This emergency project replaced approximately 60 feet of 10-inch wastewater sewer pipe that was broken during the installation of an electricity utility conduit. The project included installation of an emergency wastewater bypass pumping system, excavation and removal of the broken wastewater sewer pipe, installation of new manholes, and rehabilitation of the work site. The repairs were conducted between the hours of 9 p.m. and 5 a.m. to limit disruptions to traffic in this busy corridor.