The project included rehabilitation of approximately 1,641 linear feet of 24-inch diameter pipe with cured-in-place pipe liner and replacement of 175 linear feet of sanitary sewer pipe. Crushed glass from the I-95 Landfill Complex was used as bedding material for the pipe replacement portion of work.
2024: The FAR, Federal Acquisition Regulations, Part 30
Flatlick Sewer Rehabilitation Phase III
1. A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
Project No. WW-000007-014E
Sully District
May 10, 2019
Flatlick Sewer Rehabilitation Phase III
2. Project Details
Flatlick Sewer Rehabilitation Phase III
Capital Facilities/Wastewater Design and Construction Division
Description:
The Flatlick Sewer Rehabilitation Phase III project included rehabilitation of approximately
1,641 linear feet of 24-inch diameter pipe with cured-in-place pipe liner and replacement of
175 linear feet of sanitary sewer pipe. Crushed glass was used as bedding material for the
pipe replacement portion of work. The project was substantially complete on April 12,
2019.
Project Overview:
• Approximately 1,641 feet of existing 24-inch asbestos cement pipe was rehabilitated with
cured-in-place pipe liner.
• Approximately 175 feet of 24-inch asbestos cement pipe was replaced with 30-inch
ductile iron pipe and encased by 42-inch steel casing across the Flatlick Branch Stream.
Crushed glass from the I-95 Landfill was used as pipe bedding material.
• Three manholes were replaced and six more were rehabilitated with cementitious lining.
Project Team:
• Suzy Harding, Wastewater Design and Construction Division
• Tom Richardson, Wastewater Collection Division
• Colleen Block, Wastewater Design and Construction Division
• Craig Jeter, Solid Waste Operations Division
3. Flatlick Sewer Rehabilitation Phase III
Capital Facilities/Wastewater Design and Construction Division
Sully District, Tax Map No. 44-1
Roughly 175 LF
of completely
replaced pipe
CIPP Lined Pipe
Project
Area
4. Flatlick Sewer Rehabilitation Phase III
Capital Facilities/Wastewater Design and Construction Division
Pre-Existing Conditions
Manhole
Manhole
Pipe to
be lined
Pipe to be
replaced
5. Flatlick Sewer Rehabilitation Phase III
Capital Facilities/Wastewater Design and Construction Division
During Lining
Lining Truck
Lined Pipe
Inside the Truck
6. Flatlick Sewer Rehabilitation Phase III
Capital Facilities/Wastewater Design and Construction Division
Bypass Pumping By-pass Pumps
By-pass Pipes
7. Flatlick Sewer Rehabilitation Phase III
Capital Facilities/Wastewater Design and Construction Division
Pipe Replacement
Ductile
Iron Pipe
Steel Casing
Ductile
Iron Pipe
8. Flatlick Sewer Rehabilitation Phase III
Capital Facilities/Wastewater Design and Construction Division
Crushed Glass
Stockpile of
Crushed Glass
Crushed Glass
First load of crushed glass
being placed on site
Crushed
Glass
9. Additional Information
For additional Information, please call
www.fairfaxcounty.gov/publicworks
Flatlick Sewer Rehabilitation Phase III
Capital Facilities/Wastewater Design and Construction Division
Matthew Kaiser, Public Information Officer
703-324-8455, TTY 711
Matthew.Kaiser@fairfaxcounty.gov