ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
The country’s statutory framework requiring Environmental
Impact Assessment (EIA) for all projects that will affect
environmental quality is embodied in Presidential Decree
(PD) 1151 of 1977.
The Philippine Environmental Impact Statement System
(PEISS) established through Presidential Decree 1586 in
1978 sets a systematic EIA System to ensure that the Filipino
people will enjoy a “balanced and healthy ecology” in the
midst of intensive economic development.
The PEISS takes its roots in the provisions of the Philippine
Constitution which states that “The State shall protect and
advance the right of the people to a balanced and healthful
ecology in accord with the rhythm and harmony of nature”.
It requires Environmental Impact Statements (EIS – a Report
on the EIA Results) to be submitted to the National
Environmental Protection Council (NEPC), now the
Environmental Management Bureau (EMB) of the
Department of Environment and Natural Resources (DENR)
for review and evaluation.
It further stipulates that the President or his duly authorized
representative issues the Environmental Compliance
Certificate (ECC) for a positive review of the EIA Report
for Environmentally Critical Projects (ECP) and projects
within Environmentally Critical Areas (ECA).
Administrative Order No. 42 specifies that the DENR
Secretary, as alter ego of the President, has the power to
grant or deny ECCs on behalf of the President and further
designates the Environmental Management Bureau (EMB)
Central and Regional Directors as approving authorities for
ECC applications.
What is EIA?
• Environmental Impact Assessment (EIA)
represents both a process and a set of
information.
• It is normally undertaken in compliance with
environmental laws to determine the
environmental effects of a proposed action prior
to its implementation.
• It is a management tool to arrive at the right
decisions and not as a means to justify
predetermined notions.
How to come up with the right decisions?
Resource managers need to know…
• Environmental impact of the projects;
• Possible costs on environmental resources
• The risk of causing irreversible changes.
EIA provides the answers by
• describing the proposed action and alternatives;
• predicting the nature and magnitude of likely
environmental changes;
• identifying the relevant human concerns;
• defining to be used in measuring the significance of
environmental changes;
• Including relative weighing given to different
changes;
• Estimating the significance of predicted
environmental changes;
• Recommending acceptance or rejection of the
project;
• Recommending inspection procedures to be
followed after the action is completed.
OVERVIEW: PHILIPPINE EIA SYSTEM
An Environmental Impact Assessment (EIA) is a
"process that involves predicting and evaluating the
likely impacts of a project (including cumulative
impacts) on the environment during
construction, commissioning, operation and
abandonment.
In the country, the Philippine Environmental Impact
Statement System (PEISS) established through
Presidential Decree (PD) 1586 in 1978 sets a
systematic EIA System and the Environmental
Management Bureau (EMB) of the Department of
Environment and Natural Resources (DENR) is
mandated as the lead agency in the implementation
of the System.
As a basic principle, the Philippine EIA System is used
to enhance planning and guide decision making.
Through the EIA process, adverse environmental
impacts of proposed actions are intended to be
considerably reduced through the subsequent
formulation of appropriate Environmental
Management and Monitoring Plans.
A positive review of the EIA Report results to the
issuance of an Environmental Compliance
Commitment (ECC) document to be conformed to by
the Proponent and represents the
project/program’s Environmental Compliance
Certificate .
The issuance of the ECC which is required
for Environmentally Critical Projects (ECPs) and
projects within Environmentally Critical Areas (ECAs)
allows the project to proceed to the next stage of
project planning which is the acquisition of approvals
from other government agencies and LGUs, after
which the project can start implementation.
THE EIA PROCESS IN RELATION TO ENFORCEMENT
OF OTHER LAWS
The PEISS is supplementary and complementary to other
existing environmental laws.
As early as the project's Feasibility Study (FS) stage, the
EIA process identifies the likely issues or impacts that
may be covered later by regional environmental permits
and other regulatory bodies' permitting requirements.
In addition, where there are yet no standards or where
there is a lack of explicit definitions in existing laws, the
EIA process fills in the gap and provides appropriate
cover for environmental protection and enhancement-
related actions.
For example, the planting of greenbelts is not a
requirement under any environmental law but is
included in the ECC as a contractual obligation and
commitment of the project proponent to the DENR.
Environmental Management Bureau (EMB) of the DENR
is the lead agency tasked to coordinate the
implementation of the EIA system in the country and
recommends the issuance of ECC for environmentally
critical projects.
Two Types of Documents may be required in the EIA
Process:
1. Project Description (PD)
2. Environmental Impact Statement (EIS)
Project Description (PD) – is essentially a brief
description of the proposed undertaking and the
required resources. This is required if the project is
non-critical but is to be located in an environmentally
critical area.
Environmentally Impact Statement (EIS) – is a detailed
and in-depth analysis of the environmental
consequence of a particular project.
Generally, the Philippine EIA process, is composed of the
following steps:
1. Any project proponent should initially determine
whether the project falls within the EIS system.
2. If the project falls within the EIA system, either the
PD or the EIS is submitted to the relevant DENR
Regional Office or the EMB.
3. The EIA Group of either the EMB or the DENR
Regional Office, with the assistance of the EIA Review
Committee, conducts evaluation of the submitted
documents and recommends one of the following
actions:
a. Issuance of an ECC with the necessary stipulations,
b. Requirement of additional information from the
project proponent,
c. Denial of the ECC
d. The additional information from the proponents, if
any, will be reviewed and evaluated, and a visual
inspection of the project site may be conducted
before the ECC is granted.
e. A public hearing may be held for certain projects, in
accordance with set criteria involving magnitude and
controversy.
THE EIA STAGES
Guidelines for Reviewing EIA Report
1. Documentation aspect which pertains to the physical
acceptance, contents, and format of the report.
2. Substantive aspect which pertains to the accuracy of
data and integrity of the information presented in the
report.
3. Assessment aspect which pertains to the quality of
the analysis of impacts.
Description or Category of Enterprise, Construction or
Development which require Environmental Impact Assessment
Industrial projects
* power generation plants
* electrical transmission lines and substations 115 KV or
greater
* chemical manufacturing plants
* wood pulp and paper processing
* paint manufacture
* petroleum refinery
* food processing large scale
* fish and meat processing, large scale
* tanneries
* electroplating/metal planting
* ferrous and non-ferrous metal processing
* mining and mineral processing
- bauxite
- peat
- sand, minerals
* detergent manufacture
* distillery
* cement and lime production
* textile manufacture
* pesticide or other hazardous or toxic substances
manufacture
Development projects
* subdivisions of 10 or more lots
* housing projects of 10 houses or more
* highway and road construction or remodelling
* railway lines
* hotel/resort complex of 12 rooms or more
* airports including runway expansion greater than 20%
* harbour and port including dredging
* office complex >5000 sq. metres
* pipelines and conveyors >15 cm including
underground cables, gas line
* construction of new highways, arterial roads and
major road improvement
* river basin development projects
Other projects
* cemeteries and crematoriums
* solid waste treatment and disposal facility including
agricultural waste
* water treatment facilities (water supply, desalination
plants sewage and industrial waste water)
* hazardous waste storage, treatment and disposal
facilities
EIA

Contenu connexe

Tendances

Ra 9729 Climate Change Act of 2009
Ra 9729 Climate Change Act of 2009Ra 9729 Climate Change Act of 2009
Ra 9729 Climate Change Act of 2009Milka Pioli
 
Philippines national-climate-change-action-plan
Philippines national-climate-change-action-planPhilippines national-climate-change-action-plan
Philippines national-climate-change-action-planNAP Global Network
 
Environmental Laws PD 1586
Environmental Laws PD 1586Environmental Laws PD 1586
Environmental Laws PD 1586Ramses Bato
 
Ecological Solid Waste Management Act of 2000(RA 9003 )
Ecological Solid Waste Management Act of 2000(RA 9003 )Ecological Solid Waste Management Act of 2000(RA 9003 )
Ecological Solid Waste Management Act of 2000(RA 9003 )Jan Del Rosario
 
Solid waste management
Solid waste managementSolid waste management
Solid waste managementArnel Rivera
 
Republic act no. 9003(Ecological Solid Waste Management act of 2000)
Republic act no. 9003(Ecological Solid Waste Management act of 2000)Republic act no. 9003(Ecological Solid Waste Management act of 2000)
Republic act no. 9003(Ecological Solid Waste Management act of 2000)John Rudy Buraga
 
APPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCE
APPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCEAPPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCE
APPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCEzubeditufail
 
Water Code of the Philippines
Water Code of the PhilippinesWater Code of the Philippines
Water Code of the Philippinesharoldtaylor1113
 
Environmental presidential decrees
Environmental presidential decreesEnvironmental presidential decrees
Environmental presidential decreesAlvin Almo
 
Philippine laws in Protecting Environtment
Philippine laws in Protecting EnvirontmentPhilippine laws in Protecting Environtment
Philippine laws in Protecting EnvirontmentElly Brent Baldovino
 
Baseline study for EIA
Baseline study for EIABaseline study for EIA
Baseline study for EIAJenson Samraj
 
ENVIRONMENTAL IMPACTS ASSESMENT (EIA)
ENVIRONMENTAL  IMPACTS ASSESMENT (EIA)ENVIRONMENTAL  IMPACTS ASSESMENT (EIA)
ENVIRONMENTAL IMPACTS ASSESMENT (EIA)Lucasrukona
 
Environmental impact assessment (eia)
Environmental impact assessment (eia)Environmental impact assessment (eia)
Environmental impact assessment (eia)SANDEEP PATRE
 
Socio economic impacts
Socio economic impactsSocio economic impacts
Socio economic impactsArvind Kumar
 
E2.KEY_ELEMENTS_OF_EIA_PROCESS-1
E2.KEY_ELEMENTS_OF_EIA_PROCESS-1E2.KEY_ELEMENTS_OF_EIA_PROCESS-1
E2.KEY_ELEMENTS_OF_EIA_PROCESS-1hirencd
 

Tendances (20)

Ra 9729 Climate Change Act of 2009
Ra 9729 Climate Change Act of 2009Ra 9729 Climate Change Act of 2009
Ra 9729 Climate Change Act of 2009
 
Philippines national-climate-change-action-plan
Philippines national-climate-change-action-planPhilippines national-climate-change-action-plan
Philippines national-climate-change-action-plan
 
Environmental Laws PD 1586
Environmental Laws PD 1586Environmental Laws PD 1586
Environmental Laws PD 1586
 
Ecological Solid Waste Management Act of 2000(RA 9003 )
Ecological Solid Waste Management Act of 2000(RA 9003 )Ecological Solid Waste Management Act of 2000(RA 9003 )
Ecological Solid Waste Management Act of 2000(RA 9003 )
 
Solid waste management
Solid waste managementSolid waste management
Solid waste management
 
Comprehensive Land Use Planning
Comprehensive Land Use Planning Comprehensive Land Use Planning
Comprehensive Land Use Planning
 
Republic act no. 9003(Ecological Solid Waste Management act of 2000)
Republic act no. 9003(Ecological Solid Waste Management act of 2000)Republic act no. 9003(Ecological Solid Waste Management act of 2000)
Republic act no. 9003(Ecological Solid Waste Management act of 2000)
 
APPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCE
APPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCEAPPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCE
APPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCE
 
Water Code of the Philippines
Water Code of the PhilippinesWater Code of the Philippines
Water Code of the Philippines
 
Environmental presidential decrees
Environmental presidential decreesEnvironmental presidential decrees
Environmental presidential decrees
 
Philippine laws in Protecting Environtment
Philippine laws in Protecting EnvirontmentPhilippine laws in Protecting Environtment
Philippine laws in Protecting Environtment
 
Baseline study for EIA
Baseline study for EIABaseline study for EIA
Baseline study for EIA
 
Land use planning in the philippines
Land use planning in the philippinesLand use planning in the philippines
Land use planning in the philippines
 
Presentation on ra 8749
Presentation on ra 8749Presentation on ra 8749
Presentation on ra 8749
 
Biodiversity laws r.a 9147
Biodiversity laws r.a 9147 Biodiversity laws r.a 9147
Biodiversity laws r.a 9147
 
ENVIRONMENTAL IMPACTS ASSESMENT (EIA)
ENVIRONMENTAL  IMPACTS ASSESMENT (EIA)ENVIRONMENTAL  IMPACTS ASSESMENT (EIA)
ENVIRONMENTAL IMPACTS ASSESMENT (EIA)
 
Ecological Sold Waste Management
Ecological Sold Waste ManagementEcological Sold Waste Management
Ecological Sold Waste Management
 
Environmental impact assessment (eia)
Environmental impact assessment (eia)Environmental impact assessment (eia)
Environmental impact assessment (eia)
 
Socio economic impacts
Socio economic impactsSocio economic impacts
Socio economic impacts
 
E2.KEY_ELEMENTS_OF_EIA_PROCESS-1
E2.KEY_ELEMENTS_OF_EIA_PROCESS-1E2.KEY_ELEMENTS_OF_EIA_PROCESS-1
E2.KEY_ELEMENTS_OF_EIA_PROCESS-1
 

En vedette

Environmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit IIIEnvironmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit IIIGAURAV. H .TANDON
 
Protected areas ph eng sp1
Protected areas ph eng sp1Protected areas ph eng sp1
Protected areas ph eng sp1meigantty
 
Dec08 Climate Change Presentation
Dec08 Climate Change PresentationDec08 Climate Change Presentation
Dec08 Climate Change Presentationdempsek
 
Ecology - Environmental Problems
Ecology - Environmental ProblemsEcology - Environmental Problems
Ecology - Environmental ProblemsLemuel Sayao
 
Ecosystem impact and planning
Ecosystem impact and planningEcosystem impact and planning
Ecosystem impact and planningjonalyn shenton
 
Lecture-4 Sampling
Lecture-4 SamplingLecture-4 Sampling
Lecture-4 SamplingShankor Paul
 
Teachers practices promoting students engagement in english classrooms
Teachers practices promoting students engagement in english classroomsTeachers practices promoting students engagement in english classrooms
Teachers practices promoting students engagement in english classroomsFatema Mili
 
Barrister raihan khalid laws regulating eia in bangladesh
Barrister raihan khalid  laws regulating eia in bangladeshBarrister raihan khalid  laws regulating eia in bangladesh
Barrister raihan khalid laws regulating eia in bangladeshbd7273
 
Climate Change Science Compendium 2009
Climate Change Science Compendium 2009Climate Change Science Compendium 2009
Climate Change Science Compendium 2009Glenn Klith Andersen
 
Lecture-5 Environmental KM
Lecture-5 Environmental KMLecture-5 Environmental KM
Lecture-5 Environmental KMShankor Paul
 
Lecture-1 Understanding of Environmental Policy
Lecture-1 Understanding of Environmental PolicyLecture-1 Understanding of Environmental Policy
Lecture-1 Understanding of Environmental PolicyShankor Paul
 
Lecture-3 The Challenges of Environmental polluion and Enforcement of laws
Lecture-3 The Challenges of Environmental polluion and Enforcement of lawsLecture-3 The Challenges of Environmental polluion and Enforcement of laws
Lecture-3 The Challenges of Environmental polluion and Enforcement of lawsShankor Paul
 

En vedette (20)

Environmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit IIIEnvironmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit III
 
Environmental impact assessment (EIA)
Environmental impact assessment (EIA)Environmental impact assessment (EIA)
Environmental impact assessment (EIA)
 
Protected areas ph eng sp1
Protected areas ph eng sp1Protected areas ph eng sp1
Protected areas ph eng sp1
 
Eia
EiaEia
Eia
 
Dec08 Climate Change Presentation
Dec08 Climate Change PresentationDec08 Climate Change Presentation
Dec08 Climate Change Presentation
 
Ecology - Environmental Problems
Ecology - Environmental ProblemsEcology - Environmental Problems
Ecology - Environmental Problems
 
Ecosystem impact and planning
Ecosystem impact and planningEcosystem impact and planning
Ecosystem impact and planning
 
Lecture-4 Sampling
Lecture-4 SamplingLecture-4 Sampling
Lecture-4 Sampling
 
Teachers practices promoting students engagement in english classrooms
Teachers practices promoting students engagement in english classroomsTeachers practices promoting students engagement in english classrooms
Teachers practices promoting students engagement in english classrooms
 
Barrister raihan khalid laws regulating eia in bangladesh
Barrister raihan khalid  laws regulating eia in bangladeshBarrister raihan khalid  laws regulating eia in bangladesh
Barrister raihan khalid laws regulating eia in bangladesh
 
Climate Change Science Compendium 2009
Climate Change Science Compendium 2009Climate Change Science Compendium 2009
Climate Change Science Compendium 2009
 
Lecture-5 Environmental KM
Lecture-5 Environmental KMLecture-5 Environmental KM
Lecture-5 Environmental KM
 
DENR Strategic Planning
DENR Strategic PlanningDENR Strategic Planning
DENR Strategic Planning
 
Denr permits preparer
Denr permits preparerDenr permits preparer
Denr permits preparer
 
ECC Denial Tampakan Copper Gold Project
ECC Denial Tampakan Copper Gold ProjectECC Denial Tampakan Copper Gold Project
ECC Denial Tampakan Copper Gold Project
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
Lecture-1 Understanding of Environmental Policy
Lecture-1 Understanding of Environmental PolicyLecture-1 Understanding of Environmental Policy
Lecture-1 Understanding of Environmental Policy
 
Philippine Re Law Of 2008
Philippine Re Law Of 2008Philippine Re Law Of 2008
Philippine Re Law Of 2008
 
Ppt 1
Ppt 1Ppt 1
Ppt 1
 
Lecture-3 The Challenges of Environmental polluion and Enforcement of laws
Lecture-3 The Challenges of Environmental polluion and Enforcement of lawsLecture-3 The Challenges of Environmental polluion and Enforcement of laws
Lecture-3 The Challenges of Environmental polluion and Enforcement of laws
 

Similaire à EIA

Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdf
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdfBeige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdf
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdfHajiraThabasum
 
Environmental impact assessment 2020
Environmental impact assessment 2020Environmental impact assessment 2020
Environmental impact assessment 2020Chandrakant Singh
 
manunath1-copy-170405123133 (1).pdf
manunath1-copy-170405123133 (1).pdfmanunath1-copy-170405123133 (1).pdf
manunath1-copy-170405123133 (1).pdfChandanLawrence
 
environmental impact assessment
environmental impact assessment environmental impact assessment
environmental impact assessment Pramoda Raj
 
EIA and Environmental Permit: Tools for Sustainable Tropical Peatland Manage...
EIA and  Environmental Permit: Tools for Sustainable Tropical Peatland Manage...EIA and  Environmental Permit: Tools for Sustainable Tropical Peatland Manage...
EIA and Environmental Permit: Tools for Sustainable Tropical Peatland Manage...CIFOR-ICRAF
 
Environmental Audits
Environmental AuditsEnvironmental Audits
Environmental AuditsYajush Sonar
 
All you need to know about Environmental Clearance.pdf
All you need to know about Environmental Clearance.pdfAll you need to know about Environmental Clearance.pdf
All you need to know about Environmental Clearance.pdfJagriti Agarwal
 
Environmental impact assessment(EIA) For Thermal Power Plants.docx.pdf
Environmental impact assessment(EIA) For Thermal Power Plants.docx.pdfEnvironmental impact assessment(EIA) For Thermal Power Plants.docx.pdf
Environmental impact assessment(EIA) For Thermal Power Plants.docx.pdfJagriti Agarwal
 
Environmental impact assessment(EIA) For Thermal Power Plants.pdf
Environmental impact assessment(EIA) For Thermal Power Plants.pdfEnvironmental impact assessment(EIA) For Thermal Power Plants.pdf
Environmental impact assessment(EIA) For Thermal Power Plants.pdfJagriti Agarwal
 
What is an Environmental Clearance Certificate and How to Obtain It.pdf
What is an Environmental Clearance Certificate and How to Obtain It.pdfWhat is an Environmental Clearance Certificate and How to Obtain It.pdf
What is an Environmental Clearance Certificate and How to Obtain It.pdfPranshuSharma18498
 
Environmental Management Process-david leung
Environmental Management Process-david leungEnvironmental Management Process-david leung
Environmental Management Process-david leungicablearning
 
January 8th esp 179 lecture- class intro and eia basics
January 8th  esp 179 lecture- class intro and eia basicsJanuary 8th  esp 179 lecture- class intro and eia basics
January 8th esp 179 lecture- class intro and eia basicsCEQAplanner
 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessmentPramoda Raj
 
RPN 2022 Manila: Session 3.7 Kathleen Mangune NEDA Philippines.pdf
RPN 2022 Manila: Session 3.7 Kathleen Mangune NEDA Philippines.pdfRPN 2022 Manila: Session 3.7 Kathleen Mangune NEDA Philippines.pdf
RPN 2022 Manila: Session 3.7 Kathleen Mangune NEDA Philippines.pdfOECD Environment
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentSonikaPawar
 

Similaire à EIA (20)

Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdf
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdfBeige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdf
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdf
 
Eia regulations
Eia regulationsEia regulations
Eia regulations
 
Environmental impact assessment 2020
Environmental impact assessment 2020Environmental impact assessment 2020
Environmental impact assessment 2020
 
manunath1-copy-170405123133 (1).pdf
manunath1-copy-170405123133 (1).pdfmanunath1-copy-170405123133 (1).pdf
manunath1-copy-170405123133 (1).pdf
 
environmental impact assessment
environmental impact assessment environmental impact assessment
environmental impact assessment
 
EIA PPT.pptx
EIA PPT.pptxEIA PPT.pptx
EIA PPT.pptx
 
EIA PPT.pdf
EIA PPT.pdfEIA PPT.pdf
EIA PPT.pdf
 
EIA and Environmental Permit: Tools for Sustainable Tropical Peatland Manage...
EIA and  Environmental Permit: Tools for Sustainable Tropical Peatland Manage...EIA and  Environmental Permit: Tools for Sustainable Tropical Peatland Manage...
EIA and Environmental Permit: Tools for Sustainable Tropical Peatland Manage...
 
Environmental Audits
Environmental AuditsEnvironmental Audits
Environmental Audits
 
Environmental management
Environmental managementEnvironmental management
Environmental management
 
All you need to know about Environmental Clearance.pdf
All you need to know about Environmental Clearance.pdfAll you need to know about Environmental Clearance.pdf
All you need to know about Environmental Clearance.pdf
 
Environmental impact assessment(EIA) For Thermal Power Plants.docx.pdf
Environmental impact assessment(EIA) For Thermal Power Plants.docx.pdfEnvironmental impact assessment(EIA) For Thermal Power Plants.docx.pdf
Environmental impact assessment(EIA) For Thermal Power Plants.docx.pdf
 
Environmental impact assessment(EIA) For Thermal Power Plants.pdf
Environmental impact assessment(EIA) For Thermal Power Plants.pdfEnvironmental impact assessment(EIA) For Thermal Power Plants.pdf
Environmental impact assessment(EIA) For Thermal Power Plants.pdf
 
What is an Environmental Clearance Certificate and How to Obtain It.pdf
What is an Environmental Clearance Certificate and How to Obtain It.pdfWhat is an Environmental Clearance Certificate and How to Obtain It.pdf
What is an Environmental Clearance Certificate and How to Obtain It.pdf
 
Environmental Management Process-david leung
Environmental Management Process-david leungEnvironmental Management Process-david leung
Environmental Management Process-david leung
 
What is eia
What is eiaWhat is eia
What is eia
 
January 8th esp 179 lecture- class intro and eia basics
January 8th  esp 179 lecture- class intro and eia basicsJanuary 8th  esp 179 lecture- class intro and eia basics
January 8th esp 179 lecture- class intro and eia basics
 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessment
 
RPN 2022 Manila: Session 3.7 Kathleen Mangune NEDA Philippines.pdf
RPN 2022 Manila: Session 3.7 Kathleen Mangune NEDA Philippines.pdfRPN 2022 Manila: Session 3.7 Kathleen Mangune NEDA Philippines.pdf
RPN 2022 Manila: Session 3.7 Kathleen Mangune NEDA Philippines.pdf
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 

Dernier

HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
Science 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxScience 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxMaryGraceBautista27
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Jisc
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfphamnguyenenglishnb
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptxSherlyMaeNeri
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSJoshuaGantuangco2
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 

Dernier (20)

HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
Science 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxScience 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptx
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Raw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptxRaw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptx
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptx
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 

EIA

  • 1.
  • 2.
  • 3. ENVIRONMENTAL IMPACT ASSESSMENT (EIA) The country’s statutory framework requiring Environmental Impact Assessment (EIA) for all projects that will affect environmental quality is embodied in Presidential Decree (PD) 1151 of 1977. The Philippine Environmental Impact Statement System (PEISS) established through Presidential Decree 1586 in 1978 sets a systematic EIA System to ensure that the Filipino people will enjoy a “balanced and healthy ecology” in the midst of intensive economic development.
  • 4. The PEISS takes its roots in the provisions of the Philippine Constitution which states that “The State shall protect and advance the right of the people to a balanced and healthful ecology in accord with the rhythm and harmony of nature”. It requires Environmental Impact Statements (EIS – a Report on the EIA Results) to be submitted to the National Environmental Protection Council (NEPC), now the Environmental Management Bureau (EMB) of the Department of Environment and Natural Resources (DENR) for review and evaluation.
  • 5. It further stipulates that the President or his duly authorized representative issues the Environmental Compliance Certificate (ECC) for a positive review of the EIA Report for Environmentally Critical Projects (ECP) and projects within Environmentally Critical Areas (ECA). Administrative Order No. 42 specifies that the DENR Secretary, as alter ego of the President, has the power to grant or deny ECCs on behalf of the President and further designates the Environmental Management Bureau (EMB) Central and Regional Directors as approving authorities for ECC applications.
  • 6. What is EIA? • Environmental Impact Assessment (EIA) represents both a process and a set of information. • It is normally undertaken in compliance with environmental laws to determine the environmental effects of a proposed action prior to its implementation. • It is a management tool to arrive at the right decisions and not as a means to justify predetermined notions.
  • 7. How to come up with the right decisions? Resource managers need to know… • Environmental impact of the projects; • Possible costs on environmental resources • The risk of causing irreversible changes. EIA provides the answers by • describing the proposed action and alternatives; • predicting the nature and magnitude of likely environmental changes; • identifying the relevant human concerns;
  • 8. • defining to be used in measuring the significance of environmental changes; • Including relative weighing given to different changes; • Estimating the significance of predicted environmental changes; • Recommending acceptance or rejection of the project; • Recommending inspection procedures to be followed after the action is completed.
  • 9. OVERVIEW: PHILIPPINE EIA SYSTEM An Environmental Impact Assessment (EIA) is a "process that involves predicting and evaluating the likely impacts of a project (including cumulative impacts) on the environment during construction, commissioning, operation and abandonment.
  • 10. In the country, the Philippine Environmental Impact Statement System (PEISS) established through Presidential Decree (PD) 1586 in 1978 sets a systematic EIA System and the Environmental Management Bureau (EMB) of the Department of Environment and Natural Resources (DENR) is mandated as the lead agency in the implementation of the System.
  • 11. As a basic principle, the Philippine EIA System is used to enhance planning and guide decision making. Through the EIA process, adverse environmental impacts of proposed actions are intended to be considerably reduced through the subsequent formulation of appropriate Environmental Management and Monitoring Plans.
  • 12. A positive review of the EIA Report results to the issuance of an Environmental Compliance Commitment (ECC) document to be conformed to by the Proponent and represents the project/program’s Environmental Compliance Certificate .
  • 13. The issuance of the ECC which is required for Environmentally Critical Projects (ECPs) and projects within Environmentally Critical Areas (ECAs) allows the project to proceed to the next stage of project planning which is the acquisition of approvals from other government agencies and LGUs, after which the project can start implementation.
  • 14. THE EIA PROCESS IN RELATION TO ENFORCEMENT OF OTHER LAWS The PEISS is supplementary and complementary to other existing environmental laws. As early as the project's Feasibility Study (FS) stage, the EIA process identifies the likely issues or impacts that may be covered later by regional environmental permits and other regulatory bodies' permitting requirements.
  • 15. In addition, where there are yet no standards or where there is a lack of explicit definitions in existing laws, the EIA process fills in the gap and provides appropriate cover for environmental protection and enhancement- related actions. For example, the planting of greenbelts is not a requirement under any environmental law but is included in the ECC as a contractual obligation and commitment of the project proponent to the DENR.
  • 16.
  • 17.
  • 18. Environmental Management Bureau (EMB) of the DENR is the lead agency tasked to coordinate the implementation of the EIA system in the country and recommends the issuance of ECC for environmentally critical projects. Two Types of Documents may be required in the EIA Process: 1. Project Description (PD) 2. Environmental Impact Statement (EIS)
  • 19. Project Description (PD) – is essentially a brief description of the proposed undertaking and the required resources. This is required if the project is non-critical but is to be located in an environmentally critical area. Environmentally Impact Statement (EIS) – is a detailed and in-depth analysis of the environmental consequence of a particular project.
  • 20. Generally, the Philippine EIA process, is composed of the following steps: 1. Any project proponent should initially determine whether the project falls within the EIS system. 2. If the project falls within the EIA system, either the PD or the EIS is submitted to the relevant DENR Regional Office or the EMB. 3. The EIA Group of either the EMB or the DENR Regional Office, with the assistance of the EIA Review Committee, conducts evaluation of the submitted documents and recommends one of the following actions:
  • 21. a. Issuance of an ECC with the necessary stipulations, b. Requirement of additional information from the project proponent, c. Denial of the ECC d. The additional information from the proponents, if any, will be reviewed and evaluated, and a visual inspection of the project site may be conducted before the ECC is granted. e. A public hearing may be held for certain projects, in accordance with set criteria involving magnitude and controversy.
  • 23.
  • 24.
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30. Guidelines for Reviewing EIA Report 1. Documentation aspect which pertains to the physical acceptance, contents, and format of the report. 2. Substantive aspect which pertains to the accuracy of data and integrity of the information presented in the report. 3. Assessment aspect which pertains to the quality of the analysis of impacts.
  • 31. Description or Category of Enterprise, Construction or Development which require Environmental Impact Assessment Industrial projects * power generation plants * electrical transmission lines and substations 115 KV or greater * chemical manufacturing plants * wood pulp and paper processing * paint manufacture * petroleum refinery * food processing large scale * fish and meat processing, large scale
  • 32. * tanneries * electroplating/metal planting * ferrous and non-ferrous metal processing * mining and mineral processing - bauxite - peat - sand, minerals * detergent manufacture * distillery * cement and lime production * textile manufacture * pesticide or other hazardous or toxic substances manufacture
  • 33. Development projects * subdivisions of 10 or more lots * housing projects of 10 houses or more * highway and road construction or remodelling * railway lines * hotel/resort complex of 12 rooms or more * airports including runway expansion greater than 20% * harbour and port including dredging * office complex >5000 sq. metres * pipelines and conveyors >15 cm including underground cables, gas line * construction of new highways, arterial roads and major road improvement
  • 34. * river basin development projects Other projects * cemeteries and crematoriums * solid waste treatment and disposal facility including agricultural waste * water treatment facilities (water supply, desalination plants sewage and industrial waste water) * hazardous waste storage, treatment and disposal facilities