CONTRACT DISPUTE RESOLUTION
TECHNIQUES




          LECTURE-5

   1                  11-04-2012
CONTRACT DISPUTE
RESOLUTION TECHNIQUES
Construction Claims
   Construction contracts are seldom ideal, and claims for
    time extension or financial compensation often have to
    be made by one party on another.
   Claim analysis has become an important issue for project
    management
   Typical construction claims against owners
•   Scope changes
•   Change orders
•   Work suspension and stoppages
•   Site access or availability
•   Strikes etc.
   Typical construction claims against the contractor
•   Materials out of specification
•   Defective work
•   Property damage
•   Contractor’s late completion
Disputes

   The best practices for resolving construction disputes
    include a combination of: dispute prevention, flexibility,
    early dispute intervention, use of alternative dispute
    resolution methods, and a predetermined plan as to how
    disputes will be handled.




                          Contract Dispute Resolution Techniques
Disputes

     The various types of dispute resolution methods
      used in construction disputes are:
      Tradition Techniques
       Litigation
       Negotiation

      Alternative dispute resolution Technique
        (ADR)
       Arbitration
       Mediation
       Expert determination
       Dispute Review Boards
       Rent a Judge
                          Contract Dispute Resolution Techniques
Litigation
   Most construction disputes are tried in one of the state
    judicial systems.

   A particular state court gains jurisdiction over a case if
    one of the parties is based in that state or if the project
    itself is located in that state.

   If the two parties to the dispute are based in different
    states, whichever party initiates the litigation chooses the
    forum.
   Litigation usually refers to the process of
    submitting matters for resolution to the courts of
    the provinces, or in some instances, the federal
    court system.

   Litigation usually occurs because:
       The amount of damages is large
       One or more parties refuses to negotiate a solution
       The issue is complex
       A court-ordered solution is the quickest solution
       Litigation will not affect the project schedule
                           Contract Dispute Resolution Techniques
DISADVANTAGES OF LITIGATION:

A complex construction dispute may take anywhere from
1 to 2 years before it reaches trial.

The prolonged and detailed process makes litigation very
expensive.
Contract Negotiations
     Another way of resolving construction disputes is by
      holding negotiations
     Between the two parties without neutral party
     It is one of the most-tried methods and most-successful
      too
     Negotiations are quite simple and can be done over the
      telephone, by email or letters, at a meeting or even
      through mediation which is, another form of alternative
      dispute resolution.



                           Contract Dispute Resolution Techniques
Skills Necessary for a negotiator
     Preparation and Planning skills
     Knowledge of subject matter
     Ability to understand the interest of the firm
     Ability of persuade others
     Good listening skills
     Patience
     Ability to control emotions
     Ability to maintain flexibility



                            Contract Dispute Resolution Techniques
Arbitration
     In arbitration, each party in a dispute agrees to submit
      evidence to a neutral third party to review and render a
      judgment of responsibility.

     Arbitration is less costly and time-consuming than
      litigation, but has fallen out of favor because it is still
      more expensive and slower than mediation or
      conciliation.

     Arbitration may be binding or non-binding, depending on
      the contract provisions.
                              Contract Dispute Resolution Techniques
Mediation
     Mediation is a voluntary negotiation between the parties
      in a dispute, aided by a neutral third party (the mediator).

     The mediator’s role is to assist the parties to find their
      own solution.

     Mediation is mentioned as the desired form of problem
      resolution in agreements, and is faster and less costly
      than arbitration.


                             Contract Dispute Resolution Techniques
ADVANTAGES OF MEDIATION
Fast
Inexpensive
Conducted by experts
Confidential and convenient


DISADVANTAGES OF MEDIATION
 Mediation is non-binding
If an agreement cannot be worked out, the mediation
proceeding will have been a waste of time and money.
Expert Determination
     Some disputes are of such a nature that they can be
      resolved through objective testing or the opinion of an
      expert.

     Environmental and material testing issues are examples of
      problems in which both parties may voluntarily conclude
      that they will accept the judgment or report of an
      independent agency.




                           Contract Dispute Resolution Techniques
Dispute Review Boards

     Dispute Review Boards

         The DRB method of dispute resolution was developed by the
          committee on contracting practices of the underground
          technology research council of ASCE.
          The DRB comprises three members: one selected by the
          owner, one by the contractor, and a third selected by the first
          two.
         All DRB members are impartial and experienced in
          construction. They are appointed soon after the contract is
          awarded
                                Contract Dispute Resolution Techniques
   DRB members are sent progress reports and visit the
    project periodically.

   The DRB is not used for routine claims or differences of
    opinion, but for the resolution of major problems.

    The recommendations of the DRB are not legally
    binding, but are not likely to be reversed in litigation.
ADVANTAGES OF DISPUTES REVIEW BOARDS
The DRB hears disputes on an informal basis and can
provide recommendations for their timely resolution
before parties adopt hard positions leading to litigation.
The parties are comfortable with the recommendations of
the DRB since the selection of the DRB members is
controlled by the owner and the contractor.
 Because they meet periodically and they are sent
progress reports, the DRB members are familiar with the
elements of the project.

   Although the DRB recommendations are not binding on
    either party, there is strong motivation to accept the
    findings
   DISADVANTAGES OF DISPUTES REVIEW BOARDS
   The impartiality and conflict-of- interest portion of the
    DRB specification is so tough that sometimes there are
    not enough qualified people for the DRB.

   The project must be large enough, and the probability of
    the occurrence of disputes throughout the course of the
    project must be high enough to justify the expense of
    retaining the services of the DRB members for the entire
    duration of the project.
Rent-a- Judge
     Hire ex- judge or lawyer to give binding or non-binding
      decision




                           Contract Dispute Resolution Techniques

Contenu connexe

Tendances

Assignment 1 Complete
Assignment 1 CompleteAssignment 1 Complete
Assignment 1 Complete
John Ashton
 
Professional practices (lec 02) by k.iqbal
Professional practices (lec 02) by k.iqbalProfessional practices (lec 02) by k.iqbal
Professional practices (lec 02) by k.iqbal
Zakee Kazmee
 
Nec fidic-jbcc-gcc- ct-marketing (1) (2)
Nec fidic-jbcc-gcc- ct-marketing (1) (2)Nec fidic-jbcc-gcc- ct-marketing (1) (2)
Nec fidic-jbcc-gcc- ct-marketing (1) (2)
GPTraining
 
Alternative Dispute Resolution Methods
Alternative Dispute Resolution MethodsAlternative Dispute Resolution Methods
Alternative Dispute Resolution Methods
coburgpsych
 

Tendances (11)

Assignment 1 Complete
Assignment 1 CompleteAssignment 1 Complete
Assignment 1 Complete
 
Professional practices (lec 02) by k.iqbal
Professional practices (lec 02) by k.iqbalProfessional practices (lec 02) by k.iqbal
Professional practices (lec 02) by k.iqbal
 
Arbitration notes
Arbitration notesArbitration notes
Arbitration notes
 
TE&A news
TE&A newsTE&A news
TE&A news
 
Nvc Fund Holding Trust Transaction Platform 2152019
Nvc Fund Holding Trust Transaction Platform 2152019Nvc Fund Holding Trust Transaction Platform 2152019
Nvc Fund Holding Trust Transaction Platform 2152019
 
Delay, dispute (1st annual conf. of planning in cairo 23-8-2014) engr. m maged
Delay, dispute  (1st annual conf. of planning in cairo 23-8-2014) engr. m magedDelay, dispute  (1st annual conf. of planning in cairo 23-8-2014) engr. m maged
Delay, dispute (1st annual conf. of planning in cairo 23-8-2014) engr. m maged
 
Nec fidic-jbcc-gcc- ct-marketing (1) (2)
Nec fidic-jbcc-gcc- ct-marketing (1) (2)Nec fidic-jbcc-gcc- ct-marketing (1) (2)
Nec fidic-jbcc-gcc- ct-marketing (1) (2)
 
Master thesis defence presentation
Master thesis defence presentationMaster thesis defence presentation
Master thesis defence presentation
 
HOW TO SURVIVE CONSTRUCTION PROJECTS DURING TIMES OF ECONOMIC INSANITY
HOW TO SURVIVE CONSTRUCTION PROJECTS DURING TIMES OF ECONOMIC INSANITYHOW TO SURVIVE CONSTRUCTION PROJECTS DURING TIMES OF ECONOMIC INSANITY
HOW TO SURVIVE CONSTRUCTION PROJECTS DURING TIMES OF ECONOMIC INSANITY
 
Procurement negotiation tips and phases
Procurement negotiation tips and phasesProcurement negotiation tips and phases
Procurement negotiation tips and phases
 
Alternative Dispute Resolution Methods
Alternative Dispute Resolution MethodsAlternative Dispute Resolution Methods
Alternative Dispute Resolution Methods
 

En vedette (6)

CIVIL ENGINEERING LAW
CIVIL ENGINEERING LAWCIVIL ENGINEERING LAW
CIVIL ENGINEERING LAW
 
labour vs machionary (cep lecture)
labour vs machionary (cep lecture)labour vs machionary (cep lecture)
labour vs machionary (cep lecture)
 
Pile Foundation
Pile Foundation Pile Foundation
Pile Foundation
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
"Types and Causes of Construction Claims"
"Types and Causes of Construction Claims""Types and Causes of Construction Claims"
"Types and Causes of Construction Claims"
 
Code of Ethics
Code of EthicsCode of Ethics
Code of Ethics
 

Similaire à Civil engineering practice (lec 5)

Similaire à Civil engineering practice (lec 5) (20)

Alternative Dispute Resolution methods Level III - B.Sc QS (Salford) March ...
Alternative  Dispute Resolution methods  Level III - B.Sc QS (Salford) March ...Alternative  Dispute Resolution methods  Level III - B.Sc QS (Salford) March ...
Alternative Dispute Resolution methods Level III - B.Sc QS (Salford) March ...
 
Top 5 Methods for Resolving UK Construction Disputes
Top 5 Methods for Resolving UK Construction DisputesTop 5 Methods for Resolving UK Construction Disputes
Top 5 Methods for Resolving UK Construction Disputes
 
Lecture 2 - ADR vs Litigation.pdf
Lecture 2 - ADR vs Litigation.pdfLecture 2 - ADR vs Litigation.pdf
Lecture 2 - ADR vs Litigation.pdf
 
arbitration and it's types.pptx
arbitration and it's types.pptxarbitration and it's types.pptx
arbitration and it's types.pptx
 
arbitration and it's types.pptx
arbitration and it's types.pptxarbitration and it's types.pptx
arbitration and it's types.pptx
 
arbitration and it's types.pptx
arbitration and it's types.pptxarbitration and it's types.pptx
arbitration and it's types.pptx
 
Project dispute avoidance and mitigation through conciliation and arbitration
Project dispute avoidance and mitigation through conciliation and arbitrationProject dispute avoidance and mitigation through conciliation and arbitration
Project dispute avoidance and mitigation through conciliation and arbitration
 
SEMINAR_4_ALTERNATIVE_DISPUTE_ESOLUTION_MECHANISM[3].pdf
SEMINAR_4_ALTERNATIVE_DISPUTE_ESOLUTION_MECHANISM[3].pdfSEMINAR_4_ALTERNATIVE_DISPUTE_ESOLUTION_MECHANISM[3].pdf
SEMINAR_4_ALTERNATIVE_DISPUTE_ESOLUTION_MECHANISM[3].pdf
 
Early Dispute Resolution in the Construction Industry
Early Dispute Resolution in the Construction IndustryEarly Dispute Resolution in the Construction Industry
Early Dispute Resolution in the Construction Industry
 
Arbitration Act in Bangladesh
Arbitration Act in BangladeshArbitration Act in Bangladesh
Arbitration Act in Bangladesh
 
Priavte court
Priavte courtPriavte court
Priavte court
 
Utilizing Alternative Dispute Resolution Tactics in Employment Matters
Utilizing Alternative Dispute Resolution Tactics in Employment MattersUtilizing Alternative Dispute Resolution Tactics in Employment Matters
Utilizing Alternative Dispute Resolution Tactics in Employment Matters
 
Alternative Dispute Resolution (ADR)
Alternative Dispute Resolution (ADR)Alternative Dispute Resolution (ADR)
Alternative Dispute Resolution (ADR)
 
ADR-converted.pdf
ADR-converted.pdfADR-converted.pdf
ADR-converted.pdf
 
ADR Final - short version - 16-10-2023.pptx
ADR Final - short version - 16-10-2023.pptxADR Final - short version - 16-10-2023.pptx
ADR Final - short version - 16-10-2023.pptx
 
Meet the Adjudicator
Meet the Adjudicator Meet the Adjudicator
Meet the Adjudicator
 
Drafting Arbitration Clause
Drafting Arbitration ClauseDrafting Arbitration Clause
Drafting Arbitration Clause
 
Ehsan Kabir Solicitor : Strengths and Weaknesses of Judicial Determination
Ehsan Kabir Solicitor : Strengths and Weaknesses of Judicial DeterminationEhsan Kabir Solicitor : Strengths and Weaknesses of Judicial Determination
Ehsan Kabir Solicitor : Strengths and Weaknesses of Judicial Determination
 
ADR Presentation Assignment.pptx
ADR Presentation Assignment.pptxADR Presentation Assignment.pptx
ADR Presentation Assignment.pptx
 
ADR its processes & KP.ppt
ADR its processes & KP.pptADR its processes & KP.ppt
ADR its processes & KP.ppt
 

Dernier

FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
amitlee9823
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Anamikakaur10
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
lizamodels9
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 

Dernier (20)

FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 

Civil engineering practice (lec 5)

  • 1. CONTRACT DISPUTE RESOLUTION TECHNIQUES LECTURE-5 1 11-04-2012
  • 3. Construction Claims  Construction contracts are seldom ideal, and claims for time extension or financial compensation often have to be made by one party on another.  Claim analysis has become an important issue for project management  Typical construction claims against owners • Scope changes • Change orders • Work suspension and stoppages • Site access or availability • Strikes etc.
  • 4. Typical construction claims against the contractor • Materials out of specification • Defective work • Property damage • Contractor’s late completion
  • 5. Disputes  The best practices for resolving construction disputes include a combination of: dispute prevention, flexibility, early dispute intervention, use of alternative dispute resolution methods, and a predetermined plan as to how disputes will be handled. Contract Dispute Resolution Techniques
  • 6. Disputes  The various types of dispute resolution methods used in construction disputes are: Tradition Techniques  Litigation  Negotiation Alternative dispute resolution Technique (ADR)  Arbitration  Mediation  Expert determination  Dispute Review Boards  Rent a Judge Contract Dispute Resolution Techniques
  • 7. Litigation  Most construction disputes are tried in one of the state judicial systems.  A particular state court gains jurisdiction over a case if one of the parties is based in that state or if the project itself is located in that state.  If the two parties to the dispute are based in different states, whichever party initiates the litigation chooses the forum.
  • 8. Litigation usually refers to the process of submitting matters for resolution to the courts of the provinces, or in some instances, the federal court system.  Litigation usually occurs because:  The amount of damages is large  One or more parties refuses to negotiate a solution  The issue is complex  A court-ordered solution is the quickest solution  Litigation will not affect the project schedule Contract Dispute Resolution Techniques
  • 9. DISADVANTAGES OF LITIGATION: A complex construction dispute may take anywhere from 1 to 2 years before it reaches trial. The prolonged and detailed process makes litigation very expensive.
  • 10. Contract Negotiations  Another way of resolving construction disputes is by holding negotiations  Between the two parties without neutral party  It is one of the most-tried methods and most-successful too  Negotiations are quite simple and can be done over the telephone, by email or letters, at a meeting or even through mediation which is, another form of alternative dispute resolution. Contract Dispute Resolution Techniques
  • 11. Skills Necessary for a negotiator  Preparation and Planning skills  Knowledge of subject matter  Ability to understand the interest of the firm  Ability of persuade others  Good listening skills  Patience  Ability to control emotions  Ability to maintain flexibility Contract Dispute Resolution Techniques
  • 12. Arbitration  In arbitration, each party in a dispute agrees to submit evidence to a neutral third party to review and render a judgment of responsibility.  Arbitration is less costly and time-consuming than litigation, but has fallen out of favor because it is still more expensive and slower than mediation or conciliation.  Arbitration may be binding or non-binding, depending on the contract provisions. Contract Dispute Resolution Techniques
  • 13. Mediation  Mediation is a voluntary negotiation between the parties in a dispute, aided by a neutral third party (the mediator).  The mediator’s role is to assist the parties to find their own solution.  Mediation is mentioned as the desired form of problem resolution in agreements, and is faster and less costly than arbitration. Contract Dispute Resolution Techniques
  • 14. ADVANTAGES OF MEDIATION Fast Inexpensive Conducted by experts Confidential and convenient DISADVANTAGES OF MEDIATION  Mediation is non-binding If an agreement cannot be worked out, the mediation proceeding will have been a waste of time and money.
  • 15. Expert Determination  Some disputes are of such a nature that they can be resolved through objective testing or the opinion of an expert.  Environmental and material testing issues are examples of problems in which both parties may voluntarily conclude that they will accept the judgment or report of an independent agency. Contract Dispute Resolution Techniques
  • 16. Dispute Review Boards  Dispute Review Boards  The DRB method of dispute resolution was developed by the committee on contracting practices of the underground technology research council of ASCE.  The DRB comprises three members: one selected by the owner, one by the contractor, and a third selected by the first two.  All DRB members are impartial and experienced in construction. They are appointed soon after the contract is awarded Contract Dispute Resolution Techniques
  • 17. DRB members are sent progress reports and visit the project periodically.  The DRB is not used for routine claims or differences of opinion, but for the resolution of major problems.  The recommendations of the DRB are not legally binding, but are not likely to be reversed in litigation.
  • 18. ADVANTAGES OF DISPUTES REVIEW BOARDS The DRB hears disputes on an informal basis and can provide recommendations for their timely resolution before parties adopt hard positions leading to litigation. The parties are comfortable with the recommendations of the DRB since the selection of the DRB members is controlled by the owner and the contractor.  Because they meet periodically and they are sent progress reports, the DRB members are familiar with the elements of the project. 
  • 19. Although the DRB recommendations are not binding on either party, there is strong motivation to accept the findings
  • 20. DISADVANTAGES OF DISPUTES REVIEW BOARDS  The impartiality and conflict-of- interest portion of the DRB specification is so tough that sometimes there are not enough qualified people for the DRB.  The project must be large enough, and the probability of the occurrence of disputes throughout the course of the project must be high enough to justify the expense of retaining the services of the DRB members for the entire duration of the project.
  • 21. Rent-a- Judge  Hire ex- judge or lawyer to give binding or non-binding decision Contract Dispute Resolution Techniques