County of Fairfax, Virginia
1
Citizens Information Meeting
Kirby Road Sidewalks
Chesterbrook Elementary School to Halsey Road &
Halsey Road to Franklin Avenue
Preliminary Design
November 9, 2016
Fairfax County
Dranesville District
County of Fairfax, Virginia
2
Introduction/ Welcome
Supervisor Foust
Department of Transportation
County of Fairfax, Virginia
3
Department of Transportation
Contacts
• Supervisor Foust’s Office
• Fairfax County Department of Transportation
(FCDOT)
– Transportation Design (TDD)
– Capital Projects (CPTED)
• Fairfax County Department of Public Works &
Environmental Services (DPWES)
– Construction (UDCD)
– Land Acquisition (LAD)
• Design Consultant (WRA)
County of Fairfax, Virginia
4
Meeting Agenda
• Context and Background
• Summary of Preliminary Design Options
• Schedule
• Q & A
• “Open House”
Department of Transportation
County of Fairfax, Virginia
5
Context
• County’s 2012 Dialogue on Transportation
• Included in 2014 Bond Issue
Department of Transportation
County of Fairfax, Virginia
6
Department of Transportation
Project Limits
Limits of
New Sidewalk
County of Fairfax, Virginia
7
Existing Conditions
Existing Crosswalk at Chesterbrook Elementary School
Department of Transportation
County of Fairfax, Virginia
8
Existing Conditions
Looking west towards Halsey Road
Department of Transportation
County of Fairfax, Virginia
9
Existing Conditions
Looking west towards Franklin Avenue
Department of Transportation
County of Fairfax, Virginia
10
Existing Conditions
Crosswalk at Franklin Avenue
Department of Transportation
County of Fairfax, Virginia
11
Improvements Will Include
• New Concrete Curb & Gutter on Existing Edge of
Pavement
• New 5’-6’ Wide Sidewalk and
Curb Ramps
• New Concrete Driveway
Entrances
• New Storm Drain Inlets
and Pipes
• New Road Pavement
and Striping
• Design to VDOT Criteria
Department of Transportation
County of Fairfax, Virginia
12
Potential Impacts
• Relocation or upgrade of existing utilities
(underground and/or overhead)
• Tree Impacts
– In right-of-way and
on private property
• Fences
• Grading back slopes
Department of Transportation
County of Fairfax, Virginia
13
Sidewalk Options – ‘Alternative 1’
• 5’ Sidewalk, 4’ Buffer & 6’ Sidewalk (No Buffer) –
Requires VDOT Waiver
Department of Transportation
NEW CURB
& GUTTER
4’ GRASS
BUFFER
STRIP
NEW 5’ WIDE
SIDEWALK
County of Fairfax, Virginia
14
Sidewalk Options – ‘Alternative 1’
• 5’ Sidewalk, 4’ Buffer & 6’ Sidewalk (No Buffer) –
Requires VDOT Waiver
Department of Transportation
NEW CURB
& GUTTER
NEW 6’ WIDE
SIDEWALK
County of Fairfax, Virginia
15
Sidewalk Options – ‘Alternative 1’
• 5’ Sidewalk, 4’ Buffer & 6’ Sidewalk (No Buffer) –
Requires VDOT Waiver
Department of Transportation
SIDEWALK
CURB RAMP
DRIVEWAY REPLACEMENT
LIMITS OF DISTRUBANCE
GRADING/CONSTRUCTION EASEMENT
PROPOSED RIGHT OF WAY
DRAINAGE EASEMENT
PROPOSED TREE REMOVAL X
County of Fairfax, Virginia
16
Sidewalk Options – ‘Alternative 2’
• 5’ Sidewalk, 4’ Buffer – VDOT Standard
Department of Transportation
NEW CURB
& GUTTER
4’ GRASS
BUFFER
STRIP
NEW 5’ WIDE
SIDEWALK
County of Fairfax, Virginia
17
Sidewalk Options – ‘Alternative 2’
• 5’ Sidewalk, 4’ Buffer – VDOT Standard
Department of Transportation
SIDEWALK
CURB RAMP
DRIVEWAY REPLACEMENT
LIMITS OF DISTRUBANCE
GRADING/CONSTRUCTION EASEMENT
PROPOSED RIGHT OF WAY
DRAINAGE EASEMENT
PROPOSED TREE REMOVAL X
County of Fairfax, Virginia
18
• Limits of Disturbance show the approximate area
affected by construction.
• Driveways, fences, and
trees may be impacted
on properties adjacent
to the project.
• If private property is to
be impacted during
construction, we will
obtain an easement or right-of-way before work begins.
Will the Project Impact My Property?
Department of Transportation
LIMITS OF
DISTURBANCE
County of Fairfax, Virginia
19
Land Acquisition Process
• Will occur after pre-final design complete.
• Plats will be prepared showing easements
and/or right-of-way needed.
• Land Acquisition Agent will contact
property owners to negotiate.
Department of Transportation
County of Fairfax, Virginia
20
Construction
• We will coordinate with
property owners well in
advance.
• Fences may be temporarily
removed & replaced.
Relocation to private
property may be necessary,
if within the right-of-way.
• Work hours are set by
VDOT.
Department of Transportation
County of Fairfax, Virginia
21
Preliminary Schedule
• Intermediate Design – Early 2017
• Pre-Final Design – Fall 2017
• Land Acquisition – Mid to Late 2018
• Final Design – Late 2018/Early 2019
• Construction – 2019
Department of Transportation
County of Fairfax, Virginia
22
Department of Transportation
Questions?
County of Fairfax, Virginia
23
http://www.fairfaxcounty.gov/fcdot/
pedestrian/kirbyroad.htm
Submit Comments on Project
Website

Contenu connexe

Tendances

Tendances (20)

Route 1 Multimodal Alternatives Analysis Status Update: Sept. 17, 2013
Route 1 Multimodal Alternatives Analysis Status Update: Sept. 17, 2013Route 1 Multimodal Alternatives Analysis Status Update: Sept. 17, 2013
Route 1 Multimodal Alternatives Analysis Status Update: Sept. 17, 2013
 
Citizens Information Meeting: Sleepy Hollow Road Walkway-March 29, 2017
Citizens Information Meeting: Sleepy Hollow Road Walkway-March 29, 2017Citizens Information Meeting: Sleepy Hollow Road Walkway-March 29, 2017
Citizens Information Meeting: Sleepy Hollow Road Walkway-March 29, 2017
 
Reston Network Analysis: Existing Conditions
Reston Network Analysis: Existing ConditionsReston Network Analysis: Existing Conditions
Reston Network Analysis: Existing Conditions
 
Student Free Fare Program Update and Recommendations
Student Free Fare Program Update and RecommendationsStudent Free Fare Program Update and Recommendations
Student Free Fare Program Update and Recommendations
 
2017 Repaving and Restriping – Glade Dr., April 27th Meeting
2017 Repaving and Restriping – Glade Dr., April 27th Meeting2017 Repaving and Restriping – Glade Dr., April 27th Meeting
2017 Repaving and Restriping – Glade Dr., April 27th Meeting
 
FCDOT: Silver Line, Phase 1 Bus Service Coordination
FCDOT: Silver Line, Phase 1 Bus Service CoordinationFCDOT: Silver Line, Phase 1 Bus Service Coordination
FCDOT: Silver Line, Phase 1 Bus Service Coordination
 
Transportation Alternatives Workshop and Public Comment: Sept. 15, 2016
Transportation Alternatives Workshop and Public Comment: Sept. 15, 2016Transportation Alternatives Workshop and Public Comment: Sept. 15, 2016
Transportation Alternatives Workshop and Public Comment: Sept. 15, 2016
 
Innovation North-Side Neighborhood Access Feasibility Study
Innovation North-Side Neighborhood Access Feasibility StudyInnovation North-Side Neighborhood Access Feasibility Study
Innovation North-Side Neighborhood Access Feasibility Study
 
Reston Network Analysis Community Meeting 2050 Results and Funding Plan: Nov....
Reston Network Analysis Community Meeting 2050 Results and Funding Plan: Nov....Reston Network Analysis Community Meeting 2050 Results and Funding Plan: Nov....
Reston Network Analysis Community Meeting 2050 Results and Funding Plan: Nov....
 
Funding and Maintenance Issues for Walkways: March 15, 2016
 Funding and Maintenance Issues for Walkways: March 15, 2016   Funding and Maintenance Issues for Walkways: March 15, 2016
Funding and Maintenance Issues for Walkways: March 15, 2016
 
Bi-County Parkway: Evaluation of Impacts on Fairfax County Roads
Bi-County Parkway: Evaluation of Impacts on Fairfax County RoadsBi-County Parkway: Evaluation of Impacts on Fairfax County Roads
Bi-County Parkway: Evaluation of Impacts on Fairfax County Roads
 
Student Free Fare Program
Student Free Fare ProgramStudent Free Fare Program
Student Free Fare Program
 
Policy on Level of Service in Activity Centers
Policy on Level of Service in Activity CentersPolicy on Level of Service in Activity Centers
Policy on Level of Service in Activity Centers
 
Bicycle Parking Guidelines
Bicycle Parking GuidelinesBicycle Parking Guidelines
Bicycle Parking Guidelines
 
Mason District 2017 VDOT Repaving: Complete Streets-Improving Bicycle and Ped...
Mason District 2017 VDOT Repaving: Complete Streets-Improving Bicycle and Ped...Mason District 2017 VDOT Repaving: Complete Streets-Improving Bicycle and Ped...
Mason District 2017 VDOT Repaving: Complete Streets-Improving Bicycle and Ped...
 
Transform 66 Outside the Beltway: Multimodal Solutions- 495 to Haymarket
Transform 66 Outside the Beltway: Multimodal Solutions- 495 to HaymarketTransform 66 Outside the Beltway: Multimodal Solutions- 495 to Haymarket
Transform 66 Outside the Beltway: Multimodal Solutions- 495 to Haymarket
 
Proposed Street Design Update - VDOT Summer 2015 Repaving Tysons
Proposed Street Design Update - VDOT Summer 2015 Repaving TysonsProposed Street Design Update - VDOT Summer 2015 Repaving Tysons
Proposed Street Design Update - VDOT Summer 2015 Repaving Tysons
 
Vienna Metro Station Bicycle Access Study
Vienna Metro Station Bicycle Access StudyVienna Metro Station Bicycle Access Study
Vienna Metro Station Bicycle Access Study
 
Fairfax County Parkway/Franconia-Springfield Parkway: Alternatives Analysis a...
Fairfax County Parkway/Franconia-Springfield Parkway: Alternatives Analysis a...Fairfax County Parkway/Franconia-Springfield Parkway: Alternatives Analysis a...
Fairfax County Parkway/Franconia-Springfield Parkway: Alternatives Analysis a...
 
Mason District-2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...
Mason District-2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...Mason District-2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...
Mason District-2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...
 

En vedette

En vedette (20)

Protective Helmets
Protective HelmetsProtective Helmets
Protective Helmets
 
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of CountywideDialogue on Transportation:Project SelectionA Si...Continuation of CountywideDialogue on Transportation:Project SelectionA Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
 
Silver Line Phase 1-Status Report: Feb. 4, 2014
Silver Line Phase 1-Status Report: Feb. 4, 2014Silver Line Phase 1-Status Report: Feb. 4, 2014
Silver Line Phase 1-Status Report: Feb. 4, 2014
 
Transportation Alternatives Program Workshop and Public Comment
Transportation Alternatives Program Workshop and Public CommentTransportation Alternatives Program Workshop and Public Comment
Transportation Alternatives Program Workshop and Public Comment
 
Silver Line Update - Feb. 12, 2016
Silver Line Update - Feb. 12, 2016Silver Line Update - Feb. 12, 2016
Silver Line Update - Feb. 12, 2016
 
Discussion of Converting Roads from the Secondary System to the Primary Syste...
Discussion of Converting Roads from the Secondary System to the Primary Syste...Discussion of Converting Roads from the Secondary System to the Primary Syste...
Discussion of Converting Roads from the Secondary System to the Primary Syste...
 
Reston Network Analysis: 2050 1st Tier Mitigation Results
Reston Network Analysis: 2050 1st Tier Mitigation ResultsReston Network Analysis: 2050 1st Tier Mitigation Results
Reston Network Analysis: 2050 1st Tier Mitigation Results
 
Fairfax County Parkway Corridor Study
Fairfax County Parkway Corridor StudyFairfax County Parkway Corridor Study
Fairfax County Parkway Corridor Study
 
Reston Funding Plan
Reston Funding PlanReston Funding Plan
Reston Funding Plan
 
Proposed Bicycle Facilities: VDOT Summer 2015 Repaving-Franconia Road
Proposed Bicycle Facilities: VDOT Summer 2015 Repaving-Franconia RoadProposed Bicycle Facilities: VDOT Summer 2015 Repaving-Franconia Road
Proposed Bicycle Facilities: VDOT Summer 2015 Repaving-Franconia Road
 
Proposed Fairfax Connector Silver Line Bus Service Plan
Proposed Fairfax Connector Silver Line Bus Service PlanProposed Fairfax Connector Silver Line Bus Service Plan
Proposed Fairfax Connector Silver Line Bus Service Plan
 
Shirley Gate Road Extended Corridor Planning Study
Shirley Gate Road Extended Corridor Planning StudyShirley Gate Road Extended Corridor Planning Study
Shirley Gate Road Extended Corridor Planning Study
 
Citizens Information Meeting: North West Street and Great Falls Street Sidewalks
Citizens Information Meeting: North West Street and Great Falls Street SidewalksCitizens Information Meeting: North West Street and Great Falls Street Sidewalks
Citizens Information Meeting: North West Street and Great Falls Street Sidewalks
 
Silver Line Update: Dec. 1, 2015
Silver Line Update: Dec. 1, 2015Silver Line Update: Dec. 1, 2015
Silver Line Update: Dec. 1, 2015
 
Student Free Fare Program
Student Free Fare ProgramStudent Free Fare Program
Student Free Fare Program
 
Transportation Priorities Plan: Future Updates
Transportation Priorities Plan: Future UpdatesTransportation Priorities Plan: Future Updates
Transportation Priorities Plan: Future Updates
 
Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016
Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016
Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016
 
Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4
Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4
Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4
 
Reston Network Analysis: Tier 3 Mitigation Results: Sept. 26, 2016
Reston Network Analysis: Tier 3 Mitigation Results: Sept. 26, 2016Reston Network Analysis: Tier 3 Mitigation Results: Sept. 26, 2016
Reston Network Analysis: Tier 3 Mitigation Results: Sept. 26, 2016
 
Transportation Services Group: Employer Services in Fairfax County
Transportation Services Group: Employer Services in Fairfax CountyTransportation Services Group: Employer Services in Fairfax County
Transportation Services Group: Employer Services in Fairfax County
 

Similaire à Citizens Information Meeting: Kirby Road Sidewalks: Nov. 9, 2016

Similaire à Citizens Information Meeting: Kirby Road Sidewalks: Nov. 9, 2016 (20)

Citizens Information Meeting-Pedestrian Improvements: Center Road from Rollin...
Citizens Information Meeting-Pedestrian Improvements: Center Road from Rollin...Citizens Information Meeting-Pedestrian Improvements: Center Road from Rollin...
Citizens Information Meeting-Pedestrian Improvements: Center Road from Rollin...
 
Burke Centre VRE Connector Ph. IV: Community Meeting for Bicycle and Pedestri...
Burke Centre VRE Connector Ph. IV: Community Meeting for Bicycle and Pedestri...Burke Centre VRE Connector Ph. IV: Community Meeting for Bicycle and Pedestri...
Burke Centre VRE Connector Ph. IV: Community Meeting for Bicycle and Pedestri...
 
Braddock Road Multimodal Study: Guinea Road to I-495
Braddock Road Multimodal Study: Guinea Road to I-495Braddock Road Multimodal Study: Guinea Road to I-495
Braddock Road Multimodal Study: Guinea Road to I-495
 
Pardon Our Dust Meeting: Pedestrian Improvements at the Intersection of Old D...
Pardon Our Dust Meeting: Pedestrian Improvements at the Intersection of Old D...Pardon Our Dust Meeting: Pedestrian Improvements at the Intersection of Old D...
Pardon Our Dust Meeting: Pedestrian Improvements at the Intersection of Old D...
 
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
 
Shirley Gate Road Extended Corridor Planning Study
Shirley Gate Road Extended Corridor Planning StudyShirley Gate Road Extended Corridor Planning Study
Shirley Gate Road Extended Corridor Planning Study
 
Woodford Road Street Design Improvements Meeting
Woodford Road Street Design Improvements MeetingWoodford Road Street Design Improvements Meeting
Woodford Road Street Design Improvements Meeting
 
Southrun Road-2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobility
Southrun Road-2016 VDOT Repaving: Complete Streets-Improving Multimodal MobilitySouthrun Road-2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobility
Southrun Road-2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobility
 
Citizens Information Meeting: Sleepy Hollow Road Walkway - April 23, 2018
Citizens Information Meeting: Sleepy Hollow Road Walkway - April 23, 2018Citizens Information Meeting: Sleepy Hollow Road Walkway - April 23, 2018
Citizens Information Meeting: Sleepy Hollow Road Walkway - April 23, 2018
 
Proposed Bicycle Facilities-VDOT Summer 2015 Repaving: Mason District
Proposed Bicycle Facilities-VDOT Summer 2015 Repaving: Mason District Proposed Bicycle Facilities-VDOT Summer 2015 Repaving: Mason District
Proposed Bicycle Facilities-VDOT Summer 2015 Repaving: Mason District
 
Proposed Bicycle Facilities-VDOT Summer 2015 Repaving: Mount Vernon District
Proposed Bicycle Facilities-VDOT Summer 2015 Repaving: Mount Vernon DistrictProposed Bicycle Facilities-VDOT Summer 2015 Repaving: Mount Vernon District
Proposed Bicycle Facilities-VDOT Summer 2015 Repaving: Mount Vernon District
 
Braddock Road Second Pedestrian Bridge Workshop -- Nov. 8, 2018
Braddock Road Second Pedestrian Bridge Workshop -- Nov. 8, 2018Braddock Road Second Pedestrian Bridge Workshop -- Nov. 8, 2018
Braddock Road Second Pedestrian Bridge Workshop -- Nov. 8, 2018
 
Balls Hill Road and Old Dominion Drive Roadway Spot Improvement Intersection ...
Balls Hill Road and Old Dominion Drive Roadway Spot Improvement Intersection ...Balls Hill Road and Old Dominion Drive Roadway Spot Improvement Intersection ...
Balls Hill Road and Old Dominion Drive Roadway Spot Improvement Intersection ...
 
2017 VDOT Repaving: Rose Hill Drive
2017 VDOT Repaving: Rose Hill Drive2017 VDOT Repaving: Rose Hill Drive
2017 VDOT Repaving: Rose Hill Drive
 
Herndon Metrorail Stations Access Management Study (HMSAMS)
Herndon Metrorail Stations Access Management Study (HMSAMS)Herndon Metrorail Stations Access Management Study (HMSAMS)
Herndon Metrorail Stations Access Management Study (HMSAMS)
 
Juniper Lane Connectivity Study: August 1, 2018
Juniper Lane Connectivity Study: August 1, 2018Juniper Lane Connectivity Study: August 1, 2018
Juniper Lane Connectivity Study: August 1, 2018
 
Fairfax County and Franconia-Springfield Parkways - Alternatives Analysis and...
Fairfax County and Franconia-Springfield Parkways - Alternatives Analysis and...Fairfax County and Franconia-Springfield Parkways - Alternatives Analysis and...
Fairfax County and Franconia-Springfield Parkways - Alternatives Analysis and...
 
Braddock Road Multimodal Study-Guinea Road to I-495: Community Meeting No. 3:...
Braddock Road Multimodal Study-Guinea Road to I-495: Community Meeting No. 3:...Braddock Road Multimodal Study-Guinea Road to I-495: Community Meeting No. 3:...
Braddock Road Multimodal Study-Guinea Road to I-495: Community Meeting No. 3:...
 
2017 VDOT Repaving and Restriping Reston: Bicycle, Pedestrian and Traffic Saf...
2017 VDOT Repaving and Restriping Reston: Bicycle, Pedestrian and Traffic Saf...2017 VDOT Repaving and Restriping Reston: Bicycle, Pedestrian and Traffic Saf...
2017 VDOT Repaving and Restriping Reston: Bicycle, Pedestrian and Traffic Saf...
 
Braddock Road Pedestrian Bridge Workshop - June 20, 2018
Braddock Road Pedestrian Bridge Workshop - June 20, 2018Braddock Road Pedestrian Bridge Workshop - June 20, 2018
Braddock Road Pedestrian Bridge Workshop - June 20, 2018
 

Plus de Fairfax County

Plus de Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 

Dernier

THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
Faga1939
 

Dernier (20)

America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
 
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
 
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptxLorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
 
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
 
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
 
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
 
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover BackVerified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
 
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
 
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
 
1971 war india pakistan bangladesh liberation.ppt
1971 war india pakistan bangladesh liberation.ppt1971 war india pakistan bangladesh liberation.ppt
1971 war india pakistan bangladesh liberation.ppt
 
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdhEmbed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
 
06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf
 
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
 
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
 
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
 
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreieGujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
 
04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf
 
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
 
China's soft power in 21st century .pptx
China's soft power in 21st century   .pptxChina's soft power in 21st century   .pptx
China's soft power in 21st century .pptx
 
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxKAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
 

Citizens Information Meeting: Kirby Road Sidewalks: Nov. 9, 2016

  • 1. County of Fairfax, Virginia 1 Citizens Information Meeting Kirby Road Sidewalks Chesterbrook Elementary School to Halsey Road & Halsey Road to Franklin Avenue Preliminary Design November 9, 2016 Fairfax County Dranesville District
  • 2. County of Fairfax, Virginia 2 Introduction/ Welcome Supervisor Foust Department of Transportation
  • 3. County of Fairfax, Virginia 3 Department of Transportation Contacts • Supervisor Foust’s Office • Fairfax County Department of Transportation (FCDOT) – Transportation Design (TDD) – Capital Projects (CPTED) • Fairfax County Department of Public Works & Environmental Services (DPWES) – Construction (UDCD) – Land Acquisition (LAD) • Design Consultant (WRA)
  • 4. County of Fairfax, Virginia 4 Meeting Agenda • Context and Background • Summary of Preliminary Design Options • Schedule • Q & A • “Open House” Department of Transportation
  • 5. County of Fairfax, Virginia 5 Context • County’s 2012 Dialogue on Transportation • Included in 2014 Bond Issue Department of Transportation
  • 6. County of Fairfax, Virginia 6 Department of Transportation Project Limits Limits of New Sidewalk
  • 7. County of Fairfax, Virginia 7 Existing Conditions Existing Crosswalk at Chesterbrook Elementary School Department of Transportation
  • 8. County of Fairfax, Virginia 8 Existing Conditions Looking west towards Halsey Road Department of Transportation
  • 9. County of Fairfax, Virginia 9 Existing Conditions Looking west towards Franklin Avenue Department of Transportation
  • 10. County of Fairfax, Virginia 10 Existing Conditions Crosswalk at Franklin Avenue Department of Transportation
  • 11. County of Fairfax, Virginia 11 Improvements Will Include • New Concrete Curb & Gutter on Existing Edge of Pavement • New 5’-6’ Wide Sidewalk and Curb Ramps • New Concrete Driveway Entrances • New Storm Drain Inlets and Pipes • New Road Pavement and Striping • Design to VDOT Criteria Department of Transportation
  • 12. County of Fairfax, Virginia 12 Potential Impacts • Relocation or upgrade of existing utilities (underground and/or overhead) • Tree Impacts – In right-of-way and on private property • Fences • Grading back slopes Department of Transportation
  • 13. County of Fairfax, Virginia 13 Sidewalk Options – ‘Alternative 1’ • 5’ Sidewalk, 4’ Buffer & 6’ Sidewalk (No Buffer) – Requires VDOT Waiver Department of Transportation NEW CURB & GUTTER 4’ GRASS BUFFER STRIP NEW 5’ WIDE SIDEWALK
  • 14. County of Fairfax, Virginia 14 Sidewalk Options – ‘Alternative 1’ • 5’ Sidewalk, 4’ Buffer & 6’ Sidewalk (No Buffer) – Requires VDOT Waiver Department of Transportation NEW CURB & GUTTER NEW 6’ WIDE SIDEWALK
  • 15. County of Fairfax, Virginia 15 Sidewalk Options – ‘Alternative 1’ • 5’ Sidewalk, 4’ Buffer & 6’ Sidewalk (No Buffer) – Requires VDOT Waiver Department of Transportation SIDEWALK CURB RAMP DRIVEWAY REPLACEMENT LIMITS OF DISTRUBANCE GRADING/CONSTRUCTION EASEMENT PROPOSED RIGHT OF WAY DRAINAGE EASEMENT PROPOSED TREE REMOVAL X
  • 16. County of Fairfax, Virginia 16 Sidewalk Options – ‘Alternative 2’ • 5’ Sidewalk, 4’ Buffer – VDOT Standard Department of Transportation NEW CURB & GUTTER 4’ GRASS BUFFER STRIP NEW 5’ WIDE SIDEWALK
  • 17. County of Fairfax, Virginia 17 Sidewalk Options – ‘Alternative 2’ • 5’ Sidewalk, 4’ Buffer – VDOT Standard Department of Transportation SIDEWALK CURB RAMP DRIVEWAY REPLACEMENT LIMITS OF DISTRUBANCE GRADING/CONSTRUCTION EASEMENT PROPOSED RIGHT OF WAY DRAINAGE EASEMENT PROPOSED TREE REMOVAL X
  • 18. County of Fairfax, Virginia 18 • Limits of Disturbance show the approximate area affected by construction. • Driveways, fences, and trees may be impacted on properties adjacent to the project. • If private property is to be impacted during construction, we will obtain an easement or right-of-way before work begins. Will the Project Impact My Property? Department of Transportation LIMITS OF DISTURBANCE
  • 19. County of Fairfax, Virginia 19 Land Acquisition Process • Will occur after pre-final design complete. • Plats will be prepared showing easements and/or right-of-way needed. • Land Acquisition Agent will contact property owners to negotiate. Department of Transportation
  • 20. County of Fairfax, Virginia 20 Construction • We will coordinate with property owners well in advance. • Fences may be temporarily removed & replaced. Relocation to private property may be necessary, if within the right-of-way. • Work hours are set by VDOT. Department of Transportation
  • 21. County of Fairfax, Virginia 21 Preliminary Schedule • Intermediate Design – Early 2017 • Pre-Final Design – Fall 2017 • Land Acquisition – Mid to Late 2018 • Final Design – Late 2018/Early 2019 • Construction – 2019 Department of Transportation
  • 22. County of Fairfax, Virginia 22 Department of Transportation Questions?
  • 23. County of Fairfax, Virginia 23 http://www.fairfaxcounty.gov/fcdot/ pedestrian/kirbyroad.htm Submit Comments on Project Website