This site is located within the Difficult Run Watershed. The project involved the installation of a forebay to ease future maintenance, construction of gravel access road, replacement of head wall and BMP trash rack, stabilization of outfall channel with steps. The improvement stabilizes the existing channel and prevents/minimizes future erosion of the channel bed and banks reducing downstream sedimentation.