Chapter 3:Initiating Projects Note: See the text itself for full citations.
Learning Objectives Describe the five project management process groups, map them to the project management knowledge areas, discuss why organizations develop their own project management methodologies, and understand the importance of top management commitment and organizational standards in project management Discuss the initiating process used by Global Construction, including pre-initiating tasks, breaking large projects down into smaller projects, and initiating tasks 2
Learning Objectives (continued) Prepare a business case to justify the need for a project Identify project stakeholders and perform a stakeholder analysis Create a project charter to formally initiate a project Describe the importance of holding a good project kick-off meeting 3
Project Management Process Groups Project management process groups progress from initiating activities to planning activities, executing activities, monitoring and controlling activities, and closing activities A process is a series of actions directed toward a particular result 4
Description of Process Groups Initiating processes include actions to begin projects and project phases Planning processes include devising and maintaining a workable scheme to ensure that the project meets its scope, time, and cost goals as well as organizational needs Executing processes include coordinating people and other resources to carry out the project plans and produce the deliverables of the project or phase. A deliverable is a product or service produced or provided as part of a project Monitoring and controlling processes measure progress toward achieving project goals, monitor deviation from plans, and take corrective action to match progress with plans and customer expectations Closing processes include formalizing acceptance of the project or phase and bringing it to an orderly end 5
Characteristics of the Process Groups The level of activity and length of each process group varies for every project Normally, executing tasks require the most resources and time, followed by planning tasks Monitoring and controlling processes are done throughout the project’s life span Initiating and closing tasks are usually the shortest (at the beginning and end of a project or phase, respectively), and they require the least amount of resources and time However, every project is unique, so there can be exceptions Note that process groups apply to entire projects as well as to project phases A phase is a distinct stage in project development, and most projects have distinct phases 6
The best or “alpha” project managers spend more time on every process group than their counterparts except for execution, as follows: Initiating: 2% vs. 1% Planning: 21% vs. 11% Executing: 69% vs. 82% Controlling: 5% vs. 4% Closing: 3% vs. 2%1* Guidelines for Time Spent in Each Process Group *Andy Crowe, Alpha Project Managers: What the Top 2% Know That Everyone Else Does Not, Velociteach Press(2006). 7
Mapping the Process Groups to the Knowledge Areas You can map the five process group into the nine project management knowledge areas Based on the PMBOK® Guide, Fourth Edition (2008), there are forty-two total processes in project management Figure 3-1 provides a big-picture view of the process groups and knowledge areas 8
Figure 3-1. Project Management Process Groups and Knowledge Area Mapping  9
Figure 3-1. Project Management Process Groups and Knowledge Area Mapping (continued) 10
Developing a Project Management Methodology The PMBOK® Guide is a standard that describes best practices for what should be done to manage a project A methodology describes how things should be done, and different organizations often have different ways of doing things Successful organizations develop and follow a customized, formal project management process 11
Other Methodologies PRojects IN Controlled Environments (PRINCE2): Originally developed forIT projects, PRINCE2 was released in 1996 as a generic project management methodology by the U.K. Office of Government Commerce. It is the defacto standard in the U.K. and is used in over 50 countries Agile methodologies: Many software development projects use an iterative workflow and incremental delivery of software. Popular agile methodologies include extreme programming, scrum, feature driven development, and lean software development Rational Unified Process (RUP) framework: RUP is an iterative software development process that focuses on team productivity and delivers software best practices to all team members Six Sigma: Many organizations have projects underway that use Six Sigma methodologies. Six Sigma’s target for perfection is the achievement of no more than 3.4 defects, errors, or mistakes per million opportunities 12
What Went Right? Key findings from a five-year study by Ibbs and Reginato: Organizations with more mature project management practices have better project performance, which result in projects completed on time and within budget much more often than most projects Project management maturity is strongly correlated with a more predictable project schedule and cost performance Organizations that follow good project management methodologies have lower direct costs of project management (6 percent) than those that do not (11 percent)* Several experts have warned against cutting back on project and portfolio management during touch economic times *William Ibbs and Justin Reginato, Quantifying the Value of Project Management, Project Management Institute (2002). 13
The Importance of Top Management Commitment Without top management commitment, many projects will fail Some projects have a senior manager called a champion who acts as a key proponent for a project Projects are part of the larger organizational environment, and many factors that might affect a project are out of the project manager’s control 14
How Top Managers Can Help Project Managers Succeed Provide adequate resources Approve unique project needs in a timely manner Encourage cooperation from people in other parts of the organization and deal with political issues Mentor and coach them on leadership issues Develop and enforce organizational standards Support a project management office (PMO) 15
Project Management Office (PMO) A project management office (PMO) is an organizational entity created to assist project managers in achieving project goals A PMO can help development standards and methodologies, provide career paths for project managers, and assist project managers with training and certification 16
Best Practice It is very important to follow best practices while initiating projects, especially to avoid major scope problems. Senior management must take an active role in following these best practices: Keep the scope realistic Involve users from the start Use off-the-shelf hardware and software whenever possible Follow good project management processes 17
Figure 3-2. Initiating Process Summary 18
Pre-initiating Tasks It is good practice to lay the groundwork for a project before it officially starts After a project is approved, senior managers should meet to accomplish the following tasks: Determine the scope, time, and cost constraints for the project Identify the project sponsor Select the project manager Meet with the project manager to review the process and expectations for managing the project Determine if the project should be divided into two or more smaller projects (like the Just-In-Time Training Project was) because it is easier to manage smaller projects than larger ones 19
Figure 3-3. Summary Information for the Just-In-Time Training Phase I Project 20 Scope Goals Investigate and document the training taken in the last two years by all internal employees. Determine what courses were taken, the cost of all training, the process for approving/assigning training, and the evaluation of the training by participants, if available. Survey employees to get their input on what training they believe they’ll need in the next two years, how they’d like to take the training (i.e., instructor-led in-house, instructor-led through a local college, university, or training company, Web-based, CD/ROM, etc.). Also hold focus groups to determine training needs. Recommend how to provide the most valuable training for Global Construction employees in the next two years. Determine the scope, time, and cost goals for the development and implementation of the Just-In-Time Training Phase II project.
Figure 3-3. Summary Information for the Just-In-Time Training Phase I Project (continued) 21 Time Goals: Three months Cost Goals: $50,000 Approach/Assumptions: All of the costs would be for internal labor. All managers and employees would receive information about this study project.  A response rate of 30% would be acceptable for the survey. The project team would do extensive research to back up their recommendations. The team would also provide detailed monthly reports and presentations to a steering committee. The final deliverables would include a one-hour final presentation and a comprehensive project report documenting all of the information and recommendations.
Business Case for a Project A business case is a document that provides financial justification for investing in a project Typical contents: Introduction/Background Business Objective Current Situation and Problem/Opportunity Statement Critical Assumptions and Constraints Analysis of Options and Recommendation Preliminary Project Requirements Budget Estimate and Financial Analysis Schedule Estimate Potential Risks Exhibits See Figure 3-4 in the text for a sample (pp. 91-93) 22
Initiating Tasks Identifying and understanding project stakeholders Creating the project charter Holding a kick-off meeting 23
Figure 3-5. Initiating Processes and Outputs (PMBOK® Guide, Fourth Edition) 24
Identifying and Understanding Project Stakeholders Project stakeholders are the people involved in or affected by project activities  Internal project stakeholders generally include the project sponsor, project team, support staff, and internal customers for the project. Other internal stakeholders include top management, other functional managers, and other project managers External project stakeholders include the project’s customers (if they are external to the organization), competitors, suppliers, and other external groups that are potentially involved in or affected by the project, such as government officials and concerned citizens 25
Stakeholder Register and Stakeholder Management Strategy A stakeholder register is a document that includes details related to the identified project stakeholders -usually available to many people, so it should not include sensitive information A stakeholder management strategy is an approach to help increase the support of stakeholders throughout the project – can include sensitive information, so it should not be readily available 26
Figure 3-6. Sample Stakeholder Register 27
Figure 3-7. Sample Stakeholder Management Strategy 28
Figure 3-8. Analyzing “Formal” Stakeholder Needs (www.xkcd.com) 29
Creating a Project Charter A project charter is a document that formally recognizes the existence of a project and provides a summary of the project’s objectives and management It authorizes the project manager to use organizational resources to complete the project Ideally, the project manager will play a major role in developing the project charter Instead of project charters, some organizations initiate projects using a simple letter of agreement or formal contracts A crucial part of the project charter is the sign-off section 30
Contents of a Project Charter The project’s title and date of authorization The project manager’s name and contact information A summary schedule or timeline, including the planned start and finish dates; if a summary milestone schedule is available, it should also be included or referenced A summary of the project’s estimated cost and budget allocation A brief description of the project objectives, including the business need or other justification for authorizing the project Project success criteria, including project approval requirements and who signs off on the project A summary of the planned approach for managing the project, which should describe stakeholder needs and expectations, important assumptions, and constraints, and refer to related documents, such as a communications management plan, as available A roles and responsibilities matrix A sign-off section for signatures of key project stakeholders A comments section in which stakeholders can provide important comments related to the project 31
Figure 3-9. Sample Project Charter 32
Figure 3-6. Sample Project Charter (continued) 33
Media Snapshot In television shows like Trading Spaces, participants have two days and $1,000 to update a room in their neighbor’s house. Because the time and cost are set, it’s the scope that has the most flexibility Unlike most projects in which the project team works closely with the customer, homeowners have little say in what is done and cannot inspect the work along the way. They walk into their newly decorated room with their eyes closed What happens when the homeowners don’t like the work that’s been done? They’re stuck because they signed a release statement Too bad you can’t get sponsors for most projects to sign a similar release form. It would make project management much easier! 34
Holding a Project Kick-off Meeting Experienced project managers know that it is crucial to get projects off to a great start A kick-off meeting is a meeting held at the beginning of a project so that stakeholders can meet each other, review the goals of the project, and discuss future plans Often used to get support for a project and clarify roles and responsibilities The project champion should speak first and introduce the project sponsor and project manager Often a fair amount of work is done to prepare for the meeting Best if it can be held face-to-face 35
Figure 3-10. Sample Kick-Off Meeting Agenda 36 Just-In-Time Training Project Kick-off Meeting July 16 Meeting Objective: Get the project off to an effective start by introducing key stakeholders, reviewing project goals, and discussing future plans  Agenda: ,[object Object]
Review of the project background
Review of project-related documents (i.e., business case, project charter)

Contenu connexe

Tendances (20)

PMO 101
PMO 101PMO 101
PMO 101
 
PMO Mandate
PMO MandatePMO Mandate
PMO Mandate
 
Project Management Professional (PMP)
Project Management Professional (PMP) Project Management Professional (PMP)
Project Management Professional (PMP)
 
PMO Performance Measurement and Metrics - Kendrick
PMO Performance Measurement and Metrics - KendrickPMO Performance Measurement and Metrics - Kendrick
PMO Performance Measurement and Metrics - Kendrick
 
IT PMO Charter (Linkedin)
IT PMO Charter (Linkedin)IT PMO Charter (Linkedin)
IT PMO Charter (Linkedin)
 
PMO Presentation
PMO PresentationPMO Presentation
PMO Presentation
 
Setting up a Project Management Office (PMO)
Setting up a Project Management Office (PMO)Setting up a Project Management Office (PMO)
Setting up a Project Management Office (PMO)
 
Pmo
PmoPmo
Pmo
 
Change Management Plan
Change Management PlanChange Management Plan
Change Management Plan
 
Establishing an Effective PMO
Establishing an Effective PMOEstablishing an Effective PMO
Establishing an Effective PMO
 
PMO Charter Template
PMO Charter TemplatePMO Charter Template
PMO Charter Template
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
Overview of Program Management
Overview of Program ManagementOverview of Program Management
Overview of Program Management
 
The Project Management Plan in 20 steps
The Project Management Plan in 20 stepsThe Project Management Plan in 20 steps
The Project Management Plan in 20 steps
 
Project Management Office (PMO)
Project Management Office (PMO)Project Management Office (PMO)
Project Management Office (PMO)
 
Program governance Structure
Program governance StructureProgram governance Structure
Program governance Structure
 
1. project integration management
1. project integration management1. project integration management
1. project integration management
 
PMO Frameworks
PMO FrameworksPMO Frameworks
PMO Frameworks
 
PMBOK 7th Edition What is Changing?
PMBOK 7th Edition What is Changing?PMBOK 7th Edition What is Changing?
PMBOK 7th Edition What is Changing?
 
project management concepts
project management conceptsproject management concepts
project management concepts
 

Similaire à Project Management Process Groups and Knowledge Areas Mapping

PMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkPMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkejlp12
 
Chapter 3: The Project Management Process Groups: A Case Study
Chapter 3:The Project Management Process Groups: A Case StudyChapter 3:The Project Management Process Groups: A Case Study
Chapter 3: The Project Management Process Groups: A Case StudyShahid Riaz
 
Project Management Msc. 7Pjmn009W Project Management Project.
Project Management Msc. 7Pjmn009W Project Management Project.Project Management Msc. 7Pjmn009W Project Management Project.
Project Management Msc. 7Pjmn009W Project Management Project.Renee Jones
 
Project integration management ch 4
Project integration management ch 4Project integration management ch 4
Project integration management ch 4Sammer Qader
 
Chap 1 Modern Project Management
Chap 1 Modern Project ManagementChap 1 Modern Project Management
Chap 1 Modern Project Managementproject management
 
2014 Fire Rescue - Project Managment 101 training
2014 Fire Rescue - Project Managment 101 training2014 Fire Rescue - Project Managment 101 training
2014 Fire Rescue - Project Managment 101 trainingIan Robertson
 
UNIT-01_Fundamentals_ Project management
UNIT-01_Fundamentals_ Project managementUNIT-01_Fundamentals_ Project management
UNIT-01_Fundamentals_ Project managementsdbhosale860
 
Project Manager Primer
Project Manager PrimerProject Manager Primer
Project Manager PrimerTom Cremins
 
Project integration management ch 4
Project integration management ch 4Project integration management ch 4
Project integration management ch 4Sammer Qader
 
It Project Management
It Project ManagementIt Project Management
It Project ManagementTJ Rains
 
Project management slide show
Project management slide showProject management slide show
Project management slide showTanvir Anwar
 
PM-1 Overview.ppt
PM-1 Overview.pptPM-1 Overview.ppt
PM-1 Overview.pptnatisil1
 
2.04 integration management
2.04 integration management2.04 integration management
2.04 integration managementreddvise
 
Project Management Process Groups
Project Management Process GroupsProject Management Process Groups
Project Management Process GroupsTechNoleGirl
 

Similaire à Project Management Process Groups and Knowledge Areas Mapping (20)

Chapter 3
Chapter 3Chapter 3
Chapter 3
 
Pmbok
PmbokPmbok
Pmbok
 
PMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkPMP Training - 01 introduction to framework
PMP Training - 01 introduction to framework
 
Chapter 3: The Project Management Process Groups: A Case Study
Chapter 3:The Project Management Process Groups: A Case StudyChapter 3:The Project Management Process Groups: A Case Study
Chapter 3: The Project Management Process Groups: A Case Study
 
ICT 4109.pdf
ICT 4109.pdfICT 4109.pdf
ICT 4109.pdf
 
Project Management Msc. 7Pjmn009W Project Management Project.
Project Management Msc. 7Pjmn009W Project Management Project.Project Management Msc. 7Pjmn009W Project Management Project.
Project Management Msc. 7Pjmn009W Project Management Project.
 
Project integration management ch 4
Project integration management ch 4Project integration management ch 4
Project integration management ch 4
 
Chap 1 Modern Project Management
Chap 1 Modern Project ManagementChap 1 Modern Project Management
Chap 1 Modern Project Management
 
Cs244 w10ch1
Cs244 w10ch1Cs244 w10ch1
Cs244 w10ch1
 
2014 Fire Rescue - Project Managment 101 training
2014 Fire Rescue - Project Managment 101 training2014 Fire Rescue - Project Managment 101 training
2014 Fire Rescue - Project Managment 101 training
 
UNIT-01_Fundamentals_ Project management
UNIT-01_Fundamentals_ Project managementUNIT-01_Fundamentals_ Project management
UNIT-01_Fundamentals_ Project management
 
Project Manager Primer
Project Manager PrimerProject Manager Primer
Project Manager Primer
 
Project management – standard for today´s modern company
Project management – standard for today´s modern companyProject management – standard for today´s modern company
Project management – standard for today´s modern company
 
Project integration management ch 4
Project integration management ch 4Project integration management ch 4
Project integration management ch 4
 
It Project Management
It Project ManagementIt Project Management
It Project Management
 
Project management slide show
Project management slide showProject management slide show
Project management slide show
 
PM-1 Overview.ppt
PM-1 Overview.pptPM-1 Overview.ppt
PM-1 Overview.ppt
 
2.04 integration management
2.04 integration management2.04 integration management
2.04 integration management
 
Ch04
Ch04Ch04
Ch04
 
Project Management Process Groups
Project Management Process GroupsProject Management Process Groups
Project Management Process Groups
 

Project Management Process Groups and Knowledge Areas Mapping

  • 1. Chapter 3:Initiating Projects Note: See the text itself for full citations.
  • 2. Learning Objectives Describe the five project management process groups, map them to the project management knowledge areas, discuss why organizations develop their own project management methodologies, and understand the importance of top management commitment and organizational standards in project management Discuss the initiating process used by Global Construction, including pre-initiating tasks, breaking large projects down into smaller projects, and initiating tasks 2
  • 3. Learning Objectives (continued) Prepare a business case to justify the need for a project Identify project stakeholders and perform a stakeholder analysis Create a project charter to formally initiate a project Describe the importance of holding a good project kick-off meeting 3
  • 4. Project Management Process Groups Project management process groups progress from initiating activities to planning activities, executing activities, monitoring and controlling activities, and closing activities A process is a series of actions directed toward a particular result 4
  • 5. Description of Process Groups Initiating processes include actions to begin projects and project phases Planning processes include devising and maintaining a workable scheme to ensure that the project meets its scope, time, and cost goals as well as organizational needs Executing processes include coordinating people and other resources to carry out the project plans and produce the deliverables of the project or phase. A deliverable is a product or service produced or provided as part of a project Monitoring and controlling processes measure progress toward achieving project goals, monitor deviation from plans, and take corrective action to match progress with plans and customer expectations Closing processes include formalizing acceptance of the project or phase and bringing it to an orderly end 5
  • 6. Characteristics of the Process Groups The level of activity and length of each process group varies for every project Normally, executing tasks require the most resources and time, followed by planning tasks Monitoring and controlling processes are done throughout the project’s life span Initiating and closing tasks are usually the shortest (at the beginning and end of a project or phase, respectively), and they require the least amount of resources and time However, every project is unique, so there can be exceptions Note that process groups apply to entire projects as well as to project phases A phase is a distinct stage in project development, and most projects have distinct phases 6
  • 7. The best or “alpha” project managers spend more time on every process group than their counterparts except for execution, as follows: Initiating: 2% vs. 1% Planning: 21% vs. 11% Executing: 69% vs. 82% Controlling: 5% vs. 4% Closing: 3% vs. 2%1* Guidelines for Time Spent in Each Process Group *Andy Crowe, Alpha Project Managers: What the Top 2% Know That Everyone Else Does Not, Velociteach Press(2006). 7
  • 8. Mapping the Process Groups to the Knowledge Areas You can map the five process group into the nine project management knowledge areas Based on the PMBOK® Guide, Fourth Edition (2008), there are forty-two total processes in project management Figure 3-1 provides a big-picture view of the process groups and knowledge areas 8
  • 9. Figure 3-1. Project Management Process Groups and Knowledge Area Mapping 9
  • 10. Figure 3-1. Project Management Process Groups and Knowledge Area Mapping (continued) 10
  • 11. Developing a Project Management Methodology The PMBOK® Guide is a standard that describes best practices for what should be done to manage a project A methodology describes how things should be done, and different organizations often have different ways of doing things Successful organizations develop and follow a customized, formal project management process 11
  • 12. Other Methodologies PRojects IN Controlled Environments (PRINCE2): Originally developed forIT projects, PRINCE2 was released in 1996 as a generic project management methodology by the U.K. Office of Government Commerce. It is the defacto standard in the U.K. and is used in over 50 countries Agile methodologies: Many software development projects use an iterative workflow and incremental delivery of software. Popular agile methodologies include extreme programming, scrum, feature driven development, and lean software development Rational Unified Process (RUP) framework: RUP is an iterative software development process that focuses on team productivity and delivers software best practices to all team members Six Sigma: Many organizations have projects underway that use Six Sigma methodologies. Six Sigma’s target for perfection is the achievement of no more than 3.4 defects, errors, or mistakes per million opportunities 12
  • 13. What Went Right? Key findings from a five-year study by Ibbs and Reginato: Organizations with more mature project management practices have better project performance, which result in projects completed on time and within budget much more often than most projects Project management maturity is strongly correlated with a more predictable project schedule and cost performance Organizations that follow good project management methodologies have lower direct costs of project management (6 percent) than those that do not (11 percent)* Several experts have warned against cutting back on project and portfolio management during touch economic times *William Ibbs and Justin Reginato, Quantifying the Value of Project Management, Project Management Institute (2002). 13
  • 14. The Importance of Top Management Commitment Without top management commitment, many projects will fail Some projects have a senior manager called a champion who acts as a key proponent for a project Projects are part of the larger organizational environment, and many factors that might affect a project are out of the project manager’s control 14
  • 15. How Top Managers Can Help Project Managers Succeed Provide adequate resources Approve unique project needs in a timely manner Encourage cooperation from people in other parts of the organization and deal with political issues Mentor and coach them on leadership issues Develop and enforce organizational standards Support a project management office (PMO) 15
  • 16. Project Management Office (PMO) A project management office (PMO) is an organizational entity created to assist project managers in achieving project goals A PMO can help development standards and methodologies, provide career paths for project managers, and assist project managers with training and certification 16
  • 17. Best Practice It is very important to follow best practices while initiating projects, especially to avoid major scope problems. Senior management must take an active role in following these best practices: Keep the scope realistic Involve users from the start Use off-the-shelf hardware and software whenever possible Follow good project management processes 17
  • 18. Figure 3-2. Initiating Process Summary 18
  • 19. Pre-initiating Tasks It is good practice to lay the groundwork for a project before it officially starts After a project is approved, senior managers should meet to accomplish the following tasks: Determine the scope, time, and cost constraints for the project Identify the project sponsor Select the project manager Meet with the project manager to review the process and expectations for managing the project Determine if the project should be divided into two or more smaller projects (like the Just-In-Time Training Project was) because it is easier to manage smaller projects than larger ones 19
  • 20. Figure 3-3. Summary Information for the Just-In-Time Training Phase I Project 20 Scope Goals Investigate and document the training taken in the last two years by all internal employees. Determine what courses were taken, the cost of all training, the process for approving/assigning training, and the evaluation of the training by participants, if available. Survey employees to get their input on what training they believe they’ll need in the next two years, how they’d like to take the training (i.e., instructor-led in-house, instructor-led through a local college, university, or training company, Web-based, CD/ROM, etc.). Also hold focus groups to determine training needs. Recommend how to provide the most valuable training for Global Construction employees in the next two years. Determine the scope, time, and cost goals for the development and implementation of the Just-In-Time Training Phase II project.
  • 21. Figure 3-3. Summary Information for the Just-In-Time Training Phase I Project (continued) 21 Time Goals: Three months Cost Goals: $50,000 Approach/Assumptions: All of the costs would be for internal labor. All managers and employees would receive information about this study project. A response rate of 30% would be acceptable for the survey. The project team would do extensive research to back up their recommendations. The team would also provide detailed monthly reports and presentations to a steering committee. The final deliverables would include a one-hour final presentation and a comprehensive project report documenting all of the information and recommendations.
  • 22. Business Case for a Project A business case is a document that provides financial justification for investing in a project Typical contents: Introduction/Background Business Objective Current Situation and Problem/Opportunity Statement Critical Assumptions and Constraints Analysis of Options and Recommendation Preliminary Project Requirements Budget Estimate and Financial Analysis Schedule Estimate Potential Risks Exhibits See Figure 3-4 in the text for a sample (pp. 91-93) 22
  • 23. Initiating Tasks Identifying and understanding project stakeholders Creating the project charter Holding a kick-off meeting 23
  • 24. Figure 3-5. Initiating Processes and Outputs (PMBOK® Guide, Fourth Edition) 24
  • 25. Identifying and Understanding Project Stakeholders Project stakeholders are the people involved in or affected by project activities Internal project stakeholders generally include the project sponsor, project team, support staff, and internal customers for the project. Other internal stakeholders include top management, other functional managers, and other project managers External project stakeholders include the project’s customers (if they are external to the organization), competitors, suppliers, and other external groups that are potentially involved in or affected by the project, such as government officials and concerned citizens 25
  • 26. Stakeholder Register and Stakeholder Management Strategy A stakeholder register is a document that includes details related to the identified project stakeholders -usually available to many people, so it should not include sensitive information A stakeholder management strategy is an approach to help increase the support of stakeholders throughout the project – can include sensitive information, so it should not be readily available 26
  • 27. Figure 3-6. Sample Stakeholder Register 27
  • 28. Figure 3-7. Sample Stakeholder Management Strategy 28
  • 29. Figure 3-8. Analyzing “Formal” Stakeholder Needs (www.xkcd.com) 29
  • 30. Creating a Project Charter A project charter is a document that formally recognizes the existence of a project and provides a summary of the project’s objectives and management It authorizes the project manager to use organizational resources to complete the project Ideally, the project manager will play a major role in developing the project charter Instead of project charters, some organizations initiate projects using a simple letter of agreement or formal contracts A crucial part of the project charter is the sign-off section 30
  • 31. Contents of a Project Charter The project’s title and date of authorization The project manager’s name and contact information A summary schedule or timeline, including the planned start and finish dates; if a summary milestone schedule is available, it should also be included or referenced A summary of the project’s estimated cost and budget allocation A brief description of the project objectives, including the business need or other justification for authorizing the project Project success criteria, including project approval requirements and who signs off on the project A summary of the planned approach for managing the project, which should describe stakeholder needs and expectations, important assumptions, and constraints, and refer to related documents, such as a communications management plan, as available A roles and responsibilities matrix A sign-off section for signatures of key project stakeholders A comments section in which stakeholders can provide important comments related to the project 31
  • 32. Figure 3-9. Sample Project Charter 32
  • 33. Figure 3-6. Sample Project Charter (continued) 33
  • 34. Media Snapshot In television shows like Trading Spaces, participants have two days and $1,000 to update a room in their neighbor’s house. Because the time and cost are set, it’s the scope that has the most flexibility Unlike most projects in which the project team works closely with the customer, homeowners have little say in what is done and cannot inspect the work along the way. They walk into their newly decorated room with their eyes closed What happens when the homeowners don’t like the work that’s been done? They’re stuck because they signed a release statement Too bad you can’t get sponsors for most projects to sign a similar release form. It would make project management much easier! 34
  • 35. Holding a Project Kick-off Meeting Experienced project managers know that it is crucial to get projects off to a great start A kick-off meeting is a meeting held at the beginning of a project so that stakeholders can meet each other, review the goals of the project, and discuss future plans Often used to get support for a project and clarify roles and responsibilities The project champion should speak first and introduce the project sponsor and project manager Often a fair amount of work is done to prepare for the meeting Best if it can be held face-to-face 35
  • 36.
  • 37. Review of the project background
  • 38. Review of project-related documents (i.e., business case, project charter)
  • 39. Discussion of project organizational structure
  • 40. Discussion of project scope, time, and cost goals
  • 41. Discussion of other important topics
  • 42. List of action items from meetingDate and time of next meeting:
  • 43. Chapter Summary The five project management process groups are initiating, planning, executing, monitoring and controlling, and closing. These processes occur at varying levels of intensity throughout each phase of a project, and specific outcomes are produced as a result of each process Mapping the main activities of each project management process group into the nine project management knowledge areas provides a big picture of what activities are involved in project management 37
  • 44. Chapter Summary (continued) Global Construction’s Just-In-Time Training project demonstrates the process of initiating a project. After a project is approved, senior managers often meet to perform several pre-initiating tasks The main tasks normally involved in project initiation are the following: Identifying and understanding project stakeholders Creating the project charter Holding a kick-off meeting 38