Reporting, Monitoring and Verification under #PATScheme should be made faceless. This would be the step in the right direction. Focus should be on empowerment and not just emapanelment.
2. 478 700+
No of DCs
in Phase 1
Expected No of
DCs in Phase 2
3. 3 LACS $2 M USD
Average Cost
Incurred by each
DC for M&V
Total cost
expected to be
incurred by DCs
for M&V
4. WILL HISTORY
REPEAT ITSELF?
Questions were raised on "standards" followed
during baseline audits and many believe that
M&V audits have not really happened
the way they were supposed too.
5. IS THERE A WAY
OUT?
Empowerment, not Empanelment is the way ahead! India
needs to establish a Central Energy Data Repository,
perhaps PAT.NET needs to head in that direction.
Reporting, Monitoring and Verification needs to be