We enjoyed last night's meeting with the Ward 4 Roosevelt High School community. If you happened to have missed the meeting or simply wish to share the update and new proposed work hours with your neighbors, friends and family feel free to share! Thanks.
2. Perkins Eastman DC Team
Sean O’Donnell, AIA, LEED AP
Matt Bell, FAIA
Mary Rankin, AIA, LEED AP BD + C
Principal-In–Charge
Design Principal
Project Manager
William Griffin, AIA, LEED AP
Abbie Cronin
Tatiana Bendeck, LEED AP
Project Designer
Project Architect
Architect
PERKINS EASTMAN DC TEAM
Roosevelt High School Moderniza on
Concept Design
November 2013
4. Schedule
Design Submissions
• Concept Design
• Schematic Design
• Early Release Packages
• Design Development/GMP
• Construction Documents
October 2013
December 2013
December 2013
March 2014
June 2014
Construction Milestones
• Demolition
• GMP finalized
• Substantial Completion
• School starts
January 2014 - March 2014
May 2014
July 2015
August 2015
Upcoming Meetings
• CFA Concept Level Review
• CFA Final Submission
November 21, 2013
January/February 2014
SCHEDULE
Roosevelt High School Moderniza on
Concept Design
November 2013
5. Greater Campus
S Sharpe Health
M MacFarland
(RHS swing space)
S
R Roosevelt
P Petworth Library
R M
P
10 min
walk
Petworth Metro
Bus Stops
VICINITY MAP
Roosevelt High School Moderniza on
Concept Design
November 2013
6. Construc on Phases
1932 SITE PLAN
1932
1976
CONSTRUCTION PHASES
Roosevelt High School Moderniza on
Concept Design
November 2013
7. ADD CLEARSTORY WINDOWS
DEMO INFILL TO RESTORE COURTYARD
Restoring the Historic Par
RESTORE FRONT DOOR
1932 SITE PLAN
RESTORING THE HISTORIC PARTI
Roosevelt High School Moderniza on
Concept Design
November 2013
8. ve
orgia A
Ge
Campus Plan
Upshur Street
C
e
Av
wa
Io
P
H
“The Outdoor
Classroom”
“The Pavilion”
“The Heart”
Allison Street NW
P
M
W
H
13th Street NW
“The Terrace”
+ “The Por co”
M
C
T
“The Media Center”
“The Waterworks”
“The Gallery”
“The School Garden”
W
G
T
G
S
S
CAMPUS PLAN
Roosevelt High School Moderniza on
Concept Design
November 2013
9. C
P
H
“The Outdoor
Classroom”
“The Pavilion”
“The Heart”
T
“The Terrace”
+ “The Por co”
M
STAY/COMMUNITY ENTRY
“The Media Center”
“The Waterworks”
“The Gallery”
“The School Garden”
W
G
S
C
195.17
M
P
195.17
195.16
W
H
G
195.17
S
195.17
195.16
T
RHS ENTRY
ARTS
AUDITORIUM
ACADEMICS
CO M M U N I T Y
+ ATHLETICS
BUILDING ORGANIZATION
Roosevelt High School Moderniza on
Concept Design
November 2013
10. “The Terrace”
• Visibility
• Iden ty
• Access
ENHANCED ENTRY STAIR
“THE TERRACE”
Roosevelt High School Moderniza on
Concept Design
November 2013
11. “The Por co “
“THE PORTICO”
Roosevelt High School Moderniza on
Concept Design
November 2013
12. “The Pavilion”
• Community entrance
• STAY entrance
• Iden ty
“THE PAVILION”
Roosevelt High School Moderniza on
Concept Design
November 2013
13. “The Outdoor Classroom” and “The Pavilion”
“THE OUTDOOR CLASSROOM” AND “THE PAVILION”
Roosevelt High School Moderniza on
Concept Design
November 2013
15. “The Heart”
“Outdoor
Classroom”
Media
Center C o s m e Cafeteria
tology
Culinary
Arts
“The
Heart”
Career
Center
“The
Steps”
“The
Terrace”
13th Street
“THE HEART”
Roosevelt High School Moderniza on
Concept Design
November 2013
22. “The School Garden”
“THE SCHOOL GARDEN”
Roosevelt High School Moderniza on
Concept Design
November 2013
23. Landscape
PARKING LOT BIORETENTION SEE SWM EXHIBIT FOR
ADDITIONAL SUSTAINABLE MEASURES
EAST ENTRANCE
INTERPRETIVE
GREEN COURTYARD
WEST ENTRANCE
LANDSCAPING
RENOVATED
RECREATION AREA,
(SOFTBALL FIELD,
2 TENNIS COURTS AND
BASKETBALL COURT)
ND L
LA OO
AR CH
CF E S
A
M DL
ID
M
NORTH
COURTYARD
ROOSEVELT
HIGH SCHOOL
SOUTH
SCIENCE
COURTYARD
LANDSCAPE TO STABILIZE
STEEP EMBANKMENT
PROTECT EXISTING
SPECIMEN TREE
PROPOSED LANDSCAPE PLAN
Roosevelt High School Moderniza on
Concept Design
November 2013