SlideShare une entreprise Scribd logo
1  sur  8
Télécharger pour lire hors ligne
January 3, 2017Sherwin Williams Development
SHERWIN WILLIAMS
DEVELOPMENT
LAND USE PROGRAMMING
Sherwin Williams Development 1January 3, 2017
PDP SITE PLAN
The approved PDP site plan
provides the framework for open
spaceandbuildingdevelopment
including establishing the
overall building heights. The
final size and configuration of
each building and open space
will be developed as part of the
FDP process.
320’
190’
30’
25’
40’
98’
195’
60’
85’
90’
+-
+-
+-
+-
+-
+-
+-
+-
+-
+-
January 3 2017Sherwin Williams Development 2
WINTER SOLSTICE - DEC 21 SPRING/FALL EQUINOX - MAR|AUG 21 SUMMER SOLSTICE - JUN 21
9 am 9 am 9 am
12 pm 12 pm 12 pm
3 pm 3 pm 3 pm
SHADOW STUDY
Building massing and shadow study is based on approved PDP
building heights
*
January 3, 2017Sherwin Williams Development
LANDUSEPROGRAMMING 3
HORTON STREET
EXISTING
PARKING LOT
SHERWINAVENUE
RAILROAD TRACKS
Sherwin Williams open space for Emeryville offers a number of positive amenities for the neighboring
community and City wide including;
· connections with existing and new pedestrian and bike trails to other parts of the City
· influence from the connection with the onsite Sherwin Williams history
· view participation with the extensive adjacent rail throughway
· experience with re-created natural landscape systems
· informal play and performance experiences
· new recreational and garden experiences
· informal and formalized gathering opportunities
Facilities and vocabulary will be an interpreted expression of the unique aspects of the City’s industrial
roots. Urban streetscapes, architectural character and connected green spaces will help to express
the new neighborhood interwoven with the heritage of the area. As a result of the facilities that are
constructed to enable these experiences – the City of Emeryville will be enriched as a community.
DISTRICT2
Existing Building A
entry
point
entry
point
entry
point
entry
point
Proposed Building
Proposed Building C
Proposed Building D
OVERALL NARRATIVE
Existing
Building A
Proposed
Building
DISTRICT1
DISTRICT 1
DISTRICT 3
DISTRICT 3
link to trail
DISTRICT 2
outdoor art
play areas
emeryville greenway
cafe/brewery
seating
adult exercise
bocce
canopy trees
canopy trees
small
children
playground
tennis
parking
large multi-
purpose lawn
berms/
elevation
change
passive use
play area
picnic space
bbq grills/
group eating
areas
public art/sculpture
bike express lane
natural demonstration gardens
history interpretation areas
sitting areas
heritage
tree
seating
community bike
share station movies/events
map kiosk along
bike trail
train viewingplatform
community
garden
portal
chess
table and
seating
history/
interpretation
areas
reflecting &
refracting
sunlight
through
inviting/
interactive
lighting &
design
CONNECTIONPASSIVEservice
area
video
wall
living
wall
coffee
kiosk
DOG PARK
off-leash area
small dog area
CITY PARK
PASSIVE PARK
PASS
THROUGH
LINEAR OPEN SPACE
DISTRICT 4: BOULEVARD DISTRICT
accommodate outdoor living areas
as extension of the ground floor
entry
point
strong
connection
strong
connection
PLAZA
ART GALLERY SPACE
entry
point
January 3, 2017Sherwin Williams Development
DISTRICT1:WAREHOUSEDISTRICT 4
Keymap
3
N.T.S
1
2
4
DISTRICT 1:		 WAREHOUSE DISTRICT
Open Space:
The open space in this block is composed
of several distinct spaces with different
character, activities and materials. Materials
will reference the architecture themes of
industrial.
The Alley Space between the two residential/
mixed use buildings is pedestrian use only
and is shared between the existing Sherwin
Williams Building and new building. Emphasis
will be on contrasts in paving materials and
interesting plantings encouraging lingering
and respite. Large trees in raised planters
will bring definition to the overall space and
foster seating alcoves and breakout spaces
for small group activities for the residents
and neighbors.
A Pass-Through Space is created by a portal
through the existing Sherwin Williams
Building – making a visual and physical
connection to the park. This connects bike
circulation to the Greenway Extension.
The Horton Art Gallery Space – substantial
frontage on Horton the courtyard is an
extension of the galley in an outdoor garden
setting. The landscape will be substantially
hardscape with modern forms, materials and
furniture. Plantings will be used as garden
architecture.
January 3, 2017Sherwin Williams Development
DISTRICT 2:	 PARK DISTRICT
Open Space:
This largest area of open space – Sherwin
Avenue Park - is suitable for various activities
and has approximately 50% streetscape
frontage – making easy accessibility to the
neighborhood. The heart of the development
it offers a convenient connection and
continuation of the Greenway Extension.
The character and materials of the space are
intentionally simple, durable, and open to
encourage programming and impromptu use.
A street tree pattern will continue through
the frontage. Trees at the perimeter will
create skyline and urban green. Potential
uses of the open space include:
•	 ‘Big Green’ without definition to be
programmable.
•	 Performance space.
•	 ‘Big Forest’ edges allowing varied passive
uses under the trees.
•	 Group bar-be-que and picnic facility.
•	 Kids creative play area
•	 Family, kids, and dog friendly.
•	 Functional and aesthetically interesting
graphics and lighting.
•	 Access to public restrooms.
DISTRICT2:PARKDISTRICT
Keymap
3
N.T.S
5
2
4
1
January 3, 2017Sherwin Williams Development
DISTRICT3:RAILDISTRICT 6
Keymap N.T.S
1
2
4 3
DISTRICT 3:		 RAIL DISTRICT
Open Space:
This Linear Park space provides the buffer
for the overall project and the adjacent rail
lines. It also incorporates the extension
of the Emeryville Greenway connecting
Halleck Street to the future Horton Landing
Park and beyond. This area is intended to
accommodate travel through the site with
areas to stop and enjoy the open space. The
landscape character will be naturalistic with
mounding, native and native-like plants,
upgrading of the perimeter boundary,
and a synergy with the proposed adjacent
City Park. Potential uses of the open space
include:
•	 Emeryville Greenway multi-use trail
extension
•	 History interpretive vocabulary
•	 Native plant demonstration
•	 Train viewing opportunities
•	 Sitting opportunities
•	 Wayfinding graphics
•	 Play activities for kids
•	 Building murals
January 3, 2017Sherwin Williams Development
DISTRICT4:BOULEVARDDISTRICT 7
Keymap
3
N.T.S
1
2
4
DISTRICT 4:		 BOULEVARD DISTRICT
Open Space:
The interior Hubbard and 46th Street open
space provides the primary public circulation
component through the site to accommodate
car, bike, and pedestrian traffic, vehicular
access to the garages, and limited on-street
parking for commercial uses. It will also serve
as an extension of ground floor active uses
from the adjacent buildings. The paving, tree
locations and street furniture will advance
an urban character and encourage shared
use between cars, bikes, and pedestrians
– enforced with traffic calming devices.
Materials will reference the architecture
themes of industrial. Potential uses of the
open space may include:
•	 Vehicular traffic
•	 “On-street” parking
•	 Pedestrian and bicycle circulation
•	 Sitting areas
•	 Outdoor living areas
•	 Bike share amenity
•	 Car share amenity
•	 Street trees and landscaping

Contenu connexe

Tendances

Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder Portfolio
Dominic Holder
 
Work Samples - Michael Griffin
Work Samples - Michael GriffinWork Samples - Michael Griffin
Work Samples - Michael Griffin
griff7533
 
A_Oeth_Portfolio_LinkedIn
A_Oeth_Portfolio_LinkedInA_Oeth_Portfolio_LinkedIn
A_Oeth_Portfolio_LinkedIn
Amy Oeth
 
Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder Portfolio
Dominic Holder
 
Emmp community presentations_anc oct 15 presentation final rev1
Emmp community presentations_anc oct 15 presentation final rev1Emmp community presentations_anc oct 15 presentation final rev1
Emmp community presentations_anc oct 15 presentation final rev1
RamaChilamkurthy
 
appendix A1 -Pedestrian Plan_201402051129059977
appendix A1 -Pedestrian Plan_201402051129059977appendix A1 -Pedestrian Plan_201402051129059977
appendix A1 -Pedestrian Plan_201402051129059977
Carson Quam
 

Tendances (19)

Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder Portfolio
 
Item # 6 - PPT 237 Argo
Item # 6 - PPT 237 ArgoItem # 6 - PPT 237 Argo
Item # 6 - PPT 237 Argo
 
Item #3 PPT 320 Alta
Item #3  PPT 320 AltaItem #3  PPT 320 Alta
Item #3 PPT 320 Alta
 
Item #5 PPT Broadway Ellwood
Item #5   PPT Broadway EllwoodItem #5   PPT Broadway Ellwood
Item #5 PPT Broadway Ellwood
 
Work Samples - Michael Griffin
Work Samples - Michael GriffinWork Samples - Michael Griffin
Work Samples - Michael Griffin
 
Item # 7 - PPT Katherine Ct
Item # 7 - PPT Katherine CtItem # 7 - PPT Katherine Ct
Item # 7 - PPT Katherine Ct
 
Item # 5 - PPT 301 Encino
Item # 5 - PPT 301 EncinoItem # 5 - PPT 301 Encino
Item # 5 - PPT 301 Encino
 
A_Oeth_Portfolio_LinkedIn
A_Oeth_Portfolio_LinkedInA_Oeth_Portfolio_LinkedIn
A_Oeth_Portfolio_LinkedIn
 
Portfolio spreads
Portfolio spreadsPortfolio spreads
Portfolio spreads
 
Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder Portfolio
 
Emmp community presentations_anc oct 15 presentation final rev1
Emmp community presentations_anc oct 15 presentation final rev1Emmp community presentations_anc oct 15 presentation final rev1
Emmp community presentations_anc oct 15 presentation final rev1
 
Hosam Abdeltawab portfolio 2021
Hosam Abdeltawab portfolio 2021Hosam Abdeltawab portfolio 2021
Hosam Abdeltawab portfolio 2021
 
20170515 Parkmerced Resident Update Final
20170515 Parkmerced Resident Update Final20170515 Parkmerced Resident Update Final
20170515 Parkmerced Resident Update Final
 
Item #7 PPT Broadway Ellwood Replat
Item #7   PPT Broadway Ellwood ReplatItem #7   PPT Broadway Ellwood Replat
Item #7 PPT Broadway Ellwood Replat
 
Hearst community meeting 04.05.2018
Hearst community meeting   04.05.2018Hearst community meeting   04.05.2018
Hearst community meeting 04.05.2018
 
appendix A1 -Pedestrian Plan_201402051129059977
appendix A1 -Pedestrian Plan_201402051129059977appendix A1 -Pedestrian Plan_201402051129059977
appendix A1 -Pedestrian Plan_201402051129059977
 
Tod appi conference 2011 & evds 2012
Tod appi conference 2011 & evds 2012Tod appi conference 2011 & evds 2012
Tod appi conference 2011 & evds 2012
 
Greville King Streets Concept Plans
Greville King Streets Concept PlansGreville King Streets Concept Plans
Greville King Streets Concept Plans
 
Greville King Streets Final Concept Plans
Greville King Streets Final Concept Plans Greville King Streets Final Concept Plans
Greville King Streets Final Concept Plans
 

En vedette (8)

Mandela hotel-oakland
Mandela hotel-oaklandMandela hotel-oakland
Mandela hotel-oakland
 
Berger's Paint Guide (Interior Walls)
Berger's Paint Guide (Interior Walls)Berger's Paint Guide (Interior Walls)
Berger's Paint Guide (Interior Walls)
 
Business plan for paint industry
Business plan for paint industryBusiness plan for paint industry
Business plan for paint industry
 
44782537 asian-paints-final-ppt
44782537 asian-paints-final-ppt44782537 asian-paints-final-ppt
44782537 asian-paints-final-ppt
 
Asian Paints Business Strategy
Asian Paints Business StrategyAsian Paints Business Strategy
Asian Paints Business Strategy
 
Asian paints ylp final (1)
Asian paints ylp final (1)Asian paints ylp final (1)
Asian paints ylp final (1)
 
Asian paints
Asian paintsAsian paints
Asian paints
 
Asian paint ppt
Asian paint pptAsian paint ppt
Asian paint ppt
 

Similaire à Sherwin williams-land-use-programming

Portfolio_RobinMassingill_2015
Portfolio_RobinMassingill_2015Portfolio_RobinMassingill_2015
Portfolio_RobinMassingill_2015
Robin Massingill
 
Kaitlyn_Fulton_Portfolio
Kaitlyn_Fulton_PortfolioKaitlyn_Fulton_Portfolio
Kaitlyn_Fulton_Portfolio
Kaitlyn Fulton
 
Fortin Portfolio (Online) (Compressed)
Fortin Portfolio (Online) (Compressed)Fortin Portfolio (Online) (Compressed)
Fortin Portfolio (Online) (Compressed)
Christopher Fortin
 
Clifton Avenue Streetscape Design - Posters
Clifton Avenue Streetscape Design - PostersClifton Avenue Streetscape Design - Posters
Clifton Avenue Streetscape Design - Posters
Jake Henderson
 
Trial for online
Trial for onlineTrial for online
Trial for online
elogilvie
 
Ogilvie ldn 1 12 pt text t5
Ogilvie ldn 1 12 pt text t5Ogilvie ldn 1 12 pt text t5
Ogilvie ldn 1 12 pt text t5
elogilvie
 
Selected Planning Projects
Selected Planning ProjectsSelected Planning Projects
Selected Planning Projects
Perry Becker
 
James Joyce - Landscape Architecture Portfolio
James Joyce - Landscape Architecture PortfolioJames Joyce - Landscape Architecture Portfolio
James Joyce - Landscape Architecture Portfolio
James Joyce, RLA
 

Similaire à Sherwin williams-land-use-programming (20)

Portfolio_RobinMassingill_2015
Portfolio_RobinMassingill_2015Portfolio_RobinMassingill_2015
Portfolio_RobinMassingill_2015
 
Landscape Architecture Vision for Indian Residential Project
Landscape Architecture Vision for Indian Residential ProjectLandscape Architecture Vision for Indian Residential Project
Landscape Architecture Vision for Indian Residential Project
 
Open Space Strategy
Open Space StrategyOpen Space Strategy
Open Space Strategy
 
Memorial Park Tomorrow Nov.14
Memorial Park Tomorrow Nov.14Memorial Park Tomorrow Nov.14
Memorial Park Tomorrow Nov.14
 
Kaitlyn_Fulton_Portfolio
Kaitlyn_Fulton_PortfolioKaitlyn_Fulton_Portfolio
Kaitlyn_Fulton_Portfolio
 
Fortin Portfolio (Online) (Compressed)
Fortin Portfolio (Online) (Compressed)Fortin Portfolio (Online) (Compressed)
Fortin Portfolio (Online) (Compressed)
 
Urban Design Portfolio Tim Hays
Urban Design Portfolio Tim HaysUrban Design Portfolio Tim Hays
Urban Design Portfolio Tim Hays
 
BEORMA comp sub
BEORMA comp subBEORMA comp sub
BEORMA comp sub
 
Clifton Avenue Streetscape Design - Posters
Clifton Avenue Streetscape Design - PostersClifton Avenue Streetscape Design - Posters
Clifton Avenue Streetscape Design - Posters
 
Trial for online
Trial for onlineTrial for online
Trial for online
 
Ogilvie ldn 1 12 pt text t5
Ogilvie ldn 1 12 pt text t5Ogilvie ldn 1 12 pt text t5
Ogilvie ldn 1 12 pt text t5
 
Northside Stranger's Home For Sale - Part of Cabrini-Green Re-Development
Northside Stranger's Home For Sale - Part of Cabrini-Green Re-DevelopmentNorthside Stranger's Home For Sale - Part of Cabrini-Green Re-Development
Northside Stranger's Home For Sale - Part of Cabrini-Green Re-Development
 
Selected Planning Projects
Selected Planning ProjectsSelected Planning Projects
Selected Planning Projects
 
FLEETWOOD Public Engagement Boards Feb 2023
FLEETWOOD Public Engagement Boards Feb 2023FLEETWOOD Public Engagement Boards Feb 2023
FLEETWOOD Public Engagement Boards Feb 2023
 
James Joyce - Landscape Architecture Portfolio
James Joyce - Landscape Architecture PortfolioJames Joyce - Landscape Architecture Portfolio
James Joyce - Landscape Architecture Portfolio
 
FLEETWOOD PIM_FINAL Nov 2022.pdf
FLEETWOOD PIM_FINAL Nov 2022.pdfFLEETWOOD PIM_FINAL Nov 2022.pdf
FLEETWOOD PIM_FINAL Nov 2022.pdf
 
Mountford Pigott LLP Graphics Portfolio 2013
Mountford Pigott LLP Graphics Portfolio 2013Mountford Pigott LLP Graphics Portfolio 2013
Mountford Pigott LLP Graphics Portfolio 2013
 
A2-Poster-2Jun2016
A2-Poster-2Jun2016A2-Poster-2Jun2016
A2-Poster-2Jun2016
 
J.christopher ray sample_portfolio 2013
J.christopher ray sample_portfolio 2013J.christopher ray sample_portfolio 2013
J.christopher ray sample_portfolio 2013
 
The Windsor Siding Masterplan [DRAFT]
The Windsor Siding Masterplan [DRAFT]The Windsor Siding Masterplan [DRAFT]
The Windsor Siding Masterplan [DRAFT]
 

Plus de E'ville Eye

City of Emeryville 2023-2031 Housing Element [Public Draft]
City of Emeryville 2023-2031 Housing Element [Public Draft]City of Emeryville 2023-2031 Housing Element [Public Draft]
City of Emeryville 2023-2031 Housing Element [Public Draft]
E'ville Eye
 

Plus de E'ville Eye (20)

legal-Complaint-emery-unified-assault.pdf
legal-Complaint-emery-unified-assault.pdflegal-Complaint-emery-unified-assault.pdf
legal-Complaint-emery-unified-assault.pdf
 
EUSD Superintendent Goals 2021-2023.pdf
EUSD Superintendent Goals 2021-2023.pdfEUSD Superintendent Goals 2021-2023.pdf
EUSD Superintendent Goals 2021-2023.pdf
 
SeaWallsMap-UPDATE.pdf
SeaWallsMap-UPDATE.pdfSeaWallsMap-UPDATE.pdf
SeaWallsMap-UPDATE.pdf
 
EGR-WOAK_BART_Preso_1024.pdf
EGR-WOAK_BART_Preso_1024.pdfEGR-WOAK_BART_Preso_1024.pdf
EGR-WOAK_BART_Preso_1024.pdf
 
City of Emeryville 2023-2031 Housing Element [Public Draft]
City of Emeryville 2023-2031 Housing Element [Public Draft]City of Emeryville 2023-2031 Housing Element [Public Draft]
City of Emeryville 2023-2031 Housing Element [Public Draft]
 
Wood Street Engagement Sessions FAQ.pdf
Wood Street Engagement Sessions FAQ.pdfWood Street Engagement Sessions FAQ.pdf
Wood Street Engagement Sessions FAQ.pdf
 
Item 9.2 bay street emeryville grocery store staff report
Item 9.2 bay street emeryville grocery store staff reportItem 9.2 bay street emeryville grocery store staff report
Item 9.2 bay street emeryville grocery store staff report
 
2021 Emeryville Special Election Petition
2021 Emeryville Special Election Petition2021 Emeryville Special Election Petition
2021 Emeryville Special Election Petition
 
Wdwg press packet
Wdwg press packetWdwg press packet
Wdwg press packet
 
8 6 updated_reopeningschoolsdata_0
8 6 updated_reopeningschoolsdata_08 6 updated_reopeningschoolsdata_0
8 6 updated_reopeningschoolsdata_0
 
History and Innovation in Emeryville
History and Innovation in EmeryvilleHistory and Innovation in Emeryville
History and Innovation in Emeryville
 
Onni deemed withdrawn letter 07 22-20
Onni deemed withdrawn letter 07 22-20Onni deemed withdrawn letter 07 22-20
Onni deemed withdrawn letter 07 22-20
 
Item 7.1 art center study session
Item 7.1   art center study sessionItem 7.1   art center study session
Item 7.1 art center study session
 
Lpas rcs-3600-san-pablo
Lpas rcs-3600-san-pabloLpas rcs-3600-san-pablo
Lpas rcs-3600-san-pablo
 
Tejada retirement notice
Tejada retirement noticeTejada retirement notice
Tejada retirement notice
 
Fy 2019 21 mid-cycle budget review 5-14-2020
Fy 2019 21 mid-cycle budget review 5-14-2020Fy 2019 21 mid-cycle budget review 5-14-2020
Fy 2019 21 mid-cycle budget review 5-14-2020
 
Biomed realty-emeryville-center-innovation
Biomed realty-emeryville-center-innovationBiomed realty-emeryville-center-innovation
Biomed realty-emeryville-center-innovation
 
2020.03.19 covid-19 emergency rental assistance program
2020.03.19   covid-19 emergency rental assistance program2020.03.19   covid-19 emergency rental assistance program
2020.03.19 covid-19 emergency rental assistance program
 
Dec 3 2019 cc meeting proposed sales tax measure
Dec 3 2019 cc meeting   proposed sales tax measureDec 3 2019 cc meeting   proposed sales tax measure
Dec 3 2019 cc meeting proposed sales tax measure
 
Ac fr ogdxe1o77gyvrw6rruvtw7lusdahpeh-u_k0fz0g0qzdx80n9wtveg4_p2c17d1b-r2m4zv...
Ac fr ogdxe1o77gyvrw6rruvtw7lusdahpeh-u_k0fz0g0qzdx80n9wtveg4_p2c17d1b-r2m4zv...Ac fr ogdxe1o77gyvrw6rruvtw7lusdahpeh-u_k0fz0g0qzdx80n9wtveg4_p2c17d1b-r2m4zv...
Ac fr ogdxe1o77gyvrw6rruvtw7lusdahpeh-u_k0fz0g0qzdx80n9wtveg4_p2c17d1b-r2m4zv...
 

Dernier

Dernier (20)

The NAP process & South-South peer learning
The NAP process & South-South peer learningThe NAP process & South-South peer learning
The NAP process & South-South peer learning
 
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
 
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
 
TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...
TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...
TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...
 
celebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hour
celebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hourcelebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hour
celebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hour
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCC
 
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
 
Election 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfElection 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdf
 
2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29
 
PPT BIJNOR COUNTING Counting of Votes on ETPBs (FOR SERVICE ELECTORS
PPT BIJNOR COUNTING Counting of Votes on ETPBs (FOR SERVICE ELECTORSPPT BIJNOR COUNTING Counting of Votes on ETPBs (FOR SERVICE ELECTORS
PPT BIJNOR COUNTING Counting of Votes on ETPBs (FOR SERVICE ELECTORS
 
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition PlansSustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
 
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'IsraëlAntisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
 
World Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - PosterWorld Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - Poster
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar
 
Pimpri Chinchwad ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi R...
Pimpri Chinchwad ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi R...Pimpri Chinchwad ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi R...
Pimpri Chinchwad ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi R...
 
Financing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCFinancing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCC
 
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptx
 
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
 
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
 

Sherwin williams-land-use-programming

  • 1. January 3, 2017Sherwin Williams Development SHERWIN WILLIAMS DEVELOPMENT LAND USE PROGRAMMING
  • 2. Sherwin Williams Development 1January 3, 2017 PDP SITE PLAN The approved PDP site plan provides the framework for open spaceandbuildingdevelopment including establishing the overall building heights. The final size and configuration of each building and open space will be developed as part of the FDP process. 320’ 190’ 30’ 25’ 40’ 98’ 195’ 60’ 85’ 90’ +- +- +- +- +- +- +- +- +- +-
  • 3. January 3 2017Sherwin Williams Development 2 WINTER SOLSTICE - DEC 21 SPRING/FALL EQUINOX - MAR|AUG 21 SUMMER SOLSTICE - JUN 21 9 am 9 am 9 am 12 pm 12 pm 12 pm 3 pm 3 pm 3 pm SHADOW STUDY Building massing and shadow study is based on approved PDP building heights *
  • 4. January 3, 2017Sherwin Williams Development LANDUSEPROGRAMMING 3 HORTON STREET EXISTING PARKING LOT SHERWINAVENUE RAILROAD TRACKS Sherwin Williams open space for Emeryville offers a number of positive amenities for the neighboring community and City wide including; · connections with existing and new pedestrian and bike trails to other parts of the City · influence from the connection with the onsite Sherwin Williams history · view participation with the extensive adjacent rail throughway · experience with re-created natural landscape systems · informal play and performance experiences · new recreational and garden experiences · informal and formalized gathering opportunities Facilities and vocabulary will be an interpreted expression of the unique aspects of the City’s industrial roots. Urban streetscapes, architectural character and connected green spaces will help to express the new neighborhood interwoven with the heritage of the area. As a result of the facilities that are constructed to enable these experiences – the City of Emeryville will be enriched as a community. DISTRICT2 Existing Building A entry point entry point entry point entry point Proposed Building Proposed Building C Proposed Building D OVERALL NARRATIVE Existing Building A Proposed Building DISTRICT1 DISTRICT 1 DISTRICT 3 DISTRICT 3 link to trail DISTRICT 2 outdoor art play areas emeryville greenway cafe/brewery seating adult exercise bocce canopy trees canopy trees small children playground tennis parking large multi- purpose lawn berms/ elevation change passive use play area picnic space bbq grills/ group eating areas public art/sculpture bike express lane natural demonstration gardens history interpretation areas sitting areas heritage tree seating community bike share station movies/events map kiosk along bike trail train viewingplatform community garden portal chess table and seating history/ interpretation areas reflecting & refracting sunlight through inviting/ interactive lighting & design CONNECTIONPASSIVEservice area video wall living wall coffee kiosk DOG PARK off-leash area small dog area CITY PARK PASSIVE PARK PASS THROUGH LINEAR OPEN SPACE DISTRICT 4: BOULEVARD DISTRICT accommodate outdoor living areas as extension of the ground floor entry point strong connection strong connection PLAZA ART GALLERY SPACE entry point
  • 5. January 3, 2017Sherwin Williams Development DISTRICT1:WAREHOUSEDISTRICT 4 Keymap 3 N.T.S 1 2 4 DISTRICT 1: WAREHOUSE DISTRICT Open Space: The open space in this block is composed of several distinct spaces with different character, activities and materials. Materials will reference the architecture themes of industrial. The Alley Space between the two residential/ mixed use buildings is pedestrian use only and is shared between the existing Sherwin Williams Building and new building. Emphasis will be on contrasts in paving materials and interesting plantings encouraging lingering and respite. Large trees in raised planters will bring definition to the overall space and foster seating alcoves and breakout spaces for small group activities for the residents and neighbors. A Pass-Through Space is created by a portal through the existing Sherwin Williams Building – making a visual and physical connection to the park. This connects bike circulation to the Greenway Extension. The Horton Art Gallery Space – substantial frontage on Horton the courtyard is an extension of the galley in an outdoor garden setting. The landscape will be substantially hardscape with modern forms, materials and furniture. Plantings will be used as garden architecture.
  • 6. January 3, 2017Sherwin Williams Development DISTRICT 2: PARK DISTRICT Open Space: This largest area of open space – Sherwin Avenue Park - is suitable for various activities and has approximately 50% streetscape frontage – making easy accessibility to the neighborhood. The heart of the development it offers a convenient connection and continuation of the Greenway Extension. The character and materials of the space are intentionally simple, durable, and open to encourage programming and impromptu use. A street tree pattern will continue through the frontage. Trees at the perimeter will create skyline and urban green. Potential uses of the open space include: • ‘Big Green’ without definition to be programmable. • Performance space. • ‘Big Forest’ edges allowing varied passive uses under the trees. • Group bar-be-que and picnic facility. • Kids creative play area • Family, kids, and dog friendly. • Functional and aesthetically interesting graphics and lighting. • Access to public restrooms. DISTRICT2:PARKDISTRICT Keymap 3 N.T.S 5 2 4 1
  • 7. January 3, 2017Sherwin Williams Development DISTRICT3:RAILDISTRICT 6 Keymap N.T.S 1 2 4 3 DISTRICT 3: RAIL DISTRICT Open Space: This Linear Park space provides the buffer for the overall project and the adjacent rail lines. It also incorporates the extension of the Emeryville Greenway connecting Halleck Street to the future Horton Landing Park and beyond. This area is intended to accommodate travel through the site with areas to stop and enjoy the open space. The landscape character will be naturalistic with mounding, native and native-like plants, upgrading of the perimeter boundary, and a synergy with the proposed adjacent City Park. Potential uses of the open space include: • Emeryville Greenway multi-use trail extension • History interpretive vocabulary • Native plant demonstration • Train viewing opportunities • Sitting opportunities • Wayfinding graphics • Play activities for kids • Building murals
  • 8. January 3, 2017Sherwin Williams Development DISTRICT4:BOULEVARDDISTRICT 7 Keymap 3 N.T.S 1 2 4 DISTRICT 4: BOULEVARD DISTRICT Open Space: The interior Hubbard and 46th Street open space provides the primary public circulation component through the site to accommodate car, bike, and pedestrian traffic, vehicular access to the garages, and limited on-street parking for commercial uses. It will also serve as an extension of ground floor active uses from the adjacent buildings. The paving, tree locations and street furniture will advance an urban character and encourage shared use between cars, bikes, and pedestrians – enforced with traffic calming devices. Materials will reference the architecture themes of industrial. Potential uses of the open space may include: • Vehicular traffic • “On-street” parking • Pedestrian and bicycle circulation • Sitting areas • Outdoor living areas • Bike share amenity • Car share amenity • Street trees and landscaping