SlideShare une entreprise Scribd logo
1  sur  3
Лаборатори Е-1
Pushbutton Signal
Chapter 1 Control Specification and Programming. Ch-1.
Control Objective
Switch the traffic light signals in response to a pushbitton.
Control Specifications
The following operation should be performed in this unit. Study the required
specifications and then create the program and confirm the operetion.
1. The signal lamp Red (Y0) flickers at one-second interval (ON for 1 second and
OFF for 1second).
2. When the pushbutton (X10) on the operation panel is pressed, the indicator (Y10)
on the operation panel is lit. If the pushbutton (X10) is released, the indicator
(Y10) remains lit.
3. After the indicator (Y10) is lit for 5 second, the operation of the signal is changed
as described in 4) to 7).
4. First, the signal lamp Red (Y0) flickers for 5 seconds while indicator (Y10) is lit.
5. The signal lamp Red (Y0) turns off. The signal lamp Yellow (Y1) is lit for 5
seconds.
6. After the lamp Yellow (Y1) is extinguished, signal lamp Green (Y2) is lit for 10
seconds.
7. After the signal lamp Green (Y2) turns OFF, the signal lamp Red (Y0) flickers at
one-second interval (ON for 1 second and OFF for 1 second). The operations
starting from 1) are repeated.
Pushbutton Signal
Chapter 2 Tips for Writing the Program. Ch-2
CAUTION
Click the ladder programm area to enable operation. The title bar will turn blue. Key operation
are not enabled when the title bar and meny items are grayed out.
1. Click the (Edit Ladder) button on the remote control.
2. Input a program.
3. Press the (F4) key to convert the program.
4. Select "Online" - "Write to PLC" in the ladder program area to write the program to the
PLC.
Pushbutton Signal
Chapter 3 Tips for Program Confirmation. Ch-3
1. Initial operation confirmation.
Result = Red (Y0) flickers at one-second intervals (ON for 1 second and OFF for 1
second).
2. Button operation confirmation.
Result = When the pushbutton is pressed, the indicator displays (Please wait) (Y10) for 5
seconds and Red (Y0) flickers.
3. Operation after (Please wait) (Y10) is extinguished.
Result = Yellow (Y1) is lit for 5 seconds.
4. Operation after Yellow (Y1) is extinguished
Result = Green (Y2) is lit for 10 seconds.
5. Operation after Green (Y2) is extinguished
Result = REd (Y0) flickers at one-second intervals (ON for 1 second and OFF for 1
second).
In order to repeat operation checks, the screen should be initialized by clicking the
(Reset) button on the remote control.

Contenu connexe

En vedette

En vedette (6)

Process Involved In BASI Level 1 And 2 Qualification
Process Involved In BASI Level 1 And 2 QualificationProcess Involved In BASI Level 1 And 2 Qualification
Process Involved In BASI Level 1 And 2 Qualification
 
Nw 435
Nw 435Nw 435
Nw 435
 
Transporti me litare
Transporti me litareTransporti me litare
Transporti me litare
 
Mongol angli toloonii uge zeregtsuulel
Mongol angli toloonii uge zeregtsuulelMongol angli toloonii uge zeregtsuulel
Mongol angli toloonii uge zeregtsuulel
 
үг цээжлэх зөвлөгөө
үг цээжлэх зөвлөгөөүг цээжлэх зөвлөгөө
үг цээжлэх зөвлөгөө
 
англи хэлний авиа зүйн бүх дүрэм
англи хэлний авиа зүйн бүх дүрэмангли хэлний авиа зүйн бүх дүрэм
англи хэлний авиа зүйн бүх дүрэм
 

Similaire à Bd1 gantumur mon e 1

Mural Remote Z-Wave Plus Philio PSR04 Manual
Mural Remote Z-Wave Plus Philio PSR04 ManualMural Remote Z-Wave Plus Philio PSR04 Manual
Mural Remote Z-Wave Plus Philio PSR04 ManualDomotica daVinci
 
10 vat300 e_c4-1_rev_b
10 vat300 e_c4-1_rev_b10 vat300 e_c4-1_rev_b
10 vat300 e_c4-1_rev_bDien Ha The
 
honeywell-dc1000-dc1010-dc1030-dc1040-manual.pdf
honeywell-dc1000-dc1010-dc1030-dc1040-manual.pdfhoneywell-dc1000-dc1010-dc1030-dc1040-manual.pdf
honeywell-dc1000-dc1010-dc1030-dc1040-manual.pdfssuserbe139c
 
InfiRay Mini ML19 Thermal Helmet Mountable Monocular Instruction Manual - Opt...
InfiRay Mini ML19 Thermal Helmet Mountable Monocular Instruction Manual - Opt...InfiRay Mini ML19 Thermal Helmet Mountable Monocular Instruction Manual - Opt...
InfiRay Mini ML19 Thermal Helmet Mountable Monocular Instruction Manual - Opt...Optics-Trade
 
InfiRay Mini MH25 Instruction Manual - Optics Trade
InfiRay Mini MH25  Instruction Manual - Optics TradeInfiRay Mini MH25  Instruction Manual - Optics Trade
InfiRay Mini MH25 Instruction Manual - Optics TradeOptics-Trade
 
Wall Controller 4 Buttons rechargeable Remote Z-Wave Plus - Hank manual
Wall Controller	4 Buttons rechargeable Remote Z-Wave Plus - Hank manualWall Controller	4 Buttons rechargeable Remote Z-Wave Plus - Hank manual
Wall Controller 4 Buttons rechargeable Remote Z-Wave Plus - Hank manualDomotica daVinci
 
Tlk94 Controller
Tlk94 ControllerTlk94 Controller
Tlk94 ControllerJoseph
 
Wall controller 1 Button rechargeable Remote Z-Wave Plus - Hank Manual
Wall controller 1 Button rechargeable Remote Z-Wave Plus - Hank ManualWall controller 1 Button rechargeable Remote Z-Wave Plus - Hank Manual
Wall controller 1 Button rechargeable Remote Z-Wave Plus - Hank ManualDomotica daVinci
 
Ph psr03-zipato-z-wave-remote-user-manual
Ph psr03-zipato-z-wave-remote-user-manualPh psr03-zipato-z-wave-remote-user-manual
Ph psr03-zipato-z-wave-remote-user-manualDomotica daVinci
 
PLC applications .pdf
PLC applications .pdfPLC applications .pdf
PLC applications .pdfmohamedm56
 
PLC y Electroneumática: inversor de control vectorial
PLC y Electroneumática: inversor de control vectorialPLC y Electroneumática: inversor de control vectorial
PLC y Electroneumática: inversor de control vectorialSANTIAGO PABLO ALBERTO
 
Light sensor with lcd display user manual
Light sensor with lcd display user manualLight sensor with lcd display user manual
Light sensor with lcd display user manualDomotica daVinci
 
Instruction Manual | InfiRay CML25 | Optics Trade
Instruction Manual | InfiRay CML25 | Optics TradeInstruction Manual | InfiRay CML25 | Optics Trade
Instruction Manual | InfiRay CML25 | Optics TradeOptics-Trade
 

Similaire à Bd1 gantumur mon e 1 (20)

En moogii
En moogiiEn moogii
En moogii
 
Bd1 erdenejargal b 2
Bd1 erdenejargal b 2Bd1 erdenejargal b 2
Bd1 erdenejargal b 2
 
Mural Remote Z-Wave Plus Philio PSR04 Manual
Mural Remote Z-Wave Plus Philio PSR04 ManualMural Remote Z-Wave Plus Philio PSR04 Manual
Mural Remote Z-Wave Plus Philio PSR04 Manual
 
10 vat300 e_c4-1_rev_b
10 vat300 e_c4-1_rev_b10 vat300 e_c4-1_rev_b
10 vat300 e_c4-1_rev_b
 
honeywell-dc1000-dc1010-dc1030-dc1040-manual.pdf
honeywell-dc1000-dc1010-dc1030-dc1040-manual.pdfhoneywell-dc1000-dc1010-dc1030-dc1040-manual.pdf
honeywell-dc1000-dc1010-dc1030-dc1040-manual.pdf
 
InfiRay Mini ML19 Thermal Helmet Mountable Monocular Instruction Manual - Opt...
InfiRay Mini ML19 Thermal Helmet Mountable Monocular Instruction Manual - Opt...InfiRay Mini ML19 Thermal Helmet Mountable Monocular Instruction Manual - Opt...
InfiRay Mini ML19 Thermal Helmet Mountable Monocular Instruction Manual - Opt...
 
InfiRay Mini MH25 Instruction Manual - Optics Trade
InfiRay Mini MH25  Instruction Manual - Optics TradeInfiRay Mini MH25  Instruction Manual - Optics Trade
InfiRay Mini MH25 Instruction Manual - Optics Trade
 
Wall Controller 4 Buttons rechargeable Remote Z-Wave Plus - Hank manual
Wall Controller	4 Buttons rechargeable Remote Z-Wave Plus - Hank manualWall Controller	4 Buttons rechargeable Remote Z-Wave Plus - Hank manual
Wall Controller 4 Buttons rechargeable Remote Z-Wave Plus - Hank manual
 
Tlk94 Controller
Tlk94 ControllerTlk94 Controller
Tlk94 Controller
 
Wall controller 1 Button rechargeable Remote Z-Wave Plus - Hank Manual
Wall controller 1 Button rechargeable Remote Z-Wave Plus - Hank ManualWall controller 1 Button rechargeable Remote Z-Wave Plus - Hank Manual
Wall controller 1 Button rechargeable Remote Z-Wave Plus - Hank Manual
 
Ph psr03-zipato-z-wave-remote-user-manual
Ph psr03-zipato-z-wave-remote-user-manualPh psr03-zipato-z-wave-remote-user-manual
Ph psr03-zipato-z-wave-remote-user-manual
 
Erbe icc-80-50-icc-service-manual
Erbe icc-80-50-icc-service-manualErbe icc-80-50-icc-service-manual
Erbe icc-80-50-icc-service-manual
 
PLC applications .pdf
PLC applications .pdfPLC applications .pdf
PLC applications .pdf
 
PLC y Electroneumática: inversor de control vectorial
PLC y Electroneumática: inversor de control vectorialPLC y Electroneumática: inversor de control vectorial
PLC y Electroneumática: inversor de control vectorial
 
Li354 plc lab 0
Li354 plc lab 0Li354 plc lab 0
Li354 plc lab 0
 
Li354 plc lab 0
Li354 plc lab 0Li354 plc lab 0
Li354 plc lab 0
 
Light sensor with lcd display user manual
Light sensor with lcd display user manualLight sensor with lcd display user manual
Light sensor with lcd display user manual
 
Instruction Manual | InfiRay CML25 | Optics Trade
Instruction Manual | InfiRay CML25 | Optics TradeInstruction Manual | InfiRay CML25 | Optics Trade
Instruction Manual | InfiRay CML25 | Optics Trade
 
Mobile radios
Mobile radiosMobile radios
Mobile radios
 
Philio_pan04_User manual
Philio_pan04_User manualPhilio_pan04_User manual
Philio_pan04_User manual
 

Plus de Enhmandah Hemeelee (20)

Lab 02
Lab 02Lab 02
Lab 02
 
Bd 01
Bd 01Bd 01
Bd 01
 
Semenar 02
Semenar 02Semenar 02
Semenar 02
 
Li354 plc lects 2011a
Li354  plc lects 2011aLi354  plc lects 2011a
Li354 plc lects 2011a
 
111 120
111 120111 120
111 120
 
101 110
101 110101 110
101 110
 
91 100
91 10091 100
91 100
 
81 90
81 9081 90
81 90
 
61 70
61 7061 70
61 70
 
51 60
51 6051 60
51 60
 
41 50
41 5041 50
41 50
 
31 40
31 4031 40
31 40
 
21 30
21 3021 30
21 30
 
11 20
11 2011 20
11 20
 
1 10
1 101 10
1 10
 
1 10
1 101 10
1 10
 
Bd1 munkhbayar
Bd1 munkhbayarBd1 munkhbayar
Bd1 munkhbayar
 
Bd1 gantumur eng e 1
Bd1 gantumur eng e 1Bd1 gantumur eng e 1
Bd1 gantumur eng e 1
 
Orchuulga
OrchuulgaOrchuulga
Orchuulga
 
бие даалт 1,2 бат өлзий
бие даалт 1,2  бат өлзийбие даалт 1,2  бат өлзий
бие даалт 1,2 бат өлзий
 

Dernier

Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfOrbitshub
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobeapidays
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingEdi Saputra
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelDeepika Singh
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...DianaGray10
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Orbitshub
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024The Digital Insurer
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDropbox
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesrafiqahmad00786416
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century educationjfdjdjcjdnsjd
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...apidays
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Victor Rentea
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdfSandro Moreira
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyKhushali Kathiriya
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Zilliz
 

Dernier (20)

Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 

Bd1 gantumur mon e 1

  • 1. Лаборатори Е-1 Pushbutton Signal Chapter 1 Control Specification and Programming. Ch-1. Control Objective Switch the traffic light signals in response to a pushbitton. Control Specifications The following operation should be performed in this unit. Study the required specifications and then create the program and confirm the operetion. 1. The signal lamp Red (Y0) flickers at one-second interval (ON for 1 second and OFF for 1second). 2. When the pushbutton (X10) on the operation panel is pressed, the indicator (Y10) on the operation panel is lit. If the pushbutton (X10) is released, the indicator (Y10) remains lit. 3. After the indicator (Y10) is lit for 5 second, the operation of the signal is changed as described in 4) to 7). 4. First, the signal lamp Red (Y0) flickers for 5 seconds while indicator (Y10) is lit. 5. The signal lamp Red (Y0) turns off. The signal lamp Yellow (Y1) is lit for 5 seconds. 6. After the lamp Yellow (Y1) is extinguished, signal lamp Green (Y2) is lit for 10 seconds. 7. After the signal lamp Green (Y2) turns OFF, the signal lamp Red (Y0) flickers at one-second interval (ON for 1 second and OFF for 1 second). The operations starting from 1) are repeated.
  • 2. Pushbutton Signal Chapter 2 Tips for Writing the Program. Ch-2 CAUTION Click the ladder programm area to enable operation. The title bar will turn blue. Key operation are not enabled when the title bar and meny items are grayed out. 1. Click the (Edit Ladder) button on the remote control. 2. Input a program. 3. Press the (F4) key to convert the program. 4. Select "Online" - "Write to PLC" in the ladder program area to write the program to the PLC.
  • 3. Pushbutton Signal Chapter 3 Tips for Program Confirmation. Ch-3 1. Initial operation confirmation. Result = Red (Y0) flickers at one-second intervals (ON for 1 second and OFF for 1 second). 2. Button operation confirmation. Result = When the pushbutton is pressed, the indicator displays (Please wait) (Y10) for 5 seconds and Red (Y0) flickers. 3. Operation after (Please wait) (Y10) is extinguished. Result = Yellow (Y1) is lit for 5 seconds. 4. Operation after Yellow (Y1) is extinguished Result = Green (Y2) is lit for 10 seconds. 5. Operation after Green (Y2) is extinguished Result = REd (Y0) flickers at one-second intervals (ON for 1 second and OFF for 1 second). In order to repeat operation checks, the screen should be initialized by clicking the (Reset) button on the remote control.