Cautionary Statement
                           Regarding Forward-looking Statements
This presentation includes forward-looking statements and projections, made in reliance on the safe harbor provisions of the Private Securities Litigation
Reform Act of 1995. The company has made every reasonable effort to ensure that the information and assumptions on which these statements and
projections are based are current, reasonable, and complete. However, a variety of factors could cause actual results to differ materially from the
projections, anticipated results or other expectations expressed in this presentation, including, without limitation, changes in unaudited and/or unreviewed
financial information; our ability to implement and achieve our objectives in the 2008 plan, including earnings and cash flow targets; the effects of any
changes in accounting rules and guidance; our ability to meet production volume targets in our E&P segment; uncertainties and potential consequences
associated with the outcome of governmental investigations, including, without limitation, those related to the reserve revisions; outcome of litigation; our
ability to comply with the covenants in our various financing documents; our ability to obtain necessary governmental approvals for proposed pipeline
projects and our ability to successfully construct and operate such projects; the risks associated with recontracting of transportation commitments by our
pipelines; regulatory uncertainties associated with pipeline rate cases; actions by the credit rating agencies; the successful close of our financing
transactions; our ability to successfully exit the energy trading business; our ability to close our announced asset sales on a timely basis; changes in
commodity prices and basis differentials for oil, natural gas, and power and relevant basis spreads; inability to realize anticipated synergies and cost
savings associated with restructurings and divestitures on a timely basis; general economic and weather conditions in geographic regions or markets
served by the company and its affiliates, or where operations of the company and its affiliates are located; the uncertainties associated with governmental
regulation; political and currency risks associated with international operations of the company and its affiliates; competition; and other factors described
in the company’s (and its affiliates’) Securities and Exchange Commission filings. While the company makes these statements and projections in good
faith, neither the company nor its management can guarantee that anticipated future results will be achieved. Reference must be made to those filings for
additional important factors that may affect actual results. The company assumes no obligation to publicly update or revise any forward-looking
statements made herein or any other forward-looking statements made by the company, whether as a result of new information, future events, or
otherwise.

Certain of the production information in this presentation include the production attributable to El Paso’s 49 percent interest in Four Star Oil & Gas
Company (“Four Star”). El Paso’s Supplemental Oil and Gas disclosures, which are included in its Annual Report on Form 10-K, reflect its proportionate
share of the proved reserves of Four Star separate from its consolidated proved reserves. In addition, the proved reserves attributable to its proportionate
share of Four Star represent estimates prepared by El Paso and not those of Four Star.

Cautionary Note to U.S. Investors—The United States Securities and Exchange Commission permits oil and gas companies, in their filings with the SEC, to
disclose only proved reserves that a company has demonstrated by actual production or conclusive formation tests to be economically and legally
producible under existing economic and operating conditions. We use certain terms in this presentation that the SEC's guidelines strictly prohibit us from
including in filings with the SEC. U.S. Investors are urged to consider closely the disclosures regarding proved reserves in this presentation and the
disclosures contained in our Form 10-K for the year ended December 31, 2007, File No. 001-14365, available by writing; Investor Relations, El Paso
Corporation, 1001 Louisiana St., Houston, TX 77002. You can also obtain this form from the SEC by calling 1-800-SEC-0330.

Non-GAAP Financial Measures
This presentation includes certain Non-GAAP financial measures as defined in the SEC’s Regulation G. More information on these Non-GAAP financial
measures, including EBIT and the required reconciliations under Regulation G, are set forth in this presentation or in the appendix hereto. El Paso defines
Resource Potential as subsurface volumes of oil and natural gas the company believes may be present and eventually recoverable. The company utilizes
a net, geologic risk mean to represent this estimated ultimate recoverable amount.

                                                                                                                                                          2
Sustainable Long-Term Growth




            Pipelines                                                  E&P
  6%–8% EBIT Growth 2007–2012                        8%–12% production growth 2007–2010

                                                            • 2.8 Tcfe proved reserves*
   • Unprecedented infrastructure
     opportunities                                          • Multi-year drilling inventory
   • Committed project inventory
     nearly $4 billion



*Post 2008 divestitures—Includes proportionate share of Four Star                             3
Outlook Favors Both Businesses



                                            Pipelines
Favorable Macro Outlook
                                            • Assets well positioned
• Increasing demand for natural gas
                                               – Rockies expansions: CIG, WIC, Ruby
• Strong commodity prices
                                               – LNG related: Elba Express, Cypress
• Infrastructure opportunities with
  shifting supply source
                                            E&P
Environmental                               • Improved portfolio
• Carbon emissions                          • Increased profitability
• Power generation turning to natural gas   • Drilling success




                                                                                  4
El Paso Pipeline Group
                 North America’s Leading Natural Gas Pipeline Company

                                                                                     Tennessee
                                              Wyoming                                Gas Pipeline
                      Colorado                Interstate
                   Interstate Gas
                                                          Cheyenne
   Mojave                                               Plains Pipeline                         Southern
   Pipeline                                                                                    Natural Gas



                                                                                                      Elba Island
                                                                                                         LNG
           El Paso
          Natural Gas


                                       Mexico                             Gulf LNG             Florida Gas
                                      Ventures                             (50%)           Transmission (50%)

                    • 19% of total U.S. interstate pipeline mileage
                    • 24 Bcf/d capacity (16% of total U.S.)
                    • 17 Bcf/d throughput (28% of gas delivered to U.S. consumers)

Source: El Paso Corporation based on 2007 data
                                                                                                                5
Note: Includes El Paso Corporation and El Paso Pipeline Partners, L.P.
The Enduring Value of
                            “Last Mile” and “First Mile” Service

      Integrated with            Point-to-Point      Integrated with
         Suppliers               Transportation          Markets

               Pipeline
                                                        LDC Citygate

                      Storage
                                                      Storage
                                           Market
                                Supply
                LNG
Wellheads
                                            Hub
                                 Hub
                                                        Direct Connects
                                                    (Industrial, Power Gen)
              Processing
                                                    Pipelines



                                    Commodity
            High Value                                   High Value
                                     Service


                                                                              6
Excellent Connectivity in Markets
          ID                                                          VT
                                  SD
                                                                           NH
               WY                 NE

                                                                                     Boston
                                                                           MA
                                                               NY
                                                                                RI
                                                                           CT
                    Denver
          UT
                    CO
                                                                    NJ New York
                                                            PA
• 66 supply meters in the Rockies
• 110 delivery meters along the Front Range        • 97 delivery meters into 26 LDCs


                             UT
         NV                                                                          SC
                                                                       Atlanta
                                                    Birmingham


        CA            AZ          NM
                    Phoenix                                                 GA
                                                          AL


                                                                                FL

  • 348 delivery meters in Arizona            • 155 delivery meters into Alagasco and AGL
Committed Growth Backlog
                                                           Approaching $4 Billion

                                               WIC Medicine Bow                                                            TGP Concord
                                                  Expansion                                                                   $21 MM
                                                    $32 MM                                                                   Nov 2009
                                                   July 2008
     CIG High Plains Pipeline                                                                                               30 MMcf/d
                                                  330 MMcf/d
         $196 MM (100%)
         November 2008
                                                          WIC Piceance
           900 MMcf/d
                                                             Lateral
                                CP Coral Expansion                                                                  Elba Expansion III &
                                                             $62 MM          SNG SESH –Phase I
                                     $23 MM                                                                            Elba Express
                                                            4Q 2009              $137 MM
        CIG Totem Storage           July 2008                                                                           $1.1 Billion
                                                           219 MMcf/d            Jun 2008
         $120 MM (100%)             70 MMcf/d                                                                            2010–2013
                                                                                140 MMcf/d
            July 2009
                                                                                                                          1.2 Bcf/d
           200 MMcf/d

                                                                                                                  SNG Cypress Phase II & III
                                                                                                                       $20 MM/$82 MM
                                                                                                                     May 2008/ Jan 2011
                                                                  TGP Carthage                                     114 MMcf/d/ 161 MMcf/d
                                                                   Expansion
                                                                     $39 MM
                                                                    May 2009
                                                                   100 MMcf/d
                                                                                                              SNG South System III/
                                                                                                                  SESH Phase II
                                                                                          Gulf LNG              $286 MM/ $33 MM
                                                                                     $1.1 Billion (100%)           2010–2012
                                                                                          Oct 2011            375 MMcf/d/ 360MMcfd
         El Paso Pipeline Partners                                                        1.3 Bcf/d

         El Paso                                                                                      FGT Phase VIII
                                                                                                        Expansion
                                                                                                     $2+ Billion (100%)
                                                                                                            2011
                                                                                                         0.8 Bcf/d




                                                                                                                                           8
Note: El Paso Pipeline Partners owns 10% of SNG and CIG
Market Demand Driving Pipeline Growth
                                     Florida Gas Transmission VIII Project
 Natural Gas Demand                                               Proposed Pipeline Expansion
     Growth (Bcf)                                                 FGT


           Florida
   4.0

   3.0

                                  $2+ billion (100%)
   2.0                          •
                                • 50% EP, 50% SUG
   1.0
                                • 500 miles
   0.0
                                • 0.8 Bcf/d capacity                                 FL
          2007     2017
                                • PA with FPL for 0.4 Bcf/d for
                                  25-year term
     Power generation
                                • 2011 in-service
     Residential, Commercial,
     & Industrial



                                                                                                9
Source: EEA/ICF
Leveraging LNG Experience
         Elba Island LNG                                      Gulf LNG
             Savannah, GA                                   Pascagoula, MS




• $1.1 billion terminal expansion and           • $1.1 Billion (100%); 50% EP
  Elba Express Pipeline                         • $870 MM non-recourse financing
                                                  completed
• 8.4 Bcf incremental storage capacity
                                                • 1.3 Bcf/d base sendout
• 0.9 Bcf/d incremental send-out capacity
                                                • Fully contracted with Angola LNG and ENI
• Fully contracted with Shell and BG
                                                • EPC with Aker Kvaerner
• Current expansion will double facility        • 2011 In-service


   Investing more than $2 billion on LNG and related projects
                                                                                             10
De-risking of Backlog Capital Costs
     Typical Pipeline Capex Breakdown


30%–35%           35%–40%                   25%–35%

 • Pipe      • Contractor-related           • Right-of-way
                                            • Other

                          Primary Party
            $ Billion   At-Risk for Capex
              $1.7          Contractor
               0.8          Customer
               1.4          El Paso
              $3.9

                                                             11
El Paso Pipeline Partners
                                            • Primary focus is natural gas transmission
                                              and storage assets
                                            • Three FERC regulated interstate pipelines:
                                               – 100% of WIC: 800 miles, 2.7 Bcf/d
                                               – 10% of CIG: 4,000 miles, 3.0 Bcf/d
                                               – 10% of SNG: 7,600 miles, 3.7 Bcf/d
                                            • Demand-based revenues from high-quality
                                              customers with strong credit profiles
                                            • Several organic expansions underway




   WIC
                                      SNG
   CIG

Diverse, Growing Supply Regions   High Connectivity to Growing Markets
                                                                                           12
Pipeline Summary

• High-quality, committed growth backlog
  – Approaching $4 billion

• Focus on project execution
• Manage capital costs
• Long-term EBIT growth expectation 6%–8%
  – Higher with continued success


                                                  13
Total Company
                                                Top 10 Domestic Independent
  • Well-situated in key U.S. basins
  • Focused on unconventional and
    low-risk conventional programs                                                                         Nile
                                                           Onshore-US                                      Delta
  • ~80% natural gas                                                                                                  Sinai
                                                  • Primarily coal seam and                                        Gulf
  • 97% drilling success rate                                                                         Egypt          of
                                                    tight-gas programs                                 Egypt
  • 2.8 Tcfe of proved reserves                                                                                         Suez
                                                  • Low to medium risk
  • 798 MMcfe/d of production
                                                    repeatable plays
  • 9.6-year reserve life
                                                  • 98% drilling success rate                            Egypt
                                                  • 2.4 Tcfe of proved reserves
                                                                                                • Onshore conventional
                                                  • 650 MMcfe/d of production
                                                                                                  exploration
                                                  • 10.1-year reserve life
             Brazil
                                                                                                • 1 MM acres
                                                                                                • First drilling 2H 2008
                      Rio de
                      Janeiro
                                                                                                        GOM
             Brazil
                                                                                          • Medium to high-risk exploration
• 2 discoveries in 2007
                                                                                          • Large acreage position
• 15,000–20,000 BOE/d
                                                                                          • 46% success rate in 2007
  beginning 2H 2009
                                                                                          • 152 Bcfe of proved reserves
• 20 undrilled prospects
                                                                                          • 133 MMcfe/d of production
• 247 Bcfe of proved reserves
                                                                                          • 3.1-year reserve life
• 14 MMcfe/d of production

 Note: All data is pro forma 2007 to exclude production and reserves related to properties divested
       in 2008 and to include a full year of production from our Peoples acquisition in 2007                                   14
High Grading Our Portfolio

• Divested 309 Bcfe of properties for $845 MM (sales price
  and assumed asset retirement obligation)—$2.73/Mcfe

  – Low inventory, high operating costs

• Purchased Peoples Energy Production for $887 MM

• End result—more focused; more profitable, faster growing;
  added 450 total gross drilling locations




                                                              15
Reserves More Weighted to Onshore Region
                                                             2007 Post
         2007 YE Reported                                   Divestitures
                                                  GOM/SLA
 GOM/SLA
                                                    5%        INTL
                  INTL
   9%
                                                               9%
                   8%


                                                       TGC
                                                       16%
         TGC                 Onshore                                 Onshore
         18%                  65%                                     70%




                  3.1 Tcfe                                    2.8 Tcfe
Note: Includes proportionate share of Four Star                                16
E&P Production
                      Solid Growth Trajectory Through 2010
MMcfe/d

                                                                           R
                                                                CAG
                                                          %–12%
                                                        8

                                                 870–930
        862
                              798




                                                   20082
        2007                 2007                                        2009            2010
                          Pro Forma1

Note: Includes proportionate share of Four Star
1 Excludes volumes from domestic assets sold; assumes full year of Peoples

                                                                                                17
2 Assumes 25 MMcfe/d annualized contributed by the divestiture assets prior to closing
E&P Profitability
                                            Growing Faster Than Peers
EBITDA*/Mcfe, Including Hedging
                                                                                         $5.75–
           $6.04                                                                          $6.00
                                                        $5.84                 $5.61
                                            $5.58
                       $4.82




                  2006                            2007A                                2008E

                                          Peer Average              El Paso


 Peer group: APA, APC, CHK, DVN, EOG, FST, NBL, NFX, PXD, PXD, XEC, XTO
 Actual results from Peer company reports for 2006 and 2007; Analyst 2008E
 * EBITDA excludes exploration and dry hole expense for successful efforts companies
                                                                                                  18
Significant Undrilled Inventory
                                                •   6.1 Tcfe unrisked non-proved resources
                                                                                                      3,400
                                                •   2.8 Tcfe risked non-proved resources
                                                •   Risked resources grew 12% in 2007
      Resource Potential (Bcfe)




                                                •   Excludes domestic divestiture properties
                                   Non-Proved
                                   Risked
                                   Unrisked                                    2,130

                                                                        1,460

                                  869                                                           835
                                                       495 530


                                  PUD*              Unconventional      Conventional           Conventional
                                                                         Low-Risk              Higher-Risk
                                                     Raton, Arkoma,
                                                     Black Warrior,    Arklatex, Rockies,        GOM, TGC,
                                                      New Albany          TGC, Brazil          Int’l Exploration,
                                                                                                 Brazil, Egypt

*As of 12/31/07 and Includes proportionate share of Four Star                                                       19
Arklatex

                               AK
                                                             Production
                                                               (MMcfe/d)
                               Vacherie Dome/       200
                                 Bear Creek
                                                    150
                TX
Minden/SE                                           100
Brachfield
                                 LA                  50
                                                      0
                               Holly/Bethany
                                                          2006 2007 2008 2009 2010
                            Longstreet/Logansport

     Program Statistics:                             2008 Plan:
        1,047 operating wells                           111 gross wells
        80% avg. WI                                     $319 MM net capital
        426 PUD locations
        222 Bcfe PUD reserves                        Value Upside:
        404 non-proved locations                        Cotton Valley Horizontals
        540 Bcfe unrisked resource potential            Haynesville Shale
        504 Bcfe risked resource potential              Infill potential
        11 R/P                                                                       20
Arklatex Economics

      Objective: Hosston, Cotton Valley                                                                     Hosston
                                                                                                            8,500 ft.
      Depth:           7,500'–12,800'
      Well costs: $2.5 MM–$3.1 MM                                                                           Cotton Valley
                                                                                                            10,500 ft.
      Reserves: 1.0–1.4 Bcfe
      Initial prod: 1–5 MMcfe/d
                                                                                   Type Curve
      Spacing:         40–80 acres                                1,000
                                                                   800
      IRR:             20%–30%
                                                         Mcfe/d

                                                                   600
      PVR:             1.15–1.25                                   400
                                                                   200
      F&D:             $2.70–$3.10/Mcfe
                                                                     0
                                                                          1   2   3   4   5   6   7   8   9 10
                                                                                  Normalized Years
                                                                                                                            21
Note: PVR and rate of return based on $7.50 MMBtu and $70.00/Bbl
Haynesville Shale Play Outline—North Louisiana

                                                    Approx. 36,000Claiborne
                                                                   gross/
                                                     Webster
                  Marion
                                                     27,000 net acres of
                              Caddo
                                                     Haynesville leases
                                          Bossier
                   Chesapeake                        Petrohawk
       TX           Discovery
                                                     Discovery
       Harrison



                                                                 Bienville
                                                    LA

                                                     Red River
       Panola


                                                                  Encana Test
                                      Desoto

   Comstock
     Test
                                                          Natchitoches
                     Shelby

                                                                                22
E&P Summary

• E&P better positioned post high grading

• Greater Onshore focus

• More profitable

• Deeper inventory

• Visible 8% – 12% multi-year production growth


          E&P moving towards top-tier performance

                                                      23
2008 Natural Gas and
                                                                        Oil Hedge Positions
Positions as of April 4, 2008
(Positions are for full-year 2008)
                                                   188 TBtu
                                           Average cap $10.21/MMBtu
               Ceiling

                                     155 TBtu                          33 TBtu
   2008 Gas                       $10.75 ceiling/                         $7.65
                                    $8.00 floor                        fixed price

                Floors
                                                   188 TBtu
                                                                                      Balance at
                                           Average floor $7.94/MMBtu
                                                                                     Market Price
                                                  4.0 MMBbls
               Ceiling
                                             Average cap $82.76/Bbl

                                                                      3.1 MMBbls
                                 0.9 MMBbls
    2008 Oil                                                              $90.48
                                  $57.03 ceiling/
                                                                       fixed price
                                   $55.00 floor

                Floors
                                                 4.0 MMBbls
                                            Average floor $82.29/Bbl


                                                                                                    24
  Note: See full Production-Related Derivative Schedule in Appendix
Substantial Leverage to
                                                 Higher Commodity Prices
$ Earnings Per Share
                                                                   $1.62–
                                                                    $1.72
                                          Current
          $1.70                                       $1.44–
                                          Market
                                                       $1.54
          $1.50                           $1.25–
                      Base Case
                                           $1.35
          $1.30
                       $1.00–
                        $1.10
          $1.10

          $0.90

          $0.70

          $0.50
                      Assumes            Assumes      Assumes      Assumes
                      $7.50 Gas          $9.00 Gas   $10.00 Gas   $11.00 Gas


                                                                               25
 Note: All data includes $70.00 WTI assumption
El Paso Offers Sustainable Long-Term Growth

• Focus on growth opportunities
• Pipelines working to expand committed inventory
• E&P more profitable, more focused, increased
  opportunities post high grading
• Committed to grow El Paso Pipeline Partners
• Visible multi-year growth for both businesses
  – Pipelines 6%–8% EBIT growth
  – E&P 8%–12% production growth

                                                    26
a meaningful company
doing meaningful work
delivering meaningful results

                                                     Doug Foshee
                                President and Chief Executive Officer
                                Howard Weil Energy Conference
                                                         April 8, 2008
Appendix




           28
Disclosure of Non-GAAP
                                                               Financial Measures
The SEC’s Regulation G applies to any public disclosure or release of material information that includes a non-GAAP
financial measure. In the event of such a disclosure or release, Regulation G requires (i) the presentation of the most
directly comparable financial measure calculated and presented in accordance with GAAP and (ii) a reconciliation of
the differences between the non-GAAP financial measure presented and the most directly comparable financial
measure calculated and presented in accordance with GAAP. The required presentations and reconciliations are
provided herein.

El Paso uses the non-GAAP financial measure “earnings before interest expense and income taxes” or “EBIT” to
assess the operating results and effectiveness of the company and its business segments. The company defines EBIT
as net income (loss) adjusted for (i) items that do not impact its income (loss) from continuing operations, such as
extraordinary items, discontinued operations, and the impact of accounting changes; (ii) income taxes; (iii) interest and
debt expense; and (iv) distributions on preferred interests of consolidated subsidiaries. The company excludes interest
and debt expense and distributions on preferred interests of consolidated subsidiaries so that investors may evaluate
the company’s operating results without regard to its financing methods or capital structure. EBITDA is defined as
EBIT plus depreciation, depletion, and amortization. El Paso’s business operations consist of both consolidated
businesses as well as substantial investments in unconsolidated affiliates. As a result, the company believes that EBIT
and EBITDA, which include the results of both these consolidated and unconsolidated operations, is useful to its
investors because it allows them to evaluate more effectively the performance of all of El Paso’s businesses and
investments.

El Paso defines Resource Potential as subsurface volumes of oil and natural gas the company believes may be present
and eventually recoverable. The company utilizes a net, geologic risk mean to represent this estimated ultimate
recoverable amount.

El Paso believes that the non-GAAP financial measures described above are also useful to investors because these
measurements are used by many companies in the industry as a measurement of operating and financial performance
and are commonly employed by financial analysts and others to evaluate the operating and financial performance of
the company and its business segments and to compare the operating and financial performance of the company and
its business segments with the performance of other companies within the industry.

These non-GAAP financial measures may not be comparable to similarly titled measurements used by other companies
and should not be used as a substitute for net income, earnings per share or other GAAP measurements.

                                                                                                                            29
30
Production-Related Derivative Schedule
                                              2008                                   2009                        2010                2011–2012
                                  Notional        Avg. Hedge              Notional     Avg. Hedge     Notional     Avg. Hedge   Notional   Avg. Hedge
Natural Gas                       Volume             Price                Volume          Price       Volume          Price     Volume        Price
                                   (TBtu)         ($/MMBtu)                (TBtu)      ($/MMBtu)       (TBtu)      ($/MMBtu)     (TBtu)    ($/MMBtu)
Designated—EPEP
   Fixed price—Legacy                 4.6            $ 3.42                  4.6            $ 3.56      4.6             $3.70      6.8       $3.88
   Fixed price                       21.0            $ 8.37
   Ceiling                          121.1            $ 10.84
   Floor                            121.1            $ 8.00
Economic—EPEP
   Fixed price                         7.3           $ 8.24
   Ceiling                            33.8           $ 10.43                47.5            $ 11.01
   Floor                              33.8           $ 8.00                 47.5            $ 8.35
Economic—EPM
   Ceiling                                                                  16.8            $ 8.75
   Floor

Avg. ceiling                        187.8            $ 10.21                68.9            $ 9.96      4.6             $3.70      6.8       $3.88
Avg. floor                          187.8            $ 7.94                 52.1            $ 7.93      4.6             $3.70      6.8       $3.88

                                              2008
                                    Notional Avg. Hedge
Crude Oil                           Volume      Price
                                   (MMBbls)    ($/Bbl)

Designated—EPEP                       3.10           $ 90.48
   Fixed price
Economic—EPM                          0.93           $ 57.03
   Ceiling                            0.93           $ 55.00
   Floor
                                       4.0           $ 82.76
Avg. ceiling                           4.0           $ 82.29
Avg. floor
                                                                                                                                                     31
 Note: Positions are as of April 4, 2008 (positions for full-year 2008)

Contenu connexe

Tendances

atmos enerrgy BofA111308_Handout
atmos enerrgy BofA111308_Handoutatmos enerrgy BofA111308_Handout
atmos enerrgy BofA111308_Handoutfinance35
 
2014 RBC Capital Markets’ MLP Conference
2014 RBC Capital Markets’ MLP Conference2014 RBC Capital Markets’ MLP Conference
2014 RBC Capital Markets’ MLP Conferenceir_jpenergy
 
Q3 2014 Growth Initiatives Update
Q3 2014 Growth Initiatives UpdateQ3 2014 Growth Initiatives Update
Q3 2014 Growth Initiatives UpdateEnLinkMidstreamLLC
 
Permian Basin Takeaway Capacity & Product Markets 2014
Permian Basin Takeaway Capacity & Product Markets 2014Permian Basin Takeaway Capacity & Product Markets 2014
Permian Basin Takeaway Capacity & Product Markets 2014LBCG
 
NAPTP Conference 5-26-11
NAPTP Conference 5-26-11NAPTP Conference 5-26-11
NAPTP Conference 5-26-11pennvirginia
 
Exelon Corporation at Edison Electric Institute 42nd EEI Financial Conference
Exelon Corporation at Edison Electric Institute 42nd EEI Financial ConferenceExelon Corporation at Edison Electric Institute 42nd EEI Financial Conference
Exelon Corporation at Edison Electric Institute 42nd EEI Financial Conferencefinance14
 
EP05_08Cleary_AGA
EP05_08Cleary_AGAEP05_08Cleary_AGA
EP05_08Cleary_AGAfinance49
 
ONEOK and ONEOK Partners to Present at Houston Energy Financial
 ONEOK and ONEOK Partners to Present at Houston Energy Financial  ONEOK and ONEOK Partners to Present at Houston Energy Financial
ONEOK and ONEOK Partners to Present at Houston Energy Financial finance20
 
Plg rail summit 2015 04-30
Plg rail summit 2015 04-30Plg rail summit 2015 04-30
Plg rail summit 2015 04-30PLG Consulting
 
MARS Meeting Summer 2015-North American Energy Revolution-Implications for Rail
MARS Meeting Summer 2015-North American Energy Revolution-Implications for RailMARS Meeting Summer 2015-North American Energy Revolution-Implications for Rail
MARS Meeting Summer 2015-North American Energy Revolution-Implications for RailPLG Consulting
 
PLG Consulting Appalachian logistics League May 5, 2015
PLG Consulting Appalachian logistics League May 5, 2015PLG Consulting Appalachian logistics League May 5, 2015
PLG Consulting Appalachian logistics League May 5, 2015PLG Consulting
 
Cequence energy announces_operations_update_feb_20161
Cequence energy announces_operations_update_feb_20161Cequence energy announces_operations_update_feb_20161
Cequence energy announces_operations_update_feb_20161Julian Majic
 
RBC Capital Markets MLP Conference 2015
RBC Capital Markets MLP Conference 2015RBC Capital Markets MLP Conference 2015
RBC Capital Markets MLP Conference 2015EnLinkMidstreamLLC
 

Tendances (15)

atmos enerrgy BofA111308_Handout
atmos enerrgy BofA111308_Handoutatmos enerrgy BofA111308_Handout
atmos enerrgy BofA111308_Handout
 
2014 RBC Capital Markets’ MLP Conference
2014 RBC Capital Markets’ MLP Conference2014 RBC Capital Markets’ MLP Conference
2014 RBC Capital Markets’ MLP Conference
 
Q3 2014 Growth Initiatives Update
Q3 2014 Growth Initiatives UpdateQ3 2014 Growth Initiatives Update
Q3 2014 Growth Initiatives Update
 
Naptp presentation final
Naptp presentation   finalNaptp presentation   final
Naptp presentation final
 
Willbros 2010 Annual Report
Willbros 2010 Annual ReportWillbros 2010 Annual Report
Willbros 2010 Annual Report
 
Permian Basin Takeaway Capacity & Product Markets 2014
Permian Basin Takeaway Capacity & Product Markets 2014Permian Basin Takeaway Capacity & Product Markets 2014
Permian Basin Takeaway Capacity & Product Markets 2014
 
NAPTP Conference 5-26-11
NAPTP Conference 5-26-11NAPTP Conference 5-26-11
NAPTP Conference 5-26-11
 
Exelon Corporation at Edison Electric Institute 42nd EEI Financial Conference
Exelon Corporation at Edison Electric Institute 42nd EEI Financial ConferenceExelon Corporation at Edison Electric Institute 42nd EEI Financial Conference
Exelon Corporation at Edison Electric Institute 42nd EEI Financial Conference
 
EP05_08Cleary_AGA
EP05_08Cleary_AGAEP05_08Cleary_AGA
EP05_08Cleary_AGA
 
ONEOK and ONEOK Partners to Present at Houston Energy Financial
 ONEOK and ONEOK Partners to Present at Houston Energy Financial  ONEOK and ONEOK Partners to Present at Houston Energy Financial
ONEOK and ONEOK Partners to Present at Houston Energy Financial
 
Plg rail summit 2015 04-30
Plg rail summit 2015 04-30Plg rail summit 2015 04-30
Plg rail summit 2015 04-30
 
MARS Meeting Summer 2015-North American Energy Revolution-Implications for Rail
MARS Meeting Summer 2015-North American Energy Revolution-Implications for RailMARS Meeting Summer 2015-North American Energy Revolution-Implications for Rail
MARS Meeting Summer 2015-North American Energy Revolution-Implications for Rail
 
PLG Consulting Appalachian logistics League May 5, 2015
PLG Consulting Appalachian logistics League May 5, 2015PLG Consulting Appalachian logistics League May 5, 2015
PLG Consulting Appalachian logistics League May 5, 2015
 
Cequence energy announces_operations_update_feb_20161
Cequence energy announces_operations_update_feb_20161Cequence energy announces_operations_update_feb_20161
Cequence energy announces_operations_update_feb_20161
 
RBC Capital Markets MLP Conference 2015
RBC Capital Markets MLP Conference 2015RBC Capital Markets MLP Conference 2015
RBC Capital Markets MLP Conference 2015
 

En vedette

el paso MerrillLynch_FINAL(Web)
el paso  MerrillLynch_FINAL(Web)el paso  MerrillLynch_FINAL(Web)
el paso MerrillLynch_FINAL(Web)finance49
 
universal helath services 2003Financials
universal helath services  2003Financialsuniversal helath services  2003Financials
universal helath services 2003Financialsfinance49
 
el paso Pipelines
el paso  Pipelinesel paso  Pipelines
el paso Pipelinesfinance49
 
EP01_24GuidanceConfCallFinal
EP01_24GuidanceConfCallFinalEP01_24GuidanceConfCallFinal
EP01_24GuidanceConfCallFinalfinance49
 
EP4_25_08ClearyPlattsRockiesConf
EP4_25_08ClearyPlattsRockiesConfEP4_25_08ClearyPlattsRockiesConf
EP4_25_08ClearyPlattsRockiesConffinance49
 
universal helath services 2004front
universal helath services  2004frontuniversal helath services  2004front
universal helath services 2004frontfinance49
 
EP09_03LehmanFoshee_FINAL(Web)
EP09_03LehmanFoshee_FINAL(Web)EP09_03LehmanFoshee_FINAL(Web)
EP09_03LehmanFoshee_FINAL(Web)finance49
 
el paso C0A209DE-4313-4A81-8B00-54550DEAC9E8_Barclays_Fixed_Income_032509
el paso  C0A209DE-4313-4A81-8B00-54550DEAC9E8_Barclays_Fixed_Income_032509el paso  C0A209DE-4313-4A81-8B00-54550DEAC9E8_Barclays_Fixed_Income_032509
el paso C0A209DE-4313-4A81-8B00-54550DEAC9E8_Barclays_Fixed_Income_032509finance49
 
el paso 11_14_Foshee_BofAConferenceFINALv2(Web)
el paso  11_14_Foshee_BofAConferenceFINALv2(Web)el paso  11_14_Foshee_BofAConferenceFINALv2(Web)
el paso 11_14_Foshee_BofAConferenceFINALv2(Web)finance49
 
EP4Q2007Earnings_FINALv2(Web)
EP4Q2007Earnings_FINALv2(Web)EP4Q2007Earnings_FINALv2(Web)
EP4Q2007Earnings_FINALv2(Web)finance49
 
el paso 3Q2007Earnings_FINALv2(B&WPrint)
el paso  3Q2007Earnings_FINALv2(B&WPrint)el paso  3Q2007Earnings_FINALv2(B&WPrint)
el paso 3Q2007Earnings_FINALv2(B&WPrint)finance49
 
el paso 22758BEF-CBE8-4368-BDC6-D02434EE5C13_EP_4Q08OpStatsFinal
el paso 22758BEF-CBE8-4368-BDC6-D02434EE5C13_EP_4Q08OpStatsFinalel paso 22758BEF-CBE8-4368-BDC6-D02434EE5C13_EP_4Q08OpStatsFinal
el paso 22758BEF-CBE8-4368-BDC6-D02434EE5C13_EP_4Q08OpStatsFinalfinance49
 
el paso D7A9D355-197F-480A-8FF4-86834B0DD876_EP_4Q_2008_Earnings_FINAL(Color...
el paso  D7A9D355-197F-480A-8FF4-86834B0DD876_EP_4Q_2008_Earnings_FINAL(Color...el paso  D7A9D355-197F-480A-8FF4-86834B0DD876_EP_4Q_2008_Earnings_FINAL(Color...
el paso D7A9D355-197F-480A-8FF4-86834B0DD876_EP_4Q_2008_Earnings_FINAL(Color...finance49
 
spectra energy Q208RegG
spectra energy Q208RegGspectra energy Q208RegG
spectra energy Q208RegGfinance49
 
universal helath services ar_2002_financials
universal helath services  ar_2002_financialsuniversal helath services  ar_2002_financials
universal helath services ar_2002_financialsfinance49
 
hollycorp.annualreport.2005
hollycorp.annualreport.2005hollycorp.annualreport.2005
hollycorp.annualreport.2005finance49
 
el paso F01E85AA-D20E-424D-B73A-588DF65EC38A_Proxy_Statement_2009
el paso F01E85AA-D20E-424D-B73A-588DF65EC38A_Proxy_Statement_2009el paso F01E85AA-D20E-424D-B73A-588DF65EC38A_Proxy_Statement_2009
el paso F01E85AA-D20E-424D-B73A-588DF65EC38A_Proxy_Statement_2009finance49
 
chiquita brands international annual
chiquita brands international annualchiquita brands international annual
chiquita brands international annualfinance49
 

En vedette (19)

el paso MerrillLynch_FINAL(Web)
el paso  MerrillLynch_FINAL(Web)el paso  MerrillLynch_FINAL(Web)
el paso MerrillLynch_FINAL(Web)
 
universal helath services 2003Financials
universal helath services  2003Financialsuniversal helath services  2003Financials
universal helath services 2003Financials
 
el paso Pipelines
el paso  Pipelinesel paso  Pipelines
el paso Pipelines
 
EP01_24GuidanceConfCallFinal
EP01_24GuidanceConfCallFinalEP01_24GuidanceConfCallFinal
EP01_24GuidanceConfCallFinal
 
EP4_25_08ClearyPlattsRockiesConf
EP4_25_08ClearyPlattsRockiesConfEP4_25_08ClearyPlattsRockiesConf
EP4_25_08ClearyPlattsRockiesConf
 
universal helath services 2004front
universal helath services  2004frontuniversal helath services  2004front
universal helath services 2004front
 
elp_0608
elp_0608elp_0608
elp_0608
 
EP09_03LehmanFoshee_FINAL(Web)
EP09_03LehmanFoshee_FINAL(Web)EP09_03LehmanFoshee_FINAL(Web)
EP09_03LehmanFoshee_FINAL(Web)
 
el paso C0A209DE-4313-4A81-8B00-54550DEAC9E8_Barclays_Fixed_Income_032509
el paso  C0A209DE-4313-4A81-8B00-54550DEAC9E8_Barclays_Fixed_Income_032509el paso  C0A209DE-4313-4A81-8B00-54550DEAC9E8_Barclays_Fixed_Income_032509
el paso C0A209DE-4313-4A81-8B00-54550DEAC9E8_Barclays_Fixed_Income_032509
 
el paso 11_14_Foshee_BofAConferenceFINALv2(Web)
el paso  11_14_Foshee_BofAConferenceFINALv2(Web)el paso  11_14_Foshee_BofAConferenceFINALv2(Web)
el paso 11_14_Foshee_BofAConferenceFINALv2(Web)
 
EP4Q2007Earnings_FINALv2(Web)
EP4Q2007Earnings_FINALv2(Web)EP4Q2007Earnings_FINALv2(Web)
EP4Q2007Earnings_FINALv2(Web)
 
el paso 3Q2007Earnings_FINALv2(B&WPrint)
el paso  3Q2007Earnings_FINALv2(B&WPrint)el paso  3Q2007Earnings_FINALv2(B&WPrint)
el paso 3Q2007Earnings_FINALv2(B&WPrint)
 
el paso 22758BEF-CBE8-4368-BDC6-D02434EE5C13_EP_4Q08OpStatsFinal
el paso 22758BEF-CBE8-4368-BDC6-D02434EE5C13_EP_4Q08OpStatsFinalel paso 22758BEF-CBE8-4368-BDC6-D02434EE5C13_EP_4Q08OpStatsFinal
el paso 22758BEF-CBE8-4368-BDC6-D02434EE5C13_EP_4Q08OpStatsFinal
 
el paso D7A9D355-197F-480A-8FF4-86834B0DD876_EP_4Q_2008_Earnings_FINAL(Color...
el paso  D7A9D355-197F-480A-8FF4-86834B0DD876_EP_4Q_2008_Earnings_FINAL(Color...el paso  D7A9D355-197F-480A-8FF4-86834B0DD876_EP_4Q_2008_Earnings_FINAL(Color...
el paso D7A9D355-197F-480A-8FF4-86834B0DD876_EP_4Q_2008_Earnings_FINAL(Color...
 
spectra energy Q208RegG
spectra energy Q208RegGspectra energy Q208RegG
spectra energy Q208RegG
 
universal helath services ar_2002_financials
universal helath services  ar_2002_financialsuniversal helath services  ar_2002_financials
universal helath services ar_2002_financials
 
hollycorp.annualreport.2005
hollycorp.annualreport.2005hollycorp.annualreport.2005
hollycorp.annualreport.2005
 
el paso F01E85AA-D20E-424D-B73A-588DF65EC38A_Proxy_Statement_2009
el paso F01E85AA-D20E-424D-B73A-588DF65EC38A_Proxy_Statement_2009el paso F01E85AA-D20E-424D-B73A-588DF65EC38A_Proxy_Statement_2009
el paso F01E85AA-D20E-424D-B73A-588DF65EC38A_Proxy_Statement_2009
 
chiquita brands international annual
chiquita brands international annualchiquita brands international annual
chiquita brands international annual
 

Similaire à el paso 04_08FosheeHowardWeil(Web)2

el paso 03_27Leland_CreditSuisse_FINAL(Web)
el paso  03_27Leland_CreditSuisse_FINAL(Web)el paso  03_27Leland_CreditSuisse_FINAL(Web)
el paso 03_27Leland_CreditSuisse_FINAL(Web)finance49
 
el paso Yardley_IPAAMLPConference1
el paso  Yardley_IPAAMLPConference1el paso  Yardley_IPAAMLPConference1
el paso Yardley_IPAAMLPConference1finance49
 
el paso Yardley_IPAAMLPConference1
el paso  Yardley_IPAAMLPConference1el paso  Yardley_IPAAMLPConference1
el paso Yardley_IPAAMLPConference1finance49
 
el paso 020508_CreditSuisse_Leland
el paso  020508_CreditSuisse_Lelandel paso  020508_CreditSuisse_Leland
el paso 020508_CreditSuisse_Lelandfinance49
 
el paso 020508_CreditSuisse_Leland
el paso  020508_CreditSuisse_Lelandel paso  020508_CreditSuisse_Leland
el paso 020508_CreditSuisse_Lelandfinance49
 
el paso 032607_presentation
el paso  032607_presentationel paso  032607_presentation
el paso 032607_presentationfinance49
 
el paso 032607_presentation
el paso  032607_presentationel paso  032607_presentation
el paso 032607_presentationfinance49
 
EP09_18BankofAmerica
EP09_18BankofAmericaEP09_18BankofAmerica
EP09_18BankofAmericafinance49
 
EP09_03LehmanFoshee_FINAL(Web)
EP09_03LehmanFoshee_FINAL(Web)EP09_03LehmanFoshee_FINAL(Web)
EP09_03LehmanFoshee_FINAL(Web)finance49
 
el paso 09_04LehmanBrothersConference_FINAL
el paso  09_04LehmanBrothersConference_FINALel paso  09_04LehmanBrothersConference_FINAL
el paso 09_04LehmanBrothersConference_FINALfinance49
 
el paso AGAFinancialForum_FINAL(Web)
el paso  AGAFinancialForum_FINAL(Web)el paso  AGAFinancialForum_FINAL(Web)
el paso AGAFinancialForum_FINAL(Web)finance49
 
EMA 2009 - 2012 & Beyond: Operating in a Carbon Constrained Environment -...
EMA 2009 - 2012 & Beyond: Operating in a Carbon Constrained Environment -...EMA 2009 - 2012 & Beyond: Operating in a Carbon Constrained Environment -...
EMA 2009 - 2012 & Beyond: Operating in a Carbon Constrained Environment -...fijigeorge
 
Euec(2009)Final
Euec(2009)FinalEuec(2009)Final
Euec(2009)Finalfijigeorge
 
EP09_19Foshee_BankofAmerica_FINAL
EP09_19Foshee_BankofAmerica_FINALEP09_19Foshee_BankofAmerica_FINAL
EP09_19Foshee_BankofAmerica_FINALfinance49
 
EP09_19Foshee_BankofAmerica_FINAL
EP09_19Foshee_BankofAmerica_FINALEP09_19Foshee_BankofAmerica_FINAL
EP09_19Foshee_BankofAmerica_FINALfinance49
 
WF Basin Book July 2018.pdf
WF Basin Book July 2018.pdfWF Basin Book July 2018.pdf
WF Basin Book July 2018.pdfEagleFord1
 
WF Basin Book July 2018.pdf
WF Basin Book July 2018.pdfWF Basin Book July 2018.pdf
WF Basin Book July 2018.pdfEagleFord1
 
oneok ONEOK to Present at Lehman CEO Conference
oneok ONEOK to Present at Lehman CEO Conferenceoneok ONEOK to Present at Lehman CEO Conference
oneok ONEOK to Present at Lehman CEO Conferencefinance20
 
el paso 08_11_Leland_UBS
el paso  08_11_Leland_UBSel paso  08_11_Leland_UBS
el paso 08_11_Leland_UBSfinance49
 
PLG NUTC Presentation - 10/31/12
PLG NUTC Presentation - 10/31/12PLG NUTC Presentation - 10/31/12
PLG NUTC Presentation - 10/31/12PLG Consulting
 

Similaire à el paso 04_08FosheeHowardWeil(Web)2 (20)

el paso 03_27Leland_CreditSuisse_FINAL(Web)
el paso  03_27Leland_CreditSuisse_FINAL(Web)el paso  03_27Leland_CreditSuisse_FINAL(Web)
el paso 03_27Leland_CreditSuisse_FINAL(Web)
 
el paso Yardley_IPAAMLPConference1
el paso  Yardley_IPAAMLPConference1el paso  Yardley_IPAAMLPConference1
el paso Yardley_IPAAMLPConference1
 
el paso Yardley_IPAAMLPConference1
el paso  Yardley_IPAAMLPConference1el paso  Yardley_IPAAMLPConference1
el paso Yardley_IPAAMLPConference1
 
el paso 020508_CreditSuisse_Leland
el paso  020508_CreditSuisse_Lelandel paso  020508_CreditSuisse_Leland
el paso 020508_CreditSuisse_Leland
 
el paso 020508_CreditSuisse_Leland
el paso  020508_CreditSuisse_Lelandel paso  020508_CreditSuisse_Leland
el paso 020508_CreditSuisse_Leland
 
el paso 032607_presentation
el paso  032607_presentationel paso  032607_presentation
el paso 032607_presentation
 
el paso 032607_presentation
el paso  032607_presentationel paso  032607_presentation
el paso 032607_presentation
 
EP09_18BankofAmerica
EP09_18BankofAmericaEP09_18BankofAmerica
EP09_18BankofAmerica
 
EP09_03LehmanFoshee_FINAL(Web)
EP09_03LehmanFoshee_FINAL(Web)EP09_03LehmanFoshee_FINAL(Web)
EP09_03LehmanFoshee_FINAL(Web)
 
el paso 09_04LehmanBrothersConference_FINAL
el paso  09_04LehmanBrothersConference_FINALel paso  09_04LehmanBrothersConference_FINAL
el paso 09_04LehmanBrothersConference_FINAL
 
el paso AGAFinancialForum_FINAL(Web)
el paso  AGAFinancialForum_FINAL(Web)el paso  AGAFinancialForum_FINAL(Web)
el paso AGAFinancialForum_FINAL(Web)
 
EMA 2009 - 2012 & Beyond: Operating in a Carbon Constrained Environment -...
EMA 2009 - 2012 & Beyond: Operating in a Carbon Constrained Environment -...EMA 2009 - 2012 & Beyond: Operating in a Carbon Constrained Environment -...
EMA 2009 - 2012 & Beyond: Operating in a Carbon Constrained Environment -...
 
Euec(2009)Final
Euec(2009)FinalEuec(2009)Final
Euec(2009)Final
 
EP09_19Foshee_BankofAmerica_FINAL
EP09_19Foshee_BankofAmerica_FINALEP09_19Foshee_BankofAmerica_FINAL
EP09_19Foshee_BankofAmerica_FINAL
 
EP09_19Foshee_BankofAmerica_FINAL
EP09_19Foshee_BankofAmerica_FINALEP09_19Foshee_BankofAmerica_FINAL
EP09_19Foshee_BankofAmerica_FINAL
 
WF Basin Book July 2018.pdf
WF Basin Book July 2018.pdfWF Basin Book July 2018.pdf
WF Basin Book July 2018.pdf
 
WF Basin Book July 2018.pdf
WF Basin Book July 2018.pdfWF Basin Book July 2018.pdf
WF Basin Book July 2018.pdf
 
oneok ONEOK to Present at Lehman CEO Conference
oneok ONEOK to Present at Lehman CEO Conferenceoneok ONEOK to Present at Lehman CEO Conference
oneok ONEOK to Present at Lehman CEO Conference
 
el paso 08_11_Leland_UBS
el paso  08_11_Leland_UBSel paso  08_11_Leland_UBS
el paso 08_11_Leland_UBS
 
PLG NUTC Presentation - 10/31/12
PLG NUTC Presentation - 10/31/12PLG NUTC Presentation - 10/31/12
PLG NUTC Presentation - 10/31/12
 

Plus de finance49

jarden 2001_ar
jarden   2001_arjarden   2001_ar
jarden 2001_arfinance49
 
jarden 2001_ar
jarden   2001_arjarden   2001_ar
jarden 2001_arfinance49
 
jarden 2002_AR
jarden   2002_ARjarden   2002_AR
jarden 2002_ARfinance49
 
jarden 2002_AR
jarden   2002_ARjarden   2002_AR
jarden 2002_ARfinance49
 
jarden 2004AR
jarden   2004ARjarden   2004AR
jarden 2004ARfinance49
 
jarden 2004AR
jarden   2004ARjarden   2004AR
jarden 2004ARfinance49
 
jarden AR2006
jarden   AR2006jarden   AR2006
jarden AR2006finance49
 
chiquita brands international 2000annual
chiquita brands international 2000annualchiquita brands international 2000annual
chiquita brands international 2000annualfinance49
 
chiquita brands international 2001annual
chiquita brands international 2001annualchiquita brands international 2001annual
chiquita brands international 2001annualfinance49
 
chiquita brands international 2002annual
chiquita brands international 2002annualchiquita brands international 2002annual
chiquita brands international 2002annualfinance49
 
chiquita brands international 2003annual
chiquita brands international 2003annualchiquita brands international 2003annual
chiquita brands international 2003annualfinance49
 
chiquita brands international 2004annual
chiquita brands international 2004annualchiquita brands international 2004annual
chiquita brands international 2004annualfinance49
 
chiquita brands international 2005annual
chiquita brands international 2005annualchiquita brands international 2005annual
chiquita brands international 2005annualfinance49
 
chiquita brands international 2006annual
chiquita brands international 2006annualchiquita brands international 2006annual
chiquita brands international 2006annualfinance49
 

Plus de finance49 (20)

Jah112008
Jah112008Jah112008
Jah112008
 
Jah112008
Jah112008Jah112008
Jah112008
 
jarden 2001_ar
jarden   2001_arjarden   2001_ar
jarden 2001_ar
 
jarden 2001_ar
jarden   2001_arjarden   2001_ar
jarden 2001_ar
 
jarden 2002_AR
jarden   2002_ARjarden   2002_AR
jarden 2002_AR
 
jarden 2002_AR
jarden   2002_ARjarden   2002_AR
jarden 2002_AR
 
Jarden_AR
Jarden_ARJarden_AR
Jarden_AR
 
Jarden_AR
Jarden_ARJarden_AR
Jarden_AR
 
jarden 2004AR
jarden   2004ARjarden   2004AR
jarden 2004AR
 
jarden 2004AR
jarden   2004ARjarden   2004AR
jarden 2004AR
 
jarden ar05
jarden   ar05jarden   ar05
jarden ar05
 
jarden ar05
jarden   ar05jarden   ar05
jarden ar05
 
jarden AR2006
jarden   AR2006jarden   AR2006
jarden AR2006
 
chiquita brands international 2000annual
chiquita brands international 2000annualchiquita brands international 2000annual
chiquita brands international 2000annual
 
chiquita brands international 2001annual
chiquita brands international 2001annualchiquita brands international 2001annual
chiquita brands international 2001annual
 
chiquita brands international 2002annual
chiquita brands international 2002annualchiquita brands international 2002annual
chiquita brands international 2002annual
 
chiquita brands international 2003annual
chiquita brands international 2003annualchiquita brands international 2003annual
chiquita brands international 2003annual
 
chiquita brands international 2004annual
chiquita brands international 2004annualchiquita brands international 2004annual
chiquita brands international 2004annual
 
chiquita brands international 2005annual
chiquita brands international 2005annualchiquita brands international 2005annual
chiquita brands international 2005annual
 
chiquita brands international 2006annual
chiquita brands international 2006annualchiquita brands international 2006annual
chiquita brands international 2006annual
 

Dernier

CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceanilsa9823
 
The Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdfThe Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdfGale Pooley
 
Stock Market Brief Deck (Under Pressure).pdf
Stock Market Brief Deck (Under Pressure).pdfStock Market Brief Deck (Under Pressure).pdf
Stock Market Brief Deck (Under Pressure).pdfMichael Silva
 
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Pooja Nehwal
 
The Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdfThe Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdfGale Pooley
 
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...Pooja Nehwal
 
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )Pooja Nehwal
 
The Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdfThe Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdfGale Pooley
 
Gurley shaw Theory of Monetary Economics.
Gurley shaw Theory of Monetary Economics.Gurley shaw Theory of Monetary Economics.
Gurley shaw Theory of Monetary Economics.Vinodha Devi
 
The Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdfThe Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdfGale Pooley
 
03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptx03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptxFinTech Belgium
 
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptxFinTech Belgium
 
Log your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaignLog your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaignHenry Tapper
 
Booking open Available Pune Call Girls Wadgaon Sheri 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Wadgaon Sheri  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Wadgaon Sheri  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Wadgaon Sheri 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...ssifa0344
 

Dernier (20)

CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
 
The Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdfThe Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdf
 
Stock Market Brief Deck (Under Pressure).pdf
Stock Market Brief Deck (Under Pressure).pdfStock Market Brief Deck (Under Pressure).pdf
Stock Market Brief Deck (Under Pressure).pdf
 
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
 
Veritas Interim Report 1 January–31 March 2024
Veritas Interim Report 1 January–31 March 2024Veritas Interim Report 1 January–31 March 2024
Veritas Interim Report 1 January–31 March 2024
 
The Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdfThe Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdf
 
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
 
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )
 
(Vedika) Low Rate Call Girls in Pune Call Now 8250077686 Pune Escorts 24x7
(Vedika) Low Rate Call Girls in Pune Call Now 8250077686 Pune Escorts 24x7(Vedika) Low Rate Call Girls in Pune Call Now 8250077686 Pune Escorts 24x7
(Vedika) Low Rate Call Girls in Pune Call Now 8250077686 Pune Escorts 24x7
 
VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...
VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...
VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...
 
The Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdfThe Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdf
 
Gurley shaw Theory of Monetary Economics.
Gurley shaw Theory of Monetary Economics.Gurley shaw Theory of Monetary Economics.
Gurley shaw Theory of Monetary Economics.
 
The Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdfThe Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdf
 
03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptx03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptx
 
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
 
VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...
VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...
VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...
 
Log your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaignLog your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaign
 
Booking open Available Pune Call Girls Wadgaon Sheri 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Wadgaon Sheri  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Wadgaon Sheri  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Wadgaon Sheri 6297143586 Call Hot Ind...
 
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
 

el paso 04_08FosheeHowardWeil(Web)2

  • 1. a meaningful company doing meaningful work delivering meaningful results Doug Foshee President and Chief Executive Officer Howard Weil Energy Conference April 8, 2008
  • 2. Cautionary Statement Regarding Forward-looking Statements This presentation includes forward-looking statements and projections, made in reliance on the safe harbor provisions of the Private Securities Litigation Reform Act of 1995. The company has made every reasonable effort to ensure that the information and assumptions on which these statements and projections are based are current, reasonable, and complete. However, a variety of factors could cause actual results to differ materially from the projections, anticipated results or other expectations expressed in this presentation, including, without limitation, changes in unaudited and/or unreviewed financial information; our ability to implement and achieve our objectives in the 2008 plan, including earnings and cash flow targets; the effects of any changes in accounting rules and guidance; our ability to meet production volume targets in our E&P segment; uncertainties and potential consequences associated with the outcome of governmental investigations, including, without limitation, those related to the reserve revisions; outcome of litigation; our ability to comply with the covenants in our various financing documents; our ability to obtain necessary governmental approvals for proposed pipeline projects and our ability to successfully construct and operate such projects; the risks associated with recontracting of transportation commitments by our pipelines; regulatory uncertainties associated with pipeline rate cases; actions by the credit rating agencies; the successful close of our financing transactions; our ability to successfully exit the energy trading business; our ability to close our announced asset sales on a timely basis; changes in commodity prices and basis differentials for oil, natural gas, and power and relevant basis spreads; inability to realize anticipated synergies and cost savings associated with restructurings and divestitures on a timely basis; general economic and weather conditions in geographic regions or markets served by the company and its affiliates, or where operations of the company and its affiliates are located; the uncertainties associated with governmental regulation; political and currency risks associated with international operations of the company and its affiliates; competition; and other factors described in the company’s (and its affiliates’) Securities and Exchange Commission filings. While the company makes these statements and projections in good faith, neither the company nor its management can guarantee that anticipated future results will be achieved. Reference must be made to those filings for additional important factors that may affect actual results. The company assumes no obligation to publicly update or revise any forward-looking statements made herein or any other forward-looking statements made by the company, whether as a result of new information, future events, or otherwise. Certain of the production information in this presentation include the production attributable to El Paso’s 49 percent interest in Four Star Oil & Gas Company (“Four Star”). El Paso’s Supplemental Oil and Gas disclosures, which are included in its Annual Report on Form 10-K, reflect its proportionate share of the proved reserves of Four Star separate from its consolidated proved reserves. In addition, the proved reserves attributable to its proportionate share of Four Star represent estimates prepared by El Paso and not those of Four Star. Cautionary Note to U.S. Investors—The United States Securities and Exchange Commission permits oil and gas companies, in their filings with the SEC, to disclose only proved reserves that a company has demonstrated by actual production or conclusive formation tests to be economically and legally producible under existing economic and operating conditions. We use certain terms in this presentation that the SEC's guidelines strictly prohibit us from including in filings with the SEC. U.S. Investors are urged to consider closely the disclosures regarding proved reserves in this presentation and the disclosures contained in our Form 10-K for the year ended December 31, 2007, File No. 001-14365, available by writing; Investor Relations, El Paso Corporation, 1001 Louisiana St., Houston, TX 77002. You can also obtain this form from the SEC by calling 1-800-SEC-0330. Non-GAAP Financial Measures This presentation includes certain Non-GAAP financial measures as defined in the SEC’s Regulation G. More information on these Non-GAAP financial measures, including EBIT and the required reconciliations under Regulation G, are set forth in this presentation or in the appendix hereto. El Paso defines Resource Potential as subsurface volumes of oil and natural gas the company believes may be present and eventually recoverable. The company utilizes a net, geologic risk mean to represent this estimated ultimate recoverable amount. 2
  • 3. Sustainable Long-Term Growth Pipelines E&P 6%–8% EBIT Growth 2007–2012 8%–12% production growth 2007–2010 • 2.8 Tcfe proved reserves* • Unprecedented infrastructure opportunities • Multi-year drilling inventory • Committed project inventory nearly $4 billion *Post 2008 divestitures—Includes proportionate share of Four Star 3
  • 4. Outlook Favors Both Businesses Pipelines Favorable Macro Outlook • Assets well positioned • Increasing demand for natural gas – Rockies expansions: CIG, WIC, Ruby • Strong commodity prices – LNG related: Elba Express, Cypress • Infrastructure opportunities with shifting supply source E&P Environmental • Improved portfolio • Carbon emissions • Increased profitability • Power generation turning to natural gas • Drilling success 4
  • 5. El Paso Pipeline Group North America’s Leading Natural Gas Pipeline Company Tennessee Wyoming Gas Pipeline Colorado Interstate Interstate Gas Cheyenne Mojave Plains Pipeline Southern Pipeline Natural Gas Elba Island LNG El Paso Natural Gas Mexico Gulf LNG Florida Gas Ventures (50%) Transmission (50%) • 19% of total U.S. interstate pipeline mileage • 24 Bcf/d capacity (16% of total U.S.) • 17 Bcf/d throughput (28% of gas delivered to U.S. consumers) Source: El Paso Corporation based on 2007 data 5 Note: Includes El Paso Corporation and El Paso Pipeline Partners, L.P.
  • 6. The Enduring Value of “Last Mile” and “First Mile” Service Integrated with Point-to-Point Integrated with Suppliers Transportation Markets Pipeline LDC Citygate Storage Storage Market Supply LNG Wellheads Hub Hub Direct Connects (Industrial, Power Gen) Processing Pipelines Commodity High Value High Value Service 6
  • 7. Excellent Connectivity in Markets ID VT SD NH WY NE Boston MA NY RI CT Denver UT CO NJ New York PA • 66 supply meters in the Rockies • 110 delivery meters along the Front Range • 97 delivery meters into 26 LDCs UT NV SC Atlanta Birmingham CA AZ NM Phoenix GA AL FL • 348 delivery meters in Arizona • 155 delivery meters into Alagasco and AGL
  • 8. Committed Growth Backlog Approaching $4 Billion WIC Medicine Bow TGP Concord Expansion $21 MM $32 MM Nov 2009 July 2008 CIG High Plains Pipeline 30 MMcf/d 330 MMcf/d $196 MM (100%) November 2008 WIC Piceance 900 MMcf/d Lateral CP Coral Expansion Elba Expansion III & $62 MM SNG SESH –Phase I $23 MM Elba Express 4Q 2009 $137 MM CIG Totem Storage July 2008 $1.1 Billion 219 MMcf/d Jun 2008 $120 MM (100%) 70 MMcf/d 2010–2013 140 MMcf/d July 2009 1.2 Bcf/d 200 MMcf/d SNG Cypress Phase II & III $20 MM/$82 MM May 2008/ Jan 2011 TGP Carthage 114 MMcf/d/ 161 MMcf/d Expansion $39 MM May 2009 100 MMcf/d SNG South System III/ SESH Phase II Gulf LNG $286 MM/ $33 MM $1.1 Billion (100%) 2010–2012 Oct 2011 375 MMcf/d/ 360MMcfd El Paso Pipeline Partners 1.3 Bcf/d El Paso FGT Phase VIII Expansion $2+ Billion (100%) 2011 0.8 Bcf/d 8 Note: El Paso Pipeline Partners owns 10% of SNG and CIG
  • 9. Market Demand Driving Pipeline Growth Florida Gas Transmission VIII Project Natural Gas Demand Proposed Pipeline Expansion Growth (Bcf) FGT Florida 4.0 3.0 $2+ billion (100%) 2.0 • • 50% EP, 50% SUG 1.0 • 500 miles 0.0 • 0.8 Bcf/d capacity FL 2007 2017 • PA with FPL for 0.4 Bcf/d for 25-year term Power generation • 2011 in-service Residential, Commercial, & Industrial 9 Source: EEA/ICF
  • 10. Leveraging LNG Experience Elba Island LNG Gulf LNG Savannah, GA Pascagoula, MS • $1.1 billion terminal expansion and • $1.1 Billion (100%); 50% EP Elba Express Pipeline • $870 MM non-recourse financing completed • 8.4 Bcf incremental storage capacity • 1.3 Bcf/d base sendout • 0.9 Bcf/d incremental send-out capacity • Fully contracted with Angola LNG and ENI • Fully contracted with Shell and BG • EPC with Aker Kvaerner • Current expansion will double facility • 2011 In-service Investing more than $2 billion on LNG and related projects 10
  • 11. De-risking of Backlog Capital Costs Typical Pipeline Capex Breakdown 30%–35% 35%–40% 25%–35% • Pipe • Contractor-related • Right-of-way • Other Primary Party $ Billion At-Risk for Capex $1.7 Contractor 0.8 Customer 1.4 El Paso $3.9 11
  • 12. El Paso Pipeline Partners • Primary focus is natural gas transmission and storage assets • Three FERC regulated interstate pipelines: – 100% of WIC: 800 miles, 2.7 Bcf/d – 10% of CIG: 4,000 miles, 3.0 Bcf/d – 10% of SNG: 7,600 miles, 3.7 Bcf/d • Demand-based revenues from high-quality customers with strong credit profiles • Several organic expansions underway WIC SNG CIG Diverse, Growing Supply Regions High Connectivity to Growing Markets 12
  • 13. Pipeline Summary • High-quality, committed growth backlog – Approaching $4 billion • Focus on project execution • Manage capital costs • Long-term EBIT growth expectation 6%–8% – Higher with continued success 13
  • 14. Total Company Top 10 Domestic Independent • Well-situated in key U.S. basins • Focused on unconventional and low-risk conventional programs Nile Onshore-US Delta • ~80% natural gas Sinai • Primarily coal seam and Gulf • 97% drilling success rate Egypt of tight-gas programs Egypt • 2.8 Tcfe of proved reserves Suez • Low to medium risk • 798 MMcfe/d of production repeatable plays • 9.6-year reserve life • 98% drilling success rate Egypt • 2.4 Tcfe of proved reserves • Onshore conventional • 650 MMcfe/d of production exploration • 10.1-year reserve life Brazil • 1 MM acres • First drilling 2H 2008 Rio de Janeiro GOM Brazil • Medium to high-risk exploration • 2 discoveries in 2007 • Large acreage position • 15,000–20,000 BOE/d • 46% success rate in 2007 beginning 2H 2009 • 152 Bcfe of proved reserves • 20 undrilled prospects • 133 MMcfe/d of production • 247 Bcfe of proved reserves • 3.1-year reserve life • 14 MMcfe/d of production Note: All data is pro forma 2007 to exclude production and reserves related to properties divested in 2008 and to include a full year of production from our Peoples acquisition in 2007 14
  • 15. High Grading Our Portfolio • Divested 309 Bcfe of properties for $845 MM (sales price and assumed asset retirement obligation)—$2.73/Mcfe – Low inventory, high operating costs • Purchased Peoples Energy Production for $887 MM • End result—more focused; more profitable, faster growing; added 450 total gross drilling locations 15
  • 16. Reserves More Weighted to Onshore Region 2007 Post 2007 YE Reported Divestitures GOM/SLA GOM/SLA 5% INTL INTL 9% 9% 8% TGC 16% TGC Onshore Onshore 18% 65% 70% 3.1 Tcfe 2.8 Tcfe Note: Includes proportionate share of Four Star 16
  • 17. E&P Production Solid Growth Trajectory Through 2010 MMcfe/d R CAG %–12% 8 870–930 862 798 20082 2007 2007 2009 2010 Pro Forma1 Note: Includes proportionate share of Four Star 1 Excludes volumes from domestic assets sold; assumes full year of Peoples 17 2 Assumes 25 MMcfe/d annualized contributed by the divestiture assets prior to closing
  • 18. E&P Profitability Growing Faster Than Peers EBITDA*/Mcfe, Including Hedging $5.75– $6.04 $6.00 $5.84 $5.61 $5.58 $4.82 2006 2007A 2008E Peer Average El Paso Peer group: APA, APC, CHK, DVN, EOG, FST, NBL, NFX, PXD, PXD, XEC, XTO Actual results from Peer company reports for 2006 and 2007; Analyst 2008E * EBITDA excludes exploration and dry hole expense for successful efforts companies 18
  • 19. Significant Undrilled Inventory • 6.1 Tcfe unrisked non-proved resources 3,400 • 2.8 Tcfe risked non-proved resources • Risked resources grew 12% in 2007 Resource Potential (Bcfe) • Excludes domestic divestiture properties Non-Proved Risked Unrisked 2,130 1,460 869 835 495 530 PUD* Unconventional Conventional Conventional Low-Risk Higher-Risk Raton, Arkoma, Black Warrior, Arklatex, Rockies, GOM, TGC, New Albany TGC, Brazil Int’l Exploration, Brazil, Egypt *As of 12/31/07 and Includes proportionate share of Four Star 19
  • 20. Arklatex AK Production (MMcfe/d) Vacherie Dome/ 200 Bear Creek 150 TX Minden/SE 100 Brachfield LA 50 0 Holly/Bethany 2006 2007 2008 2009 2010 Longstreet/Logansport Program Statistics: 2008 Plan: 1,047 operating wells 111 gross wells 80% avg. WI $319 MM net capital 426 PUD locations 222 Bcfe PUD reserves Value Upside: 404 non-proved locations Cotton Valley Horizontals 540 Bcfe unrisked resource potential Haynesville Shale 504 Bcfe risked resource potential Infill potential 11 R/P 20
  • 21. Arklatex Economics Objective: Hosston, Cotton Valley Hosston 8,500 ft. Depth: 7,500'–12,800' Well costs: $2.5 MM–$3.1 MM Cotton Valley 10,500 ft. Reserves: 1.0–1.4 Bcfe Initial prod: 1–5 MMcfe/d Type Curve Spacing: 40–80 acres 1,000 800 IRR: 20%–30% Mcfe/d 600 PVR: 1.15–1.25 400 200 F&D: $2.70–$3.10/Mcfe 0 1 2 3 4 5 6 7 8 9 10 Normalized Years 21 Note: PVR and rate of return based on $7.50 MMBtu and $70.00/Bbl
  • 22. Haynesville Shale Play Outline—North Louisiana Approx. 36,000Claiborne gross/ Webster Marion 27,000 net acres of Caddo Haynesville leases Bossier Chesapeake Petrohawk TX Discovery Discovery Harrison Bienville LA Red River Panola Encana Test Desoto Comstock Test Natchitoches Shelby 22
  • 23. E&P Summary • E&P better positioned post high grading • Greater Onshore focus • More profitable • Deeper inventory • Visible 8% – 12% multi-year production growth E&P moving towards top-tier performance 23
  • 24. 2008 Natural Gas and Oil Hedge Positions Positions as of April 4, 2008 (Positions are for full-year 2008) 188 TBtu Average cap $10.21/MMBtu Ceiling 155 TBtu 33 TBtu 2008 Gas $10.75 ceiling/ $7.65 $8.00 floor fixed price Floors 188 TBtu Balance at Average floor $7.94/MMBtu Market Price 4.0 MMBbls Ceiling Average cap $82.76/Bbl 3.1 MMBbls 0.9 MMBbls 2008 Oil $90.48 $57.03 ceiling/ fixed price $55.00 floor Floors 4.0 MMBbls Average floor $82.29/Bbl 24 Note: See full Production-Related Derivative Schedule in Appendix
  • 25. Substantial Leverage to Higher Commodity Prices $ Earnings Per Share $1.62– $1.72 Current $1.70 $1.44– Market $1.54 $1.50 $1.25– Base Case $1.35 $1.30 $1.00– $1.10 $1.10 $0.90 $0.70 $0.50 Assumes Assumes Assumes Assumes $7.50 Gas $9.00 Gas $10.00 Gas $11.00 Gas 25 Note: All data includes $70.00 WTI assumption
  • 26. El Paso Offers Sustainable Long-Term Growth • Focus on growth opportunities • Pipelines working to expand committed inventory • E&P more profitable, more focused, increased opportunities post high grading • Committed to grow El Paso Pipeline Partners • Visible multi-year growth for both businesses – Pipelines 6%–8% EBIT growth – E&P 8%–12% production growth 26
  • 27. a meaningful company doing meaningful work delivering meaningful results Doug Foshee President and Chief Executive Officer Howard Weil Energy Conference April 8, 2008
  • 28. Appendix 28
  • 29. Disclosure of Non-GAAP Financial Measures The SEC’s Regulation G applies to any public disclosure or release of material information that includes a non-GAAP financial measure. In the event of such a disclosure or release, Regulation G requires (i) the presentation of the most directly comparable financial measure calculated and presented in accordance with GAAP and (ii) a reconciliation of the differences between the non-GAAP financial measure presented and the most directly comparable financial measure calculated and presented in accordance with GAAP. The required presentations and reconciliations are provided herein. El Paso uses the non-GAAP financial measure “earnings before interest expense and income taxes” or “EBIT” to assess the operating results and effectiveness of the company and its business segments. The company defines EBIT as net income (loss) adjusted for (i) items that do not impact its income (loss) from continuing operations, such as extraordinary items, discontinued operations, and the impact of accounting changes; (ii) income taxes; (iii) interest and debt expense; and (iv) distributions on preferred interests of consolidated subsidiaries. The company excludes interest and debt expense and distributions on preferred interests of consolidated subsidiaries so that investors may evaluate the company’s operating results without regard to its financing methods or capital structure. EBITDA is defined as EBIT plus depreciation, depletion, and amortization. El Paso’s business operations consist of both consolidated businesses as well as substantial investments in unconsolidated affiliates. As a result, the company believes that EBIT and EBITDA, which include the results of both these consolidated and unconsolidated operations, is useful to its investors because it allows them to evaluate more effectively the performance of all of El Paso’s businesses and investments. El Paso defines Resource Potential as subsurface volumes of oil and natural gas the company believes may be present and eventually recoverable. The company utilizes a net, geologic risk mean to represent this estimated ultimate recoverable amount. El Paso believes that the non-GAAP financial measures described above are also useful to investors because these measurements are used by many companies in the industry as a measurement of operating and financial performance and are commonly employed by financial analysts and others to evaluate the operating and financial performance of the company and its business segments and to compare the operating and financial performance of the company and its business segments with the performance of other companies within the industry. These non-GAAP financial measures may not be comparable to similarly titled measurements used by other companies and should not be used as a substitute for net income, earnings per share or other GAAP measurements. 29
  • 30. 30
  • 31. Production-Related Derivative Schedule 2008 2009 2010 2011–2012 Notional Avg. Hedge Notional Avg. Hedge Notional Avg. Hedge Notional Avg. Hedge Natural Gas Volume Price Volume Price Volume Price Volume Price (TBtu) ($/MMBtu) (TBtu) ($/MMBtu) (TBtu) ($/MMBtu) (TBtu) ($/MMBtu) Designated—EPEP Fixed price—Legacy 4.6 $ 3.42 4.6 $ 3.56 4.6 $3.70 6.8 $3.88 Fixed price 21.0 $ 8.37 Ceiling 121.1 $ 10.84 Floor 121.1 $ 8.00 Economic—EPEP Fixed price 7.3 $ 8.24 Ceiling 33.8 $ 10.43 47.5 $ 11.01 Floor 33.8 $ 8.00 47.5 $ 8.35 Economic—EPM Ceiling 16.8 $ 8.75 Floor Avg. ceiling 187.8 $ 10.21 68.9 $ 9.96 4.6 $3.70 6.8 $3.88 Avg. floor 187.8 $ 7.94 52.1 $ 7.93 4.6 $3.70 6.8 $3.88 2008 Notional Avg. Hedge Crude Oil Volume Price (MMBbls) ($/Bbl) Designated—EPEP 3.10 $ 90.48 Fixed price Economic—EPM 0.93 $ 57.03 Ceiling 0.93 $ 55.00 Floor 4.0 $ 82.76 Avg. ceiling 4.0 $ 82.29 Avg. floor 31 Note: Positions are as of April 4, 2008 (positions for full-year 2008)