C10 165. Union Square Plaza Bldg. 66-70 Union Square, Somerville. Request to AMEND COMPLAINT. Submitted
by email 9/11/12 p. 1 of 4
September 11, 2012
TO: Thomas Hopkins, Director
Donald Lang, Chair
MA DPS Architectural Access Board
One Ashburton Place, room 1310
Boston, MA 02108-1618
RE: C10 165. AMENDMENTS TO COMPLAINT
Union Square Plaza Building, 66-70 Union Square, Somerville MA1
Summary of requested Amendments:
1. Compliance achieved on 26.10.1 Please have owner submit proof that this new element also
complies with 6.4 and 20.9.
2. DISMISS 26.4 (1987) in the owner's favor;
3. ADD 20.12.4 and 28.1.
Dear Director Hopkins and Chair Lang,
Thank you for serving the First Notice on this facility, dated July 25, 2012.
As of this date, CAPS has not received any communications showing that the owner has responded
to the First Notice.
On September 6, 2012, I visited the facility and spoke with several tenants. Based on the changes
made to this facility since November 2010, plus observations following receipt of First Notice,
CAPS submits the following amendments and requests. We look forward to receiving a copy of
the AAB's communications with the Owner regarding this submission.
Thank you very much for revising the original complaint to update many code citations from 1987
to 2006 editions; and for combining the Parking Lot complaint with the Building Complaint.
1. Voluntary compliance achieved on 26.10.1
In August 2012)2
, the owner had work done to comply with this violation: 26.10.1. The threshold
no longer exceeds 1/2" at the back door entrance. Compliance was achieved after First Notice
served.
1
below, scan of filing information for this Complaint.
2
Tenants spontaneously verified that this work on the backdoor threshold had just been completed about two weeks
ago.
C10 165. Union Square Plaza Bldg. 66-70 Union Square, Somerville. Request to AMEND COMPLAINT. Submitted
by email 9/11/12 p. 2 of 4
• REQUEST: As with other voluntary compliance stipulations, please require that owner submit
proof that this new threshold element complies with all the requirements at 521 CMR, including
6.4, Clear Floor Space for Wheelchairs; and 20.9, Accessible Route Cross Slope.
below: 2 photos of new threshold apron at back (parking lot) accessible entrance:
2. CAPS requests DISMISSAL of 26.4 (1987) in favor of the owner.
• 26.4 (1987)
explanation: Although a newly constructed mezzanine level of one program on the first floor
(story) of this building is not accessible by elevator, this code citation does not cover
that issue. Please see 3 below re: 28.1.
n addition, owner has good reason to lock the doors. On the day I visited, there was actually a
bomb threat for this building. Also, at least one tenant has important safety considerations.
C10 165. Union Square Plaza Bldg. 66-70 Union Square, Somerville. Request to AMEND COMPLAINT. Submitted
by email 9/11/12 p. 3 of 4
3. ADD 20.12.4 and 28.1.
20.12.4 Two-way Communication: A method of two-way communication, with both visible and
audible signals, shall be provided between each area of rescue assistance and the primary
entrance to the building.
Complainant reports that the two-way intercoms at the primary and accessible entrances do not
have visible signals. In addition, Blind users are provided no Braille instructions on how to reach
inside staff.
below photo: In Winter 2010/11, owner added a CLOSED CIRCUIT TELEPHONE. Visitors can
use voice communication to obtain entry at the locked front or back entrances.
• This device has no Braille instructions for Blind visitors.
• This device does not have non-audible communications for Deaf and HOH visitors.
• Please have owner submit proof that this device complies with all requirements of 521CMR,
including the requirements of 521 CMR 6.00, Space Allowance and Zone of Reach.
• There are often movable obstacles placed in front of the front entrance system. Please order
owner to keep the space in front of the device clear at all times.
C10 165. Union Square Plaza Bldg. 66-70 Union Square, Somerville. Request to AMEND COMPLAINT. Submitted
by email 9/11/12 p. 4 of 4
28.1 GENERAL In all multi-story buildings and facilities, each level including mezzanines, shall be
served by a passenger elevator.
Complainant states: in 2008/2009, Owner made structural changes to first and second stories,
including addition of a MEZZANINE within the offices for a program located on the first floor.
This program is City of Somerville-owned and HUD-funded.
This mezzanine is only reachable by stairs and there are no ramps providing an interior accessible
ramp in lieu of an elevator.3
• If the AAB has granted a Variance for this structural change (cost: ~$20K), please inform CAPS
of this and omit this violation from the amendments submitted today.
Thank you.
Sincerely,
Eileen Feldman, director
on behalf of Community Access Project, Somerville
3
The original complaint named this violation as 35.1, accompanied by a photo (not reproduced
again here). It looks like the AAB substituted 26.4 (1987) instead of 35.1(1987) in the 2012 First
Notice . However, since the mezzanine was added after 2006, and since the violation involves
the lack of access between the elevator and the mezzanine; and, not between the accessible
entrance and the building elevator, we submit this amendment.

Contenu connexe

Tendances

Attachments 2012 07_24
Attachments 2012 07_24Attachments 2012 07_24
Attachments 2012 07_24dvcondicion
 
Social events newman brothers coffin fitting works tour on 19th march 2013
Social events   newman brothers coffin fitting works tour on 19th march 2013Social events   newman brothers coffin fitting works tour on 19th march 2013
Social events newman brothers coffin fitting works tour on 19th march 2013Nancy Khan
 
Mix use building case Study
Mix use building case Study Mix use building case Study
Mix use building case Study Nitesh Parmar
 
The Arcade Mall Project Proposal-Final Presentation
The Arcade Mall Project Proposal-Final PresentationThe Arcade Mall Project Proposal-Final Presentation
The Arcade Mall Project Proposal-Final PresentationAndrew Webb
 
Weikfield building B presentation 7.1.11
Weikfield building B presentation 7.1.11Weikfield building B presentation 7.1.11
Weikfield building B presentation 7.1.11VasconEngineers
 
CM&B Construction Overview
CM&B Construction OverviewCM&B Construction Overview
CM&B Construction OverviewLeah Blackman
 
Banner, Buchanan & 40th Street Rehab Presentation
Banner, Buchanan & 40th Street Rehab PresentationBanner, Buchanan & 40th Street Rehab Presentation
Banner, Buchanan & 40th Street Rehab Presentationcityofhyattsville
 
Village Retail Building
Village Retail BuildingVillage Retail Building
Village Retail BuildingHansStrauch
 
Buddh circuit studios ii infopacki
Buddh circuit studios ii  infopackiBuddh circuit studios ii  infopacki
Buddh circuit studios ii infopackiGaurav Vohra
 
Qing_Sun_Work_Sample
Qing_Sun_Work_SampleQing_Sun_Work_Sample
Qing_Sun_Work_SampleQing Sun
 
Item # 10 & 11 - PPT Katherine Court - replat
Item # 10 & 11 - PPT Katherine Court - replatItem # 10 & 11 - PPT Katherine Court - replat
Item # 10 & 11 - PPT Katherine Court - replatahcitycouncil
 

Tendances (13)

Attachments 2012 07_24
Attachments 2012 07_24Attachments 2012 07_24
Attachments 2012 07_24
 
Social events newman brothers coffin fitting works tour on 19th march 2013
Social events   newman brothers coffin fitting works tour on 19th march 2013Social events   newman brothers coffin fitting works tour on 19th march 2013
Social events newman brothers coffin fitting works tour on 19th march 2013
 
Mix use building case Study
Mix use building case Study Mix use building case Study
Mix use building case Study
 
Portfolio
PortfolioPortfolio
Portfolio
 
The Arcade Mall Project Proposal-Final Presentation
The Arcade Mall Project Proposal-Final PresentationThe Arcade Mall Project Proposal-Final Presentation
The Arcade Mall Project Proposal-Final Presentation
 
Weikfield building B presentation 7.1.11
Weikfield building B presentation 7.1.11Weikfield building B presentation 7.1.11
Weikfield building B presentation 7.1.11
 
CM&B Construction Overview
CM&B Construction OverviewCM&B Construction Overview
CM&B Construction Overview
 
Banner, Buchanan & 40th Street Rehab Presentation
Banner, Buchanan & 40th Street Rehab PresentationBanner, Buchanan & 40th Street Rehab Presentation
Banner, Buchanan & 40th Street Rehab Presentation
 
Village Retail Building
Village Retail BuildingVillage Retail Building
Village Retail Building
 
Buddh circuit studios ii infopacki
Buddh circuit studios ii  infopackiBuddh circuit studios ii  infopacki
Buddh circuit studios ii infopacki
 
Qing_Sun_Work_Sample
Qing_Sun_Work_SampleQing_Sun_Work_Sample
Qing_Sun_Work_Sample
 
Current Works
Current WorksCurrent Works
Current Works
 
Item # 10 & 11 - PPT Katherine Court - replat
Item # 10 & 11 - PPT Katherine Court - replatItem # 10 & 11 - PPT Katherine Court - replat
Item # 10 & 11 - PPT Katherine Court - replat
 

En vedette

DRIVE | Create Energy, persuasive by design
DRIVE | Create Energy, persuasive by designDRIVE | Create Energy, persuasive by design
DRIVE | Create Energy, persuasive by designCLICKNL
 
Create New Division for Small Medium Enterprise Financing
Create New Division for Small Medium Enterprise FinancingCreate New Division for Small Medium Enterprise Financing
Create New Division for Small Medium Enterprise FinancingAmal Rifadly
 
Ms 02 management of human resourcesc
Ms 02 management of human resourcescMs 02 management of human resourcesc
Ms 02 management of human resourcescsmumbahelp
 
Curso de iniciación a la contabilidad adaptado al nuevo plan general de con...
Curso de iniciación a la contabilidad   adaptado al nuevo plan general de con...Curso de iniciación a la contabilidad   adaptado al nuevo plan general de con...
Curso de iniciación a la contabilidad adaptado al nuevo plan general de con...CenproexFormacion
 
притчи иисуса, часть 2 - Parables of Jesus pt 2
притчи иисуса, часть 2 - Parables of Jesus pt 2притчи иисуса, часть 2 - Parables of Jesus pt 2
притчи иисуса, часть 2 - Parables of Jesus pt 2Freekidstories
 
Ms 65 marketing of services
Ms 65  marketing of servicesMs 65  marketing of services
Ms 65 marketing of servicessmumbahelp
 
Ms 66 marketing research
Ms 66 marketing researchMs 66 marketing research
Ms 66 marketing researchsmumbahelp
 
Curso práctico de la ley de sucesiones y donaciones
Curso práctico de la ley de sucesiones y donacionesCurso práctico de la ley de sucesiones y donaciones
Curso práctico de la ley de sucesiones y donacionesCenproexFormacion
 
Curso práctico del impuesto sobre transmisiones patrimoniales y actos jurídic...
Curso práctico del impuesto sobre transmisiones patrimoniales y actos jurídic...Curso práctico del impuesto sobre transmisiones patrimoniales y actos jurídic...
Curso práctico del impuesto sobre transmisiones patrimoniales y actos jurídic...CenproexFormacion
 

En vedette (11)

DRIVE | Create Energy, persuasive by design
DRIVE | Create Energy, persuasive by designDRIVE | Create Energy, persuasive by design
DRIVE | Create Energy, persuasive by design
 
Lose weight fast
Lose weight fastLose weight fast
Lose weight fast
 
Create New Division for Small Medium Enterprise Financing
Create New Division for Small Medium Enterprise FinancingCreate New Division for Small Medium Enterprise Financing
Create New Division for Small Medium Enterprise Financing
 
Ms 02 management of human resourcesc
Ms 02 management of human resourcescMs 02 management of human resourcesc
Ms 02 management of human resourcesc
 
Curso de iniciación a la contabilidad adaptado al nuevo plan general de con...
Curso de iniciación a la contabilidad   adaptado al nuevo plan general de con...Curso de iniciación a la contabilidad   adaptado al nuevo plan general de con...
Curso de iniciación a la contabilidad adaptado al nuevo plan general de con...
 
притчи иисуса, часть 2 - Parables of Jesus pt 2
притчи иисуса, часть 2 - Parables of Jesus pt 2притчи иисуса, часть 2 - Parables of Jesus pt 2
притчи иисуса, часть 2 - Parables of Jesus pt 2
 
Ms 65 marketing of services
Ms 65  marketing of servicesMs 65  marketing of services
Ms 65 marketing of services
 
Planeacio taller
Planeacio tallerPlaneacio taller
Planeacio taller
 
Ms 66 marketing research
Ms 66 marketing researchMs 66 marketing research
Ms 66 marketing research
 
Curso práctico de la ley de sucesiones y donaciones
Curso práctico de la ley de sucesiones y donacionesCurso práctico de la ley de sucesiones y donaciones
Curso práctico de la ley de sucesiones y donaciones
 
Curso práctico del impuesto sobre transmisiones patrimoniales y actos jurídic...
Curso práctico del impuesto sobre transmisiones patrimoniales y actos jurídic...Curso práctico del impuesto sobre transmisiones patrimoniales y actos jurídic...
Curso práctico del impuesto sobre transmisiones patrimoniales y actos jurídic...
 

Similaire à AAB #C10 165 66-70 UnionSquare Somerville Update 9/2012

Career Achievement & Contribution at MCST 4070 Centro Residences
Career  Achievement  &  Contribution  at  MCST  4070 Centro ResidencesCareer  Achievement  &  Contribution  at  MCST  4070 Centro Residences
Career Achievement & Contribution at MCST 4070 Centro ResidencesKelvin Chang
 
Gugliemino v Advance Flooring Co P.L (Home Building) [2005] NSWCTTT 162
Gugliemino v Advance Flooring Co P.L (Home Building) [2005] NSWCTTT 162Gugliemino v Advance Flooring Co P.L (Home Building) [2005] NSWCTTT 162
Gugliemino v Advance Flooring Co P.L (Home Building) [2005] NSWCTTT 162Alec Rendell [NBPR-2]
 
Peace, Property and Privacy: Objections to BSA 315-12-BZ
Peace, Property and Privacy: Objections to BSA 315-12-BZ  Peace, Property and Privacy: Objections to BSA 315-12-BZ
Peace, Property and Privacy: Objections to BSA 315-12-BZ nsutaria
 
Ici final project
Ici final projectIci final project
Ici final projectkongzc
 
DESIGN STUDIO III ARCP 301R. Belton, AIA, NOMA, CSI Associates.docx
DESIGN STUDIO III ARCP 301R. Belton, AIA, NOMA, CSI Associates.docxDESIGN STUDIO III ARCP 301R. Belton, AIA, NOMA, CSI Associates.docx
DESIGN STUDIO III ARCP 301R. Belton, AIA, NOMA, CSI Associates.docxcarolinef5
 
Item # 6 --- 333 Ogden Lane Sign. Review
Item # 6 --- 333 Ogden Lane Sign. ReviewItem # 6 --- 333 Ogden Lane Sign. Review
Item # 6 --- 333 Ogden Lane Sign. Reviewahcitycouncil
 
411 New York Ave. NE Zoning Commission Order 15-19
411 New York Ave. NE Zoning Commission Order 15-19411 New York Ave. NE Zoning Commission Order 15-19
411 New York Ave. NE Zoning Commission Order 15-19Elise Bernard
 
Item # 6 - 333 Ogden Lane Significance Review
Item # 6 - 333 Ogden Lane Significance ReviewItem # 6 - 333 Ogden Lane Significance Review
Item # 6 - 333 Ogden Lane Significance Reviewahcitycouncil
 
Item # 7 224 W. Elmview
Item # 7  224 W.  ElmviewItem # 7  224 W.  Elmview
Item # 7 224 W. Elmviewahcitycouncil
 
Items # 7&8 - 309 & 317 Lamont Replat
Items # 7&8 - 309 & 317 Lamont ReplatItems # 7&8 - 309 & 317 Lamont Replat
Items # 7&8 - 309 & 317 Lamont Replatahcitycouncil
 
Home Renovator's Guide to the Building Code - Creating a Duplex Overview Pres...
Home Renovator's Guide to the Building Code - Creating a Duplex Overview Pres...Home Renovator's Guide to the Building Code - Creating a Duplex Overview Pres...
Home Renovator's Guide to the Building Code - Creating a Duplex Overview Pres...tboyko
 
Renovator's Presentation for Orderline Duplex Simplifed for linked-in
Renovator's Presentation for Orderline Duplex Simplifed for linked-inRenovator's Presentation for Orderline Duplex Simplifed for linked-in
Renovator's Presentation for Orderline Duplex Simplifed for linked-inAnthony Boyko
 

Similaire à AAB #C10 165 66-70 UnionSquare Somerville Update 9/2012 (20)

AAB Bldg complaint Somerville 66-70 Union Square
AAB Bldg complaint Somerville 66-70 Union SquareAAB Bldg complaint Somerville 66-70 Union Square
AAB Bldg complaint Somerville 66-70 Union Square
 
MA AAB Complaint 66 70 Union Square Plaza Building
MA AAB Complaint 66 70 Union Square Plaza BuildingMA AAB Complaint 66 70 Union Square Plaza Building
MA AAB Complaint 66 70 Union Square Plaza Building
 
Armory Decision May 24, 2010 SOmerville, MA
Armory Decision May 24, 2010 SOmerville, MAArmory Decision May 24, 2010 SOmerville, MA
Armory Decision May 24, 2010 SOmerville, MA
 
Armory Decision, October 31, 2011 Somerville, MA
Armory Decision, October 31, 2011 Somerville, MAArmory Decision, October 31, 2011 Somerville, MA
Armory Decision, October 31, 2011 Somerville, MA
 
Somerville City Hall inaccessible During Construction State Board complaint
Somerville City Hall inaccessible During Construction State Board complaintSomerville City Hall inaccessible During Construction State Board complaint
Somerville City Hall inaccessible During Construction State Board complaint
 
Community Access Project re Wayne Apartments Project May 2012
Community Access Project re Wayne Apartments Project May 2012Community Access Project re Wayne Apartments Project May 2012
Community Access Project re Wayne Apartments Project May 2012
 
CAPS Somerville AAB #C10 264 Mtn4Reconsider
CAPS Somerville AAB #C10 264 Mtn4ReconsiderCAPS Somerville AAB #C10 264 Mtn4Reconsider
CAPS Somerville AAB #C10 264 Mtn4Reconsider
 
Career Achievement & Contribution at MCST 4070 Centro Residences
Career  Achievement  &  Contribution  at  MCST  4070 Centro ResidencesCareer  Achievement  &  Contribution  at  MCST  4070 Centro Residences
Career Achievement & Contribution at MCST 4070 Centro Residences
 
Gugliemino v Advance Flooring Co P.L (Home Building) [2005] NSWCTTT 162
Gugliemino v Advance Flooring Co P.L (Home Building) [2005] NSWCTTT 162Gugliemino v Advance Flooring Co P.L (Home Building) [2005] NSWCTTT 162
Gugliemino v Advance Flooring Co P.L (Home Building) [2005] NSWCTTT 162
 
Peace, Property and Privacy: Objections to BSA 315-12-BZ
Peace, Property and Privacy: Objections to BSA 315-12-BZ  Peace, Property and Privacy: Objections to BSA 315-12-BZ
Peace, Property and Privacy: Objections to BSA 315-12-BZ
 
Ici final project
Ici final projectIci final project
Ici final project
 
DESIGN STUDIO III ARCP 301R. Belton, AIA, NOMA, CSI Associates.docx
DESIGN STUDIO III ARCP 301R. Belton, AIA, NOMA, CSI Associates.docxDESIGN STUDIO III ARCP 301R. Belton, AIA, NOMA, CSI Associates.docx
DESIGN STUDIO III ARCP 301R. Belton, AIA, NOMA, CSI Associates.docx
 
Ici final project
Ici final projectIci final project
Ici final project
 
Item # 6 --- 333 Ogden Lane Sign. Review
Item # 6 --- 333 Ogden Lane Sign. ReviewItem # 6 --- 333 Ogden Lane Sign. Review
Item # 6 --- 333 Ogden Lane Sign. Review
 
411 New York Ave. NE Zoning Commission Order 15-19
411 New York Ave. NE Zoning Commission Order 15-19411 New York Ave. NE Zoning Commission Order 15-19
411 New York Ave. NE Zoning Commission Order 15-19
 
Item # 6 - 333 Ogden Lane Significance Review
Item # 6 - 333 Ogden Lane Significance ReviewItem # 6 - 333 Ogden Lane Significance Review
Item # 6 - 333 Ogden Lane Significance Review
 
Item # 7 224 W. Elmview
Item # 7  224 W.  ElmviewItem # 7  224 W.  Elmview
Item # 7 224 W. Elmview
 
Items # 7&8 - 309 & 317 Lamont Replat
Items # 7&8 - 309 & 317 Lamont ReplatItems # 7&8 - 309 & 317 Lamont Replat
Items # 7&8 - 309 & 317 Lamont Replat
 
Home Renovator's Guide to the Building Code - Creating a Duplex Overview Pres...
Home Renovator's Guide to the Building Code - Creating a Duplex Overview Pres...Home Renovator's Guide to the Building Code - Creating a Duplex Overview Pres...
Home Renovator's Guide to the Building Code - Creating a Duplex Overview Pres...
 
Renovator's Presentation for Orderline Duplex Simplifed for linked-in
Renovator's Presentation for Orderline Duplex Simplifed for linked-inRenovator's Presentation for Orderline Duplex Simplifed for linked-in
Renovator's Presentation for Orderline Duplex Simplifed for linked-in
 

Plus de eilily Community Access Project, Somerville

CAPS writes to State officials: March 23rd Surgeon General's press conference...
CAPS writes to State officials: March 23rd Surgeon General's press conference...CAPS writes to State officials: March 23rd Surgeon General's press conference...
CAPS writes to State officials: March 23rd Surgeon General's press conference...eilily Community Access Project, Somerville
 

Plus de eilily Community Access Project, Somerville (20)

Somerville, MA 2012 FHWA #Disability Rights complaint smrdact Feldman
Somerville, MA 2012 FHWA #Disability Rights complaint smrdact FeldmanSomerville, MA 2012 FHWA #Disability Rights complaint smrdact Feldman
Somerville, MA 2012 FHWA #Disability Rights complaint smrdact Feldman
 
Feldman on MA 2013 Fair Housing AI
Feldman on MA 2013 Fair Housing AIFeldman on MA 2013 Fair Housing AI
Feldman on MA 2013 Fair Housing AI
 
Economics + Disability Nationwide 2012
Economics + Disability Nationwide 2012Economics + Disability Nationwide 2012
Economics + Disability Nationwide 2012
 
SNAPS +PwD in US 2012
SNAPS +PwD in US 2012SNAPS +PwD in US 2012
SNAPS +PwD in US 2012
 
#Maleg H97 Opposing Testimony Feldman 11:19:13
#Maleg H97 Opposing Testimony Feldman 11:19:13#Maleg H97 Opposing Testimony Feldman 11:19:13
#Maleg H97 Opposing Testimony Feldman 11:19:13
 
Boston Disability Commission Ltr to AG re: Remote Participation
Boston Disability Commission Ltr to AG re: Remote ParticipationBoston Disability Commission Ltr to AG re: Remote Participation
Boston Disability Commission Ltr to AG re: Remote Participation
 
Feldman Testimony on MA Workforce Development + ADA H.136 Feldman
Feldman Testimony on MA Workforce Development + ADA H.136 FeldmanFeldman Testimony on MA Workforce Development + ADA H.136 Feldman
Feldman Testimony on MA Workforce Development + ADA H.136 Feldman
 
Somerville MA libraries Federal Settlement Agreement May 2013
Somerville MA libraries Federal Settlement Agreement May 2013Somerville MA libraries Federal Settlement Agreement May 2013
Somerville MA libraries Federal Settlement Agreement May 2013
 
Somerville libraries Voluntary Resolution Settlement May 2013
Somerville libraries Voluntary Resolution Settlement May 2013Somerville libraries Voluntary Resolution Settlement May 2013
Somerville libraries Voluntary Resolution Settlement May 2013
 
Koty public info ltr 9/24/08
Koty public info ltr 9/24/08Koty public info ltr 9/24/08
Koty public info ltr 9/24/08
 
AAB #C10 165 66-70 Union Square, Amended 2012
 AAB #C10 165 66-70 Union Square, Amended 2012 AAB #C10 165 66-70 Union Square, Amended 2012
AAB #C10 165 66-70 Union Square, Amended 2012
 
AAB parking lot complaint 66-70 Union Square, Somerville
AAB parking lot complaint 66-70 Union Square, SomervilleAAB parking lot complaint 66-70 Union Square, Somerville
AAB parking lot complaint 66-70 Union Square, Somerville
 
CAPS to AAB re: Armory Fine Abatement Decision
CAPS to AAB re: Armory Fine Abatement DecisionCAPS to AAB re: Armory Fine Abatement Decision
CAPS to AAB re: Armory Fine Abatement Decision
 
Feldman to City: Streetscape Access Plan needed
Feldman to City: Streetscape Access Plan neededFeldman to City: Streetscape Access Plan needed
Feldman to City: Streetscape Access Plan needed
 
AAB Armory decision April 11, 2012
AAB Armory decision April 11, 2012AAB Armory decision April 11, 2012
AAB Armory decision April 11, 2012
 
CAPS response to Somerville AAB plan-14 location remediation 2012
CAPS response to Somerville AAB plan-14 location remediation 2012CAPS response to Somerville AAB plan-14 location remediation 2012
CAPS response to Somerville AAB plan-14 location remediation 2012
 
Aab armory, somerville, ma first notice of violations april 23, 2010
Aab armory, somerville, ma   first notice of violations april 23, 2010Aab armory, somerville, ma   first notice of violations april 23, 2010
Aab armory, somerville, ma first notice of violations april 23, 2010
 
CAPS writes to State officials: March 23rd Surgeon General's press conference...
CAPS writes to State officials: March 23rd Surgeon General's press conference...CAPS writes to State officials: March 23rd Surgeon General's press conference...
CAPS writes to State officials: March 23rd Surgeon General's press conference...
 
Minutes MBTA/City Bus Access issues 2/8/07
Minutes MBTA/City Bus Access issues 2/8/07Minutes MBTA/City Bus Access issues 2/8/07
Minutes MBTA/City Bus Access issues 2/8/07
 
AAB #11 241 Somerville, MA:latest route around our rights
AAB #11 241 Somerville, MA:latest route around our rightsAAB #11 241 Somerville, MA:latest route around our rights
AAB #11 241 Somerville, MA:latest route around our rights
 

Dernier

#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAndikSusilo4
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?XfilesPro
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphNeo4j
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 

Dernier (20)

#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & Application
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping Elbows
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 

AAB #C10 165 66-70 UnionSquare Somerville Update 9/2012

  • 1. C10 165. Union Square Plaza Bldg. 66-70 Union Square, Somerville. Request to AMEND COMPLAINT. Submitted by email 9/11/12 p. 1 of 4 September 11, 2012 TO: Thomas Hopkins, Director Donald Lang, Chair MA DPS Architectural Access Board One Ashburton Place, room 1310 Boston, MA 02108-1618 RE: C10 165. AMENDMENTS TO COMPLAINT Union Square Plaza Building, 66-70 Union Square, Somerville MA1 Summary of requested Amendments: 1. Compliance achieved on 26.10.1 Please have owner submit proof that this new element also complies with 6.4 and 20.9. 2. DISMISS 26.4 (1987) in the owner's favor; 3. ADD 20.12.4 and 28.1. Dear Director Hopkins and Chair Lang, Thank you for serving the First Notice on this facility, dated July 25, 2012. As of this date, CAPS has not received any communications showing that the owner has responded to the First Notice. On September 6, 2012, I visited the facility and spoke with several tenants. Based on the changes made to this facility since November 2010, plus observations following receipt of First Notice, CAPS submits the following amendments and requests. We look forward to receiving a copy of the AAB's communications with the Owner regarding this submission. Thank you very much for revising the original complaint to update many code citations from 1987 to 2006 editions; and for combining the Parking Lot complaint with the Building Complaint. 1. Voluntary compliance achieved on 26.10.1 In August 2012)2 , the owner had work done to comply with this violation: 26.10.1. The threshold no longer exceeds 1/2" at the back door entrance. Compliance was achieved after First Notice served. 1 below, scan of filing information for this Complaint. 2 Tenants spontaneously verified that this work on the backdoor threshold had just been completed about two weeks ago.
  • 2. C10 165. Union Square Plaza Bldg. 66-70 Union Square, Somerville. Request to AMEND COMPLAINT. Submitted by email 9/11/12 p. 2 of 4 • REQUEST: As with other voluntary compliance stipulations, please require that owner submit proof that this new threshold element complies with all the requirements at 521 CMR, including 6.4, Clear Floor Space for Wheelchairs; and 20.9, Accessible Route Cross Slope. below: 2 photos of new threshold apron at back (parking lot) accessible entrance: 2. CAPS requests DISMISSAL of 26.4 (1987) in favor of the owner. • 26.4 (1987) explanation: Although a newly constructed mezzanine level of one program on the first floor (story) of this building is not accessible by elevator, this code citation does not cover that issue. Please see 3 below re: 28.1. n addition, owner has good reason to lock the doors. On the day I visited, there was actually a bomb threat for this building. Also, at least one tenant has important safety considerations.
  • 3. C10 165. Union Square Plaza Bldg. 66-70 Union Square, Somerville. Request to AMEND COMPLAINT. Submitted by email 9/11/12 p. 3 of 4 3. ADD 20.12.4 and 28.1. 20.12.4 Two-way Communication: A method of two-way communication, with both visible and audible signals, shall be provided between each area of rescue assistance and the primary entrance to the building. Complainant reports that the two-way intercoms at the primary and accessible entrances do not have visible signals. In addition, Blind users are provided no Braille instructions on how to reach inside staff. below photo: In Winter 2010/11, owner added a CLOSED CIRCUIT TELEPHONE. Visitors can use voice communication to obtain entry at the locked front or back entrances. • This device has no Braille instructions for Blind visitors. • This device does not have non-audible communications for Deaf and HOH visitors. • Please have owner submit proof that this device complies with all requirements of 521CMR, including the requirements of 521 CMR 6.00, Space Allowance and Zone of Reach. • There are often movable obstacles placed in front of the front entrance system. Please order owner to keep the space in front of the device clear at all times.
  • 4. C10 165. Union Square Plaza Bldg. 66-70 Union Square, Somerville. Request to AMEND COMPLAINT. Submitted by email 9/11/12 p. 4 of 4 28.1 GENERAL In all multi-story buildings and facilities, each level including mezzanines, shall be served by a passenger elevator. Complainant states: in 2008/2009, Owner made structural changes to first and second stories, including addition of a MEZZANINE within the offices for a program located on the first floor. This program is City of Somerville-owned and HUD-funded. This mezzanine is only reachable by stairs and there are no ramps providing an interior accessible ramp in lieu of an elevator.3 • If the AAB has granted a Variance for this structural change (cost: ~$20K), please inform CAPS of this and omit this violation from the amendments submitted today. Thank you. Sincerely, Eileen Feldman, director on behalf of Community Access Project, Somerville 3 The original complaint named this violation as 35.1, accompanied by a photo (not reproduced again here). It looks like the AAB substituted 26.4 (1987) instead of 35.1(1987) in the 2012 First Notice . However, since the mezzanine was added after 2006, and since the violation involves the lack of access between the elevator and the mezzanine; and, not between the accessible entrance and the building elevator, we submit this amendment.