Kirby Road Sidewalk - Citizens Information Meeting: Dec. 11, 2018
1. County of Fairfax, Virginia
1
Citizens Information Meeting
Kirby Road Sidewalk
Chesterbrook Road to Mori Street
Project No. 2G40-088-069
Preliminary Design
December 11, 2018
Latesa Turner
Fairfax County Department of
Transportation
2. County of Fairfax, Virginia
2
Department of Transportation
Project Team
• Supervisor Foust’s Office
• Fairfax County Department of Transportation
(FCDOT)
– Transportation Design (TDD)
– Capital Projects (CPTED)
• Fairfax County Department of Public Works &
Environmental Services (DPWES)
– Construction (UDCD)
– Land Acquisition (LAD)
• Design Consultant (WRA)
3. County of Fairfax, Virginia
3
Meeting Agenda
• Design Overview
• General Q & A
• “Open House”
– Return to Display boards, one-on-one
discussion, individual questions
• Meeting Ends – 9:00 PM
Department of Transportation
4. County of Fairfax, Virginia
4
Context
• Locally Funded Project
– Estimated Project Cost = $2.0 M
• Proposed pedestrian facility and infrastructure
improvements will meet all VDOT & County
Standards for maintenance and ADA (Americans
with Disabilities Act) accessibility compliance.
Department of Transportation
5. County of Fairfax, Virginia
5
Department of Transportation
Project Limits
Limits of
New Sidewalk
6. County of Fairfax, Virginia
6
Existing Conditions
Department of Transportation
Looking north from Chesterbrook Road
7. County of Fairfax, Virginia
7
Existing Conditions
Department of Transportation
Looking north along Kirby Road Looking south along Kirby Road
8. County of Fairfax, Virginia
8
Existing Conditions
Department of Transportation
Looking south towards Chesterbrook Road
9. County of Fairfax, Virginia
9
Existing Conditions
Department of Transportation
Looking south from Thompkins Drive Looking north towards Thompkins Drive
10. County of Fairfax, Virginia
10
Existing Conditions
Department of Transportation
Looking north at Thompkins Drive Intersection at Mori Street
11. County of Fairfax, Virginia
11
Improvements Will Include
• New 5’ Wide Sidewalk and ADA
accessible Curb Ramps
• New Concrete Curb & Gutter
along Existing Edge of
Pavement
• New Driveway Entrances
• New Drainage Infrastructure
– Storm Drain Inlets and Pipes
• New Road Pavement and
Striping
• Designed to VDOT Criteria
Department of Transportation
12. County of Fairfax, Virginia
12
Potential Impacts
• Relocation or upgrading of
existing utilities (underground
and/or overhead)
• Tree Impacts
– In right-of-way and
on private property
• Driveway Reconstruction
• Grading back slopes
Department of Transportation
13. County of Fairfax, Virginia
13
Sidewalk Typical Section
5’ Sidewalk, 4’ Buffer – VDOT Standard
Department of Transportation
NEW CURB
& GUTTER
4’ GRASS
BUFFER
STRIP
NEW 5’ WIDE
SIDEWALK
Kirby Road Travel Lanes
14. County of Fairfax, Virginia
14
Sidewalk Typical Section
Department of Transportation
5’ Sidewalk, 4’ Buffer – VDOT Standard
15. County of Fairfax, Virginia
15
Proposed Design
Department of Transportation
5’ Sidewalk, 4’ Buffer – VDOT Standard
SIDEWALK
CURB RAMP
DRIVEWAY REPLACEMENT
LIMITS OF DISTRUBANCE
GRADING/CONSTRUCTION EASEMENT
PROPOSED RIGHT OF WAY
PROPOSED DRAINAGE EASEMENT
PROPOSED TREE REMOVAL X
16. County of Fairfax, Virginia
16
Department of Transportation
Proposed Design
5’ Sidewalk, 4’ Buffer – VDOT Standard
SIDEWALK
CURB RAMP
DRIVEWAY REPLACEMENT
LIMITS OF DISTRUBANCE
GRADING/CONSTRUCTION EASEMENT
PROPOSED RIGHT OF WAY
PROPOSED DRAINAGE EASEMENT
PROPOSED TREE REMOVAL X
17. County of Fairfax, Virginia
17
Proposed Design (Cont’d)
• Proposed New
Pedestrian Crossing
and Median Refuge at
Mori Street
Intersection
• Construct Bulb-out
and Upgrade Existing
ADA Curb Ramps
• New Pedestrian
Crossing Requires
VDOT Approval
Department of Transportation
Bulb-Out
Pedestrian
Crossing
with Median
Refuge
Upgrade
Existing
ADA Curb
Ramps
18. County of Fairfax, Virginia
18
Proposed Design (Cont’d)
Potential Impacts to Adjacent Property
• Limits of Disturbance show the
approximate area affected by
construction.
• Driveways, fences, and trees
may be impacted on properties
adjacent to the project.
• If private property is to be
impacted during construction,
we will obtain an easement or
right-of-way before work begins.
Department of Transportation
LIMITS OF
DISTURBANCE
19. County of Fairfax, Virginia
19
Land Acquisition Process
• Will occur after Pre-Final Design.
• Plats will be prepared showing easements
and/or right-of-way needed.
• Land Acquisition Agent will contact
property owners to negotiate.
Department of Transportation
20. County of Fairfax, Virginia
20
Construction
• We will coordinate with
property owners well in
advance of construction
start.
• Fences may be temporarily
removed & replaced.
– Relocation to private
property may be
necessary, if within the
right-of-way.
• Work hours are set by
VDOT.
Department of Transportation
21. County of Fairfax, Virginia
21
Tentative Project Schedule
Concept Design Current
Intermediate Design Spring 2019
Pre-Final Design Late 2019
Land Acquisition NTP Spring 2020
Final Design Spring 2021
Utility Relocation Completion Late Spring 2021
Begin Construction Late Fall 2021
Construction Completion Summer 2022
*Schedule is Preliminary and Subject to Change
Department of Transportation
22. County of Fairfax, Virginia
22
Comments
• Fill out comment sheet tonight (Comment Box Provided)
• Submit comment on project website:
https://www.fairfaxcounty.gov/transportation/projects/kirby-
road-sidewalk-chesterbrook-road-mori-street
• Email Latesa Turner: Latesa.Turner@fairfaxcounty.gov
• Fill out and mail comment sheet:
Latesa Turner
Fairfax County Department of Transportation
4050 Legato Road, Suite 400
Fairfax, VA 22033