A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
Stormwater Maintenance Awareness Training
For privately maintained stormwater management facilities
Maintenance and Stormwater Management Division (MSMD)
Winter 2018
Stormwater Maintenance Awareness Training
MSMD/DPWES
Course Schedule
AM session (includes two short breaks)
– History of SWM and regulations
– County inspection basics
– The inspection report and MAR
– Common SWM/BMP types
• Common maintenance items-General
– Common SWM/BMP types, deficiencies, and remedies
• Above Ground Facilities
12:00-1:00 PM Lunch
PM session (includes two short breaks)
– Common SWM/BMP types, deficiencies, and remedies
• Below Ground Facilities
• Vegetative Practices
– Closing remarks/questions
2
NOTE: All pictures, unless noted, are the property of Fairfax County.
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-General Safety
3
The County’s private inspection program does NOT allow for Confined Space
Entry!
Please ensure you are properly certified, have the proper entry permits, and
are appropriately equipped before entering any applicable confined space!
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Ponds (WP, DP)
• Wet Ponds (WP) and Dry Ponds (DP) are both depressed basins
providing temporary storage for stormwater runoff.
– WP are designed to have a permanent pool.
– DP basins are designed to usually be dry, except when handling
runoff.
• Some DP basins may have permanent wet features, including deep cells,
micropools, or sediment forebays.
4
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Ponds (WP, DP)
WET POND COMPONENTS Profile of a typical WP
Plan view of WP with sediment
forebay and WL
5
Pictures: VDEQ Stormwater Design Specification No. 14, Wet Pond, Version 1.9, 3/1/11, Figure 14.1 “Wet Pond Design Schematics”
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Ponds (WP, DP)
DRY POND COMPONENTS - Under the new Virginia SWM regulations,
Extended Detention Ponds constructed after July 1, 2014 must include, at a
minimum, the following components:
• Sediment Forebay
• Micropool
6
Pictures: VDEQ Stormwater Design Specification No. 15, Dry Pond, Version 1.9, 3/1/11, Figure 15.1 “Typical Extended Detention Pond Details”
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Ponds (WP, DP)
DRY POND COMPONENTS - Dry Ponds constructed prior to July 1, 2014
are likely to have a simpler profile:
7
LEFT Picture: Page 62, http://www.novaregion.org/DocumentCenter/Home/View/1679
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Ponds (WP, DP)
Routine Deficiencies Observed:
Algae/Turbidity (WP only)
8
Trash rack crushed/damaged,
requires replacement
BELOW: High turbidity caused by suspended
materials (soil, sediment, microbes, etc.) can
harm aquatic life, create clogging concerns,
and cause build-up.
ABOVE: Algal bloom and growth can create
significant water quality issues, impacting
plant and wildlife, as well as creating visual and
odor concerns.
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Ponds (WP, DP)
Water level inconsistent with plans (WP only)
9
s
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Ponds (WP, DP)
Trickle Ditches (DP only)
10
TOP RIGHT: Erosion and
trenching along the trickle
ditch, with some overgrown
vegetation
BOTTOM RIGHT: Significant
spalling and deterioration of
concrete in trickle ditch
TOP LEFT: Obstruction or
blockage in trickle ditch
BOTTOM LEFT: Trickle ditch
with some significant sediment
and debris accumulation
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Ponds (WP, DP)
Dam/Berm - Erosion and Failure
NOTE: Remaining slides apply to both WP and DP
11
BELOW: Erosion of the dam face has led to significant
piping (formation of water channels throughout
embankment interior) and blockage, requiring immediate
attention
RIGHT: (Both pictures are from same site) Significant
erosion and sloughing of the dam/berm, requiring
immediate attention as this can lead to dam failure with
increasing area damage
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Ponds (WP, DP)
Dam/Berm - Cave-Ins and Animal Holes
12
LEFT: Dam/berm cave-ins,
possibly caused by pipe joint
separation, seepage, and/or
problems with the interior
dam fill
RIGHT: Animal holes on top
and side slope of dam/berm
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Ponds (WP, DP)
Vegetation & Trash/Debris Accumulation
13
RIGHT BOTTOM: Sediment accumulation and
debris reduces the holding capacity of the pond
and its ability to treat the designed volume of
stormwater runoff.
BELOW: Large appliance dumping and
other trash/debris accumulation from
upstream can critically impact facility
function & create problems downstream.
RIGHT TOP: The riser structure has
overgrown vegetation around it.
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Ponds (WP, DP)
Trees and Woody Vegetation on Dam/Berm
14
Back
Face
Control
Structure
No trees or woody vegetation should be on
any side of the dam/berm embankment
(face, back, top, etc.)
*Check site plans for specifics.
Pond
Floor
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Ponds (WP, DP)
Riser/Trash Rack
15
Significant sediment & debris
accumulation and trash rack
damage-requires cleaning and
trash rack replacement
Trash rack & low-flow orifice
plate, if required by site plans,
must be installed flush with
the riser structure, with no
gapping. Here, debris must be
cleared, then low-flow orifice
plate & trash rack properly re-
installed. Missing low-flow
orifice plates are a common
issue.
Inside riser blockage
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Ponds (WP, DP)
Outfalls
16
Undermining below outfall pipe (can be related to
separation at last joint of PSP, etc.)
Downstream blockage or impending blockage
within 20 feet of outfall structure (potential
back up and impact to water flow from the
PSP)
Erosion at curb cut inflow area,
needs repair
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Ponds (WP, DP)
• Common Remedies
– Algal bloom, turbidity, and water level inconsistent with plans (WP only)
• Investigate and resolve cause(s), if at all possible
– Remove all flow blockages as well as any additional trash, debris, and
accumulated sediment
– Repair/replace any damaged/missing components
• Components vary by facility type and design, and they can range
from parts (trash racks, well caps, etc.) to structural (walls, concrete,
etc.) to environmental materials (soil, gravel, etc.)
– Check approved site plans for specific facility requirements
17
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Ponds (WP, DP)
• Common Remedies
– Repair/replace any damaged/missing components (continued)
• For damaged/misaligned pipes:
– Reinforce/repair, if possible (Internal bands and gaskets)
– Slip-line pipes when possible, as this may be more cost effective
– Excavate and replace/reseal, if first two options are not possible
– Rebuild/stabilize any areas with erosion, cave-ins, and bare spots:
• Cave-ins require additional investigation to determine cause and
prevent re-occurrence
• Fill-in/stabilize any animal holes, per plan maintenance guidelines,
to discourage occupancy and re-occurrence
18
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Ponds (WP, DP)
• Common Remedies
– Cut back overgrown vegetation around facility structures to facilitate
access and proper function (WP/DP have special requirements, as noted
below)
• Remove all trees and woody vegetation from the entire dam
embankment: face, back, top, etc.
– Check plans for a ‘Planting Plan’ which may have allowed
plantings on the dam embankment
• Remove overgrown vegetation
– Within 25’ radius of channels
– Within 10’ from the heel of dam, 10’ from toe of dam
– Within inflow/outlet channels
– Other areas, as needed, for facility access
19
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Wetlands (WL)
• Shallow depressions that receive
stormwater for water quality
treatment by providing an ideal
environment for:
– Long residence time
– Gravitational settling
– Biological uptake
– Microbial activity
• Stormwater management benefits:
– Nutrient load removal and
reduction
• Nitrogen
• Phosphorus
• Sediment
20
– Runoff volume reduction
– Channel protection
– Flood mitigation
Properly Functioning Example:
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Wetlands (WL)
• Inflow
• Forebay
• Weir wall
• Permanent pool
• Low flow orifice
• Riser
• Embankment
• Outfall
• Emergency spillway
• Micro-topographic features
• Tree peninsulas
• High and low marshes
• Micropools
• Deep pools
21
Picture: VDEQ Stormwater Design Specification No. 13, constructed Wetlands, Version 1.9, 3/1/11, Figure
13.1 “Plan and Cross Sections of Constructed Wetland Level 1 and Level 2 configurations”
WETLAND COMPONENTS
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Wetlands (WL)
22
Picture: VDEQ Stormwater Design Specification No. 13, constructed Wetlands, Version 1.9, 3/1/11,
Figure 13.1 “Plan and Cross Sections of Constructed Wetland Level 1 and Level 2 configurations”
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Wetlands (WL)
Routine Deficiencies Observed:
• Clogging of pipes from sediment, vegetation and debris
– If low flow orifice is clogged, it can result in a rapid change in
wetland water elevations.
• Sedimentation accumulations in forebays and micropools
• Erosion and braiding (channel separation and intermixing,
sometimes with formation of deposited bars or islands)
• Vegetation Issues
– Growth over access points
– Invasive species
– Dead, dying, missing vegetation
– Bare spots
– Trees and woody vegetation on dam embankment
23
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Wetlands (WL)
24
Erosion on the main pool floor
Damaged wetland
habitat vegetation
Sediment and debris in upstream inflows
Sediment
accumulation in
forebays
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Wetlands (WL)
• Common Remedies
– Remedies are the same as for WP/DP (please refer to slides 16-18)
– Additional vegetative concerns specific to wetlands:
• Remove any non-spec vegetation, especially if it impacts the health and function
of the facility, as designed
• Replace/replant any dead, dying, or missing wetland vegetation per approved
site plans
– Cut back overgrown vegetation around facility structures to facilitate access and
proper function (WL have special requirements, as noted below)
• Remove all trees and woody vegetation from the entire dam embankment: face,
back, top, etc.
– Check plans for a ‘Planting Plan’ which may have allowed plantings on the
dam embankment
• Remove overgrown vegetation
– Within 10’ of control structure
– Within 5’ of all other structures
– Within inflow/outlet channels
– Other areas, as needed, for facility access
25
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities
We will finish up Above Ground Facilities
after a short
BREAK…
26
A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
Stormwater Maintenance Awareness Training
For privately maintained stormwater management facilities
Maintenance and Stormwater Management Division (MSMD)
Winter 2018
Stormwater Maintenance Awareness Training
MSMD/DPWES
Course Schedule
AM session (includes two 15 minute breaks)
– History of SWM and regulations
– County inspection basics
– The inspection report and MAR
– Common SWM/BMP types
• Common maintenance items-General
– Common SWM/BMP types, deficiencies, and remedies
• Above Ground Facilities (the rest of the story….)
12:00-1:00 PM Lunch
PM session (includes two 15 minute breaks)
– Common SWM/BMP types, deficiencies, and remedies
• Below Ground Facilities
• Vegetative Practices
– Closing remarks/questions
28
NOTE: All pictures, unless noted, are the property of Fairfax County.
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Infiltration Trenches (TR)
Provides some quantity control & treats runoff through filtration/infiltration
29
May be designed to treat surface
runoff or piped drainage (downspouts)
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Infiltration Trenches (TR)
Properly Functioning Examples: (Typical single-family residential lot facilities)
30
LEFT: Picture shows a gravel infiltration trench
with a cleanout and observation well, during a
soil probe test. A soil probe is pushed into the
underlying gravel layer to determine the topsoil
depth and confirm facility is “per design”.
Sod cover
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Infiltration Trenches (TR)
• Topsoil and sod cover
(optional)
• Observation well with
metal cap with lock
• Overflow berm
• Pea gravel or river stone
• Filter fabric layer
• Aggregate (1.5 in. – 3.5 in.
diameter)
• Sand bed (6-8 in. deep)
• Perforated underdrain
(optional)
31
Picture: VDEQ Stormwater Design Specification No. 8, Infiltration Practices, Version 1.9, 3/1/11
INFILTRATION TRENCH COMPONENTS
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Infiltration Trenches (TR)
Sediment Accumulation & Curb Cuts
32
TOP LEFT: Some debris
and sediment on
surface at curb cut
BOTTOM LEFT: Curb
cut blocked (remove
wheel stop)
TOP RIGHT: Surface
debris & sediment
accumulation
BOTTOM RIGHT:
Sediment
accumulation in gravel
bed
Routine Deficiencies Observed
Stormwater Maintenance Awareness Training
Above Ground Facilities-Infiltration Trenches (TR)
Plantings & Overgrown Vegetation
33
Downed tree limb with deep-
rooted/overgrown vegetation
Overgrown vegetation within
the limits of a gravel bed
trench may indicate sediment
accumulation, as plants do
not tend to grow in clean
gravel.
Unauthorized plantings
MSMD/DPWES
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Infiltration Trenches (TR)
Turf Covered TRs
34
Some trenches may have turf and topsoil,
covering the gravel bed; however, turf is not
automatically acceptable. ALWAYS refer to the
approved site plan!
• A soil probe test checks the gravel layer
(refer to slide 4).
• Water usually reaches the gravel bed
through underground PVC pipes connected
to the roof drain downspouts.
Common issues include:
• Missing underground gravel beds
• Disconnected roof downspouts draining
overland instead of via an underground
pipe
• Bare spots/exposed soil in turf covering
• Missing berms or observation wells
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Infiltration Trenches (TR)
Cleanouts/Observation Wells
35
Other common issues:
• Caps stuck/not removable
• Clogged cleanouts
• Presence of standing water in the cleanout
Broken/damaged well cap Missing cap
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Infiltration Trenches (TR)
• Common Remedies
– Standing water after 48 hours:
• Underdrain may need to be flushed and re-checked
– Remove all flow blockages as well as any additional trash, debris, and
accumulated sediment
• Special attention should be given, as required to gravel beds
(surface and within gravel pores) and may require
removal/replacement of clogged sections of gravel
• Fully remove any plants growing in the accumulated sediments
– Full removal includes eliminating roots and supporting
soil/sediment from the gravel bed, as spraying weed killer is not
a sufficient treatment solution
– Rebuild/stabilize any areas with erosion, cave-ins, and bare spots:
• Cave-ins require additional investigation to determine cause and
prevent re-occurrence
36
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Infiltration Trenches (TR)
• Common Remedies
– Repair/replace any damaged/missing components
• Components vary by facility type and design, and they can range
from parts to structural to environmental materials (see prior noted
examples)
– Check approved site plans for specific facility requirements
• For damaged/misaligned pipes:
– Reinforce/repair, if possible (Internal bands and gaskets)
– Slip-line pipes when possible, as this may be most cost effective
– Excavate and replace/reseal, if first two options are not possible
– Cut back overgrown vegetation around facility structures to facilitate
access and proper function
37
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Permeable Pavement (PP)
• Alternative paving surface which
treats runoff through filtration
(voids in paved surface), temporary
storage (underlying stone
reservoir), and infiltration
– Includes permeable pavement,
pervious concrete, porous
asphalt, and permeable pavers
– PP promotes a high degree of
runoff volume reduction &
nutrient removal
– Primarily used on commercial,
institutional, & residential sites
38
Properly Functioning Examples:
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Permeable Pavement (PP)
• Observation well
• Perforated underdrain
• Geotextile (optional)
• Bedding Course
• Aggregate base
• Uncompacted subgrade
soil
• Permeable joint
material (for PICP)
39
PERMEABLE PAVEMENT COMPONENTS
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Permeable Pavement (PP)
40
Picture: VDEQ Stormwater Design Specification No. 7, Permeable Pavement, Version 1.8, 3/1/11, Figure 7.1 (as noted)
PERMEABLE PAVEMENT COMPONENTS
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Permeable Pavement (PP)
Routine Deficiencies Observed
Pervious Layer
41
Sediment/Silt
Weeds/overgrown
vegetation
Deterioration &/or cracks
in pervious layer
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Permeable Pavement (PP)
Routine Deficiencies Observed
Pervious Layer
42
Asphalt Sealed Pavers Clogged
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Permeable Pavement (PP)
Outfall Structure/Underdrain
43
Damaged underdrains
Clogging and/or a potential
blockage in the outfall
structure/underdrain
Blockage in the underdrain
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Permeable Pavement (PP)
• Common Remedies
– Remove all flow blockages as well as any additional trash, debris, and
accumulated sediment
• Perform a thorough restorative vacuum sweep of paved surface
• Investigate the causes of any blockages to prevent re-occurrence, if
at all possible.
– Repair/replace any damaged/missing components
• Components vary by facility type and design, and they can range
from parts to structural to environmental materials (see prior noted
examples)
– Check approved site plans for specific facility requirements
• Specific to this facility type: any damaged, cracked, or failing pavers
or paved sections
44
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Permeable Pavement (PP)
• Common Remedies
– Rebuild/stabilize any areas of erosion:
• Adjoining land erosion can silt in permeable pavement
– Remove vegetation in permeable pavement to facilitate proper function
• Remove any non-spec vegetation, especially if it impacts the health
and function of the facility, as designed.
– Sealed permeable pavement requires a complete replacement
45
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Rooftop Detention (RT)
• Designed to slow the flow from the
roof through short-term ponding
on the roof surface
46
Properly Functioning Examples of
Rooftop Detention Devices:
Ring with
1” holes
Slotted square
detention
device
Adjustable
detention
device
Custom
devices
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Rooftop Detention (RT)
• Roof drain
• Debris cage
• Detention cage
• Parapet wall
• Scupper
• Roof access (varies)
47
ROOFTOP DETENTION COMPONENTS
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Rooftop Detention (RT)
Properly Functioning Examples:
Scuppers convey emergency overflow off rooftop
48
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Rooftop Detention (RT)
Routine Deficiencies Observed
Scuppers and Adjustable Detention Devices
49
Scupper not providing proper
water detention because it is
level with roof
Adjustable detention
device opened too
wide
Detention
device and
debris cage
missing
Debris cage is
damaged and
detention device
missing
Incorrect number of drains and/or
scuppers (usually too many)
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Rooftop Detention (RT)
Parapet Walls, Vegetation, and Detention Devices
50
Parapet wall missing
Debris Ponding Sediment
Tree growing on roof surface
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities-Rooftop Detention (RT)
• Common Remedies
– Remove all flow blockages as well as any additional trash, debris, and
accumulated sediment
– Repair/replace any damaged/missing components
• Components vary by facility type and design, and they can range from
parts to structural to environmental materials (see prior noted
examples)
– Check approved site plans for specific facility requirements
– Remove ANY vegetation around facility structures and on rooftop
– Provide required detention flow rate
• Replace any missing or damaged detention devices and debris cages
• Re-adjust detention devices, as needed
• Raise scuppers that are too low or provide detention at the scupper
• Repair or install any missing parapet walls
• Recalculate the flow based on the actual number of drains to attain the
prescribed detention
51
Stormwater Maintenance Awareness Training
MSMD/DPWES
Above Ground Facilities
LUNCH!
Please be back & ready to start at 1:00 PM
52

Contenu connexe

Tendances

FEMA Guidelines for Dam Safety
FEMA Guidelines for Dam SafetyFEMA Guidelines for Dam Safety
FEMA Guidelines for Dam SafetyJA Larson
 
1.principle of o&m
1.principle of o&m1.principle of o&m
1.principle of o&mMadhabKoirala
 
Jason Abendroth Project experience_10_2015
Jason Abendroth Project experience_10_2015Jason Abendroth Project experience_10_2015
Jason Abendroth Project experience_10_2015Jason Abendroth, PE
 
Cinder Bed Road Realignment
Cinder Bed Road RealignmentCinder Bed Road Realignment
Cinder Bed Road RealignmentFairfax County
 

Tendances (7)

FEMA Guidelines for Dam Safety
FEMA Guidelines for Dam SafetyFEMA Guidelines for Dam Safety
FEMA Guidelines for Dam Safety
 
1.principle of o&m
1.principle of o&m1.principle of o&m
1.principle of o&m
 
RYAN STODDARD
RYAN STODDARDRYAN STODDARD
RYAN STODDARD
 
Brunton D CV 2015
Brunton D CV 2015Brunton D CV 2015
Brunton D CV 2015
 
Jason Abendroth Project experience_10_2015
Jason Abendroth Project experience_10_2015Jason Abendroth Project experience_10_2015
Jason Abendroth Project experience_10_2015
 
Hawaii Pacific GIS Conference 2012: Disaster Management and Emergency Respons...
Hawaii Pacific GIS Conference 2012: Disaster Management and Emergency Respons...Hawaii Pacific GIS Conference 2012: Disaster Management and Emergency Respons...
Hawaii Pacific GIS Conference 2012: Disaster Management and Emergency Respons...
 
Cinder Bed Road Realignment
Cinder Bed Road RealignmentCinder Bed Road Realignment
Cinder Bed Road Realignment
 

Similaire à Stormwater Maintenance Awareness Above Ground Facilities parts 1 and 2

Contractor Awareness Training Above Ground Facilities Part 1 2016
Contractor Awareness Training Above Ground Facilities Part 1 2016Contractor Awareness Training Above Ground Facilities Part 1 2016
Contractor Awareness Training Above Ground Facilities Part 1 2016Fairfax County
 
Contractor Awareness Training Below Ground Facilities 2016
Contractor Awareness Training Below Ground Facilities 2016Contractor Awareness Training Below Ground Facilities 2016
Contractor Awareness Training Below Ground Facilities 2016Fairfax County
 
Contractor Awareness Training Above Ground Facilities Part 2 2016
Contractor Awareness Training Above Ground Facilities Part 2 2016Contractor Awareness Training Above Ground Facilities Part 2 2016
Contractor Awareness Training Above Ground Facilities Part 2 2016Fairfax County
 
Stormwater Maintenance Awareness Training, Part V: Vegetative Practices, Octo...
Stormwater Maintenance Awareness Training, Part V: Vegetative Practices, Octo...Stormwater Maintenance Awareness Training, Part V: Vegetative Practices, Octo...
Stormwater Maintenance Awareness Training, Part V: Vegetative Practices, Octo...Fairfax County
 
Contractor Awareness Training Vegetative Practices 2016
Contractor Awareness Training Vegetative Practices 2016Contractor Awareness Training Vegetative Practices 2016
Contractor Awareness Training Vegetative Practices 2016Fairfax County
 
Stormwater Maintenance Awareness Training, Part I: Overview, October 6, 2015
Stormwater Maintenance Awareness Training, Part I: Overview, October 6, 2015Stormwater Maintenance Awareness Training, Part I: Overview, October 6, 2015
Stormwater Maintenance Awareness Training, Part I: Overview, October 6, 2015Fairfax County
 
Contractor Awareness Training Stormwater Facilities Introduction 2016
Contractor Awareness Training Stormwater Facilities Introduction 2016Contractor Awareness Training Stormwater Facilities Introduction 2016
Contractor Awareness Training Stormwater Facilities Introduction 2016Fairfax County
 
Woodrock retrofit 11-13-14
Woodrock retrofit 11-13-14Woodrock retrofit 11-13-14
Woodrock retrofit 11-13-14MCDEP
 
Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020
Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020
Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020Fairfax County
 
Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021
Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021
Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021Fairfax County
 
Accotink Tributary at Danbury Forest
Accotink Tributary at Danbury ForestAccotink Tributary at Danbury Forest
Accotink Tributary at Danbury ForestFairfax County
 
NCASI Presentation: "Managing Risks Associated with Industrial Impoundments" ...
NCASI Presentation: "Managing Risks Associated with Industrial Impoundments" ...NCASI Presentation: "Managing Risks Associated with Industrial Impoundments" ...
NCASI Presentation: "Managing Risks Associated with Industrial Impoundments" ...TRC Companies, Inc.
 
Stormwater Maintenance Awareness Training 1
Stormwater Maintenance Awareness Training 1Stormwater Maintenance Awareness Training 1
Stormwater Maintenance Awareness Training 1Fairfax County
 
Field Rep Assessments
Field Rep AssessmentsField Rep Assessments
Field Rep AssessmentsClean Water
 
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...Fairfax County
 
Environmental Impacts of Groundwater Control and Dewatering
Environmental Impacts of Groundwater Control and DewateringEnvironmental Impacts of Groundwater Control and Dewatering
Environmental Impacts of Groundwater Control and DewateringMartin Preene
 

Similaire à Stormwater Maintenance Awareness Above Ground Facilities parts 1 and 2 (20)

Contractor Awareness Training Above Ground Facilities Part 1 2016
Contractor Awareness Training Above Ground Facilities Part 1 2016Contractor Awareness Training Above Ground Facilities Part 1 2016
Contractor Awareness Training Above Ground Facilities Part 1 2016
 
Contractor Awareness Training Below Ground Facilities 2016
Contractor Awareness Training Below Ground Facilities 2016Contractor Awareness Training Below Ground Facilities 2016
Contractor Awareness Training Below Ground Facilities 2016
 
Contractor Awareness Training Above Ground Facilities Part 2 2016
Contractor Awareness Training Above Ground Facilities Part 2 2016Contractor Awareness Training Above Ground Facilities Part 2 2016
Contractor Awareness Training Above Ground Facilities Part 2 2016
 
Stormwater Maintenance Awareness Training, Part V: Vegetative Practices, Octo...
Stormwater Maintenance Awareness Training, Part V: Vegetative Practices, Octo...Stormwater Maintenance Awareness Training, Part V: Vegetative Practices, Octo...
Stormwater Maintenance Awareness Training, Part V: Vegetative Practices, Octo...
 
Contractor Awareness Training Vegetative Practices 2016
Contractor Awareness Training Vegetative Practices 2016Contractor Awareness Training Vegetative Practices 2016
Contractor Awareness Training Vegetative Practices 2016
 
Stormwater Maintenance Awareness Training, Part I: Overview, October 6, 2015
Stormwater Maintenance Awareness Training, Part I: Overview, October 6, 2015Stormwater Maintenance Awareness Training, Part I: Overview, October 6, 2015
Stormwater Maintenance Awareness Training, Part I: Overview, October 6, 2015
 
Contractor Awareness Training Stormwater Facilities Introduction 2016
Contractor Awareness Training Stormwater Facilities Introduction 2016Contractor Awareness Training Stormwater Facilities Introduction 2016
Contractor Awareness Training Stormwater Facilities Introduction 2016
 
PIC 2 Display Boards
PIC 2 Display BoardsPIC 2 Display Boards
PIC 2 Display Boards
 
Woodrock retrofit 11-13-14
Woodrock retrofit 11-13-14Woodrock retrofit 11-13-14
Woodrock retrofit 11-13-14
 
Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020
Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020
Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020
 
Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021
Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021
Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021
 
Accotink Tributary at Danbury Forest
Accotink Tributary at Danbury ForestAccotink Tributary at Danbury Forest
Accotink Tributary at Danbury Forest
 
NCASI Presentation: "Managing Risks Associated with Industrial Impoundments" ...
NCASI Presentation: "Managing Risks Associated with Industrial Impoundments" ...NCASI Presentation: "Managing Risks Associated with Industrial Impoundments" ...
NCASI Presentation: "Managing Risks Associated with Industrial Impoundments" ...
 
Stormwater Maintenance Awareness Training 1
Stormwater Maintenance Awareness Training 1Stormwater Maintenance Awareness Training 1
Stormwater Maintenance Awareness Training 1
 
Field Rep Assessments
Field Rep AssessmentsField Rep Assessments
Field Rep Assessments
 
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
 
Environmental Impacts of Groundwater Control and Dewatering
Environmental Impacts of Groundwater Control and DewateringEnvironmental Impacts of Groundwater Control and Dewatering
Environmental Impacts of Groundwater Control and Dewatering
 
Trenchless Rehabilitation of Sewer & Water Networks
Trenchless Rehabilitation of Sewer & Water NetworksTrenchless Rehabilitation of Sewer & Water Networks
Trenchless Rehabilitation of Sewer & Water Networks
 
Rolling meadows ccwd general presentation
Rolling meadows ccwd general presentationRolling meadows ccwd general presentation
Rolling meadows ccwd general presentation
 
Wetlands and Stormwater Management
Wetlands and Stormwater ManagementWetlands and Stormwater Management
Wetlands and Stormwater Management
 

Plus de Fairfax County

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementFairfax County
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS Fairfax County
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22Fairfax County
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxFairfax County
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19 Fairfax County
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationFairfax County
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction ProgressFairfax County
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxFairfax County
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IVFairfax County
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Fairfax County
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxFairfax County
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilFairfax County
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptxFairfax County
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT Fairfax County
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap UpFairfax County
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Fairfax County
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Fairfax County
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectFairfax County
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Fairfax County
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual ArtsFairfax County
 

Plus de Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 

Dernier

Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls ServiceMira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls ServicePriya Reddy
 
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...Sareena Khatun
 
Fuel Cells and Hydrogen in Transportation - An Introduction
Fuel Cells and Hydrogen in Transportation - An IntroductionFuel Cells and Hydrogen in Transportation - An Introduction
Fuel Cells and Hydrogen in Transportation - An IntroductionGlenn Rambach
 
Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...kumargunjan9515
 
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理zubnm
 
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...HyderabadDolls
 
Corporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptxCorporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptxarnab132
 
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery NewsletterYil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery NewsletterNisqually River Council
 
Russian Escort Dubai 0503464457 Dubai Escorts
Russian Escort Dubai 0503464457 Dubai EscortsRussian Escort Dubai 0503464457 Dubai Escorts
Russian Escort Dubai 0503464457 Dubai EscortsMonica Sydney
 
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...kumargunjan9515
 
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptxEllen Book
 
Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.cojitesh
 
Russian Call girls in Dubai 0508644382 Dubai Call girls
Russian Call girls in Dubai 0508644382 Dubai Call girlsRussian Call girls in Dubai 0508644382 Dubai Call girls
Russian Call girls in Dubai 0508644382 Dubai Call girlsMonica Sydney
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...AICCRA
 
Call girl in Sharjah 0503464457 Sharjah Call girl
Call girl in Sharjah 0503464457 Sharjah Call girlCall girl in Sharjah 0503464457 Sharjah Call girl
Call girl in Sharjah 0503464457 Sharjah Call girlMonica Sydney
 
Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...ZAPPAC1
 
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...kumargunjan9515
 
case-study-marcopper-disaster in the philippines.pdf
case-study-marcopper-disaster in the philippines.pdfcase-study-marcopper-disaster in the philippines.pdf
case-study-marcopper-disaster in the philippines.pdfgarthraymundo123
 

Dernier (20)

Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls ServiceMira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
 
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
 
Fuel Cells and Hydrogen in Transportation - An Introduction
Fuel Cells and Hydrogen in Transportation - An IntroductionFuel Cells and Hydrogen in Transportation - An Introduction
Fuel Cells and Hydrogen in Transportation - An Introduction
 
Deforestation
DeforestationDeforestation
Deforestation
 
Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
 
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
 
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
 
Corporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptxCorporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptx
 
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery NewsletterYil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
 
Russian Escort Dubai 0503464457 Dubai Escorts
Russian Escort Dubai 0503464457 Dubai EscortsRussian Escort Dubai 0503464457 Dubai Escorts
Russian Escort Dubai 0503464457 Dubai Escorts
 
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...
 
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
 
Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.
 
Russian Call girls in Dubai 0508644382 Dubai Call girls
Russian Call girls in Dubai 0508644382 Dubai Call girlsRussian Call girls in Dubai 0508644382 Dubai Call girls
Russian Call girls in Dubai 0508644382 Dubai Call girls
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
 
Call girl in Sharjah 0503464457 Sharjah Call girl
Call girl in Sharjah 0503464457 Sharjah Call girlCall girl in Sharjah 0503464457 Sharjah Call girl
Call girl in Sharjah 0503464457 Sharjah Call girl
 
Water Pollution
Water Pollution Water Pollution
Water Pollution
 
Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...
 
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
 
case-study-marcopper-disaster in the philippines.pdf
case-study-marcopper-disaster in the philippines.pdfcase-study-marcopper-disaster in the philippines.pdf
case-study-marcopper-disaster in the philippines.pdf
 

Stormwater Maintenance Awareness Above Ground Facilities parts 1 and 2

  • 1. A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! Stormwater Maintenance Awareness Training For privately maintained stormwater management facilities Maintenance and Stormwater Management Division (MSMD) Winter 2018
  • 2. Stormwater Maintenance Awareness Training MSMD/DPWES Course Schedule AM session (includes two short breaks) – History of SWM and regulations – County inspection basics – The inspection report and MAR – Common SWM/BMP types • Common maintenance items-General – Common SWM/BMP types, deficiencies, and remedies • Above Ground Facilities 12:00-1:00 PM Lunch PM session (includes two short breaks) – Common SWM/BMP types, deficiencies, and remedies • Below Ground Facilities • Vegetative Practices – Closing remarks/questions 2 NOTE: All pictures, unless noted, are the property of Fairfax County.
  • 3. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-General Safety 3 The County’s private inspection program does NOT allow for Confined Space Entry! Please ensure you are properly certified, have the proper entry permits, and are appropriately equipped before entering any applicable confined space!
  • 4. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Ponds (WP, DP) • Wet Ponds (WP) and Dry Ponds (DP) are both depressed basins providing temporary storage for stormwater runoff. – WP are designed to have a permanent pool. – DP basins are designed to usually be dry, except when handling runoff. • Some DP basins may have permanent wet features, including deep cells, micropools, or sediment forebays. 4
  • 5. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Ponds (WP, DP) WET POND COMPONENTS Profile of a typical WP Plan view of WP with sediment forebay and WL 5 Pictures: VDEQ Stormwater Design Specification No. 14, Wet Pond, Version 1.9, 3/1/11, Figure 14.1 “Wet Pond Design Schematics”
  • 6. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Ponds (WP, DP) DRY POND COMPONENTS - Under the new Virginia SWM regulations, Extended Detention Ponds constructed after July 1, 2014 must include, at a minimum, the following components: • Sediment Forebay • Micropool 6 Pictures: VDEQ Stormwater Design Specification No. 15, Dry Pond, Version 1.9, 3/1/11, Figure 15.1 “Typical Extended Detention Pond Details”
  • 7. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Ponds (WP, DP) DRY POND COMPONENTS - Dry Ponds constructed prior to July 1, 2014 are likely to have a simpler profile: 7 LEFT Picture: Page 62, http://www.novaregion.org/DocumentCenter/Home/View/1679
  • 8. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Ponds (WP, DP) Routine Deficiencies Observed: Algae/Turbidity (WP only) 8 Trash rack crushed/damaged, requires replacement BELOW: High turbidity caused by suspended materials (soil, sediment, microbes, etc.) can harm aquatic life, create clogging concerns, and cause build-up. ABOVE: Algal bloom and growth can create significant water quality issues, impacting plant and wildlife, as well as creating visual and odor concerns.
  • 9. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Ponds (WP, DP) Water level inconsistent with plans (WP only) 9 s
  • 10. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Ponds (WP, DP) Trickle Ditches (DP only) 10 TOP RIGHT: Erosion and trenching along the trickle ditch, with some overgrown vegetation BOTTOM RIGHT: Significant spalling and deterioration of concrete in trickle ditch TOP LEFT: Obstruction or blockage in trickle ditch BOTTOM LEFT: Trickle ditch with some significant sediment and debris accumulation
  • 11. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Ponds (WP, DP) Dam/Berm - Erosion and Failure NOTE: Remaining slides apply to both WP and DP 11 BELOW: Erosion of the dam face has led to significant piping (formation of water channels throughout embankment interior) and blockage, requiring immediate attention RIGHT: (Both pictures are from same site) Significant erosion and sloughing of the dam/berm, requiring immediate attention as this can lead to dam failure with increasing area damage
  • 12. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Ponds (WP, DP) Dam/Berm - Cave-Ins and Animal Holes 12 LEFT: Dam/berm cave-ins, possibly caused by pipe joint separation, seepage, and/or problems with the interior dam fill RIGHT: Animal holes on top and side slope of dam/berm
  • 13. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Ponds (WP, DP) Vegetation & Trash/Debris Accumulation 13 RIGHT BOTTOM: Sediment accumulation and debris reduces the holding capacity of the pond and its ability to treat the designed volume of stormwater runoff. BELOW: Large appliance dumping and other trash/debris accumulation from upstream can critically impact facility function & create problems downstream. RIGHT TOP: The riser structure has overgrown vegetation around it.
  • 14. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Ponds (WP, DP) Trees and Woody Vegetation on Dam/Berm 14 Back Face Control Structure No trees or woody vegetation should be on any side of the dam/berm embankment (face, back, top, etc.) *Check site plans for specifics. Pond Floor
  • 15. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Ponds (WP, DP) Riser/Trash Rack 15 Significant sediment & debris accumulation and trash rack damage-requires cleaning and trash rack replacement Trash rack & low-flow orifice plate, if required by site plans, must be installed flush with the riser structure, with no gapping. Here, debris must be cleared, then low-flow orifice plate & trash rack properly re- installed. Missing low-flow orifice plates are a common issue. Inside riser blockage
  • 16. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Ponds (WP, DP) Outfalls 16 Undermining below outfall pipe (can be related to separation at last joint of PSP, etc.) Downstream blockage or impending blockage within 20 feet of outfall structure (potential back up and impact to water flow from the PSP) Erosion at curb cut inflow area, needs repair
  • 17. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Ponds (WP, DP) • Common Remedies – Algal bloom, turbidity, and water level inconsistent with plans (WP only) • Investigate and resolve cause(s), if at all possible – Remove all flow blockages as well as any additional trash, debris, and accumulated sediment – Repair/replace any damaged/missing components • Components vary by facility type and design, and they can range from parts (trash racks, well caps, etc.) to structural (walls, concrete, etc.) to environmental materials (soil, gravel, etc.) – Check approved site plans for specific facility requirements 17
  • 18. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Ponds (WP, DP) • Common Remedies – Repair/replace any damaged/missing components (continued) • For damaged/misaligned pipes: – Reinforce/repair, if possible (Internal bands and gaskets) – Slip-line pipes when possible, as this may be more cost effective – Excavate and replace/reseal, if first two options are not possible – Rebuild/stabilize any areas with erosion, cave-ins, and bare spots: • Cave-ins require additional investigation to determine cause and prevent re-occurrence • Fill-in/stabilize any animal holes, per plan maintenance guidelines, to discourage occupancy and re-occurrence 18
  • 19. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Ponds (WP, DP) • Common Remedies – Cut back overgrown vegetation around facility structures to facilitate access and proper function (WP/DP have special requirements, as noted below) • Remove all trees and woody vegetation from the entire dam embankment: face, back, top, etc. – Check plans for a ‘Planting Plan’ which may have allowed plantings on the dam embankment • Remove overgrown vegetation – Within 25’ radius of channels – Within 10’ from the heel of dam, 10’ from toe of dam – Within inflow/outlet channels – Other areas, as needed, for facility access 19
  • 20. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Wetlands (WL) • Shallow depressions that receive stormwater for water quality treatment by providing an ideal environment for: – Long residence time – Gravitational settling – Biological uptake – Microbial activity • Stormwater management benefits: – Nutrient load removal and reduction • Nitrogen • Phosphorus • Sediment 20 – Runoff volume reduction – Channel protection – Flood mitigation Properly Functioning Example:
  • 21. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Wetlands (WL) • Inflow • Forebay • Weir wall • Permanent pool • Low flow orifice • Riser • Embankment • Outfall • Emergency spillway • Micro-topographic features • Tree peninsulas • High and low marshes • Micropools • Deep pools 21 Picture: VDEQ Stormwater Design Specification No. 13, constructed Wetlands, Version 1.9, 3/1/11, Figure 13.1 “Plan and Cross Sections of Constructed Wetland Level 1 and Level 2 configurations” WETLAND COMPONENTS
  • 22. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Wetlands (WL) 22 Picture: VDEQ Stormwater Design Specification No. 13, constructed Wetlands, Version 1.9, 3/1/11, Figure 13.1 “Plan and Cross Sections of Constructed Wetland Level 1 and Level 2 configurations”
  • 23. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Wetlands (WL) Routine Deficiencies Observed: • Clogging of pipes from sediment, vegetation and debris – If low flow orifice is clogged, it can result in a rapid change in wetland water elevations. • Sedimentation accumulations in forebays and micropools • Erosion and braiding (channel separation and intermixing, sometimes with formation of deposited bars or islands) • Vegetation Issues – Growth over access points – Invasive species – Dead, dying, missing vegetation – Bare spots – Trees and woody vegetation on dam embankment 23
  • 24. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Wetlands (WL) 24 Erosion on the main pool floor Damaged wetland habitat vegetation Sediment and debris in upstream inflows Sediment accumulation in forebays
  • 25. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Wetlands (WL) • Common Remedies – Remedies are the same as for WP/DP (please refer to slides 16-18) – Additional vegetative concerns specific to wetlands: • Remove any non-spec vegetation, especially if it impacts the health and function of the facility, as designed • Replace/replant any dead, dying, or missing wetland vegetation per approved site plans – Cut back overgrown vegetation around facility structures to facilitate access and proper function (WL have special requirements, as noted below) • Remove all trees and woody vegetation from the entire dam embankment: face, back, top, etc. – Check plans for a ‘Planting Plan’ which may have allowed plantings on the dam embankment • Remove overgrown vegetation – Within 10’ of control structure – Within 5’ of all other structures – Within inflow/outlet channels – Other areas, as needed, for facility access 25
  • 26. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities We will finish up Above Ground Facilities after a short BREAK… 26
  • 27. A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! Stormwater Maintenance Awareness Training For privately maintained stormwater management facilities Maintenance and Stormwater Management Division (MSMD) Winter 2018
  • 28. Stormwater Maintenance Awareness Training MSMD/DPWES Course Schedule AM session (includes two 15 minute breaks) – History of SWM and regulations – County inspection basics – The inspection report and MAR – Common SWM/BMP types • Common maintenance items-General – Common SWM/BMP types, deficiencies, and remedies • Above Ground Facilities (the rest of the story….) 12:00-1:00 PM Lunch PM session (includes two 15 minute breaks) – Common SWM/BMP types, deficiencies, and remedies • Below Ground Facilities • Vegetative Practices – Closing remarks/questions 28 NOTE: All pictures, unless noted, are the property of Fairfax County.
  • 29. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Infiltration Trenches (TR) Provides some quantity control & treats runoff through filtration/infiltration 29 May be designed to treat surface runoff or piped drainage (downspouts)
  • 30. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Infiltration Trenches (TR) Properly Functioning Examples: (Typical single-family residential lot facilities) 30 LEFT: Picture shows a gravel infiltration trench with a cleanout and observation well, during a soil probe test. A soil probe is pushed into the underlying gravel layer to determine the topsoil depth and confirm facility is “per design”. Sod cover
  • 31. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Infiltration Trenches (TR) • Topsoil and sod cover (optional) • Observation well with metal cap with lock • Overflow berm • Pea gravel or river stone • Filter fabric layer • Aggregate (1.5 in. – 3.5 in. diameter) • Sand bed (6-8 in. deep) • Perforated underdrain (optional) 31 Picture: VDEQ Stormwater Design Specification No. 8, Infiltration Practices, Version 1.9, 3/1/11 INFILTRATION TRENCH COMPONENTS
  • 32. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Infiltration Trenches (TR) Sediment Accumulation & Curb Cuts 32 TOP LEFT: Some debris and sediment on surface at curb cut BOTTOM LEFT: Curb cut blocked (remove wheel stop) TOP RIGHT: Surface debris & sediment accumulation BOTTOM RIGHT: Sediment accumulation in gravel bed Routine Deficiencies Observed
  • 33. Stormwater Maintenance Awareness Training Above Ground Facilities-Infiltration Trenches (TR) Plantings & Overgrown Vegetation 33 Downed tree limb with deep- rooted/overgrown vegetation Overgrown vegetation within the limits of a gravel bed trench may indicate sediment accumulation, as plants do not tend to grow in clean gravel. Unauthorized plantings MSMD/DPWES
  • 34. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Infiltration Trenches (TR) Turf Covered TRs 34 Some trenches may have turf and topsoil, covering the gravel bed; however, turf is not automatically acceptable. ALWAYS refer to the approved site plan! • A soil probe test checks the gravel layer (refer to slide 4). • Water usually reaches the gravel bed through underground PVC pipes connected to the roof drain downspouts. Common issues include: • Missing underground gravel beds • Disconnected roof downspouts draining overland instead of via an underground pipe • Bare spots/exposed soil in turf covering • Missing berms or observation wells
  • 35. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Infiltration Trenches (TR) Cleanouts/Observation Wells 35 Other common issues: • Caps stuck/not removable • Clogged cleanouts • Presence of standing water in the cleanout Broken/damaged well cap Missing cap
  • 36. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Infiltration Trenches (TR) • Common Remedies – Standing water after 48 hours: • Underdrain may need to be flushed and re-checked – Remove all flow blockages as well as any additional trash, debris, and accumulated sediment • Special attention should be given, as required to gravel beds (surface and within gravel pores) and may require removal/replacement of clogged sections of gravel • Fully remove any plants growing in the accumulated sediments – Full removal includes eliminating roots and supporting soil/sediment from the gravel bed, as spraying weed killer is not a sufficient treatment solution – Rebuild/stabilize any areas with erosion, cave-ins, and bare spots: • Cave-ins require additional investigation to determine cause and prevent re-occurrence 36
  • 37. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Infiltration Trenches (TR) • Common Remedies – Repair/replace any damaged/missing components • Components vary by facility type and design, and they can range from parts to structural to environmental materials (see prior noted examples) – Check approved site plans for specific facility requirements • For damaged/misaligned pipes: – Reinforce/repair, if possible (Internal bands and gaskets) – Slip-line pipes when possible, as this may be most cost effective – Excavate and replace/reseal, if first two options are not possible – Cut back overgrown vegetation around facility structures to facilitate access and proper function 37
  • 38. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Permeable Pavement (PP) • Alternative paving surface which treats runoff through filtration (voids in paved surface), temporary storage (underlying stone reservoir), and infiltration – Includes permeable pavement, pervious concrete, porous asphalt, and permeable pavers – PP promotes a high degree of runoff volume reduction & nutrient removal – Primarily used on commercial, institutional, & residential sites 38 Properly Functioning Examples:
  • 39. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Permeable Pavement (PP) • Observation well • Perforated underdrain • Geotextile (optional) • Bedding Course • Aggregate base • Uncompacted subgrade soil • Permeable joint material (for PICP) 39 PERMEABLE PAVEMENT COMPONENTS
  • 40. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Permeable Pavement (PP) 40 Picture: VDEQ Stormwater Design Specification No. 7, Permeable Pavement, Version 1.8, 3/1/11, Figure 7.1 (as noted) PERMEABLE PAVEMENT COMPONENTS
  • 41. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Permeable Pavement (PP) Routine Deficiencies Observed Pervious Layer 41 Sediment/Silt Weeds/overgrown vegetation Deterioration &/or cracks in pervious layer
  • 42. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Permeable Pavement (PP) Routine Deficiencies Observed Pervious Layer 42 Asphalt Sealed Pavers Clogged
  • 43. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Permeable Pavement (PP) Outfall Structure/Underdrain 43 Damaged underdrains Clogging and/or a potential blockage in the outfall structure/underdrain Blockage in the underdrain
  • 44. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Permeable Pavement (PP) • Common Remedies – Remove all flow blockages as well as any additional trash, debris, and accumulated sediment • Perform a thorough restorative vacuum sweep of paved surface • Investigate the causes of any blockages to prevent re-occurrence, if at all possible. – Repair/replace any damaged/missing components • Components vary by facility type and design, and they can range from parts to structural to environmental materials (see prior noted examples) – Check approved site plans for specific facility requirements • Specific to this facility type: any damaged, cracked, or failing pavers or paved sections 44
  • 45. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Permeable Pavement (PP) • Common Remedies – Rebuild/stabilize any areas of erosion: • Adjoining land erosion can silt in permeable pavement – Remove vegetation in permeable pavement to facilitate proper function • Remove any non-spec vegetation, especially if it impacts the health and function of the facility, as designed. – Sealed permeable pavement requires a complete replacement 45
  • 46. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Rooftop Detention (RT) • Designed to slow the flow from the roof through short-term ponding on the roof surface 46 Properly Functioning Examples of Rooftop Detention Devices: Ring with 1” holes Slotted square detention device Adjustable detention device Custom devices
  • 47. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Rooftop Detention (RT) • Roof drain • Debris cage • Detention cage • Parapet wall • Scupper • Roof access (varies) 47 ROOFTOP DETENTION COMPONENTS
  • 48. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Rooftop Detention (RT) Properly Functioning Examples: Scuppers convey emergency overflow off rooftop 48
  • 49. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Rooftop Detention (RT) Routine Deficiencies Observed Scuppers and Adjustable Detention Devices 49 Scupper not providing proper water detention because it is level with roof Adjustable detention device opened too wide Detention device and debris cage missing Debris cage is damaged and detention device missing Incorrect number of drains and/or scuppers (usually too many)
  • 50. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Rooftop Detention (RT) Parapet Walls, Vegetation, and Detention Devices 50 Parapet wall missing Debris Ponding Sediment Tree growing on roof surface
  • 51. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities-Rooftop Detention (RT) • Common Remedies – Remove all flow blockages as well as any additional trash, debris, and accumulated sediment – Repair/replace any damaged/missing components • Components vary by facility type and design, and they can range from parts to structural to environmental materials (see prior noted examples) – Check approved site plans for specific facility requirements – Remove ANY vegetation around facility structures and on rooftop – Provide required detention flow rate • Replace any missing or damaged detention devices and debris cages • Re-adjust detention devices, as needed • Raise scuppers that are too low or provide detention at the scupper • Repair or install any missing parapet walls • Recalculate the flow based on the actual number of drains to attain the prescribed detention 51
  • 52. Stormwater Maintenance Awareness Training MSMD/DPWES Above Ground Facilities LUNCH! Please be back & ready to start at 1:00 PM 52