SlideShare une entreprise Scribd logo
1  sur  28
Télécharger pour lire hors ligne
CONTRATOS DE
COMPRAVENTA DE
ENERGÍA
ANÁLISIS DE BANCABILIDAD
13 de Julio de 2016
Buenos Aires
How Does a PPA Relate
to Project Finance?
2
• Costs Versus Revenues → PPA is a power project’s principal (if not
only) source of revenue.
• Links to Other Project Documents
• EPC, O&M, Real Estate, Permits, Interconnection
• Examples: Timing, Force Majeure, Damages
• Project Finance Goal – Ensure that, if things go as expected, the
project revenues under the PPA will be higher than the total capital
and operating costs of project, including debt service and return on
investment, over the entire term of project finance debt.
Specific PPA Terms
3
• Term of Agreement
• Basic Rule – Term of PPA must be longer than Financing tenor
• Pre-COD
• PPAs awarded through government auctions or by utilities require regulatory
approval of pricing given pass-through to consumers (i.e., regulated tariffs).
• Financing
• Buyer Protection – Common for Buyer to require evidence of debt and/or
equity funding to ensure performance
• Seller Protection
• Milestones
• Construction Start/NTP Under EPC → Can be different dates
• Delay damages may be payable by Seller for late start of construction
• Commercial Operation Date (COD)
• Interconnection is key – may be separate process
Specific PPA Terms
4
• COD Conditions
• Testing
• Security (Collateral)
• Interconnection Agreement/Facility Interconnection
• Insurance
• Opinions → enforceability
• Permits & Authorizations
• Early Termination
• Milestone Delay
• Other Defaults
• Delay Damages – Missed Milestones
• Fixed LDs
• Payment by Seller of Replacement Costs (not liked by lenders)
Specific PPA Terms - Obligations
5
• Purchase and Sale Obligations
• Renewable Products:
• Energy
• “Green Attributes”/Environmental Credits (Renewable Energy
Certificates)
• Quantity
• Excess Sale / Full Requirements / Dispatchable
• Minimum / Maximum Deliveries
Specific PPA Terms - Pricing
6
Pricing
Renewable Projects (Solar, Wind Primarily)
• Single Rate: Energy Payment for All Products (Price Per KWH or Per
MWH (1 MWH = 1000 KWH))
• Sometimes Separate Charge for Renewable Energy Certificates
• Has to Be “Must Run” with Limited Curtailment
• No Delivery – No Payment
• Time of Use (TOU) Rates – Better for Solar
– Higher Prices in Peak Periods
• Geothermal → Moving to energy payments only
• Currency risk
• Currency of Costs vs Currency of Revenues
• Currency of financing – FX hedges
Specific PPA Terms - Curtailment
7
Curtailment
• Right of Offtaker to Refuse to Accept Energy Deliveries
• Curtailment Can Reduce Revenue → Especially important for
renewables
• Lender Issue
• Two types of Curtailment:
• Operational
• Economic
Specific PPA Terms - Performance
8
RENEWABLES
• Minimum Production Requirement
• Seller Guaranty of Minimum Production Over One or Two Years
• Percentage of Expected Production – Solar Degradation
• Seller Excuses
• Similar to Availability Requirement
• Add Curtailment Excuse
• Compliance with Dispatch, Forecasting – Availability/Production
Specific PPA Terms
9
Damages for Performance Below Minimum
• Conventional – Availability Requirement
• Impact on Capacity Payments
• Renewable
• Minimum Production Requirement
• Liquidated Damages for Shortfall
• Fixed - $ for each MW/h not delivered
• Replacement costs of energy if above contract price
• Floors and Caps – Pay minimum floor, but cap on total liability
• Possible termination if very poor performance
Specific PPA Terms - Security
10
Security
• Collateral to put up to Assure Performance if Party Breaches and
Fails to Pay Damages
Buyer – Can or not put up Security
• Is the offtaker Investment Grade?
• In LatAm payment security is common
• If Trading Company – Parent Guarantee
Forms of Security
• Cash
• Letter or Credit (LC)
• Guarantee – Investment Grade
• Replenishment Obligation → Important for Lenders
Specific PPA Terms – Change in Law
11
Change in Law
• International PPAs: Negotiated, but not uncommon for Seller to assume a
great number of change-in-law risks
• Change-in-law risk typically assumed by Buyer if state-owned utility
• PPA may allow Seller to terminate PPA if a change in law affects costs or
revenues above a certain percentage or monetary threshold
Specific PPA Terms – Force Majeure
12
Force Majeure
General Standard: Event Not Reasonably Predictable, Out of
Party’s Control, Cannot Be Overcome By Reasonable Diligence
and Not The Result of Negligence
• Sometimes also a list or cross-reference to applicable law (e.g., Civil Code)
Typical Listed Events
• Acts of God (Lightning, Earthquake, Hurricane)
• War, Civil Disturbance, Terrorism, Sabotage, Government Action
• Strikes, Lockouts (other than plant specific)
Typical Exclusions
• Changes in Market Prices
• Changes in Financial Condition of Party/Economic Hardship
• Mechanical Breakdown, unless otherwise caused by another event of
Force Majeure
• Failure to Get Governmental Approvals
• Curtailments Under Interconnection/Transmission Agreements
Specific PPA Terms – Force Majeure
13
• Time Limits
• Notice – Time Period to Let Other Party Know Plus Details
• Duration – 6-24 Months, followed by termination right
• Milestone Deadlines – Force Majeure May Be Eliminated or Limited in
Duration
• Excuses Performance
• No Compensation to Seller Typically
Specific PPA Terms - Assignment
14
Assignment
• Generally – Consent, not to be unreasonably withheld
• Collateral Assignment
• Typically No Consent Needed But Lenders Insist on Written
Consents to Assignment With Additional Conditions
• To Affiliates – Sometimes Without Consent
• But could be issue with Lenders for Buyer Assignment. Replacement
must:
• Be creditworthy entity or provide performance security
• Have ability to perform.
Specific PPA Terms - Assignment
15
• Change of Control
• Many - but not all - PPAs have this
• Direct or indirect
• Definition – if not defined, it can benefit the Buyer
• Lender foreclosure issue
• Lender Rights in PPA or Consent Agreement
• Sale of Facility
• Sometimes Requires Consent of Buyer
• Sometimes Assignee/New Owner has to agree to assume
PPA as condition of sale
• Could be Lender issue in foreclosure scenario
Specific PPA Terms - Default
16
DEFAULTS
Utility Offtaker Default
• Primarily Nonpayment
Seller Defaults
• Typical Types
• Catch All – Material Breach
• Breach of Representation
or Warranty
• Bankruptcy or Insolvency
or Liquidation
• Termination of
Interconnection Agreement
• Missed Milestone –
Usually Only COD
• Delay Damages for Limited Period
• Loss of Credit Support
(or Downgrade of LC bank or
guarantor)
• Some Defaults May Have No
Cure Period
• Different Defaults May Have
Different Cure Period
Specific PPA Terms
17
Lender Cure and Step-in Rights
• In PPA or Direct Agreement
• Buyer must notify Lenders of Default and allow right to cure
• Buyer can’t terminate without notifying Lenders
• Must allow lenders to enforce, if necessary
• Assumption of PPA or Termination Payments
Specific PPA Terms - Termination
18
Termination
• If Default not cured within period, other party can terminate
and obtain damages
• Pre-COD Termination Remedies
• Draw on Security
• Sometimes More
• Termination Damages
• General Damages at Law
• Market Damages – cost of obtaining replacement
• Typically non-defaulting party does not pay
• Not always the case
• Limit on Liability
• No Consequential Special or Indirect Damages
• Sometimes Dollar Cap on Damages – Lender issue especially for cap on Buyer
liability as it may not be sufficient to make lender whole
Specific PPA Terms - Termination
19
• Specific Performance
• Option to purchase project by Buyer → Lender issue
• Pricing/Valuation
• End of Term
• During Term
• Right of First Refusal
• Typically only for sale of facility
• Short period for offtaker to decide
• If declined, third party deal to be on similar terms
• Typically carve-out for lender rights
Specific PPA Terms – Other Typical
Provisions
20
• Governing Law – Usually jurisdiction of performance
• Dispute Resolution – Courts vs Arbitration
• Lender Issue
EPC Bankability Issues
1
• Purpose: engineer, procure construct; complete
construction of a quality project that meets agreed
performance criteria
• Capacity of EPC contractor
• Technical capacity
• Track record/reputation
• Credit-worthiness
EPC Bankability Issues
2
• Scope of EPC obligations:
• Fully wrapped – the “gold standard”
• Limitations to liability – e.g., technology carve-outs
• Equipment suppliers plus balance of plant contractor
(the typical case for renewable energy projects)
• Finger-pointing risk
• Typical in renewables,– introducing substantial finger-
pointing risk
• Capacity (technical and financial) of principle equipment
suppliers
• Warranties (existence, duration and assignability)
• Intellectual property
• Permits (term, renewability, assignability)
EPC Bankability Issues
3
• Warranties (existence, duration and assignability)
• Intellectual property
• Permits (term, renewability, assignability)
EPC Bankability Issues
4
• Remedies for failure to perform
• Liquidated damages
• Delay LDs (to cover PPA, O&M, loan interest exposure)
• Performance LDs (applied to buy down loan)
• Liability limits (e.g., 100% of project price)
• Lender step-in rights upon Borrower failure to perform
• Notice of defaults
• Extended opportunity to cure defaults
• Assignability of EPC contract
Operations and Maintenance
Agreements - Bankability Issues
5
• Purpose: a qualified power plant operator agrees to
perform all operation, maintenance and repair services
for the project, with experienced personnel, in
accordance with prudent operating practices, permits,
applicable law and transaction documents.
O&M Agreements - Bankability Issues
6
• Operator’s responsibilities:
• administration of project agreements
• compliance with all PPA requirements and requirements of
permitting authorities or lenders
• liaising with other contracting parties
• preparation of an annual budget
• operation of the project in compliance with that budget;
• administration of warranties under the construction contract(s).
• maintaining compliance with project insurance policies
• Operator assumes responsibility for most operational risks,
except:
• force majeure events
• design defects
O&M Agreements - Bankability Issues
7
• Payment provisions under O&M Agreements vary:
• Fixed price, cost plus or bonus/penalty.
• Limitation on liability of the Operator
• Liability varies and often depends on the Operator’s potential
profit
• Force majeure provisions
• No broader than the force majeure relief available to the seller
under the PPA
• Often more limited in the O&M Agreement, allocating certain
risks, such as labor difficulties, to the Operator.
O&M Agreements - Bankability Issues
8
• Key bankability issues:
• Capacity
• Affiliate versus third party Operator
• Replacing the Operator
• Assignability of O&M contract

Contenu connexe

Tendances

Sources of finance
Sources of financeSources of finance
Sources of financevijay lahri
 
short term financing
 short term financing short term financing
short term financingAditya Singh
 
Convertible Debt Simplified
Convertible Debt SimplifiedConvertible Debt Simplified
Convertible Debt SimplifiedBen Littauer
 
Beware of Dangers Lurking in the Lending Process
Beware of Dangers Lurking in the Lending ProcessBeware of Dangers Lurking in the Lending Process
Beware of Dangers Lurking in the Lending ProcessColleen Beck-Domanico
 
[PREMONEY 2014] Gunderson Dettmer >> Joshua Cook, "The Wind-Down Round: Navig...
[PREMONEY 2014] Gunderson Dettmer >> Joshua Cook, "The Wind-Down Round: Navig...[PREMONEY 2014] Gunderson Dettmer >> Joshua Cook, "The Wind-Down Round: Navig...
[PREMONEY 2014] Gunderson Dettmer >> Joshua Cook, "The Wind-Down Round: Navig...500 Startups
 
Presentation - Venture Capital Financing, Major Deal Elements
Presentation - Venture Capital Financing, Major Deal Elements Presentation - Venture Capital Financing, Major Deal Elements
Presentation - Venture Capital Financing, Major Deal Elements Daniel Piedra
 
Types of sponsors and investors in project finance
Types of sponsors and investors in project financeTypes of sponsors and investors in project finance
Types of sponsors and investors in project financeDima Mykulo
 
Convertible Debt - How it Works
Convertible Debt - How it WorksConvertible Debt - How it Works
Convertible Debt - How it Worksbhron
 

Tendances (11)

Ppt of east
Ppt of eastPpt of east
Ppt of east
 
C7
C7C7
C7
 
Sources of finance
Sources of financeSources of finance
Sources of finance
 
short term financing
 short term financing short term financing
short term financing
 
Convertible Debt Simplified
Convertible Debt SimplifiedConvertible Debt Simplified
Convertible Debt Simplified
 
Beware of Dangers Lurking in the Lending Process
Beware of Dangers Lurking in the Lending ProcessBeware of Dangers Lurking in the Lending Process
Beware of Dangers Lurking in the Lending Process
 
[PREMONEY 2014] Gunderson Dettmer >> Joshua Cook, "The Wind-Down Round: Navig...
[PREMONEY 2014] Gunderson Dettmer >> Joshua Cook, "The Wind-Down Round: Navig...[PREMONEY 2014] Gunderson Dettmer >> Joshua Cook, "The Wind-Down Round: Navig...
[PREMONEY 2014] Gunderson Dettmer >> Joshua Cook, "The Wind-Down Round: Navig...
 
Presentation - Venture Capital Financing, Major Deal Elements
Presentation - Venture Capital Financing, Major Deal Elements Presentation - Venture Capital Financing, Major Deal Elements
Presentation - Venture Capital Financing, Major Deal Elements
 
short term financing
short term financingshort term financing
short term financing
 
Types of sponsors and investors in project finance
Types of sponsors and investors in project financeTypes of sponsors and investors in project finance
Types of sponsors and investors in project finance
 
Convertible Debt - How it Works
Convertible Debt - How it WorksConvertible Debt - How it Works
Convertible Debt - How it Works
 

Similaire à Bankability Project Documents

Negotiating The Commercial Lease(Slides)
Negotiating The Commercial Lease(Slides)Negotiating The Commercial Lease(Slides)
Negotiating The Commercial Lease(Slides)Peter_Collins
 
Liquidated damages contracts
Liquidated damages   contractsLiquidated damages   contracts
Liquidated damages contractsBhushan Goyal
 
Dissecting the Yieldco Structure
Dissecting the Yieldco StructureDissecting the Yieldco Structure
Dissecting the Yieldco StructureChadbourneMarketing
 
Key Bankruptcy Considerations Heading into a Recession
Key Bankruptcy Considerations Heading into a RecessionKey Bankruptcy Considerations Heading into a Recession
Key Bankruptcy Considerations Heading into a RecessionQuarles & Brady
 
Project finance "Jordan Renewables" Workshop, hosted by EDAMA, Amman. 16th Ma...
Project finance "Jordan Renewables" Workshop, hosted by EDAMA, Amman. 16th Ma...Project finance "Jordan Renewables" Workshop, hosted by EDAMA, Amman. 16th Ma...
Project finance "Jordan Renewables" Workshop, hosted by EDAMA, Amman. 16th Ma...Eversheds Sutherland
 
TILA Disclosures Lost at Sea - Auto-Renewals under TILA and State Law
TILA Disclosures Lost at Sea - Auto-Renewals under TILA and State LawTILA Disclosures Lost at Sea - Auto-Renewals under TILA and State Law
TILA Disclosures Lost at Sea - Auto-Renewals under TILA and State LawJustin Hosie
 
Buyer and seller beware - Distressed M&A successor liability
Buyer and seller beware - Distressed M&A successor liability Buyer and seller beware - Distressed M&A successor liability
Buyer and seller beware - Distressed M&A successor liability Jessica Johnson
 
Contract - Construction Contracts and Specification
Contract - Construction Contracts and SpecificationContract - Construction Contracts and Specification
Contract - Construction Contracts and SpecificationMANNU KUMAR
 
Property: Acquisition & Transaction Structures
Property: Acquisition & Transaction StructuresProperty: Acquisition & Transaction Structures
Property: Acquisition & Transaction StructuresRedchip
 
What is the Impact of the New Standard on the Intermediate Accounting Course?
What is the Impact of the New Standard on the Intermediate Accounting Course?What is the Impact of the New Standard on the Intermediate Accounting Course?
What is the Impact of the New Standard on the Intermediate Accounting Course?Cengage Learning
 
1285448634 409725
1285448634 4097251285448634 409725
1285448634 409725Neal Graham
 
Revenue Recognition for Contractors - NECA NOW Conference
Revenue Recognition for Contractors - NECA NOW Conference Revenue Recognition for Contractors - NECA NOW Conference
Revenue Recognition for Contractors - NECA NOW Conference CBIZ, Inc.
 
Understanding Legal Issues in Solar PPAs
Understanding Legal Issues in Solar PPAsUnderstanding Legal Issues in Solar PPAs
Understanding Legal Issues in Solar PPAshumeslaw
 
Wind_Energy_Law_2014_Amanda James_Overcoming Wind Energy Project Financing Ob...
Wind_Energy_Law_2014_Amanda James_Overcoming Wind Energy Project Financing Ob...Wind_Energy_Law_2014_Amanda James_Overcoming Wind Energy Project Financing Ob...
Wind_Energy_Law_2014_Amanda James_Overcoming Wind Energy Project Financing Ob...Amanda James
 
Commercial Lease Rights And Remedies 2009 Alberta
Commercial Lease   Rights And Remedies   2009 AlbertaCommercial Lease   Rights And Remedies   2009 Alberta
Commercial Lease Rights And Remedies 2009 AlbertaPeter_Collins
 

Similaire à Bankability Project Documents (20)

Negotiating The Commercial Lease(Slides)
Negotiating The Commercial Lease(Slides)Negotiating The Commercial Lease(Slides)
Negotiating The Commercial Lease(Slides)
 
Liquidated damages contracts
Liquidated damages   contractsLiquidated damages   contracts
Liquidated damages contracts
 
Dissecting the Yieldco Structure
Dissecting the Yieldco StructureDissecting the Yieldco Structure
Dissecting the Yieldco Structure
 
Economic Risk in Commercial Agreements
Economic Risk in Commercial Agreements Economic Risk in Commercial Agreements
Economic Risk in Commercial Agreements
 
Regulation Revolution
Regulation RevolutionRegulation Revolution
Regulation Revolution
 
Key Bankruptcy Considerations Heading into a Recession
Key Bankruptcy Considerations Heading into a RecessionKey Bankruptcy Considerations Heading into a Recession
Key Bankruptcy Considerations Heading into a Recession
 
Project finance "Jordan Renewables" Workshop, hosted by EDAMA, Amman. 16th Ma...
Project finance "Jordan Renewables" Workshop, hosted by EDAMA, Amman. 16th Ma...Project finance "Jordan Renewables" Workshop, hosted by EDAMA, Amman. 16th Ma...
Project finance "Jordan Renewables" Workshop, hosted by EDAMA, Amman. 16th Ma...
 
TILA Disclosures Lost at Sea - Auto-Renewals under TILA and State Law
TILA Disclosures Lost at Sea - Auto-Renewals under TILA and State LawTILA Disclosures Lost at Sea - Auto-Renewals under TILA and State Law
TILA Disclosures Lost at Sea - Auto-Renewals under TILA and State Law
 
Buyer and seller beware - Distressed M&A successor liability
Buyer and seller beware - Distressed M&A successor liability Buyer and seller beware - Distressed M&A successor liability
Buyer and seller beware - Distressed M&A successor liability
 
Contract - Construction Contracts and Specification
Contract - Construction Contracts and SpecificationContract - Construction Contracts and Specification
Contract - Construction Contracts and Specification
 
Property: Acquisition & Transaction Structures
Property: Acquisition & Transaction StructuresProperty: Acquisition & Transaction Structures
Property: Acquisition & Transaction Structures
 
What is the Impact of the New Standard on the Intermediate Accounting Course?
What is the Impact of the New Standard on the Intermediate Accounting Course?What is the Impact of the New Standard on the Intermediate Accounting Course?
What is the Impact of the New Standard on the Intermediate Accounting Course?
 
Hinkel Chapter 11
Hinkel Chapter 11Hinkel Chapter 11
Hinkel Chapter 11
 
1285448634 409725
1285448634 4097251285448634 409725
1285448634 409725
 
Revenue Recognition for Contractors - NECA NOW Conference
Revenue Recognition for Contractors - NECA NOW Conference Revenue Recognition for Contractors - NECA NOW Conference
Revenue Recognition for Contractors - NECA NOW Conference
 
Understanding Legal Issues in Solar PPAs
Understanding Legal Issues in Solar PPAsUnderstanding Legal Issues in Solar PPAs
Understanding Legal Issues in Solar PPAs
 
LSH-GUIDE-TO-DILAPIDATIONS
LSH-GUIDE-TO-DILAPIDATIONSLSH-GUIDE-TO-DILAPIDATIONS
LSH-GUIDE-TO-DILAPIDATIONS
 
Wind_Energy_Law_2014_Amanda James_Overcoming Wind Energy Project Financing Ob...
Wind_Energy_Law_2014_Amanda James_Overcoming Wind Energy Project Financing Ob...Wind_Energy_Law_2014_Amanda James_Overcoming Wind Energy Project Financing Ob...
Wind_Energy_Law_2014_Amanda James_Overcoming Wind Energy Project Financing Ob...
 
Commercial Lease Rights And Remedies 2009 Alberta
Commercial Lease   Rights And Remedies   2009 AlbertaCommercial Lease   Rights And Remedies   2009 Alberta
Commercial Lease Rights And Remedies 2009 Alberta
 
Negotiating an M&A Deal
Negotiating an M&A DealNegotiating an M&A Deal
Negotiating an M&A Deal
 

Plus de Doris Capurro

Renewable energy revolutionizes the energy industry
Renewable energy revolutionizes the energy industryRenewable energy revolutionizes the energy industry
Renewable energy revolutionizes the energy industryDoris Capurro
 
A New Era of Renewables in Latin America?
A New Era of Renewables in Latin America?A New Era of Renewables in Latin America?
A New Era of Renewables in Latin America?Doris Capurro
 
Argentine natural gas markets at regional inflection point: what's ahead?
Argentine natural gas markets at regional inflection point: what's ahead?Argentine natural gas markets at regional inflection point: what's ahead?
Argentine natural gas markets at regional inflection point: what's ahead?Doris Capurro
 
Will the Vaca Muerta be a game changer?
Will the Vaca Muerta be a game changer?Will the Vaca Muerta be a game changer?
Will the Vaca Muerta be a game changer?Doris Capurro
 
The Great Energy Shakeout
The Great Energy ShakeoutThe Great Energy Shakeout
The Great Energy ShakeoutDoris Capurro
 
Energías Renovables en Uruguay
Energías Renovables en UruguayEnergías Renovables en Uruguay
Energías Renovables en UruguayDoris Capurro
 
Renewables will shape Argentina’s new energy matrix
Renewables will shape Argentina’s new	energy matrixRenewables will shape Argentina’s new	energy matrix
Renewables will shape Argentina’s new energy matrixDoris Capurro
 
Luft Energy Presentation
Luft Energy PresentationLuft Energy Presentation
Luft Energy PresentationDoris Capurro
 
Limited and Non Recourse Financing Fundamentals
Limited and Non Recourse Financing FundamentalsLimited and Non Recourse Financing Fundamentals
Limited and Non Recourse Financing FundamentalsDoris Capurro
 
Renewables and World Bank Guarantees
Renewables and World Bank Guarantees Renewables and World Bank Guarantees
Renewables and World Bank Guarantees Doris Capurro
 
Argentina Renewables Workshop - Chadbourne
Argentina Renewables Workshop - ChadbourneArgentina Renewables Workshop - Chadbourne
Argentina Renewables Workshop - ChadbourneDoris Capurro
 
¿Más comunicación que política?
¿Más comunicación que política?¿Más comunicación que política?
¿Más comunicación que política?Doris Capurro
 

Plus de Doris Capurro (12)

Renewable energy revolutionizes the energy industry
Renewable energy revolutionizes the energy industryRenewable energy revolutionizes the energy industry
Renewable energy revolutionizes the energy industry
 
A New Era of Renewables in Latin America?
A New Era of Renewables in Latin America?A New Era of Renewables in Latin America?
A New Era of Renewables in Latin America?
 
Argentine natural gas markets at regional inflection point: what's ahead?
Argentine natural gas markets at regional inflection point: what's ahead?Argentine natural gas markets at regional inflection point: what's ahead?
Argentine natural gas markets at regional inflection point: what's ahead?
 
Will the Vaca Muerta be a game changer?
Will the Vaca Muerta be a game changer?Will the Vaca Muerta be a game changer?
Will the Vaca Muerta be a game changer?
 
The Great Energy Shakeout
The Great Energy ShakeoutThe Great Energy Shakeout
The Great Energy Shakeout
 
Energías Renovables en Uruguay
Energías Renovables en UruguayEnergías Renovables en Uruguay
Energías Renovables en Uruguay
 
Renewables will shape Argentina’s new energy matrix
Renewables will shape Argentina’s new	energy matrixRenewables will shape Argentina’s new	energy matrix
Renewables will shape Argentina’s new energy matrix
 
Luft Energy Presentation
Luft Energy PresentationLuft Energy Presentation
Luft Energy Presentation
 
Limited and Non Recourse Financing Fundamentals
Limited and Non Recourse Financing FundamentalsLimited and Non Recourse Financing Fundamentals
Limited and Non Recourse Financing Fundamentals
 
Renewables and World Bank Guarantees
Renewables and World Bank Guarantees Renewables and World Bank Guarantees
Renewables and World Bank Guarantees
 
Argentina Renewables Workshop - Chadbourne
Argentina Renewables Workshop - ChadbourneArgentina Renewables Workshop - Chadbourne
Argentina Renewables Workshop - Chadbourne
 
¿Más comunicación que política?
¿Más comunicación que política?¿Más comunicación que política?
¿Más comunicación que política?
 

Dernier

Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...allensay1
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...lizamodels9
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noidadlhescort
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 

Dernier (20)

Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 

Bankability Project Documents

  • 1. CONTRATOS DE COMPRAVENTA DE ENERGÍA ANÁLISIS DE BANCABILIDAD 13 de Julio de 2016 Buenos Aires
  • 2. How Does a PPA Relate to Project Finance? 2 • Costs Versus Revenues → PPA is a power project’s principal (if not only) source of revenue. • Links to Other Project Documents • EPC, O&M, Real Estate, Permits, Interconnection • Examples: Timing, Force Majeure, Damages • Project Finance Goal – Ensure that, if things go as expected, the project revenues under the PPA will be higher than the total capital and operating costs of project, including debt service and return on investment, over the entire term of project finance debt.
  • 3. Specific PPA Terms 3 • Term of Agreement • Basic Rule – Term of PPA must be longer than Financing tenor • Pre-COD • PPAs awarded through government auctions or by utilities require regulatory approval of pricing given pass-through to consumers (i.e., regulated tariffs). • Financing • Buyer Protection – Common for Buyer to require evidence of debt and/or equity funding to ensure performance • Seller Protection • Milestones • Construction Start/NTP Under EPC → Can be different dates • Delay damages may be payable by Seller for late start of construction • Commercial Operation Date (COD) • Interconnection is key – may be separate process
  • 4. Specific PPA Terms 4 • COD Conditions • Testing • Security (Collateral) • Interconnection Agreement/Facility Interconnection • Insurance • Opinions → enforceability • Permits & Authorizations • Early Termination • Milestone Delay • Other Defaults • Delay Damages – Missed Milestones • Fixed LDs • Payment by Seller of Replacement Costs (not liked by lenders)
  • 5. Specific PPA Terms - Obligations 5 • Purchase and Sale Obligations • Renewable Products: • Energy • “Green Attributes”/Environmental Credits (Renewable Energy Certificates) • Quantity • Excess Sale / Full Requirements / Dispatchable • Minimum / Maximum Deliveries
  • 6. Specific PPA Terms - Pricing 6 Pricing Renewable Projects (Solar, Wind Primarily) • Single Rate: Energy Payment for All Products (Price Per KWH or Per MWH (1 MWH = 1000 KWH)) • Sometimes Separate Charge for Renewable Energy Certificates • Has to Be “Must Run” with Limited Curtailment • No Delivery – No Payment • Time of Use (TOU) Rates – Better for Solar – Higher Prices in Peak Periods • Geothermal → Moving to energy payments only • Currency risk • Currency of Costs vs Currency of Revenues • Currency of financing – FX hedges
  • 7. Specific PPA Terms - Curtailment 7 Curtailment • Right of Offtaker to Refuse to Accept Energy Deliveries • Curtailment Can Reduce Revenue → Especially important for renewables • Lender Issue • Two types of Curtailment: • Operational • Economic
  • 8. Specific PPA Terms - Performance 8 RENEWABLES • Minimum Production Requirement • Seller Guaranty of Minimum Production Over One or Two Years • Percentage of Expected Production – Solar Degradation • Seller Excuses • Similar to Availability Requirement • Add Curtailment Excuse • Compliance with Dispatch, Forecasting – Availability/Production
  • 9. Specific PPA Terms 9 Damages for Performance Below Minimum • Conventional – Availability Requirement • Impact on Capacity Payments • Renewable • Minimum Production Requirement • Liquidated Damages for Shortfall • Fixed - $ for each MW/h not delivered • Replacement costs of energy if above contract price • Floors and Caps – Pay minimum floor, but cap on total liability • Possible termination if very poor performance
  • 10. Specific PPA Terms - Security 10 Security • Collateral to put up to Assure Performance if Party Breaches and Fails to Pay Damages Buyer – Can or not put up Security • Is the offtaker Investment Grade? • In LatAm payment security is common • If Trading Company – Parent Guarantee Forms of Security • Cash • Letter or Credit (LC) • Guarantee – Investment Grade • Replenishment Obligation → Important for Lenders
  • 11. Specific PPA Terms – Change in Law 11 Change in Law • International PPAs: Negotiated, but not uncommon for Seller to assume a great number of change-in-law risks • Change-in-law risk typically assumed by Buyer if state-owned utility • PPA may allow Seller to terminate PPA if a change in law affects costs or revenues above a certain percentage or monetary threshold
  • 12. Specific PPA Terms – Force Majeure 12 Force Majeure General Standard: Event Not Reasonably Predictable, Out of Party’s Control, Cannot Be Overcome By Reasonable Diligence and Not The Result of Negligence • Sometimes also a list or cross-reference to applicable law (e.g., Civil Code) Typical Listed Events • Acts of God (Lightning, Earthquake, Hurricane) • War, Civil Disturbance, Terrorism, Sabotage, Government Action • Strikes, Lockouts (other than plant specific) Typical Exclusions • Changes in Market Prices • Changes in Financial Condition of Party/Economic Hardship • Mechanical Breakdown, unless otherwise caused by another event of Force Majeure • Failure to Get Governmental Approvals • Curtailments Under Interconnection/Transmission Agreements
  • 13. Specific PPA Terms – Force Majeure 13 • Time Limits • Notice – Time Period to Let Other Party Know Plus Details • Duration – 6-24 Months, followed by termination right • Milestone Deadlines – Force Majeure May Be Eliminated or Limited in Duration • Excuses Performance • No Compensation to Seller Typically
  • 14. Specific PPA Terms - Assignment 14 Assignment • Generally – Consent, not to be unreasonably withheld • Collateral Assignment • Typically No Consent Needed But Lenders Insist on Written Consents to Assignment With Additional Conditions • To Affiliates – Sometimes Without Consent • But could be issue with Lenders for Buyer Assignment. Replacement must: • Be creditworthy entity or provide performance security • Have ability to perform.
  • 15. Specific PPA Terms - Assignment 15 • Change of Control • Many - but not all - PPAs have this • Direct or indirect • Definition – if not defined, it can benefit the Buyer • Lender foreclosure issue • Lender Rights in PPA or Consent Agreement • Sale of Facility • Sometimes Requires Consent of Buyer • Sometimes Assignee/New Owner has to agree to assume PPA as condition of sale • Could be Lender issue in foreclosure scenario
  • 16. Specific PPA Terms - Default 16 DEFAULTS Utility Offtaker Default • Primarily Nonpayment Seller Defaults • Typical Types • Catch All – Material Breach • Breach of Representation or Warranty • Bankruptcy or Insolvency or Liquidation • Termination of Interconnection Agreement • Missed Milestone – Usually Only COD • Delay Damages for Limited Period • Loss of Credit Support (or Downgrade of LC bank or guarantor) • Some Defaults May Have No Cure Period • Different Defaults May Have Different Cure Period
  • 17. Specific PPA Terms 17 Lender Cure and Step-in Rights • In PPA or Direct Agreement • Buyer must notify Lenders of Default and allow right to cure • Buyer can’t terminate without notifying Lenders • Must allow lenders to enforce, if necessary • Assumption of PPA or Termination Payments
  • 18. Specific PPA Terms - Termination 18 Termination • If Default not cured within period, other party can terminate and obtain damages • Pre-COD Termination Remedies • Draw on Security • Sometimes More • Termination Damages • General Damages at Law • Market Damages – cost of obtaining replacement • Typically non-defaulting party does not pay • Not always the case • Limit on Liability • No Consequential Special or Indirect Damages • Sometimes Dollar Cap on Damages – Lender issue especially for cap on Buyer liability as it may not be sufficient to make lender whole
  • 19. Specific PPA Terms - Termination 19 • Specific Performance • Option to purchase project by Buyer → Lender issue • Pricing/Valuation • End of Term • During Term • Right of First Refusal • Typically only for sale of facility • Short period for offtaker to decide • If declined, third party deal to be on similar terms • Typically carve-out for lender rights
  • 20. Specific PPA Terms – Other Typical Provisions 20 • Governing Law – Usually jurisdiction of performance • Dispute Resolution – Courts vs Arbitration • Lender Issue
  • 21. EPC Bankability Issues 1 • Purpose: engineer, procure construct; complete construction of a quality project that meets agreed performance criteria • Capacity of EPC contractor • Technical capacity • Track record/reputation • Credit-worthiness
  • 22. EPC Bankability Issues 2 • Scope of EPC obligations: • Fully wrapped – the “gold standard” • Limitations to liability – e.g., technology carve-outs • Equipment suppliers plus balance of plant contractor (the typical case for renewable energy projects) • Finger-pointing risk • Typical in renewables,– introducing substantial finger- pointing risk • Capacity (technical and financial) of principle equipment suppliers • Warranties (existence, duration and assignability) • Intellectual property • Permits (term, renewability, assignability)
  • 23. EPC Bankability Issues 3 • Warranties (existence, duration and assignability) • Intellectual property • Permits (term, renewability, assignability)
  • 24. EPC Bankability Issues 4 • Remedies for failure to perform • Liquidated damages • Delay LDs (to cover PPA, O&M, loan interest exposure) • Performance LDs (applied to buy down loan) • Liability limits (e.g., 100% of project price) • Lender step-in rights upon Borrower failure to perform • Notice of defaults • Extended opportunity to cure defaults • Assignability of EPC contract
  • 25. Operations and Maintenance Agreements - Bankability Issues 5 • Purpose: a qualified power plant operator agrees to perform all operation, maintenance and repair services for the project, with experienced personnel, in accordance with prudent operating practices, permits, applicable law and transaction documents.
  • 26. O&M Agreements - Bankability Issues 6 • Operator’s responsibilities: • administration of project agreements • compliance with all PPA requirements and requirements of permitting authorities or lenders • liaising with other contracting parties • preparation of an annual budget • operation of the project in compliance with that budget; • administration of warranties under the construction contract(s). • maintaining compliance with project insurance policies • Operator assumes responsibility for most operational risks, except: • force majeure events • design defects
  • 27. O&M Agreements - Bankability Issues 7 • Payment provisions under O&M Agreements vary: • Fixed price, cost plus or bonus/penalty. • Limitation on liability of the Operator • Liability varies and often depends on the Operator’s potential profit • Force majeure provisions • No broader than the force majeure relief available to the seller under the PPA • Often more limited in the O&M Agreement, allocating certain risks, such as labor difficulties, to the Operator.
  • 28. O&M Agreements - Bankability Issues 8 • Key bankability issues: • Capacity • Affiliate versus third party Operator • Replacing the Operator • Assignability of O&M contract