Why Rate Buildings ?
Buildings consume:
1.    40% Energy.....
2.    42% Water.......
3.    50% Raw materials …




(TERI Griha Manual Vol.1)
Building Activity contributes to :
1. 50% Air Pollution......
2. 42% Green House Gas....
3. 50% Water Pollution......
4. 48% Solid Waste Generated....
5. 50% CFC.....
We Architects and Engineers
Seem like some “Villains”.... :(
Following “Ratings” will make us less of so.. :):)

Ratings – evaluation Tool for Ecological
 Perfomance through Life Cycle of a Building..
Ratings- What do they do?
1. Look at various parameters of
a)Design....b) Construction...c) Operation
2.Criterion with assigned Points
3.A project gets points...points add up...
4.Voluntary in nature...
Some other rating systems:
BREEAM:Building Establishments
 Environmental Assessment Method.
One of the earliest developed in 1990 in UK.



CASBEE: Comprehensive Assessment System
 for Building Environment Efficiency.
Developed in Japan 2001.
GB Tools: Green Building Tools developed by
 International Framework committee of 25
 countries . Developed in 1998 and constantly
 updated

HK BEAM: Developed in1996 in Hong Kong

LEED: Leadership in Energy and Environmental
  Design developed in US 1998.
GRIHA




Green Rating for Integrated Habitat Assessment.
 Developed by TERI and endorsed by MNRE.
Salient points
GRIHA has been developed for the different
 agro-climatic Zones of India.

Developed particularly for non-ac spaces or
 partially ac building.

Evaluators are experts from different fields
 connected to the buildings and are from
 specific region where the building is situated
Stresses on optimization of visual and thermal
 indoor comfort.

Integrates all relevant Indian Codes and
  Standards to act as tools for implementation
Emphasis:
 Minimise -
-resource consumption
-waste generation
-overall ecological impact
 By Five R philosophy-

-Refuse
-Reduce
-Reuse
-Recycle
-Reinvent.
Broad categories:
 Site selection and Planning
 Building Planning and Construction

 Building Operation and Maintenance

 Innovation

(34 Criteria---for this presentation 19 criteria
  taken up)
Criterion 2:
Preserve existing Vegetaion/or plant as per
  Griha (1 point)
Proper timing of Construction w.r.t. Rains
  (optional clause no points)
Confine Const. Activity (1 point)
Erosion and sedimentation control (1 pt.)
Preserve topsoil (1 point)
TOTAL 4 POINTS.....
details
Protect by making tree guards
Tree guards to extend beyond the drip line
Detention pond
Do not-----
Do not
Criterion 3:
Soil Conservation:
Very important oft overlooked.
It takes 100 years for 25 mm of soil to form (Griha manual:Vol 2)

In India we have different types of soil, identify
  them, study fertility, pH,saline levls.,
Store it at site...
Avoid carting fertile soil from elsewhere..
Check this site : http://ceds.org/esp.html gives
 vary comprehensively cost incurred when soil
 is left un-conserved.

Involve Landscape Architect from the beginning
  of the design as well as all the time during
  construction.

Total Points -2
Criterion 8:
Health and Well being
.Follow NBC guideline 2005 for safety/sanitation
.Maintain Machinery.
.Signages at appropriate locations
.Provide Safety Equipemnts, fire extinguishres.
.Light for Night work.
.Double earthing for Hand tools.
(Point 1) ...oodles of social points...
Criterion 9:
.Control Air Pollution during Construction
.Clear minimal vegetation where needed.
.Provide hoarding around.
.Veg/Mulch where vehicles do not ply.
.Limit Vehicle movement-speed to10km/hr.
.Hard pave vehicle circulation path.
.Cover/ Enclose all loose materials, dusty loads.
(Points 2)..oodles of economic points...
Criterion 12
.Slag cement uses 1-10% less water.(Griha
  manual Vol.4)
.Employ Moist Curing better still Membrane
  Curing..
.Use Superplaticizers
.Use Precast construction Technology.
.Partitions of Dry walling.

(Points 1)...oodles of ecological points...
Criterion 15
Speaks mainly on----
Utilization of Fly Ash in construction and
Use of Pozzolana Cement



(Points 6)
Criterion 16
.Low Embodied Energy Materials and Methods.

.Pre-stressing/Pre- casting.
.Rat Trap brickwork/ Jali brickwork.
.Stabilized Mud Block
 To name a few....

(Points 4)...oodles of Ecological points...
Walls

             Bricks EE 3(MJ/Kg)
             Concrete block
             EE 0.87(MJ/Kg)


             Plaster EE1.8(MJ/Kg)



             Paint EE67.5(MJ/Kg)                CSEB EE
                                                0.275(MJ/Kg)




Brick wall                          Mud wall.
Criterion 17:

Use of Low energy materials in Interiors.
Though a subject closer to design still Project
  Manager are important players.
.Renewable.
.Use waste products
.Use of waste as raw material in different
  stages.
.Durable/Low-maintenance
.Products which generate min. waste during
  production
Built in furniture
Criterion 20:
Decide on the suitable Waste Water Treatment
  systems.
.Many new ecological systems available:
1.DEWATS
2.SBT.
3.Use of Additives like Bio-sanitizers and EM
Responsibility is to carry out regular wastewater
  treatment testing.
(Points 2)
DEWATS
Soil Bio Technology (SBT)
Criterion 21
Water Recycle and Reuse:
Rainwater Harvesting is its key requirement.
.Need inputs on Rainfall patern.
.Soil type.
.Level of underground water.
.Pollution field.
.Per capita need/ Production need.
.Dual Plumbing

(Points 2)...oodles of ecological/economical points
During Rain,
  Road Drain         Water flow
  Water Diverting    Through the
                     Valley, will be
                     Collected in
                     The open well

through
6” PVC Pipe in to
The open well.       Check Dam
                     Constructed
                     To check the
                     Rain water
Water is collected   & allow the
In the open well &   Water to
Same will be         Percolate into
allowed to           The ground
percolates           To increase
 through the         The Ground
 ground              Water Table.
Criterion 22:
Waste Management:
.Waste reduction during construction:
.Safe disposal of waste within the site—
  achieve/strive for zero debris.
Waste prevention strategy:
.Std. Dimensions.
.Consider using used bldg.materials

(Points1)...oodles of eco logical/economical points
Criterion 23:
Waste Segregation:
.Though a use parameter--
This should be attempted as part of the design
  as well as project management.

(Points1)...oodles of eco logical/economical points
Criterion 24:
Storage and Disposal of waste:

Allocate a separate space where disposal of
  collected waste can happen safely




(Points1)...oodles of eco logical/economical points
Criterion 25:
Resource recovery from waste:

.Waste can be fuel
.Waste can be manure




(Points1)...oodles of eco logical/economical points
Criterion 26:

Use low VOC Paints-
 Strive for
   No Paints
   No sealants

(Points 3)
Criterion 27
Minimize
Ozone depleting
Substances:
Live with Solar
Cycle.
In the design
Introduce courtyards

(Point 1)
Criterion 28
 Ensure Water quality as
per Indian Standards.
.Work with water optimization plan.
.Provide water quality results before and after
  treatment.
.Check quality frequently.

(Points 2)
Criterion 29
 Acceptable outdoor and indoor noise levels.
.Work with Noise reduction/sound transferrability
  coefficients and decide on materials
.Strategies outdoor noise control.
.Reduced use of noise creating equipments
  during construction

(Points 2)
Criterion 30:
Non Smoking Policy



(Point 1)
Criterion 31:
Universal design
Criterion 32/33:
 Energy audit and Validation:
 Energy audit report to be prepared by approved
   auditors of BEE and Govt.Of India.
 (Points 0)
 C33:Building Operation and maintenance:
 Validate and maintain Green performances
 Provide for O and M manuals..
 (Points 2)
Criterion 34:

Innovation:
  Lots to
  consider
  and no
  limit.........
  ...

(Points 4)
Griha presentation. for project managers..

Contenu connexe

Tendances

Certifcation of Building Using GRIHA Rating System
Certifcation of Building Using GRIHA Rating SystemCertifcation of Building Using GRIHA Rating System
Certifcation of Building Using GRIHA Rating System
Sandeep Jain
 
Civil Engineer for Green Buildings
Civil Engineer for Green BuildingsCivil Engineer for Green Buildings
Civil Engineer for Green Buildings
BC Chew
 

Tendances (20)

Green building
Green buildingGreen building
Green building
 
Certifcation of Building Using GRIHA Rating System
Certifcation of Building Using GRIHA Rating SystemCertifcation of Building Using GRIHA Rating System
Certifcation of Building Using GRIHA Rating System
 
Green building vs conventional building
Green building vs conventional buildingGreen building vs conventional building
Green building vs conventional building
 
Green Presentation
Green PresentationGreen Presentation
Green Presentation
 
Civil Engineer for Green Buildings
Civil Engineer for Green BuildingsCivil Engineer for Green Buildings
Civil Engineer for Green Buildings
 
Green building
Green building Green building
Green building
 
RGIA, Hyderabad
RGIA, HyderabadRGIA, Hyderabad
RGIA, Hyderabad
 
Green buildings
Green buildingsGreen buildings
Green buildings
 
Green building presentation
Green building presentationGreen building presentation
Green building presentation
 
Study and analysis of energy rating of real
Study and analysis of energy rating of realStudy and analysis of energy rating of real
Study and analysis of energy rating of real
 
The Green Roundtable Green Residential Case Studies
The Green Roundtable Green Residential Case StudiesThe Green Roundtable Green Residential Case Studies
The Green Roundtable Green Residential Case Studies
 
Green Building in India with Case Study
Green Building in India with Case StudyGreen Building in India with Case Study
Green Building in India with Case Study
 
ITC Green Centre Gurgaon
ITC Green Centre GurgaonITC Green Centre Gurgaon
ITC Green Centre Gurgaon
 
GRIHA RATING SYSTEM
GRIHA RATING SYSTEMGRIHA RATING SYSTEM
GRIHA RATING SYSTEM
 
Green building rating system
Green building rating systemGreen building rating system
Green building rating system
 
Green building prepared eh
Green building prepared ehGreen building prepared eh
Green building prepared eh
 
LEED green buildings
LEED green buildingsLEED green buildings
LEED green buildings
 
Green Building Index
Green Building IndexGreen Building Index
Green Building Index
 
GREEN BUILDING SUZLON PUNE
GREEN BUILDING SUZLON PUNE GREEN BUILDING SUZLON PUNE
GREEN BUILDING SUZLON PUNE
 
Green Buildings
Green BuildingsGreen Buildings
Green Buildings
 

Similaire à Griha presentation. for project managers..

Chapter 5 National Association
Chapter 5 National AssociationChapter 5 National Association
Chapter 5 National Association
Galala University
 

Similaire à Griha presentation. for project managers.. (20)

Energy Conservation Through Green Buildings
Energy Conservation Through Green BuildingsEnergy Conservation Through Green Buildings
Energy Conservation Through Green Buildings
 
Intent: The Real LEED Requirements
Intent: The Real LEED RequirementsIntent: The Real LEED Requirements
Intent: The Real LEED Requirements
 
Kala Bansal.ppt
Kala Bansal.pptKala Bansal.ppt
Kala Bansal.ppt
 
WASTE WATER TREATMENT BY USING INNOVATIVE FILTRATION TECHNIQUE
WASTE WATER TREATMENT BY USING INNOVATIVE FILTRATION TECHNIQUEWASTE WATER TREATMENT BY USING INNOVATIVE FILTRATION TECHNIQUE
WASTE WATER TREATMENT BY USING INNOVATIVE FILTRATION TECHNIQUE
 
Green
GreenGreen
Green
 
Sustainability Assessment in Buildings-A new tool
Sustainability Assessment in Buildings-A new toolSustainability Assessment in Buildings-A new tool
Sustainability Assessment in Buildings-A new tool
 
Green building
Green buildingGreen building
Green building
 
21 business i environment i society mba 2016
21 business i environment i society mba 201621 business i environment i society mba 2016
21 business i environment i society mba 2016
 
L-paper_pulp_mill_case study-ppt (1).ppt
L-paper_pulp_mill_case study-ppt (1).pptL-paper_pulp_mill_case study-ppt (1).ppt
L-paper_pulp_mill_case study-ppt (1).ppt
 
ROR BREEAM Refurbishment Domestic Buildings Presentation 17.05.2013
ROR BREEAM Refurbishment Domestic Buildings Presentation 17.05.2013ROR BREEAM Refurbishment Domestic Buildings Presentation 17.05.2013
ROR BREEAM Refurbishment Domestic Buildings Presentation 17.05.2013
 
Chapter 5 National Association
Chapter 5 National AssociationChapter 5 National Association
Chapter 5 National Association
 
MATERIALS AND RESOURCES
MATERIALS AND RESOURCES MATERIALS AND RESOURCES
MATERIALS AND RESOURCES
 
Sustainable architecture Ch 2 ASTU.pptx
Sustainable architecture Ch 2 ASTU.pptxSustainable architecture Ch 2 ASTU.pptx
Sustainable architecture Ch 2 ASTU.pptx
 
Landfilling
Landfilling Landfilling
Landfilling
 
Build it Green Landscape Points
Build it Green Landscape PointsBuild it Green Landscape Points
Build it Green Landscape Points
 
Sustainable Modifications and Innovations using LEED of a Women University in...
Sustainable Modifications and Innovations using LEED of a Women University in...Sustainable Modifications and Innovations using LEED of a Women University in...
Sustainable Modifications and Innovations using LEED of a Women University in...
 
Capstone Midterm
Capstone MidtermCapstone Midterm
Capstone Midterm
 
II 1 Piet Wens Landfill Life Cycle
II 1 Piet Wens Landfill Life CycleII 1 Piet Wens Landfill Life Cycle
II 1 Piet Wens Landfill Life Cycle
 
1 MLD STP performance evaluation.pdf
1 MLD STP performance evaluation.pdf1 MLD STP performance evaluation.pdf
1 MLD STP performance evaluation.pdf
 
Green building technology
Green building technologyGreen building technology
Green building technology
 

Dernier

Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
vu2urc
 

Dernier (20)

Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 

Griha presentation. for project managers..

  • 1. Why Rate Buildings ? Buildings consume: 1. 40% Energy..... 2. 42% Water....... 3. 50% Raw materials … (TERI Griha Manual Vol.1)
  • 2. Building Activity contributes to : 1. 50% Air Pollution...... 2. 42% Green House Gas.... 3. 50% Water Pollution...... 4. 48% Solid Waste Generated.... 5. 50% CFC.....
  • 3. We Architects and Engineers Seem like some “Villains”.... :( Following “Ratings” will make us less of so.. :):) Ratings – evaluation Tool for Ecological Perfomance through Life Cycle of a Building..
  • 4. Ratings- What do they do? 1. Look at various parameters of a)Design....b) Construction...c) Operation 2.Criterion with assigned Points 3.A project gets points...points add up... 4.Voluntary in nature...
  • 5. Some other rating systems: BREEAM:Building Establishments Environmental Assessment Method. One of the earliest developed in 1990 in UK. CASBEE: Comprehensive Assessment System for Building Environment Efficiency. Developed in Japan 2001.
  • 6. GB Tools: Green Building Tools developed by International Framework committee of 25 countries . Developed in 1998 and constantly updated HK BEAM: Developed in1996 in Hong Kong LEED: Leadership in Energy and Environmental Design developed in US 1998.
  • 7. GRIHA Green Rating for Integrated Habitat Assessment. Developed by TERI and endorsed by MNRE.
  • 8. Salient points GRIHA has been developed for the different agro-climatic Zones of India. Developed particularly for non-ac spaces or partially ac building. Evaluators are experts from different fields connected to the buildings and are from specific region where the building is situated
  • 9. Stresses on optimization of visual and thermal indoor comfort. Integrates all relevant Indian Codes and Standards to act as tools for implementation
  • 10. Emphasis:  Minimise - -resource consumption -waste generation -overall ecological impact  By Five R philosophy- -Refuse -Reduce -Reuse -Recycle -Reinvent.
  • 11. Broad categories:  Site selection and Planning  Building Planning and Construction  Building Operation and Maintenance  Innovation (34 Criteria---for this presentation 19 criteria taken up)
  • 12. Criterion 2: Preserve existing Vegetaion/or plant as per Griha (1 point) Proper timing of Construction w.r.t. Rains (optional clause no points) Confine Const. Activity (1 point) Erosion and sedimentation control (1 pt.) Preserve topsoil (1 point) TOTAL 4 POINTS.....
  • 13.
  • 14. details Protect by making tree guards Tree guards to extend beyond the drip line
  • 18. Criterion 3: Soil Conservation: Very important oft overlooked. It takes 100 years for 25 mm of soil to form (Griha manual:Vol 2) In India we have different types of soil, identify them, study fertility, pH,saline levls., Store it at site... Avoid carting fertile soil from elsewhere..
  • 19.
  • 20. Check this site : http://ceds.org/esp.html gives vary comprehensively cost incurred when soil is left un-conserved. Involve Landscape Architect from the beginning of the design as well as all the time during construction. Total Points -2
  • 21. Criterion 8: Health and Well being .Follow NBC guideline 2005 for safety/sanitation .Maintain Machinery. .Signages at appropriate locations .Provide Safety Equipemnts, fire extinguishres. .Light for Night work. .Double earthing for Hand tools. (Point 1) ...oodles of social points...
  • 22. Criterion 9: .Control Air Pollution during Construction .Clear minimal vegetation where needed. .Provide hoarding around. .Veg/Mulch where vehicles do not ply. .Limit Vehicle movement-speed to10km/hr. .Hard pave vehicle circulation path. .Cover/ Enclose all loose materials, dusty loads. (Points 2)..oodles of economic points...
  • 23.
  • 24. Criterion 12 .Slag cement uses 1-10% less water.(Griha manual Vol.4) .Employ Moist Curing better still Membrane Curing.. .Use Superplaticizers .Use Precast construction Technology. .Partitions of Dry walling. (Points 1)...oodles of ecological points...
  • 25.
  • 26. Criterion 15 Speaks mainly on---- Utilization of Fly Ash in construction and Use of Pozzolana Cement (Points 6)
  • 27. Criterion 16 .Low Embodied Energy Materials and Methods. .Pre-stressing/Pre- casting. .Rat Trap brickwork/ Jali brickwork. .Stabilized Mud Block To name a few.... (Points 4)...oodles of Ecological points...
  • 28. Walls Bricks EE 3(MJ/Kg) Concrete block EE 0.87(MJ/Kg) Plaster EE1.8(MJ/Kg) Paint EE67.5(MJ/Kg) CSEB EE 0.275(MJ/Kg) Brick wall Mud wall.
  • 29.
  • 30.
  • 31. Criterion 17: Use of Low energy materials in Interiors. Though a subject closer to design still Project Manager are important players. .Renewable. .Use waste products .Use of waste as raw material in different stages. .Durable/Low-maintenance .Products which generate min. waste during production
  • 32.
  • 34. Criterion 20: Decide on the suitable Waste Water Treatment systems. .Many new ecological systems available: 1.DEWATS 2.SBT. 3.Use of Additives like Bio-sanitizers and EM Responsibility is to carry out regular wastewater treatment testing. (Points 2)
  • 37. Criterion 21 Water Recycle and Reuse: Rainwater Harvesting is its key requirement. .Need inputs on Rainfall patern. .Soil type. .Level of underground water. .Pollution field. .Per capita need/ Production need. .Dual Plumbing (Points 2)...oodles of ecological/economical points
  • 38.
  • 39. During Rain, Road Drain Water flow Water Diverting Through the Valley, will be Collected in The open well through 6” PVC Pipe in to The open well. Check Dam Constructed To check the Rain water Water is collected & allow the In the open well & Water to Same will be Percolate into allowed to The ground percolates To increase through the The Ground ground Water Table.
  • 40.
  • 41.
  • 42. Criterion 22: Waste Management: .Waste reduction during construction: .Safe disposal of waste within the site— achieve/strive for zero debris. Waste prevention strategy: .Std. Dimensions. .Consider using used bldg.materials (Points1)...oodles of eco logical/economical points
  • 43.
  • 44. Criterion 23: Waste Segregation: .Though a use parameter-- This should be attempted as part of the design as well as project management. (Points1)...oodles of eco logical/economical points
  • 45. Criterion 24: Storage and Disposal of waste: Allocate a separate space where disposal of collected waste can happen safely (Points1)...oodles of eco logical/economical points
  • 46. Criterion 25: Resource recovery from waste: .Waste can be fuel .Waste can be manure (Points1)...oodles of eco logical/economical points
  • 47.
  • 48.
  • 49. Criterion 26: Use low VOC Paints- Strive for No Paints No sealants (Points 3)
  • 50. Criterion 27 Minimize Ozone depleting Substances: Live with Solar Cycle. In the design Introduce courtyards (Point 1)
  • 51. Criterion 28 Ensure Water quality as per Indian Standards. .Work with water optimization plan. .Provide water quality results before and after treatment. .Check quality frequently. (Points 2)
  • 52. Criterion 29 Acceptable outdoor and indoor noise levels. .Work with Noise reduction/sound transferrability coefficients and decide on materials .Strategies outdoor noise control. .Reduced use of noise creating equipments during construction (Points 2)
  • 53. Criterion 30: Non Smoking Policy (Point 1)
  • 55. Criterion 32/33: Energy audit and Validation: Energy audit report to be prepared by approved auditors of BEE and Govt.Of India. (Points 0) C33:Building Operation and maintenance: Validate and maintain Green performances Provide for O and M manuals.. (Points 2)