Dilish Pareed is an electrical engineer seeking project management roles. He has over 18 years of experience in electrical installation, testing, and commissioning. Currently, he works as a senior electrical engineer for Dorsch Qatar managing electrical works for the New Doha International Airport. Previously, he has worked on large projects such as Burj Khalifa and Dubai International Airport.
1. Page 1 of 5
DILISH PAREED.K.N.
Phone: Mobile: 00974-77305717
E-mail: dilish.noorudeen@dorsch.com
Seeking assignmentsin Project Management,Site Supervision & Execution of MV system,LV system,
Small Power & Lighting and ELV systems.
Conceptual and detailed design of 11 kV system, LV network, Small power & Lighting ,ELV etc.
ACADEMIA: Bachelor of Technology in Electrical and Electronics
with First class from T. K. M. College of Engineering, Kerala University,
Kerala, India in 1997
SYNOPSIS
A result oriented,Seasoned ElectricalEngineering professionalwith over 18 years of experience
in construction projects encompassing installation, testing & commissioning of various Electrical
installations. Astutely handled the installation of 11 kV cables, 11 kV substations, LV cables,Fire
alarm system, Telephone cabling, security system, GSM, AV, Tetra system & HVAC system .
More than 8 Years of GCC experience in Infrastructure Facilities / Building Services
Registered Electrical Engineer in Qatar MMUP.
Currently associated with Dorsch Qatar as SENIOR ELECTRICAL ENGINEER in New Doha
International Airport construction of Amiri Flight Facilities project.
Worked as Electrical Project Engineer in Burj Khalifa project,UAE.
Rich experience in Electrical installation. Expertise in handling the complete maintenance &
related manpower management.
An effective communicator with excellent relationship, management skills and strong analytical,
problem solving and organisational abilities.
AREAS OF EXPERTISE
Project Planning & Management
Supervising project activities & handling complete cycle of project management entailing
requirement, estimation and final execution of project.
Handling procurement of capital goods and consumables, Machinery / Equipment after
development of reliable and cost effective vendors.
Ensuring adherence to the rules and regulations as per the statutory bodies’ viz. Kahramaa,
DEWA, Indian electricity rules etc.
Electrical Installation, testing and commissioning of installations
Installed, tested and successfully commissioned electrification of various Installations.
Working on initiatives for energy conservation and implementation.
Materials Procurement
Team Management
Directing and leading the technical personnel. Imparting continuous on job training to the
workforce for accomplishing greater efficiency.
2. Page 2 of 5
Site management & supervision.
Working on talent pool and succession planning of the management cadre and workforce,
appraising their performance and providing feedback on the same.
ORGANISATIONAL DETAILS
Since March 2015
Dorsch Qatar
Senior Electrical Engineer
Project: New Doha International Airport / Amiri Flight Facility - Qatar
Professional consultancy services for Project Management and Construction
Management.
Job Responsibilities:
• Design review and recommendations of contract documents to incorporate Electrical
requirements.
Design review and recommendations for conceptual and detailed design for extension of 66kV
substation panels, 11 kV substation switchgears, LV systems, switchgears, 11 kV calculation
reports for CT/VT, 11 kV substation battery calculations,11 kV cable size calculations,protection
relays, power factor correction equipment calculation, transformer sizing, generator sizing, UPS
sizing, LV cable size calculations etc.
Reviewing and commenting 11kv schematic, LV schematic for cable size, breaker size, lighting
&small power drawings, containment drawings etc.
Reviewing of existing facility design and incorporate in the project.
Reviewing and incorporating the security fence light design in the airport to AFF project.
Prepare the design for single corridor 11 kV cable route instead ofdouble route for cost reduction.
• Participation in short listing and prequalification evaluation of the bidders.
• Participation in the technical and commercial evaluations of the tender.
Reviewing of BOQ with drawings and specification.
• Attending weekly, monthly Progress &Technical meetings and reporting to the Project Director.
• Coordination with the stakeholders involved in the Electrical discipline for technical or
any relevant issues.
From JAN 2013 – Feb 2015 working with Arabtec LLC, UAE as Senior Electrical Engineer
Project : Dubai International Airport-Terminal 2 expansion.
Client : DCA, Consultant: ADPI/DAR
Managing and directing the Electrical works at site in accordance with the specifications,
contract drawings, agreed procedures and method statements.
Site supervision of electrical Installation, testing and commissioning of 11KV substations,
switchgears, 11 kV/415V transformers, lighting and small power installations, cable
containments and other electrical works.
Managing and directing subcontractor’s project engineers and site engineers.
Coordination of the daily site works with subcontractors.
Attending the weekly progress meetings with the management and Client.
Preparation of weekly and monthly site progress reports.
Reviewing of materials submittals, SCRs, CVIs etc.
Inspection of material at site.
Reviewing of shop drawings and submittals.
Assist the project QS in preparation of monthly invoice applications, variation claims etc.
Preparation of project as built drawings, and close out documents.
Checking ELV installations works-CCTV Cameras, WDN,SCN,SACS,FAS,FIDS,PAS .
JAN 2011-JAN 2013 working with Arabtec LLC, UAE as Senior Electrical Engineer (MEP) .
Project: Nation Towers, Abudhabi ( 64 & 50 floors Twin towers)
Client : ICT
Responsible for all electrical, mechanical and plumbing works and site engineers.
Ensuring that electrical, mechanical and plumbing work is executed on site in accordance
with the specifications, contract drawings, agreed procedures and method statements.
3. Page 3 of 5
Inspection of every completed works prior to final inspection of the consultant.
Coordination with the QA/QC with the ongoing work, conduct site inspection .
Attend Weekly coordination meeting with Management.
Monitoring and co-ordination for Target schedule to compensate delays due to Design,
Construction, Engineering, Material Issue etc.
Preparation of correspondence for ongoing activities
Review drawing and other details of Electromechanical plan and communication/Security
layout.
Prepare correspondence in line with the ongoing work
Supervise/inspect MV and LV system, Mechanical& plumbing installations,ELV systems
such as FA, ELV ( IT & SECURITY SYSTEM ), Tetra, GSM, CCTV, FACP and other related
Electromechanical Works.
Jun 2009-JAN 2011 working with Arabtec LLC, UAE as Electrical Project Engineer.
Project : BURJ KHALIFA TOWER
Client / Design : EMAAR / SKIDMORE OWING AND MERRIL (SOM)
Responsible for all electrical works, subcontractors and site engineers.
Directing site engineers and site supervisors.
Ensuring that electrical work is executed on site in accordance with the specifications,
contract drawings, agreed procedures and method statements.
Inspection of every completed electrical works prior to final inspection of the consultant.
Coordination with the Consultant regarding the approved plan to be implemented at site.
Coordination with the QA/QC with the on going work, conduct site inspection .
Checking Electrical installations, FA, ELV ( IT & SECURITY SYSTEM ), Tetra, GSM, CCTV,
FACP, AHU/OHU and other related Electromechanical Works.
May 2008-Jun 2009 working with Arabtec LLC, UAE as Electrical site Engineer in Palazzo
Versace Hotel Project,Dubai
Supervise and Inspect electrical installations and equipment in sites for conformance to
drawings, specifications, in order to ensure compliance with regulations of local authority :,
Distribution Boards, MCB, MCCB, ELCB, Cables, Wiring method, Low current systems,
provision for Home Automation and Security systems and other components.
Exercising full control over the workforce on site.
Ensuring the work is executed in accordance with the contract drawings and
specifications, agreed procedures and method statements.
Monitoring all subcontractor’s work closely to ensure that quality of work is as per
specification and is completed on time.
Completing all necessary Q.A documentation related to the work and co-ordinate daily site
inspections.
General site management
Ensuring that all information on drawings are conveyed to the workforce in a proper
manner and details are produced where required.
Quantity take-off from drawings.
Site measurement of variations
Site measurement for interim payments.
Jul’01 - May’2008 working with SFO technologies(P) Ltd(NeST Group),Cochin,India as Senior
Electrical Engineer in Electrical Installation & Maintenance division.
The Attainments
Handled activities for:
− 11 KV/433 V Power substation & distribution systems with cable and switch board
installationshaving 1 no:500KVA transformer and 300 KVA DieselGenerator set at Saba
Powerdex(P)Ltd(Nest Group).
− Supervise and Inspect electrical installations and equipments,distribution boards, MCB,
MCCB, ELCB, Cables, Wiring method and other components in sites for conformance to
4. Page 4 of 5
drawings, specifications etc in order to ensure compliance with regulations of local
authority:
− Designing and preparation of Electrical Drawings such as selection of cable size, switch
boards and preparation of Load schedules as per the rules and regulations of Electrical
inspectorate.
- Verify and execute tender documents and award work to contractors.
− Procurement of equipment and electrical fittings for installation
− Electrical inspectorate standards& specifications, safety regulations and procedures for
electrical installations.
− Standards & procedures for Electricity Board for installation, testing & commissioning.
− Verification of materials for quality and correctness.
− Verification of work and and releasing payments to contractors.
− Arranging of inspectorate and electricity board staffs to verify & getting sanction orders
for energizing installation
− Installation, testing& commissioning of capacitor panels to enhance power factor and
thereby reducing Electricity bill.
Installed and maintained Air compressors, Vacuum pump, Air dryer and Air conditioning units.
Installed G.I Pipes and copper pipes for air, vacuum to machines.
Involved in Spare parts management.
Installation of EPABX and telephone cabling.
Installation of network cabling.
Installation of duct system for waste treatment.
Installation of eye washing and related plumbing system.
Installed fire extinguishers for the entire plant.
Installation ofsingle phase preventer relay to 3 phase main machines to prevent from damaging
while single phasing
Spare parts procurement and managements
June’99- June’01 worked with Corporate, NeST group of Companies as Project Engineer
(Electrical Installations)
The Attainments
Designed, Installed, tested and successfully commissioned the electrification of the following
Installations
Sun Fibre Optics(P) Ltd(NeST Group), Crysind Electronics(P) Ltd(NeST Group), Cochin, India
− Sun fibre Optics (P) Ltd. (NeST): 500 KVA Power Distribution System.
− Crysind Electronics (P) Ltd(NeST) : Installation, testing & commissioning of 11
KV/433 V Substation, 500KVA Transformer, CT/PT unit & TOD meter
Took care of:
− Single line electrical schematic diagrams of High voltage and Low voltage installations.
− Erection details of 11 KV/433 V Transformers, Generators and cubicle panel.
− Equipment layout.
Co-ordinated Erection, testing and commissioning for:
− 11KV/433 V, Delta/Star Oil immersed type transformers of rating 250 KVA to 500 KVA.
− 415 V AC diesel Generator of rating 300 KVA.
− MV Cubicle panels like Main MV Panel,switch board,sub switch board,Distribution board
(Light & power) Motor Control centres and Capacitor panel.
Involved in Testing of:
− Soil resistivity and earth resistance using Earth Megger
− Insulation resistance of 11KV, 4 Pole Structure, structural elements, Transformer
winding –Primary and Secondary, HT and LT cables etc. using Earth Meggar.
− Transformer Oil Dielectric Strength using 0V to 60KV Testing kit.
5. Page 5 of 5
Commenced career with Kerala state Electricity Board at Kalamassery , India as Engineer
Trainee (Apr’98- Apr’99)
Took care of:
o All sanction procedures for giving connection to various industrial, commercial & domestic
consumers.
o Taking monthly TOD meter reading and posting to raise bills to industrial consumers.
o Arranging work with workmen for troubleshooting of faults.
Proficiency in Computer: MS Excel, MS word, AutoCAD, Avante ERP software
Other certificate: Attended and successfully completed ISO 9001:2000 Internal Quality Auditor
Program.
PERSONAL DETAILS
Name : DILISH PAREED.K.N
Nationality : Indian
Religion : Islam
Date of Birth : July 24, 1975
Address : Flat No.15, Building No.5, Ezdan 9, Wukair, Qatar.
Phone No : 00974-77305717
Passport No. : G5571325. Expiry on 21st
Oct 2017
Driving License : Qatar and UAE driving license
Languages Known : English, Hindi, Malayalam (Read, write and speak), Tamil (Speak), Arabic
(Read and write)
Yours Sincerely
DILISH PAREED K N