BIG ROCKY RUN PHASE II STREAM RESTORATION
Contract Number CN10316077
Project Number SD000006-003
Sully District
July 2014
BIG ROCKY RUN PHASE II STREAM RESTORATION
Stormwater Planning, Capital Facilities/Utilities Design and Construction, Transportation/Stormwater Construction
Project Details
Big Rocky Run Phase II Stream Restoration
Stormwater Planning, Capital Facilities/Utilities Design and Construction, Transportation Stormwater Construction
Description:
The Big Rocky Run Phase II Stream Restoration project was substantially completed on June 25,
2014. The scope of this project included achieving water quality improvements through the
restoration of approximately 2,550 linear feet of the Big Rocky Run and riparian corridor by use of
natural channel design principles.
Project Overview:
• Creation of stable and regenerative stream morphology via the installation of in-stream stone and
wood structures, reinforced streambed material, stable channel cross sections, longitudinal
profile and channel geometry.
• Creation of floodplain habitat features in abandoned channel reaches.
• Restoration of native trees, shrubs, herbaceous plants and grasses along the riparian corridor.
Project Team:
• Utilities Design and Construction Division - Bill “Newt” Nolan
• Utilities Design and Construction Division - Jeff Bartlett
• Stormwater Planning Division – Justin Pistore
BIG ROCKY RUN STREAM RESTORATION PHASE II
Stormwater Planning, Capital Facilities/Utilities Design and Construction, Transportation Stormwater Construction
SULLY DISTRICT – TAX MAP NO. 54-1 & 54-2
PROJECT
SITE
BIG ROCKY RUN PHASE II STREAM RESTORATION
Stormwater Planning, Capital Facilities/Utilities Design and Construction, Transportation Stormwater Construction
Pre-Restoration View of the Stream
BIG ROCKY RUN PHASE II STREAM RESTORATION
Stormwater Planning, Capital Facilities/Utilities Design and Construction, Transportation Stormwater Construction
Pre-Restoration Views of the Stream
Stormwater Planning, Capital Facilities/Utilities Design and Construction, Transportation Stormwater Construction
BIG ROCKY RUN PHASE II STREAM INSTALLATION
Installation of Native Trees and Shrubs
Stormwater Planning, Capital Facilities/Utilities Design and Construction, Transportation Stormwater Construction
BIG ROCKY RUN PHASE II STREAM INSTALLATION
Installation of Native Plantings
Stormwater Planning, Capital Facilities/Utilities Design and Construction, Transportation Stormwater Construction
Completed Project
BIG ROCKY RUN PHASE II STREAM INSTALLATION
Stormwater Planning, Capital Facilities/Utilities Design and Construction, Transportation Stormwater Construction
Completed Project
BIG ROCKY RUN PHASE II STREAM INSTALLATION
Stormwater Planning, Capital Facilities/Utilities Design and Construction, Transportation Stormwater Construction
Completed Project
BIG ROCKY RUN PHASE II STREAM INSTALLATION
BIG ROCKY RUN PHASE II STREAM RESTORATION
Stormwater Planning, Capital Facilities/Utilities Design and Construction, Transportation Stormwater Construction
Installation of Large Woody Debris Habitat Features
Stormwater Planning, Capital Facilities/Utilities Design and Construction, Transportation Stormwater Construction
BIG ROCKY RUN PHASE II STREAM RESTORATION
Boulders Cluster Grade Control Structure
BIG ROCKY RUN PHASE II Water Quality Benefits
Stormwater Planning, Capital Facilities/Utilities Design and Construction, Transportation Stormwater Construction
Total Phosphorus 106 pounds per year
Total Nitrogen 538 pounds per year
Total Suspended Solids 202,186 pounds per year
Pollutant Removal
Before After
BIG ROCKY RUN PHASE II STREAM RESTORATION
Stormwater Planning, Capital Facilities/Utilities Design and Construction, Transportation Stormwater Construction
Additional Information
For additional Information, please call
www.fairfaxcounty.gov/dpwes
BIG ROCKY RUN PHASE II STREAM RESTORATION
Ben Boxer, Public Information Officer
703-324-5880, TTY 711
Ben. Ben Boxer, Public Information Officer
703-324-5880, TTY 711
Ben. Ben Boxer, Public Information Officer
703-324-5880, TTY 711
Ben.Boxer@fairfaxcounty.gov
Irene Haske, Public Information Officer
703-324-5821, TTY 711
SWPDmail@fairfaxcounty.gov
Stormwater Planning, Capital Facilities/Utilities Design and Construction, Transportation Stormwater Construction

Contenu connexe

Tendances

Tendances (20)

Bradley Acres Pond Retrofit Project
Bradley Acres Pond Retrofit ProjectBradley Acres Pond Retrofit Project
Bradley Acres Pond Retrofit Project
 
Difficult Run Tributary at Oakton Estates
Difficult Run Tributary at Oakton EstatesDifficult Run Tributary at Oakton Estates
Difficult Run Tributary at Oakton Estates
 
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014
 
Indian Run at Indian Run Court Stream Restoration
Indian Run at Indian Run Court Stream RestorationIndian Run at Indian Run Court Stream Restoration
Indian Run at Indian Run Court Stream Restoration
 
Paul Spring Branch Stream Restoration
Paul Spring Branch Stream RestorationPaul Spring Branch Stream Restoration
Paul Spring Branch Stream Restoration
 
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
 
Columbia Road/Randolph Court Stream Restoration July 2015
Columbia Road/Randolph Court Stream Restoration July 2015Columbia Road/Randolph Court Stream Restoration July 2015
Columbia Road/Randolph Court Stream Restoration July 2015
 
Crosspointe Pond Retrofit 2014
Crosspointe Pond Retrofit 2014Crosspointe Pond Retrofit 2014
Crosspointe Pond Retrofit 2014
 
Accotink Tributary at Oakford Drive Stream Restoration
Accotink Tributary at Oakford Drive Stream RestorationAccotink Tributary at Oakford Drive Stream Restoration
Accotink Tributary at Oakford Drive Stream Restoration
 
Miller Heights Outfall Rehabilitation Project 2014
Miller Heights Outfall Rehabilitation Project 2014Miller Heights Outfall Rehabilitation Project 2014
Miller Heights Outfall Rehabilitation Project 2014
 
Pike Branch at Wilton Road Stream Stabilization Project
Pike Branch at Wilton Road Stream Stabilization ProjectPike Branch at Wilton Road Stream Stabilization Project
Pike Branch at Wilton Road Stream Stabilization Project
 
Oakton Swim and Racquet Water Quality Retrofit
Oakton Swim and Racquet Water Quality RetrofitOakton Swim and Racquet Water Quality Retrofit
Oakton Swim and Racquet Water Quality Retrofit
 
Summerton Way Pond Retrofit
Summerton Way Pond RetrofitSummerton Way Pond Retrofit
Summerton Way Pond Retrofit
 
Colvin Run Phase I Lake Fairfax Park Stream Restoration Project
Colvin Run Phase I Lake Fairfax Park Stream Restoration ProjectColvin Run Phase I Lake Fairfax Park Stream Restoration Project
Colvin Run Phase I Lake Fairfax Park Stream Restoration Project
 
Flatlick Branch Phase II Stream Restoration Project
Flatlick Branch Phase II Stream Restoration ProjectFlatlick Branch Phase II Stream Restoration Project
Flatlick Branch Phase II Stream Restoration Project
 
Draft Chesapeake Bay TMDL Action Plan Public Meeting
Draft Chesapeake Bay TMDL Action Plan Public MeetingDraft Chesapeake Bay TMDL Action Plan Public Meeting
Draft Chesapeake Bay TMDL Action Plan Public Meeting
 
Piney Run at Lake Werowance Stream Restoration Project Oct 2019
Piney Run at Lake Werowance Stream Restoration Project Oct 2019Piney Run at Lake Werowance Stream Restoration Project Oct 2019
Piney Run at Lake Werowance Stream Restoration Project Oct 2019
 
Dead Run at Dominican Retreat- Segment 1 Stream Restoration Project
Dead Run at Dominican Retreat- Segment 1 Stream Restoration ProjectDead Run at Dominican Retreat- Segment 1 Stream Restoration Project
Dead Run at Dominican Retreat- Segment 1 Stream Restoration Project
 
Crook Branch at Mantua Elementary School Stream Restoration Project
Crook Branch at Mantua Elementary School Stream Restoration ProjectCrook Branch at Mantua Elementary School Stream Restoration Project
Crook Branch at Mantua Elementary School Stream Restoration Project
 
Flood Mitigation Project on Overly Drive
Flood Mitigation Project on Overly DriveFlood Mitigation Project on Overly Drive
Flood Mitigation Project on Overly Drive
 

En vedette

En vedette (20)

Sequoia Park Pond Retrofit Project
Sequoia Park Pond Retrofit ProjectSequoia Park Pond Retrofit Project
Sequoia Park Pond Retrofit Project
 
Hunter Mill District Community Outreach Meeting: Nov. 4, 2015
Hunter Mill District Community Outreach Meeting: Nov. 4, 2015Hunter Mill District Community Outreach Meeting: Nov. 4, 2015
Hunter Mill District Community Outreach Meeting: Nov. 4, 2015
 
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public MeetingDraft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
 
Dead Run Stream Restoration Public Meeting June 9, 2015
Dead Run Stream Restoration Public Meeting June 9, 2015Dead Run Stream Restoration Public Meeting June 9, 2015
Dead Run Stream Restoration Public Meeting June 9, 2015
 
Land Development Update: Oct. 8, 2015
Land Development Update: Oct. 8, 2015Land Development Update: Oct. 8, 2015
Land Development Update: Oct. 8, 2015
 
Land Development Update-NAIOP/NVBIA Joint Meeting: May 12, 2016
Land Development Update-NAIOP/NVBIA Joint Meeting: May 12, 2016Land Development Update-NAIOP/NVBIA Joint Meeting: May 12, 2016
Land Development Update-NAIOP/NVBIA Joint Meeting: May 12, 2016
 
Land Development Update-NAIOP/NVBIA Joint Meeting: Dec. 10, 2015
Land Development Update-NAIOP/NVBIA Joint Meeting: Dec. 10, 2015Land Development Update-NAIOP/NVBIA Joint Meeting: Dec. 10, 2015
Land Development Update-NAIOP/NVBIA Joint Meeting: Dec. 10, 2015
 
Community Gypsy Moth Management
Community Gypsy Moth ManagementCommunity Gypsy Moth Management
Community Gypsy Moth Management
 
9499 Beach Mill Road Channel Restoration Project
9499 Beach Mill Road Channel Restoration Project9499 Beach Mill Road Channel Restoration Project
9499 Beach Mill Road Channel Restoration Project
 
Contractor Awareness Training Vegetative Practices 2016
Contractor Awareness Training Vegetative Practices 2016Contractor Awareness Training Vegetative Practices 2016
Contractor Awareness Training Vegetative Practices 2016
 
Great Falls Nike Field Stormwater Enhancements 2012
Great Falls Nike Field Stormwater Enhancements 2012Great Falls Nike Field Stormwater Enhancements 2012
Great Falls Nike Field Stormwater Enhancements 2012
 
Huntington Levee Community Meeting
Huntington Levee Community MeetingHuntington Levee Community Meeting
Huntington Levee Community Meeting
 
Habitat Improvement for Cleaner Water
Habitat Improvement for Cleaner WaterHabitat Improvement for Cleaner Water
Habitat Improvement for Cleaner Water
 
Autumnwood Park Pond Retrofit Project
Autumnwood Park Pond Retrofit ProjectAutumnwood Park Pond Retrofit Project
Autumnwood Park Pond Retrofit Project
 
Contractor Awareness Training Below Ground Facilities 2016
Contractor Awareness Training Below Ground Facilities 2016Contractor Awareness Training Below Ground Facilities 2016
Contractor Awareness Training Below Ground Facilities 2016
 
Dead Run Stream Restoration Public Meeting May 19, 2015
Dead Run Stream Restoration Public Meeting May 19, 2015Dead Run Stream Restoration Public Meeting May 19, 2015
Dead Run Stream Restoration Public Meeting May 19, 2015
 
Wolftrap Creek Restoration in Vienna’s Wildwood Park, October 2013
Wolftrap Creek Restoration in Vienna’s Wildwood Park, October 2013Wolftrap Creek Restoration in Vienna’s Wildwood Park, October 2013
Wolftrap Creek Restoration in Vienna’s Wildwood Park, October 2013
 
Tripps Run Stream Improvement
Tripps Run Stream ImprovementTripps Run Stream Improvement
Tripps Run Stream Improvement
 
Mason Neck West Park Pond Retrofit July 2015
Mason Neck West Park Pond Retrofit July 2015Mason Neck West Park Pond Retrofit July 2015
Mason Neck West Park Pond Retrofit July 2015
 
Fall Cankerworm Sticky Banding: A Community Working Together
Fall Cankerworm Sticky Banding: A Community Working TogetherFall Cankerworm Sticky Banding: A Community Working Together
Fall Cankerworm Sticky Banding: A Community Working Together
 

Similaire à Big Rocky Run Phase II Stream Restoration

Similaire à Big Rocky Run Phase II Stream Restoration (20)

Bull Neck Run at Spring Hill Recreation Center Stream Restoration
Bull Neck Run at Spring Hill Recreation Center Stream RestorationBull Neck Run at Spring Hill Recreation Center Stream Restoration
Bull Neck Run at Spring Hill Recreation Center Stream Restoration
 
Long Branch Tributary at Long Branch Falls Park
Long Branch Tributary at Long Branch Falls ParkLong Branch Tributary at Long Branch Falls Park
Long Branch Tributary at Long Branch Falls Park
 
Pohick Creek Tributary at Queen Victoria - Stream Restoration
Pohick Creek Tributary at Queen Victoria - Stream RestorationPohick Creek Tributary at Queen Victoria - Stream Restoration
Pohick Creek Tributary at Queen Victoria - Stream Restoration
 
Snakeden Branch at Lake Audubon January 2021
Snakeden Branch at Lake Audubon January 2021Snakeden Branch at Lake Audubon January 2021
Snakeden Branch at Lake Audubon January 2021
 
Flatlick Branch III Stream Restoration June 6, 2020
Flatlick Branch III Stream Restoration June 6, 2020Flatlick Branch III Stream Restoration June 6, 2020
Flatlick Branch III Stream Restoration June 6, 2020
 
Substantial completion flatlick branch iii stream restoration
Substantial completion   flatlick branch iii stream restorationSubstantial completion   flatlick branch iii stream restoration
Substantial completion flatlick branch iii stream restoration
 
Dead Run Stream Restoration at McLean Central Park - Segments 2 and 3
Dead Run Stream Restoration at McLean Central Park - Segments 2 and 3Dead Run Stream Restoration at McLean Central Park - Segments 2 and 3
Dead Run Stream Restoration at McLean Central Park - Segments 2 and 3
 
Indian Run Restoration Project
Indian Run Restoration ProjectIndian Run Restoration Project
Indian Run Restoration Project
 
Peyton Run POD Presentation_5_12_21
 Peyton Run POD Presentation_5_12_21 Peyton Run POD Presentation_5_12_21
Peyton Run POD Presentation_5_12_21
 
Robey Avenue Outfall Restoration
Robey Avenue Outfall RestorationRobey Avenue Outfall Restoration
Robey Avenue Outfall Restoration
 
Pike Branch at Wilton Road Presentation
Pike Branch at Wilton Road PresentationPike Branch at Wilton Road Presentation
Pike Branch at Wilton Road Presentation
 
Pohick Stream Stabilization Phase II - Areas 2 and 3
Pohick Stream Stabilization Phase II - Areas 2 and 3Pohick Stream Stabilization Phase II - Areas 2 and 3
Pohick Stream Stabilization Phase II - Areas 2 and 3
 
Nancemond Street Outfall Stabilization
Nancemond Street Outfall StabilizationNancemond Street Outfall Stabilization
Nancemond Street Outfall Stabilization
 
Stone Mill Court Project Completion
Stone Mill Court Project CompletionStone Mill Court Project Completion
Stone Mill Court Project Completion
 
Introduction to Biohabitats presentation public meeting number one 02 11-21
Introduction to Biohabitats presentation public meeting number one 02 11-21Introduction to Biohabitats presentation public meeting number one 02 11-21
Introduction to Biohabitats presentation public meeting number one 02 11-21
 
Sutton Oaks Pond Improvements
Sutton Oaks Pond ImprovementsSutton Oaks Pond Improvements
Sutton Oaks Pond Improvements
 
Hunting Creek at Fairfield Stream Restoration
Hunting Creek at Fairfield Stream RestorationHunting Creek at Fairfield Stream Restoration
Hunting Creek at Fairfield Stream Restoration
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Meadow Run Pond Improvement
Meadow Run Pond ImprovementMeadow Run Pond Improvement
Meadow Run Pond Improvement
 
Scotts Run Tributary at Windy Hill Road Stream Stabilization
Scotts Run Tributary at Windy Hill Road Stream StabilizationScotts Run Tributary at Windy Hill Road Stream Stabilization
Scotts Run Tributary at Windy Hill Road Stream Stabilization
 

Plus de Fairfax County

Plus de Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
 

Dernier

{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
hyt3577
 

Dernier (20)

America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
 
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
 
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
 
04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf
 
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's DevelopmentNara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
 
Group_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the tradeGroup_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the trade
 
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdhEmbed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
 
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover BackVerified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
 
Kishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdf
 
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
 
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopkoEmbed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
 
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
 
06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf
 
China's soft power in 21st century .pptx
China's soft power in 21st century   .pptxChina's soft power in 21st century   .pptx
China's soft power in 21st century .pptx
 
02052024_First India Newspaper Jaipur.pdf
02052024_First India Newspaper Jaipur.pdf02052024_First India Newspaper Jaipur.pdf
02052024_First India Newspaper Jaipur.pdf
 
05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf
 
declarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdfdeclarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdf
 
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
 
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
 

Big Rocky Run Phase II Stream Restoration

  • 1. A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! BIG ROCKY RUN PHASE II STREAM RESTORATION Contract Number CN10316077 Project Number SD000006-003 Sully District July 2014
  • 2. BIG ROCKY RUN PHASE II STREAM RESTORATION Stormwater Planning, Capital Facilities/Utilities Design and Construction, Transportation/Stormwater Construction
  • 3. Project Details Big Rocky Run Phase II Stream Restoration Stormwater Planning, Capital Facilities/Utilities Design and Construction, Transportation Stormwater Construction Description: The Big Rocky Run Phase II Stream Restoration project was substantially completed on June 25, 2014. The scope of this project included achieving water quality improvements through the restoration of approximately 2,550 linear feet of the Big Rocky Run and riparian corridor by use of natural channel design principles. Project Overview: • Creation of stable and regenerative stream morphology via the installation of in-stream stone and wood structures, reinforced streambed material, stable channel cross sections, longitudinal profile and channel geometry. • Creation of floodplain habitat features in abandoned channel reaches. • Restoration of native trees, shrubs, herbaceous plants and grasses along the riparian corridor. Project Team: • Utilities Design and Construction Division - Bill “Newt” Nolan • Utilities Design and Construction Division - Jeff Bartlett • Stormwater Planning Division – Justin Pistore
  • 4. BIG ROCKY RUN STREAM RESTORATION PHASE II Stormwater Planning, Capital Facilities/Utilities Design and Construction, Transportation Stormwater Construction SULLY DISTRICT – TAX MAP NO. 54-1 & 54-2 PROJECT SITE
  • 5. BIG ROCKY RUN PHASE II STREAM RESTORATION Stormwater Planning, Capital Facilities/Utilities Design and Construction, Transportation Stormwater Construction Pre-Restoration View of the Stream
  • 6. BIG ROCKY RUN PHASE II STREAM RESTORATION Stormwater Planning, Capital Facilities/Utilities Design and Construction, Transportation Stormwater Construction Pre-Restoration Views of the Stream
  • 7. Stormwater Planning, Capital Facilities/Utilities Design and Construction, Transportation Stormwater Construction BIG ROCKY RUN PHASE II STREAM INSTALLATION Installation of Native Trees and Shrubs
  • 8. Stormwater Planning, Capital Facilities/Utilities Design and Construction, Transportation Stormwater Construction BIG ROCKY RUN PHASE II STREAM INSTALLATION Installation of Native Plantings
  • 9. Stormwater Planning, Capital Facilities/Utilities Design and Construction, Transportation Stormwater Construction Completed Project BIG ROCKY RUN PHASE II STREAM INSTALLATION
  • 10. Stormwater Planning, Capital Facilities/Utilities Design and Construction, Transportation Stormwater Construction Completed Project BIG ROCKY RUN PHASE II STREAM INSTALLATION
  • 11. Stormwater Planning, Capital Facilities/Utilities Design and Construction, Transportation Stormwater Construction Completed Project BIG ROCKY RUN PHASE II STREAM INSTALLATION
  • 12. BIG ROCKY RUN PHASE II STREAM RESTORATION Stormwater Planning, Capital Facilities/Utilities Design and Construction, Transportation Stormwater Construction Installation of Large Woody Debris Habitat Features
  • 13. Stormwater Planning, Capital Facilities/Utilities Design and Construction, Transportation Stormwater Construction BIG ROCKY RUN PHASE II STREAM RESTORATION Boulders Cluster Grade Control Structure
  • 14. BIG ROCKY RUN PHASE II Water Quality Benefits Stormwater Planning, Capital Facilities/Utilities Design and Construction, Transportation Stormwater Construction Total Phosphorus 106 pounds per year Total Nitrogen 538 pounds per year Total Suspended Solids 202,186 pounds per year Pollutant Removal
  • 15. Before After BIG ROCKY RUN PHASE II STREAM RESTORATION Stormwater Planning, Capital Facilities/Utilities Design and Construction, Transportation Stormwater Construction
  • 16. Additional Information For additional Information, please call www.fairfaxcounty.gov/dpwes BIG ROCKY RUN PHASE II STREAM RESTORATION Ben Boxer, Public Information Officer 703-324-5880, TTY 711 Ben. Ben Boxer, Public Information Officer 703-324-5880, TTY 711 Ben. Ben Boxer, Public Information Officer 703-324-5880, TTY 711 Ben.Boxer@fairfaxcounty.gov Irene Haske, Public Information Officer 703-324-5821, TTY 711 SWPDmail@fairfaxcounty.gov Stormwater Planning, Capital Facilities/Utilities Design and Construction, Transportation Stormwater Construction