SlideShare une entreprise Scribd logo
1  sur  10
Environment Delivery Management
            Services
Contents and Scope

Contents
•         Environment Delivery Management team and Services
•         A view of where Environment delivery fits from a Product life cycle perspective
•         Environment Delivery Management team’s Structure and their levels of service
          facing out to programmes/ projects and BAU work-streams
•         Environment Delivery Management workflows and entry/exit Criteria
•         Environment Delivery Management’s Key Stakeholders

Scope
In - Environment Delivery Services for:
•         Provisioning of new environments
•         Incident Lifecycle Management on new and existing environments.




Slide 2    © British Gas 06/22/12
Environments End to end Flow within
the life cycle
Key Functions and Services

 Service Engagement - In this phase a set of tasks are performed for Requirements gathering, Gap
      Analysis, Building an Environment requirements document and working comprehensibly with the
      projects to understand the environment requirements.
 Design & Delivery – This phase will be to work with the Project Team to validate the design and
      source the Environments that need to be built or shared. This stage will also be used to get the
      processes set in place for running the Environment and how they are going to be used, the number
      of hours support that is required, build with the Infrastructure teams the Environments using the
      requirements obtained in the Analysis phase, Smoke Test the Environments, make sure the
      configuration of the Environment is carried as per agreed requirements.
 Environment Management & Planning – This phase will consist of environment delivery
      managers who will be the single point of contact for all deliverables of test environments and will
      face off with PM’s and Test managers for delivery dashboards and planning.
 Support and Incident Lifecycle Management - This phase will be to work with the Project to
      support the test environments once delivered. This will include Incident Management, Problem
      Management, daily reporting of availability, reporting on support status and Root causes.



Note: Refer to Service Catalogue in Appendix for the full list of service
Environment Delivery Team’s level of
 involvement within Programmes/projects
       Resource                           Accountabilities                                               Responsibilities

Programme EDM                 Programme level Environment Delivery              Engagement, Resource Planning, Milestone Planning, Stakeholder
                                                                                Management

EDM                           Project Environment Deliveries                    Manage Delivery of Apps, Data, Batch, Users, end 2 end for individual
                                                                                projects

Incident Managers             Enviroment Incident Lifecycle Management          Post Delivery Environments Support, Metrics Production, RCA and
                                                                                Recovery Actions, Post Incident Review


               0                    1                2                    3                                 4                  5                  6
 Concept           Shape                                 Deliver                                                               Operate
                      Feasibility       High level             Detailed         Build           Test            Implement            Production
  Problem
                      Study             Design                 Design
  Definition


Programme                                                          Programme EDM

Projects
 Project 1                                                                              EDM1

 Project 4                                                                              EDM4
 Project 3                                                                              EDM3
 Project 2                                                                              EDM2

Support Phase                                                                 Incident Management Team
Environments Services Entry And Exit Criteria

                                                                      Exit Point Documentation
                                                                      •     Env Booking in Moose
                                                                      •     Booking DB updated with
                                                                            System Details
                                                                      •     Env Delivery Plan updated
                                                                      •     Env Delivery RAID logs
                                                                            updated
                                                                      •     Env Handover document
Entry Point                                                                 updated
•    Project/ Programme Time   Environment Deliverables
     lines                     •    Environment Delivery Plan
•    Delivery Approach              running through phases of
•    Infrastructure Design     •    Role Ready state of Env
•    Test Strategy and         •    Build Ready state of Env
     Timelines                 •    Config Ready state of Env
•    Test Enviornment               and
     Requirements              •    Test Ready state of Env
•    Master Test Plan                                           Exit Point Deliverables
                                                                •     Built and configured Application
                                                                      Instance
                                                                •     Fully connected E2E Env pipe
                                                                      cleaned
                                                                •     Build Deployed as per requirement
                                                                      specification
                                                                •     Installed and Configured Batch
                                                                •     Deployment facility from Moose
                                                                      enabled
                                                                •     Daily Checks and Monitoring enabled
                                                                      through TESA
                                                                •     Incident Management Process
                                                                      enabled to support the Env’s
Environment Delivery Management Key Stakeholders
and Responsibility

     Key Stakeholder                                                      Prime Responsibility
Head of Environment Delivery                 Responsible for the Test Environment Delivery Services across British Gas business.
        Business Team                         Responsible for defining the project requirements and accepting the end delivery
                                Responsible for coordinating various activities between different project streams such as development team,
                                QA team and business team and acts as a liaison between the business teams and various technical delivery
     Project Management
                                                                                    teams.
                                                             Responsible for managing project costs and budget.
                                  Responsible for project stakeholder management, continuous guidance and reviews of key deliverables in
    Subject Matter Experts
                                                                                  their area.
                                 Responsible for defect resolution by coordinating the work between the development team and the testing
  Defect Management Team                                                             team.
                                            Responsible for causal analysis of defects identified in UAT and Post Implementation

                                  Responsible for overall Test Strategy and Test Plan across multiple projects within a Business Unit. Will be
   Programme Test manager
                                                       responsible to managing Test Budgets across multiple projects.

                              Engage Projects and Programmes act a central point of contact for escalations, engage communication,
Environment Management Lead initialize Environment teams, act as a Senior Escalation point, carry out estimation and cost analysis for the
                                                                              projects.

                                               Engagement, Resource Planning, Milestone Planning, Stakeholder Management
       Programme EDM

                             Engage with required parties – such as support groups, vendors – to facilitate resolutions. Escalate to senior IT
Environment Delivery Manager   & Business management where required, carry out dashboard reporting, daily status meetings, resource
                                   Environments and components for projects, act a point of escalation when there is an escalation
                            Engage with different component teams and 3rd party support groups to facilitate resolutions for environment
Environment Support Manager related incidents. Will be responsible for doing the Level 1 TRIAGE on incidents before it is passed onto other
                                                                           Resolver Groups.
RACI Matrix-Infrastructure / Hardware
To be Reviewed in line with new provisioning + IM / PM Processes

  Deliverable                                                                          External
                            Environment                 Technical         Implementati                             TESA
                  Project                    Solution              Test                Supplier         Infra
                              Delivery                 Componen                on                                 (Sanity
                  Manager                    Architect            Manager              (eg TSL,       Architect
                              Manager                    t Teams            Manager                               Check)
                                                                                         HP)
Solution Design      I               I        R/A/C          I       I                                    I

Infrastructure       I           I/C             I             I           I              I       I    R/A/C
Design

RFW                  I           C               C            C            I            R/A       R      C


SOW - Detailed       I               I           I             I           I             A        R       I
Proposal

SOW                 C/I          R/A             I            C            I              I              C
sign-off
Overall Project    R/A            C              I            C            C             C        C      C          C
Plan
Infrastructure       I               I                        C           C/I           A/C       R
Delivery Plan
Infrastructure       I           R/A                          C            I              I       C
sign-off

                            R= Responsible for Delivery
                            A= Accountable for the deliverable
                            C=Contributes or may contribute for the deliverable
                            I=Receives a copy of the deliverables for Information purposes only
RACI Matrix-Application
 To be Reviewed in line with new provisioning + IM / PM Processes

    Deliverable    Project        Environment           Technical        TESA (Pipe      Test Lead      Build     Dev Lead
                   Manager      Delivery Manager       Component           Clean)                    Management
                                                         Teams

Requirements         R                   C                   C                C               A/C        I           C


Master Test Plan      I                   I                  I                 I              R/A        I           C


Environment           I                 R/A                  C                C                I         C           C
Delivery Plan




Environment           I                 R/A                  C                C                C         I           C
sign-off




                             R= Responsible for Delivery
                             A= Accountable for the deliverable
                             C=Contributes or may contribute for the deliverable
                             I=Receives a copy of the deliverables for Information purposes
                             only
Appendix

Service Catalogue

 Microsoft Word
    Document

Contenu connexe

Tendances

Performance testing : An Overview
Performance testing : An OverviewPerformance testing : An Overview
Performance testing : An Overviewsharadkjain
 
Testing Centre of Excellence Model 2016
Testing Centre of Excellence Model 2016Testing Centre of Excellence Model 2016
Testing Centre of Excellence Model 2016Tony Barber
 
Agile QA presentation
Agile QA presentationAgile QA presentation
Agile QA presentationCarl Bruiners
 
Role Of Qa And Testing In Agile 1225221397167302 8
Role Of Qa And Testing In Agile 1225221397167302 8Role Of Qa And Testing In Agile 1225221397167302 8
Role Of Qa And Testing In Agile 1225221397167302 8a34sharm
 
Sap test center of excellence
Sap test center of excellenceSap test center of excellence
Sap test center of excellenceInfosys
 
Test Automation Strategies For Agile
Test Automation Strategies For AgileTest Automation Strategies For Agile
Test Automation Strategies For AgileNaresh Jain
 
Idexcel Independent Testing Services Presentation
Idexcel Independent Testing Services PresentationIdexcel Independent Testing Services Presentation
Idexcel Independent Testing Services PresentationIdexcel
 
Testing As A Services (TaaS) By Testrig Technologies
Testing As A Services (TaaS) By Testrig TechnologiesTesting As A Services (TaaS) By Testrig Technologies
Testing As A Services (TaaS) By Testrig TechnologiesTestrig Technologies
 
An Overview of User Acceptance Testing (UAT)
An Overview of User Acceptance Testing (UAT)An Overview of User Acceptance Testing (UAT)
An Overview of User Acceptance Testing (UAT)Usersnap
 
Non-functional testing
Non-functional testingNon-functional testing
Non-functional testingVishwanath KC
 
How to fit Performance Testing in Devops environment.pptx.pdf
How to fit Performance Testing in Devops environment.pptx.pdfHow to fit Performance Testing in Devops environment.pptx.pdf
How to fit Performance Testing in Devops environment.pptx.pdfKnoldus Inc.
 
Infographic: Importance of Performance Testing
Infographic: Importance of Performance TestingInfographic: Importance of Performance Testing
Infographic: Importance of Performance TestingKiwiQA
 
Enterprise QA and Application Testing Services
Enterprise QA and Application Testing ServicesEnterprise QA and Application Testing Services
Enterprise QA and Application Testing ServicesCygnet Infotech
 
Setting up Center of Excellence for QA in Healthcare
Setting up Center of Excellence for QA in HealthcareSetting up Center of Excellence for QA in Healthcare
Setting up Center of Excellence for QA in HealthcareCitiusTech
 

Tendances (20)

QA Center Of Excellence (TCoE)
QA Center Of Excellence (TCoE)QA Center Of Excellence (TCoE)
QA Center Of Excellence (TCoE)
 
Performance testing : An Overview
Performance testing : An OverviewPerformance testing : An Overview
Performance testing : An Overview
 
QA-presentation
QA-presentationQA-presentation
QA-presentation
 
Testing Centre of Excellence Model 2016
Testing Centre of Excellence Model 2016Testing Centre of Excellence Model 2016
Testing Centre of Excellence Model 2016
 
Agile QA presentation
Agile QA presentationAgile QA presentation
Agile QA presentation
 
Role Of Qa And Testing In Agile 1225221397167302 8
Role Of Qa And Testing In Agile 1225221397167302 8Role Of Qa And Testing In Agile 1225221397167302 8
Role Of Qa And Testing In Agile 1225221397167302 8
 
Sap test center of excellence
Sap test center of excellenceSap test center of excellence
Sap test center of excellence
 
Tcoe team
Tcoe teamTcoe team
Tcoe team
 
Test Automation Strategies For Agile
Test Automation Strategies For AgileTest Automation Strategies For Agile
Test Automation Strategies For Agile
 
Idexcel Independent Testing Services Presentation
Idexcel Independent Testing Services PresentationIdexcel Independent Testing Services Presentation
Idexcel Independent Testing Services Presentation
 
Agile QA Process
Agile QA ProcessAgile QA Process
Agile QA Process
 
Testing As A Services (TaaS) By Testrig Technologies
Testing As A Services (TaaS) By Testrig TechnologiesTesting As A Services (TaaS) By Testrig Technologies
Testing As A Services (TaaS) By Testrig Technologies
 
Testing Services
Testing ServicesTesting Services
Testing Services
 
An Overview of User Acceptance Testing (UAT)
An Overview of User Acceptance Testing (UAT)An Overview of User Acceptance Testing (UAT)
An Overview of User Acceptance Testing (UAT)
 
Non-functional testing
Non-functional testingNon-functional testing
Non-functional testing
 
Agile QA process
Agile QA processAgile QA process
Agile QA process
 
How to fit Performance Testing in Devops environment.pptx.pdf
How to fit Performance Testing in Devops environment.pptx.pdfHow to fit Performance Testing in Devops environment.pptx.pdf
How to fit Performance Testing in Devops environment.pptx.pdf
 
Infographic: Importance of Performance Testing
Infographic: Importance of Performance TestingInfographic: Importance of Performance Testing
Infographic: Importance of Performance Testing
 
Enterprise QA and Application Testing Services
Enterprise QA and Application Testing ServicesEnterprise QA and Application Testing Services
Enterprise QA and Application Testing Services
 
Setting up Center of Excellence for QA in Healthcare
Setting up Center of Excellence for QA in HealthcareSetting up Center of Excellence for QA in Healthcare
Setting up Center of Excellence for QA in Healthcare
 

En vedette

Test Environment Management Maturity Model
Test Environment Management Maturity ModelTest Environment Management Maturity Model
Test Environment Management Maturity Modelcrawforn992
 
Environments management - A Critical Support Function
Environments management - A Critical Support FunctionEnvironments management - A Critical Support Function
Environments management - A Critical Support FunctionThyagarajan Krishnan
 
What are the common Test Environment today
What are the common Test Environment todayWhat are the common Test Environment today
What are the common Test Environment todayDoris Robinson
 
Building a software testing environment
Building a software testing environmentBuilding a software testing environment
Building a software testing environmentHimanshu
 
Continuous Delivery of (y)our infrastructure.
Continuous Delivery of (y)our infrastructure.Continuous Delivery of (y)our infrastructure.
Continuous Delivery of (y)our infrastructure.Kris Buytaert
 
Risk based testing and random testing
Risk based testing and random testingRisk based testing and random testing
Risk based testing and random testingHimanshu
 
Mobile to mainframe - The Challenges and Best Practices of Enterprise DevOps
Mobile to mainframe - The Challenges and Best Practices of Enterprise DevOps Mobile to mainframe - The Challenges and Best Practices of Enterprise DevOps
Mobile to mainframe - The Challenges and Best Practices of Enterprise DevOps IBM UrbanCode Products
 
Il brainstorming di Walt Disney
Il brainstorming di Walt Disney Il brainstorming di Walt Disney
Il brainstorming di Walt Disney Massimo Del Monte
 
Sap Customer Service In Manufacturing Industry1
Sap Customer Service In Manufacturing Industry1Sap Customer Service In Manufacturing Industry1
Sap Customer Service In Manufacturing Industry1evil66_in
 
Optimize DevOps and Agile Strategies with Deployment Automation
Optimize DevOps and Agile Strategies with Deployment AutomationOptimize DevOps and Agile Strategies with Deployment Automation
Optimize DevOps and Agile Strategies with Deployment AutomationXebiaLabs
 
Test automation - Building effective solutions
Test automation - Building effective solutionsTest automation - Building effective solutions
Test automation - Building effective solutionsArtem Nagornyi
 
ITIL Training Module 1 Service Management Part 2
ITIL Training Module 1 Service Management Part 2ITIL Training Module 1 Service Management Part 2
ITIL Training Module 1 Service Management Part 2Skillogic Solutions
 
How Can Test Data Management Overcome Mainframe Testing Challenges?
How Can Test Data Management Overcome Mainframe Testing Challenges?How Can Test Data Management Overcome Mainframe Testing Challenges?
How Can Test Data Management Overcome Mainframe Testing Challenges?CA Technologies
 
AMIS 25: DevOps Best Practice for Oracle SOA and BPM
AMIS 25: DevOps Best Practice for Oracle SOA and BPMAMIS 25: DevOps Best Practice for Oracle SOA and BPM
AMIS 25: DevOps Best Practice for Oracle SOA and BPMMatt Wright
 
File models and file accessing models
File models and file accessing modelsFile models and file accessing models
File models and file accessing modelsishmecse13
 
Practical management of development & QA environments for SharePoint 2013
Practical management of development & QA environments for SharePoint 2013Practical management of development & QA environments for SharePoint 2013
Practical management of development & QA environments for SharePoint 2013SharePointRadi
 
4.file service architecture
4.file service architecture4.file service architecture
4.file service architectureAbDul ThaYyal
 

En vedette (20)

Test Environment Management Maturity Model
Test Environment Management Maturity ModelTest Environment Management Maturity Model
Test Environment Management Maturity Model
 
Environments management - A Critical Support Function
Environments management - A Critical Support FunctionEnvironments management - A Critical Support Function
Environments management - A Critical Support Function
 
What are the common Test Environment today
What are the common Test Environment todayWhat are the common Test Environment today
What are the common Test Environment today
 
Building a software testing environment
Building a software testing environmentBuilding a software testing environment
Building a software testing environment
 
Business plan
Business planBusiness plan
Business plan
 
Continuous Delivery of (y)our infrastructure.
Continuous Delivery of (y)our infrastructure.Continuous Delivery of (y)our infrastructure.
Continuous Delivery of (y)our infrastructure.
 
Risk based testing and random testing
Risk based testing and random testingRisk based testing and random testing
Risk based testing and random testing
 
Mobile to mainframe - The Challenges and Best Practices of Enterprise DevOps
Mobile to mainframe - The Challenges and Best Practices of Enterprise DevOps Mobile to mainframe - The Challenges and Best Practices of Enterprise DevOps
Mobile to mainframe - The Challenges and Best Practices of Enterprise DevOps
 
Il brainstorming di Walt Disney
Il brainstorming di Walt Disney Il brainstorming di Walt Disney
Il brainstorming di Walt Disney
 
Sap Customer Service In Manufacturing Industry1
Sap Customer Service In Manufacturing Industry1Sap Customer Service In Manufacturing Industry1
Sap Customer Service In Manufacturing Industry1
 
Optimize DevOps and Agile Strategies with Deployment Automation
Optimize DevOps and Agile Strategies with Deployment AutomationOptimize DevOps and Agile Strategies with Deployment Automation
Optimize DevOps and Agile Strategies with Deployment Automation
 
Test automation - Building effective solutions
Test automation - Building effective solutionsTest automation - Building effective solutions
Test automation - Building effective solutions
 
ITIL Training Module 1 Service Management Part 2
ITIL Training Module 1 Service Management Part 2ITIL Training Module 1 Service Management Part 2
ITIL Training Module 1 Service Management Part 2
 
How Can Test Data Management Overcome Mainframe Testing Challenges?
How Can Test Data Management Overcome Mainframe Testing Challenges?How Can Test Data Management Overcome Mainframe Testing Challenges?
How Can Test Data Management Overcome Mainframe Testing Challenges?
 
AMIS 25: DevOps Best Practice for Oracle SOA and BPM
AMIS 25: DevOps Best Practice for Oracle SOA and BPMAMIS 25: DevOps Best Practice for Oracle SOA and BPM
AMIS 25: DevOps Best Practice for Oracle SOA and BPM
 
File models and file accessing models
File models and file accessing modelsFile models and file accessing models
File models and file accessing models
 
Practical management of development & QA environments for SharePoint 2013
Practical management of development & QA environments for SharePoint 2013Practical management of development & QA environments for SharePoint 2013
Practical management of development & QA environments for SharePoint 2013
 
Using The One Page Project Manager
Using The One Page Project ManagerUsing The One Page Project Manager
Using The One Page Project Manager
 
4.file service architecture
4.file service architecture4.file service architecture
4.file service architecture
 
11. dfs
11. dfs11. dfs
11. dfs
 

Similaire à Environment Delivery Management Services

SaaS Operations Practice Overview SoftServe DevOps
SaaS Operations Practice Overview SoftServe DevOpsSaaS Operations Practice Overview SoftServe DevOps
SaaS Operations Practice Overview SoftServe DevOpsSoftServe
 
Chef for DevOps - an Introduction
Chef for DevOps - an IntroductionChef for DevOps - an Introduction
Chef for DevOps - an IntroductionSanjeev Sharma
 
D.mathieson agile software_development_using_scrum
D.mathieson agile software_development_using_scrumD.mathieson agile software_development_using_scrum
D.mathieson agile software_development_using_scrumRamkumar Sundarakalatharan
 
Blue Monitor Software Development
Blue Monitor Software DevelopmentBlue Monitor Software Development
Blue Monitor Software Developmenturbantech
 
Blue Monitor Systems Software Development Services
Blue Monitor Systems Software Development ServicesBlue Monitor Systems Software Development Services
Blue Monitor Systems Software Development Servicesbluemonitor
 
OOW 09 EBS Application Change Management Pack
OOW 09 EBS Application Change Management PackOOW 09 EBS Application Change Management Pack
OOW 09 EBS Application Change Management Packjucaab
 
Kneat Gx Compliance By Design
Kneat Gx   Compliance By DesignKneat Gx   Compliance By Design
Kneat Gx Compliance By DesignMicheal_OConnell
 
Kneat Gx Compliance by Design
Kneat Gx Compliance by DesignKneat Gx Compliance by Design
Kneat Gx Compliance by DesignKneat Solutions
 
Unosquare SlideShare Presentation
Unosquare SlideShare PresentationUnosquare SlideShare Presentation
Unosquare SlideShare PresentationMichael Barrett
 
Quality Coding: What's New with Visual Studio 2012
Quality Coding: What's New with Visual Studio 2012Quality Coding: What's New with Visual Studio 2012
Quality Coding: What's New with Visual Studio 2012Imaginet
 
Quality Coding: What’s New with Visual Studio 2012
Quality Coding: What’s New with Visual Studio 2012Quality Coding: What’s New with Visual Studio 2012
Quality Coding: What’s New with Visual Studio 2012Imaginet
 
Quality Coding with Visual Studio 2012
Quality Coding with Visual Studio 2012Quality Coding with Visual Studio 2012
Quality Coding with Visual Studio 2012Imaginet
 
Introducing the WSO2 App Factory
Introducing the WSO2 App FactoryIntroducing the WSO2 App Factory
Introducing the WSO2 App FactoryWSO2
 
The Commissioning Process
The Commissioning ProcessThe Commissioning Process
The Commissioning Processd_mackay
 
Harvey elliott
Harvey elliottHarvey elliott
Harvey elliottNASAPMC
 
Avea Release Management IBM Innovate 2012
Avea Release Management IBM Innovate 2012Avea Release Management IBM Innovate 2012
Avea Release Management IBM Innovate 2012Oguzhan Ozavar
 

Similaire à Environment Delivery Management Services (20)

Camo
CamoCamo
Camo
 
SaaS Operations Practice Overview SoftServe DevOps
SaaS Operations Practice Overview SoftServe DevOpsSaaS Operations Practice Overview SoftServe DevOps
SaaS Operations Practice Overview SoftServe DevOps
 
Chef for DevOps - an Introduction
Chef for DevOps - an IntroductionChef for DevOps - an Introduction
Chef for DevOps - an Introduction
 
D.mathieson agile software_development_using_scrum
D.mathieson agile software_development_using_scrumD.mathieson agile software_development_using_scrum
D.mathieson agile software_development_using_scrum
 
Blue Monitor Software Development
Blue Monitor Software DevelopmentBlue Monitor Software Development
Blue Monitor Software Development
 
Blue Monitor Systems Software Development Services
Blue Monitor Systems Software Development ServicesBlue Monitor Systems Software Development Services
Blue Monitor Systems Software Development Services
 
OOW 09 EBS Application Change Management Pack
OOW 09 EBS Application Change Management PackOOW 09 EBS Application Change Management Pack
OOW 09 EBS Application Change Management Pack
 
Energy and engineering services leverages growth
Energy and engineering services leverages growthEnergy and engineering services leverages growth
Energy and engineering services leverages growth
 
Managed Services Overview
Managed Services OverviewManaged Services Overview
Managed Services Overview
 
Kneat Gx Compliance By Design
Kneat Gx   Compliance By DesignKneat Gx   Compliance By Design
Kneat Gx Compliance By Design
 
Kneat Gx Compliance by Design
Kneat Gx Compliance by DesignKneat Gx Compliance by Design
Kneat Gx Compliance by Design
 
Unosquare SlideShare Presentation
Unosquare SlideShare PresentationUnosquare SlideShare Presentation
Unosquare SlideShare Presentation
 
Quality Coding: What's New with Visual Studio 2012
Quality Coding: What's New with Visual Studio 2012Quality Coding: What's New with Visual Studio 2012
Quality Coding: What's New with Visual Studio 2012
 
Quality Coding: What’s New with Visual Studio 2012
Quality Coding: What’s New with Visual Studio 2012Quality Coding: What’s New with Visual Studio 2012
Quality Coding: What’s New with Visual Studio 2012
 
Quality Coding with Visual Studio 2012
Quality Coding with Visual Studio 2012Quality Coding with Visual Studio 2012
Quality Coding with Visual Studio 2012
 
Adv prod tools assgn5
Adv prod tools assgn5Adv prod tools assgn5
Adv prod tools assgn5
 
Introducing the WSO2 App Factory
Introducing the WSO2 App FactoryIntroducing the WSO2 App Factory
Introducing the WSO2 App Factory
 
The Commissioning Process
The Commissioning ProcessThe Commissioning Process
The Commissioning Process
 
Harvey elliott
Harvey elliottHarvey elliott
Harvey elliott
 
Avea Release Management IBM Innovate 2012
Avea Release Management IBM Innovate 2012Avea Release Management IBM Innovate 2012
Avea Release Management IBM Innovate 2012
 

Dernier

GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxOnBoard
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...HostedbyConfluent
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhisoniya singh
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 

Dernier (20)

GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptx
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 

Environment Delivery Management Services

  • 2. Contents and Scope Contents • Environment Delivery Management team and Services • A view of where Environment delivery fits from a Product life cycle perspective • Environment Delivery Management team’s Structure and their levels of service facing out to programmes/ projects and BAU work-streams • Environment Delivery Management workflows and entry/exit Criteria • Environment Delivery Management’s Key Stakeholders Scope In - Environment Delivery Services for: • Provisioning of new environments • Incident Lifecycle Management on new and existing environments. Slide 2 © British Gas 06/22/12
  • 3. Environments End to end Flow within the life cycle
  • 4. Key Functions and Services Service Engagement - In this phase a set of tasks are performed for Requirements gathering, Gap Analysis, Building an Environment requirements document and working comprehensibly with the projects to understand the environment requirements. Design & Delivery – This phase will be to work with the Project Team to validate the design and source the Environments that need to be built or shared. This stage will also be used to get the processes set in place for running the Environment and how they are going to be used, the number of hours support that is required, build with the Infrastructure teams the Environments using the requirements obtained in the Analysis phase, Smoke Test the Environments, make sure the configuration of the Environment is carried as per agreed requirements. Environment Management & Planning – This phase will consist of environment delivery managers who will be the single point of contact for all deliverables of test environments and will face off with PM’s and Test managers for delivery dashboards and planning. Support and Incident Lifecycle Management - This phase will be to work with the Project to support the test environments once delivered. This will include Incident Management, Problem Management, daily reporting of availability, reporting on support status and Root causes. Note: Refer to Service Catalogue in Appendix for the full list of service
  • 5. Environment Delivery Team’s level of involvement within Programmes/projects Resource Accountabilities Responsibilities Programme EDM Programme level Environment Delivery Engagement, Resource Planning, Milestone Planning, Stakeholder Management EDM Project Environment Deliveries Manage Delivery of Apps, Data, Batch, Users, end 2 end for individual projects Incident Managers Enviroment Incident Lifecycle Management Post Delivery Environments Support, Metrics Production, RCA and Recovery Actions, Post Incident Review 0 1 2 3 4 5 6 Concept Shape Deliver Operate Feasibility High level Detailed Build Test Implement Production Problem Study Design Design Definition Programme Programme EDM Projects Project 1 EDM1 Project 4 EDM4 Project 3 EDM3 Project 2 EDM2 Support Phase Incident Management Team
  • 6. Environments Services Entry And Exit Criteria Exit Point Documentation • Env Booking in Moose • Booking DB updated with System Details • Env Delivery Plan updated • Env Delivery RAID logs updated • Env Handover document Entry Point updated • Project/ Programme Time Environment Deliverables lines • Environment Delivery Plan • Delivery Approach running through phases of • Infrastructure Design • Role Ready state of Env • Test Strategy and • Build Ready state of Env Timelines • Config Ready state of Env • Test Enviornment and Requirements • Test Ready state of Env • Master Test Plan Exit Point Deliverables • Built and configured Application Instance • Fully connected E2E Env pipe cleaned • Build Deployed as per requirement specification • Installed and Configured Batch • Deployment facility from Moose enabled • Daily Checks and Monitoring enabled through TESA • Incident Management Process enabled to support the Env’s
  • 7. Environment Delivery Management Key Stakeholders and Responsibility Key Stakeholder Prime Responsibility Head of Environment Delivery Responsible for the Test Environment Delivery Services across British Gas business. Business Team Responsible for defining the project requirements and accepting the end delivery Responsible for coordinating various activities between different project streams such as development team, QA team and business team and acts as a liaison between the business teams and various technical delivery Project Management teams. Responsible for managing project costs and budget. Responsible for project stakeholder management, continuous guidance and reviews of key deliverables in Subject Matter Experts their area. Responsible for defect resolution by coordinating the work between the development team and the testing Defect Management Team team. Responsible for causal analysis of defects identified in UAT and Post Implementation Responsible for overall Test Strategy and Test Plan across multiple projects within a Business Unit. Will be Programme Test manager responsible to managing Test Budgets across multiple projects. Engage Projects and Programmes act a central point of contact for escalations, engage communication, Environment Management Lead initialize Environment teams, act as a Senior Escalation point, carry out estimation and cost analysis for the projects. Engagement, Resource Planning, Milestone Planning, Stakeholder Management Programme EDM Engage with required parties – such as support groups, vendors – to facilitate resolutions. Escalate to senior IT Environment Delivery Manager & Business management where required, carry out dashboard reporting, daily status meetings, resource Environments and components for projects, act a point of escalation when there is an escalation Engage with different component teams and 3rd party support groups to facilitate resolutions for environment Environment Support Manager related incidents. Will be responsible for doing the Level 1 TRIAGE on incidents before it is passed onto other Resolver Groups.
  • 8. RACI Matrix-Infrastructure / Hardware To be Reviewed in line with new provisioning + IM / PM Processes Deliverable External Environment Technical Implementati TESA Project Solution Test Supplier Infra Delivery Componen on (Sanity Manager Architect Manager (eg TSL, Architect Manager t Teams Manager Check) HP) Solution Design I I R/A/C I I I Infrastructure I I/C I I I I I R/A/C Design RFW I C C C I R/A R C SOW - Detailed I I I I I A R I Proposal SOW C/I R/A I C I I C sign-off Overall Project R/A C I C C C C C C Plan Infrastructure I I C C/I A/C R Delivery Plan Infrastructure I R/A C I I C sign-off R= Responsible for Delivery A= Accountable for the deliverable C=Contributes or may contribute for the deliverable I=Receives a copy of the deliverables for Information purposes only
  • 9. RACI Matrix-Application To be Reviewed in line with new provisioning + IM / PM Processes Deliverable Project Environment Technical TESA (Pipe Test Lead Build Dev Lead Manager Delivery Manager Component Clean) Management Teams Requirements R C C C A/C I C Master Test Plan I I I I R/A I C Environment I R/A C C I C C Delivery Plan Environment I R/A C C C I C sign-off R= Responsible for Delivery A= Accountable for the deliverable C=Contributes or may contribute for the deliverable I=Receives a copy of the deliverables for Information purposes only

Notes de l'éditeur

  1. Title slide [from Title Slide master] The title slide is available as a Title Master and the background and graphic elements are fixed. Text is editable for the slide heading and presentation details but the British Gas brand mark and other graphic elements are fixed on the Title Master. Font, type size and colours are fixed for the Title Master style and should not be modified.
  2. Text slide, with title and body text [from Slide Master] This slide exists as a Slide Master and all type specifications and graphic elements are fixed. Simply type into the prompt boxes. The layout is set as a Title Box and Text Box – within the Text Box there are five levels of type: Level 1 – Body text set in Arial Regular (18pt on 24pt linefeed) with ‘0.3 line’ space below each paragraph. Level 2 – Bulleted body text set in Arial Regular (18pt on 24pt linefeed) with ‘0.3 line’ space below each paragraph. Level 3 – Bulleted body text (using a horizontal dash) set in Arial Regular (16pt on 20pt linefeed) with ‘0.3 line’ space below each paragraph. Level 4 – Bulleted body text set in Arial Regular (15pt on 18pt linefeed) with ‘0.3 line’ space below each paragraph. Level 5 – Bulleted body text (using a horizontal dash) set in Arial Regular (14pt on 17pt linefeed) with ‘0.3 line’ space below each paragraph. Within standard body text, subheads are set in Arial Bold at the same size as the body text. Subheadings should not use different colouring or style attributes. While the text position is fixed, the text box will grow as you enter further content in the slide – therefore, care should be taken to keep within the present text box margins. Advancing through the text levels To advance to each text level from the previous one you can use the ‘Increase Indent’ and ‘Decrease Indent’ buttons on the ‘Formatting’ toolbar in PowerPoint®. Footer details Footer details appear in the bottom-left corner of the slide and appear in fixed positions and order. Editing of Footer details is done by accessing ‘Header and Footer’ under the ‘View’ menu in PowerPoint®.