How to Install Under Counter
LED strip lights
Supplies
(part one)
●
2 reels of ColorBright Warm White strip
lighting
●
100W Mean Well 12v Power Supply
●
Cerrowire extension
●
Strip-to-strip solderless connector
●
Strip-to-strip "no wire" solderless connector
●
LED strip Dimmer
Supplies
(part two)
●
Measuring tape
●
Wire strippers
●
Sharp scissors
●
4 wire nuts
●
3M Command Hanging Strips
●
Black electrical tape
Step 1:
Test your lights
● Lay out all the products to create a mock
installation to make sure you have all the
supplies necessary
● Unroll the LED strip lights from the plastic reel
● Attach all lengths of uncut lights to the power
supply
● Turn on the power supply
The strips should light up. If they do not, please
check your connections.
Step 1:
(continued)
Ask yourself - "Are these bright enough?", "Will I need a
dimmer", "Is the color perfect for my application?", "Are
all the LEDs lighting up and functioning properly?"
When the lights are functioning properly and you are
sure you have selected the correct color temperature
and brightness for you project, proceed to step two. If
they are not functioning as expected, there is usually a
simple connection error. We are here at every step of
the way for you to answer any questions.
Step 2
Take measurements
Before starting any of the installation process,
take careful measurements to determine how
many feet of strips will be necessary. Take notes
on the number and make accounts for any runs
over 16 ft., which will require you to connect
multiple lengths of strip lights together.
Step 3:
Cut the strips to length
Cut the strips to length with sharp scissors in
order to prepare them for the quick installation
process ahead.
Note: LED strips can only be cut along the
clearly marked lines that are evenly spaced after
every third LED chip.
Step 4:
Prepare strip-to-power connection
To attach the first section of lights into the
dimmer and power supply, we need to add
some length of low voltage extension wire to
the end of the first run of LED lights.
Once the low voltage wire is cut to length, strip
an inch of wire insulation from the wires coming
off the end of the LED strip and the low voltage
Cerrowire extension.
Step 5:
Secure strip-to-power connection
Wrap the exposed wires of the positive/negative
cables together, using wire nuts to secure the
connection.
Step 6:
Connecting two length of strips
To go around a 90 degree corner, we must
connect two lengths of LED strip together using
a strip-to-strip wire connecter.
To do this, first peel back a half inch of the the
3M tape on the back, exposing enough space
for a connection.
Step 7:
Unlock solderless connector mounting tray
Take the solderless connector and pull out the
mounting tray. Each solderless connector has
two sides, ensure that the wider faces upward.
Step 8:
Secure connector to the strip
Next, GENTLY secure the locking tray back in
place over the end of the flexible LED strip.
Make sure the mounting tray is securely closed,
or the lights will not work. Take note of positive
and negative charges marked on the strip and
match them to their corresponding wires on the
connector.
Repeat the process to attach the other end of
the strip-to-strip connector to the second run of
lights.
Step 9:
Connect strip-to-strip “no wire” connectors
For runs longer than 16 feet, we need to
connect two separate runs of LED strips .We
want a the transition to be seamless, so we use
strip-to-strip ("no wire") connectors to combine
the two lengths.
To complete this step, first cut the strips at
designated cut points. Then peel the adhesive
back on the strip as you did in step 4.
Step 10:
Clip together two lengths of strips
Clip into place the two lengths of strips using the
strip-to-strip "no wire" connector, again taking
care to create a firm point of contact between the
strips and correctly align positive/negative sides
Step 11:
Test strips again
Use a 2-way terminal block or wire nuts to
temporarily connect the full length of LED strip
lights with the power supply. If everything is wired
correctly, the lights should switch on when the
power supply is plugged in.
If they don't come on right away at full brightness,
check to see that the connectors are solidly
attached and that the negative and positive wires
are aligned correctly onto the strip.
Step 12:
Install the strip lights under the counter
Wipe down the under surface of the counter and
make sure it is clean. The 3M take will stick to
most non-porous and flat surfaces. For
applications under concrete or very rough
material, an additional adhesive may be used.
After wiping the under counter clean, peel back
the protective cover over the strip's adhesive
backing. Run the strip in a straight line under the
counter where you want the lights to shine.
Step 14:
Install the LED strip dimmer
To mount the dimmer to the wall, we suggest
using 3M Command Hanging Strips.
Next, wire the unplugged power supply into the
dimmer by running the wires (the black wire goes
in the negative (-) slot and the red wire goes into
the positive (+) slot) into the bottom housing on
the right side labeled "In". Use a flathead
screwdriver to secure the connection. Then wire
the Cerrowire into the section of the housing
labeled "Out", again using the screwdriver to
secure the wires into place.
Step 15:
Turn on the LED strip lights!
The last step is the easiest, but also the most
fulfilling step in the whole process. Now all you
have to do is plug in the power supply, turn up
the dimmer and enjoy your new under counter
LED lighting!
BEFORE
AFTER
With a little imagination and a clear picture of your
project in mind, you can do just about anything
with LED strip lights!
Do you need any help deciding which LED strip
lights are right for your commercial, industrial, or
home renovation project? Give us a call at 1-844-
FLEXFIRE (1-844-353-9347) or shoot us an email
to info@flexfireleds.com and we’d love to get
involved!

Contenu connexe

Tendances (7)

Physics 12
Physics 12Physics 12
Physics 12
 
Electricity653
Electricity653Electricity653
Electricity653
 
Standard Deviation
Standard DeviationStandard Deviation
Standard Deviation
 
Electrical engineering
Electrical engineeringElectrical engineering
Electrical engineering
 
Circuits1
Circuits1Circuits1
Circuits1
 
Significant digits
Significant digitsSignificant digits
Significant digits
 
Led bracelet instructions
Led bracelet instructionsLed bracelet instructions
Led bracelet instructions
 

En vedette

Internship report robi_recruitment___selection-libre (1)
Internship report robi_recruitment___selection-libre (1)Internship report robi_recruitment___selection-libre (1)
Internship report robi_recruitment___selection-libre (1)
Md Saifullah Khalid
 
Portfolio Landscape Architecture
Portfolio Landscape ArchitecturePortfolio Landscape Architecture
Portfolio Landscape Architecture
Andrea Cascapera
 
Landscape Architect CV - Ada Maciejak
Landscape Architect CV - Ada MaciejakLandscape Architect CV - Ada Maciejak
Landscape Architect CV - Ada Maciejak
Ada Maciejak
 
Revit Architecture
Revit ArchitectureRevit Architecture
Revit Architecture
niict
 
Architectural Design Works Portfolio 2009
Architectural Design Works Portfolio 2009Architectural Design Works Portfolio 2009
Architectural Design Works Portfolio 2009
Jiri Junek
 
Module 2 indian temple architecture
Module 2 indian temple architectureModule 2 indian temple architecture
Module 2 indian temple architecture
Binumol Tom
 
AMMAN J JORDAN PROFESIONAL ARCHITECTURE PORTFOLIO
AMMAN J JORDAN PROFESIONAL ARCHITECTURE PORTFOLIOAMMAN J JORDAN PROFESIONAL ARCHITECTURE PORTFOLIO
AMMAN J JORDAN PROFESIONAL ARCHITECTURE PORTFOLIO
Amman Jordan
 

En vedette (16)

Jennifer Wesselman's Digital Portfolio
Jennifer Wesselman's Digital PortfolioJennifer Wesselman's Digital Portfolio
Jennifer Wesselman's Digital Portfolio
 
Autodesk revit design building (interior)
Autodesk revit design building (interior) Autodesk revit design building (interior)
Autodesk revit design building (interior)
 
Internship report robi_recruitment___selection-libre (1)
Internship report robi_recruitment___selection-libre (1)Internship report robi_recruitment___selection-libre (1)
Internship report robi_recruitment___selection-libre (1)
 
My Amman
My AmmanMy Amman
My Amman
 
Enterprise Architecture Courseware by ITpreneurs
Enterprise Architecture Courseware by ITpreneursEnterprise Architecture Courseware by ITpreneurs
Enterprise Architecture Courseware by ITpreneurs
 
Portfolio Landscape Architecture
Portfolio Landscape ArchitecturePortfolio Landscape Architecture
Portfolio Landscape Architecture
 
Architectural Portfolio - Shilpa
Architectural Portfolio - Shilpa Architectural Portfolio - Shilpa
Architectural Portfolio - Shilpa
 
Landscape Architect CV - Ada Maciejak
Landscape Architect CV - Ada MaciejakLandscape Architect CV - Ada Maciejak
Landscape Architect CV - Ada Maciejak
 
Revit Architecture
Revit ArchitectureRevit Architecture
Revit Architecture
 
Architectural Design Works Portfolio 2009
Architectural Design Works Portfolio 2009Architectural Design Works Portfolio 2009
Architectural Design Works Portfolio 2009
 
Module 2 indian temple architecture
Module 2 indian temple architectureModule 2 indian temple architecture
Module 2 indian temple architecture
 
Architecture Portfolio Ashley Davis
Architecture Portfolio Ashley DavisArchitecture Portfolio Ashley Davis
Architecture Portfolio Ashley Davis
 
Building Information Modeling (BIM)
Building Information Modeling (BIM)Building Information Modeling (BIM)
Building Information Modeling (BIM)
 
My Architectural Portfolio.
My Architectural Portfolio.My Architectural Portfolio.
My Architectural Portfolio.
 
Revit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) PresentationRevit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) Presentation
 
AMMAN J JORDAN PROFESIONAL ARCHITECTURE PORTFOLIO
AMMAN J JORDAN PROFESIONAL ARCHITECTURE PORTFOLIOAMMAN J JORDAN PROFESIONAL ARCHITECTURE PORTFOLIO
AMMAN J JORDAN PROFESIONAL ARCHITECTURE PORTFOLIO
 

Similaire à How to install under counter LED strip lights

Ldr house activity
Ldr house activityLdr house activity
Ldr house activity
robongiers
 
Fit extra electrical sockets
Fit extra electrical socketsFit extra electrical sockets
Fit extra electrical sockets
Zulaiha Amaria
 
Itc 514 informational power point
Itc 514 informational power pointItc 514 informational power point
Itc 514 informational power point
pauhav
 

Similaire à How to install under counter LED strip lights (20)

How to Install LED Flexible Strips ?
How to Install LED Flexible Strips ?How to Install LED Flexible Strips ?
How to Install LED Flexible Strips ?
 
T8 led tubes
T8 led tubesT8 led tubes
T8 led tubes
 
Ldr house activity
Ldr house activityLdr house activity
Ldr house activity
 
EVANNEX - Lighted Emblem Installation Guide for Tesla Model S
EVANNEX - Lighted Emblem Installation Guide for Tesla Model SEVANNEX - Lighted Emblem Installation Guide for Tesla Model S
EVANNEX - Lighted Emblem Installation Guide for Tesla Model S
 
M lite mr-series-led-upgrade-kit-installation-instructions 3 led light bars m...
M lite mr-series-led-upgrade-kit-installation-instructions 3 led light bars m...M lite mr-series-led-upgrade-kit-installation-instructions 3 led light bars m...
M lite mr-series-led-upgrade-kit-installation-instructions 3 led light bars m...
 
Build-It: Dimmable LED lantern
Build-It: Dimmable LED lanternBuild-It: Dimmable LED lantern
Build-It: Dimmable LED lantern
 
Led cube
Led cubeLed cube
Led cube
 
How To Install A Car Amplifier
How To Install A Car AmplifierHow To Install A Car Amplifier
How To Install A Car Amplifier
 
CSS L15 - CRIMPING ETHERNET AND RJ-45
CSS L15  - CRIMPING ETHERNET AND RJ-45CSS L15  - CRIMPING ETHERNET AND RJ-45
CSS L15 - CRIMPING ETHERNET AND RJ-45
 
CSS L15 - CRIMPING ETHERNET CABLE AND RJ45
CSS L15 - CRIMPING ETHERNET CABLE AND RJ45CSS L15 - CRIMPING ETHERNET CABLE AND RJ45
CSS L15 - CRIMPING ETHERNET CABLE AND RJ45
 
Install-mast-accessories.pptx
Install-mast-accessories.pptxInstall-mast-accessories.pptx
Install-mast-accessories.pptx
 
M-Lite Installation instructions for our 2x2 led light bar retrofit kit
M-Lite Installation instructions for our 2x2 led light bar retrofit kitM-Lite Installation instructions for our 2x2 led light bar retrofit kit
M-Lite Installation instructions for our 2x2 led light bar retrofit kit
 
Fit extra electrical sockets
Fit extra electrical socketsFit extra electrical sockets
Fit extra electrical sockets
 
Wire Wrapped Sweetheart Round Cabochon Pendant
Wire Wrapped Sweetheart Round Cabochon PendantWire Wrapped Sweetheart Round Cabochon Pendant
Wire Wrapped Sweetheart Round Cabochon Pendant
 
Garduino automated gardening system
Garduino    automated gardening systemGarduino    automated gardening system
Garduino automated gardening system
 
Under Cabinet Lighting - UC2A Series from iLuXx - Installation Guide
Under Cabinet Lighting - UC2A Series from iLuXx - Installation GuideUnder Cabinet Lighting - UC2A Series from iLuXx - Installation Guide
Under Cabinet Lighting - UC2A Series from iLuXx - Installation Guide
 
SolarEdge Backup Interface Installation.pptx
SolarEdge Backup Interface Installation.pptxSolarEdge Backup Interface Installation.pptx
SolarEdge Backup Interface Installation.pptx
 
Cable preparation in CCTV
Cable preparation in CCTVCable preparation in CCTV
Cable preparation in CCTV
 
Itc 514 informational power point
Itc 514 informational power pointItc 514 informational power point
Itc 514 informational power point
 
WIRE BREAK CIRCUIT ALARAM
WIRE BREAK CIRCUIT ALARAMWIRE BREAK CIRCUIT ALARAM
WIRE BREAK CIRCUIT ALARAM
 

Dernier

Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Victor Rentea
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 

Dernier (20)

"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontology
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 

How to install under counter LED strip lights

  • 1. How to Install Under Counter LED strip lights
  • 2. Supplies (part one) ● 2 reels of ColorBright Warm White strip lighting ● 100W Mean Well 12v Power Supply ● Cerrowire extension ● Strip-to-strip solderless connector ● Strip-to-strip "no wire" solderless connector ● LED strip Dimmer
  • 3. Supplies (part two) ● Measuring tape ● Wire strippers ● Sharp scissors ● 4 wire nuts ● 3M Command Hanging Strips ● Black electrical tape
  • 4.
  • 5. Step 1: Test your lights ● Lay out all the products to create a mock installation to make sure you have all the supplies necessary ● Unroll the LED strip lights from the plastic reel ● Attach all lengths of uncut lights to the power supply ● Turn on the power supply The strips should light up. If they do not, please check your connections.
  • 6. Step 1: (continued) Ask yourself - "Are these bright enough?", "Will I need a dimmer", "Is the color perfect for my application?", "Are all the LEDs lighting up and functioning properly?" When the lights are functioning properly and you are sure you have selected the correct color temperature and brightness for you project, proceed to step two. If they are not functioning as expected, there is usually a simple connection error. We are here at every step of the way for you to answer any questions.
  • 7.
  • 8. Step 2 Take measurements Before starting any of the installation process, take careful measurements to determine how many feet of strips will be necessary. Take notes on the number and make accounts for any runs over 16 ft., which will require you to connect multiple lengths of strip lights together.
  • 9.
  • 10. Step 3: Cut the strips to length Cut the strips to length with sharp scissors in order to prepare them for the quick installation process ahead. Note: LED strips can only be cut along the clearly marked lines that are evenly spaced after every third LED chip.
  • 11.
  • 12. Step 4: Prepare strip-to-power connection To attach the first section of lights into the dimmer and power supply, we need to add some length of low voltage extension wire to the end of the first run of LED lights. Once the low voltage wire is cut to length, strip an inch of wire insulation from the wires coming off the end of the LED strip and the low voltage Cerrowire extension.
  • 13.
  • 14. Step 5: Secure strip-to-power connection Wrap the exposed wires of the positive/negative cables together, using wire nuts to secure the connection.
  • 15.
  • 16.
  • 17. Step 6: Connecting two length of strips To go around a 90 degree corner, we must connect two lengths of LED strip together using a strip-to-strip wire connecter. To do this, first peel back a half inch of the the 3M tape on the back, exposing enough space for a connection.
  • 18.
  • 19. Step 7: Unlock solderless connector mounting tray Take the solderless connector and pull out the mounting tray. Each solderless connector has two sides, ensure that the wider faces upward.
  • 20.
  • 21.
  • 22. Step 8: Secure connector to the strip Next, GENTLY secure the locking tray back in place over the end of the flexible LED strip. Make sure the mounting tray is securely closed, or the lights will not work. Take note of positive and negative charges marked on the strip and match them to their corresponding wires on the connector. Repeat the process to attach the other end of the strip-to-strip connector to the second run of lights.
  • 23.
  • 24. Step 9: Connect strip-to-strip “no wire” connectors For runs longer than 16 feet, we need to connect two separate runs of LED strips .We want a the transition to be seamless, so we use strip-to-strip ("no wire") connectors to combine the two lengths. To complete this step, first cut the strips at designated cut points. Then peel the adhesive back on the strip as you did in step 4.
  • 25.
  • 26. Step 10: Clip together two lengths of strips Clip into place the two lengths of strips using the strip-to-strip "no wire" connector, again taking care to create a firm point of contact between the strips and correctly align positive/negative sides
  • 27.
  • 28.
  • 29. Step 11: Test strips again Use a 2-way terminal block or wire nuts to temporarily connect the full length of LED strip lights with the power supply. If everything is wired correctly, the lights should switch on when the power supply is plugged in. If they don't come on right away at full brightness, check to see that the connectors are solidly attached and that the negative and positive wires are aligned correctly onto the strip.
  • 30.
  • 31. Step 12: Install the strip lights under the counter Wipe down the under surface of the counter and make sure it is clean. The 3M take will stick to most non-porous and flat surfaces. For applications under concrete or very rough material, an additional adhesive may be used. After wiping the under counter clean, peel back the protective cover over the strip's adhesive backing. Run the strip in a straight line under the counter where you want the lights to shine.
  • 32.
  • 33.
  • 34. Step 14: Install the LED strip dimmer To mount the dimmer to the wall, we suggest using 3M Command Hanging Strips. Next, wire the unplugged power supply into the dimmer by running the wires (the black wire goes in the negative (-) slot and the red wire goes into the positive (+) slot) into the bottom housing on the right side labeled "In". Use a flathead screwdriver to secure the connection. Then wire the Cerrowire into the section of the housing labeled "Out", again using the screwdriver to secure the wires into place.
  • 35.
  • 36. Step 15: Turn on the LED strip lights! The last step is the easiest, but also the most fulfilling step in the whole process. Now all you have to do is plug in the power supply, turn up the dimmer and enjoy your new under counter LED lighting!
  • 37.
  • 39. AFTER
  • 40. With a little imagination and a clear picture of your project in mind, you can do just about anything with LED strip lights! Do you need any help deciding which LED strip lights are right for your commercial, industrial, or home renovation project? Give us a call at 1-844- FLEXFIRE (1-844-353-9347) or shoot us an email to info@flexfireleds.com and we’d love to get involved!