SlideShare une entreprise Scribd logo
1  sur  37
Télécharger pour lire hors ligne
11
CORNUBIA
PRESENTATION TO DCCI
07 August 2013
2
BACKGROUND
& HISTORY
3
POLLUTING THE NATIONAL AIRTIME
44
Tongaat Hulett = 611ha
(48%)
eThekwini = 659ha (52%)
LAND OWNERSHIP
5
CONTEXT /
FRAMEWORK
PLAN
6
 Based on National Department of
Human Settlement’s Breaking New
Ground initiative (BNG)
 KZN & Ethekwini’s 1st sustainable
integrated human settlement initiative
 Integrated development :
 mixed-income development with
10 000 affordable / middle income
units and 15000 subsidised units
 2.5 mil.m2 of commercial/industrial
bulk
 Full suite of Social Facilities
 Largest phased mega-infrastructure
Greenfields project in the province
 R25 billion total investment
The prime location of the site with Durban
together with the diverse mix of uses
creates an ideal opportunity for the people
within Cornubia and those that surround
this area to access a full set of urban and
economic opportunity
M41
N2
MOUNT EDGECOMBE
PHOENIX
CORNUBIA
OTTAWA
WATERLOO
7
THE OVERALL PLANNING FRAMEWORK
Provides new
framework roads
integrating Cornubia
Establishes Open
Space corridor
systems
Provides for some
25 000 homes
The proposed Retail
Park complements the
mixed use nature of
Cornubia.
WATERLOO
OTTAWA
MOUNT
EDGECOMBE
UMHLANGA
PHOENIX
8
SUBREGIONAL CONTEXT
CORNUBIA
9
9
MOUNT EDGECOMBE
PHOENIX
OTTAWA
WATERLOO
UMHLANGA
RIDGE
R102
10
SOME BASIC FACTS
• 1200 hectares, 450 unuseable, 750ha developable
• Largest land use is open space
• 25 000 residential units (15 000 = low income)
• 3.7 million m2 of combined bulk
• 80ha industrial platform (max 460 800m2 bulk)
• 1.2 million m2 of commercial bulk (offices, retail etc)
• 50ha of mixed use development
• Mix of housing typologies
11
PHASE 1 – CORNUBIA INDUSTRIAL & BUSINESS ESTATE & BNG HOUSING
12
INDUSTRIAL
13
CIBE LOCALITY PLAN
14
CIBE ARTISTS IMPRESSIONS
15
CIBE AERIAL VIEWS
16
PROGRESS TO DATE
• 62/80Ha have been sold
(+R 2 billion investment)
• Servicing and platforming
of the stands well
underway
• R 202 million spent to date
on internal infrastructure
• First warehouse to open
for trading in November
2013
17
RETAIL
18
CORNUBIA RETAIL PARK PRECINCT – LOCALITY PLAN
19
CORNUBIA RETAIL PARK PRECINCT - AERIAL VIEW
20
• The intention is to create a high quality retail precinct and supporting activities
defined by boulevards, landscaping and buildings that define the edges.
•The Plan responds to the prime accessibility and visibility of the emerging corridor
creating a positive interface for Cornubia.
MIXED USE 2
(HIGH INTENSITY- TOWN
CENTRE RELATED USES)
GENERAL
BUSINESS
MIXED USE 1
TOWN CENTRE
GENERAL
BUSINESS
21
• 80 000 m2 VALUE DESTINATION RETAIL
• SINGLE STAND-ALONE END-USER
NATIONAL RETAILER STORES
• VISIBLE FROM M41 & ACCESSIBLE TO
FUTURE BRT ROUTE
22
ARTISTS IMPRESSIONS
23
ARTISTS IMPRESSIONS
24
HOUSING
25
HOUSING
• eThekwini Municipality the developer & implementing
agent;
• Project formed part of eThekwini’s slum clearance
programme.
• 15 000 government subsidised housing over 7 years;
• Funding from National Dept of Human Settlements &
Provincial Dept of Human Settlements, plus USDG;
• HDA provided funding for land acquisition;
• Construction commenced on Phase 1A (pilot) and
access road – 482 units to be complete by end
August 2013;
26
PHASE 1 – PILOT AREA DESIGN
Attached 4m wide Row Housing
Attached 6m wide Row Housing
8m Access Street
3m Pedestrian Lanes
Central Courtyard as focus of
local community identity
6m wide paved street
Larger Park Space
27
PHASE 1B
2 220 units
PHASE 1A
482 units
PHASE 1A & B (APPROVED LAYOUTS)
INDUSTRIAL
28
PHASE 1A – PILOT AREA DESIGN
29
11HA, 482 BNG UNITS
2-STOREY FREEHOLD
PLS APPROVAL
PHASE 1 – PILOT AREA DESIGN
30
PILOT – CENTRAL COURTYARD AREA
31
PILOT – STREET SPACES
32
33
8/12/2013Footer Text 33
Project brings substantial socio-economic benefits to the region
OUTCOMES EM COMM EM HSG T/HULETT SASA TOTAL
TOTAL INVESTMENT
(R) – Services (R8bn) &
Buildings/Land
(R17.8bn)
R5 160 700 R5 209 330 R14 345 220 R1 126 260 R25 839 510
JOBS
- CONSTRUCTION 77 380 78 140 215 180 16 900 387 590
- PERMANENT 10 830 0 25 540 3 460 42 830
RATES – Rm p.a. R56 160 0 R169 930 R11 530 R237 620
VAT (PERMANENT)
Rm
R487 620 0 R917 410 R87 090 R1 492 120
TAX (PERMANENT)
Rm – p.a
- PAYROLL R108 300 R7 350 R285 400 R34 560 R435 600
- COMPANY R348 300 000 0 R683 870 R62 210 R1 094 380
TOTAL ANNUAL
REVENUE TO GOVT
Rm
R1 767 600
+ VAT ONCE
OFF OF R1.5bn
34
PHASE 2
35
35
EIA PHASING
PILOT
36
37
NATIONAL PRIORITY PROJECT &
SUSTAINABLE INTEGRATED HUMAN
SETTLEMENT INITIATIVE

Contenu connexe

Tendances

Plan for the Regeneration and Improvement of the area between Lower Mall and ...
Plan for the Regeneration and Improvement of the area between Lower Mall and ...Plan for the Regeneration and Improvement of the area between Lower Mall and ...
Plan for the Regeneration and Improvement of the area between Lower Mall and ...
Edge Hill University
 
Power Point Presentation for PPA 30
Power Point Presentation for PPA 30Power Point Presentation for PPA 30
Power Point Presentation for PPA 30
TABREZ AKHTAR
 
Building Science 1: Project 1 Nanyang
Building Science 1: Project 1 Nanyang Building Science 1: Project 1 Nanyang
Building Science 1: Project 1 Nanyang
hiewyennee
 

Tendances (20)

Urban Design:of washington DC,River front development
Urban Design:of washington DC,River front developmentUrban Design:of washington DC,River front development
Urban Design:of washington DC,River front development
 
Plan for the Regeneration and Improvement of the area between Lower Mall and ...
Plan for the Regeneration and Improvement of the area between Lower Mall and ...Plan for the Regeneration and Improvement of the area between Lower Mall and ...
Plan for the Regeneration and Improvement of the area between Lower Mall and ...
 
Thesis- SIGNIFICANCE OF VERTICAL FARMING IN HYBRID ARCHITECTURE
Thesis- SIGNIFICANCE OF VERTICAL FARMING IN HYBRID ARCHITECTUREThesis- SIGNIFICANCE OF VERTICAL FARMING IN HYBRID ARCHITECTURE
Thesis- SIGNIFICANCE OF VERTICAL FARMING IN HYBRID ARCHITECTURE
 
Planning principle-philosophy of kevin lynch
Planning principle-philosophy of kevin lynchPlanning principle-philosophy of kevin lynch
Planning principle-philosophy of kevin lynch
 
Plaza and square
Plaza and squarePlaza and square
Plaza and square
 
Power Point Presentation for PPA 30
Power Point Presentation for PPA 30Power Point Presentation for PPA 30
Power Point Presentation for PPA 30
 
Bogota city
Bogota cityBogota city
Bogota city
 
Architectural Portfolio
Architectural PortfolioArchitectural Portfolio
Architectural Portfolio
 
King Abdullah Financial District - Riyadh, KSA
King Abdullah Financial District - Riyadh, KSAKing Abdullah Financial District - Riyadh, KSA
King Abdullah Financial District - Riyadh, KSA
 
Parks as Multi-Use Destinations and Catalysts for Community Development
Parks as Multi-Use Destinations and Catalysts for Community DevelopmentParks as Multi-Use Destinations and Catalysts for Community Development
Parks as Multi-Use Destinations and Catalysts for Community Development
 
KAFD Design Manual Guidelines
KAFD Design Manual GuidelinesKAFD Design Manual Guidelines
KAFD Design Manual Guidelines
 
Architectural design III - Case study on Architect's House
Architectural design III - Case study on Architect's HouseArchitectural design III - Case study on Architect's House
Architectural design III - Case study on Architect's House
 
Garden city and the Idea of Modern Planning (Lewis Mumford)
Garden city and the Idea of Modern Planning (Lewis Mumford)Garden city and the Idea of Modern Planning (Lewis Mumford)
Garden city and the Idea of Modern Planning (Lewis Mumford)
 
Tambacounda Hospital Expansion , Senegal
Tambacounda Hospital Expansion , SenegalTambacounda Hospital Expansion , Senegal
Tambacounda Hospital Expansion , Senegal
 
Abbreviated rowe and koetter presentation
Abbreviated rowe  and koetter presentationAbbreviated rowe  and koetter presentation
Abbreviated rowe and koetter presentation
 
High quality cities - Gehl Architects Presentation
High quality cities - Gehl Architects PresentationHigh quality cities - Gehl Architects Presentation
High quality cities - Gehl Architects Presentation
 
Urban design portfolio
Urban design portfolioUrban design portfolio
Urban design portfolio
 
Building Science 1: Project 1 Nanyang
Building Science 1: Project 1 Nanyang Building Science 1: Project 1 Nanyang
Building Science 1: Project 1 Nanyang
 
Landscape Architect
Landscape ArchitectLandscape Architect
Landscape Architect
 
Master Plan Guwahati
Master Plan GuwahatiMaster Plan Guwahati
Master Plan Guwahati
 

Similaire à Cornubia Presentation: Investment and Development Opportunities

Development control regulations kochi report
Development control regulations kochi reportDevelopment control regulations kochi report
Development control regulations kochi report
Geeva Chandana
 
Noble-Portfolio-S-new
Noble-Portfolio-S-newNoble-Portfolio-S-new
Noble-Portfolio-S-new
Noble George
 
Xinxin Wang_Portfolio
Xinxin Wang_PortfolioXinxin Wang_Portfolio
Xinxin Wang_Portfolio
Xinxin Wang
 
TAYU3002 - A vision for... Norton 1_0 EMAIL
TAYU3002 - A vision for... Norton 1_0 EMAILTAYU3002 - A vision for... Norton 1_0 EMAIL
TAYU3002 - A vision for... Norton 1_0 EMAIL
Geoff Whitten
 
7.сеул ту циюй, нинг су
7.сеул ту циюй, нинг су7.сеул ту циюй, нинг су
7.сеул ту циюй, нинг су
Ilya Vasilyev
 

Similaire à Cornubia Presentation: Investment and Development Opportunities (20)

Lodha the rise
Lodha the riseLodha the rise
Lodha the rise
 
Development control regulations kochi report
Development control regulations kochi reportDevelopment control regulations kochi report
Development control regulations kochi report
 
Jamshedpur Market.pdf
Jamshedpur Market.pdfJamshedpur Market.pdf
Jamshedpur Market.pdf
 
22@english
22@english22@english
22@english
 
Dossier22@english
Dossier22@englishDossier22@english
Dossier22@english
 
Dossier22@english p
Dossier22@english pDossier22@english p
Dossier22@english p
 
Tongaat Hullett - Durban Investment Roadshow
Tongaat Hullett - Durban Investment RoadshowTongaat Hullett - Durban Investment Roadshow
Tongaat Hullett - Durban Investment Roadshow
 
Noble-Portfolio-S-new
Noble-Portfolio-S-newNoble-Portfolio-S-new
Noble-Portfolio-S-new
 
ZONES OF DELHI(AJ)
ZONES OF DELHI(AJ)ZONES OF DELHI(AJ)
ZONES OF DELHI(AJ)
 
The in the norther corridor of etm compressed 190814
The in the norther corridor of etm compressed 190814The in the norther corridor of etm compressed 190814
The in the norther corridor of etm compressed 190814
 
Development Potentials of the North-South Commuter Railway.pptx
Development Potentials of the North-South Commuter Railway.pptxDevelopment Potentials of the North-South Commuter Railway.pptx
Development Potentials of the North-South Commuter Railway.pptx
 
Binder1(1)
Binder1(1)Binder1(1)
Binder1(1)
 
Fnb
FnbFnb
Fnb
 
Top hills midwest avenue sales kit ver1
Top hills midwest avenue sales kit ver1Top hills midwest avenue sales kit ver1
Top hills midwest avenue sales kit ver1
 
Xinxin Wang_Portfolio
Xinxin Wang_PortfolioXinxin Wang_Portfolio
Xinxin Wang_Portfolio
 
Porfolio
PorfolioPorfolio
Porfolio
 
TAYU3002 - A vision for... Norton 1_0 EMAIL
TAYU3002 - A vision for... Norton 1_0 EMAILTAYU3002 - A vision for... Norton 1_0 EMAIL
TAYU3002 - A vision for... Norton 1_0 EMAIL
 
RETHINKING & REDESIGN OF KARWAN BAZAR,BANGLADESH
RETHINKING & REDESIGN OF KARWAN BAZAR,BANGLADESHRETHINKING & REDESIGN OF KARWAN BAZAR,BANGLADESH
RETHINKING & REDESIGN OF KARWAN BAZAR,BANGLADESH
 
7.сеул ту циюй, нинг су
7.сеул ту циюй, нинг су7.сеул ту циюй, нинг су
7.сеул ту циюй, нинг су
 
master plan and comparative analysis of National and International case study.
master plan and comparative analysis of National and International case study.master plan and comparative analysis of National and International case study.
master plan and comparative analysis of National and International case study.
 

Plus de Durban Chamber of Commerce and Industry

Plus de Durban Chamber of Commerce and Industry (20)

SUMMARY AMENDED CCMA RULES
SUMMARY AMENDED CCMA RULESSUMMARY AMENDED CCMA RULES
SUMMARY AMENDED CCMA RULES
 
201507 caisson repair project final
201507 caisson repair project final201507 caisson repair project final
201507 caisson repair project final
 
Simply biz shift questions with allon dbn 2 v2
Simply biz shift questions with allon dbn 2 v2Simply biz shift questions with allon dbn 2 v2
Simply biz shift questions with allon dbn 2 v2
 
Speakers' profiles
Speakers' profilesSpeakers' profiles
Speakers' profiles
 
Mail shot wom. conv. a4
Mail shot   wom. conv. a4Mail shot   wom. conv. a4
Mail shot wom. conv. a4
 
Talk sign a5 flyer 2015
Talk sign a5 flyer 2015Talk sign a5 flyer 2015
Talk sign a5 flyer 2015
 
ethekwini municipality 2013 2014 annual report
ethekwini municipality 2013 2014 annual reportethekwini municipality 2013 2014 annual report
ethekwini municipality 2013 2014 annual report
 
Presentation: Durban Aerotropolis - Northern Area Business Forum: 18 February...
Presentation: Durban Aerotropolis - Northern Area Business Forum: 18 February...Presentation: Durban Aerotropolis - Northern Area Business Forum: 18 February...
Presentation: Durban Aerotropolis - Northern Area Business Forum: 18 February...
 
Sefa breakfast session presentation
Sefa breakfast session presentationSefa breakfast session presentation
Sefa breakfast session presentation
 
Invitation letter to careers expo 2015
Invitation letter to careers expo 2015Invitation letter to careers expo 2015
Invitation letter to careers expo 2015
 
Invitation to submit tenders to organise the sacci annual convention
Invitation to submit tenders to organise the sacci annual conventionInvitation to submit tenders to organise the sacci annual convention
Invitation to submit tenders to organise the sacci annual convention
 
Media release phoenix ink business directory approved 13 jan2015
Media release phoenix ink business directory approved 13 jan2015Media release phoenix ink business directory approved 13 jan2015
Media release phoenix ink business directory approved 13 jan2015
 
Daily market commentary 10122014
Daily market commentary 10122014Daily market commentary 10122014
Daily market commentary 10122014
 
Invitation
InvitationInvitation
Invitation
 
Daily market commentary 11112014
Daily market commentary 11112014Daily market commentary 11112014
Daily market commentary 11112014
 
Daily market commentary 10102014
Daily market commentary  10102014Daily market commentary  10102014
Daily market commentary 10102014
 
Jirah article 2014
Jirah article 2014Jirah article 2014
Jirah article 2014
 
KZN Infrastructure Funding Fair
KZN Infrastructure Funding Fair KZN Infrastructure Funding Fair
KZN Infrastructure Funding Fair
 
Gibela supplier specs
Gibela supplier specs Gibela supplier specs
Gibela supplier specs
 
Mntc studyarea dbnchamber.mpumalanga
Mntc studyarea dbnchamber.mpumalangaMntc studyarea dbnchamber.mpumalanga
Mntc studyarea dbnchamber.mpumalanga
 

Dernier

Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 

Dernier (20)

MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdf
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot ModelNavi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
 
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu SubbuApidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
 

Cornubia Presentation: Investment and Development Opportunities

  • 4. 44 Tongaat Hulett = 611ha (48%) eThekwini = 659ha (52%) LAND OWNERSHIP
  • 6. 6  Based on National Department of Human Settlement’s Breaking New Ground initiative (BNG)  KZN & Ethekwini’s 1st sustainable integrated human settlement initiative  Integrated development :  mixed-income development with 10 000 affordable / middle income units and 15000 subsidised units  2.5 mil.m2 of commercial/industrial bulk  Full suite of Social Facilities  Largest phased mega-infrastructure Greenfields project in the province  R25 billion total investment The prime location of the site with Durban together with the diverse mix of uses creates an ideal opportunity for the people within Cornubia and those that surround this area to access a full set of urban and economic opportunity M41 N2 MOUNT EDGECOMBE PHOENIX CORNUBIA OTTAWA WATERLOO
  • 7. 7 THE OVERALL PLANNING FRAMEWORK Provides new framework roads integrating Cornubia Establishes Open Space corridor systems Provides for some 25 000 homes The proposed Retail Park complements the mixed use nature of Cornubia. WATERLOO OTTAWA MOUNT EDGECOMBE UMHLANGA PHOENIX
  • 10. 10 SOME BASIC FACTS • 1200 hectares, 450 unuseable, 750ha developable • Largest land use is open space • 25 000 residential units (15 000 = low income) • 3.7 million m2 of combined bulk • 80ha industrial platform (max 460 800m2 bulk) • 1.2 million m2 of commercial bulk (offices, retail etc) • 50ha of mixed use development • Mix of housing typologies
  • 11. 11 PHASE 1 – CORNUBIA INDUSTRIAL & BUSINESS ESTATE & BNG HOUSING
  • 16. 16 PROGRESS TO DATE • 62/80Ha have been sold (+R 2 billion investment) • Servicing and platforming of the stands well underway • R 202 million spent to date on internal infrastructure • First warehouse to open for trading in November 2013
  • 18. 18 CORNUBIA RETAIL PARK PRECINCT – LOCALITY PLAN
  • 19. 19 CORNUBIA RETAIL PARK PRECINCT - AERIAL VIEW
  • 20. 20 • The intention is to create a high quality retail precinct and supporting activities defined by boulevards, landscaping and buildings that define the edges. •The Plan responds to the prime accessibility and visibility of the emerging corridor creating a positive interface for Cornubia. MIXED USE 2 (HIGH INTENSITY- TOWN CENTRE RELATED USES) GENERAL BUSINESS MIXED USE 1 TOWN CENTRE GENERAL BUSINESS
  • 21. 21 • 80 000 m2 VALUE DESTINATION RETAIL • SINGLE STAND-ALONE END-USER NATIONAL RETAILER STORES • VISIBLE FROM M41 & ACCESSIBLE TO FUTURE BRT ROUTE
  • 25. 25 HOUSING • eThekwini Municipality the developer & implementing agent; • Project formed part of eThekwini’s slum clearance programme. • 15 000 government subsidised housing over 7 years; • Funding from National Dept of Human Settlements & Provincial Dept of Human Settlements, plus USDG; • HDA provided funding for land acquisition; • Construction commenced on Phase 1A (pilot) and access road – 482 units to be complete by end August 2013;
  • 26. 26 PHASE 1 – PILOT AREA DESIGN Attached 4m wide Row Housing Attached 6m wide Row Housing 8m Access Street 3m Pedestrian Lanes Central Courtyard as focus of local community identity 6m wide paved street Larger Park Space
  • 27. 27 PHASE 1B 2 220 units PHASE 1A 482 units PHASE 1A & B (APPROVED LAYOUTS) INDUSTRIAL
  • 28. 28 PHASE 1A – PILOT AREA DESIGN
  • 29. 29 11HA, 482 BNG UNITS 2-STOREY FREEHOLD PLS APPROVAL PHASE 1 – PILOT AREA DESIGN
  • 30. 30 PILOT – CENTRAL COURTYARD AREA
  • 32. 32
  • 33. 33 8/12/2013Footer Text 33 Project brings substantial socio-economic benefits to the region OUTCOMES EM COMM EM HSG T/HULETT SASA TOTAL TOTAL INVESTMENT (R) – Services (R8bn) & Buildings/Land (R17.8bn) R5 160 700 R5 209 330 R14 345 220 R1 126 260 R25 839 510 JOBS - CONSTRUCTION 77 380 78 140 215 180 16 900 387 590 - PERMANENT 10 830 0 25 540 3 460 42 830 RATES – Rm p.a. R56 160 0 R169 930 R11 530 R237 620 VAT (PERMANENT) Rm R487 620 0 R917 410 R87 090 R1 492 120 TAX (PERMANENT) Rm – p.a - PAYROLL R108 300 R7 350 R285 400 R34 560 R435 600 - COMPANY R348 300 000 0 R683 870 R62 210 R1 094 380 TOTAL ANNUAL REVENUE TO GOVT Rm R1 767 600 + VAT ONCE OFF OF R1.5bn
  • 36. 36
  • 37. 37 NATIONAL PRIORITY PROJECT & SUSTAINABLE INTEGRATED HUMAN SETTLEMENT INITIATIVE