. LTD. DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 197814 264710 25014 02-08-2019 255963 211950 17153 03-08-2019 251523 146060 51123 04-08-2019 276516 173860 74741 05-08-2019 259308 232160 21292 06-08-2019 102866 145580 8698 07-08-2019 173696 194000 16565 08-08-2019 289330 265170 18213 09-08-2019 226670 104200 79747 10-08-2019 219277 279510 79202 11-08-2019 282832 229690 20724 12-08-2019 257566 280240 4050 13-08-2019 197468 105980 18845 14-08-2019 233612 195390 15196 15-08-2019 115460 123040 5082 16-08-2019 80445 125720 19501 17-08-2019 180234 90260 27006 18-08-2019 201162 40260 91704 19-08-2019 247735 284670 6182 20-08-2019 287840 333940 6764 21-08-2019 284686 319560 3368 22-08-2019 204015 211110 12827 23-08-2019 238336 239160 27561 24-08-2019 223203 198500 7097 25-08-2019 129160 155900 16238 26-08-2019 204875 210280 8316 27-08-2019 202026 151990 29036 28-08-2019 239940 144570 43431 29-08-2019 221187 231870 3833 30-08-2019 255542 271480 9048 31-08-2019 273456 254340 35600 TOTAL 6813743 6215150 803157 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 28. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-MANIKARAN ANALYTICS LTD. NAME OF POOLING STATION :-SEIL VOLTA AND SITARA DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 161540 182190 24240 02-08-2019 134320 161480 6460 03-08-2019 183920 196440 17041 04-08-2019 192308 220390 26364 05-08-2019 132154 165440 14702 06-08-2019 180075 224560 17730 07-08-2019 113753 84280 21989 08-08-2019 95830 74420 21408 09-08-2019 83957 68280 4909 10-08-2019 144664 181030 13827 11-08-2019 203326 170670 17645 12-08-2019 190843 224490 6508 13-08-2019 167753 175890 5358 14-08-2019 82905 56270 1216 15-08-2019 57439 21680 0 16-08-2019 131220 144500 1378 17-08-2019 150469 154060 16975 18-08-2019 108189 72500 1617 19-08-2019 192211 271470 21052 20-08-2019 246961 264270 29127 21-08-2019 248987 295770 1602 22-08-2019 314198 344370 5748 23-08-2019 281522 276140 8723 24-08-2019 205770 155470 7243 25-08-2019 93631 74600 1843 26-08-2019 92212 107400 10296 27-08-2019 232441 203830 19639 28-08-2019 159728 153550 6785 29-08-2019 162431 168430 7687 30-08-2019 194789 195860 16297 31-08-2019 210568 215530 13431 TOTAL 5150114 5305260 368840 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 29. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-MANIKARAN ANALYTICS LTD. NAME OF POOLING STATION :-SKY POWER SOLAR INDIA PVT LTD DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 124080 132290 6883 02-08-2019 153357 225870 29784 03-08-2019 118765 123380 6701 04-08-2019 177835 156660 20027 05-08-2019 123010 123630 8592 06-08-2019 136564 121430 330 07-08-2019 93429 68300 3150 08-08-2019 90579 44250 1414 09-08-2019 92823 84390 1018 10-08-2019 258935 300410 55677 11-08-2019 259814 249840 17149 12-08-2019 257750 261570 6817 13-08-2019 185402 187820 9377 14-08-2019 99655 73240 0 15-08-2019 123931 130130 1329 16-08-2019 288302 289880 21782 17-08-2019 270074 278320 12721 18-08-2019 241379 232950 9462 19-08-2019 184262 190700 11270 20-08-2019 228789 188870 9751 21-08-2019 216076 236720 6156 22-08-2019 276777 280630 9974 23-08-2019 223757 185910 6067 24-08-2019 121403 90440 1269 25-08-2019 68094 47340 224 26-08-2019 67138 34640 272 27-08-2019 120718 95130 1145 28-08-2019 109386 113160 2131 29-08-2019 150568 187000 9608 30-08-2019 251946 231240 28642 31-08-2019 163541 182580 25153 TOTAL 5278139 5148720 323875 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 30. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-MANIKARAN ANALYTICS LTD. NAME OF POOLING STATION :-SUZLON GUJRAT WIND PARK PVT LTD BAROD DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 146397 153429 11066 02-08-2019 185149 162159 1263 03-08-2019 111648 71734 4859 04-08-2019 108041 47520 3994 05-08-2019 111336 121810 8821 06-08-2019 191499 216336 3540 07-08-2019 178261 143483 11311 08-08-2019 110845 85851 1767 09-08-2019 142005 172182 30987 10-08-2019 341526 376972 12076 11-08-2019 195582 230164 26588 12-08-2019 158419 218104 6877 13-08-2019 167296 123384 7111 14-08-2019 152648 298837 76946 15-08-2019 294217 496809 168294 16-08-2019 323290 444904 49322 17-08-2019 265629 224702 11051 18-08-2019 174379 208324 13584 19-08-2019 149785 147825 1654 20-08-2019 144489 159049 8020 21-08-2019 207164 209429 16100 22-08-2019 203315 175183 19367 23-08-2019 172556 162618 7726 24-08-2019 183371 165075 3401 25-08-2019 138965 119529 14553 26-08-2019 92021 62740 1127 27-08-2019 68320 2671 0 28-08-2019 93086 84832 1237 29-08-2019 102715 49556 475 30-08-2019 127671 104566 5770 31-08-2019 82522 32430 0 TOTAL 5124147 5272207 528887 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 31. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-MANIKARAN ANALYTICS LTD. NAME OF POOLING STATION :-SUZLON IV RATLAM DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 67105 61023 1813 02-08-2019 58979 37676 351 03-08-2019 53624 12914 1511 04-08-2019 53138 21062 5683 05-08-2019 62584 55776 3528 06-08-2019 82865 92361 186 07-08-2019 83573 87158 5017 08-08-2019 69035 54005 3049 09-08-2019 51620 44146 9440 10-08-2019 94196 112164 8861 11-08-2019 79129 77175 4263 12-08-2019 57503 44797 268 13-08-2019 50896 16264 1695 14-08-2019 65965 81401 9709 15-08-2019 159934 163680 19181 16-08-2019 166461 172014 17174 17-08-2019 131557 75535 39892 18-08-2019 77131 56395 4678 19-08-2019 67468 43728 7839 20-08-2019 65741 51571 132 21-08-2019 82165 83834 2592 22-08-2019 70109 56995 1023 23-08-2019 60858 44805 1159 24-08-2019 81215 74531 1776 25-08-2019 84904 60518 13975 26-08-2019 52693 27231 1509 27-08-2019 48066 14886 578 28-08-2019 46713 12319 0 29-08-2019 42711 5962 148 30-08-2019 43582 9053 2 31-08-2019 42346 8195 0 TOTAL 2253866 1759174 167032 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 32. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-MANIKARAN ANALYTICS LTD. NAME OF POOLING STATION :-SUZLON V RATLAM DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 58649 57340 2005 02-08-2019 57316 38879 415 03-08-2019 52700 12069 5979 04-08-2019 42029 18700 667 05-08-2019 51693 50696 2938 06-08-2019 78410 83252 285 07-08-2019 78819 88163 5945 08-08-2019 62285 53485 2472 09-08-2019 48257 46555 9788 10-08-2019 109200 124123 7218 11-08-2019 77303 79526 4568 12-08-2019 56612 51330 177 13-08-2019 49259 50823 530 14-08-2019 60379 46545 4583 15-08-2019 138755 151480 27129 16-08-2019 164314 180670 10007 17-08-2019 125013 81086 24378 18-08-2019 73045 46897 4651 19-08-2019 61958 34247 8428 20-08-2019 44930 41163 219 21-08-2019 74438 64206 1777 22-08-2019 64631 53101 3110 23-08-2019 57334 42928 3000 24-08-2019 68511 52371 2351 25-08-2019 65095 50100 7203 26-08-2019 45867 28974 1145 27-08-2019 40601 18511 156 28-08-2019 38700 14250 0 29-08-2019 39642 8211 0 30-08-2019 38722 12463 0 31-08-2019 40072 13278 0 TOTAL 2064539 1695422 141124 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 33. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-MANIKARAN ANALYTICS LTD. NAME OF POOLING STATION :-TODAY CLEAN ENERGY PVT LTD DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 44255 46932 7647 02-08-2019 39612 45951 1999 03-08-2019 42459 63484 6180 04-08-2019 62667 83127 5238 05-08-2019 69746 74049 5685 06-08-2019 53673 65182 2539 07-08-2019 24265 13410 0 08-08-2019 33402 47830 12720 09-08-2019 29351 23878 138 10-08-2019 50306 63261 941 11-08-2019 50422 47661 873 12-08-2019 50422 66634 1311 13-08-2019 39066 65851 7412 14-08-2019 28517 18310 207 15-08-2019 20927 5425 0 16-08-2019 61463 42988 2908 17-08-2019 64079 54592 4332 18-08-2019 41001 24797 678 19-08-2019 80651 78144 1052 20-08-2019 86772 63494 4447 21-08-2019 84201 81516 1020 22-08-2019 99964 81652 1039 23-08-2019 81227 62872 8639 24-08-2019 79430 33573 21224 25-08-2019 31496 27027 1643 26-08-2019 37057 20451 464 27-08-2019 65328 62364 1553 28-08-2019 60737 51828 682 29-08-2019 73371 65163 4312 30-08-2019 67211 46324 3520 31-08-2019 64281 73798 2288 TOTAL 1717359 1601568 112691 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 34. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-MANIKARAN ANALYTICS LTD. NAME OF POOLING STATION :-UJAAS-1 BAROD DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 33484 32399 1996 02-08-2019 24203 31228 1145 03-08-2019 28662 37157 1941 04-08-2019 35068 52135 1517 05-08-2019 43944 53518 1048 06-08-2019 34547 45821 2043 07-08-2019 18249 8882 71 08-08-2019 20317 27600 2499 09-08-2019 19411 17570 1102 10-08-2019 41383 42784 1086 11-08-2019 50000 34856 6599 12-08-2019 40083 46541 1431 13-08-2019 42084 44156 382 14-08-2019 22797 12878 369 15-08-2019 18502 3521 0 16-08-2019 35373 29114 331 17-08-2019 40010 37869 1649 18-08-2019 23873 16667 135 19-08-2019 46960 56867 432 20-08-2019 45492 41791 966 21-08-2019 43590 58294 2645 22-08-2019 69172 53221 724 23-08-2019 39932 31479 1946 24-08-2019 38862 21684 3677 25-08-2019 16461 18354 227 26-08-2019 18235 17153 596 27-08-2019 38396 37763 300 28-08-2019 28609 31374 506 29-08-2019 35532 46566 1695 30-08-2019 37185 35608 764 31-08-2019 34532 48612 760 TOTAL 1064948 1073462 40582 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 35. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-MANIKARAN ANALYTICS LTD. NAME OF POOLING STATION :-UJAAS-1 BERCHHA DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 25189 26702 205 02-08-2019 27171 36726 963 03-08-2019 30755 36852 1062 04-08-2019 40889 47292 2125 05-08-2019 40489 37905 7054 06-08-2019 23814 39796 2844 07-08-2019 23078 17143 1168 08-08-2019 22973 30423 7283 09-08-2019 22539 16385 50 10-08-2019 51992 48662 2182 11-08-2019 53867 33527 4171 12-08-2019 37450 46856 2837 13-08-2019 36720 30123 1052 14-08-2019 25989 8679 390 15-08-2019 21647 7490 0 16-08-2019 25570 42769 3195 17-08-2019 37533 47244 2667 18-08-2019 27973 17525 454 19-08-2019 42677 51300 1047 20-08-2019 41546 41375 961 21-08-2019 46462 57695 1733 22-08-2019 57844 64696 159 23-08-2019 31691 24705 1878 24-08-2019 31324 19914 356 25-08-2019 32205 17615 947 26-08-2019 22910 24903 533 27-08-2019 30198 42015 3690 28-08-2019 27586 26438 1 29-08-2019 42249 52439 3657 30-08-2019 44102 53677 8788 31-08-2019 51352 63529 26186 TOTAL 1077784 1112400 89638 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 36. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-MANIKARAN ANALYTICS LTD. NAME OF POOLING STATION :-UJAAS-1 ICHHAWAR DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 20717 21606 3 02-08-2019 21912 23976 3 03-08-2019 21367 22878 54 04-08-2019 32694 46832 2396 05-08-2019 25931 26812 1525 06-08-2019 21707 20964 7 07-08-2019 27946 20332 806 08-08-2019 20479 27214 3494 09-08-2019 20307 22612 467 10-08-2019 46069 49840 2654 11-08-2019 46181 52224 356 12-08-2019 22648 39272 2813 13-08-2019 20633 29224 998 14-08-2019 19337 8872 0 15-08-2019 19595 13578 0 16-08-2019 53161 39734 1674 17-08-2019 72514 48058 8245 18-08-2019 34102 25010 689 19-08-2019 55899 62816 3166 20-08-2019 38180 40866 15288 21-08-2019 65690 54248 390 22-08-2019 65882 42700 2901 23-08-2019 44604 57326 1347 24-08-2019 20525 13270 303 25-08-2019 30216 10218 2539 26-08-2019 30888 21284 142 27-08-2019 34428 41398 2452 28-08-2019 44520 27618 6590 29-08-2019 36585 43136 2077 30-08-2019 53563 37052 6821 31-08-2019 51931 41192 2785 TOTAL 1120211 1032162 72985 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 37. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-MANIKARAN ANALYTICS LTD. NAME OF POOLING STATION :-UJAAS-1 RAJGARH (BIORA) DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 25867 28069 3450 02-08-2019 24543 22739 730 03-08-2019 29257 45738 4837 04-08-2019 30796 49802 7085 05-08-2019 35007 43748 571 06-08-2019 29216 36018 2461 07-08-2019 17956 16709 0 08-08-2019 29979 39770 2472 09-08-2019 19144 28521 1836 10-08-2019 35209 51561 2514 11-08-2019 31964 44465 1730 12-08-2019 31964 46307 2406 13-08-2019 25867 26154 1020 14-08-2019 23708 11307 540 15-08-2019 9458 5678 0 16-08-2019 47521 38192 1054 17-08-2019 51972 46902 1850 18-08-2019 26198 10446 1358 19-08-2019 58990 60139 1252 20-08-2019 66354 50302 3612 21-08-2019 52112 46109 2622 22-08-2019 54688 51380 1705 23-08-2019 51291 37968 2609 24-08-2019 51584 17149 8147 25-08-2019 34650 21106 1731 26-08-2019 45915 29620 2615 27-08-2019 53459 45212 4885 28-08-2019 59628 29369 10185 29-08-2019 40564 47827 2764 30-08-2019 41467 37352 2033 31-08-2019 54800 53317 322 TOTAL 1191128 1118976 80396 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 38. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-MANIKARAN ANALYTICS LTD. NAME OF POOLING STATION :-UJAAS-2 BAROD DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 32556 30780 2588 02-08-2019 24573 30797 828 03-08-2019 27361 37939 2780 04-08-2019 35245 49584 1531 05-08-2019 42157 52411 1355 06-08-2019 29885 40292 2420 07-08-2019 15390 9131 44 08-08-2019 17576 27320 3459 09-08-2019 17366 17287 866 10-08-2019 39725 41125 1545 11-08-2019 46261 33839 3744 12-08-2019 39858 44152 687 13-08-2019 37265 42001 758 14-08-2019 24332 12998 602 15-08-2019 15455 3602 0 16-08-2019 33153 28505 217 17-08-2019 39860 37011 2253 18-08-2019 24205 16727 396 19-08-2019 45473 54873 434 20-08-2019 46306 41435 1698 21-08-2019 42957 54671 1631 22-08-2019 63616 48792 650 23-08-2019 39533 30989 3672 24-08-2019 40919 21775 5703 25-08-2019 15675 18238 325 26-08-2019 20559 16760 474 27-08-2019 35276 36695 455 28-08-2019 27780 30209 516 29-08-2019 34946 43607 1582 30-08-2019 37393 34866 703 31-08-2019 37393 45267 754 TOTAL 1030049 1033678 44670 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 39. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-MANIKARAN ANALYTICS LTD. NAME OF POOLING STATION :-UJAAS-2 ICHHAWAR DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 20098 21376 38 02-08-2019 21032 23134 0 03-08-2019 19659 21726 10 04-08-2019 32064 44222 1409 05-08-2019 27751 27292 879 06-08-2019 21189 21628 26 07-08-2019 26746 20228 1427 08-08-2019 21788 26436 3030 09-08-2019 24629 20418 263 10-08-2019 45397 47482 1923 11-08-2019 46077 49082 403 12-08-2019 23054 38166 2695 13-08-2019 20984 27948 669 14-08-2019 21140 9422 0 15-08-2019 21023 13566 0 16-08-2019 51388 36790 1015 17-08-2019 72395 44440 9920 18-08-2019 33328 23878 677 19-08-2019 51202 57510 2071 20-08-2019 37286 39156 13551 21-08-2019 63093 51008 773 22-08-2019 63031 40514 3006 23-08-2019 43251 55756 1172 24-08-2019 19755 12918 177 25-08-2019 28534 10350 1894 26-08-2019 30826 19816 309 27-08-2019 34343 38476 775 28-08-2019 43782 26222 6208 29-08-2019 33671 39352 1092 30-08-2019 53529 33234 7771 31-08-2019 47734 32964 2304 TOTAL 1099779 974510 65487 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 40. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-MANIKARAN ANALYTICS LTD. NAME OF POOLING STATION :-UJAAS-2 RAJGARH (BIORA) DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 14686 15820 3435 02-08-2019 12939 12080 740 03-08-2019 16870 24900 2955 04-08-2019 17745 26480 5403 05-08-2019 19617 24130 761 06-08-2019 18679 20010 2226 07-08-2019 9615 9450 41 08-08-2019 16595 21200 1870 09-08-2019 8969 16310 2641 10-08-2019 19445 29440 2846 11-08-2019 17698 25900 2202 12-08-2019 17698 27380 2928 13-08-2019 14586 15970 779 14-08-2019 12460 5930 487 15-08-2019 4361 3370 0 16-08-2019 22186 20800 1247 17-08-2019 26038 28110 2160 18-08-2019 12835 6360 320 19-08-2019 28459 38010 4157 20-08-2019 39633 30400 2969 21-08-2019 31321 27610 2718 22-08-2019 32671 32370 1991 23-08-2019 30903 22320 3057 24-08-2019 31075 10470 8117 25-08-2019 20420 12690 1869 26-08-2019 25227 17170 1810 27-08-2019 29372 26850 4857 28-08-2019 32762 17540 6301 29-08-2019 25146 29580 2666 30-08-2019 22695 23260 2549 31-08-2019 31607 32410 744 TOTAL 664313 654320 76846 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 41. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-MANIKARAN ANALYTICS LTD. NAME OF POOLING STATION :-WIND WORLD (INDIA) LTD., RATADIA HILL AT BAGDI III DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 726474 702323 10692 02-08-2019 475870 367636 5812 03-08-2019 257080 176690 2955 04-08-2019 239057 111332 425 05-08-2019 259041 268161 0 06-08-2019 436749 498560 4094 07-08-2019 546793 624754 17277 08-08-2019 327182 347968 900 09-08-2019 353120 486321 66263 10-08-2019 404307 435141 10040 11-08-2019 312360 354619 24765 12-08-2019 292836 388051 8694 13-08-2019 377388 389673 18763 14-08-2019 534308 669976 68482 15-08-2019 1026556 964313 97535 16-08-2019 577561 639069 45165 17-08-2019 369579 307289 2172 18-08-2019 287265 269434 4150 19-08-2019 287234 275557 3163 20-08-2019 380890 384669 6868 21-08-2019 444114 454355 9654 22-08-2019 466101 452023 17667 23-08-2019 391311 373548 3925 24-08-2019 426730 466860 8379 25-08-2019 409745 433366 32302 26-08-2019 306113 208810 12164 27-08-2019 255832 226768 4808 28-08-2019 213337 156027 0 29-08-2019 191353 50627 0 30-08-2019 209552 138615 7 31-08-2019 203313 136669 0 TOTAL 11989151 11759204 487121 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 42. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-MANIKARAN ANALYTICS LTD. NAME OF POOLING STATION :-WIND WORLD-I SUSNER DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 78367 78280 13605 02-08-2019 71834 68112 2355 03-08-2019 50729 32666 531 04-08-2019 54996 25104 5044 05-08-2019 45212 56309 2558 06-08-2019 84829 92076 3744 07-08-2019 64413 65281 2734 08-08-2019 52031 37931 1377 09-08-2019 42432 58438 20488 10-08-2019 64958 113807 16911 11-08-2019 52474 67421 2766 12-08-2019 54494 76147 2415 13-08-2019 78909 63716 4149 14-08-2019 89589 123575 14619 15-08-2019 230907 250791 5185 16-08-2019 149206 173342 22177 17-08-2019 103491 76538 10387 18-08-2019 81850 92678 1594 19-08-2019 72310 70632 2874 20-08-2019 77350 82128 882 21-08-2019 107526 114424 4002 22-08-2019 81985 77710 22586 23-08-2019 75710 67194 1789 24-08-2019 88717 91913 6649 25-08-2019 73911 61011 4438 26-08-2019 45437 23812 0 27-08-2019 37102 9226 38 28-08-2019 40525 25717 0 29-08-2019 39040 19741 0 30-08-2019 45919 39898 56 31-08-2019 39591 16253 11 TOTAL 2275844 2251871 175964 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 43. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-MANIKARAN ANALYTICS LTD. NAME OF POOLING STATION :-WIND WORLD-II AGAR DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 76621 72500 8070 02-08-2019 72335 64576 869 03-08-2019 53490 28410 150 04-08-2019 65341 24254 3996 05-08-2019 46297 47073 1180 06-08-2019 83184 84916 1383 07-08-2019 67364 55308 1682 08-08-2019 52653 31152 782 09-08-2019 43705 62718 18765 10-08-2019 62638 140072 29666 11-08-2019 56306 70690 1980 12-08-2019 56500 81679 2316 13-08-2019 81287 56189 1781 14-08-2019 82669 116780 14078 15-08-2019 248027 277439 17034 16-08-2019 154779 199834 31655 17-08-2019 107519 88853 2710 18-08-2019 84517 95167 657 19-08-2019 72659 58930 913 20-08-2019 66343 56841 24 21-08-2019 86613 92474 2111 22-08-2019 71339 53146 2850 23-08-2019 66584 50634 627 24-08-2019 81800 69706 1732 25-08-2019 63034 45677 281 26-08-2019 44561 19019 0 27-08-2019 42776 8129 0 28-08-2019 47341 28762 0 29-08-2019 37136 19877 0 30-08-2019 45922 26817 0 31-08-2019 41943 13224 0 TOTAL 2263283 2140846 147292 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 44. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-MANIKARAN ANALYTICS LTD. NAME OF POOLING STATION :-WIND WORLD-III AGAR DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 73876 67202 7333 02-08-2019 69050 62057 1039 03-08-2019 53810 31108 1667 04-08-2019 61399 23175 2926 05-08-2019 43869 42234 1728 06-08-2019 73193 74082 383 07-08-2019 67855 56479 1638 08-08-2019 49510 35950 485 09-08-2019 43266 63531 22529 10-08-2019 58670 125655 21672 11-08-2019 53381 74823 1794 12-08-2019 56669 78741 1898 13-08-2019 69748 52163 791 14-08-2019 81645 116651 17001 15-08-2019 239279 262182 17457 16-08-2019 147884 194669 29749 17-08-2019 109231 94568 3672 18-08-2019 78032 90036 732 19-08-2019 70391 61447 818 20-08-2019 66311 59236 348 21-08-2019 86130 97227 3925 22-08-2019 74415 57969 4388 23-08-2019 47545 31184 1213 24-08-2019 65622 58374 4756 25-08-2019 59975 47617 260 26-08-2019 41930 18921 0 27-08-2019 36870 8339 0 28-08-2019 46445 27123 0 29-08-2019 39514 18967 0 30-08-2019 44021 28107 0 31-08-2019 41380 12390 0 TOTAL 2150916 2072207 150202 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 45. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-MANIKARAN ANALYTICS LTD. NAME OF POOLING STATION :-WIND WORLD-IV SUSNER DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 72554 60364 6508 02-08-2019 62049 55759 478 03-08-2019 51378 26181 312 04-08-2019 61592 19219 2937 05-08-2019 40890 39603 809 06-08-2019 70096 76550 658 07-08-2019 58800 42160 584 08-08-2019 41879 27828 492 09-08-2019 41306 64456 24427 10-08-2019 62737 141415 29554 11-08-2019 51957 75984 1533 12-08-2019 51824 72262 1263 13-08-2019 68980 51373 1342 14-08-2019 80422 106216 12053 15-08-2019 218594 243390 10090 16-08-2019 128835 176605 42483 17-08-2019 96130 85789 6940 18-08-2019 73930 81219 2934 19-08-2019 58211 40196 2779 20-08-2019 61651 43808 61 21-08-2019 78107 78999 2337 22-08-2019 64465 44533 3513 23-08-2019 63775 47870 268 24-08-2019 72055 54552 3355 25-08-2019 53522 38087 0 26-08-2019 39559 16545 0 27-08-2019 36560 6287 0 28-08-2019 46896 23934 0 29-08-2019 36386 15313 0 30-08-2019 43284 21502 0 31-08-2019 41724 8222 0 TOTAL 2030148 1886221 157710 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 46. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-NA NAME OF POOLING STATION :-NTPC LIMITED, RAJGARH (PROJECT UNDER JNSM) DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 138250 137487 3941 02-08-2019 105500 85391 3074 03-08-2019 152750 164685 5156 04-08-2019 165500 187026 6919 05-08-2019 167750 163811 3292 06-08-2019 150000 135880 9047 07-08-2019 83250 65404 3124 08-08-2019 152750 136966 5162 09-08-2019 105000 102121 3182 10-08-2019 169750 184080 3703 11-08-2019 156500 164413 2300 12-08-2019 156750 176147 6284 13-08-2019 126750 103070 475 14-08-2019 65000 41039 0 15-08-2019 57750 18190 0 16-08-2019 133500 136374 8378 17-08-2019 183250 188354 1275 18-08-2019 83000 36376 63 19-08-2019 213000 239105 2063 20-08-2019 198250 201521 540 21-08-2019 194750 187160 4065 22-08-2019 191500 198787 2266 23-08-2019 121000 135699 3172 24-08-2019 87750 63347 729 25-08-2019 88750 77891 239 26-08-2019 115250 110420 810 27-08-2019 145000 168327 8788 28-08-2019 122000 112001 2133 29-08-2019 178750 188330 1125 30-08-2019 144375 137754 1380 31-08-2019 197500 191956 138 TOTAL 4350875 4239112 92823 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 47. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-NA NAME OF POOLING STATION :-PIONEER WINCON DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 0 6685 7514 02-08-2019 0 5608 6305 03-08-2019 0 2283 2566 04-08-2019 0 1784 1996 05-08-2019 0 4869 5473 06-08-2019 0 9309 10467 07-08-2019 0 6578 7392 08-08-2019 0 5743 6454 09-08-2019 0 3876 4352 10-08-2019 0 13971 15716 11-08-2019 0 9748 10961 12-08-2019 0 5838 6568 13-08-2019 0 5092 5728 14-08-2019 0 6407 7207 15-08-2019 0 9841 11066 16-08-2019 0 19221 21620 17-08-2019 0 10320 11606 18-08-2019 0 7879 8857 19-08-2019 0 4186 4702 20-08-2019 0 5399 6070 21-08-2019 0 7380 8298 22-08-2019 0 6153 6919 23-08-2019 0 5019 5642 24-08-2019 0 7608 8559 25-08-2019 0 4886 5486 26-08-2019 0 3575 4011 27-08-2019 0 2845 3195 28-08-2019 0 2450 2751 29-08-2019 0 1684 1885 30-08-2019 0 2041 2295 31-08-2019 0 1832 2056 TOTAL 0 190110 213717 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 48. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD NAME OF POOLING STATION :-AVP POWER INFRA PVT LTD (SONKATCHH) DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 416324 401597 15831 02-08-2019 300578 234680 5593 03-08-2019 169367 129108 9142 04-08-2019 115568 81250 17547 05-08-2019 171541 164117 144 06-08-2019 295242 321328 6185 07-08-2019 317779 322585 17729 08-08-2019 252170 226580 3044 09-08-2019 265206 237337 19592 10-08-2019 318909 302737 6583 11-08-2019 206145 183832 22526 12-08-2019 267840 271679 3299 13-08-2019 258922 251428 6207 14-08-2019 343623 352795 3869 15-08-2019 481699 537140 10663 16-08-2019 440682 450531 13427 17-08-2019 257189 228963 14804 18-08-2019 185439 238508 32653 19-08-2019 183508 198524 10009 20-08-2019 274858 284608 18032 21-08-2019 310381 317999 19889 22-08-2019 295590 296589 47784 23-08-2019 274832 292047 43661 24-08-2019 322815 319636 12085 25-08-2019 307100 290168 26348 26-08-2019 169274 123229 8365 27-08-2019 128055 84787 2952 28-08-2019 125666 99938 351 29-08-2019 69905 32251 21 30-08-2019 116293 110905 1764 31-08-2019 106367 79971 13285 TOTAL 7748867 7466847 413384 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 49. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD NAME OF POOLING STATION :-BADONI POWER PVT LTD (MAXI) DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 413466 389614 12121 02-08-2019 298308 222320 7784 03-08-2019 185088 129038 8142 04-08-2019 134413 70364 8063 05-08-2019 205600 173937 3850 06-08-2019 288751 297102 4881 07-08-2019 278439 276922 30370 08-08-2019 228622 168164 6726 09-08-2019 284204 274661 9292 10-08-2019 406484 371764 11447 11-08-2019 289043 221598 53985 12-08-2019 236956 276542 4411 13-08-2019 230768 221476 10021 14-08-2019 330393 396008 72039 15-08-2019 561099 585156 11456 16-08-2019 483567 481519 5621 17-08-2019 425422 284145 63311 18-08-2019 295144 206097 21135 19-08-2019 167893 182448 10070 20-08-2019 197593 226984 11556 21-08-2019 292176 298747 22260 22-08-2019 294016 253066 44058 23-08-2019 248148 254591 27361 24-08-2019 296558 280270 9978 25-08-2019 268166 225528 15398 26-08-2019 198712 85598 29806 27-08-2019 128819 79408 7041 28-08-2019 129999 107153 941 29-08-2019 76480 39636 130 30-08-2019 104360 87159 95 31-08-2019 95921 56540 1783 TOTAL 8074608 7223555 525132 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 50. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD NAME OF POOLING STATION :-BANCO 1 DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 28640 34520 2881 02-08-2019 30034 38174 899 03-08-2019 49080 22564 13586 04-08-2019 54142 39889 7044 05-08-2019 59055 34778 13619 06-08-2019 56622 51412 2895 07-08-2019 17569 18160 966 08-08-2019 35659 26554 2110 09-08-2019 12645 23721 1056 10-08-2019 76914 52110 9609 11-08-2019 86125 41008 22570 12-08-2019 64555 49804 5070 13-08-2019 51048 34229 4871 14-08-2019 27094 11460 2963 15-08-2019 12004 8149 0 16-08-2019 53415 52024 1424 17-08-2019 70547 48641 7878 18-08-2019 67425 24611 22035 19-08-2019 73842 64586 1408 20-08-2019 69870 50299 6321 21-08-2019 88375 66712 3057 22-08-2019 91824 63178 7092 23-08-2019 83861 29251 37177 24-08-2019 57577 20993 20359 25-08-2019 11461 21328 0 26-08-2019 13304 25996 4285 27-08-2019 51980 45640 4745 28-08-2019 59305 38649 3356 29-08-2019 67435 57264 3558 30-08-2019 70010 48845 12865 31-08-2019 69925 65796 1019 TOTAL 1661342 1210345 226718 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 51. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD NAME OF POOLING STATION :-BANCO 2 DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 24349 37214 6702 02-08-2019 25437 35557 2106 03-08-2019 41508 19638 10724 04-08-2019 45852 42380 2242 05-08-2019 49974 35050 7158 06-08-2019 47878 48692 3564 07-08-2019 14944 13350 172 08-08-2019 30131 23306 841 09-08-2019 10693 20817 1676 10-08-2019 65037 45239 6817 11-08-2019 72735 36011 17706 12-08-2019 54561 50291 2874 13-08-2019 43145 41539 2663 14-08-2019 22944 12937 1995 15-08-2019 10178 6272 0 16-08-2019 45151 42676 1155 17-08-2019 59291 46490 4133 18-08-2019 57022 21336 16773 19-08-2019 62418 58741 359 20-08-2019 59068 48867 3951 21-08-2019 74843 64238 429 22-08-2019 77739 50393 6201 23-08-2019 70934 25359 27773 24-08-2019 48653 19986 15117 25-08-2019 9704 20251 292 26-08-2019 11363 23940 4678 27-08-2019 43982 42079 2727 28-08-2019 50125 34586 3467 29-08-2019 57039 45055 2318 30-08-2019 59192 38016 13054 31-08-2019 59126 55556 711 TOTAL 1405016 1105862 170378 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 52. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD NAME OF POOLING STATION :-BANCO 3 DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 25551 45090 13016 02-08-2019 26691 43562 4428 03-08-2019 43563 40622 1866 04-08-2019 48076 53720 6952 05-08-2019 52491 42625 7849 06-08-2019 50232 59225 6595 07-08-2019 15548 16222 528 08-08-2019 31623 28394 1482 09-08-2019 11222 24550 3130 10-08-2019 68254 53716 4706 11-08-2019 76310 43016 15084 12-08-2019 57234 62996 4682 13-08-2019 45299 49893 3348 14-08-2019 24038 15288 2641 15-08-2019 10650 6173 0 16-08-2019 47420 51237 1294 17-08-2019 62241 55483 3719 18-08-2019 59844 25204 15429 19-08-2019 65536 71841 644 20-08-2019 62030 59283 3464 21-08-2019 78430 73675 793 22-08-2019 81559 59579 5105 23-08-2019 74445 30443 25857 24-08-2019 51086 23857 14009 25-08-2019 10235 24615 557 26-08-2019 11890 28680 8116 27-08-2019 46124 37962 7475 28-08-2019 52599 40987 2818 29-08-2019 59870 54310 2159 30-08-2019 62128 45864 13806 31-08-2019 62000 68187 2821 TOTAL 1474219 1336299 184373 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 53. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD NAME OF POOLING STATION :-BEHAPUR-1 (SUJLON-1)DALODA (MPC12456) DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 88544 55082 4675 02-08-2019 76799 48541 1269 03-08-2019 67599 3020 16952 04-08-2019 46496 14968 8302 05-08-2019 64973 48873 4546 06-08-2019 129597 110614 3120 07-08-2019 115143 88662 3684 08-08-2019 74876 32310 5877 09-08-2019 74276 53513 17471 10-08-2019 157198 130788 5033 11-08-2019 96026 80022 3493 12-08-2019 89851 65152 1921 13-08-2019 86633 63615 938 14-08-2019 103804 93040 10745 15-08-2019 157712 160033 4021 16-08-2019 216230 199423 5366 17-08-2019 179828 135308 12392 18-08-2019 90256 94638 6686 19-08-2019 67137 56598 4899 20-08-2019 61230 48504 1771 21-08-2019 90505 84138 1515 22-08-2019 74617 67754 2621 23-08-2019 65692 45477 4914 24-08-2019 72242 52933 135 25-08-2019 57734 37131 2923 26-08-2019 46081 13397 1059 27-08-2019 37168 11356 193 28-08-2019 31024 7746 0 29-08-2019 33050 8933 87 30-08-2019 38473 13565 872 31-08-2019 33606 9169 0 TOTAL 2624400 1934303 137480 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 54. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD NAME OF POOLING STATION :-BEHAPUR-2 (SUJLON-2)DALODA (MPC12448) DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 127216 61190 21111 02-08-2019 83290 55898 1030 03-08-2019 89323 13129 28041 04-08-2019 57608 18500 19791 05-08-2019 60524 47334 2226 06-08-2019 113121 106326 396 07-08-2019 101531 80383 4623 08-08-2019 61377 24390 3765 09-08-2019 64680 55272 14876 10-08-2019 165149 127984 7739 11-08-2019 101116 81664 4566 12-08-2019 81160 67336 97 13-08-2019 80890 67116 461 14-08-2019 106045 90691 14105 15-08-2019 184676 9 142026 16-08-2019 243089 45062 171215 17-08-2019 214434 140136 27053 18-08-2019 106925 99382 5594 19-08-2019 75698 57370 7783 20-08-2019 61510 49613 377 21-08-2019 88318 81068 1788 22-08-2019 84654 70461 2154 23-08-2019 71255 52305 1242 24-08-2019 80933 65191 2689 25-08-2019 63785 35908 5360 26-08-2019 47119 13868 674 27-08-2019 42426 11718 159 28-08-2019 38046 7825 515 29-08-2019 33776 11081 30 30-08-2019 41887 18628 247 31-08-2019 34341 9722 0 TOTAL 2805902 1666560 491733 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 55. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD NAME OF POOLING STATION :-BETUL WIND FARM DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 719521 738722 35522 02-08-2019 505616 655204 52262 03-08-2019 508001 342513 54188 04-08-2019 384553 132866 77269 05-08-2019 240110 320862 14694 06-08-2019 246604 609693 221715 07-08-2019 499022 840276 149868 08-08-2019 602455 771415 53099 09-08-2019 492749 713646 90066 10-08-2019 214165 326043 33337 11-08-2019 210332 375830 82675 12-08-2019 284244 695399 243221 13-08-2019 469245 863308 204884 14-08-2019 555917 823671 220236 15-08-2019 342427 652998 139428 16-08-2019 227239 543825 204354 17-08-2019 189131 405054 170213 18-08-2019 171228 463403 214379 19-08-2019 244263 564622 222386 20-08-2019 400583 849126 247400 21-08-2019 444265 715775 127720 22-08-2019 510843 870169 194612 23-08-2019 442761 931954 331900 24-08-2019 515540 858273 141959 25-08-2019 612292 825176 91609 26-08-2019 579024 467656 130188 27-08-2019 341187 355605 12642 28-08-2019 84520 179159 26922 29-08-2019 49337 232536 38688 30-08-2019 92856 315482 83580 31-08-2019 106509 245872 26233 TOTAL 11286539 17686133 3937249 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 56. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD NAME OF POOLING STATION :-BHADRESH TRADING CORP. LTD.(10MW) DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 15345 30015 13482 02-08-2019 21294 22067 350 03-08-2019 24046 22694 3783 04-08-2019 40179 40432 2078 05-08-2019 35779 41458 2251 06-08-2019 31917 32474 1897 07-08-2019 10182 5780 89 08-08-2019 20558 16236 7126 09-08-2019 11838 18293 1614 10-08-2019 43728 42374 894 11-08-2019 50238 34193 6192 12-08-2019 46549 47563 1236 13-08-2019 38354 37378 106 14-08-2019 13934 11046 0 15-08-2019 4184 2593 0 16-08-2019 18425 28236 2396 17-08-2019 30135 35774 2371 18-08-2019 40684 15417 10197 19-08-2019 45823 50992 934 20-08-2019 45675 46059 1062 21-08-2019 53329 56037 1896 22-08-2019 55461 52354 1921 23-08-2019 54208 26789 15825 24-08-2019 42253 17678 15200 25-08-2019 9236 18065 394 26-08-2019 8469 14853 1397 27-08-2019 32608 31062 3627 28-08-2019 26395 28658 648 29-08-2019 38840 46903 1595 30-08-2019 45879 31662 2623 31-08-2019 37865 47470 2040 TOTAL 993410 952605 105224 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 57. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD NAME OF POOLING STATION :-CHOKASI ENERGY & INFRA P L DODAR (MTR No.Y0056963) DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 87597 73814 1841 02-08-2019 95344 41340 20549 03-08-2019 44721 18489 704 04-08-2019 47403 26978 4943 05-08-2019 92116 32335 17463 06-08-2019 103687 99095 4334 07-08-2019 95387 110291 5304 08-08-2019 83234 57071 6625 09-08-2019 59276 44867 4035 10-08-2019 143333 118890 5643 11-08-2019 94015 61104 8448 12-08-2019 64827 56706 1544 13-08-2019 76314 66423 325 14-08-2019 115482 102278 9819 15-08-2019 219430 107631 104919 16-08-2019 209129 54390 138046 17-08-2019 186691 137235 25004 18-08-2019 88891 88467 1265 19-08-2019 57958 58734 982 20-08-2019 81775 64593 8666 21-08-2019 76648 106856 6138 22-08-2019 91212 55673 6014 23-08-2019 81142 51350 10889 24-08-2019 83402 82162 1993 25-08-2019 76177 54442 7915 26-08-2019 72236 53018 1222 27-08-2019 51927 15748 2462 28-08-2019 37979 21345 25 29-08-2019 38297 13900 500 30-08-2019 44368 25706 34 31-08-2019 43565 12225 2102 TOTAL 2743563 1913156 409753 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 58. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD NAME OF POOLING STATION :-CHOKASI ENERGY & INFRA P L RINGDOD (MTR No..Y0056961) DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 101701 77464 5371 02-08-2019 82161 55855 2554 03-08-2019 47910 19671 347 04-08-2019 53598 28749 9735 05-08-2019 73520 54790 3305 06-08-2019 105766 121185 892 07-08-2019 103298 105512 4513 08-08-2019 91285 34980 27338 09-08-2019 56901 60080 9125 10-08-2019 133970 143501 3290 11-08-2019 87335 97328 5859 12-08-2019 65801 66645 2173 13-08-2019 76914 68817 437 14-08-2019 125502 74923 20542 15-08-2019 219960 197048 19711 16-08-2019 208677 165758 9222 17-08-2019 180064 139090 22027 18-08-2019 88777 88362 658 19-08-2019 59560 63415 2568 20-08-2019 89558 68528 20105 21-08-2019 78337 94400 5919 22-08-2019 92486 100643 269 23-08-2019 86372 59485 7728 24-08-2019 93180 81624 936 25-08-2019 89226 62187 9525 26-08-2019 78027 47701 2629 27-08-2019 49174 17397 1948 28-08-2019 37299 21300 34 29-08-2019 38744 13055 533 30-08-2019 39055 23383 13 31-08-2019 38978 11309 662 TOTAL 2773136 2264185 199968 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 59. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD NAME OF POOLING STATION :-D J ENERGY & UTTAR URJA DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 1487016 1151390 60584 02-08-2019 1251863 926340 13554 03-08-2019 876651 382310 41716 04-08-2019 607619 378780 40679 05-08-2019 1056682 1040520 61384 06-08-2019 1637714 1800570 7071 07-08-2019 1610433 1676330 18795 08-08-2019 1081257 846140 26572 09-08-2019 927386 899700 165795 10-08-2019 1938313 1872530 36780 11-08-2019 1386651 1269250 33528 12-08-2019 986555 1015980 0 13-08-2019 1151967 1138520 1444 14-08-2019 1457184 1590640 154180 15-08-2019 2517051 2620010 61631 16-08-2019 2829546 3062790 23772 17-08-2019 2039222 1984730 38298 18-08-2019 1390163 1339330 46949 19-08-2019 992252 1029080 21455 20-08-2019 1089478 1017050 78 21-08-2019 1442218 1453640 44659 22-08-2019 1295296 1374300 69001 23-08-2019 1129603 1034940 71550 24-08-2019 1396087 1287420 32249 25-08-2019 1196705 983500 151975 26-08-2019 884988 600180 9483 27-08-2019 655365 356000 129 28-08-2019 486715 317710 0 29-08-2019 472627 276810 101 30-08-2019 475747 417520 0 31-08-2019 457421 351080 0 TOTAL 38207775 35495090 1233412 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 60. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD NAME OF POOLING STATION :-DELIGENTIA 1 DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 28533 65886 19829 02-08-2019 58368 64803 1469 03-08-2019 55678 73372 9842 04-08-2019 81759 72545 435 05-08-2019 66027 32956 8797 06-08-2019 46681 50243 1150 07-08-2019 19692 26866 325 08-08-2019 77442 58687 9862 09-08-2019 46283 27473 4410 10-08-2019 55501 69911 1438 11-08-2019 72781 58087 2898 12-08-2019 106594 70390 14906 13-08-2019 79978 107105 4115 14-08-2019 37564 23561 4739 15-08-2019 7018 12513 216 16-08-2019 31044 30018 0 17-08-2019 45507 55398 1041 18-08-2019 77880 79755 12309 19-08-2019 113929 118836 793 20-08-2019 118073 113484 5594 21-08-2019 118859 116478 4463 22-08-2019 119489 120777 5213 23-08-2019 116363 106521 8973 24-08-2019 82735 40758 17902 25-08-2019 26292 41402 750 26-08-2019 30332 44772 7834 27-08-2019 64966 73934 6879 28-08-2019 71334 64785 13651 29-08-2019 84345 82056 247 30-08-2019 81938 76308 3801 31-08-2019 84208 100855 6232 TOTAL 2107193 2080535 180113 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 61. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD NAME OF POOLING STATION :-DHAR WIND POWER PROJECTS PVT LTD DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 190343 164276 4931 02-08-2019 94740 66049 393 03-08-2019 78023 42455 3916 04-08-2019 64091 40586 456 05-08-2019 81110 86315 847 06-08-2019 107677 107678 1402 07-08-2019 108605 115363 676 08-08-2019 145895 149488 14140 09-08-2019 185484 160252 11136 10-08-2019 199308 190884 3775 11-08-2019 118017 113000 6390 12-08-2019 83002 77462 540 13-08-2019 91687 79579 966 14-08-2019 109371 100105 773 15-08-2019 184084 177525 149 16-08-2019 185052 161289 5894 17-08-2019 156222 126304 10542 18-08-2019 94767 100696 8967 19-08-2019 62977 57105 1384 20-08-2019 90595 68709 2271 21-08-2019 98941 93894 900 22-08-2019 98009 89637 15 23-08-2019 92128 73326 1747 24-08-2019 115319 84993 4025 25-08-2019 106432 79251 2287 26-08-2019 128480 88372 8500 27-08-2019 101883 82652 927 28-08-2019 71596 62385 17 29-08-2019 41918 18948 0 30-08-2019 44784 23674 0 31-08-2019 38653 20919 24 TOTAL 3369193 2903171 97990 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 62. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD NAME OF POOLING STATION :-ENERCON (I) LTD.-I RATEDI HILL,BAGLI DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 215233 122991 32654 02-08-2019 139595 65432 18570 03-08-2019 105705 32923 10827 04-08-2019 85553 25043 10572 05-08-2019 72442 44214 2001 06-08-2019 84723 82581 931 07-08-2019 121837 107033 5930 08-08-2019 141721 62437 37250 09-08-2019 185501 114509 26601 10-08-2019 202172 109869 32891 11-08-2019 91343 78246 1017 12-08-2019 89670 68042 411 13-08-2019 109098 72370 3788 14-08-2019 186505 119537 19338 15-08-2019 251578 175829 22287 16-08-2019 163935 132662 4341 17-08-2019 111024 62189 6639 18-08-2019 56495 46669 108 19-08-2019 78880 39990 8457 20-08-2019 105046 66859 2220 21-08-2019 106637 87014 289 22-08-2019 135961 81248 9784 23-08-2019 112437 66577 6259 24-08-2019 132244 80236 10072 25-08-2019 185825 76529 55540 26-08-2019 152336 41376 57727 27-08-2019 110204 43650 21603 28-08-2019 49684 27092 93 29-08-2019 21369 6863 0 30-08-2019 36541 25647 0 31-08-2019 32749 24332 0 TOTAL 3674043 2189989 408200 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 63. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD NAME OF POOLING STATION :-FINSURYA SOLAR ENERGY (10MW) DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 17724 30581 3820 02-08-2019 21338 36726 6051 03-08-2019 22596 21477 486 04-08-2019 42540 39280 4468 05-08-2019 37854 29149 1032 06-08-2019 36607 44256 4015 07-08-2019 15527 15056 1252 08-08-2019 32973 22741 3568 09-08-2019 12538 16212 359 10-08-2019 53427 43236 5120 11-08-2019 56588 35287 7845 12-08-2019 48524 45663 2483 13-08-2019 37303 38815 1223 14-08-2019 15392 12982 745 15-08-2019 8293 7352 0 16-08-2019 40157 35054 3082 17-08-2019 44635 36241 4221 18-08-2019 47026 20952 11778 19-08-2019 51502 54365 561 20-08-2019 51096 38634 3001 21-08-2019 61300 63009 411 22-08-2019 61322 55011 2119 23-08-2019 59394 24024 23296 24-08-2019 37462 17532 7827 25-08-2019 11130 18722 199 26-08-2019 14673 19992 3304 27-08-2019 33507 35747 4791 28-08-2019 43155 25831 6403 29-08-2019 40685 50281 5335 30-08-2019 43679 39476 5492 31-08-2019 49487 53825 1934 TOTAL 1149434 1027509 126221 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 64. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD NAME OF POOLING STATION :-Friends Salt Works & Allied Industries, Susner DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 2014 23315 12873 02-08-2019 2864 16445 2176 03-08-2019 3126 29441 14412 04-08-2019 3992 28476 12644 05-08-2019 3642 33634 17537 06-08-2019 3330 24372 9528 07-08-2019 1005 6557 31 08-08-2019 4057 13286 4492 09-08-2019 1225 13476 2243 10-08-2019 4977 31877 11080 11-08-2019 5136 22148 3018 12-08-2019 4066 33558 13741 13-08-2019 3523 25959 9089 14-08-2019 1644 7140 0 15-08-2019 423 766 0 16-08-2019 3634 11355 1722 17-08-2019 3362 26116 9532 18-08-2019 4501 12684 434 19-08-2019 5155 35991 17520 20-08-2019 4894 33371 17959 21-08-2019 5558 39812 22866 22-08-2019 5883 34670 19873 23-08-2019 5402 17392 2888 24-08-2019 3614 11041 162 25-08-2019 776 13034 1208 26-08-2019 1969 10208 1554 27-08-2019 3134 24708 11840 28-08-2019 4166 17344 2584 29-08-2019 4353 31286 13029 30-08-2019 4123 18800 5887 31-08-2019 4579 30404 12099 TOTAL 110127 678666 254021 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 65. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD NAME OF POOLING STATION :-GAMESA RENEWABLE PVT LTD DEWAS DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 1460137 1367233 53455 02-08-2019 983052 728481 13249 03-08-2019 633378 408219 26046 04-08-2019 433298 278324 18960 05-08-2019 629045 539198 1303 06-08-2019 908207 966653 2054 07-08-2019 934298 933171 18700 08-08-2019 763700 595547 10028 09-08-2019 988421 1014528 78771 10-08-2019 1362911 1384069 25777 11-08-2019 874351 803818 109612 12-08-2019 884969 873607 12728 13-08-2019 771083 712847 19768 14-08-2019 1247879 1273626 69511 15-08-2019 2049225 2226837 8717 16-08-2019 1735565 1731217 39239 17-08-2019 1030150 930144 7353 18-08-2019 750691 717962 12180 19-08-2019 597770 548948 13846 20-08-2019 802365 712050 18672 21-08-2019 968451 917175 74136 22-08-2019 875178 826523 78492 23-08-2019 820510 815188 63358 24-08-2019 964312 914756 30206 25-08-2019 863846 749282 45369 26-08-2019 596639 402354 15585 27-08-2019 479368 313938 11960 28-08-2019 448943 371434 0 29-08-2019 309348 109867 9430 30-08-2019 355570 260039 389 31-08-2019 322363 201993 0 TOTAL 26845023 24629028 888894 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 66. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD NAME OF POOLING STATION :-GIRIRAJ ENTERPRISES,AFJALPUR DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 105553 65783 8163 02-08-2019 104061 75225 6071 03-08-2019 57807 37927 926 04-08-2019 60920 18895 3219 05-08-2019 110082 59759 10995 06-08-2019 119445 129666 2438 07-08-2019 113471 33018 28168 08-08-2019 79201 62113 1334 09-08-2019 64245 48141 2819 10-08-2019 202902 94136 111888 11-08-2019 99086 99962 2058 12-08-2019 79187 82410 447 13-08-2019 98080 80549 9936 14-08-2019 130321 90527 33383 15-08-2019 261248 224849 18569 16-08-2019 220354 177280 13036 17-08-2019 177981 155913 24337 18-08-2019 85805 109085 7437 19-08-2019 72700 66381 302 20-08-2019 91087 86586 819 21-08-2019 104393 98304 6890 22-08-2019 122931 100276 15845 23-08-2019 89211 86703 3227 24-08-2019 101077 75200 17883 25-08-2019 117282 59542 15663 26-08-2019 98509 65257 8558 27-08-2019 65852 22784 8018 28-08-2019 55934 25993 1850 29-08-2019 35451 19695 77 30-08-2019 37303 36109 531 31-08-2019 39792 21690 63 TOTAL 3201271 2409758 364950 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 67. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD NAME OF POOLING STATION :-GIRIRAJ ENTERPRISES,KUCHROD DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 118845 57292 21385 02-08-2019 83008 70463 2381 03-08-2019 63967 37656 2131 04-08-2019 49062 20772 1327 05-08-2019 74436 54090 4624 06-08-2019 112163 121693 2691 07-08-2019 111216 11009 37323 08-08-2019 61754 45838 2846 09-08-2019 64158 48550 3448 10-08-2019 156575 146523 18820 11-08-2019 103715 109814 2347 12-08-2019 84472 75052 208 13-08-2019 86546 78701 857 14-08-2019 115714 68499 11885 15-08-2019 233265 116578 72388 16-08-2019 227349 5554 200330 17-08-2019 160610 94556 45431 18-08-2019 89700 82806 4763 19-08-2019 66150 58304 241 20-08-2019 77956 79124 1770 21-08-2019 96837 100520 1280 22-08-2019 90348 100835 3365 23-08-2019 77906 82379 4186 24-08-2019 96699 86323 17487 25-08-2019 116762 56054 21470 26-08-2019 98340 69960 6844 27-08-2019 65093 21067 9408 28-08-2019 55691 24733 1577 29-08-2019 36336 12998 469 30-08-2019 36156 28681 44 31-08-2019 37418 19841 0 TOTAL 2948247 1986265 503326 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 68. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD NAME OF POOLING STATION :-INOX WIND INFRA BETUL DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 461316 329861 129585 02-08-2019 363925 393133 17608 03-08-2019 187156 139923 18189 04-08-2019 131618 30691 20460 05-08-2019 174648 167168 21869 06-08-2019 365271 374593 43163 07-08-2019 518482 561005 7981 08-08-2019 426912 451035 31060 09-08-2019 360146 334716 58872 10-08-2019 231693 119430 49316 11-08-2019 202613 202535 51413 12-08-2019 406317 432257 20365 13-08-2019 495712 526233 8079 14-08-2019 460927 484890 26914 15-08-2019 378121 285668 40440 16-08-2019 286115 253440 32406 17-08-2019 247944 206781 24986 18-08-2019 281471 293649 32345 19-08-2019 329890 335644 26327 20-08-2019 493582 513267 3265 21-08-2019 455643 442371 16294 22-08-2019 504388 504710 11605 23-08-2019 527044 542812 13528 24-08-2019 506157 513228 4560 25-08-2019 497970 500883 7053 26-08-2019 342712 260775 19244 27-08-2019 226101 176365 15042 28-08-2019 133338 71612 6337 29-08-2019 138908 128677 2647 30-08-2019 195119 175694 11706 31-08-2019 173252 131878 3900 TOTAL 10504491 9884924 776559 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 69. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD NAME OF POOLING STATION :-JAMGODRANI WIND FARMS PVT LTD DEWAS DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 464361 429408 6422 02-08-2019 351586 326220 20956 03-08-2019 257727 128874 40668 04-08-2019 148638 70812 5954 05-08-2019 203497 182790 795 06-08-2019 312025 352170 16543 07-08-2019 338619 313938 9444 08-08-2019 300135 252456 11755 09-08-2019 306476 219210 38243 10-08-2019 348162 227904 76822 11-08-2019 266911 219618 13931 12-08-2019 271013 279762 9435 13-08-2019 314443 274962 20170 14-08-2019 404653 368586 11787 15-08-2019 543421 362172 150868 16-08-2019 457347 371976 59424 17-08-2019 305894 288336 15080 18-08-2019 248394 239142 11586 19-08-2019 184336 173010 7291 20-08-2019 279357 288750 9915 21-08-2019 334529 352542 8625 22-08-2019 318454 296694 15047 23-08-2019 299522 301734 11871 24-08-2019 313881 332808 22358 25-08-2019 367783 291534 29507 26-08-2019 343119 169782 128604 27-08-2019 258228 102876 119322 28-08-2019 133130 133344 1286 29-08-2019 71789 39642 20 30-08-2019 142743 91110 6779 31-08-2019 173010 79386 29637 TOTAL 9063183 7561548 910145 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur
  • 70. STATE LOAD DESPATCH CENTRE - JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED DATE WISE DEVIATION REPORT FOR THE MONTH OF AUGUST - 2019 NAME OF QCA :-RECONNECT ENERGY SOLUTIONS PVT LTD NAME OF POOLING STATION :-KSHEMA POWER & INFRA PVT LTD (BHERUGARH) DATE SCHEDULE in KWH ACTUAL in KWH DEVIATION CHARGES in Rs. 01-08-2019 301685 221506 16594 02-08-2019 216039 142220 3812 03-08-2019 152903 75981 11744 04-08-2019 139512 50566 30543 05-08-2019 146529 120466 1224 06-08-2019 202945 198060 394 07-08-2019 286453 173452 34193 08-08-2019 229224 125509 39079 09-08-2019 293480 185345 74981 10-08-2019 412904 382691 4921 11-08-2019 227680 204324 11095 12-08-2019 222064 171955 1776 13-08-2019 170941 115671 1615 14-08-2019 276704 235090 21479 15-08-2019 431550 442078 25259 16-08-2019 417379 382662 14420 17-08-2019 290669 230699 14466 18-08-2019 161316 156438 2336 19-08-2019 118753 99149 453 20-08-2019 142641 122144 635 21-08-2019 212226 178213 7871 22-08-2019 207332 156688 11358 23-08-2019 183351 132987 6119 24-08-2019 181374 139412 212 25-08-2019 186216 129789 9547 26-08-2019 154824 101359 3254 27-08-2019 109341 61724 472 28-08-2019 103989 87345 571 29-08-2019 77386 36251 251 30-08-2019 100753 67127 3931 31-08-2019 81930 49717 205 TOTAL 6440093 4976618 354810 (+) Payable (-) Receivable Junior Engineer(LD) Assistant Engineer(LD) MPPTCL,Jabalpur MPPTCL,Jabalpur