SlideShare une entreprise Scribd logo
1  sur  6
Télécharger pour lire hors ligne
OLAFARE MICHAEL OLADELE
Address: Number 34, Salawe Street, Off loveall Street, Ikosi, Ketu, Lagos;
Email: dele_olafare@yahoo.com; Gender: Male; Tel: 08136065952, 08179030950;
State Of Origin: Osun; Marital Status: Single
EXECUTIVE PROFILE
A civil engineer, project supervisor in possession of 7 years technical and administrative skills
and experience in building construction and Engineering activities from inception to completion.
Key responsibilities includes; contributing positively to organizational policy in a merit driven
working environment with focus on the environment impacts, social well- being and financial
bottom lines.
AREAS OF EXPERTISES
 Construction project supervision and administration.
 Project planning, documentation, and implementation.
 Infrastructure improvement projects.
 Civil/ structural engineering design.
 Cost estimation / item scheduling on project.
 Computer usage (Ms office suites, Ms project, autoCAD, ORION, SCALES, RCC).
EDUCATIONAL BACKGROUND
YEAR INSTITUTION DISCIPLINE GRADE
2014- Till Date University of Lagos MSc, Civil Engineering In View
(Structure Option)
2004 -2009 LadokeAkintola University Of B. TECH, 2nd
Class Upper
Technology, Ogbomoso, Civil engineering
Oyo State.
1996 -2001 Scottfield InternationalSecondary Senior Secondary School
School,Festac Town, Lagos. Certificate (SSCE)
EMPLOYMENT HISTORY.
YEAR ORGANISATION ROLE
March 2016-Till date Carian Ltd, The Ashers, Plot 24, Project Engineer
Admiralty Way, Lekki Phase 1, Lagos.
A- IOG PROPERTIES (A Four Storey Building With Six Numbers of Three Bedroom
Flat, a Four Bedroom Maisonette, a Swimming Pool And a Gym, And it’s Located
at MOJISOLA ONIKOYI STR, OFF BANANA ROAD, IKOYI, LAGOS STATE).
B- LATIN SQUARE PROPERTIES (A 3 Storey Building With Four Numbers of
Four Bedroom Maisonette, With a Swimming Pool And a Gym)
 Supervising the site engineers to ensure the adequate Setting out of pilecap points to
accommodate the existing piles on ground and also the columns as specified in the
structural drawing.
 Vetting the bending schedules issued to the steel fixers by the site engineers so as to
conform to what was given by the structural consultant.
 Ensuring that all sub-contractors meet up with the desired quality of work and on time
delivery.
 Vet all structural, architectural and “M&E’’ drawings meant for the construction works.
 Manage project scope and escalate any issues where necessary.
 Ensure that all services (M&E) are being put in place as specified before any concreting
works.
 Supervision of finishing works on both site.
 Monitor and report on project progress and performance and provide status report to the
project sponsors and developers.
 Ensure proper documentation of project related documents.
EMPLOYMENT HISTORY.
YEAR ORGANISATION ROLE
April 2015- Feb 2016 Dutum Company Ltd, 1st
Floor, Gwandal Construction Engineer
Center, Coree Bay Cresent, Near EFCC HQ
Wuse 11, Abuja
HARROW PARK ART HOTEL (A Pentagonal, Irregular Shaped ongoing 6 storey
building Hotel with building area of about 891m2
, 46 luxury bedrooms and a swimming
pool at the roof top and its located directly opposite CITY OF DAVID CHURCH , V.I,
LAGOS STATE)
 Setting out of pilecap points to accommodate the existing piles on ground.
 Setting out of column as specified in the structural drawing.
 Issuing of bending schedules to steel fixers as specified in the drawing.
 Supervision of all sub-contractors to ensure quality control and on time delivery.
 Vet all structural, architectural and “M&E’’ drawings meant for the construction works.
 Manage project scope and escalate any issues where necessary.
 Ensure that all services (M&E) are being put in place as specified before any concreting
works.
 Monitor and report on project progress and performance and provide status report to the
project sponsors and developers.
 Ensure proper documentation of project related documents.
 Prepare and attend bi-weekly meetings with all stake holders as related to the project.
YEAR ORGANISATION ROLE
May 2012 – Dec 2014 Primewaterview Limited, 185B MoshoodOlugbani, Project supervisor
OffLigali, Ayorinde, Victoria Island, Lagos.
Primewaterview Gardens 2, Ikate, Lekki.348 Units (24units of 5Bed penthouses, 8units of 5
Bed- semi-detached duplexes and 316units of 3Bed) residential apartment.
 Issuing milestones, milestone evaluation report, drawing updates and mile stone
certificates.
 Examining, reviewing contractors work programme
 Supervision and co-ordination of all site works including bi-monthly formal site and
technical meetings.
 Conduct building inspections for quality control and assurance programs, reporting
findings including quality standard, all health and safety checks are adhered to.
YEAR ORGANISATION ROLE
June 2012 – Dec 2013 Primewaterview Limited, 185B MoshoodOlugbani, Project supervisor
OffLigali, Ayorinde, Victoria Island, Lagos.
Ajiran Mews, Agungi, Lekki. 17 units ( 8unit of 5bed terrace flats, 9units of 3bed block of flats
all with BQ) residential apartment.
 Supervision and co-ordination of all site works.
 Monitor and report on project progress and performance and provide status reports to the
project steering andsenior management.
 Manage project scope and escalate any issues where necessary.
 Examining, reviewing contractors work programme.
 Ensure that delivery based on milestone are being adhered to.
 Checking of all structural elements during construction works.
Others general responsibilities include.
 Supervision of all civil works from inception to completion.
 Preparation of work program using Microsoft project.
 Conduct building inspections for quality control and assurance programs, reporting
findings including quality standard, all health and safety checks are adhered.
 Make site inspections to check progress and ensure that project is run according to
specific standards within the agreed timescale and within budget.
 Coordinate and plan the schedule of construction materials procurement and allocation.
 Prepare workdone valuations, issue certificate of payments and reconciliation of account
carried out monthly as agreed with contractors and consultants.
YEAR ORGANISATION ROLE
Jan 2012 – May 2012 Alpha pride limited, 2nd
floor, Rear wing, Fly (Site Engineer)
Bond (suit A1) oshopey Plaza, Allen Avenue,
Ikeja.
Proposed construction of caring heart Mega schools at Ode- irele, Ore &Odigbo, ONDO
STATE.
 Setting out of buildings (at the 3sites) to located the edges of buildings as specified by
the drawing.
 Supervision of construction work to ensure ontime delivery and quality control.
 Ensuring that all site rules (including health and safety) are being adhered to.
 Carrying out of Bar bending and other building materials schedule to ensure that the
exact quantity of materials needed for construction are being provided for.
 Issuing of payment to sub-contractors.
 Report on progress of work and also provide status of work report to the management.
YEAR ORGANISATION ROLE
July 2011 – Dec 2011 Structures construction company, Suit 41 (Site Engineer)
Ikorodu Crecent, Dolphin estate, Lagos
Proposed 5unit (3bed each all with BQs and a central swimming pool) residential flat located at
elf bus stop, lekki phase 1.
 Supervision of construction work to ensure ontime delivery and quality control.
 Report on progress of work and also provide status of work report to the management.
 Issuing of payment to sub-contractors.
YEAR ORGANISATION ROLE
July 2010 – June 2011 Sokoto Rima River Basin And Rural DevAuth (Civil Engineer)
(SRRBRDA), JibiaL.g, katsina state.
(NYSC programme).
Existing Dam for irrigation purpose.
 Assist in the maintenance of mechanized tools.
 Supervision of the construction of residential buildings for staffs.
ACCOMPLISHMENTS
 Reduction in the cost of construction.
 Ensure quality control.
 Execution of building projects from inception to completion.
 Coordinate adequate and perfect working relationship among all stakeholders in the project.
 Meeting objectives and target mapped out for various tasks.
 Getting deliverables on time and within the budget.
CORE SKILLS:
 Proficient in the use of micro soft applications such as, MS Word, Excel, MS Project and
MS Power point.
 Ability to do Structural design and detailings using “ORION, SCALES, RCC and
AUTOCAD”.
 Ability to study, interpret and apply detailed drawing as specified on site.
 Ability to supervise individuals and groups to the completion of tasks.
 Good communication skills.
 Organizational and problem solving skills.
 Ability to adapt to changes in the organization.
INTEREST
To contribute positively to organizational policy in a merit driven working environment while
improving on my personal skill.
HOBBIES:
Reading, Meeting people, Traveling, And Watching Sports.
REFREES
Available upon request

Contenu connexe

Tendances (20)

Resume - Senior Projects Planner / Schedule
Resume - Senior Projects Planner / ScheduleResume - Senior Projects Planner / Schedule
Resume - Senior Projects Planner / Schedule
 
CV-R.B.Guinir Jr.(01-15-17)
CV-R.B.Guinir Jr.(01-15-17)CV-R.B.Guinir Jr.(01-15-17)
CV-R.B.Guinir Jr.(01-15-17)
 
J hay resume final com pm 2016 v dp
J hay resume final com pm 2016 v dpJ hay resume final com pm 2016 v dp
J hay resume final com pm 2016 v dp
 
J hay resume final com pm 2016 v dp
J hay resume final com pm 2016 v dpJ hay resume final com pm 2016 v dp
J hay resume final com pm 2016 v dp
 
aravind ..
aravind ..aravind ..
aravind ..
 
Engr._Fahad_CV[1]
Engr._Fahad_CV[1]Engr._Fahad_CV[1]
Engr._Fahad_CV[1]
 
CV OF MVV
CV OF MVVCV OF MVV
CV OF MVV
 
Remi Lumbo_12082016
Remi Lumbo_12082016Remi Lumbo_12082016
Remi Lumbo_12082016
 
Fady samir cv
Fady samir cvFady samir cv
Fady samir cv
 
Muneer CV 2016
Muneer CV 2016Muneer CV 2016
Muneer CV 2016
 
Engr. Sikandar_resume
Engr. Sikandar_resumeEngr. Sikandar_resume
Engr. Sikandar_resume
 
Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)
 
Amulya Gupta CV
Amulya Gupta CVAmulya Gupta CV
Amulya Gupta CV
 
CV_JomarDuyao
CV_JomarDuyaoCV_JomarDuyao
CV_JomarDuyao
 
Mostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cvMostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cv
 
Resume
ResumeResume
Resume
 
AMJATH-PLANNER CV
AMJATH-PLANNER CVAMJATH-PLANNER CV
AMJATH-PLANNER CV
 
Che Abdul Roni Bin Mustafa
Che Abdul Roni Bin MustafaChe Abdul Roni Bin Mustafa
Che Abdul Roni Bin Mustafa
 
Ahmed Darandari CV..
Ahmed Darandari CV..Ahmed Darandari CV..
Ahmed Darandari CV..
 
Oberoi Hotel
Oberoi HotelOberoi Hotel
Oberoi Hotel
 

En vedette

Samples 217 copy
Samples 217 copySamples 217 copy
Samples 217 copyRon Dahl
 
Reunión padres de familia 2017
Reunión padres de familia 2017Reunión padres de familia 2017
Reunión padres de familia 2017paola aguirre
 
Guías pedagógicas para la convivencia escolar, ley 1620 de 2013
Guías pedagógicas para la convivencia escolar, ley 1620 de 2013Guías pedagógicas para la convivencia escolar, ley 1620 de 2013
Guías pedagógicas para la convivencia escolar, ley 1620 de 2013Ektwr1982
 
Copy of CURRICULUM VITAE1
Copy of CURRICULUM VITAE1Copy of CURRICULUM VITAE1
Copy of CURRICULUM VITAE1pranav jaiswal
 
Geometria 7aa
Geometria 7aaGeometria 7aa
Geometria 7aagabjor
 
Gulotta_Wright_Parisi_FinalProjectOverview1
Gulotta_Wright_Parisi_FinalProjectOverview1Gulotta_Wright_Parisi_FinalProjectOverview1
Gulotta_Wright_Parisi_FinalProjectOverview1Nicholas Parisi
 
Konduksi panas dengan sumber panas nuklir
Konduksi panas dengan sumber panas nuklirKonduksi panas dengan sumber panas nuklir
Konduksi panas dengan sumber panas nuklirMichael Situmorang
 
Pp nomor 66 tahun 2015 (pp66 2015pjl)
Pp nomor 66 tahun 2015 (pp66 2015pjl)Pp nomor 66 tahun 2015 (pp66 2015pjl)
Pp nomor 66 tahun 2015 (pp66 2015pjl)Yosep Yosep
 
Administración de la función informática
Administración de la función informática Administración de la función informática
Administración de la función informática marcelino garcia
 
Har du provat den där Galna Wrapgrejen?
Har du provat den där Galna Wrapgrejen?Har du provat den där Galna Wrapgrejen?
Har du provat den där Galna Wrapgrejen?Jens Byström
 
Best psychic medium in Oakland County
Best psychic medium in Oakland CountyBest psychic medium in Oakland County
Best psychic medium in Oakland Countyjohnplayer120
 
Cómo se mide el diodo condensador y cable de poder
Cómo se mide el diodo condensador y cable de poderCómo se mide el diodo condensador y cable de poder
Cómo se mide el diodo condensador y cable de poderJajo Hernandez
 

En vedette (20)

Samples 217 copy
Samples 217 copySamples 217 copy
Samples 217 copy
 
Reunión padres de familia 2017
Reunión padres de familia 2017Reunión padres de familia 2017
Reunión padres de familia 2017
 
Guías pedagógicas para la convivencia escolar, ley 1620 de 2013
Guías pedagógicas para la convivencia escolar, ley 1620 de 2013Guías pedagógicas para la convivencia escolar, ley 1620 de 2013
Guías pedagógicas para la convivencia escolar, ley 1620 de 2013
 
06 11 2015
06 11 201506 11 2015
06 11 2015
 
Khutbah jumat
Khutbah jumatKhutbah jumat
Khutbah jumat
 
Copy of CURRICULUM VITAE1
Copy of CURRICULUM VITAE1Copy of CURRICULUM VITAE1
Copy of CURRICULUM VITAE1
 
Geometria 7aa
Geometria 7aaGeometria 7aa
Geometria 7aa
 
Group4part2
Group4part2Group4part2
Group4part2
 
Gulotta_Wright_Parisi_FinalProjectOverview1
Gulotta_Wright_Parisi_FinalProjectOverview1Gulotta_Wright_Parisi_FinalProjectOverview1
Gulotta_Wright_Parisi_FinalProjectOverview1
 
Konduksi panas dengan sumber panas nuklir
Konduksi panas dengan sumber panas nuklirKonduksi panas dengan sumber panas nuklir
Konduksi panas dengan sumber panas nuklir
 
Awards
AwardsAwards
Awards
 
Pp nomor 66 tahun 2015 (pp66 2015pjl)
Pp nomor 66 tahun 2015 (pp66 2015pjl)Pp nomor 66 tahun 2015 (pp66 2015pjl)
Pp nomor 66 tahun 2015 (pp66 2015pjl)
 
Administración de la función informática
Administración de la función informática Administración de la función informática
Administración de la función informática
 
Har du provat den där Galna Wrapgrejen?
Har du provat den där Galna Wrapgrejen?Har du provat den där Galna Wrapgrejen?
Har du provat den där Galna Wrapgrejen?
 
Best psychic medium in Oakland County
Best psychic medium in Oakland CountyBest psychic medium in Oakland County
Best psychic medium in Oakland County
 
IV International scientific conference September 19, 2015
IV International scientific conference September 19, 2015IV International scientific conference September 19, 2015
IV International scientific conference September 19, 2015
 
Cómo se mide el diodo condensador y cable de poder
Cómo se mide el diodo condensador y cable de poderCómo se mide el diodo condensador y cable de poder
Cómo se mide el diodo condensador y cable de poder
 
Recommender Systems
Recommender SystemsRecommender Systems
Recommender Systems
 
Research Thesis
Research ThesisResearch Thesis
Research Thesis
 
Mean cat videos
Mean cat videosMean cat videos
Mean cat videos
 

Similaire à olafare michael CV2

Similaire à olafare michael CV2 (20)

Engr Nuhu Solomon Updated CV v1
Engr Nuhu Solomon Updated CV v1Engr Nuhu Solomon Updated CV v1
Engr Nuhu Solomon Updated CV v1
 
NEW NWAOBI DAVID RESUME FOR 2015
NEW NWAOBI DAVID RESUME FOR 2015NEW NWAOBI DAVID RESUME FOR 2015
NEW NWAOBI DAVID RESUME FOR 2015
 
EDOZIE GODWIN M.
EDOZIE GODWIN M.EDOZIE GODWIN M.
EDOZIE GODWIN M.
 
CV Updated 2
CV Updated 2CV Updated 2
CV Updated 2
 
Mohamed abdelaziz c.v.
Mohamed abdelaziz c.v.Mohamed abdelaziz c.v.
Mohamed abdelaziz c.v.
 
Rehan CV
Rehan CVRehan CV
Rehan CV
 
CV AMINUL 19-05-2015
CV AMINUL 19-05-2015CV AMINUL 19-05-2015
CV AMINUL 19-05-2015
 
CV-Essam Saadeh
CV-Essam SaadehCV-Essam Saadeh
CV-Essam Saadeh
 
Amer Kallas resume ,Civil Engineer
Amer Kallas resume ,Civil EngineerAmer Kallas resume ,Civil Engineer
Amer Kallas resume ,Civil Engineer
 
Harley's cv
Harley's  cvHarley's  cv
Harley's cv
 
Harley's cv
Harley's  cvHarley's  cv
Harley's cv
 
PROFESSIONAL EXPERIENCE
PROFESSIONAL EXPERIENCEPROFESSIONAL EXPERIENCE
PROFESSIONAL EXPERIENCE
 
Aromal_CV.PDF
Aromal_CV.PDFAromal_CV.PDF
Aromal_CV.PDF
 
Pankaj Resume - Construction Project Manager
Pankaj Resume - Construction Project ManagerPankaj Resume - Construction Project Manager
Pankaj Resume - Construction Project Manager
 
CV (1)
CV (1)CV (1)
CV (1)
 
Updated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKHUpdated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKH
 
Sami resume new
Sami resume newSami resume new
Sami resume new
 
ENGINEERING PROJECTS 1
ENGINEERING PROJECTS 1ENGINEERING PROJECTS 1
ENGINEERING PROJECTS 1
 
Engr ilyas cv new
Engr ilyas cv newEngr ilyas cv new
Engr ilyas cv new
 
Chee Wong - CV DEC2016
Chee Wong - CV DEC2016Chee Wong - CV DEC2016
Chee Wong - CV DEC2016
 

olafare michael CV2

  • 1. OLAFARE MICHAEL OLADELE Address: Number 34, Salawe Street, Off loveall Street, Ikosi, Ketu, Lagos; Email: dele_olafare@yahoo.com; Gender: Male; Tel: 08136065952, 08179030950; State Of Origin: Osun; Marital Status: Single EXECUTIVE PROFILE A civil engineer, project supervisor in possession of 7 years technical and administrative skills and experience in building construction and Engineering activities from inception to completion. Key responsibilities includes; contributing positively to organizational policy in a merit driven working environment with focus on the environment impacts, social well- being and financial bottom lines. AREAS OF EXPERTISES  Construction project supervision and administration.  Project planning, documentation, and implementation.  Infrastructure improvement projects.  Civil/ structural engineering design.  Cost estimation / item scheduling on project.  Computer usage (Ms office suites, Ms project, autoCAD, ORION, SCALES, RCC). EDUCATIONAL BACKGROUND YEAR INSTITUTION DISCIPLINE GRADE 2014- Till Date University of Lagos MSc, Civil Engineering In View (Structure Option) 2004 -2009 LadokeAkintola University Of B. TECH, 2nd Class Upper Technology, Ogbomoso, Civil engineering Oyo State. 1996 -2001 Scottfield InternationalSecondary Senior Secondary School School,Festac Town, Lagos. Certificate (SSCE)
  • 2. EMPLOYMENT HISTORY. YEAR ORGANISATION ROLE March 2016-Till date Carian Ltd, The Ashers, Plot 24, Project Engineer Admiralty Way, Lekki Phase 1, Lagos. A- IOG PROPERTIES (A Four Storey Building With Six Numbers of Three Bedroom Flat, a Four Bedroom Maisonette, a Swimming Pool And a Gym, And it’s Located at MOJISOLA ONIKOYI STR, OFF BANANA ROAD, IKOYI, LAGOS STATE). B- LATIN SQUARE PROPERTIES (A 3 Storey Building With Four Numbers of Four Bedroom Maisonette, With a Swimming Pool And a Gym)  Supervising the site engineers to ensure the adequate Setting out of pilecap points to accommodate the existing piles on ground and also the columns as specified in the structural drawing.  Vetting the bending schedules issued to the steel fixers by the site engineers so as to conform to what was given by the structural consultant.  Ensuring that all sub-contractors meet up with the desired quality of work and on time delivery.  Vet all structural, architectural and “M&E’’ drawings meant for the construction works.  Manage project scope and escalate any issues where necessary.  Ensure that all services (M&E) are being put in place as specified before any concreting works.  Supervision of finishing works on both site.  Monitor and report on project progress and performance and provide status report to the project sponsors and developers.  Ensure proper documentation of project related documents.
  • 3. EMPLOYMENT HISTORY. YEAR ORGANISATION ROLE April 2015- Feb 2016 Dutum Company Ltd, 1st Floor, Gwandal Construction Engineer Center, Coree Bay Cresent, Near EFCC HQ Wuse 11, Abuja HARROW PARK ART HOTEL (A Pentagonal, Irregular Shaped ongoing 6 storey building Hotel with building area of about 891m2 , 46 luxury bedrooms and a swimming pool at the roof top and its located directly opposite CITY OF DAVID CHURCH , V.I, LAGOS STATE)  Setting out of pilecap points to accommodate the existing piles on ground.  Setting out of column as specified in the structural drawing.  Issuing of bending schedules to steel fixers as specified in the drawing.  Supervision of all sub-contractors to ensure quality control and on time delivery.  Vet all structural, architectural and “M&E’’ drawings meant for the construction works.  Manage project scope and escalate any issues where necessary.  Ensure that all services (M&E) are being put in place as specified before any concreting works.  Monitor and report on project progress and performance and provide status report to the project sponsors and developers.  Ensure proper documentation of project related documents.  Prepare and attend bi-weekly meetings with all stake holders as related to the project. YEAR ORGANISATION ROLE May 2012 – Dec 2014 Primewaterview Limited, 185B MoshoodOlugbani, Project supervisor OffLigali, Ayorinde, Victoria Island, Lagos. Primewaterview Gardens 2, Ikate, Lekki.348 Units (24units of 5Bed penthouses, 8units of 5 Bed- semi-detached duplexes and 316units of 3Bed) residential apartment.  Issuing milestones, milestone evaluation report, drawing updates and mile stone certificates.  Examining, reviewing contractors work programme  Supervision and co-ordination of all site works including bi-monthly formal site and technical meetings.  Conduct building inspections for quality control and assurance programs, reporting findings including quality standard, all health and safety checks are adhered to.
  • 4. YEAR ORGANISATION ROLE June 2012 – Dec 2013 Primewaterview Limited, 185B MoshoodOlugbani, Project supervisor OffLigali, Ayorinde, Victoria Island, Lagos. Ajiran Mews, Agungi, Lekki. 17 units ( 8unit of 5bed terrace flats, 9units of 3bed block of flats all with BQ) residential apartment.  Supervision and co-ordination of all site works.  Monitor and report on project progress and performance and provide status reports to the project steering andsenior management.  Manage project scope and escalate any issues where necessary.  Examining, reviewing contractors work programme.  Ensure that delivery based on milestone are being adhered to.  Checking of all structural elements during construction works. Others general responsibilities include.  Supervision of all civil works from inception to completion.  Preparation of work program using Microsoft project.  Conduct building inspections for quality control and assurance programs, reporting findings including quality standard, all health and safety checks are adhered.  Make site inspections to check progress and ensure that project is run according to specific standards within the agreed timescale and within budget.  Coordinate and plan the schedule of construction materials procurement and allocation.  Prepare workdone valuations, issue certificate of payments and reconciliation of account carried out monthly as agreed with contractors and consultants. YEAR ORGANISATION ROLE Jan 2012 – May 2012 Alpha pride limited, 2nd floor, Rear wing, Fly (Site Engineer) Bond (suit A1) oshopey Plaza, Allen Avenue, Ikeja. Proposed construction of caring heart Mega schools at Ode- irele, Ore &Odigbo, ONDO STATE.  Setting out of buildings (at the 3sites) to located the edges of buildings as specified by the drawing.  Supervision of construction work to ensure ontime delivery and quality control.  Ensuring that all site rules (including health and safety) are being adhered to.  Carrying out of Bar bending and other building materials schedule to ensure that the exact quantity of materials needed for construction are being provided for.  Issuing of payment to sub-contractors.
  • 5.  Report on progress of work and also provide status of work report to the management. YEAR ORGANISATION ROLE July 2011 – Dec 2011 Structures construction company, Suit 41 (Site Engineer) Ikorodu Crecent, Dolphin estate, Lagos Proposed 5unit (3bed each all with BQs and a central swimming pool) residential flat located at elf bus stop, lekki phase 1.  Supervision of construction work to ensure ontime delivery and quality control.  Report on progress of work and also provide status of work report to the management.  Issuing of payment to sub-contractors. YEAR ORGANISATION ROLE July 2010 – June 2011 Sokoto Rima River Basin And Rural DevAuth (Civil Engineer) (SRRBRDA), JibiaL.g, katsina state. (NYSC programme). Existing Dam for irrigation purpose.  Assist in the maintenance of mechanized tools.  Supervision of the construction of residential buildings for staffs. ACCOMPLISHMENTS  Reduction in the cost of construction.  Ensure quality control.  Execution of building projects from inception to completion.  Coordinate adequate and perfect working relationship among all stakeholders in the project.  Meeting objectives and target mapped out for various tasks.  Getting deliverables on time and within the budget.
  • 6. CORE SKILLS:  Proficient in the use of micro soft applications such as, MS Word, Excel, MS Project and MS Power point.  Ability to do Structural design and detailings using “ORION, SCALES, RCC and AUTOCAD”.  Ability to study, interpret and apply detailed drawing as specified on site.  Ability to supervise individuals and groups to the completion of tasks.  Good communication skills.  Organizational and problem solving skills.  Ability to adapt to changes in the organization. INTEREST To contribute positively to organizational policy in a merit driven working environment while improving on my personal skill. HOBBIES: Reading, Meeting people, Traveling, And Watching Sports. REFREES Available upon request