Brown's Chapel Property Pond and Outfall Improvement

529 vues

Publié le

This site is located within the Difficult Run Watershed. The project involved the installation of a forebay to ease future maintenance, construction of gravel access road, replacement of head wall and BMP trash rack, stabilization of outfall channel with steps. The improvement stabilizes the existing channel and prevents/minimizes future erosion of the channel bed and banks reducing downstream sedimentation.

Publié dans : Environnement
  • Soyez le premier à commenter

  • Soyez le premier à aimer ceci

Brown's Chapel Property Pond and Outfall Improvement

  1. 1. A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! Brown’s Chapel Property Pond (1250DP) & Outfall Improvement Contract No. CN18125207 Project No. SD-000033-063 Hunter Mill District Tax Map ID 18-2-((23))-A August 6, 2019
  2. 2. Project Details Brown’s Chapel Property Pond (1250DP) & Outfall Improvement Capital Facilities/Utilities Design and Construction Division/Stormwater Construction Branch Description: The Brown’s Chapel Property Pond (1250DP) and Outfall Improvement has been substantially completed. This site is located within the Difficult Run Watershed. The project improvement is located adjacent to 1300 Newkirk CT, Vienna, VA 22182 The project involved the installation of a forebay to ease future maintenance, construction of gravel access road, replacement of head wall and BMP trash rack, stabilization of outfall channel with steps. The improvement stabilizes the existing channel and prevents/minimizes future erosion of the channel bed and banks reducing downstream sedimentation. Project Team: • Project Manager – Thornton Glenn, Maintenance and Stormwater Management Division • Construction Manager – Bed Chhetri, Utilities Design and Construction Division (UDCD) • Construction Inspector – Hammad Hashmi, UDCD • Land Development Services – Nak Chea
  3. 3. Brown’s Chapel Property Pond (1250DP) & Outfall Improvement Capital Facilities/Utilities Design and Construction Division/Stormwater Construction Branch Tax Map No. 18-2 Upper Section of the project site Lower Section of the project site Trickle ditch
  4. 4. Brown’s Chapel Property Pond (1250DP) & Outfall Improvement PRE-EXISTING CONDITION Capital Facilities/Utilities Design and Construction Division/Stormwater Construction Branch
  5. 5. Brown’s Chapel Property Pond (1250DP) & Outfall Improvement DURING CONSTRUCTION Capital Facilities/Utilities Design and Construction Division/Stormwater Construction Branch
  6. 6. Brown’s Chapel Property Pond (1250DP) & Outfall Improvement POST CONSTRUCTION Capital Facilities/Utilities Design and Construction Division/Stormwater Construction Branch
  7. 7. Before After Brown’s Chapel Property Pond (1250DP) & Outfall Improvement Capital Facilities/Utilities Design and Construction Division/Stormwater Construction Branch
  8. 8. Before After Brown’s Chapel Property Pond (1250DP) & Outfall Improvement Capital Facilities/Utilities Design and Construction Division/Stormwater Construction Branch
  9. 9. Additional Information For additional Information, please call www.fairfaxcounty.gov/publicworks Matthew Kaiser, Public Information Officer 703-324-8455, TTY 711 Matthew.Kaiser@fairfaxcounty.gov Capital Facilities/Utilities Design and Construction Division/Stormwater Construction Branch

×