SlideShare une entreprise Scribd logo
1  sur  17
Fusion Utilization Improvement


   Gap improvement in Standby Time
         Analsys from ACS.




                        Fusion in FTF by C.S.Tu
All down mode Analysis
   Compared with all down rates ,unknown down is the top one .
                                All downmode analsys in Aug,2002 .


               13 Unstable   14 Handler Unstable                     2 No record of down
                                                       18 ACS Down
                  14%               1%                                 Unknown down
                                                           0%
                                                                             16%
 11 Change Type
       5%
                                                                                    3 Standby
    10 Other                                                                           7%
      8%



8 Handler Down                                                                      4 Calibration
      5%                                                                                9%

                  7 Type當
                    13%                                               5 工Engineering
                                                   6 系統當
                                                     11%                  11%
Compared with standby time
    1.Unknow down occupy 34% of standby time.

    2.Small down occupy 27% of standby time.
    .            Standby Time Status in Aug, 2002


                            Others          Idle
  Handler/Prob
                            10%             7%
   er Cal./PM
       0%                                             Small down
                                                        27%
     Unknown
      down
       34%           Handler/                  Type down
                   Prober down                   16%
                       6%
Small down Happen
1.It happen when production stop over 2
  minutes.
2.Each problem happened will casue small
 stop first, why ?
                                   System down

                                   Handler down
ACS
        Small
         stop
                 Unknown
                   stop        ?    Type down
                           t
 When do you found problem ?       or
Small down v.s Others
 The   relativity of top six down modes .


        Unknow down 34%             System Down


                    Small down 27%
                                         Handler
   TypeDown 16%                           down
                          Other &
                          Idle 7%
Type Down Analysis
   OneC 4058XH have more problem with Fusion.

                     VP40584       OM635X
                       6%           15%

                                                PCD80XXH
                                                   13%
VP40581
 35%




                                                       PCF50601
                                                         1%



           VP40554                          PCF50872
             2%       VP22344                 9%
                                PCF87750
                        5%
                                  14%
System Down
 Hardware   fail :
   PECHF,FARMNT,DPS,PSCM…
 Hang   problem.
   Hardware hang, bad die hang &
   software hang …
System Down Analysis
                        System Down in Aug, 2002

                                               Power
75% Casued by printer
  without paper ,and     summary out          Cut
  wait for processing       22%               2%
        (hang).                                        Compared with
                                                        system down.



                                                         Tester Hang
        Teste down
                                                             64%
           11%

                              Vaccum Source
                                   1%
Handler Down
   TESEC handlers loader have more problem 38% in Aug.

                                   Handler down in Aug,2002
                             Peripheral problem   Socket problem
                                  ofhandler            0%
                                     4%
         Index abnormal                                            Pin bend problem
              20%                                                         6%


     Handler temperature
          problem
             7%
                                                                            Loader problem
               Handler test area                                                 38%
                                         Unloader problem
                  problem
                                               19%
                     6%
Unknown Down
 Unknow   down occupy 34% of
  standby time in ACS.
 Why we don’t know it down ?
     No one found it .
     No down happened .
     or Other …
Cause Analysis & Team members
                             Small Stop



    UnknowStop              Unknow Stop          Unknow Stop
    from handler             from Type           from System



                         OneC have more 40%
  Handler down 5%                             System down have 11%
                          Of type down 13%:
  And Unstable 1%         40581H occupy 35%      of all down mode:
 Loader problem occupy        (40575 WT)        Hang have 64 % of
   38% of all handler          40584 6%           system down.
        problem             Om635X 15%

      J.R Wang               Peace Lin               C.S Tu
Hang problem
   Production hang .
    Double dataviewers casue test time longer.
              (Need support from System,C.S.Tu and Vendor)
    MS_Dlog could not worte (OneC DC log).
              (Need support from CSTD, Peace.Lin & BL)
    Fail die casue hang (OneC).
              (Need support from CSTD. Peace.Lin & BL)

   Hardware hang .
    Load board casued it hung when failed TXD1.
              (Need support from CSTD. Peace.Lin )
    Hardware configuration miss.
              (Need support from System,C.S.Tu and Vendor)
Secondary dataviewers problem
 Why   Fusion processes have two dataviewers?
  1. Normally only one work with optool , but when test
     program was unloaded , it still exited .Next launcher
     command be run , a new dataviewer will popup.
  2. It casue test time longer than default for all types.
       For example :
       OneC > 1.5 times
       (normally dual sites 8.5sec ,become 12.8sec , but not always)
  3. It influence output .

  4. A bug of OS.
Two dataviewers delay test time
==== :fusion12 dataviewer monitor : =============================
prod 1529 1 50 19:52:07 ?       236:51 dataviewer -name DataViewerDefault:prod:1480:head_1 -tester fusion12 -head 1
prod 6240 6190 0 10:24:22 ?        0:01 dataviewer -name DataViewerDefault:prod:6190:head_1 -tester fusion12 -head 1
prod 6190 1 0 10:24:14 ?        0:03 optool -head 1 -load /tp/devices/vp40581h_R1084/V09/Prog/vp40581H_V09.eva time
                                                                    This the one caused longer test time in Fusion .
Thu Jul 25 11:10:21 CST 2002
==== :fusion09 dataviewer monitor : =============================
preprod 18666 1 50 15:37:56 ?        314:31 dataviewer -name DataViewerDefault:preprod:18628:head_1 -tester fusion09 -head
prod 22120 22072 0 05:49:49 ?       0:02 dataviewer -name DataViewerDefault:prod:22072:head_1 -tester fusion09 -head 1
prod 22072 1 0 05:49:40 ?        0:13 optool -head 1 -load /tp/devices/pcf50872_R1084/V1E/019/Prog/pcf50872-V1E_019.e
                                                                   This the one caused longer test time in Fusion .
Thu Jul 25 11:10:32 CST 2002
==== :fusion13 dataviewer monitor : =============================
envdiag 11442 11428 0 09:15:22 pts/3 0:07 dataviewer -name DataViewerDefault:envdiag:11428:head_1 -tester fusion13 -head
prod 9532 1 42 16:10:57 ?       829:14 dataviewer -name DataViewerDefault:prod:9482:head_1 -tester fusion13 -head 1
prod 10499 1 32 18:52:10 ?       90:37 dataviewer -name DataViewerDefault:prod:10449:head_1 -tester fusion13 -head 1
How serious is it ?
 • FTF would have more problems than WTF, because it happened
   when one exit optool after unload TP .


                           Users Happen Times
WeekUser Prod    Envdiag Preprod Pre_vlsi   Str   Vlsi   Pre_3gsm Others
Week227     27      4        3        1       3     1        2       2
Week228     32      7        5        0       2     0        1       1
Week229     20      5        2        0       5     1        1       0
Week230     25      1        3        0       1     1        1       1
July,2002 total
            104     17      13        1      11     3        5       4

                             These with records!!!
The result after using pkill before
  Short-term solution :
                         Pload
       a .Kill the process before next optool popup automatically .
       b. Two dataviewer prevention process was execute in Aug,2002 week 231.
     Long-term solution :
       Vendor’s SPR and improvement of OS are necessary.
          Week   User      Prod   Envdiag Preprod Pre_vlsi   Str   Vlsi   Pre_3gsm
*         Week231(Aug/1 )     9       1       2       0        1     0         1
          Week232             6       1       1       0        0     0         0
          Week233             4       0       2       0        0     0         1
          Week234             0       0       1       0        0     0         0
          Week235             0       1       1       0        0     0         0
          J uly to ta l      19       3       7       0        1     0         2
Improvement result and Target
          • Compared to with pkill and without pkill.

                                   Dataviewer casue long test time
                 120
                       104
                 100
 Secondary
                 80
 Dataviewer
  happen         60
   Times
                 40
                             19    17
                                                 13                         11
                 20                         3
                                                          7
                                                                                         3             5       2    4       2
                                                               1       0             1           0
                  0
                       Prod       Envdiag       Preprod       Pre_vlsi       Str         Vlsi        Pre_3gsm      Others
         No Pkill       104         17            13               1         11              3             5            4
         Pkill           19             3             7            0             1           0             2            2
                                                                   User account




         • Finally target is no secondary dataviewer found .

Contenu connexe

Plus de Stone Striker

Tester utilisation definitions
Tester utilisation definitionsTester utilisation definitions
Tester utilisation definitions
Stone Striker
 
Eeprom rewrite on_pscm
Eeprom rewrite on_pscmEeprom rewrite on_pscm
Eeprom rewrite on_pscm
Stone Striker
 
Titl fusion usage y01 03
Titl fusion usage y01 03Titl fusion usage y01 03
Titl fusion usage y01 03
Stone Striker
 
Fusion utilization update 7
Fusion utilization update 7Fusion utilization update 7
Fusion utilization update 7
Stone Striker
 
Tester utilisation definitions
Tester utilisation definitionsTester utilisation definitions
Tester utilisation definitions
Stone Striker
 
Hr file p_candidate_overview_template040127
Hr file p_candidate_overview_template040127Hr file p_candidate_overview_template040127
Hr file p_candidate_overview_template040127
Stone Striker
 
Mse procedure synchro
Mse procedure synchroMse procedure synchro
Mse procedure synchro
Stone Striker
 
Tester utilization fusion dec 2002_cs tu
Tester utilization fusion dec 2002_cs tuTester utilization fusion dec 2002_cs tu
Tester utilization fusion dec 2002_cs tu
Stone Striker
 
Pre screen double-check
Pre screen double-checkPre screen double-check
Pre screen double-check
Stone Striker
 
Fusion material (psk meeting)
Fusion material (psk meeting)Fusion material (psk meeting)
Fusion material (psk meeting)
Stone Striker
 

Plus de Stone Striker (20)

Tester utilisation definitions
Tester utilisation definitionsTester utilisation definitions
Tester utilisation definitions
 
Fusion xp
Fusion xpFusion xp
Fusion xp
 
Eeprom rewrite on_pscm
Eeprom rewrite on_pscmEeprom rewrite on_pscm
Eeprom rewrite on_pscm
 
Titl fusion usage y01 03
Titl fusion usage y01 03Titl fusion usage y01 03
Titl fusion usage y01 03
 
Fusion in psk_3
Fusion in psk_3Fusion in psk_3
Fusion in psk_3
 
Fusion utilization update 7
Fusion utilization update 7Fusion utilization update 7
Fusion utilization update 7
 
Tester utilisation definitions
Tester utilisation definitionsTester utilisation definitions
Tester utilisation definitions
 
Hang problem
Hang problemHang problem
Hang problem
 
Hr file p_candidate_overview_template040127
Hr file p_candidate_overview_template040127Hr file p_candidate_overview_template040127
Hr file p_candidate_overview_template040127
 
Mse procedure synchro
Mse procedure synchroMse procedure synchro
Mse procedure synchro
 
Mse procedure delta
Mse procedure deltaMse procedure delta
Mse procedure delta
 
Fusion repair
Fusion repairFusion repair
Fusion repair
 
Tester utilization fusion dec 2002_cs tu
Tester utilization fusion dec 2002_cs tuTester utilization fusion dec 2002_cs tu
Tester utilization fusion dec 2002_cs tu
 
Pre screen double-check
Pre screen double-checkPre screen double-check
Pre screen double-check
 
Fusion improvement
Fusion improvementFusion improvement
Fusion improvement
 
Fusion material (psk meeting)
Fusion material (psk meeting)Fusion material (psk meeting)
Fusion material (psk meeting)
 
Dow duw
Dow duwDow duw
Dow duw
 
Q4 qrm 2003
Q4 qrm 2003Q4 qrm 2003
Q4 qrm 2003
 
Q2 qrm 2005_ok
Q2 qrm 2005_okQ2 qrm 2005_ok
Q2 qrm 2005_ok
 
Qrm 2004 final
Qrm 2004 finalQrm 2004 final
Qrm 2004 final
 

Dernier

Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 

Dernier (20)

"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
A Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusA Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source Milvus
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024
 

Data viewer improvement

  • 1. Fusion Utilization Improvement Gap improvement in Standby Time Analsys from ACS. Fusion in FTF by C.S.Tu
  • 2. All down mode Analysis Compared with all down rates ,unknown down is the top one . All downmode analsys in Aug,2002 . 13 Unstable 14 Handler Unstable 2 No record of down 18 ACS Down 14% 1% Unknown down 0% 16% 11 Change Type 5% 3 Standby 10 Other 7% 8% 8 Handler Down 4 Calibration 5% 9% 7 Type當 13% 5 工Engineering 6 系統當 11% 11%
  • 3. Compared with standby time 1.Unknow down occupy 34% of standby time. 2.Small down occupy 27% of standby time. . Standby Time Status in Aug, 2002 Others Idle Handler/Prob 10% 7% er Cal./PM 0% Small down 27% Unknown down 34% Handler/ Type down Prober down 16% 6%
  • 4. Small down Happen 1.It happen when production stop over 2 minutes. 2.Each problem happened will casue small stop first, why ? System down Handler down ACS Small stop Unknown stop ? Type down t When do you found problem ? or
  • 5. Small down v.s Others  The relativity of top six down modes . Unknow down 34% System Down Small down 27% Handler TypeDown 16% down Other & Idle 7%
  • 6. Type Down Analysis OneC 4058XH have more problem with Fusion. VP40584 OM635X 6% 15% PCD80XXH 13% VP40581 35% PCF50601 1% VP40554 PCF50872 2% VP22344 9% PCF87750 5% 14%
  • 7. System Down  Hardware fail : PECHF,FARMNT,DPS,PSCM…  Hang problem. Hardware hang, bad die hang & software hang …
  • 8. System Down Analysis System Down in Aug, 2002 Power 75% Casued by printer without paper ,and summary out Cut wait for processing 22% 2% (hang). Compared with system down. Tester Hang Teste down 64% 11% Vaccum Source 1%
  • 9. Handler Down  TESEC handlers loader have more problem 38% in Aug. Handler down in Aug,2002 Peripheral problem Socket problem ofhandler 0% 4% Index abnormal Pin bend problem 20% 6% Handler temperature problem 7% Loader problem Handler test area 38% Unloader problem problem 19% 6%
  • 10. Unknown Down  Unknow down occupy 34% of standby time in ACS.  Why we don’t know it down ? No one found it . No down happened . or Other …
  • 11. Cause Analysis & Team members Small Stop UnknowStop Unknow Stop Unknow Stop from handler from Type from System OneC have more 40% Handler down 5% System down have 11% Of type down 13%: And Unstable 1% 40581H occupy 35% of all down mode: Loader problem occupy (40575 WT) Hang have 64 % of 38% of all handler 40584 6% system down. problem Om635X 15% J.R Wang Peace Lin C.S Tu
  • 12. Hang problem  Production hang . Double dataviewers casue test time longer. (Need support from System,C.S.Tu and Vendor) MS_Dlog could not worte (OneC DC log). (Need support from CSTD, Peace.Lin & BL) Fail die casue hang (OneC). (Need support from CSTD. Peace.Lin & BL)  Hardware hang . Load board casued it hung when failed TXD1. (Need support from CSTD. Peace.Lin ) Hardware configuration miss. (Need support from System,C.S.Tu and Vendor)
  • 13. Secondary dataviewers problem  Why Fusion processes have two dataviewers? 1. Normally only one work with optool , but when test program was unloaded , it still exited .Next launcher command be run , a new dataviewer will popup. 2. It casue test time longer than default for all types. For example : OneC > 1.5 times (normally dual sites 8.5sec ,become 12.8sec , but not always) 3. It influence output . 4. A bug of OS.
  • 14. Two dataviewers delay test time ==== :fusion12 dataviewer monitor : ============================= prod 1529 1 50 19:52:07 ? 236:51 dataviewer -name DataViewerDefault:prod:1480:head_1 -tester fusion12 -head 1 prod 6240 6190 0 10:24:22 ? 0:01 dataviewer -name DataViewerDefault:prod:6190:head_1 -tester fusion12 -head 1 prod 6190 1 0 10:24:14 ? 0:03 optool -head 1 -load /tp/devices/vp40581h_R1084/V09/Prog/vp40581H_V09.eva time This the one caused longer test time in Fusion . Thu Jul 25 11:10:21 CST 2002 ==== :fusion09 dataviewer monitor : ============================= preprod 18666 1 50 15:37:56 ? 314:31 dataviewer -name DataViewerDefault:preprod:18628:head_1 -tester fusion09 -head prod 22120 22072 0 05:49:49 ? 0:02 dataviewer -name DataViewerDefault:prod:22072:head_1 -tester fusion09 -head 1 prod 22072 1 0 05:49:40 ? 0:13 optool -head 1 -load /tp/devices/pcf50872_R1084/V1E/019/Prog/pcf50872-V1E_019.e This the one caused longer test time in Fusion . Thu Jul 25 11:10:32 CST 2002 ==== :fusion13 dataviewer monitor : ============================= envdiag 11442 11428 0 09:15:22 pts/3 0:07 dataviewer -name DataViewerDefault:envdiag:11428:head_1 -tester fusion13 -head prod 9532 1 42 16:10:57 ? 829:14 dataviewer -name DataViewerDefault:prod:9482:head_1 -tester fusion13 -head 1 prod 10499 1 32 18:52:10 ? 90:37 dataviewer -name DataViewerDefault:prod:10449:head_1 -tester fusion13 -head 1
  • 15. How serious is it ? • FTF would have more problems than WTF, because it happened when one exit optool after unload TP . Users Happen Times WeekUser Prod Envdiag Preprod Pre_vlsi Str Vlsi Pre_3gsm Others Week227 27 4 3 1 3 1 2 2 Week228 32 7 5 0 2 0 1 1 Week229 20 5 2 0 5 1 1 0 Week230 25 1 3 0 1 1 1 1 July,2002 total 104 17 13 1 11 3 5 4 These with records!!!
  • 16. The result after using pkill before  Short-term solution : Pload a .Kill the process before next optool popup automatically . b. Two dataviewer prevention process was execute in Aug,2002 week 231.  Long-term solution : Vendor’s SPR and improvement of OS are necessary. Week User Prod Envdiag Preprod Pre_vlsi Str Vlsi Pre_3gsm * Week231(Aug/1 ) 9 1 2 0 1 0 1 Week232 6 1 1 0 0 0 0 Week233 4 0 2 0 0 0 1 Week234 0 0 1 0 0 0 0 Week235 0 1 1 0 0 0 0 J uly to ta l 19 3 7 0 1 0 2
  • 17. Improvement result and Target • Compared to with pkill and without pkill. Dataviewer casue long test time 120 104 100 Secondary 80 Dataviewer happen 60 Times 40 19 17 13 11 20 3 7 3 5 2 4 2 1 0 1 0 0 Prod Envdiag Preprod Pre_vlsi Str Vlsi Pre_3gsm Others No Pkill 104 17 13 1 11 3 5 4 Pkill 19 3 7 0 1 0 2 2 User account • Finally target is no secondary dataviewer found .