Exploring the Future Potential of AI-Enabled Smartphone Processors
Geothermal US
1. Researched & Organized by:
SAVE
gEotHErMAl opErAtions AnD $200
Register by August 19
plAnt optiMiZAtion ConFErEnCE
sEptEMbEr 15tH-16tH , ConVEntion plAZA HotEl, sAn JosE, CAliForniA
MaxiMize Plant PrOduCtivity and drive
dOWn OPeratiOnal COsts by adOPtinG the
latest best PraCtiCes and teChnOlOGies
EXpErt spEAkErs FroM
KEYNOTE UTILITY
Michael Avidan, Monte Morrison, Sigurður Guðni Jose Antonio Rodriguez,
Renewable Vice President for Sigurðsson, COO,Latin America,
Transactions, Operations, Manager of Operation, RamPower
Pacific Gas Alterra Landsvirkjun
& Electric
GEOTHErMaL UTILITIEs
> MAXiMiZE proFit: Gain best practice advice from geothermal
experts to ensure that your plant maximizes resources and
produces energy to full capacity
> plAn AHEAD: analyze common challenges faced during
operations and develop best practice solutions for dealing with
emergencies in a cost effective manner
> tECHnologY ADVAnCEs: discover the latest technologies EXpErT spEaKErs FrOM
which will help your plant run to maximum capacity and drive
costs down throughout its life cycle
> EXClUsiVE CAsE stUDiEs: hear the latest development plans
for geothermal projects and discover how your business can
secure work for 2011 and beyond
> sECUring FUnDing: understand the options available for your
business to gain funding for future projects
UnMissAblE bUsinEss AnD trAining
opportUnitiEs inClUDing... MEdIa parTNErs
> Key note presentations from Alterra Power Corp, Landsvirkjun,
Ram Power, Pacific Gas and Electric and the Geothermal
Program Office - US Navy
> Exclusive power plant maintenance and reservoir
management workshop With initial cost for geothermal field and
> The latest solutions from PowerChemTech, Mitsubishi, GE power plant development approximately
Global Research and Baker Hughes $2500 per installed KW in the US and
substantial renewable standards across
> Technology updates from Potter Drilling, Veizades & Associates
5 key states, it is essential to ensure you
and Global Power Solutions
are maximizing your existing resources
to drive down maintenance costs and
Look inside NOW for the full agenda and speaker line up! achieve maximum ROI
2. Welcome to the
Geothermal Operations and Plant Optimization Conference us 2011
dear Colleague,
Great news! …. as you know, the geothermal industry showed 26% Who will you be rubbing
growth in new projects under development in the uS. With 188 projects
underway in 15 states. This could produce as much as 7,875 MW of shoulders with this year?
new electric power (according to the GEa’s 2010 uS Geothermal
power production and development update) Join us in San Jose this year and meet key geothermal
In addition, four of the top five states with geothermal power under developers and decision makers who want to hear
development have substantial renewable standards including about the latest technologies and services for cost
Nevada with 25%, California 33% and Oregon with 25%. Over $600 effective and efficient operating and maintaining at
million of federal stimulus funding in the geothermal industry is said to their geothermal plants.
be spent on research into new technology at 135 projects in 25 states
5%
over the next two years.
It is therefore critical that geothermal operators use the latest Regulators
technologies and services available to maximize production on their
existing resources in order to meet growing renewable standards and
save on operations and maintenance costs. Maximizing production
on your existing plants whilst driving operating and maintenance costs
down is key.
Consultants
25%
30%
Join us at the only geothermal conference in the uS which focuses
on driving costs down during the operations and maintenance Geothermal
of your geothermal plant which will ultimately lower the costs of Developers
40%
geothermal power including:
» best practice solutions for common challenges during the Geothermal Suppliers &
production cycle such as scaling and corrosion Technology Providers
» discovering the latest technologies which will optimize production
and reduce maintenance costs
» advice which power purchase agreement to choose to ensure you
get the best deal
» plant Maintenance and reservoir Management training on how to
groUp DisCoUnts
run and maintain your plant effectively Maximize rOI at the conference by sending
a group of employees for the latest training
Can you afford to miss out on this business opportunity? I look forward
and networking opportunities.
to meeting you in September!
For further information please contact
emmab@fcbusinessintelligence.com
Tel: quoting GROUP BOOKING in the subject line
Emma banymandhub +44 (0) 207 375 7565
Senior Industry Analyst Email:
FC Business Intelligence emmab@fcbusinessintelligence.com
our guarantee to geothermal operators our guarantee to geothermal
The Geothermal Operations and plant Optimization Conference Consultants and Contractors
will provide geothermal operators with all the tools, training and
technology to drive operating costs down and increase production This is the only niche conference focused solely on geothermal
on existing resources to maximize profit for 2011 and beyond! operations and maintenance in the uS – if you are serious
about getting your business in front of the right people you
» Meet 100+ vendors who could provide you with the technical
need to be here.
solutions you require to operate your plant more efficiently and
cost effectively. » Commercial Opportunities - Listen to case studies from
geothermal utilities such as alterra and rampower to
» discuss and share experiences from previous and current
discover future business development opportunities
optimization projects with fellow developers to understand what
factors are necessary to maximize productivity and extend plant life. » Stay ahead of your competitors by understanding the
challenges involved in operations and the solutions which
» Listen to geothermal experts who will provide you with the latest
your business can provide
technologies to ensure you overcome common operating and
maintenance challenges swiftly and cost effectively. » understand the funding available for current and future
projects and how you can secure finance for your business
» understand what funding will be made available over the next
two years and how to secure funds for further development of » 20+ hours of networking time with the industry thought
your power plant. leaders and decision makers to ensure you secure work for
2011 and beyond
+ Training – send your staff to our power plant maintenance and
reservoir management workshop so that they leave with the most up + Limited exhibition booths - contact business development
to date knowledge to run your power plant. Manager bhav at bpatel@fcbusinessintelligence.com
Register today - visit www.geothermalinsider.com/operations or phone US TOLL FREE: 1800 814 3459 ext 7565
3. Why should you be at
the Geothermal Operations and Plant Optimization Conference.....
John Candelaria
Hand picked speakers... Senior Associate
Aspen Environmental
Group
Sigurður Guðni
Michael avidan, Monte Morrison, Sigurðsson
Renewable Transactions, VP for Operations,
Pacific Gas & Electric Alterra US Manager of Operation
Landsvirkjun
Marco Sanchez,
dr andrew Sabin, Jose antonio rodriguez,
Service Sales Manager,
Geothermal Lead, Chief Operating Officer,
Mitsubishi Power
US Navy RamPower
Systems
Leonardo Cruz,
Walter Castro, bruce Cutright,
Geomechanic Specialist,
Technical Sales Research Associate,
GeoMechanics
Representative, Bureau of Economic
International, Inc,
Baker Hughes Geology
a Baker Hughes Company
Oleh Weres phd, Chief
ajilli hardy, Mark hankowski,
Scientist, PowerChem
Energy Systems Engineer, Business Development
Technology,
GE Global Research Manager, Potter Drilling
a division of ChemTreat
Mark Stapleton,
henry
Founder and Sales Manager, Subir Sanyal,
Veizades,Consultant,
PowerChem President,
Henry Veizades &
Technology, GeothermEx
Associates
a division of ChemTreat
Jill haizlip, Kevin Wallace, robert Tucker,
Senior Geochemist, Consultant, Principle, Global
Geologica Power Engineers Power Solutions
Cutting edge sessions you need to attend
Date Morning Afternoon Evening
ThurSday pLaNT MaINTENaNCE & GEOThErMaL OpEraTIONS NETWOrKING drINKS
SEpTEMbEr 15Th rESErVOIr MaNaGEMENT aNd pLaNT OpTIMIzaTION parTy
WOrKShOp CaSE STudIES
FrIday MaXIMIzING prOduCTION ENd OF CONFErENCE
SEpTEMbEr 16Th FINaNCE TraNSMISSION VS drIVING COSTS dOWN
aNd rEGuLaTOry ISSuES aNd TEChNOLOGy
adVaNCEMENTS
Excellent reviews from our previous conferences..
“Last year’s EGS Conference and Expo provided an
excellent basis for understanding the regulatory snares
facing EGS development”
Mark Walters, Senior Geologist, Calpine Corporation
“that conference was one of the best I have attended in
many years. all the presentations were spot on and clear”
Michal Moor, Senior Fellow, ISEEE
Register today - visit www.geothermalinsider.com/operations or phone US TOLL FREE: 1800 814 3459 ext 7565
4. 15th-16th september 2011 agenda
1: gEotHErMAl opErAtions Best Practice Tips for Managing Strengths and Weaknesses of Power
Geothermal Power Plants Purchase Agreements
AnD plAnt optiMiZAtion
• Understand the need in keeping • Understand the criteria necessary to
CAsE stUDiEs safety evergreen for the best encourage utilities entering into power
performance on your power plant purchase agreements with geothermal
• Learn how to manage small plants developers
Case Histories of Geothermal
Resource Degradation and their with a very small workforce and • Discuss the pros and cons of these
ensure your power plant runs agreements and discuss alternative ideas
Mitigation History
efficiently for ways of encouraging geothermal energy
• Learn about the types of resource buying in the uS
• Discover how to improve the
degradation in geothermal operations
longevity of down hole pumps • Get details regarding the different clauses
to understand how to identify challenges
through maintenance and which can form part of a power purchase
easily and come up with solutions swiftly
operations practices agreement and which model would best
• Listen to examples of degradation and suit your geothermal development plans
its mitigation from case histories – apply Monte Morrison, Country Manager,
lessons learned from these experiences Alterra US Michael avidan, Renewable Transactions,
to ensure your plant works at maximum Pacific Gas & Electric
efficiency Improvements in operation and
• Hear case histories of low temperature, maintenance of geothermal Grid Access Challenges and
high temperature, two phase and plant through 30 years of Opportunities for Geothermal
steam reservoir projects to identify operation. Developers
which solutions can be applied to your • Discuss transmission challenges and
• Operation of Krafla geothermal
geothermal plant opportunities faced by geothermal
power plant from 1977.
• Understand the importance of developers
• Lifetime of boreholes. During the
monitoring and numerical monitoring • Understand the cost involved in accessing
years several new holes have
in resource degradation to ensure grid
been drilled and others have been
continuous development in the running
closed. • What does California want?
of your geothermal plant
• Steam separation and level of • Nevada case studies
Subir Sanyal, President, GeothermEx automation has been improved, John Candelaria, Senior Associate, Aspen
leading to better steam quality and Environmental Group
Case Study: San Jacinto Tizate extend lifetime of the plant.
Geothermal Field • How improvements have kept Krafla
power plant comparable in reliability
3: MAXiMiZing proDUCtion
• Listen to a history of the San Jacinto 10
MW backpressure development and with new modern geothermal Vs DriVing Costs DoWn
understand how it contributes to the power plants
plants long term development Sigurður Guðni Sigurðsson, Manager of Higher Efficiency Geothermal:
• Hear about the progress with Operation and Steinn Ágúst Steinsson, Opportunities in power plant design
construction of the 72 MW condensing Power Plant Manager Lake Mývatn area,
• Understand the various types of geothermal
development at San Jacinto and how Landsvirkjun
power plants and the effect the design has
this will maximize the overall production on overall operations and maintenance
of the plant 2: FinAnCE, trAnsMission • Learn about Organic Rankine Cycles
• Understand plans for the San Jacinto for resource temperatures below 300C
geothermal field and how rampower
AnD rEgUlAtorY issUEs
and discover the potential they have for
have identified future commercial maximizing efficiency on your power plant
opportunities within the supply chain O&M and impact on • Identify the appropriate fluid selection for
Jose antonio rodriquez, Chief Operating Geothermal Power Costs and higher efficiency power plants
Officer of Latin America, Ram Power Future Funding
ajilli J hardy, Energy Systems Engineer,
• Why should O&M costs take priority? GE Global Research
US Navy’s Approach towards understand why and prioritise this
in your future business strategy to
Geothermal Production Power Plant and Gathering System
ensure you maximise profit
• Analyze the US Navy’s geothermal Enhancements and Improvements to
• Learn about the correlation
program to discover the future plans
between O&M costs and the overall Match Changing Reservoir Condition
for geothermal development which will
geothermal power costs to discover • Listen to ways of identifying Power Plant
open more commercial opportunities for
the importance of running an Efficiency degradation as a result of
the supply chain
efficient power plant changing reservoir conditions
• Hear about the latest technologies
• Identify the factors private investors • Analyse condenser and cooling tower
which are being used during the
look for in order to re-invest with performance and impacts on power
operating cycle and whether these are
geothermal developers to ensure generation
applicable to your geothermal plant
you secure future private funding for • Determine production pipeline bottle necks
• Listen to current and future projects your future geothermal projects
and ways in which production is being and understand how to prepare a cost
• O&M and impacts on Maintaining benefit analysis
maximized and maintenance costs
high availability • Learn about steam path redesign and how
reduced
robert E. Tucker, Principal, it can mitigate changes in reservoir
dr andy Sabin, Director, Geothermal Program
Global Power Solutions henry Veizades, Principal,
Office, US Navy
Veizades & Associates, Inc.
Register today - visit www.geothermalinsider.com/operations or phone US TOLL FREE: 1800 814 3459 ext 7565
5. 15th-16th september 2011 agenda
Corrosion in geothermal energy Scale deposition in geothermal energy Wireline Logging – making
production: problems and production: problems and solutions informed operating decisions
solutions • Listen to case studies to gain an overviews of • Understand how wireline logging
• Listen to case studies and understand scales deposited from geothermal fluids and can help you make decisions about
the various corrosive environments ensure you can identify early signs drilling and production operations
encountered in geothermal energy • Learn how to avoid problems by design of • Cost vs. Benefit – discuss whether
production to enable you to identify power generating processes wireline logging is a worthy
them quickly during the production • Discover how to control scale deposition investment and understand how it
cycle by chemical inhibitors to save on overall can drive the long term operating
• Learn how to avoid corrosion maintenance costs costs down
by proper design and selection Mark Stapleton, Founder and Sales Director, • Gain an overview of the various
of materials to save on overall PowerChem Technology a Division of options for logging and which is most
maintenance costs ChemTreat appropriate for your plant
• Discover how to control corrosion by • Listen to the latest details on high
chemical inhibitors to understand the temperature wire logging and the
benefits this can have in preventing
4: CHoosing tHE effect it has on overall operations
future corrosion AppropriAtE tECHnologY and maintenance of the plant
Oleh Weres, phd, Chief Scientist, Walter Castro, Technical Sales
PowerChem Technology a Division Recent advances in geothermal power Representative, Baker Hughes wireline
of ChemTreat conversion technologies logging operations
• Understand the factors which you have Leonardo Cruz, Geomechanic Specialist,
to take into consideration when choosing GeoMechanics International, Inc,
Capitalizing on existing power conversion equipment to ensure you a Baker Hughes Company
infrastructure to make maximise conversion on your geothermal
geothermal power production plant
even more competitive • Discover plans for future power conversion Tracer testing and the benefit
• Understand how exploration, drilling technologies available and the benefits for from the results
and testing contribute up to 35 future geothermal production • Understand the difference in using a
% of the total geothermal plant • Learn about ways of effectively maintaining radioactive or chemical tracer and
development costs and how these your existing conversion technology which is most appropriate for your
can be reduced to less than 5% of Kevin Wallace, Geothermal Lead, plant
the total costs Power Engineers • Learn about the way in which
• Uncertainty, from an investor’s tracers can be used to locate
viewpoint, is the greatest risk, and underground connections between
therefore a requirement for the Choosing the right turbine to drive
wells.
greatest reserve, in a geothermal maintenance costs down
• Assess geological features such as
project. Learn how to use the • Understand the various materials used to fault on fluid movement, suitability
available information which can manufacture and the effect they have on of wells for reinjection geothermal
reduce this uncertainty, and risk, and power operations and maintenance of your waste waters and siting new
therefore necessary dollar reserve to geothermal plants production wells
near zero • Learn lessons from previous turbines which • Understand how to design an
• Discuss where the next step is to have been used to understand which best effective trace test, sampling
develop geothermal energy where suits your power plant protocol, data collection and how to
existing infrastructure can be utilized • Minimize maintenance costs by ensuring evaluate results
bruce Cutright, Research Associate, you maintain your turbines efficiently to save
Jill haizlip, Senior Geochemist and
Bureau of Economic Geology inspection costs
President, Geologica Inc
Marco Sanchez, Regional Manager,
Mitsubishi Power Systems Americas
Best practice for locating Driving costs down in the drilling
injection wells to provide process
reservoir pressure support This is the must attend
• Understand the use of hydrothermal
• Understand the relationship between conference for any geothermal spallation technologies to improve
injection and seismicity and learn operator, contractor or service well productivity
how to mitigate the risks provider who is serious on gaining • Discover the impact of Hydrothermal
• Listen to lessons learned from current optimum return for their investment spallation slotting on LCOE of
and previous projects to gain best and placing their business at the forefront geothermal power
practice tips for effectively targeting of this multi million dollar industry. • Gain an update on the
injection wells commercialization plans for
Download your exclusive brochure now
• Learn about injection limits and how hydrothermal spallation slotting
to get your unique discount code to save
to control thermal break through technologies
you a further $100 off the lowest ticket
• Analyze water supply challenges and Mark hankowski, Business Development
price.
sources and discuss how they can be Manager, Potter Drilling
overcome in the future Secure your place at this market
leading conference now and receive a
$400 discount on our standard prices.
Register today - visit www.geothermalinsider.com/operations or phone US TOLL FREE: 1800 814 3459 ext 7565
6. Why should you be at the
geothermal operations and plant optimization Conference in september
Companies who attended our 2010 energy conferences
Find out how you can get exposure for your products and services to these companies.
Take a look at some of the leading stakeholders who have attended our conferences in the last year.
alta rock Energy Conocophillips Electric power GrC Layne Christensen SaIC
aMECO Coreworx, Inc research Institute Green bull Energy Livelocal renoSparks Southern Company
american Electric CSI Technologies Energy Future Guest account LLNL Southern California
power Curtiss-Wright Flow holdings Gullewa Milbank Edison
arEVa Enrichment Control Energy Solutions halliburton Miller Consulting ThermaSource
Services darchem Entergy hdr Energy National Geothermal TurboCare
arEVa Np Engineering Export-Import bank hitachi power data System u.S. department of
arizona public dept. of Interior of uSa Systems america New Mexico State Energy
Service Commission dextra Florida public Service university (NMSu) u.S. Geothermal
honeywell
auckland uniServices dhS drilling Commission
hydro resources Northern California urS Corporation
babcock & Wilcox Company GE Global research power agency
IESE uS doi-Oig
baker hughes dominion resources Geodynamics Owens Technology
ISEEE Western
bechtel dOOSaN heavy General dynamics pinnacle Environmental Testing
Electric boat Lageo
bentley Systems Industries potter drilling Laboratory
GeoTek Energy Law Office of
black & Veatch dpM r. W. beck Westinghouse
Kathleen Callison
dTE Energy Geothermal advisory Electric Company
bLM Law Offices of alan resourcive Capital
duke Energy Geothermal Wilson Sonsini
Ch2M hill resources Council Waltner rMOTC
EdF North america Goodrich & rosati
Chemetall Foote GeothermEx Lawrence berkeley ruen drilling
Corp. Effective project National Lab Xtreme Coil drilling
Google ruinril petroleum
Corporation
Exhibition floorplan bUilD YoUr
oWn pACkAgE in
3 siMplE stEps!
Co ee
1 unlike many other industry trade shows, exhibitions and
conferences our packages are not standard “one size fits
all”. you tell us what you want and we build it for you…..
5 2
simple! Take 3 simple steps to build your very own package
today and we will build it whatever your budget!
Conference Room
6 3 1. MAKE A LIST OF YOUR MOST IMPORTANT AIMS
• Exhibition booth • Brand visibility
4 • Private meetings • Breakfast briefings
7 • Seatdrops • Speaking slots
• Conference Branding • Segment Sponsor
Co ee
8 2. WORK OUT YOUR BUDGET
Speak with your marketing team and decide on your
annual conference investment - make sure you assign
the right budget to the right show! No matter what your
past Exhibitors and sponsors include budget total, we will work with you to build a package
that achieves your aims and exceeds expectations.
3. CALL BHAV PATEL AT FC BUSINESS INTELLIGENCE TO
DISCUSS YOUR PACKAGE NOW!
Our exhibition space regularly sells out weeks in advance
of the conference. So call today to make sure you secure
your spot before you miss the chance.
CALL NOW
Bhav Patel +44 (0) 207 375 7515
or email bpatel@fcbusinessintelligence.com
For the latest www.geothermalinsider.com/operations or phone US TOLL FREE: 1800 814 3459 ext 7565
Register today - visit speaker updates visit www.cpvtoday.com/eu09
7. Researched & Organized by:
SAVE
gEotHErMAl opErAtions AnD plAnt optiMiZAtion ConFErEnCE
sEptEMbEr 15tH-16tH , ConVEntion plAZA HotEl, sAn JosE, CAliForniA
$200
Register by August 19
Discount Code:
rEgistEr noW in 3 EAsY stEps: ONLINE100
This is your unique discount code, use it
1. SELECT YOUR REGISTRATION PACKAGE: online or via this form to get an extra $100 off
Pass Features PLATINUM PASS GOLD PASS BASIC PASS
access to power plant maintenance and reservoir management
workshop
audio Visual access
Networking drinks party & Lunch
Full two day pass
Super Early Bird Price - expires July 22nd 2011 $1495 $1295 $1195
Early Bird Price - expires August 19th 2011 $1695 $1495 $1395
Full Price $1895 $1695 $1595
Post Conference Audio Visual $395
2. ENTER ATTENDEE DETAILS:
Mr/Mrs/Ms/Dr: First name: Last name:
Company: Position/Title:
Telephone: Fax: Email:
Address: Postcode: Country:
3. PAYMENT OPTIONS:
I enclose a check/draft for: Credit card number:
(Payable to FC Business Intelligence Ltd)
Expiry date: Security number:
Please invoice my company:
Purchase Order Number: Name on card:
Please charge my credit card: Amex Visa Mastercard
Signature:
TERMS & CONDITIONS Places are transferable without any charge.
Cancellations before August 19, 2011 incur an administrative
More Ways to register charge of 25%. If you cancel your registration after August 19,
2011 we will be obliged to charge the full fee. Please note – you
must notify Telematics Update in writing of a cancellation, or
we will be obliged to charge the full fee. The organizers reserve
> ONLINE: Secure & simple registration online at the right to make changes to the programme without notice.
www.geothermalinsider.com/operations All prices displayed are exclusive of VAT unless otherwise stated but, VAT
will be charged where applicable, at the prevailing rate on the invoice
> EMAIL: bpatel@fcbusinessintelligence.com Just give us your date and the relevant details will appear on the invoice. FC Business
details and pass type – we’ll do the rest! Intelligence Ltd. takes every care to ensure that prices quoted are correct
at time of publishing however, bookings will only be accepted if there
> PHONE: Call Stevie bell on uS TOLL FrEE:1800 814 3459 ext 7565 is no material error in the price advertised on the website. NB: FULL
PAYMENT MUST BE RECEIVED BEFORE THE EVENT.
Visit www.telematicsdetroit.com for more event information.
> FAX: Fill out this form and faxback to +44 (0) 207 375 7576 Designed by The Creative Tree Ltd.: www.TheCreativeTree.co.uk
Register today - visit www.geothermalinsider.com/operations or phone US TOLL FREE: 1800 814 3459 ext 7565
8. Researched & Organized by:
SAVE
gEotHErMAl opErAtions AnD $200
Register by August 19
plAnt optiMiZAtion ConFErEnCE
sEptEMbEr 15tH-16tH , ConVEntion plAZA HotEl, sAn JosE, CAliForniA
MaxiMize Plant PrOduCtivity and drive
dOWn OPeratiOnal COsts by adOPtinG the
latest best PraCtiCes and teChnOlOGies
EXpErt spEAkErs FroM
KEYNOTE UTILITY
Michael Avidan, Monte Morrison, Sigurður Guðni Jose Antonio Rodriguez,
Renewable Vice President for Sigurðsson, COO,Latin America,
Transactions, Operations, Manager of Operation, RamPower
Pacific Gas Alterra Landsvirkjun
& Electric
GEOTHErMaL UTILITIEs
> MAXiMiZE proFit: Gain best practice advice from geothermal
experts to ensure that your plant maximizes resources and
produces energy to full capacity
> plAn AHEAD: analyze common challenges faced during
operations and develop best practice solutions for dealing with
emergencies in a cost effective manner
> tECHnologY ADVAnCEs: discover the latest technologies EXpErT spEaKErs FrOM
which will help your plant run to maximum capacity and drive
costs down throughout its life cycle
> EXClUsiVE CAsE stUDiEs: hear the latest development plans
for geothermal projects and discover how your business can
secure work for 2011 and beyond
> sECUring FUnDing: understand the options available for your
business to gain funding for future projects
UnMissAblE bUsinEss AnD trAining
opportUnitiEs inClUDing... MEdIa parTNErs
> Key note presentations from Alterra Power Corp, Landsvirkjun,
Ram Power, Pacific Gas and Electric and the Geothermal
Program Office - US Navy
> Exclusive power plant maintenance and reservoir
management workshop With initial cost for geothermal field and
> The latest solutions from PowerChemTech, Mitsubishi, GE power plant development approximately
Global Research and Baker Hughes $2500 per installed KW in the US and
substantial renewable standards across
> Technology updates from Potter Drilling, Veizades & Associates
5 key states, it is essential to ensure you
and Global Power Solutions
are maximizing your existing resources
to drive down maintenance costs and
Look inside NOW for the full agenda and speaker line up! achieve maximum ROI