/ ©2018 NAVIGANT CONSULTING, INC. ALL RIGHTS RESERVED1
CONFERENCE AUCTION SUPPORT
SCHEME IN UKRAINE FOR
RENEWABLE ENERGY DEPLOYMENT
KIEV, 21.02.2019
FABIAN WIGAND
ASSOCIATE DIRECTOR,
NAVIGANT
BEST PRACTICES FOR THE
TRANSITION TOWARDS AUCTIONS
Part of
/ ©2018 NAVIGANT CONSULTING, INC. ALL RIGHTS RESERVED2
Consultancy services on auctions performed
Analysis of auction schemes
Navigant/Ecofys
>600 energy experts
>60 offices wordlwide
>20 years experience designing &
implementing competitive
procurement/auctions
Part of the EUH2020
research project on
renewables auctions
RECOMMENDATIONS BASED ON 20 YEARS OF EXPERIENCE IN
AUCTION ANALYSIS & DESIGN
/ ©2018 NAVIGANT CONSULTING, INC. ALL RIGHTS RESERVED3/ ©2019 NAVIGANT CONSULTING, INC. ALL RIGHTS RESERVED3
UNDERSTANDING THE TRANSITION TOWARDS AUCTIONS
Transition from feed-in tariffs to acutioned tariffs
• Increases volume control, increases price competition
• Increases new risks for bidders (pre-development costs and risk of sunk costs)
• Quickly reflects market price developments but require competition
• More difficult for some smaller bidders
Administratively-set feed-in tariff Auctioned tariff
• Government sets volume
• Market sets price
• Government sets price
• Market sets volume
/ ©2018 NAVIGANT CONSULTING, INC. ALL RIGHTS RESERVED4
Policy goals
• Price competition
• Volume control
• Other goals such as grid & system integration, local value creation etc.
• Be aware of trade-offs
Market readiness
• Market size & concentration, competition with other renumeration (e.. feed.in tariffs)
• Risk & duration of project development phases, ease of permitting
• Available funding (domestic/international, debt/equity), preparedness, risk perception
Institutional readiness
• Depend on type of auction, implementation timeline, desire for scalability of the auction.
• Alignment of relevant ministries, grid operators, permitting authorities, energy regulator
• Trust, transparency, independence
• Use international best-practices but tailor auction to individual case
PREPARE FOR AUCTIONS: TAILOR THEM TO POLITICAL,
MARKET & INSTITUTIONAL READINESS OF THE COUNTRY
/ ©2018 NAVIGANT CONSULTING, INC. ALL RIGHTS RESERVED5
THE AUCTION DESIGN PROCESS
5
Target
definition
Market &
regulatory
analysis
Auction
design
Imple-
mentation
Evaluation
Institutional set-up
General design
elements
Procurement
procedure
Conditions for
participation
Deadlines and
penalties
Policy goals Market size
Pre-developed
project
Market players
Technology cost
Project
development &
operation
Existing
regulations &
incentives
Drafting of
required
documents
Market building
Procurement
conduction
• RfQ
• RfP and
awarding of
bids
Contracting
Monitoring of
realization
Lessons learned
Adjustment of
procurement
design
/ ©2018 NAVIGANT CONSULTING, INC. ALL RIGHTS RESERVED6
• Build capabilities: Working groups, trainings (bidder simulation also for auctioning
authority)
• Align on political goals, be aware of trade-offs
• Study the market, prepare bidders
THE AUCTION IMPLEMENTATION PROCESS REQUIRES
BUILDING OF CAPACITIES & ALIGNMENT OF GOALS
Formal
regulation
Participation
documents
RfQ/RfP
Bid
evaluation
Results
Auction
Auction platform
Schedule
Key parameters
Clarifications
Qualification
Ranking
Publication of
awards
Publication of
reasons for
exclusion
Timely contract
award and
signature
Provision for
legal disputs
Market
building
Pre-bid
conference
Market feedback
Auction
simulation
Auction conduction
Announce-
ment
Drafting of
required
documents
Contract-
ing
Example of auction process
/ ©2018 NAVIGANT CONSULTING, INC. ALL RIGHTS RESERVED7
Understand bidders
• Risk for bidders:
– Bid risks with sunk costs
– Penalty risks if not realizing projects
– Revenue risks, such as
▪ Off-taker risk, i.e. curtailment or off-taker default
▪ Political risks, i.e. expropriation, contract breach, changes in law/tax
▪ Currency risk, i.e.. currency fluctuations & exchange controls
• Avoiding collusion
– Collusion more likely if small, concentrated market
– Limit collusion through simple auction design and no post-auction negotiations
Prepare bidders
• Sufficient preparation time
• Pre-bidder conferences
• Trainings & auction simulations
Address concerns:
• Receive bidder feedback on design
• Guarantees
• Pot. exempt some sizes/technologies from auction
CREATE FAVORABLE CONDITIONS FOR INVESTMENT THROUGH
UNDERSTANDING, PREPARING AND ADRESSING BIDDERS
/ ©2018 NAVIGANT CONSULTING, INC. ALL RIGHTS RESERVED8
EXAMPLE OF DESIGN CONSIDERATIONS DESIGN ELEMENTS:
SELECTION OF PROJECT-SITE
Government-site auction Bidder-site auction
Bidder 1
Bidder 2
Bidder 3
Bidder 4
Auctioneer
Project site
Selected
& pre-
developed
Pre-development by the auctioneer might
include:
• Grid connection
• Land lease
• Environmental assessments
• Resource measurements
15
MW
30 MW
Auction volume
(e.g. 100 MW)
30 MW
25
MW
Bidder 1Bidder 2
Bidder 3
Bidder 4
Auctioneer
Project-site is selected by bidders
Bidders compete with their projects
Bidders pre-develop their projects, e.g:
• Defining site boundaries
• Measuring resource availability
• Procuring land lease
/ ©2018 NAVIGANT CONSULTING, INC. ALL RIGHTS RESERVED9
Government-site auction
SELECTION OF PROJECT-SITE: COUNTRY EXAMPLES
Bidder-site auction
Bidder 1
Bidder 2
Bidder 3
Bidder 4
Auctioneer
Project site
Selected
& pre-
developed
15
MW
30 MW
Procured volume
(e.g. 100 MW)
30 MW
25
MW
Bidder 1Bidder 2
Bidder 3
Bidder 4
Auctioneer
Country examples:
• Denmark/Germany/Netherlands wind
offshore
• Dubai/Abu Dhabi (UAE)
• Morocco
Country examples:
• Germany PV & wind onshore
• South Africa (with easier project
development in Renewable Energy
Development Zones - REDZ)
• Mexico, Chile
/ ©2018 NAVIGANT CONSULTING, INC. ALL RIGHTS RESERVED10
FABIAN WIGAND
Associate Director Energy
Phone: +49 (0) 30 29 77 35 79 –
23
Mobile: +49 (0) 172 5833 265
E-Mail:
fabian.wigand@navigant.com
CONTACTS

Contenu connexe

Similaire à BEST PRACTICES FOR THE TRANSITION TRANSITION TOWARDS TOWARDS AUCTIONS

Archiver omc stansted_tendering_procedure_and_requirements_final
Archiver omc stansted_tendering_procedure_and_requirements_finalArchiver omc stansted_tendering_procedure_and_requirements_final
Archiver omc stansted_tendering_procedure_and_requirements_finalArchiver
 
Carbon Catalysts Consultancy introduction
Carbon Catalysts Consultancy introductionCarbon Catalysts Consultancy introduction
Carbon Catalysts Consultancy introductionCaroline Joseph
 
FERC Order 1000: Understanding Transmission Planning in a New Paradigm
FERC Order 1000: Understanding Transmission Planning in a New ParadigmFERC Order 1000: Understanding Transmission Planning in a New Paradigm
FERC Order 1000: Understanding Transmission Planning in a New ParadigmDNVGLEnergy
 
Glyn Hughes CV 081015
Glyn Hughes CV 081015Glyn Hughes CV 081015
Glyn Hughes CV 081015Glyn Hughes
 
Competitive Selection and Support for Renewable Energy
Competitive Selection and Support for Renewable EnergyCompetitive Selection and Support for Renewable Energy
Competitive Selection and Support for Renewable Energyenergydialog
 
SBRI competition: Sort and Segregate Nuclear Waste
SBRI competition: Sort and Segregate Nuclear WasteSBRI competition: Sort and Segregate Nuclear Waste
SBRI competition: Sort and Segregate Nuclear WasteKTN
 
Meridian 2: connected vehicles data exchange - competition scope
Meridian 2: connected vehicles data exchange - competition scopeMeridian 2: connected vehicles data exchange - competition scope
Meridian 2: connected vehicles data exchange - competition scopeKTN
 
AGNI ENERGY & SYNERGY CONSULTANCY SERVICES OIL GAS ENERGY PETROCHEMICALS
AGNI ENERGY & SYNERGY CONSULTANCY SERVICES OIL GAS ENERGY PETROCHEMICALSAGNI ENERGY & SYNERGY CONSULTANCY SERVICES OIL GAS ENERGY PETROCHEMICALS
AGNI ENERGY & SYNERGY CONSULTANCY SERVICES OIL GAS ENERGY PETROCHEMICALSNoor Jivraj
 
180301 BIA funding possibilities 2018
180301 BIA funding possibilities 2018180301 BIA funding possibilities 2018
180301 BIA funding possibilities 2018Trond Knudsen
 
TCI 2015 The Construction Cluster Initiative in Bucaramanga, Colombia
TCI 2015 The Construction Cluster Initiative in Bucaramanga, ColombiaTCI 2015 The Construction Cluster Initiative in Bucaramanga, Colombia
TCI 2015 The Construction Cluster Initiative in Bucaramanga, ColombiaTCI Network
 
Using prize based competitions for implementing innovations
Using prize based competitions for implementing innovationsUsing prize based competitions for implementing innovations
Using prize based competitions for implementing innovationsRick Wielens
 
Meridian 3: autonomous highway, rural and parking test facilities: Competitio...
Meridian 3: autonomous highway, rural and parking test facilities: Competitio...Meridian 3: autonomous highway, rural and parking test facilities: Competitio...
Meridian 3: autonomous highway, rural and parking test facilities: Competitio...KTN
 
ARCHIVER Tender Requirements
ARCHIVER Tender RequirementsARCHIVER Tender Requirements
ARCHIVER Tender RequirementsArchiver
 
Tendering documentation
Tendering documentationTendering documentation
Tendering documentationnipuna_bopage
 
Cross Whitehall Prosperity Framework | Supplier Engagement
Cross Whitehall Prosperity Framework | Supplier Engagement Cross Whitehall Prosperity Framework | Supplier Engagement
Cross Whitehall Prosperity Framework | Supplier Engagement UKinBrazilNetwork
 

Similaire à BEST PRACTICES FOR THE TRANSITION TRANSITION TOWARDS TOWARDS AUCTIONS (20)

Archiver omc stansted_tendering_procedure_and_requirements_final
Archiver omc stansted_tendering_procedure_and_requirements_finalArchiver omc stansted_tendering_procedure_and_requirements_final
Archiver omc stansted_tendering_procedure_and_requirements_final
 
Carbon Catalysts Consultancy introduction
Carbon Catalysts Consultancy introductionCarbon Catalysts Consultancy introduction
Carbon Catalysts Consultancy introduction
 
FERC Order 1000: Understanding Transmission Planning in a New Paradigm
FERC Order 1000: Understanding Transmission Planning in a New ParadigmFERC Order 1000: Understanding Transmission Planning in a New Paradigm
FERC Order 1000: Understanding Transmission Planning in a New Paradigm
 
Glyn Hughes CV 081015
Glyn Hughes CV 081015Glyn Hughes CV 081015
Glyn Hughes CV 081015
 
Competitive Selection and Support for Renewable Energy
Competitive Selection and Support for Renewable EnergyCompetitive Selection and Support for Renewable Energy
Competitive Selection and Support for Renewable Energy
 
SBRI competition: Sort and Segregate Nuclear Waste
SBRI competition: Sort and Segregate Nuclear WasteSBRI competition: Sort and Segregate Nuclear Waste
SBRI competition: Sort and Segregate Nuclear Waste
 
Procurement Strategy Development
Procurement Strategy DevelopmentProcurement Strategy Development
Procurement Strategy Development
 
Meridian 2: connected vehicles data exchange - competition scope
Meridian 2: connected vehicles data exchange - competition scopeMeridian 2: connected vehicles data exchange - competition scope
Meridian 2: connected vehicles data exchange - competition scope
 
Fighting Rigging in the Energy Sector in Ukraine – A review of Public Procure...
Fighting Rigging in the Energy Sector in Ukraine – A review of Public Procure...Fighting Rigging in the Energy Sector in Ukraine – A review of Public Procure...
Fighting Rigging in the Energy Sector in Ukraine – A review of Public Procure...
 
AGNI ENERGY & SYNERGY CONSULTANCY SERVICES OIL GAS ENERGY PETROCHEMICALS
AGNI ENERGY & SYNERGY CONSULTANCY SERVICES OIL GAS ENERGY PETROCHEMICALSAGNI ENERGY & SYNERGY CONSULTANCY SERVICES OIL GAS ENERGY PETROCHEMICALS
AGNI ENERGY & SYNERGY CONSULTANCY SERVICES OIL GAS ENERGY PETROCHEMICALS
 
180301 BIA funding possibilities 2018
180301 BIA funding possibilities 2018180301 BIA funding possibilities 2018
180301 BIA funding possibilities 2018
 
Portfolio, programme and project risk (Peter Campbell)
Portfolio, programme and project risk (Peter Campbell)Portfolio, programme and project risk (Peter Campbell)
Portfolio, programme and project risk (Peter Campbell)
 
Project Development Methodology
Project Development MethodologyProject Development Methodology
Project Development Methodology
 
PPRA.ppt
PPRA.pptPPRA.ppt
PPRA.ppt
 
TCI 2015 The Construction Cluster Initiative in Bucaramanga, Colombia
TCI 2015 The Construction Cluster Initiative in Bucaramanga, ColombiaTCI 2015 The Construction Cluster Initiative in Bucaramanga, Colombia
TCI 2015 The Construction Cluster Initiative in Bucaramanga, Colombia
 
Using prize based competitions for implementing innovations
Using prize based competitions for implementing innovationsUsing prize based competitions for implementing innovations
Using prize based competitions for implementing innovations
 
Meridian 3: autonomous highway, rural and parking test facilities: Competitio...
Meridian 3: autonomous highway, rural and parking test facilities: Competitio...Meridian 3: autonomous highway, rural and parking test facilities: Competitio...
Meridian 3: autonomous highway, rural and parking test facilities: Competitio...
 
ARCHIVER Tender Requirements
ARCHIVER Tender RequirementsARCHIVER Tender Requirements
ARCHIVER Tender Requirements
 
Tendering documentation
Tendering documentationTendering documentation
Tendering documentation
 
Cross Whitehall Prosperity Framework | Supplier Engagement
Cross Whitehall Prosperity Framework | Supplier Engagement Cross Whitehall Prosperity Framework | Supplier Engagement
Cross Whitehall Prosperity Framework | Supplier Engagement
 

Plus de energydialog

ВІТРОЕНЕРГЕТИКА УКРАЇНИ 2019
ВІТРОЕНЕРГЕТИКА УКРАЇНИ 2019ВІТРОЕНЕРГЕТИКА УКРАЇНИ 2019
ВІТРОЕНЕРГЕТИКА УКРАЇНИ 2019energydialog
 
Investor View on Auctions for Large-scale Biomass Project
Investor View on Auctions for Large-scale Biomass ProjectInvestor View on Auctions for Large-scale Biomass Project
Investor View on Auctions for Large-scale Biomass Projectenergydialog
 
Lessons learned with the Brazilian experience with energy auctions
Lessons learned with the Brazilian experience with energy auctions Lessons learned with the Brazilian experience with energy auctions
Lessons learned with the Brazilian experience with energy auctions energydialog
 
RECOMMENDATIONS FOR AN EFFICIENT AND EFFECTIVE AUCTION DESIGN IN UKRAINE
RECOMMENDATIONS FOR AN EFFICIENT AND EFFECTIVE AUCTION DESIGN IN UKRAINERECOMMENDATIONS FOR AN EFFICIENT AND EFFECTIVE AUCTION DESIGN IN UKRAINE
RECOMMENDATIONS FOR AN EFFICIENT AND EFFECTIVE AUCTION DESIGN IN UKRAINEenergydialog
 
The transition to auction system of REN support failed: Less investment and ...
The transition to auction system of REN support failed: Less investment and ...The transition to auction system of REN support failed: Less investment and ...
The transition to auction system of REN support failed: Less investment and ...energydialog
 
Аукционная система ВИЭ в Казахстане
Аукционная система ВИЭ в КазахстанеАукционная система ВИЭ в Казахстане
Аукционная система ВИЭ в Казахстанеenergydialog
 
Auctions for RES support - the convincing list of pros
Auctions for RES support - the convincing list of prosAuctions for RES support - the convincing list of pros
Auctions for RES support - the convincing list of prosenergydialog
 
Tenders for renewables in the EU
Tenders for renewables in the EUTenders for renewables in the EU
Tenders for renewables in the EUenergydialog
 
The role of auctions in the energy transition
The role of auctions in the energy transitionThe role of auctions in the energy transition
The role of auctions in the energy transitionenergydialog
 
UKRAINE:RENEWABLE ENERGY DEVELOPMENT
UKRAINE:RENEWABLE ENERGY DEVELOPMENTUKRAINE:RENEWABLE ENERGY DEVELOPMENT
UKRAINE:RENEWABLE ENERGY DEVELOPMENTenergydialog
 
Роздрібний ринок електроенергії
Роздрібний ринок електроенергіїРоздрібний ринок електроенергії
Роздрібний ринок електроенергіїenergydialog
 
«Дорожня карта» збільшення інвестицій у розвідку та видобування природного га...
«Дорожня карта» збільшення інвестицій у розвідку та видобування природного га...«Дорожня карта» збільшення інвестицій у розвідку та видобування природного га...
«Дорожня карта» збільшення інвестицій у розвідку та видобування природного га...energydialog
 
Стан виконання Концепції розвитку газовидобувної галузі України на період до ...
Стан виконання Концепції розвитку газовидобувної галузі України на період до ...Стан виконання Концепції розвитку газовидобувної галузі України на період до ...
Стан виконання Концепції розвитку газовидобувної галузі України на період до ...energydialog
 
Зростання видобутку в умовах штучного ліцензомору
Зростання видобутку в умовах штучного ліцензоморуЗростання видобутку в умовах штучного ліцензомору
Зростання видобутку в умовах штучного ліцензоморуenergydialog
 
MAXIMISING THE ECONOMIC RECOVERY OF THE UK’S OIL AND GAS RESERVES
MAXIMISING THE ECONOMIC RECOVERY OF THE UK’S OIL AND GAS RESERVESMAXIMISING THE ECONOMIC RECOVERY OF THE UK’S OIL AND GAS RESERVES
MAXIMISING THE ECONOMIC RECOVERY OF THE UK’S OIL AND GAS RESERVESenergydialog
 
A roadmap for increased investment in natural gas exploration and production ...
A roadmap for increased investment in natural gas exploration and production ...A roadmap for increased investment in natural gas exploration and production ...
A roadmap for increased investment in natural gas exploration and production ...energydialog
 
Нові інвестиційні можливості вугільної галузі
Нові інвестиційні можливості вугільної галузіНові інвестиційні можливості вугільної галузі
Нові інвестиційні можливості вугільної галузіenergydialog
 
Coal Regions in Transition Initiative
Coal Regions in Transition InitiativeCoal Regions in Transition Initiative
Coal Regions in Transition Initiativeenergydialog
 
Ефективність управління об'єктами державної власності у вугільній галузі
Ефективність управління об'єктами державної власності у вугільній галузі Ефективність управління об'єктами державної власності у вугільній галузі
Ефективність управління об'єктами державної власності у вугільній галузі energydialog
 
The Restructuring and Privatisation of Coal in the UK. Lessons for Ukraine
The Restructuring and Privatisation of Coal in the UK. Lessons for UkraineThe Restructuring and Privatisation of Coal in the UK. Lessons for Ukraine
The Restructuring and Privatisation of Coal in the UK. Lessons for Ukraineenergydialog
 

Plus de energydialog (20)

ВІТРОЕНЕРГЕТИКА УКРАЇНИ 2019
ВІТРОЕНЕРГЕТИКА УКРАЇНИ 2019ВІТРОЕНЕРГЕТИКА УКРАЇНИ 2019
ВІТРОЕНЕРГЕТИКА УКРАЇНИ 2019
 
Investor View on Auctions for Large-scale Biomass Project
Investor View on Auctions for Large-scale Biomass ProjectInvestor View on Auctions for Large-scale Biomass Project
Investor View on Auctions for Large-scale Biomass Project
 
Lessons learned with the Brazilian experience with energy auctions
Lessons learned with the Brazilian experience with energy auctions Lessons learned with the Brazilian experience with energy auctions
Lessons learned with the Brazilian experience with energy auctions
 
RECOMMENDATIONS FOR AN EFFICIENT AND EFFECTIVE AUCTION DESIGN IN UKRAINE
RECOMMENDATIONS FOR AN EFFICIENT AND EFFECTIVE AUCTION DESIGN IN UKRAINERECOMMENDATIONS FOR AN EFFICIENT AND EFFECTIVE AUCTION DESIGN IN UKRAINE
RECOMMENDATIONS FOR AN EFFICIENT AND EFFECTIVE AUCTION DESIGN IN UKRAINE
 
The transition to auction system of REN support failed: Less investment and ...
The transition to auction system of REN support failed: Less investment and ...The transition to auction system of REN support failed: Less investment and ...
The transition to auction system of REN support failed: Less investment and ...
 
Аукционная система ВИЭ в Казахстане
Аукционная система ВИЭ в КазахстанеАукционная система ВИЭ в Казахстане
Аукционная система ВИЭ в Казахстане
 
Auctions for RES support - the convincing list of pros
Auctions for RES support - the convincing list of prosAuctions for RES support - the convincing list of pros
Auctions for RES support - the convincing list of pros
 
Tenders for renewables in the EU
Tenders for renewables in the EUTenders for renewables in the EU
Tenders for renewables in the EU
 
The role of auctions in the energy transition
The role of auctions in the energy transitionThe role of auctions in the energy transition
The role of auctions in the energy transition
 
UKRAINE:RENEWABLE ENERGY DEVELOPMENT
UKRAINE:RENEWABLE ENERGY DEVELOPMENTUKRAINE:RENEWABLE ENERGY DEVELOPMENT
UKRAINE:RENEWABLE ENERGY DEVELOPMENT
 
Роздрібний ринок електроенергії
Роздрібний ринок електроенергіїРоздрібний ринок електроенергії
Роздрібний ринок електроенергії
 
«Дорожня карта» збільшення інвестицій у розвідку та видобування природного га...
«Дорожня карта» збільшення інвестицій у розвідку та видобування природного га...«Дорожня карта» збільшення інвестицій у розвідку та видобування природного га...
«Дорожня карта» збільшення інвестицій у розвідку та видобування природного га...
 
Стан виконання Концепції розвитку газовидобувної галузі України на період до ...
Стан виконання Концепції розвитку газовидобувної галузі України на період до ...Стан виконання Концепції розвитку газовидобувної галузі України на період до ...
Стан виконання Концепції розвитку газовидобувної галузі України на період до ...
 
Зростання видобутку в умовах штучного ліцензомору
Зростання видобутку в умовах штучного ліцензоморуЗростання видобутку в умовах штучного ліцензомору
Зростання видобутку в умовах штучного ліцензомору
 
MAXIMISING THE ECONOMIC RECOVERY OF THE UK’S OIL AND GAS RESERVES
MAXIMISING THE ECONOMIC RECOVERY OF THE UK’S OIL AND GAS RESERVESMAXIMISING THE ECONOMIC RECOVERY OF THE UK’S OIL AND GAS RESERVES
MAXIMISING THE ECONOMIC RECOVERY OF THE UK’S OIL AND GAS RESERVES
 
A roadmap for increased investment in natural gas exploration and production ...
A roadmap for increased investment in natural gas exploration and production ...A roadmap for increased investment in natural gas exploration and production ...
A roadmap for increased investment in natural gas exploration and production ...
 
Нові інвестиційні можливості вугільної галузі
Нові інвестиційні можливості вугільної галузіНові інвестиційні можливості вугільної галузі
Нові інвестиційні можливості вугільної галузі
 
Coal Regions in Transition Initiative
Coal Regions in Transition InitiativeCoal Regions in Transition Initiative
Coal Regions in Transition Initiative
 
Ефективність управління об'єктами державної власності у вугільній галузі
Ефективність управління об'єктами державної власності у вугільній галузі Ефективність управління об'єктами державної власності у вугільній галузі
Ефективність управління об'єктами державної власності у вугільній галузі
 
The Restructuring and Privatisation of Coal in the UK. Lessons for Ukraine
The Restructuring and Privatisation of Coal in the UK. Lessons for UkraineThe Restructuring and Privatisation of Coal in the UK. Lessons for Ukraine
The Restructuring and Privatisation of Coal in the UK. Lessons for Ukraine
 

Dernier

George Lever - eCommerce Day Chile 2024
George Lever -  eCommerce Day Chile 2024George Lever -  eCommerce Day Chile 2024
George Lever - eCommerce Day Chile 2024eCommerce Institute
 
ANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docxANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docxNikitaBankoti2
 
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptxMohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptxmohammadalnahdi22
 
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesVVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesPooja Nehwal
 
Presentation on Engagement in Book Clubs
Presentation on Engagement in Book ClubsPresentation on Engagement in Book Clubs
Presentation on Engagement in Book Clubssamaasim06
 
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024eCommerce Institute
 
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...Sheetaleventcompany
 
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptxChiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptxraffaeleoman
 
Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510Vipesco
 
Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Chameera Dedduwage
 
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Report Writing Webinar Training
Report Writing Webinar TrainingReport Writing Webinar Training
Report Writing Webinar TrainingKylaCullinane
 
Air breathing and respiratory adaptations in diver animals
Air breathing and respiratory adaptations in diver animalsAir breathing and respiratory adaptations in diver animals
Air breathing and respiratory adaptations in diver animalsaqsarehman5055
 
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...Hasting Chen
 
Mathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptxMathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptxMoumonDas2
 
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Kayode Fayemi
 
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdfThe workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdfSenaatti-kiinteistöt
 
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779Delhi Call girls
 
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
If this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaIf this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaKayode Fayemi
 

Dernier (20)

George Lever - eCommerce Day Chile 2024
George Lever -  eCommerce Day Chile 2024George Lever -  eCommerce Day Chile 2024
George Lever - eCommerce Day Chile 2024
 
ANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docxANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docx
 
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptxMohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptx
 
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesVVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
 
Presentation on Engagement in Book Clubs
Presentation on Engagement in Book ClubsPresentation on Engagement in Book Clubs
Presentation on Engagement in Book Clubs
 
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
 
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
 
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptxChiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
 
Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510
 
Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)
 
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
 
Report Writing Webinar Training
Report Writing Webinar TrainingReport Writing Webinar Training
Report Writing Webinar Training
 
Air breathing and respiratory adaptations in diver animals
Air breathing and respiratory adaptations in diver animalsAir breathing and respiratory adaptations in diver animals
Air breathing and respiratory adaptations in diver animals
 
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
 
Mathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptxMathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptx
 
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
 
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdfThe workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
 
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
 
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
 
If this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaIf this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New Nigeria
 

BEST PRACTICES FOR THE TRANSITION TRANSITION TOWARDS TOWARDS AUCTIONS

  • 1. / ©2018 NAVIGANT CONSULTING, INC. ALL RIGHTS RESERVED1 CONFERENCE AUCTION SUPPORT SCHEME IN UKRAINE FOR RENEWABLE ENERGY DEPLOYMENT KIEV, 21.02.2019 FABIAN WIGAND ASSOCIATE DIRECTOR, NAVIGANT BEST PRACTICES FOR THE TRANSITION TOWARDS AUCTIONS Part of
  • 2. / ©2018 NAVIGANT CONSULTING, INC. ALL RIGHTS RESERVED2 Consultancy services on auctions performed Analysis of auction schemes Navigant/Ecofys >600 energy experts >60 offices wordlwide >20 years experience designing & implementing competitive procurement/auctions Part of the EUH2020 research project on renewables auctions RECOMMENDATIONS BASED ON 20 YEARS OF EXPERIENCE IN AUCTION ANALYSIS & DESIGN
  • 3. / ©2018 NAVIGANT CONSULTING, INC. ALL RIGHTS RESERVED3/ ©2019 NAVIGANT CONSULTING, INC. ALL RIGHTS RESERVED3 UNDERSTANDING THE TRANSITION TOWARDS AUCTIONS Transition from feed-in tariffs to acutioned tariffs • Increases volume control, increases price competition • Increases new risks for bidders (pre-development costs and risk of sunk costs) • Quickly reflects market price developments but require competition • More difficult for some smaller bidders Administratively-set feed-in tariff Auctioned tariff • Government sets volume • Market sets price • Government sets price • Market sets volume
  • 4. / ©2018 NAVIGANT CONSULTING, INC. ALL RIGHTS RESERVED4 Policy goals • Price competition • Volume control • Other goals such as grid & system integration, local value creation etc. • Be aware of trade-offs Market readiness • Market size & concentration, competition with other renumeration (e.. feed.in tariffs) • Risk & duration of project development phases, ease of permitting • Available funding (domestic/international, debt/equity), preparedness, risk perception Institutional readiness • Depend on type of auction, implementation timeline, desire for scalability of the auction. • Alignment of relevant ministries, grid operators, permitting authorities, energy regulator • Trust, transparency, independence • Use international best-practices but tailor auction to individual case PREPARE FOR AUCTIONS: TAILOR THEM TO POLITICAL, MARKET & INSTITUTIONAL READINESS OF THE COUNTRY
  • 5. / ©2018 NAVIGANT CONSULTING, INC. ALL RIGHTS RESERVED5 THE AUCTION DESIGN PROCESS 5 Target definition Market & regulatory analysis Auction design Imple- mentation Evaluation Institutional set-up General design elements Procurement procedure Conditions for participation Deadlines and penalties Policy goals Market size Pre-developed project Market players Technology cost Project development & operation Existing regulations & incentives Drafting of required documents Market building Procurement conduction • RfQ • RfP and awarding of bids Contracting Monitoring of realization Lessons learned Adjustment of procurement design
  • 6. / ©2018 NAVIGANT CONSULTING, INC. ALL RIGHTS RESERVED6 • Build capabilities: Working groups, trainings (bidder simulation also for auctioning authority) • Align on political goals, be aware of trade-offs • Study the market, prepare bidders THE AUCTION IMPLEMENTATION PROCESS REQUIRES BUILDING OF CAPACITIES & ALIGNMENT OF GOALS Formal regulation Participation documents RfQ/RfP Bid evaluation Results Auction Auction platform Schedule Key parameters Clarifications Qualification Ranking Publication of awards Publication of reasons for exclusion Timely contract award and signature Provision for legal disputs Market building Pre-bid conference Market feedback Auction simulation Auction conduction Announce- ment Drafting of required documents Contract- ing Example of auction process
  • 7. / ©2018 NAVIGANT CONSULTING, INC. ALL RIGHTS RESERVED7 Understand bidders • Risk for bidders: – Bid risks with sunk costs – Penalty risks if not realizing projects – Revenue risks, such as ▪ Off-taker risk, i.e. curtailment or off-taker default ▪ Political risks, i.e. expropriation, contract breach, changes in law/tax ▪ Currency risk, i.e.. currency fluctuations & exchange controls • Avoiding collusion – Collusion more likely if small, concentrated market – Limit collusion through simple auction design and no post-auction negotiations Prepare bidders • Sufficient preparation time • Pre-bidder conferences • Trainings & auction simulations Address concerns: • Receive bidder feedback on design • Guarantees • Pot. exempt some sizes/technologies from auction CREATE FAVORABLE CONDITIONS FOR INVESTMENT THROUGH UNDERSTANDING, PREPARING AND ADRESSING BIDDERS
  • 8. / ©2018 NAVIGANT CONSULTING, INC. ALL RIGHTS RESERVED8 EXAMPLE OF DESIGN CONSIDERATIONS DESIGN ELEMENTS: SELECTION OF PROJECT-SITE Government-site auction Bidder-site auction Bidder 1 Bidder 2 Bidder 3 Bidder 4 Auctioneer Project site Selected & pre- developed Pre-development by the auctioneer might include: • Grid connection • Land lease • Environmental assessments • Resource measurements 15 MW 30 MW Auction volume (e.g. 100 MW) 30 MW 25 MW Bidder 1Bidder 2 Bidder 3 Bidder 4 Auctioneer Project-site is selected by bidders Bidders compete with their projects Bidders pre-develop their projects, e.g: • Defining site boundaries • Measuring resource availability • Procuring land lease
  • 9. / ©2018 NAVIGANT CONSULTING, INC. ALL RIGHTS RESERVED9 Government-site auction SELECTION OF PROJECT-SITE: COUNTRY EXAMPLES Bidder-site auction Bidder 1 Bidder 2 Bidder 3 Bidder 4 Auctioneer Project site Selected & pre- developed 15 MW 30 MW Procured volume (e.g. 100 MW) 30 MW 25 MW Bidder 1Bidder 2 Bidder 3 Bidder 4 Auctioneer Country examples: • Denmark/Germany/Netherlands wind offshore • Dubai/Abu Dhabi (UAE) • Morocco Country examples: • Germany PV & wind onshore • South Africa (with easier project development in Renewable Energy Development Zones - REDZ) • Mexico, Chile
  • 10. / ©2018 NAVIGANT CONSULTING, INC. ALL RIGHTS RESERVED10 FABIAN WIGAND Associate Director Energy Phone: +49 (0) 30 29 77 35 79 – 23 Mobile: +49 (0) 172 5833 265 E-Mail: fabian.wigand@navigant.com CONTACTS