SlideShare une entreprise Scribd logo
1  sur  25
EV-Readiness policy introduction and
VCI - MUD Pilot Project Overview
Eric Huang,
Program Manager
10/20/2020
Electric Vehicle Readiness and
Charging at Multi-Unit Dwellings
Photo @Dylan VanWeelden
● Building Codes Intro
● Why EV-Readiness in Building Codes?
● Introduction to Preliminary Learnings from the
VCI-MUD Project
2
Today’s Topics:
What are Building Codes?
“Collection of laws, regulations, ordinances adopted by a government legislative authority
with the physical structure and health conditions of buildings and building sites”
● Who creates model codes?
○ ICC - Int’l Code Council
○ NFPA - National Fire Protection Association
○ ASHARE - American Society of Heating and Air-Conditioning Engineers
● What codes are there?
○ IBC - Int’l Building Code
○ IRC - Int’l Residential Code
○ IECC - Int’l Energy Conservation Code
○ NEC - National Electrical Code
3
Building Codes FAQ (Cont.d)
● Who adopts?
○ AHJs:
-Nations, States, and Provinces adopt codes recommended by the ICC
● How often are they updated?
○ Code cycles is generally 3-yr (ICC)
■ Code Development Committee, Code Change Proposal, Code Development
hearing, Call for Public Comment, Final Action Hearing
■ Code adoption cycle in U.S. States is also generally 3-yr (i.e. OR, WA)
4
5
• Building codes are divided by
sections i.e.
• Building, Electrical,
Mechanical, and Plumbing
are common ones.
• Model Codes are developed by
specific agencies and adopted by
AHJs.
• The ability of each level to create
and enforce codes varies
depending on the local authority
Summary:
Building Codes
Why we care about building codes for EV?
● Access to charging is critical
○ MUD tenants have substantial barriers installing EVSE
○ Full circle: Residential, workplace, and public charging
● Building codes nowadays have energy efficiency requirements, which will free up
electrical capacity for the building to accommodate EV charging
● New buildings:
○ Last for decades
○ EV readiness is a technology-neutral
○ EV charging is a marketable amenity
○ Financially optimal comparing to retrofitting
7
Avoided Costs for EV-Ready Parking
8
(per space) Enclosed
2 EV-Ready
Space
Enclosed
6 EV-Ready
Space
Enclosed
12 EV-Ready
Space
San Francisco 1 $2,800 n/a $1,511
Oakland 2 $1,660 $890 $470
Source:
1. Plug-In Electric Vehicle Infrastructure Cost-Effectiveness Report for San Francisco. November 17, 2016
2. Plug-In Electric Vehicle Infrastructure Cost-Effectiveness Report, City of Oakland. July 20, 2016
3. ELECTRIC VEHICLE (EV) CHARGING INFRASTRUCTURE: MULTIFAMILY BUILDING STANDARDS. Report. April 2018. Accessed January 2019.
https://arb.ca.gov/cc/greenbuildings/pdf/tcac2018.pdf
“An estimated $7,000 per parking space can be avoided with multiple installations of Level 2
charging stations. An estimated $8,000 per parking space can be avoided when an individual
Level 2 charging station is installed.” 3
What Building Code Language to adopt/propose?
9
Definitions
● EV-Capable Space:
○ Electrical panel capacity and space to support a minimum 40-ampere,
208/240-volt branch circuit for each EV parking space, and the
installation of raceways, both underground and surface mounted, to
support the EVSE.
● EV-Ready Space:
○ A designated parking space which is provided with one 40-ampere,
208/240-volt dedicated branch circuit for EVSE servicing Electric Vehicles.
The circuit shall terminate in a suitable point such as a receptacle,
junction box, or an EVSE for the EV parking spaces.
EV-Readiness Code:
10
EV-Capable
EV-Ready
EV-Readiness in Commercial and Residential New Developments
• EV-readiness amendments were passed in Jan. 2020
• Commercial:
• Minimum 2 EV-Ready spaces, 20% EV-capable, 208/240V 50-amp dedicated circuit
• Residential:
• At least one EV-Ready space at one or two-family dwellings;
• Multi-Family dwellings: minimum 2 EV-Ready spaces, 20% EV-capable, 208/240V 40-amp
dedicated circuit
• Latest update: ICC's Board invalidated the EV-ready and electrification-ready proposals ---- TBD
11
Recent Update on IECC 2018
• Project Overview
• Preliminary Results Overview
• MUD EVSE Innovative Technologies
VCI-MUD
Project Introduction
Photo @Dylan VanWeelden
13
Project Objectives
• Engaging stakeholders to determine
the barriers with MUD charging
• Demonstrating innovative
technologies addressing the barriers
• Compiling project findings in a toolkit
• Disseminating the toolkit
Impact on Barriers
•Collect and analyze data on existing
MUD charging stations utilization
•Demonstrate technologies that
reduce MUD charging costs and ease
management barriers
•Create an outreach tool and engage
MUD owners, managers and
residents
Baseline Multi-Unit
Dwelling PEV Charging
Infrastructure Data
Analysis Review
Photo @Dylan VanWeelden
• Level 2 or above charging
• Charging that took place at or near
the MUD locations
• Charging station usage pattern
• MUD Decision-Making
• Barriers to MUD Charging
Implementation
Forth 15
What are we assessing in “Baseline Analysis”
Photo @Dylan VanWeelden
Final Analyzed Dataset
TO EDIT: View>Header&Footer>Apply to All | 04.07.2017 | Forth 16
Type EVSE
ports
Charge
Sessions
Total Collected 1,474 512,175
Outliers removed 432,863
MUD-Located 223 23,925
MUD-Supporting (L2) 12 2,699
MUD-Supporting (DCFC) 8 2,022
• Increasing annual usage
trends as expected
• 12.2 hour average session; 3.6
hours average charge duration
• Energy profiles similar for both
longer and shorter sessions
• Highlights opportunity to
increase utilization
MUD Charging | 09.22.2020 | Forth 17
PEV Charging
Session Summary
Data Analysis
MUD-Located
• Increasing annual usage
• 2.9 hour average session;
2.2 hours average charge
duration (incentivized to
move on after session)
• Shorter charge sessions
overall.
• Energy profiles similar for
longer and shorter
sessions
• Highlights opportunity to
increase utilization
18
PEV Charging
Session Summary
Data Analysis –
MUD-Supporting L2
MUD Charging | 09.22.2020 | Forth
MUD Decision-Making Process:
• Apartment Building – simpler process with owner and management ruling
• Condominium – complicated and political process of association mixed with local
jurisdictional complexities
Key Barriers Identified:
• Education and Awareness Barriers
• Financial Barriers
• Electrical Preparedness Barriers
• Building Physical and Design Barriers
19
Qualitative Baseline Data Aggregation and
Analysis
MUD Charging | 09.22.2020 | Forth
Project Outreach Interview Results
TO EDIT: View>Header&Footer>Apply to All | 06.07.2016 | Drive Oregon 20
Barrier
Number
of
Responses Descriptions and Examples
Information and
education
15
-Chicken-and-egg problem for PEV adoption and EVSE need
-Need proper information for building owners, managers, and HOA on features and benefits
HOA related 17
-Common area management
-Association approval difficulties and homeowner buy-in
-A few stalls far from electrical panel will be extremely costly
Parking limitation 15
-Deeded parking and limited parking spaces
-Parking garage or spaces far from electrical panel, increasing costs
Parking operation 8
-Drivers do not unplug when done charging
-Outside free-riders problem
Capital constraints 8 -Not enough funding and/or may need grants or incentives
Electrical related 12
-Older building may not have enough electrical capacity and require costly upgrades
-Distance of electrical panel from garage increases installation costs
-Potential need to conduct expensive load study
Cost of installation 14
-Installation cost of running electrical circuit and conduit for EVSE
-Installation cost for electrical panel or service upgrade
O&M ongoing cost 15 -Power management and network subscription fees
Network signal 4
-Weak cellular signal in garages
-Expensive to run internet cables and install Wi-Fi router or cellular repeaters
Innovative
Charging
Infrastructure
Technology Pilot
Demonstration Plan
Photo @Dylan VanWeelden
Finalized Innovative Technologies List
20
Finalized Innovative Technologies
List Finalized Innovative Technologies List
Electric Vehicle Institute Converted gas station to EV-only charging station
Xeal Energy EVSE scheduling/reservations, overstay notifications, adjacent session user
communication, billing, data collection (baseline + in-use), analytics
Cyber Switching + ampUp
(combined)
CyberSwitching EV Master Controller - Rotational charging (on/off) to
manage ≤4 EVSE on one electrical circuit.
EVMatch EVSE scheduling/reservations, overstay notifications, billing, data collection
(baseline + in-use), analytics
PowerFlex Systems Power Management System
OpConnect Smart Charging network service and equipment
MUD Charging | 09.22.2020 | Forth
Finalized Innovative Technologies List
20
Company Technology Solution
Liberty Plugins HYDRA Power Management System
ampUp SW control added functionality to non-networked
“dumb” stations (billing, data collection, analytics) for
shared EV charging spots (best) and dedicated spots
FreeWire Technologies
Portable power storage with Level-2 charging
capability
MUD Charging | 09.22.2020 | Forth
Pilot Demonstration Implementation
24
EVSE Utilization Data Analysis
• Collect / analyze system utilization data
• Summarize findings in case studies
Business Case Data Analysis
• Collect / analyze business case data (electrical service costs
[energy and power], charging infrastructure capital costs, monthly
service fees [MUD and users], monthly MUD revenue)
• Summarize findings in case studies
MUD Property Stakeholder Feedback Analysis
• Collect / analyze MUD property owner/operator and MUD
resident (PEV owner and non-PEV owner) feedback
• Summarize findings in case studies
MUD Charging | 09.22.2020 | Forth
Questions?
Photo @Dylan VanWeelden

Contenu connexe

Tendances

Driving Plug-in Electric Vehicle Adoption with Green Building Codes by Ed Pik...
Driving Plug-in Electric Vehicle Adoption with Green Building Codes by Ed Pik...Driving Plug-in Electric Vehicle Adoption with Green Building Codes by Ed Pik...
Driving Plug-in Electric Vehicle Adoption with Green Building Codes by Ed Pik...Forth
 
Engage with...ZF
Engage with...ZFEngage with...ZF
Engage with...ZFKTN
 
Control strategies and electric drive design of induction and synchronous rel...
Control strategies and electric drive design of induction and synchronous rel...Control strategies and electric drive design of induction and synchronous rel...
Control strategies and electric drive design of induction and synchronous rel...Leonardo ENERGY
 
HOW NEXT-GENERATION INDUCTIVE CHARGING IS ACCELERATING TRANSITION TO CLEANER ...
HOW NEXT-GENERATION INDUCTIVE CHARGING IS ACCELERATING TRANSITION TO CLEANER ...HOW NEXT-GENERATION INDUCTIVE CHARGING IS ACCELERATING TRANSITION TO CLEANER ...
HOW NEXT-GENERATION INDUCTIVE CHARGING IS ACCELERATING TRANSITION TO CLEANER ...DesignTeam8
 
Engage with...Custom Interconnect
Engage with...Custom InterconnectEngage with...Custom Interconnect
Engage with...Custom InterconnectKTN
 
Next generation electric drivetrains for fully electric vehicles, focusing on...
Next generation electric drivetrains for fully electric vehicles, focusing on...Next generation electric drivetrains for fully electric vehicles, focusing on...
Next generation electric drivetrains for fully electric vehicles, focusing on...Leonardo ENERGY
 
AURES II - Renewable energy Auction Database and overview of auction schemes ...
AURES II - Renewable energy Auction Database and overview of auction schemes ...AURES II - Renewable energy Auction Database and overview of auction schemes ...
AURES II - Renewable energy Auction Database and overview of auction schemes ...Leonardo ENERGY
 
Engage with...Electrification of the AgriFood Sector
Engage with...Electrification of the AgriFood SectorEngage with...Electrification of the AgriFood Sector
Engage with...Electrification of the AgriFood SectorKTN
 
Remida energy agency of la ribera - gorizia 13.5.2015
Remida   energy agency of la ribera - gorizia 13.5.2015Remida   energy agency of la ribera - gorizia 13.5.2015
Remida energy agency of la ribera - gorizia 13.5.2015Informest
 
US Cleantech's Market Webinar - 18th of June 2019
US Cleantech's Market Webinar - 18th of June 2019US Cleantech's Market Webinar - 18th of June 2019
US Cleantech's Market Webinar - 18th of June 2019Cluster TWEED
 
ReFreeDrive - Next Generation Electric Drivetrains for Fully Electric Vehicles
ReFreeDrive - Next Generation Electric Drivetrains for Fully Electric VehiclesReFreeDrive - Next Generation Electric Drivetrains for Fully Electric Vehicles
ReFreeDrive - Next Generation Electric Drivetrains for Fully Electric VehiclesLeonardo ENERGY
 
Evergreen Fleet Electrification Program by Greg Harr
Evergreen Fleet Electrification Program by Greg Harr Evergreen Fleet Electrification Program by Greg Harr
Evergreen Fleet Electrification Program by Greg Harr Forth
 
Opportunities for v2 g integrating plug-in vehicles and the electric grid (to...
Opportunities for v2 g integrating plug-in vehicles and the electric grid (to...Opportunities for v2 g integrating plug-in vehicles and the electric grid (to...
Opportunities for v2 g integrating plug-in vehicles and the electric grid (to...CALSTART
 
CO2 emissions of vehicles: a broad and persistent problem
 CO2 emissions of vehicles: a broad and persistent problem CO2 emissions of vehicles: a broad and persistent problem
CO2 emissions of vehicles: a broad and persistent problemLeonardo ENERGY
 
20150212 ATL Group Introduction-NaatBatt
20150212 ATL Group Introduction-NaatBatt20150212 ATL Group Introduction-NaatBatt
20150212 ATL Group Introduction-NaatBattChristopher Groesbeck
 
SMART V2G APPPLICATIONS
SMART V2G APPPLICATIONSSMART V2G APPPLICATIONS
SMART V2G APPPLICATIONSkenduko
 
Electric vehicle grid integration policies to benefit consumers
Electric vehicle grid integration policies to benefit consumersElectric vehicle grid integration policies to benefit consumers
Electric vehicle grid integration policies to benefit consumersLeonardo ENERGY
 
ReFreeDrive 03 - Webinar induction motor advanced manufacturing
ReFreeDrive 03 - Webinar induction motor advanced manufacturingReFreeDrive 03 - Webinar induction motor advanced manufacturing
ReFreeDrive 03 - Webinar induction motor advanced manufacturingLeonardo ENERGY
 
Department of Defense Plug In Electric Vehicle Program
Department of Defense Plug In Electric Vehicle Program Department of Defense Plug In Electric Vehicle Program
Department of Defense Plug In Electric Vehicle Program Forth
 

Tendances (20)

Driving Plug-in Electric Vehicle Adoption with Green Building Codes by Ed Pik...
Driving Plug-in Electric Vehicle Adoption with Green Building Codes by Ed Pik...Driving Plug-in Electric Vehicle Adoption with Green Building Codes by Ed Pik...
Driving Plug-in Electric Vehicle Adoption with Green Building Codes by Ed Pik...
 
Engage with...ZF
Engage with...ZFEngage with...ZF
Engage with...ZF
 
Control strategies and electric drive design of induction and synchronous rel...
Control strategies and electric drive design of induction and synchronous rel...Control strategies and electric drive design of induction and synchronous rel...
Control strategies and electric drive design of induction and synchronous rel...
 
HOW NEXT-GENERATION INDUCTIVE CHARGING IS ACCELERATING TRANSITION TO CLEANER ...
HOW NEXT-GENERATION INDUCTIVE CHARGING IS ACCELERATING TRANSITION TO CLEANER ...HOW NEXT-GENERATION INDUCTIVE CHARGING IS ACCELERATING TRANSITION TO CLEANER ...
HOW NEXT-GENERATION INDUCTIVE CHARGING IS ACCELERATING TRANSITION TO CLEANER ...
 
Engage with...Custom Interconnect
Engage with...Custom InterconnectEngage with...Custom Interconnect
Engage with...Custom Interconnect
 
Next generation electric drivetrains for fully electric vehicles, focusing on...
Next generation electric drivetrains for fully electric vehicles, focusing on...Next generation electric drivetrains for fully electric vehicles, focusing on...
Next generation electric drivetrains for fully electric vehicles, focusing on...
 
AURES II - Renewable energy Auction Database and overview of auction schemes ...
AURES II - Renewable energy Auction Database and overview of auction schemes ...AURES II - Renewable energy Auction Database and overview of auction schemes ...
AURES II - Renewable energy Auction Database and overview of auction schemes ...
 
Engage with...Electrification of the AgriFood Sector
Engage with...Electrification of the AgriFood SectorEngage with...Electrification of the AgriFood Sector
Engage with...Electrification of the AgriFood Sector
 
Remida energy agency of la ribera - gorizia 13.5.2015
Remida   energy agency of la ribera - gorizia 13.5.2015Remida   energy agency of la ribera - gorizia 13.5.2015
Remida energy agency of la ribera - gorizia 13.5.2015
 
US Cleantech's Market Webinar - 18th of June 2019
US Cleantech's Market Webinar - 18th of June 2019US Cleantech's Market Webinar - 18th of June 2019
US Cleantech's Market Webinar - 18th of June 2019
 
ReFreeDrive - Next Generation Electric Drivetrains for Fully Electric Vehicles
ReFreeDrive - Next Generation Electric Drivetrains for Fully Electric VehiclesReFreeDrive - Next Generation Electric Drivetrains for Fully Electric Vehicles
ReFreeDrive - Next Generation Electric Drivetrains for Fully Electric Vehicles
 
Evergreen Fleet Electrification Program by Greg Harr
Evergreen Fleet Electrification Program by Greg Harr Evergreen Fleet Electrification Program by Greg Harr
Evergreen Fleet Electrification Program by Greg Harr
 
Opportunities for v2 g integrating plug-in vehicles and the electric grid (to...
Opportunities for v2 g integrating plug-in vehicles and the electric grid (to...Opportunities for v2 g integrating plug-in vehicles and the electric grid (to...
Opportunities for v2 g integrating plug-in vehicles and the electric grid (to...
 
CO2 emissions of vehicles: a broad and persistent problem
 CO2 emissions of vehicles: a broad and persistent problem CO2 emissions of vehicles: a broad and persistent problem
CO2 emissions of vehicles: a broad and persistent problem
 
20150212 ATL Group Introduction-NaatBatt
20150212 ATL Group Introduction-NaatBatt20150212 ATL Group Introduction-NaatBatt
20150212 ATL Group Introduction-NaatBatt
 
Rafael Sánchez _Energy Transition and Ennergy Regulatory Sandboxes_Funseam Se...
Rafael Sánchez _Energy Transition and Ennergy Regulatory Sandboxes_Funseam Se...Rafael Sánchez _Energy Transition and Ennergy Regulatory Sandboxes_Funseam Se...
Rafael Sánchez _Energy Transition and Ennergy Regulatory Sandboxes_Funseam Se...
 
SMART V2G APPPLICATIONS
SMART V2G APPPLICATIONSSMART V2G APPPLICATIONS
SMART V2G APPPLICATIONS
 
Electric vehicle grid integration policies to benefit consumers
Electric vehicle grid integration policies to benefit consumersElectric vehicle grid integration policies to benefit consumers
Electric vehicle grid integration policies to benefit consumers
 
ReFreeDrive 03 - Webinar induction motor advanced manufacturing
ReFreeDrive 03 - Webinar induction motor advanced manufacturingReFreeDrive 03 - Webinar induction motor advanced manufacturing
ReFreeDrive 03 - Webinar induction motor advanced manufacturing
 
Department of Defense Plug In Electric Vehicle Program
Department of Defense Plug In Electric Vehicle Program Department of Defense Plug In Electric Vehicle Program
Department of Defense Plug In Electric Vehicle Program
 

Similaire à Electric Vehicles Readiness and Charging at Multi-Unit Dwellings by Eric Huang

DOE Vehicle Charging Innovations VCI-MUD Project by Eric Huang
DOE Vehicle Charging Innovations VCI-MUD Project by Eric HuangDOE Vehicle Charging Innovations VCI-MUD Project by Eric Huang
DOE Vehicle Charging Innovations VCI-MUD Project by Eric HuangForth
 
EV-Readiness & Building Codes by Eric Huang
EV-Readiness & Building Codes by Eric HuangEV-Readiness & Building Codes by Eric Huang
EV-Readiness & Building Codes by Eric HuangForth
 
Workplace Charging Best Practices (CALSTART) Detroit June 18 2013
Workplace Charging Best Practices (CALSTART) Detroit June 18 2013Workplace Charging Best Practices (CALSTART) Detroit June 18 2013
Workplace Charging Best Practices (CALSTART) Detroit June 18 2013CALSTART
 
EV CHARGING INFRASTRUCTURE - INDUSTRY TRENDS
EV CHARGING INFRASTRUCTURE - INDUSTRY TRENDSEV CHARGING INFRASTRUCTURE - INDUSTRY TRENDS
EV CHARGING INFRASTRUCTURE - INDUSTRY TRENDSDesignTeam8
 
PLS 2017: Residential electric vehicle charging - utilising the common street...
PLS 2017: Residential electric vehicle charging - utilising the common street...PLS 2017: Residential electric vehicle charging - utilising the common street...
PLS 2017: Residential electric vehicle charging - utilising the common street...Institution of Lighting Professionals
 
Emobility Wkshop Presentation _ tonga 201020.pptx
Emobility Wkshop Presentation _ tonga 201020.pptxEmobility Wkshop Presentation _ tonga 201020.pptx
Emobility Wkshop Presentation _ tonga 201020.pptxcxvx1
 
Emobility Wkshop Presentation _ tonga 201020.pptx
Emobility Wkshop Presentation _ tonga 201020.pptxEmobility Wkshop Presentation _ tonga 201020.pptx
Emobility Wkshop Presentation _ tonga 201020.pptxNitinwaghmare321
 
Ev employer initiative2-10-30-12
Ev employer initiative2-10-30-12Ev employer initiative2-10-30-12
Ev employer initiative2-10-30-12CALSTART
 
Webinar - Meet the Belgian players : innovation & knowhow for the implementat...
Webinar - Meet the Belgian players : innovation & knowhow for the implementat...Webinar - Meet the Belgian players : innovation & knowhow for the implementat...
Webinar - Meet the Belgian players : innovation & knowhow for the implementat...Cluster TWEED
 
Jordan Baroody - Freewire Presentation
Jordan Baroody - Freewire PresentationJordan Baroody - Freewire Presentation
Jordan Baroody - Freewire PresentationForth
 
DESIGNING A FUTURE-PROOF EV CHARGING NETWORK
DESIGNING A FUTURE-PROOF EV CHARGING NETWORKDESIGNING A FUTURE-PROOF EV CHARGING NETWORK
DESIGNING A FUTURE-PROOF EV CHARGING NETWORKiQHub
 
Electric Vehicle Services for Your Property by Eric Smith
Electric Vehicle Services for Your Property by Eric SmithElectric Vehicle Services for Your Property by Eric Smith
Electric Vehicle Services for Your Property by Eric SmithForth
 
vss102_lewis_2013_o
vss102_lewis_2013_ovss102_lewis_2013_o
vss102_lewis_2013_oAllan Lewis
 
UCT Electrical Vehicle Infrastructure
UCT Electrical Vehicle InfrastructureUCT Electrical Vehicle Infrastructure
UCT Electrical Vehicle InfrastructureThe IOT Academy
 
UNIQUE CHARGING INFRASTRUCTURE SYSTEM: GRID EMOTION FLASH CHARGING
UNIQUE CHARGING INFRASTRUCTURE SYSTEM: GRID EMOTION FLASH CHARGINGUNIQUE CHARGING INFRASTRUCTURE SYSTEM: GRID EMOTION FLASH CHARGING
UNIQUE CHARGING INFRASTRUCTURE SYSTEM: GRID EMOTION FLASH CHARGINGiQHub
 
Prospering from the Energy Revolution: Six in Sixty - Technology and Infrastr...
Prospering from the Energy Revolution: Six in Sixty - Technology and Infrastr...Prospering from the Energy Revolution: Six in Sixty - Technology and Infrastr...
Prospering from the Energy Revolution: Six in Sixty - Technology and Infrastr...KTN
 
CHADEMO: ACCELERATOR OF VEHICLE-GRID-INTEGRATION AND ZERO-EMISSION MOBILITY
CHADEMO: ACCELERATOR OF VEHICLE-GRID-INTEGRATION AND ZERO-EMISSION MOBILITYCHADEMO: ACCELERATOR OF VEHICLE-GRID-INTEGRATION AND ZERO-EMISSION MOBILITY
CHADEMO: ACCELERATOR OF VEHICLE-GRID-INTEGRATION AND ZERO-EMISSION MOBILITYiQHub
 

Similaire à Electric Vehicles Readiness and Charging at Multi-Unit Dwellings by Eric Huang (20)

DOE Vehicle Charging Innovations VCI-MUD Project by Eric Huang
DOE Vehicle Charging Innovations VCI-MUD Project by Eric HuangDOE Vehicle Charging Innovations VCI-MUD Project by Eric Huang
DOE Vehicle Charging Innovations VCI-MUD Project by Eric Huang
 
EV-Readiness & Building Codes by Eric Huang
EV-Readiness & Building Codes by Eric HuangEV-Readiness & Building Codes by Eric Huang
EV-Readiness & Building Codes by Eric Huang
 
Workplace Charging Best Practices (CALSTART) Detroit June 18 2013
Workplace Charging Best Practices (CALSTART) Detroit June 18 2013Workplace Charging Best Practices (CALSTART) Detroit June 18 2013
Workplace Charging Best Practices (CALSTART) Detroit June 18 2013
 
EV CHARGING INFRASTRUCTURE - INDUSTRY TRENDS
EV CHARGING INFRASTRUCTURE - INDUSTRY TRENDSEV CHARGING INFRASTRUCTURE - INDUSTRY TRENDS
EV CHARGING INFRASTRUCTURE - INDUSTRY TRENDS
 
PLS 2017: Residential electric vehicle charging - utilising the common street...
PLS 2017: Residential electric vehicle charging - utilising the common street...PLS 2017: Residential electric vehicle charging - utilising the common street...
PLS 2017: Residential electric vehicle charging - utilising the common street...
 
Emobility Wkshop Presentation _ tonga 201020.pptx
Emobility Wkshop Presentation _ tonga 201020.pptxEmobility Wkshop Presentation _ tonga 201020.pptx
Emobility Wkshop Presentation _ tonga 201020.pptx
 
Emobility Wkshop Presentation _ tonga 201020.pptx
Emobility Wkshop Presentation _ tonga 201020.pptxEmobility Wkshop Presentation _ tonga 201020.pptx
Emobility Wkshop Presentation _ tonga 201020.pptx
 
Ev employer initiative2-10-30-12
Ev employer initiative2-10-30-12Ev employer initiative2-10-30-12
Ev employer initiative2-10-30-12
 
CALSTATE
CALSTATECALSTATE
CALSTATE
 
Webinar - Meet the Belgian players : innovation & knowhow for the implementat...
Webinar - Meet the Belgian players : innovation & knowhow for the implementat...Webinar - Meet the Belgian players : innovation & knowhow for the implementat...
Webinar - Meet the Belgian players : innovation & knowhow for the implementat...
 
Jordan Baroody - Freewire Presentation
Jordan Baroody - Freewire PresentationJordan Baroody - Freewire Presentation
Jordan Baroody - Freewire Presentation
 
DESIGNING A FUTURE-PROOF EV CHARGING NETWORK
DESIGNING A FUTURE-PROOF EV CHARGING NETWORKDESIGNING A FUTURE-PROOF EV CHARGING NETWORK
DESIGNING A FUTURE-PROOF EV CHARGING NETWORK
 
Smart Grid in Korea
Smart Grid in Korea Smart Grid in Korea
Smart Grid in Korea
 
Electric Vehicle Services for Your Property by Eric Smith
Electric Vehicle Services for Your Property by Eric SmithElectric Vehicle Services for Your Property by Eric Smith
Electric Vehicle Services for Your Property by Eric Smith
 
vss102_lewis_2013_o
vss102_lewis_2013_ovss102_lewis_2013_o
vss102_lewis_2013_o
 
UCT Electrical Vehicle Infrastructure
UCT Electrical Vehicle InfrastructureUCT Electrical Vehicle Infrastructure
UCT Electrical Vehicle Infrastructure
 
ELECTRICAL VEHICLE2.pptx
ELECTRICAL VEHICLE2.pptxELECTRICAL VEHICLE2.pptx
ELECTRICAL VEHICLE2.pptx
 
UNIQUE CHARGING INFRASTRUCTURE SYSTEM: GRID EMOTION FLASH CHARGING
UNIQUE CHARGING INFRASTRUCTURE SYSTEM: GRID EMOTION FLASH CHARGINGUNIQUE CHARGING INFRASTRUCTURE SYSTEM: GRID EMOTION FLASH CHARGING
UNIQUE CHARGING INFRASTRUCTURE SYSTEM: GRID EMOTION FLASH CHARGING
 
Prospering from the Energy Revolution: Six in Sixty - Technology and Infrastr...
Prospering from the Energy Revolution: Six in Sixty - Technology and Infrastr...Prospering from the Energy Revolution: Six in Sixty - Technology and Infrastr...
Prospering from the Energy Revolution: Six in Sixty - Technology and Infrastr...
 
CHADEMO: ACCELERATOR OF VEHICLE-GRID-INTEGRATION AND ZERO-EMISSION MOBILITY
CHADEMO: ACCELERATOR OF VEHICLE-GRID-INTEGRATION AND ZERO-EMISSION MOBILITYCHADEMO: ACCELERATOR OF VEHICLE-GRID-INTEGRATION AND ZERO-EMISSION MOBILITY
CHADEMO: ACCELERATOR OF VEHICLE-GRID-INTEGRATION AND ZERO-EMISSION MOBILITY
 

Plus de Forth

Equity & Freight Electrification by Jose Miguel Acosta Cordova
Equity & Freight Electrification by Jose Miguel Acosta CordovaEquity & Freight Electrification by Jose Miguel Acosta Cordova
Equity & Freight Electrification by Jose Miguel Acosta CordovaForth
 
Electric Nation Upper Midwest Inter-Tribal Electric Vehicle (EV) Charging Com...
Electric Nation Upper Midwest Inter-Tribal Electric Vehicle (EV) Charging Com...Electric Nation Upper Midwest Inter-Tribal Electric Vehicle (EV) Charging Com...
Electric Nation Upper Midwest Inter-Tribal Electric Vehicle (EV) Charging Com...Forth
 
Centering Equity Panel by Samantha Bingham
Centering Equity Panel by Samantha BinghamCentering Equity Panel by Samantha Bingham
Centering Equity Panel by Samantha BinghamForth
 
Where to Start: Listen Panel Discussion & Session by Maggie Striz Calnin
Where to Start: ListenPanel Discussion & Session by Maggie Striz CalninWhere to Start: ListenPanel Discussion & Session by Maggie Striz Calnin
Where to Start: Listen Panel Discussion & Session by Maggie Striz CalninForth
 
EPA Funding Opportunities for Equitable Electric Transportation by Mike Moltzen
EPA Funding Opportunities for Equitable Electric Transportationby Mike MoltzenEPA Funding Opportunities for Equitable Electric Transportationby Mike Moltzen
EPA Funding Opportunities for Equitable Electric Transportation by Mike MoltzenForth
 
Building a Future Where Everyone Can Ride and Drive Electric by Bridget Gilmore
Building a Future Where Everyone Can Ride and Drive Electric by Bridget GilmoreBuilding a Future Where Everyone Can Ride and Drive Electric by Bridget Gilmore
Building a Future Where Everyone Can Ride and Drive Electric by Bridget GilmoreForth
 
Transportation Electrification Funding Strategy by Jeff Allen and Brandt Hert...
Transportation Electrification Funding Strategy by Jeff Allen and Brandt Hert...Transportation Electrification Funding Strategy by Jeff Allen and Brandt Hert...
Transportation Electrification Funding Strategy by Jeff Allen and Brandt Hert...Forth
 
Program Design by Prateek Suri and Christian Williss
Program Design by Prateek Suri and Christian WillissProgram Design by Prateek Suri and Christian Williss
Program Design by Prateek Suri and Christian WillissForth
 
Building a Budget by Cat Plein and Josh Rodriguez
Building a Budget by Cat Plein and Josh RodriguezBuilding a Budget by Cat Plein and Josh Rodriguez
Building a Budget by Cat Plein and Josh RodriguezForth
 
Increasing Community Impact with Meaningful Engagement by Brytanee Brown
Increasing Community Impact with Meaningful Engagement by Brytanee BrownIncreasing Community Impact with Meaningful Engagement by Brytanee Brown
Increasing Community Impact with Meaningful Engagement by Brytanee BrownForth
 
Clean Mobility Options Program by Sarah Huang
Clean Mobility Options Program by Sarah HuangClean Mobility Options Program by Sarah Huang
Clean Mobility Options Program by Sarah HuangForth
 
Bizwerx Innovation & Mobility Hub by Dr. Cassandra Little
Bizwerx Innovation & Mobility Hub by Dr. Cassandra LittleBizwerx Innovation & Mobility Hub by Dr. Cassandra Little
Bizwerx Innovation & Mobility Hub by Dr. Cassandra LittleForth
 
Program Design by Prateek Suri and Shakaya Cooper
Program Design by Prateek Suri and Shakaya CooperProgram Design by Prateek Suri and Shakaya Cooper
Program Design by Prateek Suri and Shakaya CooperForth
 
Building a Budget by Jeff Allen and Josh Rodriguez
Building a Budget by Jeff Allen and Josh RodriguezBuilding a Budget by Jeff Allen and Josh Rodriguez
Building a Budget by Jeff Allen and Josh RodriguezForth
 
Transportation Electrification Funding Strategy.pptx
Transportation Electrification Funding Strategy.pptxTransportation Electrification Funding Strategy.pptx
Transportation Electrification Funding Strategy.pptxForth
 
Equity Lab: Inked with Intent by The Greenlining Institute
Equity Lab: Inked with Intent by The Greenlining InstituteEquity Lab: Inked with Intent by The Greenlining Institute
Equity Lab: Inked with Intent by The Greenlining InstituteForth
 
USDA’s EV Charging Infrastructure Solutions by Chris McLean
USDA’s EV Charging Infrastructure Solutionsby Chris McLeanUSDA’s EV Charging Infrastructure Solutionsby Chris McLean
USDA’s EV Charging Infrastructure Solutions by Chris McLeanForth
 
Design and Fund Equitable Electric Transportation For Communities by Jasmine ...
Design and Fund Equitable Electric Transportation For Communities by Jasmine ...Design and Fund Equitable Electric Transportation For Communities by Jasmine ...
Design and Fund Equitable Electric Transportation For Communities by Jasmine ...Forth
 
Building a Future Where Everyone Can Ride and Drive Electric by Linda Bailey
Building a Future Where Everyone Can Ride and Drive Electric by Linda BaileyBuilding a Future Where Everyone Can Ride and Drive Electric by Linda Bailey
Building a Future Where Everyone Can Ride and Drive Electric by Linda BaileyForth
 
Environmental and Climate Justice Programby Karen Campblin
Environmental and Climate Justice Programby Karen CampblinEnvironmental and Climate Justice Programby Karen Campblin
Environmental and Climate Justice Programby Karen CampblinForth
 

Plus de Forth (20)

Equity & Freight Electrification by Jose Miguel Acosta Cordova
Equity & Freight Electrification by Jose Miguel Acosta CordovaEquity & Freight Electrification by Jose Miguel Acosta Cordova
Equity & Freight Electrification by Jose Miguel Acosta Cordova
 
Electric Nation Upper Midwest Inter-Tribal Electric Vehicle (EV) Charging Com...
Electric Nation Upper Midwest Inter-Tribal Electric Vehicle (EV) Charging Com...Electric Nation Upper Midwest Inter-Tribal Electric Vehicle (EV) Charging Com...
Electric Nation Upper Midwest Inter-Tribal Electric Vehicle (EV) Charging Com...
 
Centering Equity Panel by Samantha Bingham
Centering Equity Panel by Samantha BinghamCentering Equity Panel by Samantha Bingham
Centering Equity Panel by Samantha Bingham
 
Where to Start: Listen Panel Discussion & Session by Maggie Striz Calnin
Where to Start: ListenPanel Discussion & Session by Maggie Striz CalninWhere to Start: ListenPanel Discussion & Session by Maggie Striz Calnin
Where to Start: Listen Panel Discussion & Session by Maggie Striz Calnin
 
EPA Funding Opportunities for Equitable Electric Transportation by Mike Moltzen
EPA Funding Opportunities for Equitable Electric Transportationby Mike MoltzenEPA Funding Opportunities for Equitable Electric Transportationby Mike Moltzen
EPA Funding Opportunities for Equitable Electric Transportation by Mike Moltzen
 
Building a Future Where Everyone Can Ride and Drive Electric by Bridget Gilmore
Building a Future Where Everyone Can Ride and Drive Electric by Bridget GilmoreBuilding a Future Where Everyone Can Ride and Drive Electric by Bridget Gilmore
Building a Future Where Everyone Can Ride and Drive Electric by Bridget Gilmore
 
Transportation Electrification Funding Strategy by Jeff Allen and Brandt Hert...
Transportation Electrification Funding Strategy by Jeff Allen and Brandt Hert...Transportation Electrification Funding Strategy by Jeff Allen and Brandt Hert...
Transportation Electrification Funding Strategy by Jeff Allen and Brandt Hert...
 
Program Design by Prateek Suri and Christian Williss
Program Design by Prateek Suri and Christian WillissProgram Design by Prateek Suri and Christian Williss
Program Design by Prateek Suri and Christian Williss
 
Building a Budget by Cat Plein and Josh Rodriguez
Building a Budget by Cat Plein and Josh RodriguezBuilding a Budget by Cat Plein and Josh Rodriguez
Building a Budget by Cat Plein and Josh Rodriguez
 
Increasing Community Impact with Meaningful Engagement by Brytanee Brown
Increasing Community Impact with Meaningful Engagement by Brytanee BrownIncreasing Community Impact with Meaningful Engagement by Brytanee Brown
Increasing Community Impact with Meaningful Engagement by Brytanee Brown
 
Clean Mobility Options Program by Sarah Huang
Clean Mobility Options Program by Sarah HuangClean Mobility Options Program by Sarah Huang
Clean Mobility Options Program by Sarah Huang
 
Bizwerx Innovation & Mobility Hub by Dr. Cassandra Little
Bizwerx Innovation & Mobility Hub by Dr. Cassandra LittleBizwerx Innovation & Mobility Hub by Dr. Cassandra Little
Bizwerx Innovation & Mobility Hub by Dr. Cassandra Little
 
Program Design by Prateek Suri and Shakaya Cooper
Program Design by Prateek Suri and Shakaya CooperProgram Design by Prateek Suri and Shakaya Cooper
Program Design by Prateek Suri and Shakaya Cooper
 
Building a Budget by Jeff Allen and Josh Rodriguez
Building a Budget by Jeff Allen and Josh RodriguezBuilding a Budget by Jeff Allen and Josh Rodriguez
Building a Budget by Jeff Allen and Josh Rodriguez
 
Transportation Electrification Funding Strategy.pptx
Transportation Electrification Funding Strategy.pptxTransportation Electrification Funding Strategy.pptx
Transportation Electrification Funding Strategy.pptx
 
Equity Lab: Inked with Intent by The Greenlining Institute
Equity Lab: Inked with Intent by The Greenlining InstituteEquity Lab: Inked with Intent by The Greenlining Institute
Equity Lab: Inked with Intent by The Greenlining Institute
 
USDA’s EV Charging Infrastructure Solutions by Chris McLean
USDA’s EV Charging Infrastructure Solutionsby Chris McLeanUSDA’s EV Charging Infrastructure Solutionsby Chris McLean
USDA’s EV Charging Infrastructure Solutions by Chris McLean
 
Design and Fund Equitable Electric Transportation For Communities by Jasmine ...
Design and Fund Equitable Electric Transportation For Communities by Jasmine ...Design and Fund Equitable Electric Transportation For Communities by Jasmine ...
Design and Fund Equitable Electric Transportation For Communities by Jasmine ...
 
Building a Future Where Everyone Can Ride and Drive Electric by Linda Bailey
Building a Future Where Everyone Can Ride and Drive Electric by Linda BaileyBuilding a Future Where Everyone Can Ride and Drive Electric by Linda Bailey
Building a Future Where Everyone Can Ride and Drive Electric by Linda Bailey
 
Environmental and Climate Justice Programby Karen Campblin
Environmental and Climate Justice Programby Karen CampblinEnvironmental and Climate Justice Programby Karen Campblin
Environmental and Climate Justice Programby Karen Campblin
 

Dernier

ENJOY Call Girls In Okhla Vihar Delhi Call 9654467111
ENJOY Call Girls In Okhla Vihar Delhi Call 9654467111ENJOY Call Girls In Okhla Vihar Delhi Call 9654467111
ENJOY Call Girls In Okhla Vihar Delhi Call 9654467111Sapana Sha
 
John Deere 335 375 385 435 Service Repair Manual
John Deere 335 375 385 435 Service Repair ManualJohn Deere 335 375 385 435 Service Repair Manual
John Deere 335 375 385 435 Service Repair ManualExcavator
 
What Causes BMW Chassis Stabilization Malfunction Warning To Appear
What Causes BMW Chassis Stabilization Malfunction Warning To AppearWhat Causes BMW Chassis Stabilization Malfunction Warning To Appear
What Causes BMW Chassis Stabilization Malfunction Warning To AppearJCL Automotive
 
Lucknow 💋 (Genuine) Escort Service Lucknow | Service-oriented sexy call girls...
Lucknow 💋 (Genuine) Escort Service Lucknow | Service-oriented sexy call girls...Lucknow 💋 (Genuine) Escort Service Lucknow | Service-oriented sexy call girls...
Lucknow 💋 (Genuine) Escort Service Lucknow | Service-oriented sexy call girls...anilsa9823
 
Vip Mumbai Call Girls Mira Road Call On 9920725232 With Body to body massage ...
Vip Mumbai Call Girls Mira Road Call On 9920725232 With Body to body massage ...Vip Mumbai Call Girls Mira Road Call On 9920725232 With Body to body massage ...
Vip Mumbai Call Girls Mira Road Call On 9920725232 With Body to body massage ...amitlee9823
 
Bangalore Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore E...
Bangalore Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore E...Bangalore Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore E...
Bangalore Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore E...amitlee9823
 
Call me @ 9892124323 Call Girl in Andheri East With Free Home Delivery
Call me @ 9892124323 Call Girl in Andheri East With Free Home DeliveryCall me @ 9892124323 Call Girl in Andheri East With Free Home Delivery
Call me @ 9892124323 Call Girl in Andheri East With Free Home DeliveryPooja Nehwal
 
Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...
Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...
Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...Delhi Call girls
 
Sanjay Nagar Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalor...
Sanjay Nagar Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalor...Sanjay Nagar Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalor...
Sanjay Nagar Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalor...amitlee9823
 
Sales & Marketing Alignment_ How to Synergize for Success.pptx.pdf
Sales & Marketing Alignment_ How to Synergize for Success.pptx.pdfSales & Marketing Alignment_ How to Synergize for Success.pptx.pdf
Sales & Marketing Alignment_ How to Synergize for Success.pptx.pdfAggregage
 
John Deere 7430 7530 Tractors Diagnostic Service Manual W.pdf
John Deere 7430 7530 Tractors Diagnostic Service Manual W.pdfJohn Deere 7430 7530 Tractors Diagnostic Service Manual W.pdf
John Deere 7430 7530 Tractors Diagnostic Service Manual W.pdfExcavator
 
What Could Cause Your Subaru's Touch Screen To Stop Working
What Could Cause Your Subaru's Touch Screen To Stop WorkingWhat Could Cause Your Subaru's Touch Screen To Stop Working
What Could Cause Your Subaru's Touch Screen To Stop WorkingBruce Cox Imports
 
Vip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Vip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp NumberVip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Vip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Numberkumarajju5765
 
design a four cylinder internal combustion engine
design a four cylinder internal combustion enginedesign a four cylinder internal combustion engine
design a four cylinder internal combustion enginepiyushsingh943161
 
Delhi Call Girls Vikaspuri 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Vikaspuri 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls Vikaspuri 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Vikaspuri 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Callshivangimorya083
 
Call Girls In Kotla Mubarakpur Delhi ❤️8448577510 ⊹Best Escorts Service In 24...
Call Girls In Kotla Mubarakpur Delhi ❤️8448577510 ⊹Best Escorts Service In 24...Call Girls In Kotla Mubarakpur Delhi ❤️8448577510 ⊹Best Escorts Service In 24...
Call Girls In Kotla Mubarakpur Delhi ❤️8448577510 ⊹Best Escorts Service In 24...lizamodels9
 
How To Fix Mercedes Benz Anti-Theft Protection Activation Issue
How To Fix Mercedes Benz Anti-Theft Protection Activation IssueHow To Fix Mercedes Benz Anti-Theft Protection Activation Issue
How To Fix Mercedes Benz Anti-Theft Protection Activation IssueTerry Sayther Automotive
 
Greenery-Palette Pitch Deck by Slidesgo.pptx
Greenery-Palette Pitch Deck by Slidesgo.pptxGreenery-Palette Pitch Deck by Slidesgo.pptx
Greenery-Palette Pitch Deck by Slidesgo.pptxzohiiimughal286
 
John Deere Tractors 6130M 6140M Diagnostic Manual
John Deere Tractors  6130M 6140M Diagnostic ManualJohn Deere Tractors  6130M 6140M Diagnostic Manual
John Deere Tractors 6130M 6140M Diagnostic ManualExcavator
 

Dernier (20)

ENJOY Call Girls In Okhla Vihar Delhi Call 9654467111
ENJOY Call Girls In Okhla Vihar Delhi Call 9654467111ENJOY Call Girls In Okhla Vihar Delhi Call 9654467111
ENJOY Call Girls In Okhla Vihar Delhi Call 9654467111
 
John Deere 335 375 385 435 Service Repair Manual
John Deere 335 375 385 435 Service Repair ManualJohn Deere 335 375 385 435 Service Repair Manual
John Deere 335 375 385 435 Service Repair Manual
 
What Causes BMW Chassis Stabilization Malfunction Warning To Appear
What Causes BMW Chassis Stabilization Malfunction Warning To AppearWhat Causes BMW Chassis Stabilization Malfunction Warning To Appear
What Causes BMW Chassis Stabilization Malfunction Warning To Appear
 
Lucknow 💋 (Genuine) Escort Service Lucknow | Service-oriented sexy call girls...
Lucknow 💋 (Genuine) Escort Service Lucknow | Service-oriented sexy call girls...Lucknow 💋 (Genuine) Escort Service Lucknow | Service-oriented sexy call girls...
Lucknow 💋 (Genuine) Escort Service Lucknow | Service-oriented sexy call girls...
 
Vip Mumbai Call Girls Mira Road Call On 9920725232 With Body to body massage ...
Vip Mumbai Call Girls Mira Road Call On 9920725232 With Body to body massage ...Vip Mumbai Call Girls Mira Road Call On 9920725232 With Body to body massage ...
Vip Mumbai Call Girls Mira Road Call On 9920725232 With Body to body massage ...
 
Bangalore Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore E...
Bangalore Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore E...Bangalore Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore E...
Bangalore Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore E...
 
Call me @ 9892124323 Call Girl in Andheri East With Free Home Delivery
Call me @ 9892124323 Call Girl in Andheri East With Free Home DeliveryCall me @ 9892124323 Call Girl in Andheri East With Free Home Delivery
Call me @ 9892124323 Call Girl in Andheri East With Free Home Delivery
 
Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...
Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...
Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...
 
Sanjay Nagar Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalor...
Sanjay Nagar Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalor...Sanjay Nagar Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalor...
Sanjay Nagar Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalor...
 
Sales & Marketing Alignment_ How to Synergize for Success.pptx.pdf
Sales & Marketing Alignment_ How to Synergize for Success.pptx.pdfSales & Marketing Alignment_ How to Synergize for Success.pptx.pdf
Sales & Marketing Alignment_ How to Synergize for Success.pptx.pdf
 
John Deere 7430 7530 Tractors Diagnostic Service Manual W.pdf
John Deere 7430 7530 Tractors Diagnostic Service Manual W.pdfJohn Deere 7430 7530 Tractors Diagnostic Service Manual W.pdf
John Deere 7430 7530 Tractors Diagnostic Service Manual W.pdf
 
What Could Cause Your Subaru's Touch Screen To Stop Working
What Could Cause Your Subaru's Touch Screen To Stop WorkingWhat Could Cause Your Subaru's Touch Screen To Stop Working
What Could Cause Your Subaru's Touch Screen To Stop Working
 
Vip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Vip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp NumberVip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Vip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
 
design a four cylinder internal combustion engine
design a four cylinder internal combustion enginedesign a four cylinder internal combustion engine
design a four cylinder internal combustion engine
 
Delhi Call Girls Vikaspuri 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Vikaspuri 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls Vikaspuri 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Vikaspuri 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
 
Stay Cool and Compliant: Know Your Window Tint Laws Before You Tint
Stay Cool and Compliant: Know Your Window Tint Laws Before You TintStay Cool and Compliant: Know Your Window Tint Laws Before You Tint
Stay Cool and Compliant: Know Your Window Tint Laws Before You Tint
 
Call Girls In Kotla Mubarakpur Delhi ❤️8448577510 ⊹Best Escorts Service In 24...
Call Girls In Kotla Mubarakpur Delhi ❤️8448577510 ⊹Best Escorts Service In 24...Call Girls In Kotla Mubarakpur Delhi ❤️8448577510 ⊹Best Escorts Service In 24...
Call Girls In Kotla Mubarakpur Delhi ❤️8448577510 ⊹Best Escorts Service In 24...
 
How To Fix Mercedes Benz Anti-Theft Protection Activation Issue
How To Fix Mercedes Benz Anti-Theft Protection Activation IssueHow To Fix Mercedes Benz Anti-Theft Protection Activation Issue
How To Fix Mercedes Benz Anti-Theft Protection Activation Issue
 
Greenery-Palette Pitch Deck by Slidesgo.pptx
Greenery-Palette Pitch Deck by Slidesgo.pptxGreenery-Palette Pitch Deck by Slidesgo.pptx
Greenery-Palette Pitch Deck by Slidesgo.pptx
 
John Deere Tractors 6130M 6140M Diagnostic Manual
John Deere Tractors  6130M 6140M Diagnostic ManualJohn Deere Tractors  6130M 6140M Diagnostic Manual
John Deere Tractors 6130M 6140M Diagnostic Manual
 

Electric Vehicles Readiness and Charging at Multi-Unit Dwellings by Eric Huang

  • 1. EV-Readiness policy introduction and VCI - MUD Pilot Project Overview Eric Huang, Program Manager 10/20/2020 Electric Vehicle Readiness and Charging at Multi-Unit Dwellings Photo @Dylan VanWeelden
  • 2. ● Building Codes Intro ● Why EV-Readiness in Building Codes? ● Introduction to Preliminary Learnings from the VCI-MUD Project 2 Today’s Topics:
  • 3. What are Building Codes? “Collection of laws, regulations, ordinances adopted by a government legislative authority with the physical structure and health conditions of buildings and building sites” ● Who creates model codes? ○ ICC - Int’l Code Council ○ NFPA - National Fire Protection Association ○ ASHARE - American Society of Heating and Air-Conditioning Engineers ● What codes are there? ○ IBC - Int’l Building Code ○ IRC - Int’l Residential Code ○ IECC - Int’l Energy Conservation Code ○ NEC - National Electrical Code 3
  • 4. Building Codes FAQ (Cont.d) ● Who adopts? ○ AHJs: -Nations, States, and Provinces adopt codes recommended by the ICC ● How often are they updated? ○ Code cycles is generally 3-yr (ICC) ■ Code Development Committee, Code Change Proposal, Code Development hearing, Call for Public Comment, Final Action Hearing ■ Code adoption cycle in U.S. States is also generally 3-yr (i.e. OR, WA) 4
  • 5. 5
  • 6. • Building codes are divided by sections i.e. • Building, Electrical, Mechanical, and Plumbing are common ones. • Model Codes are developed by specific agencies and adopted by AHJs. • The ability of each level to create and enforce codes varies depending on the local authority Summary: Building Codes
  • 7. Why we care about building codes for EV? ● Access to charging is critical ○ MUD tenants have substantial barriers installing EVSE ○ Full circle: Residential, workplace, and public charging ● Building codes nowadays have energy efficiency requirements, which will free up electrical capacity for the building to accommodate EV charging ● New buildings: ○ Last for decades ○ EV readiness is a technology-neutral ○ EV charging is a marketable amenity ○ Financially optimal comparing to retrofitting 7
  • 8. Avoided Costs for EV-Ready Parking 8 (per space) Enclosed 2 EV-Ready Space Enclosed 6 EV-Ready Space Enclosed 12 EV-Ready Space San Francisco 1 $2,800 n/a $1,511 Oakland 2 $1,660 $890 $470 Source: 1. Plug-In Electric Vehicle Infrastructure Cost-Effectiveness Report for San Francisco. November 17, 2016 2. Plug-In Electric Vehicle Infrastructure Cost-Effectiveness Report, City of Oakland. July 20, 2016 3. ELECTRIC VEHICLE (EV) CHARGING INFRASTRUCTURE: MULTIFAMILY BUILDING STANDARDS. Report. April 2018. Accessed January 2019. https://arb.ca.gov/cc/greenbuildings/pdf/tcac2018.pdf “An estimated $7,000 per parking space can be avoided with multiple installations of Level 2 charging stations. An estimated $8,000 per parking space can be avoided when an individual Level 2 charging station is installed.” 3
  • 9. What Building Code Language to adopt/propose? 9
  • 10. Definitions ● EV-Capable Space: ○ Electrical panel capacity and space to support a minimum 40-ampere, 208/240-volt branch circuit for each EV parking space, and the installation of raceways, both underground and surface mounted, to support the EVSE. ● EV-Ready Space: ○ A designated parking space which is provided with one 40-ampere, 208/240-volt dedicated branch circuit for EVSE servicing Electric Vehicles. The circuit shall terminate in a suitable point such as a receptacle, junction box, or an EVSE for the EV parking spaces. EV-Readiness Code: 10 EV-Capable EV-Ready
  • 11. EV-Readiness in Commercial and Residential New Developments • EV-readiness amendments were passed in Jan. 2020 • Commercial: • Minimum 2 EV-Ready spaces, 20% EV-capable, 208/240V 50-amp dedicated circuit • Residential: • At least one EV-Ready space at one or two-family dwellings; • Multi-Family dwellings: minimum 2 EV-Ready spaces, 20% EV-capable, 208/240V 40-amp dedicated circuit • Latest update: ICC's Board invalidated the EV-ready and electrification-ready proposals ---- TBD 11 Recent Update on IECC 2018
  • 12. • Project Overview • Preliminary Results Overview • MUD EVSE Innovative Technologies VCI-MUD Project Introduction Photo @Dylan VanWeelden
  • 13. 13 Project Objectives • Engaging stakeholders to determine the barriers with MUD charging • Demonstrating innovative technologies addressing the barriers • Compiling project findings in a toolkit • Disseminating the toolkit Impact on Barriers •Collect and analyze data on existing MUD charging stations utilization •Demonstrate technologies that reduce MUD charging costs and ease management barriers •Create an outreach tool and engage MUD owners, managers and residents
  • 14. Baseline Multi-Unit Dwelling PEV Charging Infrastructure Data Analysis Review Photo @Dylan VanWeelden
  • 15. • Level 2 or above charging • Charging that took place at or near the MUD locations • Charging station usage pattern • MUD Decision-Making • Barriers to MUD Charging Implementation Forth 15 What are we assessing in “Baseline Analysis” Photo @Dylan VanWeelden
  • 16. Final Analyzed Dataset TO EDIT: View>Header&Footer>Apply to All | 04.07.2017 | Forth 16 Type EVSE ports Charge Sessions Total Collected 1,474 512,175 Outliers removed 432,863 MUD-Located 223 23,925 MUD-Supporting (L2) 12 2,699 MUD-Supporting (DCFC) 8 2,022
  • 17. • Increasing annual usage trends as expected • 12.2 hour average session; 3.6 hours average charge duration • Energy profiles similar for both longer and shorter sessions • Highlights opportunity to increase utilization MUD Charging | 09.22.2020 | Forth 17 PEV Charging Session Summary Data Analysis MUD-Located
  • 18. • Increasing annual usage • 2.9 hour average session; 2.2 hours average charge duration (incentivized to move on after session) • Shorter charge sessions overall. • Energy profiles similar for longer and shorter sessions • Highlights opportunity to increase utilization 18 PEV Charging Session Summary Data Analysis – MUD-Supporting L2 MUD Charging | 09.22.2020 | Forth
  • 19. MUD Decision-Making Process: • Apartment Building – simpler process with owner and management ruling • Condominium – complicated and political process of association mixed with local jurisdictional complexities Key Barriers Identified: • Education and Awareness Barriers • Financial Barriers • Electrical Preparedness Barriers • Building Physical and Design Barriers 19 Qualitative Baseline Data Aggregation and Analysis MUD Charging | 09.22.2020 | Forth
  • 20. Project Outreach Interview Results TO EDIT: View>Header&Footer>Apply to All | 06.07.2016 | Drive Oregon 20 Barrier Number of Responses Descriptions and Examples Information and education 15 -Chicken-and-egg problem for PEV adoption and EVSE need -Need proper information for building owners, managers, and HOA on features and benefits HOA related 17 -Common area management -Association approval difficulties and homeowner buy-in -A few stalls far from electrical panel will be extremely costly Parking limitation 15 -Deeded parking and limited parking spaces -Parking garage or spaces far from electrical panel, increasing costs Parking operation 8 -Drivers do not unplug when done charging -Outside free-riders problem Capital constraints 8 -Not enough funding and/or may need grants or incentives Electrical related 12 -Older building may not have enough electrical capacity and require costly upgrades -Distance of electrical panel from garage increases installation costs -Potential need to conduct expensive load study Cost of installation 14 -Installation cost of running electrical circuit and conduit for EVSE -Installation cost for electrical panel or service upgrade O&M ongoing cost 15 -Power management and network subscription fees Network signal 4 -Weak cellular signal in garages -Expensive to run internet cables and install Wi-Fi router or cellular repeaters
  • 22. Finalized Innovative Technologies List 20 Finalized Innovative Technologies List Finalized Innovative Technologies List Electric Vehicle Institute Converted gas station to EV-only charging station Xeal Energy EVSE scheduling/reservations, overstay notifications, adjacent session user communication, billing, data collection (baseline + in-use), analytics Cyber Switching + ampUp (combined) CyberSwitching EV Master Controller - Rotational charging (on/off) to manage ≤4 EVSE on one electrical circuit. EVMatch EVSE scheduling/reservations, overstay notifications, billing, data collection (baseline + in-use), analytics PowerFlex Systems Power Management System OpConnect Smart Charging network service and equipment MUD Charging | 09.22.2020 | Forth
  • 23. Finalized Innovative Technologies List 20 Company Technology Solution Liberty Plugins HYDRA Power Management System ampUp SW control added functionality to non-networked “dumb” stations (billing, data collection, analytics) for shared EV charging spots (best) and dedicated spots FreeWire Technologies Portable power storage with Level-2 charging capability MUD Charging | 09.22.2020 | Forth
  • 24. Pilot Demonstration Implementation 24 EVSE Utilization Data Analysis • Collect / analyze system utilization data • Summarize findings in case studies Business Case Data Analysis • Collect / analyze business case data (electrical service costs [energy and power], charging infrastructure capital costs, monthly service fees [MUD and users], monthly MUD revenue) • Summarize findings in case studies MUD Property Stakeholder Feedback Analysis • Collect / analyze MUD property owner/operator and MUD resident (PEV owner and non-PEV owner) feedback • Summarize findings in case studies MUD Charging | 09.22.2020 | Forth