AJEDREZ PROJECT 
 ESPIRITU DE LOS ANDES S.A. is an Argentine company focused on the 
exploration, development and exploitation of alluvail ecolgical gold projects 
in the country. 
 AJEDREZ PROJECT is one of most important alluvial gold projects in 
Argentina due to the quality of the ore and the estimate amount of its reserves 
 The Project is located in the well-known Gold District Sierra de La 
Rinconada, in the northwest region of the Province of Jujuy, 300 km away 
from the capital of the province, the City of San Salvador de Jujuy. 
1 
THE PROJECT
AJEDREZ PROJECT 
LOCATION & DISTANCE 
PROVINCE OF JUJUY - ARGENTINA 
70Km. 
25 Km. 
25 Km. 
50Km. 
200Km. 
AJEDREZ 
PROJECT 
LA QUIACA
AJEDREZ PROJECT 
2 Mining Properties 
6.000 Ha 
3.900 m. a. s. l.
AJEDREZ PROJECT 
 Given the characteristics of 
this deposit, it is possible to 
implement conventional 
mechanical methods to 
extract and concentrate gold 
at a very low cost. 
 The main gold reserves of 
the Project are located in the 
river terraces and the 
floodplain. 
4 
THE PROJECT
AJEDREZ PROJECT 
 The average ore grade within these exploration targets is 0,6 g/m3. Areas with 
up to 1,0 g/m3 have also been found. 
 The current exploration area represents approximately 25% of the total 
surface of the Project. Preliminary Studies and previous exploitation work in 
the area allow the estimation of the existence of at least 100,000 troy ounces 
(around 3,000 kg) of gold in this sector of the Project. 
 Due to the almost complete lack of snow season, exploration and exploitation 
activities can be carried out through the entire year. 
5 
THE PROJECT
AJEDREZ PROJECT 
PROVINCE OF JUJUY - ARGENTINA
AJEDREZ PROJECT 
ACCESS & ROADS 
PROVINCE OF JUJUY - ARGENTINA
8 
AJEDREZ PROJECT 
ACCESS & ROADS
AJEDREZ PROJECT 
CERRO OROSMAYO
10 
AJEDREZ PROJECT 
BACKGROUND - EXPLOITATION HISTORICAL SITES
11 
AJEDREZ PROJECT 
BACKGROUND- EXPLOITATION AREAS AT OROSMAYO (2006) 
Mines Alfa, Beta & Gama
AJEDREZ PROJECT 
BACKGROUND - EXPLOITATION AREAS AT OROSMAYO (2006) 
Ciénaga Grande Sector
AJEDREZ PROJECT 
BACKGROUND - EXPLOITATION AREAS AT OROSMAYO (2006) 
Campo Lavadero Sector
AJEDREZ PROJECT 
BACKGROUND - EXPLOITATION AREAS AT OROSMAYO (2006) 
Campo Lavadero Sector 
Delta Mine 
Thickness of the 
Mineralized Sector: 
2 meters (from bottom to top)
AJEDREZ PROJECT 
BACKGROUND – EXPLOITATION AREAS AT OROSMAYO (2006) 
Cortaderoyoc Sector 
Epsilon Mine 
Thickness of the 
Mineralized Sector: 
2 meters (from bottom to top)
16 
AJEDREZ PROJECT 
BACKGROUND- GOLD PANNING AT OROSMAYO RIVER (2006)
17 
AJEDREZ PROJECT 
BACKGROUND- GOLD PANNING AT OROSMAYO RIVER (2006)
AJEDREZ PROJECT 
BACKGROUND- CONCENTRATION PILOT PLANT AT OROSMAYO (2006) 
knelson 32” 
Tromel 
Knelson 10”
AJEDREZ PROJECT 
BACKGROUND- GOLD AT OROSMAYO (2006)
AJEDREZ PROJECT 
 By the end of 2013, ESPIRITU DE LOS ANDES S.A. signed a Joint Venture Contract with 
J.E.M.S.E. (Energy and Mining State Company of the Province of Jujuy), in the pursuit of 
development and growth of both Companies, as well as the economy and welfare of the 
local Communities and the areas of influence where the Project is located. 
20 
PRESENT
AJEDREZ PROJECT 
 During the last two years, 
ESPIRITU DE LOS 
ANDES S.A. has been 
engaged to the intense task 
of socialization with the 
local Communities that 
inhabit the Project area, 
reaching a very positive and 
important Company- 
Community relationship. 
21 
PRESENT
AJEDREZ PROJECT 
 The Environmental Impact Assessment (E.I.A.) of the Project has recently been 
unanimously agreed on and approved by the Provincial Environmental Management 
Unit of Jujuy, Unidad de Gestión Ambiental Provincial (U.G.A.M.P.). This entity is 
formed by more than ten (10) state organizations of the Province of Jujuy, the 
University of Jujuy, the Central Union of Mine Workers and representatives of the 
local communities and indigenous peoples. 
 On May 7th 2014, the Directorate of Mining of the Province of Jujuy approved the 
E.I.A., thus authorizing the exploration activities for the Ajedrez Project. 
22 
PRESENT
23 
AJEDREZ PROJECT 
MINING 
POTENTIAL 
GENERAL 
CONDITIONS 
NETWORKING
AJEDREZ PROJECT 
 Since the approval of the E.I.A., an intense exploration programme is being carried out. 
Its main objective is to confirm the gold potential of the Project and to define its 
economic feasibility as soon as possible: 
- Mineralogical Analysis 
- Granulometric Analysis 
- Sedimentological Analysis 
- Hydrological Survey 
- Geochemical Analysis 
24 
PRESENT
25 
AJEDREZ PROJECT
26 
AJEDREZ PROJECT
AJEDREZ PROJECT 
 A treatment plant will be installed within the Project area, and it will be equipped 
mainly with centrifugal concentrators, with a high recovery rate of very fine ore. 
27 
FUTURE INVESTMENT & EXPLOITATION PLAN
AJEDREZ PROJECT 
 The current design for the Exploitation Stage foresees the monthly production of eight 
(8) to twelve (12) kilograms of gold, with the ore concentration equipment in use. 
 Provided this production rate is maintained, the Project could have a mine life of thirty 
(30) years. 
 Due to the strong commitment to the continuous improvement of the life conditions of 
the Local Communities, the Company is carrying out constant corporate social 
responsibility work. 
 ESPIRITU DE LOS ANDES S.A. plans to start producing ecological gold on the first 
semester of 2015. 
28 
FUTURE INVESTMENT & EXPLOITATION PLAN
AJEDREZ PROJECT 
THANK YOU FOR 
YOUR ATTENTION!!!

Contenu connexe

Similaire à Ajedrez Project | Alluvial Ecological Gold Argentina (2014)

Republic Gold managing director's presentation to AGM Nov 2013
Republic Gold managing director's presentation to AGM Nov 2013Republic Gold managing director's presentation to AGM Nov 2013
Republic Gold managing director's presentation to AGM Nov 2013RepublicGold
 
World’s largest undeveloped tin deposit in Kazakhstan
World’s largest undeveloped tin deposit in KazakhstanWorld’s largest undeveloped tin deposit in Kazakhstan
World’s largest undeveloped tin deposit in KazakhstanSyrymbet JSC
 
Claude Resources Inc. 2012 Year in Review
Claude Resources Inc. 2012 Year in ReviewClaude Resources Inc. 2012 Year in Review
Claude Resources Inc. 2012 Year in ReviewClaude Resources Inc.
 
TNR Gold Presentation October 2014
TNR Gold Presentation October 2014TNR Gold Presentation October 2014
TNR Gold Presentation October 2014Kirill Klip
 
Salazar Resources Corporate Presentation 2017
Salazar Resources Corporate Presentation 2017Salazar Resources Corporate Presentation 2017
Salazar Resources Corporate Presentation 2017Freddy Salazar
 
EraResources_YanderaProject_brochure
EraResources_YanderaProject_brochureEraResources_YanderaProject_brochure
EraResources_YanderaProject_brochureAndre Wessels
 
TNR Gold Presentation January 2015.
TNR Gold Presentation January 2015.TNR Gold Presentation January 2015.
TNR Gold Presentation January 2015.Kirill Klip
 
Dredging and Marine Works (EN) V2015-3
Dredging and Marine Works (EN)  V2015-3Dredging and Marine Works (EN)  V2015-3
Dredging and Marine Works (EN) V2015-3Séamus Day
 
Som ir 14july2021
Som ir 14july2021Som ir 14july2021
Som ir 14july2021AdnetNew
 
wagdy garas CV 1
wagdy garas CV 1wagdy garas CV 1
wagdy garas CV 1Wagdy Garas
 
Andean American - Corporate Presentation (Sept. 2010)
Andean American - Corporate Presentation (Sept. 2010)Andean American - Corporate Presentation (Sept. 2010)
Andean American - Corporate Presentation (Sept. 2010)Andean American Gold
 

Similaire à Ajedrez Project | Alluvial Ecological Gold Argentina (2014) (20)

Minex no. 40
Minex no. 40Minex no. 40
Minex no. 40
 
Republic Gold managing director's presentation to AGM Nov 2013
Republic Gold managing director's presentation to AGM Nov 2013Republic Gold managing director's presentation to AGM Nov 2013
Republic Gold managing director's presentation to AGM Nov 2013
 
ANACONDA_ER_Issue 3 2015_BROCH
ANACONDA_ER_Issue 3 2015_BROCHANACONDA_ER_Issue 3 2015_BROCH
ANACONDA_ER_Issue 3 2015_BROCH
 
World’s largest undeveloped tin deposit in Kazakhstan
World’s largest undeveloped tin deposit in KazakhstanWorld’s largest undeveloped tin deposit in Kazakhstan
World’s largest undeveloped tin deposit in Kazakhstan
 
Claude Resources Inc. 2012 Year in Review
Claude Resources Inc. 2012 Year in ReviewClaude Resources Inc. 2012 Year in Review
Claude Resources Inc. 2012 Year in Review
 
TNR Gold Presentation October 2014
TNR Gold Presentation October 2014TNR Gold Presentation October 2014
TNR Gold Presentation October 2014
 
Salazar Resources Corporate Presentation 2017
Salazar Resources Corporate Presentation 2017Salazar Resources Corporate Presentation 2017
Salazar Resources Corporate Presentation 2017
 
EraResources_YanderaProject_brochure
EraResources_YanderaProject_brochureEraResources_YanderaProject_brochure
EraResources_YanderaProject_brochure
 
TNR Gold Presentation January 2015.
TNR Gold Presentation January 2015.TNR Gold Presentation January 2015.
TNR Gold Presentation January 2015.
 
ALTOS DE LIPANGUE PROJECT
ALTOS DE LIPANGUE PROJECTALTOS DE LIPANGUE PROJECT
ALTOS DE LIPANGUE PROJECT
 
MINE PLANNING
MINE PLANNINGMINE PLANNING
MINE PLANNING
 
Dredging and Marine Works (EN) V2015-3
Dredging and Marine Works (EN)  V2015-3Dredging and Marine Works (EN)  V2015-3
Dredging and Marine Works (EN) V2015-3
 
58
5858
58
 
Som ir 14july2021
Som ir 14july2021Som ir 14july2021
Som ir 14july2021
 
wagdy garas CV 1
wagdy garas CV 1wagdy garas CV 1
wagdy garas CV 1
 
Ksm project group 3
Ksm project  group 3Ksm project  group 3
Ksm project group 3
 
Aa ggold presentation 10 4-10
Aa ggold presentation 10 4-10Aa ggold presentation 10 4-10
Aa ggold presentation 10 4-10
 
Andean American - Corporate Presentation (Sept. 2010)
Andean American - Corporate Presentation (Sept. 2010)Andean American - Corporate Presentation (Sept. 2010)
Andean American - Corporate Presentation (Sept. 2010)
 
Aa ggold 13-10-10 pdf
Aa ggold 13-10-10 pdfAa ggold 13-10-10 pdf
Aa ggold 13-10-10 pdf
 
Castor project
Castor projectCastor project
Castor project
 

Plus de Federation of Indian Chambers of Commerce & Industry (FICCI)

Plus de Federation of Indian Chambers of Commerce & Industry (FICCI) (20)

ANNUAL FIBAC PRODUCTIVITY REPORT ON INDIAN BANKING INDUSTRY, 2018
ANNUAL FIBAC PRODUCTIVITY REPORT ON INDIAN BANKING INDUSTRY, 2018ANNUAL FIBAC PRODUCTIVITY REPORT ON INDIAN BANKING INDUSTRY, 2018
ANNUAL FIBAC PRODUCTIVITY REPORT ON INDIAN BANKING INDUSTRY, 2018
 
FICCI | "One Year of GST" Survey 2018
FICCI | "One Year of GST" Survey 2018FICCI | "One Year of GST" Survey 2018
FICCI | "One Year of GST" Survey 2018
 
Opportunities and Financing Outlook for Aviation sector
Opportunities and Financing Outlook for Aviation sectorOpportunities and Financing Outlook for Aviation sector
Opportunities and Financing Outlook for Aviation sector
 
Sustainable Development Goals - Linkages with corporate actions in India
Sustainable Development Goals - Linkages with corporate actions in IndiaSustainable Development Goals - Linkages with corporate actions in India
Sustainable Development Goals - Linkages with corporate actions in India
 
FICCI-Avalon Non-ferrous Metals industry report 2018
FICCI-Avalon Non-ferrous Metals industry report 2018FICCI-Avalon Non-ferrous Metals industry report 2018
FICCI-Avalon Non-ferrous Metals industry report 2018
 
Industry Survey Report on GST
Industry Survey Report on GST Industry Survey Report on GST
Industry Survey Report on GST
 
Medical Device Conference 2018: CEO Speak
Medical Device Conference 2018: CEO SpeakMedical Device Conference 2018: CEO Speak
Medical Device Conference 2018: CEO Speak
 
Trends & Opportunities for Indian Pharma
Trends & Opportunities for Indian PharmaTrends & Opportunities for Indian Pharma
Trends & Opportunities for Indian Pharma
 
FICCI IBA Bankers' Survey
FICCI IBA Bankers' Survey FICCI IBA Bankers' Survey
FICCI IBA Bankers' Survey
 
FICCI's Voice (December 2017)
FICCI's Voice (December 2017)FICCI's Voice (December 2017)
FICCI's Voice (December 2017)
 
FICCI Economic Outlook Survey | November 2017
FICCI Economic Outlook Survey | November 2017 FICCI Economic Outlook Survey | November 2017
FICCI Economic Outlook Survey | November 2017
 
FICCI Manufacturing Survey Report - July 2017
FICCI Manufacturing Survey Report -  July 2017FICCI Manufacturing Survey Report -  July 2017
FICCI Manufacturing Survey Report - July 2017
 
FICCI's Voice, May, 2017
FICCI's Voice, May, 2017FICCI's Voice, May, 2017
FICCI's Voice, May, 2017
 
FICCI Business Confidence Survey | January 2017
FICCI Business Confidence Survey | January 2017FICCI Business Confidence Survey | January 2017
FICCI Business Confidence Survey | January 2017
 
FICCI Economic Outlook Survey | January 2017
FICCI Economic Outlook Survey | January 2017FICCI Economic Outlook Survey | January 2017
FICCI Economic Outlook Survey | January 2017
 
FICCI IBA Bankers Survey Report | July - December 2016
FICCI IBA Bankers Survey Report | July - December 2016FICCI IBA Bankers Survey Report | July - December 2016
FICCI IBA Bankers Survey Report | July - December 2016
 
FICCI's Voice (December 2016)
FICCI's Voice (December 2016)FICCI's Voice (December 2016)
FICCI's Voice (December 2016)
 
FICCI Business Confidence Survey | October 2016
FICCI Business Confidence Survey | October 2016FICCI Business Confidence Survey | October 2016
FICCI Business Confidence Survey | October 2016
 
FICCI's Voice
FICCI's VoiceFICCI's Voice
FICCI's Voice
 
FICCI Voice
FICCI VoiceFICCI Voice
FICCI Voice
 

Ajedrez Project | Alluvial Ecological Gold Argentina (2014)

  • 1.
  • 2. AJEDREZ PROJECT  ESPIRITU DE LOS ANDES S.A. is an Argentine company focused on the exploration, development and exploitation of alluvail ecolgical gold projects in the country.  AJEDREZ PROJECT is one of most important alluvial gold projects in Argentina due to the quality of the ore and the estimate amount of its reserves  The Project is located in the well-known Gold District Sierra de La Rinconada, in the northwest region of the Province of Jujuy, 300 km away from the capital of the province, the City of San Salvador de Jujuy. 1 THE PROJECT
  • 3. AJEDREZ PROJECT LOCATION & DISTANCE PROVINCE OF JUJUY - ARGENTINA 70Km. 25 Km. 25 Km. 50Km. 200Km. AJEDREZ PROJECT LA QUIACA
  • 4. AJEDREZ PROJECT 2 Mining Properties 6.000 Ha 3.900 m. a. s. l.
  • 5. AJEDREZ PROJECT  Given the characteristics of this deposit, it is possible to implement conventional mechanical methods to extract and concentrate gold at a very low cost.  The main gold reserves of the Project are located in the river terraces and the floodplain. 4 THE PROJECT
  • 6. AJEDREZ PROJECT  The average ore grade within these exploration targets is 0,6 g/m3. Areas with up to 1,0 g/m3 have also been found.  The current exploration area represents approximately 25% of the total surface of the Project. Preliminary Studies and previous exploitation work in the area allow the estimation of the existence of at least 100,000 troy ounces (around 3,000 kg) of gold in this sector of the Project.  Due to the almost complete lack of snow season, exploration and exploitation activities can be carried out through the entire year. 5 THE PROJECT
  • 7. AJEDREZ PROJECT PROVINCE OF JUJUY - ARGENTINA
  • 8. AJEDREZ PROJECT ACCESS & ROADS PROVINCE OF JUJUY - ARGENTINA
  • 9. 8 AJEDREZ PROJECT ACCESS & ROADS
  • 11. 10 AJEDREZ PROJECT BACKGROUND - EXPLOITATION HISTORICAL SITES
  • 12. 11 AJEDREZ PROJECT BACKGROUND- EXPLOITATION AREAS AT OROSMAYO (2006) Mines Alfa, Beta & Gama
  • 13. AJEDREZ PROJECT BACKGROUND - EXPLOITATION AREAS AT OROSMAYO (2006) Ciénaga Grande Sector
  • 14. AJEDREZ PROJECT BACKGROUND - EXPLOITATION AREAS AT OROSMAYO (2006) Campo Lavadero Sector
  • 15. AJEDREZ PROJECT BACKGROUND - EXPLOITATION AREAS AT OROSMAYO (2006) Campo Lavadero Sector Delta Mine Thickness of the Mineralized Sector: 2 meters (from bottom to top)
  • 16. AJEDREZ PROJECT BACKGROUND – EXPLOITATION AREAS AT OROSMAYO (2006) Cortaderoyoc Sector Epsilon Mine Thickness of the Mineralized Sector: 2 meters (from bottom to top)
  • 17. 16 AJEDREZ PROJECT BACKGROUND- GOLD PANNING AT OROSMAYO RIVER (2006)
  • 18. 17 AJEDREZ PROJECT BACKGROUND- GOLD PANNING AT OROSMAYO RIVER (2006)
  • 19. AJEDREZ PROJECT BACKGROUND- CONCENTRATION PILOT PLANT AT OROSMAYO (2006) knelson 32” Tromel Knelson 10”
  • 20. AJEDREZ PROJECT BACKGROUND- GOLD AT OROSMAYO (2006)
  • 21. AJEDREZ PROJECT  By the end of 2013, ESPIRITU DE LOS ANDES S.A. signed a Joint Venture Contract with J.E.M.S.E. (Energy and Mining State Company of the Province of Jujuy), in the pursuit of development and growth of both Companies, as well as the economy and welfare of the local Communities and the areas of influence where the Project is located. 20 PRESENT
  • 22. AJEDREZ PROJECT  During the last two years, ESPIRITU DE LOS ANDES S.A. has been engaged to the intense task of socialization with the local Communities that inhabit the Project area, reaching a very positive and important Company- Community relationship. 21 PRESENT
  • 23. AJEDREZ PROJECT  The Environmental Impact Assessment (E.I.A.) of the Project has recently been unanimously agreed on and approved by the Provincial Environmental Management Unit of Jujuy, Unidad de Gestión Ambiental Provincial (U.G.A.M.P.). This entity is formed by more than ten (10) state organizations of the Province of Jujuy, the University of Jujuy, the Central Union of Mine Workers and representatives of the local communities and indigenous peoples.  On May 7th 2014, the Directorate of Mining of the Province of Jujuy approved the E.I.A., thus authorizing the exploration activities for the Ajedrez Project. 22 PRESENT
  • 24. 23 AJEDREZ PROJECT MINING POTENTIAL GENERAL CONDITIONS NETWORKING
  • 25. AJEDREZ PROJECT  Since the approval of the E.I.A., an intense exploration programme is being carried out. Its main objective is to confirm the gold potential of the Project and to define its economic feasibility as soon as possible: - Mineralogical Analysis - Granulometric Analysis - Sedimentological Analysis - Hydrological Survey - Geochemical Analysis 24 PRESENT
  • 28. AJEDREZ PROJECT  A treatment plant will be installed within the Project area, and it will be equipped mainly with centrifugal concentrators, with a high recovery rate of very fine ore. 27 FUTURE INVESTMENT & EXPLOITATION PLAN
  • 29. AJEDREZ PROJECT  The current design for the Exploitation Stage foresees the monthly production of eight (8) to twelve (12) kilograms of gold, with the ore concentration equipment in use.  Provided this production rate is maintained, the Project could have a mine life of thirty (30) years.  Due to the strong commitment to the continuous improvement of the life conditions of the Local Communities, the Company is carrying out constant corporate social responsibility work.  ESPIRITU DE LOS ANDES S.A. plans to start producing ecological gold on the first semester of 2015. 28 FUTURE INVESTMENT & EXPLOITATION PLAN
  • 30. AJEDREZ PROJECT THANK YOU FOR YOUR ATTENTION!!!

Notes de l'éditeur

  1. EPSILON Y OMEGA
  2. EPSILON Y OMEGA