SlideShare une entreprise Scribd logo
1  sur  2
Télécharger pour lire hors ligne
Maintenance Planning Checklist
Work Request/ Order Documentation

      Is the correct equipment number assigned?
      Is there enough information to understand the scope of work required?
      Are key words used such as Inspect, Replace, Rebuild, Calibrate, etc.?
      Does this Work Order duplicate another already in the system?
      Is the location of the work clearly identified?
      Is the Work Order coding such as Priority and Work Type appropriate?

Job Research

      Has this work been done before? If so, does a reusable job plan already exist?
      If no job plan exists, can parts of other job plans be applied to create a new one if needed?
      Is this job so frequent that Maintenance Engineering attention/ further analysis is warranted?
      Is a trip to the job site required to accurately plan materials, task steps and safety requirements?
      Will a picture or sketch help move the work execution along?

Job Planning

      Basic (utilizes a continuous improvement feedback loop to capture and improve job plan)

              If a comprehensive job plan is not required or timing prohibits development, have the
               crafts, parts and consumables, and estimated times been determined for a minimum job
               plan?
              If multiple crafts are required, have child Work Orders been established?
              If the parts are staged and kitted, is that location identified in the plan?

      Intermediate (Thorough planning or use of a continuous improvement feedback loop on
       repetitive jobs to capture and improve task steps/ materials on each execution)

              Is a separate child Work Order/ notification in place as needed to clean/ empty the
               equipment, purge, blind, isolate, remove insulation, etc. prior to commencing work
               activities?
              Are the work tasks/ steps clearly described in the job plan?
              Are tolerances, clearances, wear measurements, torque, belt tension, and other
               specifications defined?
              Are serialized replacement parts needed? If so, step to capture & validate serial #
               removed/ installed is required.
              Are any special tools/fixtures/ equipment required to execute the job?
              Have the safety procedures and permits been noted on the plan?
   People and Processes, Inc.      PO Box 460    Yulee, FL 32041-0460   (800) 930-4276   (866) 637-9437 Fax
                                                Page 1 of 2
   Are all environmental issues and permits properly addressed in the job plan?
              Is any special technical documentation such as manuals, pictures, or drawings required?
               If so, have they been noted on the job plan?
              Is Engineering assistance required?
              Is housekeeping/ cleanup identified in the plan as a task step?
              Are rebuild-able parts identified and noted for return to the appropriate area on job
               completion and a Work Order written to address the rebuild if a Maintenance function?
              Do any special contact personnel require notification before or on job completion?
              Have other craft planners, as required; been notified of upcoming work to leverage
               downtime?
              Are there any special disposal requirements for removed equipment components?
              What level of testing (laboratory biological sampling/ operations) is required prior to
               equipment return to service and who will be the contact?
              What level of performance testing is needed after work end?
              Are any special activities to be done on work completion prior to releasing the equipment
               to ensure safe operation (vibration readings, NDT control, hydraulic test, sealing test,
               etc.)?

Job Package
Includes the following from the Research and Job Planning activities:

      Job Plan
      Safety and Environmental Permit Forms (Completed if prior approval required)
      Complete Bill of Materials listing
      Pick list of necessary materials and consumables required for this work.
      Equipment history
      Technical specifications, manuals, pictures, and drawings as required




       Check out our training and services at www.peopleandprocesses.com

   People and Processes, Inc.    PO Box 460    Yulee, FL 32041-0460   (800) 930-4276   (866) 637-9437 Fax
                                               Page 2 of 2

Contenu connexe

Tendances

Lec8 maintenance planning and scheduling1
Lec8 maintenance planning and scheduling1Lec8 maintenance planning and scheduling1
Lec8 maintenance planning and scheduling1Maxwell Odira
 
maintenance engineering
maintenance engineeringmaintenance engineering
maintenance engineeringnagoorvali8
 
Introduction to maintenance
Introduction to maintenanceIntroduction to maintenance
Introduction to maintenanceTanveer Hussain
 
Effective Spare Parts Management - 8 rules
Effective Spare Parts Management - 8 rulesEffective Spare Parts Management - 8 rules
Effective Spare Parts Management - 8 rulesLogio_official
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance ManagementVijay325
 
Maintenance Leading and Lagging Key Performance Indicators (KPIs)
Maintenance Leading and Lagging Key Performance Indicators (KPIs)Maintenance Leading and Lagging Key Performance Indicators (KPIs)
Maintenance Leading and Lagging Key Performance Indicators (KPIs)Ricky Smith CMRP
 
Spares criticality assessment methods & equipment overhaul replacementrepairs...
Spares criticality assessment methods & equipment overhaul replacementrepairs...Spares criticality assessment methods & equipment overhaul replacementrepairs...
Spares criticality assessment methods & equipment overhaul replacementrepairs...Amirul Faiz Amil Azman
 
DFMEA: Reduce Design Errors, Time and Cost
DFMEA: Reduce Design Errors, Time and CostDFMEA: Reduce Design Errors, Time and Cost
DFMEA: Reduce Design Errors, Time and CostRicardo Gonzalez Luna
 
Maintenance engineering
Maintenance engineeringMaintenance engineering
Maintenance engineeringAnirudh Goyal
 
Spare Parts Management
Spare Parts ManagementSpare Parts Management
Spare Parts ManagementDavid Inbar
 
Spare parts management
Spare parts managementSpare parts management
Spare parts managementMedha Yadav
 
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCEMAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCElaxtwinsme
 
DFM Design Principles
DFM Design PrinciplesDFM Design Principles
DFM Design PrinciplesNIELITA
 
Maintenance planning systems
Maintenance planning  systemsMaintenance planning  systems
Maintenance planning systemsAnil Mohindru
 

Tendances (20)

Lec8 maintenance planning and scheduling1
Lec8 maintenance planning and scheduling1Lec8 maintenance planning and scheduling1
Lec8 maintenance planning and scheduling1
 
maintenance engineering
maintenance engineeringmaintenance engineering
maintenance engineering
 
Introduction to maintenance
Introduction to maintenanceIntroduction to maintenance
Introduction to maintenance
 
Maintenance strategies
Maintenance strategiesMaintenance strategies
Maintenance strategies
 
Effective Spare Parts Management - 8 rules
Effective Spare Parts Management - 8 rulesEffective Spare Parts Management - 8 rules
Effective Spare Parts Management - 8 rules
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance Management
 
Maintenance Leading and Lagging Key Performance Indicators (KPIs)
Maintenance Leading and Lagging Key Performance Indicators (KPIs)Maintenance Leading and Lagging Key Performance Indicators (KPIs)
Maintenance Leading and Lagging Key Performance Indicators (KPIs)
 
Maintenance cost
Maintenance costMaintenance cost
Maintenance cost
 
Maintenence management
Maintenence managementMaintenence management
Maintenence management
 
Plant Maintenance
Plant MaintenancePlant Maintenance
Plant Maintenance
 
Spares criticality assessment methods & equipment overhaul replacementrepairs...
Spares criticality assessment methods & equipment overhaul replacementrepairs...Spares criticality assessment methods & equipment overhaul replacementrepairs...
Spares criticality assessment methods & equipment overhaul replacementrepairs...
 
DFMEA: Reduce Design Errors, Time and Cost
DFMEA: Reduce Design Errors, Time and CostDFMEA: Reduce Design Errors, Time and Cost
DFMEA: Reduce Design Errors, Time and Cost
 
Maintenance engineering
Maintenance engineeringMaintenance engineering
Maintenance engineering
 
TPM: Planned Maintenance
TPM: Planned MaintenanceTPM: Planned Maintenance
TPM: Planned Maintenance
 
Spare Parts Management
Spare Parts ManagementSpare Parts Management
Spare Parts Management
 
Spare parts management
Spare parts managementSpare parts management
Spare parts management
 
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCEMAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
 
DFM Design Principles
DFM Design PrinciplesDFM Design Principles
DFM Design Principles
 
Maintenance planning systems
Maintenance planning  systemsMaintenance planning  systems
Maintenance planning systems
 
Kaizen
KaizenKaizen
Kaizen
 

Similaire à Maintenance Planning Checklist

Healthcare facility design stat consultants
Healthcare facility design stat consultantsHealthcare facility design stat consultants
Healthcare facility design stat consultantsArun Sebastian
 
Healthcare facility design
Healthcare facility designHealthcare facility design
Healthcare facility designArun Sebastian
 
Maintenance Management Process
Maintenance Management ProcessMaintenance Management Process
Maintenance Management ProcessPIPINAZRIN
 
Erp implementation checklist
Erp implementation checklistErp implementation checklist
Erp implementation checklistMitch Rushing
 
Business continuity plan
Business continuity planBusiness continuity plan
Business continuity planzaffar abbasi
 
Business continuity plan
Business continuity planBusiness continuity plan
Business continuity planWBDC of Florida
 
Gary Hayashi Resume 2016_05_23
Gary Hayashi Resume 2016_05_23Gary Hayashi Resume 2016_05_23
Gary Hayashi Resume 2016_05_23Gary Hayashi
 
Electronic Controls Engineer
Electronic Controls EngineerElectronic Controls Engineer
Electronic Controls EngineerRonald Ehrhardt
 
Tool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and SchedulingTool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and SchedulingRicky Smith CMRP, CMRT
 
Energy Consulting SDVOSB DOE Experience
Energy Consulting SDVOSB DOE ExperienceEnergy Consulting SDVOSB DOE Experience
Energy Consulting SDVOSB DOE ExperienceLink Resources
 
Energy Consulting SDVOSB DOE Experience
Energy Consulting SDVOSB  DOE ExperienceEnergy Consulting SDVOSB  DOE Experience
Energy Consulting SDVOSB DOE Experiencegasanden
 
Energy Consulting SDVOSB DOE Experience
Energy Consulting SDVOSB  DOE ExperienceEnergy Consulting SDVOSB  DOE Experience
Energy Consulting SDVOSB DOE Experiencenatalyabelmont
 
Gentile Consulting
Gentile ConsultingGentile Consulting
Gentile Consultingcgentile
 

Similaire à Maintenance Planning Checklist (20)

Healthcare facility design stat consultants
Healthcare facility design stat consultantsHealthcare facility design stat consultants
Healthcare facility design stat consultants
 
Healthcare facility design
Healthcare facility designHealthcare facility design
Healthcare facility design
 
Maintenance Management Process
Maintenance Management ProcessMaintenance Management Process
Maintenance Management Process
 
Kit Capangpangan
Kit CapangpanganKit Capangpangan
Kit Capangpangan
 
Viziya
Viziya Viziya
Viziya
 
Pangan_Jefferson_CV
Pangan_Jefferson_CVPangan_Jefferson_CV
Pangan_Jefferson_CV
 
Pangan_Jefferson_CV
Pangan_Jefferson_CVPangan_Jefferson_CV
Pangan_Jefferson_CV
 
RAOUF CURRICULUM VITAE 2016 Oil & Gas
RAOUF CURRICULUM VITAE 2016 Oil & GasRAOUF CURRICULUM VITAE 2016 Oil & Gas
RAOUF CURRICULUM VITAE 2016 Oil & Gas
 
Erp implementation checklist
Erp implementation checklistErp implementation checklist
Erp implementation checklist
 
Business continuity plan
Business continuity planBusiness continuity plan
Business continuity plan
 
Business continuity plan
Business continuity planBusiness continuity plan
Business continuity plan
 
Oasize llnl
Oasize llnlOasize llnl
Oasize llnl
 
Gary Hayashi Resume 2016_05_23
Gary Hayashi Resume 2016_05_23Gary Hayashi Resume 2016_05_23
Gary Hayashi Resume 2016_05_23
 
Electronic Controls Engineer
Electronic Controls EngineerElectronic Controls Engineer
Electronic Controls Engineer
 
Industrial Machines Maintenance
Industrial Machines MaintenanceIndustrial Machines Maintenance
Industrial Machines Maintenance
 
Tool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and SchedulingTool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and Scheduling
 
Energy Consulting SDVOSB DOE Experience
Energy Consulting SDVOSB DOE ExperienceEnergy Consulting SDVOSB DOE Experience
Energy Consulting SDVOSB DOE Experience
 
Energy Consulting SDVOSB DOE Experience
Energy Consulting SDVOSB  DOE ExperienceEnergy Consulting SDVOSB  DOE Experience
Energy Consulting SDVOSB DOE Experience
 
Energy Consulting SDVOSB DOE Experience
Energy Consulting SDVOSB  DOE ExperienceEnergy Consulting SDVOSB  DOE Experience
Energy Consulting SDVOSB DOE Experience
 
Gentile Consulting
Gentile ConsultingGentile Consulting
Gentile Consulting
 

Maintenance Planning Checklist

  • 1. Maintenance Planning Checklist Work Request/ Order Documentation  Is the correct equipment number assigned?  Is there enough information to understand the scope of work required?  Are key words used such as Inspect, Replace, Rebuild, Calibrate, etc.?  Does this Work Order duplicate another already in the system?  Is the location of the work clearly identified?  Is the Work Order coding such as Priority and Work Type appropriate? Job Research  Has this work been done before? If so, does a reusable job plan already exist?  If no job plan exists, can parts of other job plans be applied to create a new one if needed?  Is this job so frequent that Maintenance Engineering attention/ further analysis is warranted?  Is a trip to the job site required to accurately plan materials, task steps and safety requirements?  Will a picture or sketch help move the work execution along? Job Planning  Basic (utilizes a continuous improvement feedback loop to capture and improve job plan)  If a comprehensive job plan is not required or timing prohibits development, have the crafts, parts and consumables, and estimated times been determined for a minimum job plan?  If multiple crafts are required, have child Work Orders been established?  If the parts are staged and kitted, is that location identified in the plan?  Intermediate (Thorough planning or use of a continuous improvement feedback loop on repetitive jobs to capture and improve task steps/ materials on each execution)  Is a separate child Work Order/ notification in place as needed to clean/ empty the equipment, purge, blind, isolate, remove insulation, etc. prior to commencing work activities?  Are the work tasks/ steps clearly described in the job plan?  Are tolerances, clearances, wear measurements, torque, belt tension, and other specifications defined?  Are serialized replacement parts needed? If so, step to capture & validate serial # removed/ installed is required.  Are any special tools/fixtures/ equipment required to execute the job?  Have the safety procedures and permits been noted on the plan? People and Processes, Inc. PO Box 460 Yulee, FL 32041-0460 (800) 930-4276 (866) 637-9437 Fax Page 1 of 2
  • 2. Are all environmental issues and permits properly addressed in the job plan?  Is any special technical documentation such as manuals, pictures, or drawings required? If so, have they been noted on the job plan?  Is Engineering assistance required?  Is housekeeping/ cleanup identified in the plan as a task step?  Are rebuild-able parts identified and noted for return to the appropriate area on job completion and a Work Order written to address the rebuild if a Maintenance function?  Do any special contact personnel require notification before or on job completion?  Have other craft planners, as required; been notified of upcoming work to leverage downtime?  Are there any special disposal requirements for removed equipment components?  What level of testing (laboratory biological sampling/ operations) is required prior to equipment return to service and who will be the contact?  What level of performance testing is needed after work end?  Are any special activities to be done on work completion prior to releasing the equipment to ensure safe operation (vibration readings, NDT control, hydraulic test, sealing test, etc.)? Job Package Includes the following from the Research and Job Planning activities:  Job Plan  Safety and Environmental Permit Forms (Completed if prior approval required)  Complete Bill of Materials listing  Pick list of necessary materials and consumables required for this work.  Equipment history  Technical specifications, manuals, pictures, and drawings as required Check out our training and services at www.peopleandprocesses.com People and Processes, Inc. PO Box 460 Yulee, FL 32041-0460 (800) 930-4276 (866) 637-9437 Fax Page 2 of 2