LEE DISTRICT 2019
PAVING & RESTRIPING
Public Information Meeting
March 8, 2019 6.30 pm
Presenters: Terry Yates, VDOT and Chris Wells, FCDOT
AGENDA
 VDOT Paving Program Overview
 Proposed Striping Modifications
 Summary
 Q&A
VDOT Paving
Program Overview
NOVA DISTRICT PAVEMENT CONDITION RATINGS 2018
PAVING ALLOCATIONS FOR NOVA DISTRICT
2013-2019
Fiscal Year
Interstate Primary Secondary Total
($M) ($M) ($M) ($M)
FY 2013 9.4 21.9 26.8 58.1
FY 2014 22 17.3 44 83.3
FY 2015 6.9 14.8 114.1 135.8
FY 2016 7.8 23.9 107.2 138.9
FY 2017 9.4 21 104.9 135.3
FY 2018 14.2 16.1 110.6 140.9
FY 2019 9.6 15.6 80.7 105.9
Total 2013-2019 79.3 130.6 588.3 798.2
2013-2019 NOVA DISTRICT REPAVING FACTS
2013-2019
Interstate Primary Secondary Total
(Fairfax - Arlington)
Total Expended 2013-2019, $M $79 $130 $588 $798
Lane Miles Paved,
(Fairfax + Arlington)
213 330 2,879 3,422
Total Lane Miles Inventory
(Arlington + Fairfax)
511 912 5,597 7,021
Total Lane Miles Inventory
(NOVA District)
727 1,736 11,122 13,585
% of Network Paved in
42% 36% 51% 49%
Past 7 Years (Fairfax + Arlington)
PAVEMENT CONDITIONS
Northern Virginia District: May 2018
Targets: Interstate 82%; Primary 82%;
Secondary 65%
HOW ARE ROADS SELECTED FOR PAVING?
Some Factors that Affect Paving Selections:
 Pavement Condition
 Traffic Volume
 Whole Neighborhoods versus Paving Main Streets Only
 Economies of Scale/Mobilization Costs
 Feedback from Maintenance Crews
TYPES OF TREATMENT
Preventive Maintenance
 Slurry Seal/Latex/Chip Seal
 Patching (not extensive)
 Crack Seal
Plant Mix (Corrective Maintenance)
 Mill less than 2 inches
 Overlay less than 2 inches of Surface Mix
Asphalt
 Patching
Plant Mix (Restorative Maintenance)
 Mill greater than 2 inches less than 4 inches
 Overlay 2 inches of Intermediate Mix Asphalt
 Overlay < 2 inches of Surface Mix Asphalt
Full Depth Reclamation (FDR)
 Existing Asphalt / Aggregate / Soil Stabilization with
Cement (6-8 inch.)
 Overlay Intermediate Mix Asphalt
 Overlay Surface Mix Asphalt
SCHEDULE FOR PAVING PLANNING/IMPLEMENTATION
January-February
Bids are received for current calendar year schedules, contracts are executed. Next calendar year schedules are in planning stages.
March-April
Work begins on current calendar year schedules when weather is warm enough. Next calendar year schedules are being reviewed and further data
gathered.
May-October
Current year schedules are underway. Next calendar year schedules are coordinated and sent to Richmond to prepare for contract advertisement.
November-December
Current year schedules close out. Next year contracts are advertised for bids.
ONLINE PAVING MAP
http://www.virginiadot.org/novapaving
PAVING INFORMATION ONLINE
 Online paving map located at http://www.virginiadot.org/novapaving
 Virginia Roads pavement condition information located at http://www.virginiaroads.org
 MyVDOT (https://my.vdot.virginia.gov) or call 1-800-FOR-ROAD (367-7623) for maintenance
requests
Lee District Proposed
Striping
Modifications
FAIRFAX COUNTY COMPREHENSIVE PLAN
 Seeks to improve traffic safety and provide transportation options to people around the County
 Bicycle Network Plan: Establishes key bike route network and suggests type of bicycle facility
 Safer/more comfortable facility type can be implemented if space allows
 Routes can be added to connect destinations/origins to the bike network
 Implementation Options (if no road widening needed):
 Capital Projects ($$$)
 Through Paving & Restriping Process ($)
TYPES OF BICYCLE RIDERS IN FAIRFAX COUNTY
TYPES OF BICYCLE FACILITIES IN FAIRFAX COUNTY
BENEFITS OF BICYCLE INFRASTRUCTURE
THE TRAFFIC CALMING EFFECT
Annandale Road
BEFORE AFTER
Top speeds virtually eliminatedSpeeding Concerns
LOISDALE COURT - EXISTING
 Two wide travel lanes and intermitted
parking on one side
 Sidewalks but no bike lanes
LOISDALE COURT - PLANNED
LOISDALE COURT - PROPOSED
 Stripe a standard bike lane
southbound and a bike lane/shared
lane markings northbound. Removal
of legal on-street parking is currently
not proposed.
METRO PARK - EXISTING
 Two wide travel lanes and street parking on
both sides
 Sidewalks but no bike lanes
METRO PARK - PLANNED
METRO PARK - PROPOSED
 Stripe bike lanes and parking planes in both directions
 On street parking will remain on both sides
(Pictured: Braeburn Drive)
WALKER LANE - EXISTING
 Four travel lanes and turn lanes, low traffic
volume
 Sidewalks, but no bicycle facilities
WALKER LANE - PLANNED
WALKER LANE - PROPOSED
 Convert the underutilized outside travel lanes to
buffered bike lanes
 Impacts on traffic are not expected due to low
traffic volumes
(Pictured: South Lakes Drive)
PEDESTRIAN SAFETY
Opportunity to review
 Study busy pedestrian crossing locations without
crosswalk markings
 Upgrade existing crosswalk striping
 Improve unsafe crosswalks
COMMUNITY FEEDBACK
 Paving-related comments (e.g., drainage issues, missing signage, signal repair, walkway repair and sight
distance issues due to vegetation overgrowth) should be submitted through the myVDOT portal:
https://my.vdot.virginia.gov/. If you would like to request road repairs, please follow the "I need a road
repaired" link on the VDOT portal or call 1-800-FOR-ROAD (1-800-367-7623).
Unfortunately, no additional roads can be added
to the preliminary 2019 paving schedule at this point.
 Striping-related comments (e.g., marked parking lanes, crosswalks, and/or sight distance issues due to
parked vehicles) can be submitted electronically to FCDOT.
Comments due by March 29, 2019
Questions/Comments?
Thank you!

Contenu connexe

Tendances

Transportation Milton, presentation by Tim Dennis, Halton Region
Transportation Milton, presentation by Tim Dennis, Halton RegionTransportation Milton, presentation by Tim Dennis, Halton Region
Transportation Milton, presentation by Tim Dennis, Halton Region
Milton Chamber of Commerce
 

Tendances (20)

Hunter Mill Road and Sunset Hills Road Study
Hunter Mill Road and Sunset Hills Road StudyHunter Mill Road and Sunset Hills Road Study
Hunter Mill Road and Sunset Hills Road Study
 
Fort Hunt Road Walkway
Fort Hunt Road WalkwayFort Hunt Road Walkway
Fort Hunt Road Walkway
 
Dulles Metrorail Silver Line Phase 2 Status and Funding Update
Dulles Metrorail Silver Line Phase 2 Status and Funding UpdateDulles Metrorail Silver Line Phase 2 Status and Funding Update
Dulles Metrorail Silver Line Phase 2 Status and Funding Update
 
Burke Road Realignment-Citizen Information Meeting: June 1, 2017
Burke Road Realignment-Citizen Information Meeting: June 1, 2017Burke Road Realignment-Citizen Information Meeting: June 1, 2017
Burke Road Realignment-Citizen Information Meeting: June 1, 2017
 
Reston Network Analysis: 2050 2nd Tier Mitigation Results
Reston Network Analysis: 2050 2nd Tier Mitigation ResultsReston Network Analysis: 2050 2nd Tier Mitigation Results
Reston Network Analysis: 2050 2nd Tier Mitigation Results
 
Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, ...
Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, ...Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, ...
Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, ...
 
Board of Supervisors Transportation Committee-Next Steps for Urban Street Sta...
Board of Supervisors Transportation Committee-Next Steps for Urban Street Sta...Board of Supervisors Transportation Committee-Next Steps for Urban Street Sta...
Board of Supervisors Transportation Committee-Next Steps for Urban Street Sta...
 
Brian K. Hollier
Brian K. HollierBrian K. Hollier
Brian K. Hollier
 
Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...
Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...
Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...
 
Springfield Multi-Use Parking Garage: Public Information Meeting Aug. 17, 2016
Springfield Multi-Use Parking Garage: Public Information Meeting Aug. 17, 2016Springfield Multi-Use Parking Garage: Public Information Meeting Aug. 17, 2016
Springfield Multi-Use Parking Garage: Public Information Meeting Aug. 17, 2016
 
Silver Line Update July 2016
Silver Line Update July 2016Silver Line Update July 2016
Silver Line Update July 2016
 
Tysons Status Report: Board of Supervisors Community Revitalization and Reinv...
Tysons Status Report: Board of Supervisors Community Revitalization and Reinv...Tysons Status Report: Board of Supervisors Community Revitalization and Reinv...
Tysons Status Report: Board of Supervisors Community Revitalization and Reinv...
 
Agenda Item 5: VDOT Paving Program
Agenda Item 5: VDOT Paving ProgramAgenda Item 5: VDOT Paving Program
Agenda Item 5: VDOT Paving Program
 
Silver Line Phase 1-Status Report
Silver Line Phase 1-Status ReportSilver Line Phase 1-Status Report
Silver Line Phase 1-Status Report
 
Operational Analysis of Dulles Toll Road Ramps to Tysons
Operational Analysis of Dulles Toll Road Ramps to TysonsOperational Analysis of Dulles Toll Road Ramps to Tysons
Operational Analysis of Dulles Toll Road Ramps to Tysons
 
Sunset Hills Road Walkway
Sunset Hills Road WalkwaySunset Hills Road Walkway
Sunset Hills Road Walkway
 
Vesper St. Shared Use Path
Vesper St. Shared Use PathVesper St. Shared Use Path
Vesper St. Shared Use Path
 
Transportation Milton, presentation by Tim Dennis, Halton Region
Transportation Milton, presentation by Tim Dennis, Halton RegionTransportation Milton, presentation by Tim Dennis, Halton Region
Transportation Milton, presentation by Tim Dennis, Halton Region
 
North Kings Highway (VA 241) Intersection Improvements Study
North Kings Highway (VA 241) Intersection Improvements StudyNorth Kings Highway (VA 241) Intersection Improvements Study
North Kings Highway (VA 241) Intersection Improvements Study
 
Hunter Mill Road and Sunset Hills Road Study
Hunter Mill Road and Sunset Hills Road StudyHunter Mill Road and Sunset Hills Road Study
Hunter Mill Road and Sunset Hills Road Study
 

Similaire à Lee District 2019 Paving and Restriping - Public Information Meeting : March 8, 2019

Similaire à Lee District 2019 Paving and Restriping - Public Information Meeting : March 8, 2019 (20)

Providence District 2019 Paving and Restriping - Public Information Meeting: ...
Providence District 2019 Paving and Restriping - Public Information Meeting: ...Providence District 2019 Paving and Restriping - Public Information Meeting: ...
Providence District 2019 Paving and Restriping - Public Information Meeting: ...
 
Springfield District 2018 Paving and Restriping: Public Information Meeting A...
Springfield District 2018 Paving and Restriping: Public Information Meeting A...Springfield District 2018 Paving and Restriping: Public Information Meeting A...
Springfield District 2018 Paving and Restriping: Public Information Meeting A...
 
Lee District 2018 Paving and Restriping: Public Information Meeting-March 7, ...
Lee District 2018 Paving and Restriping: Public Information Meeting-March 7, ...Lee District 2018 Paving and Restriping: Public Information Meeting-March 7, ...
Lee District 2018 Paving and Restriping: Public Information Meeting-March 7, ...
 
Springfield District Paving and Restriping - Public Information Meeting: Marc...
Springfield District Paving and Restriping - Public Information Meeting: Marc...Springfield District Paving and Restriping - Public Information Meeting: Marc...
Springfield District Paving and Restriping - Public Information Meeting: Marc...
 
Dranesville District 2019 Paving and Restriping - Public Information Meeting:...
Dranesville District 2019 Paving and Restriping - Public Information Meeting:...Dranesville District 2019 Paving and Restriping - Public Information Meeting:...
Dranesville District 2019 Paving and Restriping - Public Information Meeting:...
 
Braddock District 2019 Paving and Restriping: Public Information Meeting - Ma...
Braddock District 2019 Paving and Restriping: Public Information Meeting - Ma...Braddock District 2019 Paving and Restriping: Public Information Meeting - Ma...
Braddock District 2019 Paving and Restriping: Public Information Meeting - Ma...
 
Hunter Mill District 2018 Paving and Restriping: Public Information Meeting M...
Hunter Mill District 2018 Paving and Restriping: Public Information Meeting M...Hunter Mill District 2018 Paving and Restriping: Public Information Meeting M...
Hunter Mill District 2018 Paving and Restriping: Public Information Meeting M...
 
North Kings Highway (VA 241) Intersection Improvements Study
North Kings Highway (VA 241) Intersection Improvements StudyNorth Kings Highway (VA 241) Intersection Improvements Study
North Kings Highway (VA 241) Intersection Improvements Study
 
County and Local Transportation Infrastructure Needs
County and Local Transportation Infrastructure NeedsCounty and Local Transportation Infrastructure Needs
County and Local Transportation Infrastructure Needs
 
How the West was One Gold Rush Survival Kit
How the West was One Gold Rush Survival KitHow the West was One Gold Rush Survival Kit
How the West was One Gold Rush Survival Kit
 
San Bernardino County Transportation Funding Update
San Bernardino County Transportation Funding UpdateSan Bernardino County Transportation Funding Update
San Bernardino County Transportation Funding Update
 
FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Oct. 27, 2011
FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Oct. 27, 2011FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Oct. 27, 2011
FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Oct. 27, 2011
 
San Francisco Transportation Plan - May 30, 2013 Board Workshop Presentations
San Francisco Transportation Plan - May 30, 2013 Board Workshop PresentationsSan Francisco Transportation Plan - May 30, 2013 Board Workshop Presentations
San Francisco Transportation Plan - May 30, 2013 Board Workshop Presentations
 
TOWNSHIP OF LANGLEY/PROVINCIAL, REGIONAL AND LOCAL TRANSPORTATION PLANS AND S...
TOWNSHIP OF LANGLEY/PROVINCIAL, REGIONAL AND LOCAL TRANSPORTATION PLANS AND S...TOWNSHIP OF LANGLEY/PROVINCIAL, REGIONAL AND LOCAL TRANSPORTATION PLANS AND S...
TOWNSHIP OF LANGLEY/PROVINCIAL, REGIONAL AND LOCAL TRANSPORTATION PLANS AND S...
 
May 11, 2021 BPAC Virtual Workshop
May 11, 2021 BPAC Virtual WorkshopMay 11, 2021 BPAC Virtual Workshop
May 11, 2021 BPAC Virtual Workshop
 
North Kings Highway (VA 241) Intersection Improvement Study
North Kings Highway (VA 241) Intersection Improvement StudyNorth Kings Highway (VA 241) Intersection Improvement Study
North Kings Highway (VA 241) Intersection Improvement Study
 
The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...
The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...
The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...
 
Lorton Road and Silverbrook Road Intersection Improvement Study
Lorton Road and Silverbrook Road Intersection Improvement StudyLorton Road and Silverbrook Road Intersection Improvement Study
Lorton Road and Silverbrook Road Intersection Improvement Study
 
October 13, 2020 BPAC Virtual Meeting
October 13, 2020 BPAC Virtual Meeting October 13, 2020 BPAC Virtual Meeting
October 13, 2020 BPAC Virtual Meeting
 
Reston Transportation Service District FY 2019 Tax Rate Discussion
Reston Transportation Service DistrictFY 2019 Tax Rate DiscussionReston Transportation Service DistrictFY 2019 Tax Rate Discussion
Reston Transportation Service District FY 2019 Tax Rate Discussion
 

Plus de Fairfax County

Plus de Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 

Dernier

Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPowerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
PsychicRuben LoveSpells
 
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
Faga1939
 
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
hyt3577
 

Dernier (20)

BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
 
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)
 
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
 
05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf
 
Group_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the tradeGroup_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the trade
 
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreieGujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
 
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
 
04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf
 
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopkoEmbed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
 
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPowerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
 
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
 
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
 
Kishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdf
 
China's soft power in 21st century .pptx
China's soft power in 21st century   .pptxChina's soft power in 21st century   .pptx
China's soft power in 21st century .pptx
 
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
 
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover BackVerified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
 
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
 
Julius Randle's Injury Status: Surgery Not Off the Table
Julius Randle's Injury Status: Surgery Not Off the TableJulius Randle's Injury Status: Surgery Not Off the Table
Julius Randle's Injury Status: Surgery Not Off the Table
 

Lee District 2019 Paving and Restriping - Public Information Meeting : March 8, 2019

  • 1. LEE DISTRICT 2019 PAVING & RESTRIPING Public Information Meeting March 8, 2019 6.30 pm Presenters: Terry Yates, VDOT and Chris Wells, FCDOT
  • 2. AGENDA  VDOT Paving Program Overview  Proposed Striping Modifications  Summary  Q&A
  • 4. NOVA DISTRICT PAVEMENT CONDITION RATINGS 2018
  • 5. PAVING ALLOCATIONS FOR NOVA DISTRICT 2013-2019 Fiscal Year Interstate Primary Secondary Total ($M) ($M) ($M) ($M) FY 2013 9.4 21.9 26.8 58.1 FY 2014 22 17.3 44 83.3 FY 2015 6.9 14.8 114.1 135.8 FY 2016 7.8 23.9 107.2 138.9 FY 2017 9.4 21 104.9 135.3 FY 2018 14.2 16.1 110.6 140.9 FY 2019 9.6 15.6 80.7 105.9 Total 2013-2019 79.3 130.6 588.3 798.2
  • 6. 2013-2019 NOVA DISTRICT REPAVING FACTS 2013-2019 Interstate Primary Secondary Total (Fairfax - Arlington) Total Expended 2013-2019, $M $79 $130 $588 $798 Lane Miles Paved, (Fairfax + Arlington) 213 330 2,879 3,422 Total Lane Miles Inventory (Arlington + Fairfax) 511 912 5,597 7,021 Total Lane Miles Inventory (NOVA District) 727 1,736 11,122 13,585 % of Network Paved in 42% 36% 51% 49% Past 7 Years (Fairfax + Arlington)
  • 7. PAVEMENT CONDITIONS Northern Virginia District: May 2018 Targets: Interstate 82%; Primary 82%; Secondary 65%
  • 8. HOW ARE ROADS SELECTED FOR PAVING? Some Factors that Affect Paving Selections:  Pavement Condition  Traffic Volume  Whole Neighborhoods versus Paving Main Streets Only  Economies of Scale/Mobilization Costs  Feedback from Maintenance Crews
  • 9. TYPES OF TREATMENT Preventive Maintenance  Slurry Seal/Latex/Chip Seal  Patching (not extensive)  Crack Seal Plant Mix (Corrective Maintenance)  Mill less than 2 inches  Overlay less than 2 inches of Surface Mix Asphalt  Patching Plant Mix (Restorative Maintenance)  Mill greater than 2 inches less than 4 inches  Overlay 2 inches of Intermediate Mix Asphalt  Overlay < 2 inches of Surface Mix Asphalt Full Depth Reclamation (FDR)  Existing Asphalt / Aggregate / Soil Stabilization with Cement (6-8 inch.)  Overlay Intermediate Mix Asphalt  Overlay Surface Mix Asphalt
  • 10. SCHEDULE FOR PAVING PLANNING/IMPLEMENTATION January-February Bids are received for current calendar year schedules, contracts are executed. Next calendar year schedules are in planning stages. March-April Work begins on current calendar year schedules when weather is warm enough. Next calendar year schedules are being reviewed and further data gathered. May-October Current year schedules are underway. Next calendar year schedules are coordinated and sent to Richmond to prepare for contract advertisement. November-December Current year schedules close out. Next year contracts are advertised for bids.
  • 12. PAVING INFORMATION ONLINE  Online paving map located at http://www.virginiadot.org/novapaving  Virginia Roads pavement condition information located at http://www.virginiaroads.org  MyVDOT (https://my.vdot.virginia.gov) or call 1-800-FOR-ROAD (367-7623) for maintenance requests
  • 14. FAIRFAX COUNTY COMPREHENSIVE PLAN  Seeks to improve traffic safety and provide transportation options to people around the County  Bicycle Network Plan: Establishes key bike route network and suggests type of bicycle facility  Safer/more comfortable facility type can be implemented if space allows  Routes can be added to connect destinations/origins to the bike network  Implementation Options (if no road widening needed):  Capital Projects ($$$)  Through Paving & Restriping Process ($)
  • 15. TYPES OF BICYCLE RIDERS IN FAIRFAX COUNTY
  • 16. TYPES OF BICYCLE FACILITIES IN FAIRFAX COUNTY
  • 17. BENEFITS OF BICYCLE INFRASTRUCTURE
  • 18. THE TRAFFIC CALMING EFFECT Annandale Road BEFORE AFTER Top speeds virtually eliminatedSpeeding Concerns
  • 19. LOISDALE COURT - EXISTING  Two wide travel lanes and intermitted parking on one side  Sidewalks but no bike lanes
  • 20. LOISDALE COURT - PLANNED
  • 21. LOISDALE COURT - PROPOSED  Stripe a standard bike lane southbound and a bike lane/shared lane markings northbound. Removal of legal on-street parking is currently not proposed.
  • 22. METRO PARK - EXISTING  Two wide travel lanes and street parking on both sides  Sidewalks but no bike lanes
  • 23. METRO PARK - PLANNED
  • 24. METRO PARK - PROPOSED  Stripe bike lanes and parking planes in both directions  On street parking will remain on both sides (Pictured: Braeburn Drive)
  • 25. WALKER LANE - EXISTING  Four travel lanes and turn lanes, low traffic volume  Sidewalks, but no bicycle facilities
  • 26. WALKER LANE - PLANNED
  • 27. WALKER LANE - PROPOSED  Convert the underutilized outside travel lanes to buffered bike lanes  Impacts on traffic are not expected due to low traffic volumes (Pictured: South Lakes Drive)
  • 28. PEDESTRIAN SAFETY Opportunity to review  Study busy pedestrian crossing locations without crosswalk markings  Upgrade existing crosswalk striping  Improve unsafe crosswalks
  • 29. COMMUNITY FEEDBACK  Paving-related comments (e.g., drainage issues, missing signage, signal repair, walkway repair and sight distance issues due to vegetation overgrowth) should be submitted through the myVDOT portal: https://my.vdot.virginia.gov/. If you would like to request road repairs, please follow the "I need a road repaired" link on the VDOT portal or call 1-800-FOR-ROAD (1-800-367-7623). Unfortunately, no additional roads can be added to the preliminary 2019 paving schedule at this point.  Striping-related comments (e.g., marked parking lanes, crosswalks, and/or sight distance issues due to parked vehicles) can be submitted electronically to FCDOT. Comments due by March 29, 2019