This document proposes an innovative and more cost-effective plan for expanding subway lines in York Region. The "Smart Subways" plan would build 14.5 km of tunneling for $800 million, including 9 free subway stations, with no operating costs. This is far less than the estimated $3.56 billion and ongoing operating costs of the existing plan. The innovative approach uses precision-controlled trains that can bypass or shuttle between stations, reducing travel times and costs.
York region smart subways and smart stations innovatiion by sharon yetman
1. Did you know ...
York Region's
Yonge Subway
Could cost
JUST 750 MILLION DOLLARS?
2. Correction...
That is ...
125 Million Dollars
York Region's Share
For 7.4 Km's of Subway
WITH A BUILT IN 50% Contingency
The next slide declares LINE by LINE...
York Region's share should only have been
113 Million Dollars on the Spadina Subway.
WITH A 100% Built-in Contingency
4. Sharon Yetman Plan A: John Tory Plan
14.5 Kilometres 5.6 Km's
9 Stations Just1 Station
Zero Operating Costs 30 Million/Yr
1.2 Billion $ 3.56 Billion $
5. “Smart Subways” FLOW PLAN:
10 – 3 Car Trains (adaptable)
ZERO OPERATION COSTS
Train Every 4 Minutes either direction
STC to Kennedy – 6 Minutes
STC to Don Mills – 12 Minutes
9 Free “Smart Stations”
And fully funded!
Sharon Yetman
Innovation Plan A:
6. Trains MEET with Computer Operated Precision
And By-Pass OR act as SHUTTLE SYSTEM
As Shuttle System: EASY TRANSFER
only about 12 second lengthened dwell !
Built Underground
Prepped for Future
FREE STATIONS
7. NO 2 Trains can collide
Trains MEET with Precision
EASY 20 Second Transfer
Wheelchairs always go first
Platform Ready for
EASY future
Station Access from Above
8. Yetman A Plan Cost:
14.5 Km's of Tunnelling
With Free Operational System
= 800 Mllion Dollars (55 Million/Km)
9 Short Subways = 90 Million
9 Short Platforms = 90 Million
Innovation Fee = .5 Million
200 Million Contingency
Toronto Planning select precise station locations with drawings !
TOTAL = 1.2 Billion Dollars
9. Sharon Yetman Plan B: John Tory Plan:
5 Stations 1 Station
2 Minute Service 6 to 9 Minute Service
Innovative Dome Disruption & Gridlock
Cost less than 500 Million Dollars
Less the 325 Million Dollar
Kennedy Station Savings
Project complete 1-2 Years Complete in 10 Years
Total Cost 175 Million Dollars 3.56 Billion $
13. With one tunnel system
A Train can arrive
EVERY 3 Minutes
6 Trains = 120 Million
“Smart Subways” = 550 Million Dollars
14. YORK Planners
Choose exact Station Locations
And do all drawings !
While ALL YOUR SUBWAYS ARE FREE using “Smart Stations”
YORK = 125 MILLION
TORONTO = 125 MILLION
Province = 250 Million
Federal = 250 Million
Built-In Contingency = 250 Million @ 50%
16. “Smart Subways” is like a
“MINI SUBWAY SYSTEM”
Innovatively built within a BROADER SUBWAY SYSTEM,
While uniquely creating FREE OPERATIONAL COSTS !
While uniquely creating FREE SUBWAY STATIONS !
17. TTC's Expensive
“NON” Innovative System
400 Million/Km
York Region
INNOVATIVE
SUBWAY SYSTEM
80 Million in Total/Km
“6 Free Stations”
&
“Tunnelling Cost HALF”
Saves 320 Million/Km
19. SSE –New Cost –
Under 1 Billion Dollars
3 to 5 Stations
Free Operational Costs
With 3 FREE “Smart Stations” Plan
20. SSE –Or 9 to 10 FREE Subway Stations
To Don Mills Station
STILL UNDER 1 Billion Dollars,
“Smarter” to plan for complete subway plan system!
Innovators design bigger picture subway systems !
21. YSE – 6 FREE Subway Stations,
Under 1 Billion Dollars,
Completed 4 Years Faster to Richmond Heights Station
Free Operational Costs
22. TTTTechnically ...
Revenue - 40% York Region
60% - TTC, (example)
York Region build YTC Subway System,
TTC retained to Maintain Track + Trains.
23. A different Tunnel Machine does this section
Tunnel
Innovation
ONLY Short Platforms required !
LIKELY JUST 3 CAR Platforms
Boring Machines remain underground until Durham Region or Don Mills Station
While Centre Platforms are constructed from Kennedy eastward.
28. Suppose the SSE was...
TWICE as LONG
COST LESS TO BUILD
Had 9 FREE “Smart Stations”, instead of just 1 expensive one...
And had...
60 Million Annuallized Average Operating Costs,
Becoming YOUR AMMORTIZED CAPITAL COSTS paid for.. meaning
NOW YOUR ...NOW YOUR ... Subway Cost is Almost Free
9 Free “Smart Stations”
+ Almost 3 times the Subway Length !
31. It's ALL ABOUT ...
“Finding the Efficiencies”
That ONLY
Innovators do !
32. ... as recap
Every PlatformPlatform is “prepped” for
FUTURE FREE SUBWAY STATIONS
Each Station adds just 12 seconds to your commute
WHILE SAVING 3 Billion Dollars
33. * MEET WITH PRECISION
* have lots of extra WIDE DOORS
*Operate Driverless
*Can Never Collide
Easy Passenger Flow -Traffic Lighting
SHORT 20 SECOND DWELL
Easy Future Street Access
34. NO 2 Trains can collide
Trains MEET with Precision
EASY 20 Second Transfer
Wheelchairs always go first
Platform Ready for
EASY future
Station Access from Above
35. Trains MEET with Computer Operated Precision
And By-Pass OR act as SHUTTLE SYSTEM
As Shuttle System: EASY TRANSFER
only about 12 second lengthened dwell !
Built Underground
Prepped for Future
FREE STATIONS
36. New Cost of SSE
= 560 Million Dollars
FREE to operate
Old Cost 4.6 Billion
PLUS Operation Costs
37. New Cost of YSE
= 750 Million Dollars
FREE to operate
Old Cost = 4 Billion
+ Opertional Costs
1 Less Access Station
38. Transit Innovation Plan
Creates...
● Free Subway Stations
● HALF COST Tunnelling
● FREE OPERATIONAL COSTS
● Operational Savings pays for Capital Costs !.
Subway Paid by Operational SAVINGS over 50 years.
OLD SUBWAY Cost - 3.56 Billion Dollars
NEW INNOVATIVE SUBWAY Cost – 800 Million Dollars.
39. Innovation Plan B
● Since Kennedy Reconstruction
has 325 Million Dollars in Savings
... Such Savings pays for
1. “Innovative Dome”
2. “Innovative Spur”
3. “The Innovator's Fee”
(the same small fee TTC paid for a
13 Page Report to steal my Yonge/Bloor Solution)
46. INNOVATION is the “Better and ONLY WAY TO SAVINGS”
Sharon Yetman of
Platform Technology Consultancy
2 Times Dragon's Den Winning Contestant
5 Registered Transit Inventions with CIPO
47. Because of TTC's Pride..
● I went on to invent
“Smart Track”
“Smart Subways”
“Smart Stations”
“Smart LRT”
“Smart Streetcars”
“Smart Flow Technology”
...for Union Station and the SSE.
● (EACH saving multiple billions of dollars).
48. Kindly contact me at platformtechnology@yahoo.ca
Sharon Yetman
If you care about the “Taxpayers Bottom Line”
And Getting Transit Built Faster
I have other more DESCRIPTIVE and DETAILED
“Smart Stations” and “Smart Subways” Presentations
From 2011, when I was attempting to save 1 Billion Dollars on the York-Spadina Subway
49. There is a reason why I have 1,600 Linkedin Followers,
70+ Metrolinx Followers, 60+ MTO Followers,
50. Innovators have only 1 TOOL,
Timing ...
Let the professionals make their mistakes,
than in the 11th
hour,
DECLARE YOUR INNOVATION SOLUTIONS !
51. Thank you for listening.
Kindly take the next step and connect with me,
And help me SAVE TAXPAYERS BILLIONS !
Sharon Yetman
PlatformTechnology@yahoo.ca
Platform Technology Consultancy
Canada's ONLY Transit Innovation Firm
.