A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
Nottoway Park
Stormwater & Water Quality Improvements, Phases 1, 2, & 3
June 20, 2016
Nottoway Park BMP Retrofits Project
DPWES Stormwater Planning Division
Meeting Outline
2
• Fairfax County Stormwater Management Program Drivers
• Accotink Creek Watershed Management Plan and Project
Examples
• Nottoway Park BMP Retrofits – Project Scope
• Design Approach
• Next Steps
• Q&A
Nottoway Park BMP Retrofits Project
DPWES Stormwater Planning Division
Program Drivers and Project Types
3
• Chesapeake Bay Total Maximum Daily Load (TMDL)
• Other (local streams) TMDLs
• MS4 permit
• Major project types
 Stream and outfall restorations
 Stormwater Pond retrofits
 Site retrofits using Green Infrastructure
• List of projects is developed from watershed plans, and
referral from a variety of sources including the
maintenance division and citizen complaints
Nottoway Park BMP Retrofits Project
DPWES Stormwater Planning Division
Countywide Watershed Planning
4
“Healthy Watersheds, Healthy
Communities”
• 30 Designated
Watersheds
• All 15 watershed plans
have been adopted by
Fairfax County
Nottoway Park BMP Retrofits Project
DPWES Stormwater Planning Division
Accotink Creek Watershed Management Plan
5
Nottoway Park: AC9555
http://www.fairfaxcounty.gov/dpwes/watersheds/accotinkcreek.htm
Nottoway Park BMP Retrofits Project
DPWES Stormwater Planning Division
Accotink Creek Watershed Management Plan
Wakefield Run Stream Restoration
6
Nottoway Park BMP Retrofits Project
DPWES Stormwater Planning Division
Accotink Creek Watershed Management Plan
Brookfield Pond Repair and Retrofit
7
Nottoway Park BMP Retrofits Project
DPWES Stormwater Planning Division
Accotink Creek Watershed Management Plan
Brookfield Pond Repair and Retrofit
8
Nottoway Park BMP Retrofits Project
DPWES Stormwater Planning Division
Accotink Creek Watershed Management Plan
Mantua Elementary School Stormwater Retrofit (proposed)
9
Nottoway Park BMP Retrofits Project
DPWES Stormwater Planning Division
Accotink Creek Watershed Management Plan
Crook Branch Stream Restoration Project (proposed)
10
Reach 2
Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
Stantec
11
Specializing in Water Resources Engineering & Stream Restoration
Williamsburg Environmental Group (WEG) joined Stantec in 2014
Stantec at a glance:
• Founded in 1954
• Over 15,000 employees in more than 200 locations
• Diverse range of services and sectors, practice areas include:
• Architecture, Buildings Engineering, Community Development, Environmental Services, Geotechnical
Engineering, Mining Engineering, Oil & Gas Engineering, Power Engineering, Project Management,
Transportation Infrastructure Engineering, Water and Wastewater Engineering
• Stormwater BMP Retrofit, Stream Restoration and Water Quality Improvements:
• James City County Green Infrastructure Plan, Stafford County stormwater BMP design, Town of Ashland
stream restoration, Fairfax County stream restoration and stormwater BMP design, VDMA stormwater BMP
inspections and design, Ft. Belvoir stormwater BMP inspections and Corrective Action Plans; VDOT stream
restoration and stormwater concepts
• Stantec Project & Design Team: J. Alex Forasté, P.E.; George Rhodes; Doug Beisch, P.E.;
Ryan Haynes; Daniel Malone, L.A.; Karen Hall, P.E., CFM; Loretta Cummings, Ph.D.; Jason
Mann.
Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
Project Development
1. Walking the Park
2. Assessments & Evaluation
3. Stormwater Retrofits (Phase 1)
4. Stormwater Retrofits (Phase 2 & 3)
12
Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
1. Walking the Park
• Approx. 90 Acres
• Baseball/Softball Fields
• Tennis Courts
• Volleyball
• Basketball Courts
• Walking Trails
• Garden Plots
13
Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
1. Walking the Park
• Observe Drainage Patterns
• Identify Existing drainage/
erosion related issues/
problems
• Identify potential areas
for stormwater & water
quality improvements
• Watershed Characterization
14
Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
1. Walking the Park
• Identify tree, vegetation, and
natural resource inventory
and condition.
• Identify areas of high use
and high pedestrian traffic
areas (e.g. foot paths)
• Identify constraints
15
Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
1. Walking the Park
• Existing Issues
16
Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
1. Walking the Park
• Existing Issues
17
Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
1. Walking the Park
• Existing Issues
18
Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
1. Walking the Park
• Existing Issues
19
Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
1. Walking the Park
• Existing Issues
20
Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
1. Walking the Park
• Existing Issues
21
Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
2. Assessments & Evaluation
15 Potential Stormwater Retrofits Identified
Types of Practices/BMPs Considered:
o Bioretention Cells
o Engineered Dry Swales w/ & w/out check dams
o Step Pool Storm Conveyance
o Outfall Stabilization
o Stream Restoration
o Floodplain Reconnection
o Riparian Plantings
o Land Cover Conversion
o Rain Gardens
o Conversions of Existing Dry Detention
basin to Extended Detention w/ wetlands
o Permeable Pavement
o Soil Compost Amendments
o Wetland Creation
o Wetland Enhancement
22
Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
2. Assessments & Evaluation
For each potential BMP evaluated:
1.) Watershed & BMP Description
2.) Quantitative Assessment
3.) Qualitative Assessment
23
Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
3. Stormwater Retrofits (Phase 1)
24
BMP Type ID # Phase
Step Pool Storm Conveyance 1 1
Step Pool Storm Conveyance 2 1
Floodplain Reconnection & Wetlands 3 2
Urban Bioretention Basin & Dry Swale 4 2
Engineered Dry Swale w/ Check Dams 5 2
Engineered Dry Swale 8 2
Urban Bioretention Basin 9 2
Converted Dry Detention Basin to Extended
Detention & Wetlands
10C 3
Bioretention Cell 11A 3
Bioretention Cell 11B 3
Engineered Dry Swale 11C 3
Engineered Dry Swale 11D 3
Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
3. Stormwater Retrofits (Phase 1)
25
BMP #1 – Outfall Stabilization w/ Step Pools
Invasive Plant Removal
Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
3. Stormwater Retrofits (Phase 1)
26
BMP #1 – Outfall Stabilization w/ Step Pools
Contributing Drainage Area = 39.56 Acres; storm drain network draining residential neighborhoods
Flow Events: Q1 = 34.7 cfs; Q100 = 230.16 cfs
Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
3. Stormwater Retrofits (Phase 1)
27
BMP #1 – Outfall Stabilization w/ Step Pools
Outfall Stabilization
Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
3. Stormwater Retrofits (Phase 1)
28
BMP #1 – Outfall Stabilization w/ Step Pools
Riparian Tree & Shrub Planting
Plant Palette Approx. #
Shrubs 490
Understory Trees 144
Canopy Trees 94
Specimen Trees 12
NOTE: Plant counts approximately only; planting palette
will be revised.
Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
3. Stormwater Retrofits (Phase 1)
29
BMP #2 – Outfall Stabilization w/ Step Pools
Contributing Drainage Area = 20+ Acres; storm drain network draining residential neighborhood & roadside ditch
Flow Events: Q1 = 12.8+ cfs; Q100 = 80+ cfs
Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
3. Stormwater Retrofits (Phase 1)
30
BMP #2 – Outfall Stabilization w/ Step Pools
2nd Pedestrian Bridge
Access & Drainage
Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
3. Stormwater Retrofits (Phase 1)
31
BMP #2 – Outfall Stabilization w/ Step Pools
Existing Channel Erosion
Channel Incision
Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
3. Stormwater Retrofits (Phase 1)
32
Step Pool
BMP #2 – Outfall Stabilization w/ Step Pools
Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
4. Stormwater Retrofits (Phase 2)
33
BMP #3 – Floodplain Reconnection & Wetland Creation/Enhancement
Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
4. Stormwater Retrofits (Phase 2)
34
BMP #3 – Floodplain Reconnection & Wetland Creation/Enhancement
Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
4. Stormwater Retrofits (Phase 2)
35
BMP #4 – Bioretention Cell & Dry Swale
Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
4. Stormwater Retrofits (Phase 2)
36
BMP #5 – Engineered Dry Swale w/ Check Dams
Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
4. Stormwater Retrofits (Phase 2)
37
BMP #5 – Engineered Dry Swale w/ Check Dams
Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
4. Stormwater Retrofits (Phase 2)
38
BMP #8 – Engineered Dry Swale
Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
4. Stormwater Retrofits (Phase 2)
39
BMP #9 – Bioretention Basin
Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
4. Stormwater Retrofits (Phase 3)
40
BMP #10C – Converted Dry Detention Basin to Extended Detention & Wetland Creation
Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
4. Stormwater Retrofits (Phase 3)
41
BMP #10C – Converted Dry Detention Basin to Extended Detention & Wetland Creation
Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
4. Stormwater Retrofits (Phase 3)
42
BMP #10C – Converted Dry Detention Basin to Extended Detention & Wetland Creation
Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
4. Stormwater Retrofits (Phase 3)
43
BMP #10C – Converted Dry Detention Basin to Extended Detention & Wetland Creation
Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
4. Stormwater Retrofits (Phase 3)
44
BMP #11A & 11B – Bioretention Cells
Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
4. Stormwater Retrofits (Phase 3)
45
BMP #11C & 11D – Engineered Dry Swales
Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
4. Stormwater Retrofits (Phase 3)
46
BMP #11C & 11D – Engineered Dry Swales
Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
4. Stormwater Retrofits
47
Nottoway Park BMP Retrofits Project
DPWES Stormwater Planning Division
Project Schedule
• Project Community Meeting (June 20, 2016)
• Phase 1 Design Completion ~ 2-3 months
• Phase 1 Construction ~ Fall 2016
• Phases 2 & 3 Design Completion ~ 9 months
• Phases 2 & 3 Construction ~ Late Summer/Fall 2017
* “Pardon our Dust” meetings to be held with contractor prior to construction of each phase.
48
Additional Information
For additional information, please contact
www.fairfaxcounty.gov/dpwes
Nottoway Park BMP Retrofits Project
DPWES Stormwater Planning Division 49
Joe Riley-Ryan, Project Manager
Matt Meyers, Branch Chief
Watershed Projects implementation Branch - North
703-324-5500
Joseph.Riley-Ryan@fairfaxcounty.gov
Matthew.Meyers@fairfaxcounty.gov

Contenu connexe

Tendances

Tendances (20)

Huntsman Lake “Pardon Our Dust”
Huntsman Lake “Pardon Our Dust” Huntsman Lake “Pardon Our Dust”
Huntsman Lake “Pardon Our Dust”
 
Dead Run Stream Restoration Public Meeting June 9, 2015
Dead Run Stream Restoration Public Meeting June 9, 2015Dead Run Stream Restoration Public Meeting June 9, 2015
Dead Run Stream Restoration Public Meeting June 9, 2015
 
Sequoia Park Pond Retrofit Project
Sequoia Park Pond Retrofit ProjectSequoia Park Pond Retrofit Project
Sequoia Park Pond Retrofit Project
 
Stormwater Management Information Sharing with Shandong Province, China
Stormwater Management Information Sharing with Shandong Province, ChinaStormwater Management Information Sharing with Shandong Province, China
Stormwater Management Information Sharing with Shandong Province, China
 
Dead Run Stream Restoration Public meeting February 18, 2015
Dead Run Stream Restoration Public meeting February 18, 2015Dead Run Stream Restoration Public meeting February 18, 2015
Dead Run Stream Restoration Public meeting February 18, 2015
 
Colvin Run Phase I Lake Fairfax Park Stream Restoration Project
Colvin Run Phase I Lake Fairfax Park Stream Restoration ProjectColvin Run Phase I Lake Fairfax Park Stream Restoration Project
Colvin Run Phase I Lake Fairfax Park Stream Restoration Project
 
Wolftrap Creek Restoration in Vienna’s Wildwood Park, October 2013
Wolftrap Creek Restoration in Vienna’s Wildwood Park, October 2013Wolftrap Creek Restoration in Vienna’s Wildwood Park, October 2013
Wolftrap Creek Restoration in Vienna’s Wildwood Park, October 2013
 
Tripps Run Stream Improvement
Tripps Run Stream ImprovementTripps Run Stream Improvement
Tripps Run Stream Improvement
 
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public MeetingDraft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
 
Dead Run Stream Restoration Public Meeting April 23, 2014
Dead Run Stream Restoration Public Meeting April 23, 2014Dead Run Stream Restoration Public Meeting April 23, 2014
Dead Run Stream Restoration Public Meeting April 23, 2014
 
Dead Run Stream Restoration Public Meeting May 19, 2015
Dead Run Stream Restoration Public Meeting May 19, 2015Dead Run Stream Restoration Public Meeting May 19, 2015
Dead Run Stream Restoration Public Meeting May 19, 2015
 
Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and RestorationWoodglen Lake Dredging and Restoration
Woodglen Lake Dredging and Restoration
 
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
 
Habitat Improvement for Cleaner Water
Habitat Improvement for Cleaner WaterHabitat Improvement for Cleaner Water
Habitat Improvement for Cleaner Water
 
Crook Branch at Mantua Elementary School Stream Restoration Project
Crook Branch at Mantua Elementary School Stream Restoration ProjectCrook Branch at Mantua Elementary School Stream Restoration Project
Crook Branch at Mantua Elementary School Stream Restoration Project
 
Columbia Road/Randolph Court Stream Restoration July 2015
Columbia Road/Randolph Court Stream Restoration July 2015Columbia Road/Randolph Court Stream Restoration July 2015
Columbia Road/Randolph Court Stream Restoration July 2015
 
Dead Run Stream Restoration Stream Team Kick Off August 18, 2015
Dead Run Stream Restoration Stream Team Kick Off August 18, 2015Dead Run Stream Restoration Stream Team Kick Off August 18, 2015
Dead Run Stream Restoration Stream Team Kick Off August 18, 2015
 
Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021
Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021
Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021
 
Pike Branch at Wilton Road Stream Stabilization Project
Pike Branch at Wilton Road Stream Stabilization ProjectPike Branch at Wilton Road Stream Stabilization Project
Pike Branch at Wilton Road Stream Stabilization Project
 
Dead Run Stream Restoration Existing Conditions August 18, 2015
Dead Run Stream Restoration Existing Conditions August 18, 2015Dead Run Stream Restoration Existing Conditions August 18, 2015
Dead Run Stream Restoration Existing Conditions August 18, 2015
 

Similaire à Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3

Similaire à Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3 (20)

Accotink Tributary at Danbury Forest
Accotink Tributary at Danbury ForestAccotink Tributary at Danbury Forest
Accotink Tributary at Danbury Forest
 
Paul Spring Branch at Sherwood Hall Stream Restoration Project
Paul Spring Branch at Sherwood Hall Stream Restoration ProjectPaul Spring Branch at Sherwood Hall Stream Restoration Project
Paul Spring Branch at Sherwood Hall Stream Restoration Project
 
Difficult Run at Brittenford Drive Information Meeting May 17, 2017
Difficult Run at Brittenford Drive Information Meeting May 17, 2017Difficult Run at Brittenford Drive Information Meeting May 17, 2017
Difficult Run at Brittenford Drive Information Meeting May 17, 2017
 
Piney Run Tributary at Lamplighter Way
Piney Run Tributary at Lamplighter WayPiney Run Tributary at Lamplighter Way
Piney Run Tributary at Lamplighter Way
 
Dead Run Stream Restoration Project Meeting: Feb. 18, 2015
Dead Run Stream Restoration Project Meeting: Feb. 18, 2015Dead Run Stream Restoration Project Meeting: Feb. 18, 2015
Dead Run Stream Restoration Project Meeting: Feb. 18, 2015
 
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
 
Cameron Run Tributary at La Vista Drive Stream Restoration June 2020
Cameron Run Tributary at La Vista Drive Stream Restoration June 2020Cameron Run Tributary at La Vista Drive Stream Restoration June 2020
Cameron Run Tributary at La Vista Drive Stream Restoration June 2020
 
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014
 
Old Courthouse Spring Branch at Ashgrove Historic Park Stream Restoration Pro...
Old Courthouse Spring Branch at Ashgrove Historic Park Stream Restoration Pro...Old Courthouse Spring Branch at Ashgrove Historic Park Stream Restoration Pro...
Old Courthouse Spring Branch at Ashgrove Historic Park Stream Restoration Pro...
 
Dead Run at Georgetown Pike Stream Restoration Community Meeting Oct 7, 2020
Dead Run at Georgetown Pike Stream Restoration Community Meeting Oct 7, 2020Dead Run at Georgetown Pike Stream Restoration Community Meeting Oct 7, 2020
Dead Run at Georgetown Pike Stream Restoration Community Meeting Oct 7, 2020
 
Tucker Avenue Neighborhood Stormwater Project Community Meeting Sept 19, 2019
Tucker Avenue Neighborhood Stormwater Project Community Meeting Sept 19, 2019Tucker Avenue Neighborhood Stormwater Project Community Meeting Sept 19, 2019
Tucker Avenue Neighborhood Stormwater Project Community Meeting Sept 19, 2019
 
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018
 
Area 38 pic 1 final presentation
Area 38 pic 1   final presentationArea 38 pic 1   final presentation
Area 38 pic 1 final presentation
 
Piney Run Public Meeting 1 October 17, 2018
Piney Run Public Meeting 1 October 17, 2018Piney Run Public Meeting 1 October 17, 2018
Piney Run Public Meeting 1 October 17, 2018
 
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
 
Long Branch Tributary at Long Branch Falls Park Public Meeting 8-20-2015
Long Branch Tributary at Long Branch Falls Park Public Meeting 8-20-2015Long Branch Tributary at Long Branch Falls Park Public Meeting 8-20-2015
Long Branch Tributary at Long Branch Falls Park Public Meeting 8-20-2015
 
Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018
Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018
Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018
 
Dead Run Stream Restoration May 2014
Dead Run Stream Restoration May 2014Dead Run Stream Restoration May 2014
Dead Run Stream Restoration May 2014
 
Indian Run at Indian Run Court Stream Restoration
Indian Run at Indian Run Court Stream RestorationIndian Run at Indian Run Court Stream Restoration
Indian Run at Indian Run Court Stream Restoration
 
Franklin Park Chesterbrook Neighborhood Project Highlights
Franklin Park Chesterbrook Neighborhood Project HighlightsFranklin Park Chesterbrook Neighborhood Project Highlights
Franklin Park Chesterbrook Neighborhood Project Highlights
 

Plus de Fairfax County

Plus de Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 

Dernier

THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
Faga1939
 
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
hyt3577
 

Dernier (20)

Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptxLorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
 
China's soft power in 21st century .pptx
China's soft power in 21st century   .pptxChina's soft power in 21st century   .pptx
China's soft power in 21st century .pptx
 
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
 
Pakistan PMLN Election Manifesto 2024.pdf
Pakistan PMLN Election Manifesto 2024.pdfPakistan PMLN Election Manifesto 2024.pdf
Pakistan PMLN Election Manifesto 2024.pdf
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
 
30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf
 
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
 
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)
 
1971 war india pakistan bangladesh liberation.ppt
1971 war india pakistan bangladesh liberation.ppt1971 war india pakistan bangladesh liberation.ppt
1971 war india pakistan bangladesh liberation.ppt
 
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s LeadershipTDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
 
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdhEmbed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
 
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopkoEmbed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
 
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
 
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
 
06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf
 
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxKAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
 
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
 
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's DevelopmentNara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
 
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
 

Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3

  • 1. A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! Nottoway Park Stormwater & Water Quality Improvements, Phases 1, 2, & 3 June 20, 2016
  • 2. Nottoway Park BMP Retrofits Project DPWES Stormwater Planning Division Meeting Outline 2 • Fairfax County Stormwater Management Program Drivers • Accotink Creek Watershed Management Plan and Project Examples • Nottoway Park BMP Retrofits – Project Scope • Design Approach • Next Steps • Q&A
  • 3. Nottoway Park BMP Retrofits Project DPWES Stormwater Planning Division Program Drivers and Project Types 3 • Chesapeake Bay Total Maximum Daily Load (TMDL) • Other (local streams) TMDLs • MS4 permit • Major project types  Stream and outfall restorations  Stormwater Pond retrofits  Site retrofits using Green Infrastructure • List of projects is developed from watershed plans, and referral from a variety of sources including the maintenance division and citizen complaints
  • 4. Nottoway Park BMP Retrofits Project DPWES Stormwater Planning Division Countywide Watershed Planning 4 “Healthy Watersheds, Healthy Communities” • 30 Designated Watersheds • All 15 watershed plans have been adopted by Fairfax County
  • 5. Nottoway Park BMP Retrofits Project DPWES Stormwater Planning Division Accotink Creek Watershed Management Plan 5 Nottoway Park: AC9555 http://www.fairfaxcounty.gov/dpwes/watersheds/accotinkcreek.htm
  • 6. Nottoway Park BMP Retrofits Project DPWES Stormwater Planning Division Accotink Creek Watershed Management Plan Wakefield Run Stream Restoration 6
  • 7. Nottoway Park BMP Retrofits Project DPWES Stormwater Planning Division Accotink Creek Watershed Management Plan Brookfield Pond Repair and Retrofit 7
  • 8. Nottoway Park BMP Retrofits Project DPWES Stormwater Planning Division Accotink Creek Watershed Management Plan Brookfield Pond Repair and Retrofit 8
  • 9. Nottoway Park BMP Retrofits Project DPWES Stormwater Planning Division Accotink Creek Watershed Management Plan Mantua Elementary School Stormwater Retrofit (proposed) 9
  • 10. Nottoway Park BMP Retrofits Project DPWES Stormwater Planning Division Accotink Creek Watershed Management Plan Crook Branch Stream Restoration Project (proposed) 10 Reach 2
  • 11. Nottoway Park Stormwater & Water Quality Improvements Stormwater Planning Division Stantec 11 Specializing in Water Resources Engineering & Stream Restoration Williamsburg Environmental Group (WEG) joined Stantec in 2014 Stantec at a glance: • Founded in 1954 • Over 15,000 employees in more than 200 locations • Diverse range of services and sectors, practice areas include: • Architecture, Buildings Engineering, Community Development, Environmental Services, Geotechnical Engineering, Mining Engineering, Oil & Gas Engineering, Power Engineering, Project Management, Transportation Infrastructure Engineering, Water and Wastewater Engineering • Stormwater BMP Retrofit, Stream Restoration and Water Quality Improvements: • James City County Green Infrastructure Plan, Stafford County stormwater BMP design, Town of Ashland stream restoration, Fairfax County stream restoration and stormwater BMP design, VDMA stormwater BMP inspections and design, Ft. Belvoir stormwater BMP inspections and Corrective Action Plans; VDOT stream restoration and stormwater concepts • Stantec Project & Design Team: J. Alex Forasté, P.E.; George Rhodes; Doug Beisch, P.E.; Ryan Haynes; Daniel Malone, L.A.; Karen Hall, P.E., CFM; Loretta Cummings, Ph.D.; Jason Mann.
  • 12. Nottoway Park Stormwater & Water Quality Improvements Stormwater Planning Division Project Development 1. Walking the Park 2. Assessments & Evaluation 3. Stormwater Retrofits (Phase 1) 4. Stormwater Retrofits (Phase 2 & 3) 12
  • 13. Nottoway Park Stormwater & Water Quality Improvements Stormwater Planning Division 1. Walking the Park • Approx. 90 Acres • Baseball/Softball Fields • Tennis Courts • Volleyball • Basketball Courts • Walking Trails • Garden Plots 13
  • 14. Nottoway Park Stormwater & Water Quality Improvements Stormwater Planning Division 1. Walking the Park • Observe Drainage Patterns • Identify Existing drainage/ erosion related issues/ problems • Identify potential areas for stormwater & water quality improvements • Watershed Characterization 14
  • 15. Nottoway Park Stormwater & Water Quality Improvements Stormwater Planning Division 1. Walking the Park • Identify tree, vegetation, and natural resource inventory and condition. • Identify areas of high use and high pedestrian traffic areas (e.g. foot paths) • Identify constraints 15
  • 16. Nottoway Park Stormwater & Water Quality Improvements Stormwater Planning Division 1. Walking the Park • Existing Issues 16
  • 17. Nottoway Park Stormwater & Water Quality Improvements Stormwater Planning Division 1. Walking the Park • Existing Issues 17
  • 18. Nottoway Park Stormwater & Water Quality Improvements Stormwater Planning Division 1. Walking the Park • Existing Issues 18
  • 19. Nottoway Park Stormwater & Water Quality Improvements Stormwater Planning Division 1. Walking the Park • Existing Issues 19
  • 20. Nottoway Park Stormwater & Water Quality Improvements Stormwater Planning Division 1. Walking the Park • Existing Issues 20
  • 21. Nottoway Park Stormwater & Water Quality Improvements Stormwater Planning Division 1. Walking the Park • Existing Issues 21
  • 22. Nottoway Park Stormwater & Water Quality Improvements Stormwater Planning Division 2. Assessments & Evaluation 15 Potential Stormwater Retrofits Identified Types of Practices/BMPs Considered: o Bioretention Cells o Engineered Dry Swales w/ & w/out check dams o Step Pool Storm Conveyance o Outfall Stabilization o Stream Restoration o Floodplain Reconnection o Riparian Plantings o Land Cover Conversion o Rain Gardens o Conversions of Existing Dry Detention basin to Extended Detention w/ wetlands o Permeable Pavement o Soil Compost Amendments o Wetland Creation o Wetland Enhancement 22
  • 23. Nottoway Park Stormwater & Water Quality Improvements Stormwater Planning Division 2. Assessments & Evaluation For each potential BMP evaluated: 1.) Watershed & BMP Description 2.) Quantitative Assessment 3.) Qualitative Assessment 23
  • 24. Nottoway Park Stormwater & Water Quality Improvements Stormwater Planning Division 3. Stormwater Retrofits (Phase 1) 24 BMP Type ID # Phase Step Pool Storm Conveyance 1 1 Step Pool Storm Conveyance 2 1 Floodplain Reconnection & Wetlands 3 2 Urban Bioretention Basin & Dry Swale 4 2 Engineered Dry Swale w/ Check Dams 5 2 Engineered Dry Swale 8 2 Urban Bioretention Basin 9 2 Converted Dry Detention Basin to Extended Detention & Wetlands 10C 3 Bioretention Cell 11A 3 Bioretention Cell 11B 3 Engineered Dry Swale 11C 3 Engineered Dry Swale 11D 3
  • 25. Nottoway Park Stormwater & Water Quality Improvements Stormwater Planning Division 3. Stormwater Retrofits (Phase 1) 25 BMP #1 – Outfall Stabilization w/ Step Pools Invasive Plant Removal
  • 26. Nottoway Park Stormwater & Water Quality Improvements Stormwater Planning Division 3. Stormwater Retrofits (Phase 1) 26 BMP #1 – Outfall Stabilization w/ Step Pools Contributing Drainage Area = 39.56 Acres; storm drain network draining residential neighborhoods Flow Events: Q1 = 34.7 cfs; Q100 = 230.16 cfs
  • 27. Nottoway Park Stormwater & Water Quality Improvements Stormwater Planning Division 3. Stormwater Retrofits (Phase 1) 27 BMP #1 – Outfall Stabilization w/ Step Pools Outfall Stabilization
  • 28. Nottoway Park Stormwater & Water Quality Improvements Stormwater Planning Division 3. Stormwater Retrofits (Phase 1) 28 BMP #1 – Outfall Stabilization w/ Step Pools Riparian Tree & Shrub Planting Plant Palette Approx. # Shrubs 490 Understory Trees 144 Canopy Trees 94 Specimen Trees 12 NOTE: Plant counts approximately only; planting palette will be revised.
  • 29. Nottoway Park Stormwater & Water Quality Improvements Stormwater Planning Division 3. Stormwater Retrofits (Phase 1) 29 BMP #2 – Outfall Stabilization w/ Step Pools Contributing Drainage Area = 20+ Acres; storm drain network draining residential neighborhood & roadside ditch Flow Events: Q1 = 12.8+ cfs; Q100 = 80+ cfs
  • 30. Nottoway Park Stormwater & Water Quality Improvements Stormwater Planning Division 3. Stormwater Retrofits (Phase 1) 30 BMP #2 – Outfall Stabilization w/ Step Pools 2nd Pedestrian Bridge Access & Drainage
  • 31. Nottoway Park Stormwater & Water Quality Improvements Stormwater Planning Division 3. Stormwater Retrofits (Phase 1) 31 BMP #2 – Outfall Stabilization w/ Step Pools Existing Channel Erosion Channel Incision
  • 32. Nottoway Park Stormwater & Water Quality Improvements Stormwater Planning Division 3. Stormwater Retrofits (Phase 1) 32 Step Pool BMP #2 – Outfall Stabilization w/ Step Pools
  • 33. Nottoway Park Stormwater & Water Quality Improvements Stormwater Planning Division 4. Stormwater Retrofits (Phase 2) 33 BMP #3 – Floodplain Reconnection & Wetland Creation/Enhancement
  • 34. Nottoway Park Stormwater & Water Quality Improvements Stormwater Planning Division 4. Stormwater Retrofits (Phase 2) 34 BMP #3 – Floodplain Reconnection & Wetland Creation/Enhancement
  • 35. Nottoway Park Stormwater & Water Quality Improvements Stormwater Planning Division 4. Stormwater Retrofits (Phase 2) 35 BMP #4 – Bioretention Cell & Dry Swale
  • 36. Nottoway Park Stormwater & Water Quality Improvements Stormwater Planning Division 4. Stormwater Retrofits (Phase 2) 36 BMP #5 – Engineered Dry Swale w/ Check Dams
  • 37. Nottoway Park Stormwater & Water Quality Improvements Stormwater Planning Division 4. Stormwater Retrofits (Phase 2) 37 BMP #5 – Engineered Dry Swale w/ Check Dams
  • 38. Nottoway Park Stormwater & Water Quality Improvements Stormwater Planning Division 4. Stormwater Retrofits (Phase 2) 38 BMP #8 – Engineered Dry Swale
  • 39. Nottoway Park Stormwater & Water Quality Improvements Stormwater Planning Division 4. Stormwater Retrofits (Phase 2) 39 BMP #9 – Bioretention Basin
  • 40. Nottoway Park Stormwater & Water Quality Improvements Stormwater Planning Division 4. Stormwater Retrofits (Phase 3) 40 BMP #10C – Converted Dry Detention Basin to Extended Detention & Wetland Creation
  • 41. Nottoway Park Stormwater & Water Quality Improvements Stormwater Planning Division 4. Stormwater Retrofits (Phase 3) 41 BMP #10C – Converted Dry Detention Basin to Extended Detention & Wetland Creation
  • 42. Nottoway Park Stormwater & Water Quality Improvements Stormwater Planning Division 4. Stormwater Retrofits (Phase 3) 42 BMP #10C – Converted Dry Detention Basin to Extended Detention & Wetland Creation
  • 43. Nottoway Park Stormwater & Water Quality Improvements Stormwater Planning Division 4. Stormwater Retrofits (Phase 3) 43 BMP #10C – Converted Dry Detention Basin to Extended Detention & Wetland Creation
  • 44. Nottoway Park Stormwater & Water Quality Improvements Stormwater Planning Division 4. Stormwater Retrofits (Phase 3) 44 BMP #11A & 11B – Bioretention Cells
  • 45. Nottoway Park Stormwater & Water Quality Improvements Stormwater Planning Division 4. Stormwater Retrofits (Phase 3) 45 BMP #11C & 11D – Engineered Dry Swales
  • 46. Nottoway Park Stormwater & Water Quality Improvements Stormwater Planning Division 4. Stormwater Retrofits (Phase 3) 46 BMP #11C & 11D – Engineered Dry Swales
  • 47. Nottoway Park Stormwater & Water Quality Improvements Stormwater Planning Division 4. Stormwater Retrofits 47
  • 48. Nottoway Park BMP Retrofits Project DPWES Stormwater Planning Division Project Schedule • Project Community Meeting (June 20, 2016) • Phase 1 Design Completion ~ 2-3 months • Phase 1 Construction ~ Fall 2016 • Phases 2 & 3 Design Completion ~ 9 months • Phases 2 & 3 Construction ~ Late Summer/Fall 2017 * “Pardon our Dust” meetings to be held with contractor prior to construction of each phase. 48
  • 49. Additional Information For additional information, please contact www.fairfaxcounty.gov/dpwes Nottoway Park BMP Retrofits Project DPWES Stormwater Planning Division 49 Joe Riley-Ryan, Project Manager Matt Meyers, Branch Chief Watershed Projects implementation Branch - North 703-324-5500 Joseph.Riley-Ryan@fairfaxcounty.gov Matthew.Meyers@fairfaxcounty.gov

Notes de l'éditeur

  1. Construction: FY2018 = July 2018