Building Repositioning/Repurposing
Board Community Revitalization & Reinvestment Committee
October 11, 2016
Economic Success Plan
1
Recommendation 2.8 of the Strategic
Plan to Facilitate the Economic Success
of Fairfax County states:
“Study and implement ways to repurpose
empty or obsolete commercial space for
residential uses; urban schools or other public
facilities; art and cultural purposes;
live/work/manufacture uses; and/or start-up
companies. Engage stakeholders in research
and recommendations.
a. Consider implementation tools such as land
use and regulatory changes, innovative tax
policies, and the use of public seed money or
equity participation to spur or support
redevelopment and infill, revitalization, and
partnership opportunities for repurposing.
Workgroup
2
The Fairfax County Building Repositioning Workgroup
• Private and public sector stakeholders
• Evaluated:
o Changing office market conditions within region
o How buildings are changed over time to improve
value
o Potential process, policy and regulatory changes
the County should consider to address these
challenges and opportunities
• Informed by local case studies, research on trends
and best practices from other jurisdictions
3
Employment
• Fairfax County
Unemployment Rate
is lower that the
national average
• 3.2% - July, 2016
• National average - s
4.9%
• Since 2010, Fairfax
has added almost
47,000 jobs
Data per DMB, Economic Indicators, Sept. 2016 and
FCEDA 2010-2015 Annual Reports
4
Office Leasing Activity
Data per FCEDA, Real Estate Report, Year-End 2015
Strong and consistent leasing activity
5
Office Construction
Data per FCEDA, Real Estate Report, Year-End 2015
2.3M sq. ft. of private office currently under development
6
Current Office Market
Direct Vacancy Rate for Office – 16.2%
Total Amount of Vacant Office – 18.8M sq. ft.
Data per FCEDA, Real Estate Report, Year-End 2015
7
Why is this happening?
Data per Colliers International, 2nd Quarter 2016
• Flight to quality buildings in most submarkets
• Location and building characteristics driving
relocation decisions
All Office
Classes
Class A Office
Class B & C
Office
Fairfax Area Total 18.2% 17.4% 19.1%
Reston Submarket 16.0% 14.4% 18.3%
Route 28 Corridor
South 18.2% 15.1% 23.4%
Tysons Submarket 18.6% 15.1% 22.1%
8
Significant Office
Market Changes
• Reduction in amount of space per employee
o 40% reduction anticipated between 2010-2017
o Move to more efficient floorplates
• Demand for amenity rich locations to attract
employees
o From “birds and bunnies” to “burgers and brews”
o Can be addressed with in-building amenities
• Access to transit is
critical
9
Critical Factors
Affecting Solutions
Elements Under Owner Control (to some extent)
• In-building amenities
• Investment in building (renovation, system
enhancements)
Elements Outside Owner Control (to some extent)
• Existing building size, dimension, and floor plate
• Proximity to transit and amenities
10
Improve viability through
investment in existing
structure to make current
use more competitive
For example:
• Façade and system
improvements
• Addition of in-building
amenities
• Changes to floor layout
and leasing models
Building Repositioning
New Façade – Silverline Center
Removal of Precast Façade – 7900 Westpark Drive
11
Repositioning
Recommendations
Changes to processes and Zoning Ordinance to
facilitate repositioning
• Add flexibility under Minor Modification provisions
• Permit minor increases in maximum allowable sq.ft.
• Provide greater flexibility for proffer interpretations
• Create a simplified Proffered Condition Amendment
process for repositioning properties
Improve information sharing on repositioning
• Outreach on State of Virginia Rehabilitation Code
• Advertise new processes and potential to building
owners and broker associations
12
Improve viability through
change in building use, for
example:
• Office to Residential
• Office to Institutional
(e.g., school or church)
Driven by changes in office
market/forces outside of
owner control
Building Repurposing
Office to School Conversion - Seven Corners, VA
Office to Residential Conversion (e-Lofts) – Alexandria, VA
13
Repurposing
Recommendations
Changes to land use planning policy
• Amend Comprehensive Plan Policy Plan to provide
guidance for repurposing commercial buildings
• Participate in repurposing demonstration project
• Consider repurposing commercial buildings as part of
public facility planning
• Consider a Special Exception process for designated
area(s) permitting change in use without change to
Comprehensive Plan or a rezoning
• Consider Board’s Own Motion rezoning for selected
buildings to position them for repurposing
14
Repurposing
Recommendations
Improve information sharing
• Create a solutions database to address common
issues and resolutions
• Establish and document process for ‘temporary’ and
‘pop-up’ uses
• Utilize Economic Development Authority as a
matchmaker between existing building owners and
potential users
5
Initial items identified as emerging trends and
technologies for owners seeking to reposition or
repurpose buildings:
• Co-Working
• Co-Living & Flexible Live/Work
• Makerspaces
• Food Incubator
• Urban Farming & Vertical Farming
Emerging Trends & Technologies
Case Studies
5
Co-Working
• Office space re-imagined
• An office or other working
environment that is shared
by people who often do not
work for the same employer
• Lowers the financial entry
point for those who are self-
employed or start-ups, while
free from typical lease
constraints or commitments
Emerging Trends & Technologies
Example Images of Co-Working Spaces
Emerging Trends & Technologies
Co-Living
• A communal living concept
akin to “dorms for adults”
17
Example Images of WeLive – Crystal
City/Arlington, VA
Emerging Trends & Technologies
Flexible Live/Work Units (e-Lofts)
• Unit may be used for living, for working, or for live/work
purposes
• Standard size, configuration and finishes regardless of end user
choice
• No segregation of units by use (e.g., by floor)
18
Example Renderings of e-Lofts (Flexible Live/Work
Units) – Alexandria, VA
19
Makerspaces
• Community workshop facilities that integrate
multiple uses at a single site (e.g. commercial,
industrial and educational uses)
Food Incubator
• Offer shared commercial kitchen space and
business coaching for food business entrepreneurs
Emerging Trends & Technologies
NOVA Labs – Reston, VA Frontier Kitchen – Lorton, VA
20
Urban Farming
• The production and distribution of food in a heavily
populated community. Often used interchangeably with
urban agriculture or urban gardening, and sometimes
associated with vertical farming
Vertical Farming
• Hydroponic food production within buildings - multi-
story greenhouse
• Generally more futuristic/large scale
Emerging Trends & Technologies
Harding Street Project, Urban Ag/Indoor Farm – Petersburg, VA Sky Greens, Vertical Farming – Singapore
21
Emerging Trend
Recommendations
• Establish inter-disciplinary staff group to identify,
monitor, and track emerging land use trends and how
to accommodate them within the Zoning Ordinance
• Continue to use Building Repositioning Workgroup to
vet ideas and regional land use trends
• Evaluate need for additional flexibility to
accommodate multiple uses within a single space
• Monitor programs used in other jurisdictions to
support fostering emerging trends
• Create a ‘Repositioning Coordinator’ position to
facilitate the management of building repositioning
and repurposing efforts
22
Next Steps
Publication of Final Phase 1 Workgroup Report
Initial implementation focus on:
• Addition of a section to the Policy Plan on
Repositioning/Repurposing
• Identification of potential area(s) for flexibility
through Special Exception process
Move forward with implementation of recommendations
through existing work plans:
• Zoning Ordinance Amendment Work Program
• Economic Success Strategic Plan initiatives
• Fairfax First
Phase 2 of Workgroup to address similar issues in existing
industrial and retail sites

Contenu connexe

Similaire à Fairfax County Building Repositioning Presentation

WS3 Project Realities
WS3 Project Realities WS3 Project Realities
WS3 Project Realities us2unionsquare
 
Plan Amendment 2017-CW-6CP : Non-Office Building Repurposing
Plan Amendment 2017-CW-6CP : Non-Office Building RepurposingPlan Amendment 2017-CW-6CP : Non-Office Building Repurposing
Plan Amendment 2017-CW-6CP : Non-Office Building RepurposingFairfax County
 
Final Power Point project 3
Final Power Point project 3Final Power Point project 3
Final Power Point project 3James Chun
 
Zoning Ordinance Modernization Project (zMOD): April 13, 2017
Zoning Ordinance Modernization Project (zMOD): April 13, 2017Zoning Ordinance Modernization Project (zMOD): April 13, 2017
Zoning Ordinance Modernization Project (zMOD): April 13, 2017Fairfax County
 
Fairfax County Zoning Ordinance Modernization Project
Fairfax County Zoning Ordinance Modernization ProjectFairfax County Zoning Ordinance Modernization Project
Fairfax County Zoning Ordinance Modernization ProjectFairfax County
 
2.26.2014_Northern VA Realtor_Korean Forum 5
2.26.2014_Northern VA Realtor_Korean Forum 52.26.2014_Northern VA Realtor_Korean Forum 5
2.26.2014_Northern VA Realtor_Korean Forum 5Hyojung Garland
 
OCR: Fairfax County Revitalization Program
OCR: Fairfax County Revitalization ProgramOCR: Fairfax County Revitalization Program
OCR: Fairfax County Revitalization ProgramFairfax County
 
Plan Amendment 2017-CW-5CP: Office Building Repurposing, Phase 2
Plan Amendment 2017-CW-5CP: Office Building Repurposing, Phase 2Plan Amendment 2017-CW-5CP: Office Building Repurposing, Phase 2
Plan Amendment 2017-CW-5CP: Office Building Repurposing, Phase 2Fairfax County
 
Monona APA Presentatin_10-09-15
Monona APA Presentatin_10-09-15Monona APA Presentatin_10-09-15
Monona APA Presentatin_10-09-15Sonja Reichertz
 
Waco Plan Draft Presentation022410v2
Waco Plan Draft Presentation022410v2Waco Plan Draft Presentation022410v2
Waco Plan Draft Presentation022410v2fregoneseassociates
 
Waco Plan Draft Presentation022410
Waco Plan Draft Presentation022410Waco Plan Draft Presentation022410
Waco Plan Draft Presentation022410fregoneseassociates
 
Waco Plan Draft Presentation022410v2
Waco Plan Draft Presentation022410v2Waco Plan Draft Presentation022410v2
Waco Plan Draft Presentation022410v2guest0847081
 
Principles of Sustainable Urban Design
Principles of Sustainable Urban DesignPrinciples of Sustainable Urban Design
Principles of Sustainable Urban DesignESD UNU-IAS
 
Leading Age 2015 Presentation Repositioning ROI Synergy in Design, Care, and...
Leading Age 2015 Presentation Repositioning ROI  Synergy in Design, Care, and...Leading Age 2015 Presentation Repositioning ROI  Synergy in Design, Care, and...
Leading Age 2015 Presentation Repositioning ROI Synergy in Design, Care, and...Christine Rancourt
 
Ontario Business Retention and Expansion Overview 2017
Ontario Business Retention and Expansion Overview 2017Ontario Business Retention and Expansion Overview 2017
Ontario Business Retention and Expansion Overview 2017Stephen Morris Ec.D.
 
Facility Renewal Planning and how to Minimize Budget Surprises
Facility Renewal Planning and how to Minimize Budget SurprisesFacility Renewal Planning and how to Minimize Budget Surprises
Facility Renewal Planning and how to Minimize Budget SurprisesBarry Lynch
 
DiNucci Resume 11.27.16 Linked in
DiNucci Resume 11.27.16 Linked inDiNucci Resume 11.27.16 Linked in
DiNucci Resume 11.27.16 Linked inJo Ellen Dinucci
 
City Partnerships Challenge - Inner Metro Sustainability Hub (IMSH) brief
City Partnerships Challenge - Inner Metro Sustainability Hub (IMSH) briefCity Partnerships Challenge - Inner Metro Sustainability Hub (IMSH) brief
City Partnerships Challenge - Inner Metro Sustainability Hub (IMSH) briefESD UNU-IAS
 
Judicial (Massey) Complex Master Plan Briefing July 2020
Judicial (Massey) Complex Master Plan Briefing July 2020Judicial (Massey) Complex Master Plan Briefing July 2020
Judicial (Massey) Complex Master Plan Briefing July 2020Fairfax County
 

Similaire à Fairfax County Building Repositioning Presentation (20)

WS3 Project Realities
WS3 Project Realities WS3 Project Realities
WS3 Project Realities
 
Plan Amendment 2017-CW-6CP : Non-Office Building Repurposing
Plan Amendment 2017-CW-6CP : Non-Office Building RepurposingPlan Amendment 2017-CW-6CP : Non-Office Building Repurposing
Plan Amendment 2017-CW-6CP : Non-Office Building Repurposing
 
Final Power Point project 3
Final Power Point project 3Final Power Point project 3
Final Power Point project 3
 
Zoning Ordinance Modernization Project (zMOD): April 13, 2017
Zoning Ordinance Modernization Project (zMOD): April 13, 2017Zoning Ordinance Modernization Project (zMOD): April 13, 2017
Zoning Ordinance Modernization Project (zMOD): April 13, 2017
 
Fairfax County Zoning Ordinance Modernization Project
Fairfax County Zoning Ordinance Modernization ProjectFairfax County Zoning Ordinance Modernization Project
Fairfax County Zoning Ordinance Modernization Project
 
2.26.2014_Northern VA Realtor_Korean Forum 5
2.26.2014_Northern VA Realtor_Korean Forum 52.26.2014_Northern VA Realtor_Korean Forum 5
2.26.2014_Northern VA Realtor_Korean Forum 5
 
Staff Report on Modifications to Planned Development Ordinance.
Staff Report on Modifications to Planned Development Ordinance. Staff Report on Modifications to Planned Development Ordinance.
Staff Report on Modifications to Planned Development Ordinance.
 
OCR: Fairfax County Revitalization Program
OCR: Fairfax County Revitalization ProgramOCR: Fairfax County Revitalization Program
OCR: Fairfax County Revitalization Program
 
Plan Amendment 2017-CW-5CP: Office Building Repurposing, Phase 2
Plan Amendment 2017-CW-5CP: Office Building Repurposing, Phase 2Plan Amendment 2017-CW-5CP: Office Building Repurposing, Phase 2
Plan Amendment 2017-CW-5CP: Office Building Repurposing, Phase 2
 
Monona APA Presentatin_10-09-15
Monona APA Presentatin_10-09-15Monona APA Presentatin_10-09-15
Monona APA Presentatin_10-09-15
 
Waco Plan Draft Presentation022410v2
Waco Plan Draft Presentation022410v2Waco Plan Draft Presentation022410v2
Waco Plan Draft Presentation022410v2
 
Waco Plan Draft Presentation022410
Waco Plan Draft Presentation022410Waco Plan Draft Presentation022410
Waco Plan Draft Presentation022410
 
Waco Plan Draft Presentation022410v2
Waco Plan Draft Presentation022410v2Waco Plan Draft Presentation022410v2
Waco Plan Draft Presentation022410v2
 
Principles of Sustainable Urban Design
Principles of Sustainable Urban DesignPrinciples of Sustainable Urban Design
Principles of Sustainable Urban Design
 
Leading Age 2015 Presentation Repositioning ROI Synergy in Design, Care, and...
Leading Age 2015 Presentation Repositioning ROI  Synergy in Design, Care, and...Leading Age 2015 Presentation Repositioning ROI  Synergy in Design, Care, and...
Leading Age 2015 Presentation Repositioning ROI Synergy in Design, Care, and...
 
Ontario Business Retention and Expansion Overview 2017
Ontario Business Retention and Expansion Overview 2017Ontario Business Retention and Expansion Overview 2017
Ontario Business Retention and Expansion Overview 2017
 
Facility Renewal Planning and how to Minimize Budget Surprises
Facility Renewal Planning and how to Minimize Budget SurprisesFacility Renewal Planning and how to Minimize Budget Surprises
Facility Renewal Planning and how to Minimize Budget Surprises
 
DiNucci Resume 11.27.16 Linked in
DiNucci Resume 11.27.16 Linked inDiNucci Resume 11.27.16 Linked in
DiNucci Resume 11.27.16 Linked in
 
City Partnerships Challenge - Inner Metro Sustainability Hub (IMSH) brief
City Partnerships Challenge - Inner Metro Sustainability Hub (IMSH) briefCity Partnerships Challenge - Inner Metro Sustainability Hub (IMSH) brief
City Partnerships Challenge - Inner Metro Sustainability Hub (IMSH) brief
 
Judicial (Massey) Complex Master Plan Briefing July 2020
Judicial (Massey) Complex Master Plan Briefing July 2020Judicial (Massey) Complex Master Plan Briefing July 2020
Judicial (Massey) Complex Master Plan Briefing July 2020
 

Plus de Fairfax County

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementFairfax County
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS Fairfax County
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22Fairfax County
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxFairfax County
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19 Fairfax County
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationFairfax County
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction ProgressFairfax County
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxFairfax County
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IVFairfax County
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Fairfax County
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxFairfax County
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilFairfax County
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptxFairfax County
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT Fairfax County
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap UpFairfax County
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Fairfax County
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Fairfax County
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectFairfax County
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Fairfax County
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual ArtsFairfax County
 

Plus de Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 

Dernier

An Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCCAn Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCCNAP Global Network
 
Time, Stress & Work Life Balance for Clerks with Beckie Whitehouse
Time, Stress & Work Life Balance for Clerks with Beckie WhitehouseTime, Stress & Work Life Balance for Clerks with Beckie Whitehouse
Time, Stress & Work Life Balance for Clerks with Beckie Whitehousesubs7
 
Scaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP processScaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP processNAP Global Network
 
Honasa Consumer Limited Impact Report 2024.pdf
Honasa Consumer Limited Impact Report 2024.pdfHonasa Consumer Limited Impact Report 2024.pdf
Honasa Consumer Limited Impact Report 2024.pdfSocial Samosa
 
Kolkata Call Girls Halisahar 💯Call Us 🔝 8005736733 🔝 💃 Top Class Call Girl ...
Kolkata Call Girls Halisahar  💯Call Us 🔝 8005736733 🔝 💃  Top Class Call Girl ...Kolkata Call Girls Halisahar  💯Call Us 🔝 8005736733 🔝 💃  Top Class Call Girl ...
Kolkata Call Girls Halisahar 💯Call Us 🔝 8005736733 🔝 💃 Top Class Call Girl ...Namrata Singh
 
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...Sareena Khatun
 
Unique Value Prop slide deck________.pdf
Unique Value Prop slide deck________.pdfUnique Value Prop slide deck________.pdf
Unique Value Prop slide deck________.pdfScottMeyers35
 
Call Girls AS Rao Nagar - 8250092165 Our call girls are sure to provide you w...
Call Girls AS Rao Nagar - 8250092165 Our call girls are sure to provide you w...Call Girls AS Rao Nagar - 8250092165 Our call girls are sure to provide you w...
Call Girls AS Rao Nagar - 8250092165 Our call girls are sure to provide you w...kumargunjan9515
 
9867746289 Independent Call Girls in Mumbai Airport 24/7 - Mumbai Escorts
9867746289 Independent Call Girls in Mumbai Airport 24/7 - Mumbai Escorts9867746289 Independent Call Girls in Mumbai Airport 24/7 - Mumbai Escorts
9867746289 Independent Call Girls in Mumbai Airport 24/7 - Mumbai EscortsPooja Nehwal
 
Election 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfElection 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfSamirsinh Parmar
 
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdf
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdfPeace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdf
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdfNAP Global Network
 
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...gajnagarg
 
NGO working for orphan children’s education
NGO working for orphan children’s educationNGO working for orphan children’s education
NGO working for orphan children’s educationSERUDS INDIA
 
Dating Call Girls inBaloda Bazar Bhatapara 9332606886Call Girls Advance Cash...
Dating Call Girls inBaloda Bazar Bhatapara  9332606886Call Girls Advance Cash...Dating Call Girls inBaloda Bazar Bhatapara  9332606886Call Girls Advance Cash...
Dating Call Girls inBaloda Bazar Bhatapara 9332606886Call Girls Advance Cash...kumargunjan9515
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCNAP Global Network
 
Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)NAP Global Network
 
Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'NAP Global Network
 
NAP Expo - Delivering effective and adequate adaptation.pptx
NAP Expo - Delivering effective and adequate adaptation.pptxNAP Expo - Delivering effective and adequate adaptation.pptx
NAP Expo - Delivering effective and adequate adaptation.pptxNAP Global Network
 

Dernier (20)

An Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCCAn Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCC
 
Time, Stress & Work Life Balance for Clerks with Beckie Whitehouse
Time, Stress & Work Life Balance for Clerks with Beckie WhitehouseTime, Stress & Work Life Balance for Clerks with Beckie Whitehouse
Time, Stress & Work Life Balance for Clerks with Beckie Whitehouse
 
Scaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP processScaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP process
 
Honasa Consumer Limited Impact Report 2024.pdf
Honasa Consumer Limited Impact Report 2024.pdfHonasa Consumer Limited Impact Report 2024.pdf
Honasa Consumer Limited Impact Report 2024.pdf
 
Panchayath circular KLC -Panchayath raj act s 169, 218
Panchayath circular KLC -Panchayath raj act s 169, 218Panchayath circular KLC -Panchayath raj act s 169, 218
Panchayath circular KLC -Panchayath raj act s 169, 218
 
Kolkata Call Girls Halisahar 💯Call Us 🔝 8005736733 🔝 💃 Top Class Call Girl ...
Kolkata Call Girls Halisahar  💯Call Us 🔝 8005736733 🔝 💃  Top Class Call Girl ...Kolkata Call Girls Halisahar  💯Call Us 🔝 8005736733 🔝 💃  Top Class Call Girl ...
Kolkata Call Girls Halisahar 💯Call Us 🔝 8005736733 🔝 💃 Top Class Call Girl ...
 
AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024
 
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
 
Unique Value Prop slide deck________.pdf
Unique Value Prop slide deck________.pdfUnique Value Prop slide deck________.pdf
Unique Value Prop slide deck________.pdf
 
Call Girls AS Rao Nagar - 8250092165 Our call girls are sure to provide you w...
Call Girls AS Rao Nagar - 8250092165 Our call girls are sure to provide you w...Call Girls AS Rao Nagar - 8250092165 Our call girls are sure to provide you w...
Call Girls AS Rao Nagar - 8250092165 Our call girls are sure to provide you w...
 
9867746289 Independent Call Girls in Mumbai Airport 24/7 - Mumbai Escorts
9867746289 Independent Call Girls in Mumbai Airport 24/7 - Mumbai Escorts9867746289 Independent Call Girls in Mumbai Airport 24/7 - Mumbai Escorts
9867746289 Independent Call Girls in Mumbai Airport 24/7 - Mumbai Escorts
 
Election 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfElection 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdf
 
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdf
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdfPeace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdf
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdf
 
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
 
NGO working for orphan children’s education
NGO working for orphan children’s educationNGO working for orphan children’s education
NGO working for orphan children’s education
 
Dating Call Girls inBaloda Bazar Bhatapara 9332606886Call Girls Advance Cash...
Dating Call Girls inBaloda Bazar Bhatapara  9332606886Call Girls Advance Cash...Dating Call Girls inBaloda Bazar Bhatapara  9332606886Call Girls Advance Cash...
Dating Call Girls inBaloda Bazar Bhatapara 9332606886Call Girls Advance Cash...
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCC
 
Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)
 
Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'
 
NAP Expo - Delivering effective and adequate adaptation.pptx
NAP Expo - Delivering effective and adequate adaptation.pptxNAP Expo - Delivering effective and adequate adaptation.pptx
NAP Expo - Delivering effective and adequate adaptation.pptx
 

Fairfax County Building Repositioning Presentation

  • 1. Building Repositioning/Repurposing Board Community Revitalization & Reinvestment Committee October 11, 2016
  • 2. Economic Success Plan 1 Recommendation 2.8 of the Strategic Plan to Facilitate the Economic Success of Fairfax County states: “Study and implement ways to repurpose empty or obsolete commercial space for residential uses; urban schools or other public facilities; art and cultural purposes; live/work/manufacture uses; and/or start-up companies. Engage stakeholders in research and recommendations. a. Consider implementation tools such as land use and regulatory changes, innovative tax policies, and the use of public seed money or equity participation to spur or support redevelopment and infill, revitalization, and partnership opportunities for repurposing.
  • 3. Workgroup 2 The Fairfax County Building Repositioning Workgroup • Private and public sector stakeholders • Evaluated: o Changing office market conditions within region o How buildings are changed over time to improve value o Potential process, policy and regulatory changes the County should consider to address these challenges and opportunities • Informed by local case studies, research on trends and best practices from other jurisdictions
  • 4. 3 Employment • Fairfax County Unemployment Rate is lower that the national average • 3.2% - July, 2016 • National average - s 4.9% • Since 2010, Fairfax has added almost 47,000 jobs Data per DMB, Economic Indicators, Sept. 2016 and FCEDA 2010-2015 Annual Reports
  • 5. 4 Office Leasing Activity Data per FCEDA, Real Estate Report, Year-End 2015 Strong and consistent leasing activity
  • 6. 5 Office Construction Data per FCEDA, Real Estate Report, Year-End 2015 2.3M sq. ft. of private office currently under development
  • 7. 6 Current Office Market Direct Vacancy Rate for Office – 16.2% Total Amount of Vacant Office – 18.8M sq. ft. Data per FCEDA, Real Estate Report, Year-End 2015
  • 8. 7 Why is this happening? Data per Colliers International, 2nd Quarter 2016 • Flight to quality buildings in most submarkets • Location and building characteristics driving relocation decisions All Office Classes Class A Office Class B & C Office Fairfax Area Total 18.2% 17.4% 19.1% Reston Submarket 16.0% 14.4% 18.3% Route 28 Corridor South 18.2% 15.1% 23.4% Tysons Submarket 18.6% 15.1% 22.1%
  • 9. 8 Significant Office Market Changes • Reduction in amount of space per employee o 40% reduction anticipated between 2010-2017 o Move to more efficient floorplates • Demand for amenity rich locations to attract employees o From “birds and bunnies” to “burgers and brews” o Can be addressed with in-building amenities • Access to transit is critical
  • 10. 9 Critical Factors Affecting Solutions Elements Under Owner Control (to some extent) • In-building amenities • Investment in building (renovation, system enhancements) Elements Outside Owner Control (to some extent) • Existing building size, dimension, and floor plate • Proximity to transit and amenities
  • 11. 10 Improve viability through investment in existing structure to make current use more competitive For example: • Façade and system improvements • Addition of in-building amenities • Changes to floor layout and leasing models Building Repositioning New Façade – Silverline Center Removal of Precast Façade – 7900 Westpark Drive
  • 12. 11 Repositioning Recommendations Changes to processes and Zoning Ordinance to facilitate repositioning • Add flexibility under Minor Modification provisions • Permit minor increases in maximum allowable sq.ft. • Provide greater flexibility for proffer interpretations • Create a simplified Proffered Condition Amendment process for repositioning properties Improve information sharing on repositioning • Outreach on State of Virginia Rehabilitation Code • Advertise new processes and potential to building owners and broker associations
  • 13. 12 Improve viability through change in building use, for example: • Office to Residential • Office to Institutional (e.g., school or church) Driven by changes in office market/forces outside of owner control Building Repurposing Office to School Conversion - Seven Corners, VA Office to Residential Conversion (e-Lofts) – Alexandria, VA
  • 14. 13 Repurposing Recommendations Changes to land use planning policy • Amend Comprehensive Plan Policy Plan to provide guidance for repurposing commercial buildings • Participate in repurposing demonstration project • Consider repurposing commercial buildings as part of public facility planning • Consider a Special Exception process for designated area(s) permitting change in use without change to Comprehensive Plan or a rezoning • Consider Board’s Own Motion rezoning for selected buildings to position them for repurposing
  • 15. 14 Repurposing Recommendations Improve information sharing • Create a solutions database to address common issues and resolutions • Establish and document process for ‘temporary’ and ‘pop-up’ uses • Utilize Economic Development Authority as a matchmaker between existing building owners and potential users
  • 16. 5 Initial items identified as emerging trends and technologies for owners seeking to reposition or repurpose buildings: • Co-Working • Co-Living & Flexible Live/Work • Makerspaces • Food Incubator • Urban Farming & Vertical Farming Emerging Trends & Technologies Case Studies
  • 17. 5 Co-Working • Office space re-imagined • An office or other working environment that is shared by people who often do not work for the same employer • Lowers the financial entry point for those who are self- employed or start-ups, while free from typical lease constraints or commitments Emerging Trends & Technologies Example Images of Co-Working Spaces
  • 18. Emerging Trends & Technologies Co-Living • A communal living concept akin to “dorms for adults” 17 Example Images of WeLive – Crystal City/Arlington, VA
  • 19. Emerging Trends & Technologies Flexible Live/Work Units (e-Lofts) • Unit may be used for living, for working, or for live/work purposes • Standard size, configuration and finishes regardless of end user choice • No segregation of units by use (e.g., by floor) 18 Example Renderings of e-Lofts (Flexible Live/Work Units) – Alexandria, VA
  • 20. 19 Makerspaces • Community workshop facilities that integrate multiple uses at a single site (e.g. commercial, industrial and educational uses) Food Incubator • Offer shared commercial kitchen space and business coaching for food business entrepreneurs Emerging Trends & Technologies NOVA Labs – Reston, VA Frontier Kitchen – Lorton, VA
  • 21. 20 Urban Farming • The production and distribution of food in a heavily populated community. Often used interchangeably with urban agriculture or urban gardening, and sometimes associated with vertical farming Vertical Farming • Hydroponic food production within buildings - multi- story greenhouse • Generally more futuristic/large scale Emerging Trends & Technologies Harding Street Project, Urban Ag/Indoor Farm – Petersburg, VA Sky Greens, Vertical Farming – Singapore
  • 22. 21 Emerging Trend Recommendations • Establish inter-disciplinary staff group to identify, monitor, and track emerging land use trends and how to accommodate them within the Zoning Ordinance • Continue to use Building Repositioning Workgroup to vet ideas and regional land use trends • Evaluate need for additional flexibility to accommodate multiple uses within a single space • Monitor programs used in other jurisdictions to support fostering emerging trends • Create a ‘Repositioning Coordinator’ position to facilitate the management of building repositioning and repurposing efforts
  • 23. 22 Next Steps Publication of Final Phase 1 Workgroup Report Initial implementation focus on: • Addition of a section to the Policy Plan on Repositioning/Repurposing • Identification of potential area(s) for flexibility through Special Exception process Move forward with implementation of recommendations through existing work plans: • Zoning Ordinance Amendment Work Program • Economic Success Strategic Plan initiatives • Fairfax First Phase 2 of Workgroup to address similar issues in existing industrial and retail sites