Overview
• Project Background
• Bicycle Facility Types
• Proposed Plan
• Anticipated Schedule
• Feedback/Q&A
County of Fairfax, Virginia
Project Background
• Multiple requests over the years to improve biking in the Merrifield area and to
connect the Metro station to Mosaic and Inova Hospital
• Recommended by MWCOG Metro Access Study
• Staff identified this segment as a low cost, easy to implement section of a
potential longer bikeway to the Inova Hospital Campus
• County has funding for federal TAP funding for expanding Bikeshare in the
Providence District and is Dunn-Loring Merrifield expansion
• Bike infrastructure will support successful expansion into this area
• Funding available from 2014 Transportation Priorities Plan
Department of Transportation
3
County of Fairfax, Virginia
Bicycle Facility Types
• Sharrow-Shared Lane Markings (SLMs), or “sharrows,” are road
markings used to indicate a shared lane environment for bicycles and
automobiles. Among other benefits shared lane markings reinforce
the legitimacy of bicycle traffic on the street, recommend proper
bicyclist positioning, and may be configured to offer directional and
wayfinding guidance
County of Fairfax, Virginia
Bicycle Facility Types
• Bike Lane-Bike lanes designate an exclusive space for bicyclists
through the use of pavement markings and signage. The bike lane is
located adjacent to motor vehicle travel lanes and flows in the same
direction as motor vehicle traffic. Bike lanes are typically on the right
side of the street, between the adjacent travel lane and curb, road
edge, or parking lane.
County of Fairfax, Virginia
Bicycle Facility Types
• Buffered Bike Lane-Buffered bike lanes are conventional bicycle
lanes paired with a designated buffer space separating the bicycle
lane from the adjacent motor vehicle travel lane and/or parking lane.
County of Fairfax, Virginia
Project Background
• Project limits are from
Prosperity Avenue to
Strawberry Lane
• Avenir Place is a private road,
thus County can’t make
improvements
• Reaching out to property
owner to work together to
connect to Metro via
wayfinding signage
Department of Transportation
7
County of Fairfax, Virginia
Lane Diet
• A Lane Diet is generally described as narrowing travel
lanes from a roadway and utilizing the space for other uses
and travel modes. Does not involve reducing the number of
travel lanes.
• Benefits
• Traffic Calming – Reduce speeding
• Providing transportation alternatives and options
• Increasing safety for non-motorized users
Department of Transportation
8
County of Fairfax, Virginia
Lane Width and Vehicle Speeds
Department of Transportation
9
County of Fairfax, Virginia
Project Background
• Project split into three
sections based on existing
cross sections
1) Prosperity Avenue to Lauren
Elizabeth Drive
2) Lauren Elizabeth Drive to
Lee Highway
3) Lee Highway to Strawberry
Lane
Department of Transportation
10
County of Fairfax, Virginia
Project Plan
1) Prosperity Avenue to
Lauren Elizabeth Drive
• Existing condition: urban cross
section, on street parking on one
or both sides
• Plan calls for sharrows and
wayfinding in this sections
Department of Transportation
11
County of Fairfax, Virginia
Project Plan
1) Prosperity Avenue to
Lauren Elizabeth Drive
• Existing condition: urban cross
section, on street parking on one
or both sides
• Plan calls for sharrows and
wayfinding in this sections
Department of Transportation
12
County of Fairfax, Virginia
Project Plan
2) Lauren Elizabeth Drive to
Lee Highway (Rt. 29)
• Existing condition: mostly
unmarked pavement, 40’ wide +
curb and gutter, no parking
• Plan proposes to add buffered
bike lanes for the majority of
section, includes sections of bike
lanes and sharrows
• Existing median at intersection
causes bike lane to drop heading
southbound
Department of Transportation
13
County of Fairfax, Virginia
Project Plan
2) Lauren Elizabeth Drive to
Lee Highway (Rt. 29)
• Lauren Elizabeth to Home Depot
Entrance
Department of Transportation
14
County of Fairfax, Virginia
Project Plan
2) Lauren Elizabeth Drive to
Lee Highway (Rt. 29)
• Home Depot to Lee Hwy
Department of Transportation
15
County of Fairfax, Virginia
Project Plan
3) Lee Highway to Mosaic
• 2 route options
Department of Transportation
16
A) Wayfinding via Eskridge Rd
to Strawberry Ln
B) Wayfinding via Lee Hwy/
Sidewalk to District Ave
County of Fairfax, Virginia
Proposed Schedule
Department of Transportation
17
• Community Feedback and Design Updates- 1
month
• Design review and Permitting 6 months
• Project Advertisement and Bidding – 1 month
• Construction – 1 month
• Anticipated completion June 2018
County of Fairfax, Virginia
Feedback
Department of Transportation
18
• Comments accepted through October 20th
• Can submit feedback via comment forms, mail, and
e-mail DOTBicyclePrograms@fairfaxcounty.gov
• Staff will review and make updates to the design
before first submittal to VDOT
County of Fairfax, Virginia
Thank You
Department of Transportation
19
Questions/Comments?
DOTBicyclePrograms@fairfaxcounty.gov

Contenu connexe

Tendances

Tendances (20)

Agenda Item 4:I-66 Outside the Beltway
Agenda Item 4:I-66 Outside the BeltwayAgenda Item 4:I-66 Outside the Beltway
Agenda Item 4:I-66 Outside the Beltway
 
Proposed Bicycle Facilities-VDOT Summer 2015 Repaving: Mount Vernon District
Proposed Bicycle Facilities-VDOT Summer 2015 Repaving: Mount Vernon DistrictProposed Bicycle Facilities-VDOT Summer 2015 Repaving: Mount Vernon District
Proposed Bicycle Facilities-VDOT Summer 2015 Repaving: Mount Vernon District
 
Richmond Highway Transit Center Feasibility Study: Public Information Meeting
Richmond Highway Transit Center Feasibility Study: Public Information MeetingRichmond Highway Transit Center Feasibility Study: Public Information Meeting
Richmond Highway Transit Center Feasibility Study: Public Information Meeting
 
Braddock District 2016 VDOT Repaving: Complete Streets-Improving Multimodal M...
Braddock District 2016 VDOT Repaving: Complete Streets-Improving Multimodal M...Braddock District 2016 VDOT Repaving: Complete Streets-Improving Multimodal M...
Braddock District 2016 VDOT Repaving: Complete Streets-Improving Multimodal M...
 
Dranesville District 2017 VDOT Repaving
Dranesville District 2017 VDOT RepavingDranesville District 2017 VDOT Repaving
Dranesville District 2017 VDOT Repaving
 
Proposed Street Design Updates-VDOT Summer 2015 Repaving
Proposed Street Design Updates-VDOT Summer 2015 RepavingProposed Street Design Updates-VDOT Summer 2015 Repaving
Proposed Street Design Updates-VDOT Summer 2015 Repaving
 
2017 Repaving and Restriping – Glade Dr., April 27th Meeting
2017 Repaving and Restriping – Glade Dr., April 27th Meeting2017 Repaving and Restriping – Glade Dr., April 27th Meeting
2017 Repaving and Restriping – Glade Dr., April 27th Meeting
 
Parking Ordinance Revisions: Board Transportation Committee: Feb. 7, 2017
Parking Ordinance Revisions: Board Transportation Committee: Feb. 7, 2017Parking Ordinance Revisions: Board Transportation Committee: Feb. 7, 2017
Parking Ordinance Revisions: Board Transportation Committee: Feb. 7, 2017
 
2017 VDOT Repaving: Rose Hill Drive
2017 VDOT Repaving: Rose Hill Drive2017 VDOT Repaving: Rose Hill Drive
2017 VDOT Repaving: Rose Hill Drive
 
Fairfax County Parkway Corridor Study
Fairfax County Parkway Corridor StudyFairfax County Parkway Corridor Study
Fairfax County Parkway Corridor Study
 
Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4
Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4
Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4
 
95 Express Lanes Project Update
95 Express Lanes Project Update95 Express Lanes Project Update
95 Express Lanes Project Update
 
Heavy Duty and Medium Duty Transit Bus Analysis
Heavy Duty and Medium Duty Transit Bus AnalysisHeavy Duty and Medium Duty Transit Bus Analysis
Heavy Duty and Medium Duty Transit Bus Analysis
 
Springfield Community Business Center Commuter Parking Garage: Design Public ...
Springfield Community Business Center Commuter Parking Garage: Design Public ...Springfield Community Business Center Commuter Parking Garage: Design Public ...
Springfield Community Business Center Commuter Parking Garage: Design Public ...
 
Discussion of Converting Braddock Road from a Secondary to Primary Road-Feb. ...
Discussion of Converting Braddock Road from a Secondary to Primary Road-Feb. ...Discussion of Converting Braddock Road from a Secondary to Primary Road-Feb. ...
Discussion of Converting Braddock Road from a Secondary to Primary Road-Feb. ...
 
Fairfax County Countywide Transit Network Study-February 2016 Public Meetings
Fairfax County Countywide Transit Network Study-February 2016 Public MeetingsFairfax County Countywide Transit Network Study-February 2016 Public Meetings
Fairfax County Countywide Transit Network Study-February 2016 Public Meetings
 
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
 
Huntington Area Transportation Study (HATS) Project Update
Huntington Area Transportation Study (HATS) Project UpdateHuntington Area Transportation Study (HATS) Project Update
Huntington Area Transportation Study (HATS) Project Update
 
Reston Network Analysis: Existing Conditions
Reston Network Analysis: Existing ConditionsReston Network Analysis: Existing Conditions
Reston Network Analysis: Existing Conditions
 
Bi-County Parkway: Evaluation of Impacts on Fairfax County Roads
Bi-County Parkway: Evaluation of Impacts on Fairfax County RoadsBi-County Parkway: Evaluation of Impacts on Fairfax County Roads
Bi-County Parkway: Evaluation of Impacts on Fairfax County Roads
 

Similaire à Metro to Mosaic Bikeway

Similaire à Metro to Mosaic Bikeway (20)

Southrun Road-2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobility
Southrun Road-2016 VDOT Repaving: Complete Streets-Improving Multimodal MobilitySouthrun Road-2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobility
Southrun Road-2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobility
 
Shirley Gate Road Extended Corridor Planning Study
Shirley Gate Road Extended Corridor Planning StudyShirley Gate Road Extended Corridor Planning Study
Shirley Gate Road Extended Corridor Planning Study
 
Transportation Alternatives Program Workshop and Public Comment
Transportation Alternatives Program Workshop and Public CommentTransportation Alternatives Program Workshop and Public Comment
Transportation Alternatives Program Workshop and Public Comment
 
Reston Network Analysis: Stakeholder Kick-off Meeting
Reston Network Analysis: Stakeholder Kick-off Meeting Reston Network Analysis: Stakeholder Kick-off Meeting
Reston Network Analysis: Stakeholder Kick-off Meeting
 
Vienna Metro Station Area Bicycle Access Study
Vienna Metro Station Area Bicycle Access StudyVienna Metro Station Area Bicycle Access Study
Vienna Metro Station Area Bicycle Access Study
 
Mason District-2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...
Mason District-2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...Mason District-2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...
Mason District-2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...
 
Mason District 2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...
Mason District 2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...Mason District 2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...
Mason District 2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobi...
 
Requirements for Pedestrian Improvements on Road Projects in the Board's Six ...
Requirements for Pedestrian Improvements on Road Projects in the Board's Six ...Requirements for Pedestrian Improvements on Road Projects in the Board's Six ...
Requirements for Pedestrian Improvements on Road Projects in the Board's Six ...
 
Vienna Metro Station Bicycle Access Study
Vienna Metro Station Bicycle Access StudyVienna Metro Station Bicycle Access Study
Vienna Metro Station Bicycle Access Study
 
Reston Network Analysis: Transportation Advisory Commission: July 19, 2016
Reston Network Analysis: Transportation Advisory Commission: July 19, 2016 Reston Network Analysis: Transportation Advisory Commission: July 19, 2016
Reston Network Analysis: Transportation Advisory Commission: July 19, 2016
 
Burke Road Corridor Community Meeting : June 18, 2018
Burke Road Corridor Community Meeting : June 18, 2018Burke Road Corridor Community Meeting : June 18, 2018
Burke Road Corridor Community Meeting : June 18, 2018
 
Pardon Our Dust Meeting: Pedestrian Improvements at the Intersection of Old D...
Pardon Our Dust Meeting: Pedestrian Improvements at the Intersection of Old D...Pardon Our Dust Meeting: Pedestrian Improvements at the Intersection of Old D...
Pardon Our Dust Meeting: Pedestrian Improvements at the Intersection of Old D...
 
2017 VDOT Repaving and Restriping-Reston: Nov. 14, 2016
2017 VDOT Repaving and Restriping-Reston: Nov. 14, 20162017 VDOT Repaving and Restriping-Reston: Nov. 14, 2016
2017 VDOT Repaving and Restriping-Reston: Nov. 14, 2016
 
Braddock Road Multimodal Study: Guinea Road to I-495
Braddock Road Multimodal Study: Guinea Road to I-495Braddock Road Multimodal Study: Guinea Road to I-495
Braddock Road Multimodal Study: Guinea Road to I-495
 
Fairfax County Parkway Trail at Dulles Toll Road EB Ramp Improvement Study
Fairfax County Parkway Trail at Dulles Toll Road EB Ramp Improvement StudyFairfax County Parkway Trail at Dulles Toll Road EB Ramp Improvement Study
Fairfax County Parkway Trail at Dulles Toll Road EB Ramp Improvement Study
 
Proposed Street Design Updates-VDOT Summer 2015 Repaving
Proposed Street Design Updates-VDOT Summer 2015 RepavingProposed Street Design Updates-VDOT Summer 2015 Repaving
Proposed Street Design Updates-VDOT Summer 2015 Repaving
 
Woodford Road Street Design Improvements Meeting
Woodford Road Street Design Improvements MeetingWoodford Road Street Design Improvements Meeting
Woodford Road Street Design Improvements Meeting
 
Reston Network Analysis - Community Kick-Off: Feb. 1, 2016
Reston Network Analysis - Community Kick-Off: Feb. 1, 2016Reston Network Analysis - Community Kick-Off: Feb. 1, 2016
Reston Network Analysis - Community Kick-Off: Feb. 1, 2016
 
Proposed Bicycle Facilities: VDOT Summer 2015 Repaving-Franconia Road
Proposed Bicycle Facilities: VDOT Summer 2015 Repaving-Franconia RoadProposed Bicycle Facilities: VDOT Summer 2015 Repaving-Franconia Road
Proposed Bicycle Facilities: VDOT Summer 2015 Repaving-Franconia Road
 
Burke Centre VRE Connector Ph. IV: Community Meeting for Bicycle and Pedestri...
Burke Centre VRE Connector Ph. IV: Community Meeting for Bicycle and Pedestri...Burke Centre VRE Connector Ph. IV: Community Meeting for Bicycle and Pedestri...
Burke Centre VRE Connector Ph. IV: Community Meeting for Bicycle and Pedestri...
 

Plus de Fairfax County

Plus de Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 

Dernier

THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
Faga1939
 

Dernier (20)

Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptxLorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
 
1971 war india pakistan bangladesh liberation.ppt
1971 war india pakistan bangladesh liberation.ppt1971 war india pakistan bangladesh liberation.ppt
1971 war india pakistan bangladesh liberation.ppt
 
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopkoEmbed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
 
China's soft power in 21st century .pptx
China's soft power in 21st century   .pptxChina's soft power in 21st century   .pptx
China's soft power in 21st century .pptx
 
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
 
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
 
06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf
 
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
 
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
 
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
 
Pakistan PMLN Election Manifesto 2024.pdf
Pakistan PMLN Election Manifesto 2024.pdfPakistan PMLN Election Manifesto 2024.pdf
Pakistan PMLN Election Manifesto 2024.pdf
 
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s LeadershipTDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
 
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
 
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover BackVerified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
 
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
 
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
 
Group_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the tradeGroup_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the trade
 
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
 

Metro to Mosaic Bikeway

  • 1. County of Fairfax, VirginiaCounty of Fairfax, Virginia METRO TO MOSAIC BIKEWAY Merrilee Drive Bikeway Dunn Loring-Merrifield Metro Station to Strawberry Lane Department of Transportation Adam Lind Bicycle Program Coordinator October 5, 2017
  • 2. County of Fairfax, Virginia Department of Transportation 2 Overview • Project Background • Bicycle Facility Types • Proposed Plan • Anticipated Schedule • Feedback/Q&A
  • 3. County of Fairfax, Virginia Project Background • Multiple requests over the years to improve biking in the Merrifield area and to connect the Metro station to Mosaic and Inova Hospital • Recommended by MWCOG Metro Access Study • Staff identified this segment as a low cost, easy to implement section of a potential longer bikeway to the Inova Hospital Campus • County has funding for federal TAP funding for expanding Bikeshare in the Providence District and is Dunn-Loring Merrifield expansion • Bike infrastructure will support successful expansion into this area • Funding available from 2014 Transportation Priorities Plan Department of Transportation 3
  • 4. County of Fairfax, Virginia Bicycle Facility Types • Sharrow-Shared Lane Markings (SLMs), or “sharrows,” are road markings used to indicate a shared lane environment for bicycles and automobiles. Among other benefits shared lane markings reinforce the legitimacy of bicycle traffic on the street, recommend proper bicyclist positioning, and may be configured to offer directional and wayfinding guidance
  • 5. County of Fairfax, Virginia Bicycle Facility Types • Bike Lane-Bike lanes designate an exclusive space for bicyclists through the use of pavement markings and signage. The bike lane is located adjacent to motor vehicle travel lanes and flows in the same direction as motor vehicle traffic. Bike lanes are typically on the right side of the street, between the adjacent travel lane and curb, road edge, or parking lane.
  • 6. County of Fairfax, Virginia Bicycle Facility Types • Buffered Bike Lane-Buffered bike lanes are conventional bicycle lanes paired with a designated buffer space separating the bicycle lane from the adjacent motor vehicle travel lane and/or parking lane.
  • 7. County of Fairfax, Virginia Project Background • Project limits are from Prosperity Avenue to Strawberry Lane • Avenir Place is a private road, thus County can’t make improvements • Reaching out to property owner to work together to connect to Metro via wayfinding signage Department of Transportation 7
  • 8. County of Fairfax, Virginia Lane Diet • A Lane Diet is generally described as narrowing travel lanes from a roadway and utilizing the space for other uses and travel modes. Does not involve reducing the number of travel lanes. • Benefits • Traffic Calming – Reduce speeding • Providing transportation alternatives and options • Increasing safety for non-motorized users Department of Transportation 8
  • 9. County of Fairfax, Virginia Lane Width and Vehicle Speeds Department of Transportation 9
  • 10. County of Fairfax, Virginia Project Background • Project split into three sections based on existing cross sections 1) Prosperity Avenue to Lauren Elizabeth Drive 2) Lauren Elizabeth Drive to Lee Highway 3) Lee Highway to Strawberry Lane Department of Transportation 10
  • 11. County of Fairfax, Virginia Project Plan 1) Prosperity Avenue to Lauren Elizabeth Drive • Existing condition: urban cross section, on street parking on one or both sides • Plan calls for sharrows and wayfinding in this sections Department of Transportation 11
  • 12. County of Fairfax, Virginia Project Plan 1) Prosperity Avenue to Lauren Elizabeth Drive • Existing condition: urban cross section, on street parking on one or both sides • Plan calls for sharrows and wayfinding in this sections Department of Transportation 12
  • 13. County of Fairfax, Virginia Project Plan 2) Lauren Elizabeth Drive to Lee Highway (Rt. 29) • Existing condition: mostly unmarked pavement, 40’ wide + curb and gutter, no parking • Plan proposes to add buffered bike lanes for the majority of section, includes sections of bike lanes and sharrows • Existing median at intersection causes bike lane to drop heading southbound Department of Transportation 13
  • 14. County of Fairfax, Virginia Project Plan 2) Lauren Elizabeth Drive to Lee Highway (Rt. 29) • Lauren Elizabeth to Home Depot Entrance Department of Transportation 14
  • 15. County of Fairfax, Virginia Project Plan 2) Lauren Elizabeth Drive to Lee Highway (Rt. 29) • Home Depot to Lee Hwy Department of Transportation 15
  • 16. County of Fairfax, Virginia Project Plan 3) Lee Highway to Mosaic • 2 route options Department of Transportation 16 A) Wayfinding via Eskridge Rd to Strawberry Ln B) Wayfinding via Lee Hwy/ Sidewalk to District Ave
  • 17. County of Fairfax, Virginia Proposed Schedule Department of Transportation 17 • Community Feedback and Design Updates- 1 month • Design review and Permitting 6 months • Project Advertisement and Bidding – 1 month • Construction – 1 month • Anticipated completion June 2018
  • 18. County of Fairfax, Virginia Feedback Department of Transportation 18 • Comments accepted through October 20th • Can submit feedback via comment forms, mail, and e-mail DOTBicyclePrograms@fairfaxcounty.gov • Staff will review and make updates to the design before first submittal to VDOT
  • 19. County of Fairfax, Virginia Thank You Department of Transportation 19 Questions/Comments? DOTBicyclePrograms@fairfaxcounty.gov