Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3
1. A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
Nottoway Park
Stormwater & Water Quality Improvements, Phases 1, 2, & 3
June 20, 2016
2. Nottoway Park BMP Retrofits Project
DPWES Stormwater Planning Division
Meeting Outline
2
• Fairfax County Stormwater Management Program Drivers
• Accotink Creek Watershed Management Plan and Project
Examples
• Nottoway Park BMP Retrofits – Project Scope
• Design Approach
• Next Steps
• Q&A
3. Nottoway Park BMP Retrofits Project
DPWES Stormwater Planning Division
Program Drivers and Project Types
3
• Chesapeake Bay Total Maximum Daily Load (TMDL)
• Other (local streams) TMDLs
• MS4 permit
• Major project types
Stream and outfall restorations
Stormwater Pond retrofits
Site retrofits using Green Infrastructure
• List of projects is developed from watershed plans, and
referral from a variety of sources including the
maintenance division and citizen complaints
4. Nottoway Park BMP Retrofits Project
DPWES Stormwater Planning Division
Countywide Watershed Planning
4
“Healthy Watersheds, Healthy
Communities”
• 30 Designated
Watersheds
• All 15 watershed plans
have been adopted by
Fairfax County
5. Nottoway Park BMP Retrofits Project
DPWES Stormwater Planning Division
Accotink Creek Watershed Management Plan
5
Nottoway Park: AC9555
http://www.fairfaxcounty.gov/dpwes/watersheds/accotinkcreek.htm
6. Nottoway Park BMP Retrofits Project
DPWES Stormwater Planning Division
Accotink Creek Watershed Management Plan
Wakefield Run Stream Restoration
6
7. Nottoway Park BMP Retrofits Project
DPWES Stormwater Planning Division
Accotink Creek Watershed Management Plan
Brookfield Pond Repair and Retrofit
7
8. Nottoway Park BMP Retrofits Project
DPWES Stormwater Planning Division
Accotink Creek Watershed Management Plan
Brookfield Pond Repair and Retrofit
8
9. Nottoway Park BMP Retrofits Project
DPWES Stormwater Planning Division
Accotink Creek Watershed Management Plan
Mantua Elementary School Stormwater Retrofit (proposed)
9
10. Nottoway Park BMP Retrofits Project
DPWES Stormwater Planning Division
Accotink Creek Watershed Management Plan
Crook Branch Stream Restoration Project (proposed)
10
Reach 2
11. Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
Stantec
11
Specializing in Water Resources Engineering & Stream Restoration
Williamsburg Environmental Group (WEG) joined Stantec in 2014
Stantec at a glance:
• Founded in 1954
• Over 15,000 employees in more than 200 locations
• Diverse range of services and sectors, practice areas include:
• Architecture, Buildings Engineering, Community Development, Environmental Services, Geotechnical
Engineering, Mining Engineering, Oil & Gas Engineering, Power Engineering, Project Management,
Transportation Infrastructure Engineering, Water and Wastewater Engineering
• Stormwater BMP Retrofit, Stream Restoration and Water Quality Improvements:
• James City County Green Infrastructure Plan, Stafford County stormwater BMP design, Town of Ashland
stream restoration, Fairfax County stream restoration and stormwater BMP design, VDMA stormwater BMP
inspections and design, Ft. Belvoir stormwater BMP inspections and Corrective Action Plans; VDOT stream
restoration and stormwater concepts
• Stantec Project & Design Team: J. Alex Forasté, P.E.; George Rhodes; Doug Beisch, P.E.;
Ryan Haynes; Daniel Malone, L.A.; Karen Hall, P.E., CFM; Loretta Cummings, Ph.D.; Jason
Mann.
12. Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
Project Development
1. Walking the Park
2. Assessments & Evaluation
3. Stormwater Retrofits (Phase 1)
4. Stormwater Retrofits (Phase 2 & 3)
12
13. Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
1. Walking the Park
• Approx. 90 Acres
• Baseball/Softball Fields
• Tennis Courts
• Volleyball
• Basketball Courts
• Walking Trails
• Garden Plots
13
14. Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
1. Walking the Park
• Observe Drainage Patterns
• Identify Existing drainage/
erosion related issues/
problems
• Identify potential areas
for stormwater & water
quality improvements
• Watershed Characterization
14
15. Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
1. Walking the Park
• Identify tree, vegetation, and
natural resource inventory
and condition.
• Identify areas of high use
and high pedestrian traffic
areas (e.g. foot paths)
• Identify constraints
15
16. Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
1. Walking the Park
• Existing Issues
16
17. Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
1. Walking the Park
• Existing Issues
17
18. Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
1. Walking the Park
• Existing Issues
18
19. Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
1. Walking the Park
• Existing Issues
19
20. Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
1. Walking the Park
• Existing Issues
20
21. Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
1. Walking the Park
• Existing Issues
21
22. Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
2. Assessments & Evaluation
15 Potential Stormwater Retrofits Identified
Types of Practices/BMPs Considered:
o Bioretention Cells
o Engineered Dry Swales w/ & w/out check dams
o Step Pool Storm Conveyance
o Outfall Stabilization
o Stream Restoration
o Floodplain Reconnection
o Riparian Plantings
o Land Cover Conversion
o Rain Gardens
o Conversions of Existing Dry Detention
basin to Extended Detention w/ wetlands
o Permeable Pavement
o Soil Compost Amendments
o Wetland Creation
o Wetland Enhancement
22
23. Nottoway Park Stormwater & Water Quality Improvements
Stormwater Planning Division
2. Assessments & Evaluation
For each potential BMP evaluated:
1.) Watershed & BMP Description
2.) Quantitative Assessment
3.) Qualitative Assessment
23