Castle Rock Ridge Project




In April 2011, Eagle West Wind Energy Inc. applied their experience and expertise to complete the installation of 33
Enercon E70s (2.3MW) at the Castle Rock Ridge Wind Farm in Pincher Creek, AB.

This wind farm will generate approximately 76 MW of power, which will produce enough clean, renewable electricity
to power approximately 20,000 typical Canadian homes.

This project began in September 2010 for Enercon Canada & Enercon Services Nova Scotia who specializes in the
manufacturing and marketing of wind turbines and wind energy plants.

This installation wasn’t without its challenges; crews faced temperatures of -30 degrees Celsius and wind speeds of
up to 145 kilometers/hour (90 miles/hour) proving that Eagle West has the equipment and manpower necessary to
overcome any challenge safely and efficiently. “We trudged through all the obstacles and managed to complete the
                                                                                                 st
erection of the turbines eight days ahead of the scheduled completion date which was March 31 ” commented Randy
Trowsse, Project Manager.

At the peak of operation, Eagle West had thirty-five staff on site, six hydraulic cranes ranging from 90 ton to 300 ton,
two 300 ton crawler cranes and two freight trucks which were used to complete this large project.
“Eagle West Wind Energy’s highly experienced personnel combined with a technologically advanced and very well
maintained crane fleet performed the work both safely and efficiently. Eagle West has shown they are dedicated to
providing the highest quality of service to their customer and I am pleased to recommend their services to others.”

Michael Weidemann
Executive Vice President
ENERCON Canada Inc.
Bear Mountain Wind Farm Project




In May 2009, Eagle West Wind Energy Inc. applied their experience and expertise to complete the installation of 34
Enercon E82s (3.0MW) at the Bear Mountain Wind Farm 10 km west of Dawson Creek, BC.

This wind farm will generate approximately 102 MW of power, which will produce enough clean, renewable electricity
to power approximately 30,000 typical Canadian homes.

This project was completed from May – September of 2009 for Enercon Canada & Enercon Services Nova Scotia
who specializes in the manufacturing and marketing of wind turbines and wind energy plants. It was stated by
Enercon that this was the most efficient and best installation that they have had in all of Canada.

This installation wasn’t without its challenges; the roads were built to only 5.5m wide. For this reason, Eagle West
purchased a Liebherr LR1400/2w Narrow Track Crawler crane which would walk fully assembled from one turbine to
the next without having to be broken down. This is in large part why the project was such a huge success for the
client.

At the peak of operation, Eagle West had sixty staff on site, six hydraulic cranes ranging from 90 ton to 300 ton, two
440 ton crawler cranes and two freight trucks which were used to complete this large project.
“Eagle West Wind Energy’s highly experienced personnel combined with a technologically advanced and very well
maintained crane fleet performed the work both safely and efficiently. Eagle West has shown they are dedicated to
providing the highest quality of service to their customer and I am pleased to recommend their services to others.”

Nils Wingert
Project Manager
ENERCON Canada Inc.
Dokie Wind Farm Project




This project was built in two phases. It began in 2008 with a phase of 5 turbines and finished with a phase in 2010 of
43 turbines. This totals 48 Vestas V90 (3MW) turbines which were erected.

This wind farm will generate approximately 144 MW of power, which will produce enough clean, renewable electricity
to power approximately 40,000 typical Canadian homes.

This project was very remote being located in Northeastern BC on a mountain side that was situated 45 km northwest
of the small town of Chetywnd, BC. Further challenges were faced due to narrow roads where the Liebherr
LR1400/2w Narrow Track proved especially helpful. Eagle West had to navigate their cranes over steep grades
throughout the mountains in very icy conditions in order to complete this project on time for our client.

“Eagle West worked diligently and productively despite harsh weather and difficult terrain. They performed their work
both safely and efficiently and always gave particular care to provide us with the highest quality of service.”

Bob Baird
Project Manager
Canadian Projects Ltd.
Talbot Wind Farm Project




In December 2010, Eagle West Wind Energy completed the installation of 43 Siemens wind turbines for the Talbot
Wind Farm project near Ridgetown, Ontario. Illustrating Eagle West Wind Energy’s capability to provide turn-key
solutions in this industry, the project included the installation of wind towers, the mechanical work on all towers, all
tower electrical wiring, installation of NavCan lights and the installation of the OCAS radar system for the first time in
all of North America.

The Talbot Wind Farm generates approximately 98.9 megawatts (MW) of power, which produces enough clean,
renewable electricity to power approximately 30,000 typical Canadian homes.

The project began in August 2010 for RES Canada, a division of RES Americas. RES Americas has been active in
North America since 1997 and during this time has either developed or constructed more than 10% of the installed
capacity of wind energy in the United States.

At the peak of the project, over one hundred qualified personnel and pieces of equipment were utilized for the
completion of the wind farm. Crews managed extremely soft and muddy ground conditions while developing night lift
procedures to install turbines ensuring the project schedule was maintained in spite of dramatically short daylight
hours in the winter months. No one provides a higher level of service in wind turbine installation in Canada than Eagle
West Wind Energy.
“Eagle West Wind Energy Inc. performed the work on this project in a timely, safe, quality and professional manner.
The work was professionally adequately staffed and well supervised. We recommend Eagle West Wind Energy to
any contractor or owner and we look forward to the opportunity to work with Eagle West Energy Inc. on future
projects.”

Robb Phiri
Project Manager
RES Canada Construction LP.
Wintering Hills Wind Farm




At peak operation, Wintering Hills is expected to generate enough clean electricity to power approximately 35,000
Alberta homes, displacing the equivalent of approximately 200,000 tonnes of carbon dioxide per year.
                  2
The site is 64 km , so staging of activities to meet tight deadlines is critical. Working in an active oil and gas sector
also requires multiple sweeps to locate buried utilities and ensure the project site upholds Ledcor and Eagle West’s
safety standards.

The scope of work also includes temporary access roads, permanent low impact roads, an underground cable
collector system, ground wires and fibre optic cables and substation building foundations, and complete turn-key
installation of the 55 x GE 1.6 MW turbines.

Client Reference - Suncor Energy Services - Mr. Gary Prine - 403.650.1430
Greenwich Lake Wind Farm




RES/Enbridge was pleased with success of Talbot and thus engaged us to erect 43 more Siemens SWT-2.3 MW
turbines at the Greenwich Lake Wind Farm.

It is located near Thunder Bay, ON. The site consists of rolling hills comprised greatly of bedrock. The roads are all
narrow and steep. These challenges are being overcome by the use of 2 x Liebherr LR1400/2w Narrow Track
Crawler Cranes.

Completed on-time and on-budget in November 2012.

Contenu connexe

Tendances

RodneyBrown_CV_July2015
RodneyBrown_CV_July2015RodneyBrown_CV_July2015
RodneyBrown_CV_July2015Rodney Brown
 
Cerro Dominador Solar Complex - Chile
Cerro Dominador Solar Complex - ChileCerro Dominador Solar Complex - Chile
Cerro Dominador Solar Complex - ChileAbengoa
 
Zero Carbon Options: Report launch
Zero Carbon Options: Report launchZero Carbon Options: Report launch
Zero Carbon Options: Report launchBen Heard
 
Balpara Project Highlights 2015
Balpara Project Highlights 2015Balpara Project Highlights 2015
Balpara Project Highlights 2015Sean Blanche
 
2009 rammage
2009 rammage2009 rammage
2009 rammageNgy Ea
 
Regenerco_Brochure [email] 2016
Regenerco_Brochure [email] 2016Regenerco_Brochure [email] 2016
Regenerco_Brochure [email] 2016Nigel Price
 
Muhammad Babar, CV 2015
Muhammad Babar, CV 2015Muhammad Babar, CV 2015
Muhammad Babar, CV 2015Muhammad Babar
 
Derek Dhonau resume
Derek Dhonau resumeDerek Dhonau resume
Derek Dhonau resumeDerek Dhonau
 
Gagnon Patrice new CV3 light
Gagnon Patrice new CV3 lightGagnon Patrice new CV3 light
Gagnon Patrice new CV3 lightPatrice Gagnon
 

Tendances (17)

RodneyBrown_CV_July2015
RodneyBrown_CV_July2015RodneyBrown_CV_July2015
RodneyBrown_CV_July2015
 
Rich Mathias CV 2016
Rich Mathias CV 2016Rich Mathias CV 2016
Rich Mathias CV 2016
 
Cerro Dominador Solar Complex - Chile
Cerro Dominador Solar Complex - ChileCerro Dominador Solar Complex - Chile
Cerro Dominador Solar Complex - Chile
 
Zero Carbon Options: Report launch
Zero Carbon Options: Report launchZero Carbon Options: Report launch
Zero Carbon Options: Report launch
 
Balpara Project Highlights 2015
Balpara Project Highlights 2015Balpara Project Highlights 2015
Balpara Project Highlights 2015
 
Mo u indus
Mo u indusMo u indus
Mo u indus
 
Mayur
MayurMayur
Mayur
 
PG InfoGraphic Long-V4-IG
PG InfoGraphic Long-V4-IGPG InfoGraphic Long-V4-IG
PG InfoGraphic Long-V4-IG
 
2009 rammage
2009 rammage2009 rammage
2009 rammage
 
Important issues for fossil power plants for the 21st Century - Robin Irons a...
Important issues for fossil power plants for the 21st Century - Robin Irons a...Important issues for fossil power plants for the 21st Century - Robin Irons a...
Important issues for fossil power plants for the 21st Century - Robin Irons a...
 
Micks CV_10_07_16
Micks CV_10_07_16Micks CV_10_07_16
Micks CV_10_07_16
 
Regenerco_Brochure [email] 2016
Regenerco_Brochure [email] 2016Regenerco_Brochure [email] 2016
Regenerco_Brochure [email] 2016
 
Building Harvest Wind Project
Building Harvest Wind ProjectBuilding Harvest Wind Project
Building Harvest Wind Project
 
GreenWell 2013
GreenWell 2013GreenWell 2013
GreenWell 2013
 
Muhammad Babar, CV 2015
Muhammad Babar, CV 2015Muhammad Babar, CV 2015
Muhammad Babar, CV 2015
 
Derek Dhonau resume
Derek Dhonau resumeDerek Dhonau resume
Derek Dhonau resume
 
Gagnon Patrice new CV3 light
Gagnon Patrice new CV3 lightGagnon Patrice new CV3 light
Gagnon Patrice new CV3 light
 

En vedette (11)

Recycling Energy Forum 2015
Recycling Energy Forum 2015Recycling Energy Forum 2015
Recycling Energy Forum 2015
 
Water-for-the-trees
Water-for-the-treesWater-for-the-trees
Water-for-the-trees
 
It's All About Your Selfie
It's All About Your SelfieIt's All About Your Selfie
It's All About Your Selfie
 
Paradise: Music Spark
Paradise: Music SparkParadise: Music Spark
Paradise: Music Spark
 
Gondwana DA Trussell Sewell Pietramale
Gondwana DA Trussell Sewell PietramaleGondwana DA Trussell Sewell Pietramale
Gondwana DA Trussell Sewell Pietramale
 
ISI WOK training
ISI WOK trainingISI WOK training
ISI WOK training
 
Slide Makeover #78: Showing trends in related series of data
Slide Makeover #78: Showing trends in related series of dataSlide Makeover #78: Showing trends in related series of data
Slide Makeover #78: Showing trends in related series of data
 
17.05.2013, NEWSWIRE, Issue 274
17.05.2013, NEWSWIRE, Issue 27417.05.2013, NEWSWIRE, Issue 274
17.05.2013, NEWSWIRE, Issue 274
 
Health Spectrum, June 2016
Health Spectrum, June 2016Health Spectrum, June 2016
Health Spectrum, June 2016
 
Starbucks_CaseStudy
Starbucks_CaseStudyStarbucks_CaseStudy
Starbucks_CaseStudy
 
talkingcloud_Design_Samples
talkingcloud_Design_Samplestalkingcloud_Design_Samples
talkingcloud_Design_Samples
 

Similaire à Sampling of Eagle West Wind Energy Projects

McConnell Dowell Mastermyne - Made to Mine
McConnell Dowell Mastermyne - Made to MineMcConnell Dowell Mastermyne - Made to Mine
McConnell Dowell Mastermyne - Made to MineChris Swaine
 
Gaelectric Developments Limited, David Arnold
Gaelectric Developments Limited, David ArnoldGaelectric Developments Limited, David Arnold
Gaelectric Developments Limited, David ArnoldInvest Northern Ireland
 
Non conventional power plants
Non conventional power plantsNon conventional power plants
Non conventional power plantsSiraskarCom
 
E ON_ABQ_US Construction_ePrint
E ON_ABQ_US Construction_ePrintE ON_ABQ_US Construction_ePrint
E ON_ABQ_US Construction_ePrintJohn Badeusz
 
Caddo Wind Virtual Public Meeting Presentation
Caddo Wind Virtual Public Meeting PresentationCaddo Wind Virtual Public Meeting Presentation
Caddo Wind Virtual Public Meeting PresentationHeritage Wind
 
Chalcroft Special Projects
Chalcroft Special ProjectsChalcroft Special Projects
Chalcroft Special ProjectsChalcroft Ltd
 
MPC Capability Brochure_V6_2016_Digital
MPC Capability Brochure_V6_2016_DigitalMPC Capability Brochure_V6_2016_Digital
MPC Capability Brochure_V6_2016_DigitalDave Machin
 
Zinfra Renewables Capability Statement
Zinfra Renewables Capability StatementZinfra Renewables Capability Statement
Zinfra Renewables Capability StatementZinfra Group
 
EPIC Engineering/Valero Case Study
EPIC Engineering/Valero Case StudyEPIC Engineering/Valero Case Study
EPIC Engineering/Valero Case StudyMichael Gauthier
 
MCD_Oil & Gas Profile 2017.pdf
MCD_Oil & Gas Profile 2017.pdfMCD_Oil & Gas Profile 2017.pdf
MCD_Oil & Gas Profile 2017.pdfKAWMAW
 
GLASS, Ian (Mar15)
GLASS, Ian (Mar15)GLASS, Ian (Mar15)
GLASS, Ian (Mar15)ian glass
 
Seawater pumped hydro electric storageppsshow2
Seawater pumped hydro electric storageppsshow2Seawater pumped hydro electric storageppsshow2
Seawater pumped hydro electric storageppsshow2James Nolan
 
JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15Joe Fain
 

Similaire à Sampling of Eagle West Wind Energy Projects (20)

McConnell Dowell Mastermyne - Made to Mine
McConnell Dowell Mastermyne - Made to MineMcConnell Dowell Mastermyne - Made to Mine
McConnell Dowell Mastermyne - Made to Mine
 
Gaelectric Developments Limited, David Arnold
Gaelectric Developments Limited, David ArnoldGaelectric Developments Limited, David Arnold
Gaelectric Developments Limited, David Arnold
 
Non conventional power plants
Non conventional power plantsNon conventional power plants
Non conventional power plants
 
E ON_ABQ_US Construction_ePrint
E ON_ABQ_US Construction_ePrintE ON_ABQ_US Construction_ePrint
E ON_ABQ_US Construction_ePrint
 
WQ-2
WQ-2WQ-2
WQ-2
 
Wind Power EPCM
Wind Power EPCMWind Power EPCM
Wind Power EPCM
 
Caddo Wind Virtual Public Meeting Presentation
Caddo Wind Virtual Public Meeting PresentationCaddo Wind Virtual Public Meeting Presentation
Caddo Wind Virtual Public Meeting Presentation
 
Chalcroft Special Projects
Chalcroft Special ProjectsChalcroft Special Projects
Chalcroft Special Projects
 
MPC Capability Brochure_V6_2016_Digital
MPC Capability Brochure_V6_2016_DigitalMPC Capability Brochure_V6_2016_Digital
MPC Capability Brochure_V6_2016_Digital
 
Zinfra Renewables Capability Statement
Zinfra Renewables Capability StatementZinfra Renewables Capability Statement
Zinfra Renewables Capability Statement
 
EPIC Engineering/Valero Case Study
EPIC Engineering/Valero Case StudyEPIC Engineering/Valero Case Study
EPIC Engineering/Valero Case Study
 
MCD_Oil & Gas Profile 2017.pdf
MCD_Oil & Gas Profile 2017.pdfMCD_Oil & Gas Profile 2017.pdf
MCD_Oil & Gas Profile 2017.pdf
 
GLASS, Ian (Mar15)
GLASS, Ian (Mar15)GLASS, Ian (Mar15)
GLASS, Ian (Mar15)
 
Seawater pumped hydro electric storageppsshow2
Seawater pumped hydro electric storageppsshow2Seawater pumped hydro electric storageppsshow2
Seawater pumped hydro electric storageppsshow2
 
Bentley Case Study
Bentley Case StudyBentley Case Study
Bentley Case Study
 
JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15
 
Brochure CMR Marine
Brochure CMR MarineBrochure CMR Marine
Brochure CMR Marine
 
BTE-Digital-Brochure.pdf
BTE-Digital-Brochure.pdfBTE-Digital-Brochure.pdf
BTE-Digital-Brochure.pdf
 
Clough Enercore Brochure
Clough Enercore BrochureClough Enercore Brochure
Clough Enercore Brochure
 
CV J LOWTHER WORD
CV J LOWTHER WORDCV J LOWTHER WORD
CV J LOWTHER WORD
 

Plus de Eagle West Cranes JB

Eagle West Precast Landscape Products
Eagle West Precast Landscape ProductsEagle West Precast Landscape Products
Eagle West Precast Landscape ProductsEagle West Cranes JB
 
Redi-Rock Installation Manual - Eagle West Precast
Redi-Rock Installation Manual - Eagle West PrecastRedi-Rock Installation Manual - Eagle West Precast
Redi-Rock Installation Manual - Eagle West PrecastEagle West Cranes JB
 
Redi-Rock Water Applications Brochure - Eagle West Precast
Redi-Rock Water Applications Brochure - Eagle West PrecastRedi-Rock Water Applications Brochure - Eagle West Precast
Redi-Rock Water Applications Brochure - Eagle West PrecastEagle West Cranes JB
 
Redi-Rock Products & Solutions Catalog - Eagle West Precast
Redi-Rock Products & Solutions Catalog - Eagle West PrecastRedi-Rock Products & Solutions Catalog - Eagle West Precast
Redi-Rock Products & Solutions Catalog - Eagle West PrecastEagle West Cranes JB
 
COR Certification - Eagle West Wind Energy Inc
COR Certification - Eagle West Wind Energy IncCOR Certification - Eagle West Wind Energy Inc
COR Certification - Eagle West Wind Energy IncEagle West Cranes JB
 
Tower Cranes vs. Mobile Cranes - Case History - Eagle West Cranes & Equipment
Tower Cranes vs. Mobile Cranes - Case History - Eagle West Cranes & EquipmentTower Cranes vs. Mobile Cranes - Case History - Eagle West Cranes & Equipment
Tower Cranes vs. Mobile Cranes - Case History - Eagle West Cranes & EquipmentEagle West Cranes JB
 
Rising to the Task - Case History - Eagle West Cranes
Rising to the Task - Case History - Eagle West CranesRising to the Task - Case History - Eagle West Cranes
Rising to the Task - Case History - Eagle West CranesEagle West Cranes JB
 
Signage Installation - Case History - Eagle West Cranes
Signage Installation - Case History - Eagle West CranesSignage Installation - Case History - Eagle West Cranes
Signage Installation - Case History - Eagle West CranesEagle West Cranes JB
 
Custom Engineered Rail-Truck - Case History - Eagle West Cranes
Custom Engineered Rail-Truck - Case History - Eagle West Cranes Custom Engineered Rail-Truck - Case History - Eagle West Cranes
Custom Engineered Rail-Truck - Case History - Eagle West Cranes Eagle West Cranes JB
 

Plus de Eagle West Cranes JB (20)

Eagle West Precast Landscape Products
Eagle West Precast Landscape ProductsEagle West Precast Landscape Products
Eagle West Precast Landscape Products
 
2010 01 20_stormwater
2010 01 20_stormwater2010 01 20_stormwater
2010 01 20_stormwater
 
2009 12 15_stormwater solutions
2009 12 15_stormwater solutions2009 12 15_stormwater solutions
2009 12 15_stormwater solutions
 
2009 11 18_erosion control
2009 11 18_erosion control2009 11 18_erosion control
2009 11 18_erosion control
 
2009 07 14_erosion control
2009 07 14_erosion control2009 07 14_erosion control
2009 07 14_erosion control
 
2009 06 09_erosion control
2009 06 09_erosion control2009 06 09_erosion control
2009 06 09_erosion control
 
2009 05 28_precast inc.
2009 05 28_precast inc.2009 05 28_precast inc.
2009 05 28_precast inc.
 
2009 02 01_precast solutions
2009 02 01_precast solutions2009 02 01_precast solutions
2009 02 01_precast solutions
 
2006 09 15_ce news
2006 09 15_ce news2006 09 15_ce news
2006 09 15_ce news
 
2006 04 12_geosynthetics
2006 04 12_geosynthetics2006 04 12_geosynthetics
2006 04 12_geosynthetics
 
2006 04 04_ce news
2006 04 04_ce news2006 04 04_ce news
2006 04 04_ce news
 
2004 08 15_ncbva
2004 08 15_ncbva2004 08 15_ncbva
2004 08 15_ncbva
 
Redi-Rock Installation Manual - Eagle West Precast
Redi-Rock Installation Manual - Eagle West PrecastRedi-Rock Installation Manual - Eagle West Precast
Redi-Rock Installation Manual - Eagle West Precast
 
Redi-Rock Water Applications Brochure - Eagle West Precast
Redi-Rock Water Applications Brochure - Eagle West PrecastRedi-Rock Water Applications Brochure - Eagle West Precast
Redi-Rock Water Applications Brochure - Eagle West Precast
 
Redi-Rock Products & Solutions Catalog - Eagle West Precast
Redi-Rock Products & Solutions Catalog - Eagle West PrecastRedi-Rock Products & Solutions Catalog - Eagle West Precast
Redi-Rock Products & Solutions Catalog - Eagle West Precast
 
COR Certification - Eagle West Wind Energy Inc
COR Certification - Eagle West Wind Energy IncCOR Certification - Eagle West Wind Energy Inc
COR Certification - Eagle West Wind Energy Inc
 
Tower Cranes vs. Mobile Cranes - Case History - Eagle West Cranes & Equipment
Tower Cranes vs. Mobile Cranes - Case History - Eagle West Cranes & EquipmentTower Cranes vs. Mobile Cranes - Case History - Eagle West Cranes & Equipment
Tower Cranes vs. Mobile Cranes - Case History - Eagle West Cranes & Equipment
 
Rising to the Task - Case History - Eagle West Cranes
Rising to the Task - Case History - Eagle West CranesRising to the Task - Case History - Eagle West Cranes
Rising to the Task - Case History - Eagle West Cranes
 
Signage Installation - Case History - Eagle West Cranes
Signage Installation - Case History - Eagle West CranesSignage Installation - Case History - Eagle West Cranes
Signage Installation - Case History - Eagle West Cranes
 
Custom Engineered Rail-Truck - Case History - Eagle West Cranes
Custom Engineered Rail-Truck - Case History - Eagle West Cranes Custom Engineered Rail-Truck - Case History - Eagle West Cranes
Custom Engineered Rail-Truck - Case History - Eagle West Cranes
 

Dernier

RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 

Dernier (20)

RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 

Sampling of Eagle West Wind Energy Projects

  • 1. Castle Rock Ridge Project In April 2011, Eagle West Wind Energy Inc. applied their experience and expertise to complete the installation of 33 Enercon E70s (2.3MW) at the Castle Rock Ridge Wind Farm in Pincher Creek, AB. This wind farm will generate approximately 76 MW of power, which will produce enough clean, renewable electricity to power approximately 20,000 typical Canadian homes. This project began in September 2010 for Enercon Canada & Enercon Services Nova Scotia who specializes in the manufacturing and marketing of wind turbines and wind energy plants. This installation wasn’t without its challenges; crews faced temperatures of -30 degrees Celsius and wind speeds of up to 145 kilometers/hour (90 miles/hour) proving that Eagle West has the equipment and manpower necessary to overcome any challenge safely and efficiently. “We trudged through all the obstacles and managed to complete the st erection of the turbines eight days ahead of the scheduled completion date which was March 31 ” commented Randy Trowsse, Project Manager. At the peak of operation, Eagle West had thirty-five staff on site, six hydraulic cranes ranging from 90 ton to 300 ton, two 300 ton crawler cranes and two freight trucks which were used to complete this large project.
  • 2. “Eagle West Wind Energy’s highly experienced personnel combined with a technologically advanced and very well maintained crane fleet performed the work both safely and efficiently. Eagle West has shown they are dedicated to providing the highest quality of service to their customer and I am pleased to recommend their services to others.” Michael Weidemann Executive Vice President ENERCON Canada Inc.
  • 3. Bear Mountain Wind Farm Project In May 2009, Eagle West Wind Energy Inc. applied their experience and expertise to complete the installation of 34 Enercon E82s (3.0MW) at the Bear Mountain Wind Farm 10 km west of Dawson Creek, BC. This wind farm will generate approximately 102 MW of power, which will produce enough clean, renewable electricity to power approximately 30,000 typical Canadian homes. This project was completed from May – September of 2009 for Enercon Canada & Enercon Services Nova Scotia who specializes in the manufacturing and marketing of wind turbines and wind energy plants. It was stated by Enercon that this was the most efficient and best installation that they have had in all of Canada. This installation wasn’t without its challenges; the roads were built to only 5.5m wide. For this reason, Eagle West purchased a Liebherr LR1400/2w Narrow Track Crawler crane which would walk fully assembled from one turbine to the next without having to be broken down. This is in large part why the project was such a huge success for the client. At the peak of operation, Eagle West had sixty staff on site, six hydraulic cranes ranging from 90 ton to 300 ton, two 440 ton crawler cranes and two freight trucks which were used to complete this large project.
  • 4. “Eagle West Wind Energy’s highly experienced personnel combined with a technologically advanced and very well maintained crane fleet performed the work both safely and efficiently. Eagle West has shown they are dedicated to providing the highest quality of service to their customer and I am pleased to recommend their services to others.” Nils Wingert Project Manager ENERCON Canada Inc.
  • 5. Dokie Wind Farm Project This project was built in two phases. It began in 2008 with a phase of 5 turbines and finished with a phase in 2010 of 43 turbines. This totals 48 Vestas V90 (3MW) turbines which were erected. This wind farm will generate approximately 144 MW of power, which will produce enough clean, renewable electricity to power approximately 40,000 typical Canadian homes. This project was very remote being located in Northeastern BC on a mountain side that was situated 45 km northwest of the small town of Chetywnd, BC. Further challenges were faced due to narrow roads where the Liebherr LR1400/2w Narrow Track proved especially helpful. Eagle West had to navigate their cranes over steep grades throughout the mountains in very icy conditions in order to complete this project on time for our client. “Eagle West worked diligently and productively despite harsh weather and difficult terrain. They performed their work both safely and efficiently and always gave particular care to provide us with the highest quality of service.” Bob Baird Project Manager Canadian Projects Ltd.
  • 6. Talbot Wind Farm Project In December 2010, Eagle West Wind Energy completed the installation of 43 Siemens wind turbines for the Talbot Wind Farm project near Ridgetown, Ontario. Illustrating Eagle West Wind Energy’s capability to provide turn-key solutions in this industry, the project included the installation of wind towers, the mechanical work on all towers, all tower electrical wiring, installation of NavCan lights and the installation of the OCAS radar system for the first time in all of North America. The Talbot Wind Farm generates approximately 98.9 megawatts (MW) of power, which produces enough clean, renewable electricity to power approximately 30,000 typical Canadian homes. The project began in August 2010 for RES Canada, a division of RES Americas. RES Americas has been active in North America since 1997 and during this time has either developed or constructed more than 10% of the installed capacity of wind energy in the United States. At the peak of the project, over one hundred qualified personnel and pieces of equipment were utilized for the completion of the wind farm. Crews managed extremely soft and muddy ground conditions while developing night lift procedures to install turbines ensuring the project schedule was maintained in spite of dramatically short daylight hours in the winter months. No one provides a higher level of service in wind turbine installation in Canada than Eagle West Wind Energy.
  • 7. “Eagle West Wind Energy Inc. performed the work on this project in a timely, safe, quality and professional manner. The work was professionally adequately staffed and well supervised. We recommend Eagle West Wind Energy to any contractor or owner and we look forward to the opportunity to work with Eagle West Energy Inc. on future projects.” Robb Phiri Project Manager RES Canada Construction LP.
  • 8. Wintering Hills Wind Farm At peak operation, Wintering Hills is expected to generate enough clean electricity to power approximately 35,000 Alberta homes, displacing the equivalent of approximately 200,000 tonnes of carbon dioxide per year. 2 The site is 64 km , so staging of activities to meet tight deadlines is critical. Working in an active oil and gas sector also requires multiple sweeps to locate buried utilities and ensure the project site upholds Ledcor and Eagle West’s safety standards. The scope of work also includes temporary access roads, permanent low impact roads, an underground cable collector system, ground wires and fibre optic cables and substation building foundations, and complete turn-key installation of the 55 x GE 1.6 MW turbines. Client Reference - Suncor Energy Services - Mr. Gary Prine - 403.650.1430
  • 9. Greenwich Lake Wind Farm RES/Enbridge was pleased with success of Talbot and thus engaged us to erect 43 more Siemens SWT-2.3 MW turbines at the Greenwich Lake Wind Farm. It is located near Thunder Bay, ON. The site consists of rolling hills comprised greatly of bedrock. The roads are all narrow and steep. These challenges are being overcome by the use of 2 x Liebherr LR1400/2w Narrow Track Crawler Cranes. Completed on-time and on-budget in November 2012.