• In April 2007, the Virginia General Assembly authorized Northern Virginia localities the
authority to implement a supplemental tax on commercial and industrial property for
transportation purposes.
• The Fairfax County Board of Supervisors approved an ordinance establishing the
commercial and industrial property tax for transportation in September 2007.
• Collection of this revenue source began in 2008 (FY 2009).
• The C&I tax is currently a $0.125 assessment per $100 of assessed value of
commercial and industrial real estate within the County.
2
County of Fairfax, Virginia
Transportation Funding Challenges
• The County’s C&I revenue is just one source of many revenue sources that are
needed to fund transportation improvements.
– Rare to find large projects funded by only one source.
– Often, a combination of local, regional, state, and federal sources are needed.
• Funding sources and requirements change periodically.
– Funding may need to be shifted from projects that cannot be built in the near
future to projects that are shovel-ready.
– While some sources of revenue are eliminated, new sources may arise, such as
HB 2313 (2013).
• C&I revenues are flexible. C&I funding can be used to start or complete a project, and
remains flexible enough to shift from one project to another.
3
County of Fairfax, Virginia
There are three general ways the County uses
C&I revenue to advance projects.
• To date, the County’s Board of Supervisors have approved project allocations for
anticipated C&I revenues through FY 2020.
• Approximately $650 million has been approved by the Board and allocated to
transportation projects countywide.
• In general, C&I revenues help advance transportation projects in these significant
ways:
– Primary funding source
– Supplemental funding source
– Strategic reserves
4
County of Fairfax, Virginia
Primary Funding Source
• C&I revenues are used as the sole or primary funding source for a variety of
transportation projects.
• Without C&I revenues, it is unlikely these projects would ever be advanced without
some other new funding source.
– Fairfax Connector expanded bus service and fleet purchases, and facility
expansions and associated maintenance.
– Pedestrian and bicycle improvement projects that provide common sense
connections for pedestrians and bicyclists, including connections to Metrorail
stations and transit facilities, improvements in major activity centers and missing
links.
– Debt service on $50 million in Economic Development Authority (EDA) revenue
bonds for transportation projects.
• EDA bonds supports projects like: Lorton Road widening, Jones Branch
Connector, Springfield Park and Ride parking garage, and Route 29
widening.
5
County of Fairfax, Virginia
Examples of C&I Funding as a Primary Source
• Fairfax Connector Expansion Service
– C&I contribution: ~ $225 million through FY20
– Some service includes: Expansion of high priority/ridership routes (i.e. 171 (Richmond
Highway), 401/402 (Springfield/Tysons), 950 (Dulles Corridor)), and Centreville-
Chantilly service, and Tysons Circulator.
• Pedestrian and Bicycle Projects
– Project cost: > $220 million
– C&I contribution: > $100 million
– More than 130 projects Countywide
• (i.e. Lees Corner Road Walkway, Hunter Village
Drive Walkway, Van Dorn Street Bike and Pedestrian Improvements, Sleepy
Hollow Road Walkways, Compton Road Walkway, Little River Turnpike Corridor
Improvements, Chesterbrook and Kirby Roads Improvements)
• Debt Service on EDA revenue bonds and TIFIA loan
– C&I contribution to EDA debt service:
~ $11.6 million through FY20
– C&I contribution to TIFIA: $13.5 million/year starting in FY 2024.
6
County of Fairfax, Virginia
Supplemental Funding Source
• C&I revenues are also used as the last remaining funding piece for large projects with
multiple funding sources.
• As a supplemental funding source, C&I revenues complete the funding for long
awaited projects and ensure that other projects aren’t delayed due to lack of funding.
• At times, C&I revenues are used in this way to respond to unexpected situations such
as the reduction or elimination of previously allocated funding or an increase in a
project’s cost estimate. C&I funding helps to keep project implementation moving
forward.
7
County of Fairfax, Virginia
Examples of C&I Funding as a Supplemental
Source
• Stringfellow Road widening (4 to 6
lanes) – Fair Lakes Parkway to US 50
– Project cost: ~$61 million
– C&I contribution: - $6 million
– Open to traffic December 15, 2014
• Jones Branch Connector extension
– Project cost: ~$56 million
– C&I contribution: ~$18 million
– Design completion scheduled for
Fall 2016.
• Route 29 widening (Legato Road to
Shirley Gate Road)
– Project cost: ~ $14 million
– C&I contribution: ~ $5 million
– Construction begins in Spring 2015
• West Ox Bus Garage Phase II
Construction
– Project cost: ~$20 million
– C&I contribution: ~$2 million
– Construction Summer 2015
• Lorton Road widening (Route 123 to
Silverbrook)
– Project cost: - $58 million
– C&I contribution: ~ $40 million
– Under construction
• Rolling Road widening (Old Keene Mill
to Franconia Springfield Pkwy)
– Project Cost: - $35 million
– C&I contribution: - $2 million
– In preliminary engineering
8
County of Fairfax, Virginia
Strategic Reserves
• Some C&I revenues are held in reserve to take advantage of the following
opportunities:
– Advanced purchase of land for a future project at below market values
• i.e. Annandale (McWhorter Place), Springfield parking garage, Telegraph
Road
– Initiating planning studies and preliminary engineering work for future projects
• i.e. Herndon Metrorail Station Access Management study, Tysons Corner /
Dulles Toll Road ramp connections
– Taking advantage of grant opportunities that require matching funds
• i.e. the Commonwealth’s Revenue Sharing program, and Council of
Governments (COG) Transportation Alternatives Program (TAP)
• C&I revenues allow the County to implement more transportation projects than it
would otherwise be able to do under existing funding sources.
9
County of Fairfax, Virginia
Distribution of FY09-FY20 Approved C&I
Allocations
10
Capital Equipment,
2.6%
Capital Projects,
57.6%
Transit Operating,
35.4%
Debt Service/Reserve,
4.4%
County of Fairfax, Virginia
Selected Completed Projects
Transit Capital
• Fairfax Connector bus purchase (16) for expansion
service, complete
• Wiehle – Reston East Metrorail parking garage,
complete
• West Ox Bus Garage Expansion Design, construction
scheduled for Summer/Fall 2015.
Roadway Capital
• Jeff Todd Way (Mount Vernon Hwy/Route 1 to
Telegraph Road), open to traffic
• Telegraph Road Widening (Beulah to Leaf), open to
traffic
• Stringfellow Road Widening (Fair Lakes Pkwy to US
50), open to traffic
• Nearly 15 countywide Spot Roadway intersection
improvement projects
– Danbury Forest @ Wakefield Chapel
– Gambrill Road @ Pohick Road
– Westmoreland @ Haycock
– North Kings Highway Median
– Arlington Boulevard @ Graham Road
– Fox Mill Road @ Monroe Street
Pedestrian and Bicycle Projects
• More than 50 countywide Pedestrian and Bicycle
improvement projects including:
– Lewinsville Road Improvements
– Powatan Street Walkway
– Mount Vernon Highway Walkway
– Dead Run Drive Sidewalk
– School Street Sidewalk
– Wiehle Avenue Trail
– Intersection improvements along Leesburg Pike
and Old Dominion Drive
– Little River Turnpike and Backlick Road
– Intersection improvements along Braddock
Road
– Burke Center Parkway Walkway
Studies
• Herndon Metrorail Station Access Management
• Tysons Corner / Dulles Toll Road ramp connections
11
County of Fairfax, Virginia
Current/Ongoing Projects
Transit Capital
• Springfield parking garage
– Currently under design
– $10 million in C&I allocation
• Huntington Bus Facility improvements
– Construction scheduled Summer 2015
– $5.2 million in C&I allocation
• Herndon and Innovation Center Metrorail Stations
parking garages
– Currently under design
– $7.5 million in C&I allocation
• Lorton VRE Park & Ride parking expansion
– Design scheduled to begin in Summer 2015
– $2.1 million in C&I allocation
• Stringfellow Road Park & Ride
– Construction scheduled Spring 2015
– $1.1 million in C&I allocation
• Dulles Rail Phase II Capital
– Debt service on ~ $180 million TIFIA loan.
Transit Operating
• Fairfax Connector expansion service ongoing
– ~$225 million in approved allocations through
FY20 for:
• Routes 151/152 – Mount Vernon,
• Route 171 - Richmond Highway,
• Routes 401/402 - Springfield/Tysons,
• Route 950 - Dulles Corridor,
• Routes 493/494/495 – I-495 Express
Lanes Routes,
• Routes 422/423/424 – Tysons Circulator,
• and Centreville-Chantilly expansion
service out of West Ox.
12
County of Fairfax, Virginia
Current/Ongoing Projects Continued
Roadway Capital
• Lorton Road widening (Route 123 to Silverbrook
Road)
– Currently under construction
– $40 million in C&I allocation
• Jones Branch Connector extension
– Design scheduled to be complete Fall 2016
– ~$18 million in C&I allocation
• Route 29 Widening (Legato Road to Shirley Gate
Road)
– Construction begins Spring 2015
– ~$5 million in C&I allocation
Pedestrian and Bicycle Projects
More than 80 countywide Pedestrian and Bicycle
improvement projects in early stages of preliminary
engineering or design including:
• Mount Vernon Memorial Highway (Potomac Heritage
National Scenic Trail) - Complete missing segments
of the trail from Route 1 to Grist Mill Park. Includes
bridge over Dogue Creek.
– $6.5 million in C&I allocation
• Herndon Metrorail Station Access Management Study
(HMSAMS), and Reston Metrorail Access Group
projects (RMAG)
– Construction of intersection pedestrian
improvements, new sidewalks, new trails and
new on-road bicycle facilities around the
Herndon and Innovation Center Metrorail
Stations.
– ~$12 million in C&I allocation (HMSAMS)
– ~$15 million in C&I allocation
• Backlick Road Walkway – Provides two segments of
walkway along Backlick Road.
– $3.1 million in C&I allocation
• Edsall Road Walkway - Provides two segments of
walkway along Edsall Road.
– $4.7 million in C&I allocation
• Cinder Bed Road Bikeway - Provide approximately
three miles of bikeway, from Fairfax County Parkway
to the Franconia-Springfield Metrorail station.
– $4 million in C&I allocation.
• Arlington Boulevard Walkway - Construct walkway on
the south side from 8301 Arlington Boulevard to
Gallows Road.
– $700,000 in C&I allocation.
13
County of Fairfax, Virginia
Questions?
14
County of Fairfax, Virginia
15
County of Fairfax, Virginia
16
County of Fairfax, Virginia
17
County of Fairfax, Virginia
Distribution of FY09-FY20 Approved C&I
Allocations
Project
Implementation &
Support, 6.1%
Capital Equipment, 2.5%
Capital Projects, 54.0%
Transit Operating, 33.2%
Debt Service/Reserve,
4.1%
18
County of Fairfax, Virginia
Examples of C&I Funding as a Primary Source
• Fairfax Connector Expansion Service
– C&I contribution: ~ $225 million through FY20
– Some service includes: Tysons Circulator; expansion of high priority/ridership
routes (i.e. 171 (Richmond Highway), 401/402 (Springfield/Tysons), 950 (Dulles
Corridor)), and West County mid-day service
• Pedestrian and Bicycle Projects
– Project cost: > $220 million
– C&I contribution: > $100 million
– More than 130 projects Countywide
• Debt Service on $50 million EDA revenue bonds
– C&I contribution: -$11.6 million through FY20
19
County of Fairfax, Virginia
Long Term Outlook FY21-FY30
Project
Implementation
& Support,
8.4%
Capital
Projects, 17.9%
Transit
Operating,
52.7%
Debt
Service/Reserv
e, 21.1%
• $635 million in estimated
C&I revenues to be
allocated.
• Assumes 2.5%
growth in assessed
value.
• Increased contribution to
debt service due to TIFIA.
• Increased contribution to
transit due to increases in
costs outpacing growth in
revenues.
20
County of Fairfax, Virginia
C&I Statement FY09 – FY14
Actuals
Revenues FY09 FY10 FY11 FY12 FY13 FY14 FY09-FY14
Beginning Balance $46,775,993 $60,348,670 $57,311,012 $66,371,422 $79,117,104
C&I Tax $52,567,744 $50,874,426 $40,620,771 $41,852,100 $45,598,592 $51,623,604 $ 283,137,237
Miscellaneous $0 $0 $6,681,688 $267,090 $8,416,922 $229,167 $ 15,594,867
MWAA $0 $0 $0 $328,775 $507,081 $1,138,042 $ 1,973,898
EDA Bonds $0 $0 $0 $0 $0 $0 $ -
Total $52,567,744 $97,650,419 $107,651,129 $99,758,977 $120,894,017 $132,107,917 $300,706,002
Expenditures
Project
Implementation & Support $1,433,308 $2,276,646 $2,808,073 $2,880,006 $3,218,679 $3,282,394 $ 15,899,106
Capital Equipment $639,223 $7,556,285 $4,882,131 $3,679,888 $0 $0 $ 16,757,527
Capital Projects $3,719,220 $11,961,606 $31,782,299 $7,368,189 $11,856,248 $11,038,527 $ 77,726,089
Transit Operating $0 $15,507,212 $10,867,614 $19,459,472 $26,701,986 $11,442,434 $ 83,978,718
Debt Service/Reserve $0 $0 $0 $0 $0 $0 $ -
Total $5,791,751 $37,301,749 $50,340,117 $33,387,555 $41,776,913 $25,763,355 $194,361,440
Balance $46,775,993 $60,348,670 $57,311,012 $66,371,422 $79,117,104 $106,344,562 $ 106,344,562
21
County of Fairfax, Virginia
Distribution of FY09-FY14 C&I Expenditures
Project
Implementation & Support,
8.2%
Capital Equipment, 8.6%
Capital Projects, 40.0%
Transit Operating, 43.2%
22
County of Fairfax, Virginia
C&I Planned Allocations FY15 – FY20
Estimates
Revenues FY15 FY16 FY17 FY18 FY19 FY20 FY15-FY20
Beginning Balance $106,344,562 $0 $0 $0 $0 $0 $ 106,344,562
C&I Tax $50,495,455 $51,623,604 $52,139,840 $52,661,238 $53,977,769 $55,327,214 $ 316,225,121
Miscellaneous $3,167,200 $0 $0 $0 $0 $0 $ 3,167,200
MWAA $4,756,102 $0 $0 $0 $0 $0 $ 4,756,102
EDA Bonds $0 $50,000,000 $0 $0 $0 $0 $ 50,000,000
Total $164,763,319 $101,623,604 $52,139,840 $52,661,238 $53,977,769 $55,327,214 $480,492,985
Expenditures
Project
Implementation & Support $ 4,417,356 $ 3,918,836 $ 4,045,401 $ 4,176,078 $ 4,311,001 $ 4,450,310 $ 25,318,982
Capital Equipment $ - $ - $ - $ - $ - $ - $ -
Capital Projects $ 126,248,966 $ 72,952,560 $ 22,358,882 $ 21,722,003 $ 21,829,768 $ 21,917,739 $ 287,029,918
Transit Operating $ 20,796,997 $ 21,852,208 $ 22,835,557 $ 23,863,157 $ 24,937,000 $ 26,059,165 $ 140,344,084
Debt Service/Reserve $ 13,300,000 $ 2,900,000 $ 2,900,000 $ 2,900,000 $ 2,900,000 $ 2,900,000 $ 27,800,000
Total $ 164,763,319 $ 101,623,604 $ 52,139,840 $ 52,661,238 $ 53,977,769 $ 55,327,214 $480,492,984
Balance $0 $0 $0 $0 $0 $0
23
County of Fairfax, Virginia
Planned Allocation of FY15-FY20 C&I Revenues
Project
Implementation & Support,
5.3%
Capital Projects, 59.7%
Transit Operating, 29.2%
Debt Service/Reserve, 5.8%
24
County of Fairfax, Virginia
There are four general ways the County uses
C&I revenue to advance projects.
• To date, the County’s Board of
Supervisors have approved project
allocations for anticipated C&I revenues
through FY 2020.
• Approximately $480 million has been
allocated to transportation projects
countywide.
• In general, C&I revenues help advance
transportation projects in four different
ways:
– Primary funding source
– Supplemental funding source
– Strategic reserves
– Project implementation
Implementatio
n
6%
Strategic
Reserves
22%
Primary
Funding
Source
63%
Supplemental
Funding
Source
9%
26
County of Fairfax, Virginia
Examples of C&I Funding as a
Supplemental Source
• C&I revenues are also used as
the last remaining funding piece
for large projects with multiple
funding sources.
• Many times, C&I revenues are
used in this way to respond to
unexpected situations such as
the reduction or elimination of
previously allocated funding or
an increase in a project’s cost
estimate.
• As a supplemental funding
source, C&I revenues complete
the funding for long awaited
projects and ensure that other
projects aren’t delayed due to
lack of funding.
C&I
Other
Sources
$0 $20 $40 $60 $80 $100 $120 $140
Route 29 at Gallows Road Intersection Project
Project cost: $119 million
C&I
Other
Sources
$0 $10 $20 $30 $40
Route 7 Widening – Rolling Holly Dr to Reston Ave
Project cost: $36.6 million
Stringfellow Road Widening – Fair Lakes Parkway to US
Project cost: $60.9 million
C&I
Other
Sources
$0 $10 $20 $30 $40 $50 $60 $70
27
County of Fairfax, Virginia
What projects are currently funded or planned with C&I revenues?
$314 Million Allocated to Various Project Categories FY13-FY16
Total C&I Allocations FY13-16 $314,034,692
Roadway Projects $61,337,219
Transit Projects $134,342,810
Pedestrian, Bike, Bus Stop, and
Spot Intersection
Improvements $31,840,443
Dulles Rail and Tysons Corner
Related Projects $42,189,280
BRAC Related Projects $3,243,102
Advanced Planning, Design,
Land Acquisition for Future
Projects and Project Reserves $41,081,838
Roadway Projects
20%
Transit Projects
43%
Pedestrian, Bike, Bus
Stop, and Spot
Intersection
Improvements
10%
Dulles Rail and Tysons
Corner Related
Projects
13%
BRAC Related Projects
1%
Advanced Planning,
Design, Land
Acquisition for Future
Projects and Project
Reserves
13%
28
County of Fairfax, Virginia
What projects are currently funded or planned with C&I revenues?
$314 Million Allocated to Projects in Various Stages FY13-FY16
Design, Land
Acquisition, Construction
20.14%
Design, Land Acquisition
3.87%
Capital
Equipment
Purchase
1.06%
Ongoing Operating
Support
41.50%
Match
0.67%
Project Reserve
22.00%
Design
0.97%
Debt Service
8.96%
Planning
0.44%
Land Acquisition
0.40%
Project Funded Stages
Design, Land Acquisition, Construction
Design, Land Acquisition
Capital Equipment Purchase
Ongoing Operating Support
Match
Project Reserve
Design
Debt Service
Planning
Land Acquisition
29
County of Fairfax, Virginia
Fairfax County encountered dramatic changes in
transportation funding over the past two years.
HB 2313
• During the Winter/Spring 2013 Virginia General Assembly (GA) session, the GA met and considered a variety of
transportation funding strategies/bills.
• In April 2013, HB 2313, a transportation funding plan that included regional funding for Northern Virginia, is
enacted.
– Provides approximately $300 million annually to the Northern Virginia region.
70% will be provided to the Northern Virginia Transportation Authority (NVTA) to be used on:
• Regional projects included in TransAction 2040 that have evaluated by VDOT for congestion mitigation or
• Mass transit capital projects that increase capacity.
• The Authority shall give priority to selecting projects that are expected to provide the greatest congestion
reduction relative to the cost of the project
30% of funds will be distributed to the individual localities for transportation needs:
• Uses include: urban or secondary road construction, capital improvements that reduce congestion, projects
included in TransAction 2040 or its updates, and public transportation purposes.
• Localities must enact the local C&I tax at $0.125 per $100 valuation or dedicate an equivalent amount to
transportation to receive the full amount.
30
County of Fairfax, Virginia
HB2313 – Additional Taxes• Additional Taxes:
– Sales tax on new vehicles in VA to increase from 3% to 4.3% of total
sales price. Expected Revenue: $900 million
– Regional Congestion Relief Fee, grantor’s tax on real estate property
transactions in Northern VA are increased by .25 for every $100 in sales
price.
– Transient Occupancy Tax – “Hotel Tax” is 3%
– Bill includes Federal Marketplace Equity Act (HR3179) funding. It allows
states to charge sales taxes on internet sales. When HB2313 passed
the Virginia General Assembly, HR3179 was still being drafted. If the bill
doesn’t pass by January 2015 the sales tax on gas increases 1.7%
– Annual $100 license fee for alternative fuel vehicles.
– Change in structure of gas taxes. Old tax 17.5% per gallon of gas price is
gone. New tax 3.5% on wholesale gas prices and 6% on diesel fuel.
31
County of Fairfax, Virginia
HB2313 – Projected Revenues
• $3.5B – VA highways and rails over the next 5 years
– $880M – annually after the first 5 years
• $300-350M for Northern Virginia
– 30% of total revenues after the first 5 years
Revenue Composition:
• $1.5B total increase in state taxes over next five years.
• $1.2B over next five years from increased vehicle titling taxes
• $200M moved from Virginia’s General Fund to transportation
• $300M from general funds for Metro Silver Line extension
• $300-350M raised each year by maintaining 2.1% local fuel taxes
• Increased percentage of general fund transfer to transportation from 0.5% to 0.675%
32
County of Fairfax, Virginia
HB2313 – Virginia Transportation Funding Bill and C&I• Addresses transportation problems in Northern Virginia, first
time since 1986.
• Fairfax County‘s 30% share of HB2313 funds in FY14 is $37.5
million
• Programmed in the Commercial and Industrial Tax fund
33
County of Fairfax, Virginia
HB 2313 Northern Virginia Revenue
70% will be provided to the Northern Virginia Transportation Authority
(NVTA) to be used on:
• Regional projects included in TransAction 2040 that have evaluated by VDOT for
congestion mitigation or
• Mass transit capital projects that increase capacity.
• The Authority shall give priority to selecting projects that are expected to provide
the greatest congestion reduction relative to the cost of the project
30% of funds will be distributed to the individual localities for
transportation needs:
• Uses include: urban or secondary road construction, capital improvements that
reduce congestion, projects included in TransAction 2040 or its updates, and
public transportation purposes.
• Localities must enact the local C&I tax at $0.125 per $100 valuation or dedicate an
equivalent amount to transportation to receive the full amount
34

Contenu connexe

Tendances

Richmond Highway Transit Center Feasibility Study: Public Information Meeting
Richmond Highway Transit Center Feasibility Study: Public Information MeetingRichmond Highway Transit Center Feasibility Study: Public Information Meeting
Richmond Highway Transit Center Feasibility Study: Public Information MeetingFairfax County
 
Fairfax County Countywide Transit Network Study-February 2016 Public Meetings
Fairfax County Countywide Transit Network Study-February 2016 Public MeetingsFairfax County Countywide Transit Network Study-February 2016 Public Meetings
Fairfax County Countywide Transit Network Study-February 2016 Public MeetingsFairfax County
 
I-66 Beltway to Haymarket - VDOT
 I-66 Beltway to Haymarket - VDOT I-66 Beltway to Haymarket - VDOT
I-66 Beltway to Haymarket - VDOTFairfax County
 
Dulles Rail Phase 1-Status Report: June 21, 2013
Dulles Rail Phase 1-Status Report: June 21, 2013Dulles Rail Phase 1-Status Report: June 21, 2013
Dulles Rail Phase 1-Status Report: June 21, 2013Fairfax County
 
Transportation Plan Map In County Comprehensive Plan-Completed Facilities
Transportation Plan Map In County Comprehensive Plan-Completed FacilitiesTransportation Plan Map In County Comprehensive Plan-Completed Facilities
Transportation Plan Map In County Comprehensive Plan-Completed FacilitiesFairfax County
 
Fairfax County Parkway/Franconia-Springfield Parkway: Alternatives Analysis a...
Fairfax County Parkway/Franconia-Springfield Parkway: Alternatives Analysis a...Fairfax County Parkway/Franconia-Springfield Parkway: Alternatives Analysis a...
Fairfax County Parkway/Franconia-Springfield Parkway: Alternatives Analysis a...Fairfax County
 
Reston Network Analysis: Community Meeting Tier 1 & Tier 2
Reston Network Analysis: Community Meeting Tier 1 & Tier 2Reston Network Analysis: Community Meeting Tier 1 & Tier 2
Reston Network Analysis: Community Meeting Tier 1 & Tier 2Fairfax County
 
Fairfax County Countywide Transit Network Study: Proposed High Quality Transi...
Fairfax County Countywide Transit Network Study: Proposed High Quality Transi...Fairfax County Countywide Transit Network Study: Proposed High Quality Transi...
Fairfax County Countywide Transit Network Study: Proposed High Quality Transi...Fairfax County
 
Braddock Road Multimodal Study-Guinea Road to I-495: Community Meeting No. 3:...
Braddock Road Multimodal Study-Guinea Road to I-495: Community Meeting No. 3:...Braddock Road Multimodal Study-Guinea Road to I-495: Community Meeting No. 3:...
Braddock Road Multimodal Study-Guinea Road to I-495: Community Meeting No. 3:...Fairfax County
 
Endorsement of the Recommended Design Concept (Preferred Alternative) for Tra...
Endorsement of the Recommended Design Concept (Preferred Alternative) for Tra...Endorsement of the Recommended Design Concept (Preferred Alternative) for Tra...
Endorsement of the Recommended Design Concept (Preferred Alternative) for Tra...Fairfax County
 
Status Report on the Columbia Pike Streetcar and Preview of Upcoming Decisions
Status Report on the Columbia Pike Streetcar and Preview of Upcoming DecisionsStatus Report on the Columbia Pike Streetcar and Preview of Upcoming Decisions
Status Report on the Columbia Pike Streetcar and Preview of Upcoming DecisionsFairfax County
 
Reston Transportation Funding Plan: Community Meeting June 27, 2016
Reston Transportation Funding Plan: Community Meeting June 27, 2016Reston Transportation Funding Plan: Community Meeting June 27, 2016
Reston Transportation Funding Plan: Community Meeting June 27, 2016Fairfax County
 
Reston Network Analysis: 2050 1st Tier Mitigation Results
Reston Network Analysis: 2050 1st Tier Mitigation ResultsReston Network Analysis: 2050 1st Tier Mitigation Results
Reston Network Analysis: 2050 1st Tier Mitigation ResultsFairfax County
 
Hunter Mill Road and Sunset Hills Road Study
Hunter Mill Road and Sunset Hills Road StudyHunter Mill Road and Sunset Hills Road Study
Hunter Mill Road and Sunset Hills Road StudyFairfax County
 
Fairfax County Countywide Transit Network Study-February 2016 Public Meeting:...
Fairfax County Countywide Transit Network Study-February 2016 Public Meeting:...Fairfax County Countywide Transit Network Study-February 2016 Public Meeting:...
Fairfax County Countywide Transit Network Study-February 2016 Public Meeting:...Fairfax County
 
Proposed Bicycle Facilities: VDOT Summer 2015 Repaving-Franconia Road
Proposed Bicycle Facilities: VDOT Summer 2015 Repaving-Franconia RoadProposed Bicycle Facilities: VDOT Summer 2015 Repaving-Franconia Road
Proposed Bicycle Facilities: VDOT Summer 2015 Repaving-Franconia RoadFairfax County
 
Mason District 2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...
Mason District 2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...Mason District 2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...
Mason District 2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...Fairfax County
 
Silver Line Update-Board Transportation Committee: Oct. 13, 2015
Silver Line Update-Board Transportation Committee: Oct. 13, 2015Silver Line Update-Board Transportation Committee: Oct. 13, 2015
Silver Line Update-Board Transportation Committee: Oct. 13, 2015Fairfax County
 
Continuation of Countywide Dialogue on Transportation
Continuation of Countywide Dialogue on TransportationContinuation of Countywide Dialogue on Transportation
Continuation of Countywide Dialogue on TransportationFairfax County
 
Fairfax County Bicycle Master Plan
Fairfax County Bicycle Master PlanFairfax County Bicycle Master Plan
Fairfax County Bicycle Master PlanFairfax County
 

Tendances (20)

Richmond Highway Transit Center Feasibility Study: Public Information Meeting
Richmond Highway Transit Center Feasibility Study: Public Information MeetingRichmond Highway Transit Center Feasibility Study: Public Information Meeting
Richmond Highway Transit Center Feasibility Study: Public Information Meeting
 
Fairfax County Countywide Transit Network Study-February 2016 Public Meetings
Fairfax County Countywide Transit Network Study-February 2016 Public MeetingsFairfax County Countywide Transit Network Study-February 2016 Public Meetings
Fairfax County Countywide Transit Network Study-February 2016 Public Meetings
 
I-66 Beltway to Haymarket - VDOT
 I-66 Beltway to Haymarket - VDOT I-66 Beltway to Haymarket - VDOT
I-66 Beltway to Haymarket - VDOT
 
Dulles Rail Phase 1-Status Report: June 21, 2013
Dulles Rail Phase 1-Status Report: June 21, 2013Dulles Rail Phase 1-Status Report: June 21, 2013
Dulles Rail Phase 1-Status Report: June 21, 2013
 
Transportation Plan Map In County Comprehensive Plan-Completed Facilities
Transportation Plan Map In County Comprehensive Plan-Completed FacilitiesTransportation Plan Map In County Comprehensive Plan-Completed Facilities
Transportation Plan Map In County Comprehensive Plan-Completed Facilities
 
Fairfax County Parkway/Franconia-Springfield Parkway: Alternatives Analysis a...
Fairfax County Parkway/Franconia-Springfield Parkway: Alternatives Analysis a...Fairfax County Parkway/Franconia-Springfield Parkway: Alternatives Analysis a...
Fairfax County Parkway/Franconia-Springfield Parkway: Alternatives Analysis a...
 
Reston Network Analysis: Community Meeting Tier 1 & Tier 2
Reston Network Analysis: Community Meeting Tier 1 & Tier 2Reston Network Analysis: Community Meeting Tier 1 & Tier 2
Reston Network Analysis: Community Meeting Tier 1 & Tier 2
 
Fairfax County Countywide Transit Network Study: Proposed High Quality Transi...
Fairfax County Countywide Transit Network Study: Proposed High Quality Transi...Fairfax County Countywide Transit Network Study: Proposed High Quality Transi...
Fairfax County Countywide Transit Network Study: Proposed High Quality Transi...
 
Braddock Road Multimodal Study-Guinea Road to I-495: Community Meeting No. 3:...
Braddock Road Multimodal Study-Guinea Road to I-495: Community Meeting No. 3:...Braddock Road Multimodal Study-Guinea Road to I-495: Community Meeting No. 3:...
Braddock Road Multimodal Study-Guinea Road to I-495: Community Meeting No. 3:...
 
Endorsement of the Recommended Design Concept (Preferred Alternative) for Tra...
Endorsement of the Recommended Design Concept (Preferred Alternative) for Tra...Endorsement of the Recommended Design Concept (Preferred Alternative) for Tra...
Endorsement of the Recommended Design Concept (Preferred Alternative) for Tra...
 
Status Report on the Columbia Pike Streetcar and Preview of Upcoming Decisions
Status Report on the Columbia Pike Streetcar and Preview of Upcoming DecisionsStatus Report on the Columbia Pike Streetcar and Preview of Upcoming Decisions
Status Report on the Columbia Pike Streetcar and Preview of Upcoming Decisions
 
Reston Transportation Funding Plan: Community Meeting June 27, 2016
Reston Transportation Funding Plan: Community Meeting June 27, 2016Reston Transportation Funding Plan: Community Meeting June 27, 2016
Reston Transportation Funding Plan: Community Meeting June 27, 2016
 
Reston Network Analysis: 2050 1st Tier Mitigation Results
Reston Network Analysis: 2050 1st Tier Mitigation ResultsReston Network Analysis: 2050 1st Tier Mitigation Results
Reston Network Analysis: 2050 1st Tier Mitigation Results
 
Hunter Mill Road and Sunset Hills Road Study
Hunter Mill Road and Sunset Hills Road StudyHunter Mill Road and Sunset Hills Road Study
Hunter Mill Road and Sunset Hills Road Study
 
Fairfax County Countywide Transit Network Study-February 2016 Public Meeting:...
Fairfax County Countywide Transit Network Study-February 2016 Public Meeting:...Fairfax County Countywide Transit Network Study-February 2016 Public Meeting:...
Fairfax County Countywide Transit Network Study-February 2016 Public Meeting:...
 
Proposed Bicycle Facilities: VDOT Summer 2015 Repaving-Franconia Road
Proposed Bicycle Facilities: VDOT Summer 2015 Repaving-Franconia RoadProposed Bicycle Facilities: VDOT Summer 2015 Repaving-Franconia Road
Proposed Bicycle Facilities: VDOT Summer 2015 Repaving-Franconia Road
 
Mason District 2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...
Mason District 2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...Mason District 2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...
Mason District 2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...
 
Silver Line Update-Board Transportation Committee: Oct. 13, 2015
Silver Line Update-Board Transportation Committee: Oct. 13, 2015Silver Line Update-Board Transportation Committee: Oct. 13, 2015
Silver Line Update-Board Transportation Committee: Oct. 13, 2015
 
Continuation of Countywide Dialogue on Transportation
Continuation of Countywide Dialogue on TransportationContinuation of Countywide Dialogue on Transportation
Continuation of Countywide Dialogue on Transportation
 
Fairfax County Bicycle Master Plan
Fairfax County Bicycle Master PlanFairfax County Bicycle Master Plan
Fairfax County Bicycle Master Plan
 

En vedette

Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages & WMATA ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages & WMATA ...Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages & WMATA ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages & WMATA ...Fairfax County
 
Board of Supervisors Transportation Committee: Proposed High Quality Transit ...
Board of Supervisors Transportation Committee: Proposed High Quality Transit ...Board of Supervisors Transportation Committee: Proposed High Quality Transit ...
Board of Supervisors Transportation Committee: Proposed High Quality Transit ...Fairfax County
 
VDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next Steps
VDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next StepsVDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next Steps
VDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next StepsFairfax County
 
Metrorail SafeTrack Overview and Mitigation
Metrorail SafeTrack Overview and MitigationMetrorail SafeTrack Overview and Mitigation
Metrorail SafeTrack Overview and MitigationFairfax County
 
Silver Line Update: Board Transportation Committee May 24, 2016
Silver Line Update: Board Transportation Committee May 24, 2016Silver Line Update: Board Transportation Committee May 24, 2016
Silver Line Update: Board Transportation Committee May 24, 2016Fairfax County
 
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...Fairfax County
 
Silver Line Phase 1-Status Report: Sept. 2013
Silver Line Phase 1-Status Report: Sept. 2013Silver Line Phase 1-Status Report: Sept. 2013
Silver Line Phase 1-Status Report: Sept. 2013Fairfax County
 
Requirements for Pedestrian Improvements on Road Projects in the Board's Six ...
Requirements for Pedestrian Improvements on Road Projects in the Board's Six ...Requirements for Pedestrian Improvements on Road Projects in the Board's Six ...
Requirements for Pedestrian Improvements on Road Projects in the Board's Six ...Fairfax County
 
Fairfax Connector Silver Line Bus Service
Fairfax Connector Silver Line Bus ServiceFairfax Connector Silver Line Bus Service
Fairfax Connector Silver Line Bus ServiceFairfax County
 
Update on Route 1 Multimodal Alternatives Analysis
Update on Route 1 Multimodal Alternatives AnalysisUpdate on Route 1 Multimodal Alternatives Analysis
Update on Route 1 Multimodal Alternatives AnalysisFairfax County
 
Snow Removal on Sidewalks
Snow Removal on SidewalksSnow Removal on Sidewalks
Snow Removal on SidewalksFairfax County
 
Dulles Metrorail Silver Line Phase 2 Status and Funding
Dulles Metrorail Silver Line Phase 2 Status and FundingDulles Metrorail Silver Line Phase 2 Status and Funding
Dulles Metrorail Silver Line Phase 2 Status and FundingFairfax County
 
Student Free Fare Program Update and Recommendations: Board Transportation Co...
Student Free Fare Program Update and Recommendations: Board Transportation Co...Student Free Fare Program Update and Recommendations: Board Transportation Co...
Student Free Fare Program Update and Recommendations: Board Transportation Co...Fairfax County
 
Board Transportation Committee Update: March 17, 2015
Board Transportation Committee Update: March 17, 2015Board Transportation Committee Update: March 17, 2015
Board Transportation Committee Update: March 17, 2015Fairfax County
 
Mobile Food Vending within VDOT Right-of-Way: Board Transportation Committee ...
Mobile Food Vending within VDOT Right-of-Way: Board Transportation Committee ...Mobile Food Vending within VDOT Right-of-Way: Board Transportation Committee ...
Mobile Food Vending within VDOT Right-of-Way: Board Transportation Committee ...Fairfax County
 
Herndon Metrorail Stations Access Management Study (HMSAMS)
Herndon Metrorail Stations Access Management Study (HMSAMS)Herndon Metrorail Stations Access Management Study (HMSAMS)
Herndon Metrorail Stations Access Management Study (HMSAMS)Fairfax County
 
Transform 66 Outside the Beltway: Multimodal Solutions- 495 to Haymarket
Transform 66 Outside the Beltway: Multimodal Solutions- 495 to HaymarketTransform 66 Outside the Beltway: Multimodal Solutions- 495 to Haymarket
Transform 66 Outside the Beltway: Multimodal Solutions- 495 to HaymarketFairfax County
 
Dulles Metrorail Silver Line Phase 2 Update
Dulles Metrorail Silver Line Phase 2 UpdateDulles Metrorail Silver Line Phase 2 Update
Dulles Metrorail Silver Line Phase 2 UpdateFairfax County
 
Fairfax County and the NVTA TransAction Update
Fairfax County and the NVTA TransAction UpdateFairfax County and the NVTA TransAction Update
Fairfax County and the NVTA TransAction UpdateFairfax County
 
I-66 Multimodal Improvements Inside the Beltway
I-66 Multimodal Improvements Inside the BeltwayI-66 Multimodal Improvements Inside the Beltway
I-66 Multimodal Improvements Inside the BeltwayFairfax County
 

En vedette (20)

Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages & WMATA ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages & WMATA ...Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages & WMATA ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages & WMATA ...
 
Board of Supervisors Transportation Committee: Proposed High Quality Transit ...
Board of Supervisors Transportation Committee: Proposed High Quality Transit ...Board of Supervisors Transportation Committee: Proposed High Quality Transit ...
Board of Supervisors Transportation Committee: Proposed High Quality Transit ...
 
VDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next Steps
VDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next StepsVDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next Steps
VDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next Steps
 
Metrorail SafeTrack Overview and Mitigation
Metrorail SafeTrack Overview and MitigationMetrorail SafeTrack Overview and Mitigation
Metrorail SafeTrack Overview and Mitigation
 
Silver Line Update: Board Transportation Committee May 24, 2016
Silver Line Update: Board Transportation Committee May 24, 2016Silver Line Update: Board Transportation Committee May 24, 2016
Silver Line Update: Board Transportation Committee May 24, 2016
 
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
 
Silver Line Phase 1-Status Report: Sept. 2013
Silver Line Phase 1-Status Report: Sept. 2013Silver Line Phase 1-Status Report: Sept. 2013
Silver Line Phase 1-Status Report: Sept. 2013
 
Requirements for Pedestrian Improvements on Road Projects in the Board's Six ...
Requirements for Pedestrian Improvements on Road Projects in the Board's Six ...Requirements for Pedestrian Improvements on Road Projects in the Board's Six ...
Requirements for Pedestrian Improvements on Road Projects in the Board's Six ...
 
Fairfax Connector Silver Line Bus Service
Fairfax Connector Silver Line Bus ServiceFairfax Connector Silver Line Bus Service
Fairfax Connector Silver Line Bus Service
 
Update on Route 1 Multimodal Alternatives Analysis
Update on Route 1 Multimodal Alternatives AnalysisUpdate on Route 1 Multimodal Alternatives Analysis
Update on Route 1 Multimodal Alternatives Analysis
 
Snow Removal on Sidewalks
Snow Removal on SidewalksSnow Removal on Sidewalks
Snow Removal on Sidewalks
 
Dulles Metrorail Silver Line Phase 2 Status and Funding
Dulles Metrorail Silver Line Phase 2 Status and FundingDulles Metrorail Silver Line Phase 2 Status and Funding
Dulles Metrorail Silver Line Phase 2 Status and Funding
 
Student Free Fare Program Update and Recommendations: Board Transportation Co...
Student Free Fare Program Update and Recommendations: Board Transportation Co...Student Free Fare Program Update and Recommendations: Board Transportation Co...
Student Free Fare Program Update and Recommendations: Board Transportation Co...
 
Board Transportation Committee Update: March 17, 2015
Board Transportation Committee Update: March 17, 2015Board Transportation Committee Update: March 17, 2015
Board Transportation Committee Update: March 17, 2015
 
Mobile Food Vending within VDOT Right-of-Way: Board Transportation Committee ...
Mobile Food Vending within VDOT Right-of-Way: Board Transportation Committee ...Mobile Food Vending within VDOT Right-of-Way: Board Transportation Committee ...
Mobile Food Vending within VDOT Right-of-Way: Board Transportation Committee ...
 
Herndon Metrorail Stations Access Management Study (HMSAMS)
Herndon Metrorail Stations Access Management Study (HMSAMS)Herndon Metrorail Stations Access Management Study (HMSAMS)
Herndon Metrorail Stations Access Management Study (HMSAMS)
 
Transform 66 Outside the Beltway: Multimodal Solutions- 495 to Haymarket
Transform 66 Outside the Beltway: Multimodal Solutions- 495 to HaymarketTransform 66 Outside the Beltway: Multimodal Solutions- 495 to Haymarket
Transform 66 Outside the Beltway: Multimodal Solutions- 495 to Haymarket
 
Dulles Metrorail Silver Line Phase 2 Update
Dulles Metrorail Silver Line Phase 2 UpdateDulles Metrorail Silver Line Phase 2 Update
Dulles Metrorail Silver Line Phase 2 Update
 
Fairfax County and the NVTA TransAction Update
Fairfax County and the NVTA TransAction UpdateFairfax County and the NVTA TransAction Update
Fairfax County and the NVTA TransAction Update
 
I-66 Multimodal Improvements Inside the Beltway
I-66 Multimodal Improvements Inside the BeltwayI-66 Multimodal Improvements Inside the Beltway
I-66 Multimodal Improvements Inside the Beltway
 

Similaire à Fairfax Commercial and Industrial Property Tax for Transportation

Fairfax County Commercial and Industrial Property Tax for Transportation
Fairfax County Commercial and Industrial Property Tax for TransportationFairfax County Commercial and Industrial Property Tax for Transportation
Fairfax County Commercial and Industrial Property Tax for TransportationFairfax County
 
Update of Fairfax County's Transportation Priorities Plan (TPP)
Update of Fairfax County's Transportation Priorities Plan (TPP)Update of Fairfax County's Transportation Priorities Plan (TPP)
Update of Fairfax County's Transportation Priorities Plan (TPP)Fairfax County
 
Transportation Priorities: Project Timelines and the 2014 Bond Referendum
Transportation Priorities: Project Timelines and the 2014 Bond ReferendumTransportation Priorities: Project Timelines and the 2014 Bond Referendum
Transportation Priorities: Project Timelines and the 2014 Bond ReferendumFairfax County
 
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...Fairfax County
 
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of CountywideDialogue on Transportation:Project SelectionA Si...Continuation of CountywideDialogue on Transportation:Project SelectionA Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...Fairfax County
 
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...Fairfax County
 
I-66 Inside the Beltway Initial Traffic Analysis and Framework Agreement
I-66 Inside the Beltway Initial Traffic Analysis and Framework AgreementI-66 Inside the Beltway Initial Traffic Analysis and Framework Agreement
I-66 Inside the Beltway Initial Traffic Analysis and Framework AgreementFairfax County
 
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages : Herndo...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages : Herndo...Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages : Herndo...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages : Herndo...Fairfax County
 
Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016
Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016
Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016Fairfax County
 
Reston Transportation Service District FY 2019 Tax Rate Discussion
Reston Transportation Service DistrictFY 2019 Tax Rate DiscussionReston Transportation Service DistrictFY 2019 Tax Rate Discussion
Reston Transportation Service District FY 2019 Tax Rate DiscussionFairfax County
 
Reston Funding Plan-Funding Scenarios
Reston Funding Plan-Funding ScenariosReston Funding Plan-Funding Scenarios
Reston Funding Plan-Funding ScenariosFairfax County
 
Transportation Priorities Plan: Future Updates
Transportation Priorities Plan: Future UpdatesTransportation Priorities Plan: Future Updates
Transportation Priorities Plan: Future UpdatesFairfax County
 
Transportation Priorities Plan Future Updates
Transportation Priorities Plan Future UpdatesTransportation Priorities Plan Future Updates
Transportation Priorities Plan Future UpdatesFairfax County
 
Update on Reston Development and Transportation Projects
Update on Reston Development and Transportation ProjectsUpdate on Reston Development and Transportation Projects
Update on Reston Development and Transportation ProjectsFairfax County
 
Fairfax County and the NVTA TransAction Update
Fairfax County and the NVTA TransAction UpdateFairfax County and the NVTA TransAction Update
Fairfax County and the NVTA TransAction UpdateFairfax County
 
Reston Transportation Funding Plan: July 15, 2016
Reston Transportation Funding Plan: July 15, 2016Reston Transportation Funding Plan: July 15, 2016
Reston Transportation Funding Plan: July 15, 2016Fairfax County
 
Fairfax County Comprehensive Transit Plan and Transit Development Plan
Fairfax County Comprehensive Transit Plan and Transit Development PlanFairfax County Comprehensive Transit Plan and Transit Development Plan
Fairfax County Comprehensive Transit Plan and Transit Development PlanFairfax County
 

Similaire à Fairfax Commercial and Industrial Property Tax for Transportation (20)

Fairfax County Commercial and Industrial Property Tax for Transportation
Fairfax County Commercial and Industrial Property Tax for TransportationFairfax County Commercial and Industrial Property Tax for Transportation
Fairfax County Commercial and Industrial Property Tax for Transportation
 
Update of Fairfax County's Transportation Priorities Plan (TPP)
Update of Fairfax County's Transportation Priorities Plan (TPP)Update of Fairfax County's Transportation Priorities Plan (TPP)
Update of Fairfax County's Transportation Priorities Plan (TPP)
 
Transportation Priorities: Project Timelines and the 2014 Bond Referendum
Transportation Priorities: Project Timelines and the 2014 Bond ReferendumTransportation Priorities: Project Timelines and the 2014 Bond Referendum
Transportation Priorities: Project Timelines and the 2014 Bond Referendum
 
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
 
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of CountywideDialogue on Transportation:Project SelectionA Si...Continuation of CountywideDialogue on Transportation:Project SelectionA Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
 
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
 
I-66 Inside the Beltway Initial Traffic Analysis and Framework Agreement
I-66 Inside the Beltway Initial Traffic Analysis and Framework AgreementI-66 Inside the Beltway Initial Traffic Analysis and Framework Agreement
I-66 Inside the Beltway Initial Traffic Analysis and Framework Agreement
 
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages : Herndo...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages : Herndo...Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages : Herndo...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages : Herndo...
 
Reston Funding Plan
Reston Funding PlanReston Funding Plan
Reston Funding Plan
 
Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016
Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016
Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016
 
Reston Transportation Service District FY 2019 Tax Rate Discussion
Reston Transportation Service DistrictFY 2019 Tax Rate DiscussionReston Transportation Service DistrictFY 2019 Tax Rate Discussion
Reston Transportation Service District FY 2019 Tax Rate Discussion
 
Reston Funding Plan
Reston Funding PlanReston Funding Plan
Reston Funding Plan
 
Reston Funding Plan-Funding Scenarios
Reston Funding Plan-Funding ScenariosReston Funding Plan-Funding Scenarios
Reston Funding Plan-Funding Scenarios
 
Transportation Priorities Plan: Future Updates
Transportation Priorities Plan: Future UpdatesTransportation Priorities Plan: Future Updates
Transportation Priorities Plan: Future Updates
 
Transportation Priorities Plan Future Updates
Transportation Priorities Plan Future UpdatesTransportation Priorities Plan Future Updates
Transportation Priorities Plan Future Updates
 
State of the City of Norman
State of the City of NormanState of the City of Norman
State of the City of Norman
 
Update on Reston Development and Transportation Projects
Update on Reston Development and Transportation ProjectsUpdate on Reston Development and Transportation Projects
Update on Reston Development and Transportation Projects
 
Fairfax County and the NVTA TransAction Update
Fairfax County and the NVTA TransAction UpdateFairfax County and the NVTA TransAction Update
Fairfax County and the NVTA TransAction Update
 
Reston Transportation Funding Plan: July 15, 2016
Reston Transportation Funding Plan: July 15, 2016Reston Transportation Funding Plan: July 15, 2016
Reston Transportation Funding Plan: July 15, 2016
 
Fairfax County Comprehensive Transit Plan and Transit Development Plan
Fairfax County Comprehensive Transit Plan and Transit Development PlanFairfax County Comprehensive Transit Plan and Transit Development Plan
Fairfax County Comprehensive Transit Plan and Transit Development Plan
 

Plus de Fairfax County

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementFairfax County
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS Fairfax County
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22Fairfax County
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxFairfax County
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19 Fairfax County
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationFairfax County
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction ProgressFairfax County
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxFairfax County
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IVFairfax County
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Fairfax County
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxFairfax County
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilFairfax County
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptxFairfax County
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT Fairfax County
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap UpFairfax County
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Fairfax County
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Fairfax County
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectFairfax County
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Fairfax County
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual ArtsFairfax County
 

Plus de Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 

Dernier

TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s LeadershipTDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadershipanjanibaddipudi1
 
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort ServiceDelhi Call girls
 
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...Andy (Avraham) Blumenthal
 
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)Delhi Call girls
 
Group_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the tradeGroup_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the tradeRahatulAshafeen
 
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docxkfjstone13
 
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...srinuseo15
 
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Kishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKISHAN REDDY OFFICE
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)Delhi Call girls
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)Delhi Call girls
 
05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Pakistan PMLN Election Manifesto 2024.pdf
Pakistan PMLN Election Manifesto 2024.pdfPakistan PMLN Election Manifesto 2024.pdf
Pakistan PMLN Election Manifesto 2024.pdfFahimUddin61
 
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopkoEmbed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopkobhavenpr
 
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptxLorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptxlorenzodemidio01
 
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...narsireddynannuri1
 
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdfFIRST INDIA
 
30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdfFIRST INDIA
 

Dernier (20)

TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s LeadershipTDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
 
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
 
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
 
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)
 
Group_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the tradeGroup_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the trade
 
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
 
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
 
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
 
Kishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdf
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
 
05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf
 
Pakistan PMLN Election Manifesto 2024.pdf
Pakistan PMLN Election Manifesto 2024.pdfPakistan PMLN Election Manifesto 2024.pdf
Pakistan PMLN Election Manifesto 2024.pdf
 
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopkoEmbed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
 
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptxLorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
 
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
 
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
 
04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf
 
30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf
 

Fairfax Commercial and Industrial Property Tax for Transportation

  • 1. County of Fairfax, Virginia Fairfax County Commercial and Industrial (C&I) Property Tax for Transportation Board Transportation Committee January 20, 2015 Tom Biesiadny and Ray Johnson Fairfax County Department of Transportation
  • 2. County of Fairfax, Virginia Fairfax County Commercial and Industrial (C&I) Tax for Transportation • In April 2007, the Virginia General Assembly authorized Northern Virginia localities the authority to implement a supplemental tax on commercial and industrial property for transportation purposes. • The Fairfax County Board of Supervisors approved an ordinance establishing the commercial and industrial property tax for transportation in September 2007. • Collection of this revenue source began in 2008 (FY 2009). • The C&I tax is currently a $0.125 assessment per $100 of assessed value of commercial and industrial real estate within the County. 2
  • 3. County of Fairfax, Virginia Transportation Funding Challenges • The County’s C&I revenue is just one source of many revenue sources that are needed to fund transportation improvements. – Rare to find large projects funded by only one source. – Often, a combination of local, regional, state, and federal sources are needed. • Funding sources and requirements change periodically. – Funding may need to be shifted from projects that cannot be built in the near future to projects that are shovel-ready. – While some sources of revenue are eliminated, new sources may arise, such as HB 2313 (2013). • C&I revenues are flexible. C&I funding can be used to start or complete a project, and remains flexible enough to shift from one project to another. 3
  • 4. County of Fairfax, Virginia There are three general ways the County uses C&I revenue to advance projects. • To date, the County’s Board of Supervisors have approved project allocations for anticipated C&I revenues through FY 2020. • Approximately $650 million has been approved by the Board and allocated to transportation projects countywide. • In general, C&I revenues help advance transportation projects in these significant ways: – Primary funding source – Supplemental funding source – Strategic reserves 4
  • 5. County of Fairfax, Virginia Primary Funding Source • C&I revenues are used as the sole or primary funding source for a variety of transportation projects. • Without C&I revenues, it is unlikely these projects would ever be advanced without some other new funding source. – Fairfax Connector expanded bus service and fleet purchases, and facility expansions and associated maintenance. – Pedestrian and bicycle improvement projects that provide common sense connections for pedestrians and bicyclists, including connections to Metrorail stations and transit facilities, improvements in major activity centers and missing links. – Debt service on $50 million in Economic Development Authority (EDA) revenue bonds for transportation projects. • EDA bonds supports projects like: Lorton Road widening, Jones Branch Connector, Springfield Park and Ride parking garage, and Route 29 widening. 5
  • 6. County of Fairfax, Virginia Examples of C&I Funding as a Primary Source • Fairfax Connector Expansion Service – C&I contribution: ~ $225 million through FY20 – Some service includes: Expansion of high priority/ridership routes (i.e. 171 (Richmond Highway), 401/402 (Springfield/Tysons), 950 (Dulles Corridor)), and Centreville- Chantilly service, and Tysons Circulator. • Pedestrian and Bicycle Projects – Project cost: > $220 million – C&I contribution: > $100 million – More than 130 projects Countywide • (i.e. Lees Corner Road Walkway, Hunter Village Drive Walkway, Van Dorn Street Bike and Pedestrian Improvements, Sleepy Hollow Road Walkways, Compton Road Walkway, Little River Turnpike Corridor Improvements, Chesterbrook and Kirby Roads Improvements) • Debt Service on EDA revenue bonds and TIFIA loan – C&I contribution to EDA debt service: ~ $11.6 million through FY20 – C&I contribution to TIFIA: $13.5 million/year starting in FY 2024. 6
  • 7. County of Fairfax, Virginia Supplemental Funding Source • C&I revenues are also used as the last remaining funding piece for large projects with multiple funding sources. • As a supplemental funding source, C&I revenues complete the funding for long awaited projects and ensure that other projects aren’t delayed due to lack of funding. • At times, C&I revenues are used in this way to respond to unexpected situations such as the reduction or elimination of previously allocated funding or an increase in a project’s cost estimate. C&I funding helps to keep project implementation moving forward. 7
  • 8. County of Fairfax, Virginia Examples of C&I Funding as a Supplemental Source • Stringfellow Road widening (4 to 6 lanes) – Fair Lakes Parkway to US 50 – Project cost: ~$61 million – C&I contribution: - $6 million – Open to traffic December 15, 2014 • Jones Branch Connector extension – Project cost: ~$56 million – C&I contribution: ~$18 million – Design completion scheduled for Fall 2016. • Route 29 widening (Legato Road to Shirley Gate Road) – Project cost: ~ $14 million – C&I contribution: ~ $5 million – Construction begins in Spring 2015 • West Ox Bus Garage Phase II Construction – Project cost: ~$20 million – C&I contribution: ~$2 million – Construction Summer 2015 • Lorton Road widening (Route 123 to Silverbrook) – Project cost: - $58 million – C&I contribution: ~ $40 million – Under construction • Rolling Road widening (Old Keene Mill to Franconia Springfield Pkwy) – Project Cost: - $35 million – C&I contribution: - $2 million – In preliminary engineering 8
  • 9. County of Fairfax, Virginia Strategic Reserves • Some C&I revenues are held in reserve to take advantage of the following opportunities: – Advanced purchase of land for a future project at below market values • i.e. Annandale (McWhorter Place), Springfield parking garage, Telegraph Road – Initiating planning studies and preliminary engineering work for future projects • i.e. Herndon Metrorail Station Access Management study, Tysons Corner / Dulles Toll Road ramp connections – Taking advantage of grant opportunities that require matching funds • i.e. the Commonwealth’s Revenue Sharing program, and Council of Governments (COG) Transportation Alternatives Program (TAP) • C&I revenues allow the County to implement more transportation projects than it would otherwise be able to do under existing funding sources. 9
  • 10. County of Fairfax, Virginia Distribution of FY09-FY20 Approved C&I Allocations 10 Capital Equipment, 2.6% Capital Projects, 57.6% Transit Operating, 35.4% Debt Service/Reserve, 4.4%
  • 11. County of Fairfax, Virginia Selected Completed Projects Transit Capital • Fairfax Connector bus purchase (16) for expansion service, complete • Wiehle – Reston East Metrorail parking garage, complete • West Ox Bus Garage Expansion Design, construction scheduled for Summer/Fall 2015. Roadway Capital • Jeff Todd Way (Mount Vernon Hwy/Route 1 to Telegraph Road), open to traffic • Telegraph Road Widening (Beulah to Leaf), open to traffic • Stringfellow Road Widening (Fair Lakes Pkwy to US 50), open to traffic • Nearly 15 countywide Spot Roadway intersection improvement projects – Danbury Forest @ Wakefield Chapel – Gambrill Road @ Pohick Road – Westmoreland @ Haycock – North Kings Highway Median – Arlington Boulevard @ Graham Road – Fox Mill Road @ Monroe Street Pedestrian and Bicycle Projects • More than 50 countywide Pedestrian and Bicycle improvement projects including: – Lewinsville Road Improvements – Powatan Street Walkway – Mount Vernon Highway Walkway – Dead Run Drive Sidewalk – School Street Sidewalk – Wiehle Avenue Trail – Intersection improvements along Leesburg Pike and Old Dominion Drive – Little River Turnpike and Backlick Road – Intersection improvements along Braddock Road – Burke Center Parkway Walkway Studies • Herndon Metrorail Station Access Management • Tysons Corner / Dulles Toll Road ramp connections 11
  • 12. County of Fairfax, Virginia Current/Ongoing Projects Transit Capital • Springfield parking garage – Currently under design – $10 million in C&I allocation • Huntington Bus Facility improvements – Construction scheduled Summer 2015 – $5.2 million in C&I allocation • Herndon and Innovation Center Metrorail Stations parking garages – Currently under design – $7.5 million in C&I allocation • Lorton VRE Park & Ride parking expansion – Design scheduled to begin in Summer 2015 – $2.1 million in C&I allocation • Stringfellow Road Park & Ride – Construction scheduled Spring 2015 – $1.1 million in C&I allocation • Dulles Rail Phase II Capital – Debt service on ~ $180 million TIFIA loan. Transit Operating • Fairfax Connector expansion service ongoing – ~$225 million in approved allocations through FY20 for: • Routes 151/152 – Mount Vernon, • Route 171 - Richmond Highway, • Routes 401/402 - Springfield/Tysons, • Route 950 - Dulles Corridor, • Routes 493/494/495 – I-495 Express Lanes Routes, • Routes 422/423/424 – Tysons Circulator, • and Centreville-Chantilly expansion service out of West Ox. 12
  • 13. County of Fairfax, Virginia Current/Ongoing Projects Continued Roadway Capital • Lorton Road widening (Route 123 to Silverbrook Road) – Currently under construction – $40 million in C&I allocation • Jones Branch Connector extension – Design scheduled to be complete Fall 2016 – ~$18 million in C&I allocation • Route 29 Widening (Legato Road to Shirley Gate Road) – Construction begins Spring 2015 – ~$5 million in C&I allocation Pedestrian and Bicycle Projects More than 80 countywide Pedestrian and Bicycle improvement projects in early stages of preliminary engineering or design including: • Mount Vernon Memorial Highway (Potomac Heritage National Scenic Trail) - Complete missing segments of the trail from Route 1 to Grist Mill Park. Includes bridge over Dogue Creek. – $6.5 million in C&I allocation • Herndon Metrorail Station Access Management Study (HMSAMS), and Reston Metrorail Access Group projects (RMAG) – Construction of intersection pedestrian improvements, new sidewalks, new trails and new on-road bicycle facilities around the Herndon and Innovation Center Metrorail Stations. – ~$12 million in C&I allocation (HMSAMS) – ~$15 million in C&I allocation • Backlick Road Walkway – Provides two segments of walkway along Backlick Road. – $3.1 million in C&I allocation • Edsall Road Walkway - Provides two segments of walkway along Edsall Road. – $4.7 million in C&I allocation • Cinder Bed Road Bikeway - Provide approximately three miles of bikeway, from Fairfax County Parkway to the Franconia-Springfield Metrorail station. – $4 million in C&I allocation. • Arlington Boulevard Walkway - Construct walkway on the south side from 8301 Arlington Boulevard to Gallows Road. – $700,000 in C&I allocation. 13
  • 14. County of Fairfax, Virginia Questions? 14
  • 15. County of Fairfax, Virginia 15
  • 16. County of Fairfax, Virginia 16
  • 17. County of Fairfax, Virginia 17
  • 18. County of Fairfax, Virginia Distribution of FY09-FY20 Approved C&I Allocations Project Implementation & Support, 6.1% Capital Equipment, 2.5% Capital Projects, 54.0% Transit Operating, 33.2% Debt Service/Reserve, 4.1% 18
  • 19. County of Fairfax, Virginia Examples of C&I Funding as a Primary Source • Fairfax Connector Expansion Service – C&I contribution: ~ $225 million through FY20 – Some service includes: Tysons Circulator; expansion of high priority/ridership routes (i.e. 171 (Richmond Highway), 401/402 (Springfield/Tysons), 950 (Dulles Corridor)), and West County mid-day service • Pedestrian and Bicycle Projects – Project cost: > $220 million – C&I contribution: > $100 million – More than 130 projects Countywide • Debt Service on $50 million EDA revenue bonds – C&I contribution: -$11.6 million through FY20 19
  • 20. County of Fairfax, Virginia Long Term Outlook FY21-FY30 Project Implementation & Support, 8.4% Capital Projects, 17.9% Transit Operating, 52.7% Debt Service/Reserv e, 21.1% • $635 million in estimated C&I revenues to be allocated. • Assumes 2.5% growth in assessed value. • Increased contribution to debt service due to TIFIA. • Increased contribution to transit due to increases in costs outpacing growth in revenues. 20
  • 21. County of Fairfax, Virginia C&I Statement FY09 – FY14 Actuals Revenues FY09 FY10 FY11 FY12 FY13 FY14 FY09-FY14 Beginning Balance $46,775,993 $60,348,670 $57,311,012 $66,371,422 $79,117,104 C&I Tax $52,567,744 $50,874,426 $40,620,771 $41,852,100 $45,598,592 $51,623,604 $ 283,137,237 Miscellaneous $0 $0 $6,681,688 $267,090 $8,416,922 $229,167 $ 15,594,867 MWAA $0 $0 $0 $328,775 $507,081 $1,138,042 $ 1,973,898 EDA Bonds $0 $0 $0 $0 $0 $0 $ - Total $52,567,744 $97,650,419 $107,651,129 $99,758,977 $120,894,017 $132,107,917 $300,706,002 Expenditures Project Implementation & Support $1,433,308 $2,276,646 $2,808,073 $2,880,006 $3,218,679 $3,282,394 $ 15,899,106 Capital Equipment $639,223 $7,556,285 $4,882,131 $3,679,888 $0 $0 $ 16,757,527 Capital Projects $3,719,220 $11,961,606 $31,782,299 $7,368,189 $11,856,248 $11,038,527 $ 77,726,089 Transit Operating $0 $15,507,212 $10,867,614 $19,459,472 $26,701,986 $11,442,434 $ 83,978,718 Debt Service/Reserve $0 $0 $0 $0 $0 $0 $ - Total $5,791,751 $37,301,749 $50,340,117 $33,387,555 $41,776,913 $25,763,355 $194,361,440 Balance $46,775,993 $60,348,670 $57,311,012 $66,371,422 $79,117,104 $106,344,562 $ 106,344,562 21
  • 22. County of Fairfax, Virginia Distribution of FY09-FY14 C&I Expenditures Project Implementation & Support, 8.2% Capital Equipment, 8.6% Capital Projects, 40.0% Transit Operating, 43.2% 22
  • 23. County of Fairfax, Virginia C&I Planned Allocations FY15 – FY20 Estimates Revenues FY15 FY16 FY17 FY18 FY19 FY20 FY15-FY20 Beginning Balance $106,344,562 $0 $0 $0 $0 $0 $ 106,344,562 C&I Tax $50,495,455 $51,623,604 $52,139,840 $52,661,238 $53,977,769 $55,327,214 $ 316,225,121 Miscellaneous $3,167,200 $0 $0 $0 $0 $0 $ 3,167,200 MWAA $4,756,102 $0 $0 $0 $0 $0 $ 4,756,102 EDA Bonds $0 $50,000,000 $0 $0 $0 $0 $ 50,000,000 Total $164,763,319 $101,623,604 $52,139,840 $52,661,238 $53,977,769 $55,327,214 $480,492,985 Expenditures Project Implementation & Support $ 4,417,356 $ 3,918,836 $ 4,045,401 $ 4,176,078 $ 4,311,001 $ 4,450,310 $ 25,318,982 Capital Equipment $ - $ - $ - $ - $ - $ - $ - Capital Projects $ 126,248,966 $ 72,952,560 $ 22,358,882 $ 21,722,003 $ 21,829,768 $ 21,917,739 $ 287,029,918 Transit Operating $ 20,796,997 $ 21,852,208 $ 22,835,557 $ 23,863,157 $ 24,937,000 $ 26,059,165 $ 140,344,084 Debt Service/Reserve $ 13,300,000 $ 2,900,000 $ 2,900,000 $ 2,900,000 $ 2,900,000 $ 2,900,000 $ 27,800,000 Total $ 164,763,319 $ 101,623,604 $ 52,139,840 $ 52,661,238 $ 53,977,769 $ 55,327,214 $480,492,984 Balance $0 $0 $0 $0 $0 $0 23
  • 24. County of Fairfax, Virginia Planned Allocation of FY15-FY20 C&I Revenues Project Implementation & Support, 5.3% Capital Projects, 59.7% Transit Operating, 29.2% Debt Service/Reserve, 5.8% 24
  • 25. County of Fairfax, Virginia There are four general ways the County uses C&I revenue to advance projects. • To date, the County’s Board of Supervisors have approved project allocations for anticipated C&I revenues through FY 2020. • Approximately $480 million has been allocated to transportation projects countywide. • In general, C&I revenues help advance transportation projects in four different ways: – Primary funding source – Supplemental funding source – Strategic reserves – Project implementation Implementatio n 6% Strategic Reserves 22% Primary Funding Source 63% Supplemental Funding Source 9% 26
  • 26. County of Fairfax, Virginia Examples of C&I Funding as a Supplemental Source • C&I revenues are also used as the last remaining funding piece for large projects with multiple funding sources. • Many times, C&I revenues are used in this way to respond to unexpected situations such as the reduction or elimination of previously allocated funding or an increase in a project’s cost estimate. • As a supplemental funding source, C&I revenues complete the funding for long awaited projects and ensure that other projects aren’t delayed due to lack of funding. C&I Other Sources $0 $20 $40 $60 $80 $100 $120 $140 Route 29 at Gallows Road Intersection Project Project cost: $119 million C&I Other Sources $0 $10 $20 $30 $40 Route 7 Widening – Rolling Holly Dr to Reston Ave Project cost: $36.6 million Stringfellow Road Widening – Fair Lakes Parkway to US Project cost: $60.9 million C&I Other Sources $0 $10 $20 $30 $40 $50 $60 $70 27
  • 27. County of Fairfax, Virginia What projects are currently funded or planned with C&I revenues? $314 Million Allocated to Various Project Categories FY13-FY16 Total C&I Allocations FY13-16 $314,034,692 Roadway Projects $61,337,219 Transit Projects $134,342,810 Pedestrian, Bike, Bus Stop, and Spot Intersection Improvements $31,840,443 Dulles Rail and Tysons Corner Related Projects $42,189,280 BRAC Related Projects $3,243,102 Advanced Planning, Design, Land Acquisition for Future Projects and Project Reserves $41,081,838 Roadway Projects 20% Transit Projects 43% Pedestrian, Bike, Bus Stop, and Spot Intersection Improvements 10% Dulles Rail and Tysons Corner Related Projects 13% BRAC Related Projects 1% Advanced Planning, Design, Land Acquisition for Future Projects and Project Reserves 13% 28
  • 28. County of Fairfax, Virginia What projects are currently funded or planned with C&I revenues? $314 Million Allocated to Projects in Various Stages FY13-FY16 Design, Land Acquisition, Construction 20.14% Design, Land Acquisition 3.87% Capital Equipment Purchase 1.06% Ongoing Operating Support 41.50% Match 0.67% Project Reserve 22.00% Design 0.97% Debt Service 8.96% Planning 0.44% Land Acquisition 0.40% Project Funded Stages Design, Land Acquisition, Construction Design, Land Acquisition Capital Equipment Purchase Ongoing Operating Support Match Project Reserve Design Debt Service Planning Land Acquisition 29
  • 29. County of Fairfax, Virginia Fairfax County encountered dramatic changes in transportation funding over the past two years. HB 2313 • During the Winter/Spring 2013 Virginia General Assembly (GA) session, the GA met and considered a variety of transportation funding strategies/bills. • In April 2013, HB 2313, a transportation funding plan that included regional funding for Northern Virginia, is enacted. – Provides approximately $300 million annually to the Northern Virginia region. 70% will be provided to the Northern Virginia Transportation Authority (NVTA) to be used on: • Regional projects included in TransAction 2040 that have evaluated by VDOT for congestion mitigation or • Mass transit capital projects that increase capacity. • The Authority shall give priority to selecting projects that are expected to provide the greatest congestion reduction relative to the cost of the project 30% of funds will be distributed to the individual localities for transportation needs: • Uses include: urban or secondary road construction, capital improvements that reduce congestion, projects included in TransAction 2040 or its updates, and public transportation purposes. • Localities must enact the local C&I tax at $0.125 per $100 valuation or dedicate an equivalent amount to transportation to receive the full amount. 30
  • 30. County of Fairfax, Virginia HB2313 – Additional Taxes• Additional Taxes: – Sales tax on new vehicles in VA to increase from 3% to 4.3% of total sales price. Expected Revenue: $900 million – Regional Congestion Relief Fee, grantor’s tax on real estate property transactions in Northern VA are increased by .25 for every $100 in sales price. – Transient Occupancy Tax – “Hotel Tax” is 3% – Bill includes Federal Marketplace Equity Act (HR3179) funding. It allows states to charge sales taxes on internet sales. When HB2313 passed the Virginia General Assembly, HR3179 was still being drafted. If the bill doesn’t pass by January 2015 the sales tax on gas increases 1.7% – Annual $100 license fee for alternative fuel vehicles. – Change in structure of gas taxes. Old tax 17.5% per gallon of gas price is gone. New tax 3.5% on wholesale gas prices and 6% on diesel fuel. 31
  • 31. County of Fairfax, Virginia HB2313 – Projected Revenues • $3.5B – VA highways and rails over the next 5 years – $880M – annually after the first 5 years • $300-350M for Northern Virginia – 30% of total revenues after the first 5 years Revenue Composition: • $1.5B total increase in state taxes over next five years. • $1.2B over next five years from increased vehicle titling taxes • $200M moved from Virginia’s General Fund to transportation • $300M from general funds for Metro Silver Line extension • $300-350M raised each year by maintaining 2.1% local fuel taxes • Increased percentage of general fund transfer to transportation from 0.5% to 0.675% 32
  • 32. County of Fairfax, Virginia HB2313 – Virginia Transportation Funding Bill and C&I• Addresses transportation problems in Northern Virginia, first time since 1986. • Fairfax County‘s 30% share of HB2313 funds in FY14 is $37.5 million • Programmed in the Commercial and Industrial Tax fund 33
  • 33. County of Fairfax, Virginia HB 2313 Northern Virginia Revenue 70% will be provided to the Northern Virginia Transportation Authority (NVTA) to be used on: • Regional projects included in TransAction 2040 that have evaluated by VDOT for congestion mitigation or • Mass transit capital projects that increase capacity. • The Authority shall give priority to selecting projects that are expected to provide the greatest congestion reduction relative to the cost of the project 30% of funds will be distributed to the individual localities for transportation needs: • Uses include: urban or secondary road construction, capital improvements that reduce congestion, projects included in TransAction 2040 or its updates, and public transportation purposes. • Localities must enact the local C&I tax at $0.125 per $100 valuation or dedicate an equivalent amount to transportation to receive the full amount 34

Notes de l'éditeur

  1. FY11 ABP C&I tax revenue was $43.1M, $3M deficit was offset using prior year’s carryover.
  2. FY11 ABP C&I tax revenue was $43.1M, $3M deficit was offset using prior year’s carryover.
  3. Declining statewide revenue projections result in VDOT cutting $4.6 billion statewide from its six-year transportation plan. The federal government passed several different economic stimulus programs which provided millions of dollars to transportation projects. In the midst of this, the County strategically allocated C&I revenues in order to take advantage of these federal programs and fill in other remaining funding gaps resulting from VDOT’s cuts. Initially, the County collected $52 million (FY2009) in C&I taxes. This amount dropped to about $43 million in FY2011, $42 million in FY2012. It is expected that $45.8 million will be collected in FY2013.
  4. http://www.themoyersteam.com/2013/03/01/virginia-transportation-funding-bill-hb2313/
  5. http://www.themoyersteam.com/2013/03/01/virginia-transportation-funding-bill-hb2313/
  6. Declining statewide revenue projections result in VDOT cutting $4.6 billion statewide from its six-year transportation plan. The federal government passed several different economic stimulus programs which provided millions of dollars to transportation projects. In the midst of this, the County strategically allocated C&I revenues in order to take advantage of these federal programs and fill in other remaining funding gaps resulting from VDOT’s cuts. Initially, the County collected $52 million (FY2009) in C&I taxes. This amount dropped to about $43 million in FY2011, $42 million in FY2012. It is expected that $45.8 million will be collected in FY2013.