May 2014
 INTRODUCTION
 SCOPE
 VISION & MISSION
 HSE Management System (MS)
 2. HSE POLICY
 3. HSE ORGANIZATION CHART
 4. HSE HAZARD IDENTIFICATIO RISK ASSESSMENT (HIRA) COMMUNICATION
 5. HSE PROGRAM & PERFORMANCE
 HSE IMPROVEMENT
 HSE MASTER DOCUMENT REGISTER
 SHO CARD REPORT
 6. HSE INCIDENT / ACCIDENT REPORT
 HSE INSPECTION REPORT
 8. HSE AUDIT
 HSE PERFORMANCE STATISTIC OVERALL (2010 – 2014)
 TRIR PT GUF vs WORLD WIDE
2
3
Our Health Safety & Environment Management System is a part of
overall PTG management system and established based on integrated
system of SMK3 PP No.50 /2012, OHSAS 18001:2007, ISO 14001:2004
and ISO 9001:2000. PTG HSE Management system covered
organization, structure, responsibility, procedures, processes,
resources and objectives and developed to meet statutory regulations
and compliance to standard requirements for implementing the
Health, Safety and Environment Management System of PTG business
and operations
4
This HSEMS is applied by. PT. Gunanusa Utama Fabricators
and its subcontractors during fabrication activities at PTG
Yard or in other site under PTG control and the main objective
is to achieve HSE Objectives.
5
VISION STATEMENT
TO BE A WORLD CLASS AND MARKET-LEADING TURNKEY ENGINEERING
COMPANY WITHIN THE OIL & GAS AND HEAVY CONSTRUCTION
INDUSTRIES
MISSION STATEMENT
TO BE A GLOBAL OPERATING COMPANY BY 2014 WITH SUSTAINABLE
REVENUE, DELIVERING ALL PROJECTS WITHIN BUDGET AND SCHEDULE
WHILST MEETING INTERNATIONALLY ACCEPTABLE QUALITY & SAFETY
STANDARDS
SHARED VALUE
INTEGRITY, MAGNANIMOUS, PROFESIONAL, AMIABLE, CARING AND TEAM
WORK
6
1. Leadership and Commitment
2. Policy and Strategic Objective
3. Organization, Resources and
Documentation :
A. Organizational structure and
responsibilities
B. Management Representative(s)
C. Resources
D. Competence
E. Subcontractors
F. Communication
G. Documentation and its control
4. Evaluation and Risk Management
A. Identification of hazards and
effects
B. Evaluation
C. Recording of hazards and effects
D. Objectives and performance
criteria
E. Risk reduction measures
7
5. Planning
A. General
B. Asset Integrity
C. Procedures and Work Instructions
D. Management Of Change
E. Contingency and Emergency Planning
7. Auditing and Reviewing
A. Activities and Tasks
B. Monitoring
C. Records
D. Non-compliance and corrective
action
E. Incident reporting
F. Incident follow-up
6. Implementation and Monitoring
A. Auditing
B. Reviewing
8
HSEMS Element Addressing
1 Leadership and Commitment Top-down & Down-Top commitment and company culture,
essential to the success of the system.
2 Policy and Strategic Objective Corporate intention, principles of action and aspirations
with respect to health, safety and environment.
3 Organization, resources and
documentation
Organization of people, resources and documentation for
sound HSE Performance
4 Evaluation and risk
management
Identification and evaluation of HSE risks, for activities,
products and services, and development of risk reduction
measures.
5 Planning Planning the conduct of work activities, including planning
for changes and emergency response
6 Implementation and
monitoring
Performance and monitoring of activities, and how
corrective action is to be taken when necessary
7 Auditing and reviewing Periodic assessment of system performance, effectiveness
and fundamental suitability
9
10
11
• Conduct HIRA Meeting to discuss for preparing the critical job
risk assessment.
• Socialized Last Minute Risk Assessment Card during Safety
induction.
• Conduct pre job meeting to personnel involved for socialized
JRA prior starting the critical job.
• Apply JRA (Job Risk Assessment) for routine job.
• Lesson learned socialization trough Tool Box Meeting.
• Conduct JRA training regularly.
HIRA WORK SHEET
JRA (Job Risk
Assessment)
12
1. Preparation of HSE PLAN
HSE Policy review
HSE Objective review
Set-up/Up-dated HSE
Organization chart/struct
Set-up/Up-dated HSE
personnel job description
Up-dated Health & Safety
Management Plan
Up-dated Environmental
Management Plan
Up-dated Waste
Management Plan
Up-dated Emergency
Response Plan
Up-dated HSE Manual &
Procedures
Hazard Identification
2. HSE ACTIVITY
Safety Induction to New
Hires
Personal Protective
Equipment Issued
Medical Check-
up
Internal HSE
Audit
Risk Assesment/ TRA
HSE Meeting
Program
HSE Inspections
HSE Equipment
Inspections
Environmental Control &
Waste Management
HSE Records &
Reports
Work Permits Issued and
Control
3. SAFETY
ADMINISTRATION
Provided Safety Work
instruction / Safety
Plan
Heavy Equipments Test
load & Recertification
Color coding system for
lifting gears
Equipments &
lifting gears
tagging
Safety record &
filling
HSE objectives
achievements
monitoring
4. SUBSTANDARD
CONDITION/ACT
IDENTIFICATION
Anomaly or
Hazob or Stop
card issue
Follow-up of
corrective
action
Violation Card
System
5. TRAINING
PROGRAM
In-house safety
training
External safety
training
On the job
safety training
Emergency drill
6. AUDIT
HSE Internal
Audit
Subcontractors
Audit
External Audit
from Clients
7.SAFETYAWARD
8.SAFETYCAMPAIGN
13
14
Work Package (WP) 10/13
HSE MANAGEMENT, CONTROL AND PROCEDURE
Wu 10.1/13.1
HSE
DELIVERABLES
Exhibit A Scope
of Work
MDR
WU 10.2/13.2
HSEIMPROVEMENTSAT
WORKSHOP/WORKSITE
Exhibit L– HSE Requirements
HSEProgram
Att. G3 Cut Off date Calendar
HSEProcedure:MM-YAD-OO-
GUNA-020044:HSE
IMPROVEMENTPLAN – AFC
WU 10.2/13.3
HSEINCENTIVE
SCHEME
Exhibit B – Schedule Of Prices
Section6. HSEIncentive Scheme
HSEProcedure:MM-YAD-
00-GUNA-020042 :
INCENTIVESCHEME
PROGRAM - AFC
WU 10.2/13.4
HSETRAINING
Exhibit L– HSE Requirements
HSEProcedure:MM-YAD-
00-GUNA-020018 : HSE
TRAINING PLAN - AFC
15
1 ID-SPA-ALL-2020-105010 PJC_SN2B&PCK7B_EPSC(1+2)_PRC_Scaffolding Procedure
2 ID-SPA-ALL-2020-105030 PJC_SN2B&PCK7B_EPSC(1+2)_PRC_CONTRACTOR Management Safety Tour Procedure
3 ID-SPA-ALL-2020-105040 PJC_SN2B&PCK7B_EPSC(1+2)_PRC_Work Permit System Procedure
4 ID-SPA-ALL-2020-105050 PJC_SN2B&PCK7B_EPSC(1+2)_PLN_Safety Risk Management
5 ID-SPA-ALL-2020-105060 PJC_SN2B&PCK7B_EPSC(1+2)_PLN_Environment Management Plan
6 ID-SPA-ALL-2020-105070 PJC_SN2B&PCK7B_EPSC(1+2)_PLN_Security Management Plan
7 ID-SPA-ALL-2020-105080 PJC_SN2B&PCK7B_EPSC(1+2)_PRC_Medical Check-up Control Procedure
8 ID-SPA-ALL-2020-105090 PJC_SN2B&PCK7B_EPSC(1+2)_PLN_Personal Protective Equipment Control Procedure
9 ID-SPA-ALL-2020-105100 PJC_SN2B&PCK7B_EPSC(1+2)_PLN_Driving Policy
10 ID-SPA-ALL-2020-105110 PJC_SN2B&PCK7B_EPSC(1+2)_PLN_HSE Training Plan
Document TitleNo Technical Document number
16
Scheme
1
• WORKSITES AND CONSTRUCTION
EQUIPMENT STANDARDS IMPROVEMENT
(YARD)
Scheme
2
• IMPROVEMENT ABOVE SPECIFICATION
BASED ON COMPANY REQUEST (YARD &
SITE/OFFSHORE)
Scheme
3
• REMUNERATION BASED ON LEADING
INDICATORS (YARD & SITE/OFFSHORE)
Done
In Progress
17
Done
18
Cut Off Date January 24th, 2014
19
Foundblue Terpaulin at all Deckworkplace ProtectionUsingFire Blankets
as HOTWORK Activities
Foundcutters that usedbyworkers tocut cable andothers. Change withcuttingcable andsocialize
howtouse cuttingcable correctly.
20
Cut Off Date January 24th, 2014
21
48%
1%1%7%
1%
11%
16%
4%
0% 11%
0%
0%
Risk Situations Traffic Gestures/Postures/Tools
PPE PermitTo work Lifting
WorkOnPowered Systems ConfinedSpaces Excavation Works
WorkingATHeight ChangeManagement Simultanous Operations and Co-activities
COMPANY
SAFETYHAZARDOBSERVATIONCARDCHART
PERIOD: Jan'2012toJan 2014
52%
1%
2%
17%
1%
7%
15%
1% 0% 3%
0%
1%
Risk Situations Traffic
Gestures/Postures/Tools PPE
PermitTo work Lifting
Work On Powered Systems Confined Spaces
Excavation Works WorkingAT Height
Change Management Simultanous Operations and Co-activities
CONTRACTOR
SAFETY HAZARD OBSERVATION CARD CHART
PERIOD : Jan'2012 toJan 2014
22
23
24
Distribution Panel & Extension Panel Inspection
25
External by TEPM
26
Over the last 5 (five) years
27
Over the last 5 (five) years
12,250,874
5,143,427
2,592,608
11,265,450
668,017-
2,000,000
4,000,000
6,000,000
8,000,000
10,000,000
12,000,000
14,000,000
2010 2011 2012 2013 2014
HoursWorked
(Including Company, Contractors andSubcontractors)
LTI
Cut Off Date January 31th, 2014
28
Over the last 5 (five) years
Cut Off Date January 31th, 2014
FAT
LTI
LWDC
RWDC + MTC
FAC
NMI
ANOMALY/CeRMAT
Manhours
0
3
13
2
42
108
1,873
31,920,376
29
0
1
2
3
4
5
6
7
8
1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013
PT GUNANUSA and World Wide TRIR Trends
PTG WW
World Wide data from The International Association of Oil & Gas Producers (OGP) Reports
30

Contenu connexe

Tendances

Safety commitee meeting
Safety commitee meetingSafety commitee meeting
Safety commitee meetingsssaravana
 
Achieving Safety Culture HSE Presentation HSE Formats.pptx
Achieving Safety Culture HSE Presentation HSE Formats.pptxAchieving Safety Culture HSE Presentation HSE Formats.pptx
Achieving Safety Culture HSE Presentation HSE Formats.pptxolorunyomi wale
 
HSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptHSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptssuser0ebdc3
 
The Keys to Unlocking Safety Culture
The Keys to Unlocking Safety CultureThe Keys to Unlocking Safety Culture
The Keys to Unlocking Safety CultureMedgate Inc.
 
Basic safety
Basic safetyBasic safety
Basic safetyLalit M
 
Health safety induction_overview
Health safety induction_overviewHealth safety induction_overview
Health safety induction_overviewzz_bedee
 
BANKSMAN TRAINING.ppt
BANKSMAN TRAINING.pptBANKSMAN TRAINING.ppt
BANKSMAN TRAINING.pptKamran Zafar
 
HSE Management.pptx
HSE Management.pptxHSE Management.pptx
HSE Management.pptxfawad71
 
Permit to work system
Permit to work systemPermit to work system
Permit to work systemAsif Khan
 
3 emergency management risk assessment templates
3 emergency management risk assessment templates3 emergency management risk assessment templates
3 emergency management risk assessment templatesDwarika Bhushan Sharma
 
New Employee Orientation 05
New Employee Orientation 05New Employee Orientation 05
New Employee Orientation 05txsafety1
 
Ppt for IMPROVEMENT OF SAFETY THROUGH SAFETY MANAGAMENT PLAN – office p...
Ppt for IMPROVEMENT OF SAFETY   THROUGH    SAFETY MANAGAMENT PLAN –  office p...Ppt for IMPROVEMENT OF SAFETY   THROUGH    SAFETY MANAGAMENT PLAN –  office p...
Ppt for IMPROVEMENT OF SAFETY THROUGH SAFETY MANAGAMENT PLAN – office p...AMIT SAHU
 
Occupational health and safety implementation
Occupational health and safety implementationOccupational health and safety implementation
Occupational health and safety implementationDr Madhu Aman Sharma
 
Behaviour based safety
Behaviour based safetyBehaviour based safety
Behaviour based safetyPrudhvi raj
 
EMERGENCY RESPONSE TEAM (ERT).pptx
EMERGENCY RESPONSE TEAM (ERT).pptxEMERGENCY RESPONSE TEAM (ERT).pptx
EMERGENCY RESPONSE TEAM (ERT).pptxssuserd19c3e
 

Tendances (20)

HIRA training
HIRA   trainingHIRA   training
HIRA training
 
Safety commitee meeting
Safety commitee meetingSafety commitee meeting
Safety commitee meeting
 
Achieving Safety Culture HSE Presentation HSE Formats.pptx
Achieving Safety Culture HSE Presentation HSE Formats.pptxAchieving Safety Culture HSE Presentation HSE Formats.pptx
Achieving Safety Culture HSE Presentation HSE Formats.pptx
 
HSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptHSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.ppt
 
The Keys to Unlocking Safety Culture
The Keys to Unlocking Safety CultureThe Keys to Unlocking Safety Culture
The Keys to Unlocking Safety Culture
 
Basic safety
Basic safetyBasic safety
Basic safety
 
Health safety induction_overview
Health safety induction_overviewHealth safety induction_overview
Health safety induction_overview
 
BANKSMAN TRAINING.ppt
BANKSMAN TRAINING.pptBANKSMAN TRAINING.ppt
BANKSMAN TRAINING.ppt
 
HSE Management.pptx
HSE Management.pptxHSE Management.pptx
HSE Management.pptx
 
Permit to work system
Permit to work systemPermit to work system
Permit to work system
 
Staff safety hand book
Staff   safety hand bookStaff   safety hand book
Staff safety hand book
 
3 emergency management risk assessment templates
3 emergency management risk assessment templates3 emergency management risk assessment templates
3 emergency management risk assessment templates
 
Workplace hazards
Workplace hazardsWorkplace hazards
Workplace hazards
 
New Employee Orientation 05
New Employee Orientation 05New Employee Orientation 05
New Employee Orientation 05
 
HSE REPORT 2013-2014.ppt
HSE REPORT 2013-2014.pptHSE REPORT 2013-2014.ppt
HSE REPORT 2013-2014.ppt
 
Ppt for IMPROVEMENT OF SAFETY THROUGH SAFETY MANAGAMENT PLAN – office p...
Ppt for IMPROVEMENT OF SAFETY   THROUGH    SAFETY MANAGAMENT PLAN –  office p...Ppt for IMPROVEMENT OF SAFETY   THROUGH    SAFETY MANAGAMENT PLAN –  office p...
Ppt for IMPROVEMENT OF SAFETY THROUGH SAFETY MANAGAMENT PLAN – office p...
 
Occupational health and safety implementation
Occupational health and safety implementationOccupational health and safety implementation
Occupational health and safety implementation
 
Behaviour based safety
Behaviour based safetyBehaviour based safety
Behaviour based safety
 
EMERGENCY RESPONSE TEAM (ERT).pptx
EMERGENCY RESPONSE TEAM (ERT).pptxEMERGENCY RESPONSE TEAM (ERT).pptx
EMERGENCY RESPONSE TEAM (ERT).pptx
 
Construction Safety Training
Construction Safety TrainingConstruction Safety Training
Construction Safety Training
 

Similaire à Hse presentation general rev.00 may 2014

US5620 A3 2012002052 FS
US5620 A3 2012002052 FSUS5620 A3 2012002052 FS
US5620 A3 2012002052 FSPhillip Jonker
 
PECB Webinar: Occupational Hazard Identification Risk Assessment and Risk Con...
PECB Webinar: Occupational Hazard Identification Risk Assessment and Risk Con...PECB Webinar: Occupational Hazard Identification Risk Assessment and Risk Con...
PECB Webinar: Occupational Hazard Identification Risk Assessment and Risk Con...PECB
 
Health and safety
Health and safetyHealth and safety
Health and safetyMahmood Ali
 
QESH Training slides with Check list for
QESH Training slides with Check list forQESH Training slides with Check list for
QESH Training slides with Check list forGobiNava1
 
EMS OHSAS Awareness Traning .pptx
EMS OHSAS Awareness Traning .pptxEMS OHSAS Awareness Traning .pptx
EMS OHSAS Awareness Traning .pptxAshweeniTiwari
 
Jd hse supervisor (abu samra)
Jd  hse supervisor (abu samra)Jd  hse supervisor (abu samra)
Jd hse supervisor (abu samra)Daryl Wake
 
ISO 14001 ems & OHSAS18001
ISO 14001 ems & OHSAS18001 ISO 14001 ems & OHSAS18001
ISO 14001 ems & OHSAS18001 Erma Noralia
 
Bizsafe Risk Assessment
Bizsafe Risk AssessmentBizsafe Risk Assessment
Bizsafe Risk Assessmentsearchgeeksg
 
Bizsafe risk assessment
Bizsafe risk assessmentBizsafe risk assessment
Bizsafe risk assessmentsearchgeeksg
 
CV_Senior HSEQ Officer_ Ayman Morshed
CV_Senior HSEQ Officer_ Ayman MorshedCV_Senior HSEQ Officer_ Ayman Morshed
CV_Senior HSEQ Officer_ Ayman MorshedAyman Morshed
 
Resume - SHIVAVIKRAM
Resume - SHIVAVIKRAMResume - SHIVAVIKRAM
Resume - SHIVAVIKRAMShiva Vikram
 

Similaire à Hse presentation general rev.00 may 2014 (20)

Hse 6 revision_2
Hse 6 revision_2Hse 6 revision_2
Hse 6 revision_2
 
US5620 A3 2012002052 FS
US5620 A3 2012002052 FSUS5620 A3 2012002052 FS
US5620 A3 2012002052 FS
 
PECB Webinar: Occupational Hazard Identification Risk Assessment and Risk Con...
PECB Webinar: Occupational Hazard Identification Risk Assessment and Risk Con...PECB Webinar: Occupational Hazard Identification Risk Assessment and Risk Con...
PECB Webinar: Occupational Hazard Identification Risk Assessment and Risk Con...
 
Welcome heath safety
Welcome heath safetyWelcome heath safety
Welcome heath safety
 
Welcome heath safety
Welcome heath safetyWelcome heath safety
Welcome heath safety
 
Health and safety
Health and safetyHealth and safety
Health and safety
 
QESH Training slides with Check list for
QESH Training slides with Check list forQESH Training slides with Check list for
QESH Training slides with Check list for
 
Naren_Saudi
Naren_SaudiNaren_Saudi
Naren_Saudi
 
HSEQ (IMS) by Saad Abdul Wahab
HSEQ (IMS) by Saad Abdul WahabHSEQ (IMS) by Saad Abdul Wahab
HSEQ (IMS) by Saad Abdul Wahab
 
Mushtaq hussain profile
Mushtaq hussain   profileMushtaq hussain   profile
Mushtaq hussain profile
 
Rehman Khattak CV
Rehman Khattak CVRehman Khattak CV
Rehman Khattak CV
 
Waseem HSE Officer CV
Waseem HSE Officer CVWaseem HSE Officer CV
Waseem HSE Officer CV
 
EMS OHSAS Awareness Traning .pptx
EMS OHSAS Awareness Traning .pptxEMS OHSAS Awareness Traning .pptx
EMS OHSAS Awareness Traning .pptx
 
Jd hse supervisor (abu samra)
Jd  hse supervisor (abu samra)Jd  hse supervisor (abu samra)
Jd hse supervisor (abu samra)
 
ISO 14001 ems & OHSAS18001
ISO 14001 ems & OHSAS18001 ISO 14001 ems & OHSAS18001
ISO 14001 ems & OHSAS18001
 
Bizsafe Risk Assessment
Bizsafe Risk AssessmentBizsafe Risk Assessment
Bizsafe Risk Assessment
 
Bizsafe risk assessment
Bizsafe risk assessmentBizsafe risk assessment
Bizsafe risk assessment
 
SM Unit2.pptx
SM Unit2.pptxSM Unit2.pptx
SM Unit2.pptx
 
CV_Senior HSEQ Officer_ Ayman Morshed
CV_Senior HSEQ Officer_ Ayman MorshedCV_Senior HSEQ Officer_ Ayman Morshed
CV_Senior HSEQ Officer_ Ayman Morshed
 
Resume - SHIVAVIKRAM
Resume - SHIVAVIKRAMResume - SHIVAVIKRAM
Resume - SHIVAVIKRAM
 

Plus de Fitri Ifony

Id spa-all-2020-105232 rev.d personnel on board (pob) control (offshore scope...
Id spa-all-2020-105232 rev.d personnel on board (pob) control (offshore scope...Id spa-all-2020-105232 rev.d personnel on board (pob) control (offshore scope...
Id spa-all-2020-105232 rev.d personnel on board (pob) control (offshore scope...Fitri Ifony
 
Id spa-all-2020-105230 rev.d emergency respon plan (offshore scope)-31 dec 2013
Id spa-all-2020-105230 rev.d emergency respon plan  (offshore scope)-31 dec 2013Id spa-all-2020-105230 rev.d emergency respon plan  (offshore scope)-31 dec 2013
Id spa-all-2020-105230 rev.d emergency respon plan (offshore scope)-31 dec 2013Fitri Ifony
 
Id spa-all-2020-105229 rev.e project hse plan (offshore scope)-31 dec 2013
Id spa-all-2020-105229 rev.e project hse plan (offshore scope)-31 dec 2013Id spa-all-2020-105229 rev.e project hse plan (offshore scope)-31 dec 2013
Id spa-all-2020-105229 rev.e project hse plan (offshore scope)-31 dec 2013Fitri Ifony
 
Env monthly report september 2014 for Petronas Bukit Tua
Env monthly report september 2014 for Petronas Bukit TuaEnv monthly report september 2014 for Petronas Bukit Tua
Env monthly report september 2014 for Petronas Bukit TuaFitri Ifony
 
Hse incentive scheme rev 05 approved by yard (3)
Hse incentive scheme rev 05  approved by yard (3)Hse incentive scheme rev 05  approved by yard (3)
Hse incentive scheme rev 05 approved by yard (3)Fitri Ifony
 
Qhse objective & target 2015
Qhse objective & target 2015Qhse objective & target 2015
Qhse objective & target 2015Fitri Ifony
 
Safety performance 2015 rev.00 pp epc project
Safety performance 2015 rev.00 pp epc projectSafety performance 2015 rev.00 pp epc project
Safety performance 2015 rev.00 pp epc projectFitri Ifony
 
Hiradc training rev.0
Hiradc training rev.0Hiradc training rev.0
Hiradc training rev.0Fitri Ifony
 
Keajaiban penciptaan manusia1
Keajaiban penciptaan manusia1Keajaiban penciptaan manusia1
Keajaiban penciptaan manusia1Fitri Ifony
 
Melihat kebaikan-di-segala-hal by Harun Yahya
Melihat kebaikan-di-segala-hal by Harun YahyaMelihat kebaikan-di-segala-hal by Harun Yahya
Melihat kebaikan-di-segala-hal by Harun YahyaFitri Ifony
 
World day for health & safety rev.00
World day for health & safety rev.00World day for health & safety rev.00
World day for health & safety rev.00Fitri Ifony
 
Perhitungan & penilaian hse statistik bagian 1 rev.00
Perhitungan & penilaian hse statistik bagian 1 rev.00Perhitungan & penilaian hse statistik bagian 1 rev.00
Perhitungan & penilaian hse statistik bagian 1 rev.00Fitri Ifony
 
World safety day proposal rev.02 for slide share
World safety day proposal rev.02 for slide shareWorld safety day proposal rev.02 for slide share
World safety day proposal rev.02 for slide shareFitri Ifony
 
Shoc proposal dec 2013 rev.01_ok
Shoc proposal dec 2013 rev.01_okShoc proposal dec 2013 rev.01_ok
Shoc proposal dec 2013 rev.01_okFitri Ifony
 
Fmc close out repot hse dept. rev.000
Fmc close out repot hse dept. rev.000Fmc close out repot hse dept. rev.000
Fmc close out repot hse dept. rev.000Fitri Ifony
 
Integrated management system training
Integrated management system trainingIntegrated management system training
Integrated management system trainingFitri Ifony
 

Plus de Fitri Ifony (16)

Id spa-all-2020-105232 rev.d personnel on board (pob) control (offshore scope...
Id spa-all-2020-105232 rev.d personnel on board (pob) control (offshore scope...Id spa-all-2020-105232 rev.d personnel on board (pob) control (offshore scope...
Id spa-all-2020-105232 rev.d personnel on board (pob) control (offshore scope...
 
Id spa-all-2020-105230 rev.d emergency respon plan (offshore scope)-31 dec 2013
Id spa-all-2020-105230 rev.d emergency respon plan  (offshore scope)-31 dec 2013Id spa-all-2020-105230 rev.d emergency respon plan  (offshore scope)-31 dec 2013
Id spa-all-2020-105230 rev.d emergency respon plan (offshore scope)-31 dec 2013
 
Id spa-all-2020-105229 rev.e project hse plan (offshore scope)-31 dec 2013
Id spa-all-2020-105229 rev.e project hse plan (offshore scope)-31 dec 2013Id spa-all-2020-105229 rev.e project hse plan (offshore scope)-31 dec 2013
Id spa-all-2020-105229 rev.e project hse plan (offshore scope)-31 dec 2013
 
Env monthly report september 2014 for Petronas Bukit Tua
Env monthly report september 2014 for Petronas Bukit TuaEnv monthly report september 2014 for Petronas Bukit Tua
Env monthly report september 2014 for Petronas Bukit Tua
 
Hse incentive scheme rev 05 approved by yard (3)
Hse incentive scheme rev 05  approved by yard (3)Hse incentive scheme rev 05  approved by yard (3)
Hse incentive scheme rev 05 approved by yard (3)
 
Qhse objective & target 2015
Qhse objective & target 2015Qhse objective & target 2015
Qhse objective & target 2015
 
Safety performance 2015 rev.00 pp epc project
Safety performance 2015 rev.00 pp epc projectSafety performance 2015 rev.00 pp epc project
Safety performance 2015 rev.00 pp epc project
 
Hiradc training rev.0
Hiradc training rev.0Hiradc training rev.0
Hiradc training rev.0
 
Keajaiban penciptaan manusia1
Keajaiban penciptaan manusia1Keajaiban penciptaan manusia1
Keajaiban penciptaan manusia1
 
Melihat kebaikan-di-segala-hal by Harun Yahya
Melihat kebaikan-di-segala-hal by Harun YahyaMelihat kebaikan-di-segala-hal by Harun Yahya
Melihat kebaikan-di-segala-hal by Harun Yahya
 
World day for health & safety rev.00
World day for health & safety rev.00World day for health & safety rev.00
World day for health & safety rev.00
 
Perhitungan & penilaian hse statistik bagian 1 rev.00
Perhitungan & penilaian hse statistik bagian 1 rev.00Perhitungan & penilaian hse statistik bagian 1 rev.00
Perhitungan & penilaian hse statistik bagian 1 rev.00
 
World safety day proposal rev.02 for slide share
World safety day proposal rev.02 for slide shareWorld safety day proposal rev.02 for slide share
World safety day proposal rev.02 for slide share
 
Shoc proposal dec 2013 rev.01_ok
Shoc proposal dec 2013 rev.01_okShoc proposal dec 2013 rev.01_ok
Shoc proposal dec 2013 rev.01_ok
 
Fmc close out repot hse dept. rev.000
Fmc close out repot hse dept. rev.000Fmc close out repot hse dept. rev.000
Fmc close out repot hse dept. rev.000
 
Integrated management system training
Integrated management system trainingIntegrated management system training
Integrated management system training
 

Dernier

Low Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service Bhilai
Low Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service BhilaiLow Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service Bhilai
Low Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service BhilaiSuhani Kapoor
 
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Midocean dropshipping via API with DroFx
Midocean dropshipping via API with DroFxMidocean dropshipping via API with DroFx
Midocean dropshipping via API with DroFxolyaivanovalion
 
Edukaciniai dropshipping via API with DroFx
Edukaciniai dropshipping via API with DroFxEdukaciniai dropshipping via API with DroFx
Edukaciniai dropshipping via API with DroFxolyaivanovalion
 
Mature dropshipping via API with DroFx.pptx
Mature dropshipping via API with DroFx.pptxMature dropshipping via API with DroFx.pptx
Mature dropshipping via API with DroFx.pptxolyaivanovalion
 
Generative AI on Enterprise Cloud with NiFi and Milvus
Generative AI on Enterprise Cloud with NiFi and MilvusGenerative AI on Enterprise Cloud with NiFi and Milvus
Generative AI on Enterprise Cloud with NiFi and MilvusTimothy Spann
 
Week-01-2.ppt BBB human Computer interaction
Week-01-2.ppt BBB human Computer interactionWeek-01-2.ppt BBB human Computer interaction
Week-01-2.ppt BBB human Computer interactionfulawalesam
 
100-Concepts-of-AI by Anupama Kate .pptx
100-Concepts-of-AI by Anupama Kate .pptx100-Concepts-of-AI by Anupama Kate .pptx
100-Concepts-of-AI by Anupama Kate .pptxAnupama Kate
 
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al Barsha
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al BarshaAl Barsha Escorts $#$ O565212860 $#$ Escort Service In Al Barsha
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al BarshaAroojKhan71
 
Brighton SEO | April 2024 | Data Storytelling
Brighton SEO | April 2024 | Data StorytellingBrighton SEO | April 2024 | Data Storytelling
Brighton SEO | April 2024 | Data StorytellingNeil Barnes
 
Schema on read is obsolete. Welcome metaprogramming..pdf
Schema on read is obsolete. Welcome metaprogramming..pdfSchema on read is obsolete. Welcome metaprogramming..pdf
Schema on read is obsolete. Welcome metaprogramming..pdfLars Albertsson
 
VIP Call Girls Service Miyapur Hyderabad Call +91-8250192130
VIP Call Girls Service Miyapur Hyderabad Call +91-8250192130VIP Call Girls Service Miyapur Hyderabad Call +91-8250192130
VIP Call Girls Service Miyapur Hyderabad Call +91-8250192130Suhani Kapoor
 
FESE Capital Markets Fact Sheet 2024 Q1.pdf
FESE Capital Markets Fact Sheet 2024 Q1.pdfFESE Capital Markets Fact Sheet 2024 Q1.pdf
FESE Capital Markets Fact Sheet 2024 Q1.pdfMarinCaroMartnezBerg
 
BPAC WITH UFSBI GENERAL PRESENTATION 18_05_2017-1.pptx
BPAC WITH UFSBI GENERAL PRESENTATION 18_05_2017-1.pptxBPAC WITH UFSBI GENERAL PRESENTATION 18_05_2017-1.pptx
BPAC WITH UFSBI GENERAL PRESENTATION 18_05_2017-1.pptxMohammedJunaid861692
 
B2 Creative Industry Response Evaluation.docx
B2 Creative Industry Response Evaluation.docxB2 Creative Industry Response Evaluation.docx
B2 Creative Industry Response Evaluation.docxStephen266013
 
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...Suhani Kapoor
 
Delhi Call Girls CP 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls CP 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls CP 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls CP 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Callshivangimorya083
 

Dernier (20)

Low Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service Bhilai
Low Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service BhilaiLow Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service Bhilai
Low Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service Bhilai
 
VIP Call Girls Service Charbagh { Lucknow Call Girls Service 9548273370 } Boo...
VIP Call Girls Service Charbagh { Lucknow Call Girls Service 9548273370 } Boo...VIP Call Girls Service Charbagh { Lucknow Call Girls Service 9548273370 } Boo...
VIP Call Girls Service Charbagh { Lucknow Call Girls Service 9548273370 } Boo...
 
Sampling (random) method and Non random.ppt
Sampling (random) method and Non random.pptSampling (random) method and Non random.ppt
Sampling (random) method and Non random.ppt
 
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
 
Midocean dropshipping via API with DroFx
Midocean dropshipping via API with DroFxMidocean dropshipping via API with DroFx
Midocean dropshipping via API with DroFx
 
Edukaciniai dropshipping via API with DroFx
Edukaciniai dropshipping via API with DroFxEdukaciniai dropshipping via API with DroFx
Edukaciniai dropshipping via API with DroFx
 
Mature dropshipping via API with DroFx.pptx
Mature dropshipping via API with DroFx.pptxMature dropshipping via API with DroFx.pptx
Mature dropshipping via API with DroFx.pptx
 
Generative AI on Enterprise Cloud with NiFi and Milvus
Generative AI on Enterprise Cloud with NiFi and MilvusGenerative AI on Enterprise Cloud with NiFi and Milvus
Generative AI on Enterprise Cloud with NiFi and Milvus
 
Week-01-2.ppt BBB human Computer interaction
Week-01-2.ppt BBB human Computer interactionWeek-01-2.ppt BBB human Computer interaction
Week-01-2.ppt BBB human Computer interaction
 
100-Concepts-of-AI by Anupama Kate .pptx
100-Concepts-of-AI by Anupama Kate .pptx100-Concepts-of-AI by Anupama Kate .pptx
100-Concepts-of-AI by Anupama Kate .pptx
 
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al Barsha
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al BarshaAl Barsha Escorts $#$ O565212860 $#$ Escort Service In Al Barsha
Al Barsha Escorts $#$ O565212860 $#$ Escort Service In Al Barsha
 
Brighton SEO | April 2024 | Data Storytelling
Brighton SEO | April 2024 | Data StorytellingBrighton SEO | April 2024 | Data Storytelling
Brighton SEO | April 2024 | Data Storytelling
 
Schema on read is obsolete. Welcome metaprogramming..pdf
Schema on read is obsolete. Welcome metaprogramming..pdfSchema on read is obsolete. Welcome metaprogramming..pdf
Schema on read is obsolete. Welcome metaprogramming..pdf
 
VIP Call Girls Service Miyapur Hyderabad Call +91-8250192130
VIP Call Girls Service Miyapur Hyderabad Call +91-8250192130VIP Call Girls Service Miyapur Hyderabad Call +91-8250192130
VIP Call Girls Service Miyapur Hyderabad Call +91-8250192130
 
FESE Capital Markets Fact Sheet 2024 Q1.pdf
FESE Capital Markets Fact Sheet 2024 Q1.pdfFESE Capital Markets Fact Sheet 2024 Q1.pdf
FESE Capital Markets Fact Sheet 2024 Q1.pdf
 
BPAC WITH UFSBI GENERAL PRESENTATION 18_05_2017-1.pptx
BPAC WITH UFSBI GENERAL PRESENTATION 18_05_2017-1.pptxBPAC WITH UFSBI GENERAL PRESENTATION 18_05_2017-1.pptx
BPAC WITH UFSBI GENERAL PRESENTATION 18_05_2017-1.pptx
 
B2 Creative Industry Response Evaluation.docx
B2 Creative Industry Response Evaluation.docxB2 Creative Industry Response Evaluation.docx
B2 Creative Industry Response Evaluation.docx
 
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...
 
Delhi Call Girls CP 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls CP 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls CP 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls CP 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
 
꧁❤ Aerocity Call Girls Service Aerocity Delhi ❤꧂ 9999965857 ☎️ Hard And Sexy ...
꧁❤ Aerocity Call Girls Service Aerocity Delhi ❤꧂ 9999965857 ☎️ Hard And Sexy ...꧁❤ Aerocity Call Girls Service Aerocity Delhi ❤꧂ 9999965857 ☎️ Hard And Sexy ...
꧁❤ Aerocity Call Girls Service Aerocity Delhi ❤꧂ 9999965857 ☎️ Hard And Sexy ...
 

Hse presentation general rev.00 may 2014

  • 2.  INTRODUCTION  SCOPE  VISION & MISSION  HSE Management System (MS)  2. HSE POLICY  3. HSE ORGANIZATION CHART  4. HSE HAZARD IDENTIFICATIO RISK ASSESSMENT (HIRA) COMMUNICATION  5. HSE PROGRAM & PERFORMANCE  HSE IMPROVEMENT  HSE MASTER DOCUMENT REGISTER  SHO CARD REPORT  6. HSE INCIDENT / ACCIDENT REPORT  HSE INSPECTION REPORT  8. HSE AUDIT  HSE PERFORMANCE STATISTIC OVERALL (2010 – 2014)  TRIR PT GUF vs WORLD WIDE 2
  • 3. 3 Our Health Safety & Environment Management System is a part of overall PTG management system and established based on integrated system of SMK3 PP No.50 /2012, OHSAS 18001:2007, ISO 14001:2004 and ISO 9001:2000. PTG HSE Management system covered organization, structure, responsibility, procedures, processes, resources and objectives and developed to meet statutory regulations and compliance to standard requirements for implementing the Health, Safety and Environment Management System of PTG business and operations
  • 4. 4 This HSEMS is applied by. PT. Gunanusa Utama Fabricators and its subcontractors during fabrication activities at PTG Yard or in other site under PTG control and the main objective is to achieve HSE Objectives.
  • 5. 5 VISION STATEMENT TO BE A WORLD CLASS AND MARKET-LEADING TURNKEY ENGINEERING COMPANY WITHIN THE OIL & GAS AND HEAVY CONSTRUCTION INDUSTRIES MISSION STATEMENT TO BE A GLOBAL OPERATING COMPANY BY 2014 WITH SUSTAINABLE REVENUE, DELIVERING ALL PROJECTS WITHIN BUDGET AND SCHEDULE WHILST MEETING INTERNATIONALLY ACCEPTABLE QUALITY & SAFETY STANDARDS SHARED VALUE INTEGRITY, MAGNANIMOUS, PROFESIONAL, AMIABLE, CARING AND TEAM WORK
  • 6. 6 1. Leadership and Commitment 2. Policy and Strategic Objective 3. Organization, Resources and Documentation : A. Organizational structure and responsibilities B. Management Representative(s) C. Resources D. Competence E. Subcontractors F. Communication G. Documentation and its control 4. Evaluation and Risk Management A. Identification of hazards and effects B. Evaluation C. Recording of hazards and effects D. Objectives and performance criteria E. Risk reduction measures
  • 7. 7 5. Planning A. General B. Asset Integrity C. Procedures and Work Instructions D. Management Of Change E. Contingency and Emergency Planning 7. Auditing and Reviewing A. Activities and Tasks B. Monitoring C. Records D. Non-compliance and corrective action E. Incident reporting F. Incident follow-up 6. Implementation and Monitoring A. Auditing B. Reviewing
  • 8. 8 HSEMS Element Addressing 1 Leadership and Commitment Top-down & Down-Top commitment and company culture, essential to the success of the system. 2 Policy and Strategic Objective Corporate intention, principles of action and aspirations with respect to health, safety and environment. 3 Organization, resources and documentation Organization of people, resources and documentation for sound HSE Performance 4 Evaluation and risk management Identification and evaluation of HSE risks, for activities, products and services, and development of risk reduction measures. 5 Planning Planning the conduct of work activities, including planning for changes and emergency response 6 Implementation and monitoring Performance and monitoring of activities, and how corrective action is to be taken when necessary 7 Auditing and reviewing Periodic assessment of system performance, effectiveness and fundamental suitability
  • 9. 9
  • 10. 10
  • 11. 11 • Conduct HIRA Meeting to discuss for preparing the critical job risk assessment. • Socialized Last Minute Risk Assessment Card during Safety induction. • Conduct pre job meeting to personnel involved for socialized JRA prior starting the critical job. • Apply JRA (Job Risk Assessment) for routine job. • Lesson learned socialization trough Tool Box Meeting. • Conduct JRA training regularly. HIRA WORK SHEET JRA (Job Risk Assessment)
  • 12. 12 1. Preparation of HSE PLAN HSE Policy review HSE Objective review Set-up/Up-dated HSE Organization chart/struct Set-up/Up-dated HSE personnel job description Up-dated Health & Safety Management Plan Up-dated Environmental Management Plan Up-dated Waste Management Plan Up-dated Emergency Response Plan Up-dated HSE Manual & Procedures Hazard Identification 2. HSE ACTIVITY Safety Induction to New Hires Personal Protective Equipment Issued Medical Check- up Internal HSE Audit Risk Assesment/ TRA HSE Meeting Program HSE Inspections HSE Equipment Inspections Environmental Control & Waste Management HSE Records & Reports Work Permits Issued and Control 3. SAFETY ADMINISTRATION Provided Safety Work instruction / Safety Plan Heavy Equipments Test load & Recertification Color coding system for lifting gears Equipments & lifting gears tagging Safety record & filling HSE objectives achievements monitoring 4. SUBSTANDARD CONDITION/ACT IDENTIFICATION Anomaly or Hazob or Stop card issue Follow-up of corrective action Violation Card System 5. TRAINING PROGRAM In-house safety training External safety training On the job safety training Emergency drill 6. AUDIT HSE Internal Audit Subcontractors Audit External Audit from Clients 7.SAFETYAWARD 8.SAFETYCAMPAIGN
  • 13. 13
  • 14. 14 Work Package (WP) 10/13 HSE MANAGEMENT, CONTROL AND PROCEDURE Wu 10.1/13.1 HSE DELIVERABLES Exhibit A Scope of Work MDR WU 10.2/13.2 HSEIMPROVEMENTSAT WORKSHOP/WORKSITE Exhibit L– HSE Requirements HSEProgram Att. G3 Cut Off date Calendar HSEProcedure:MM-YAD-OO- GUNA-020044:HSE IMPROVEMENTPLAN – AFC WU 10.2/13.3 HSEINCENTIVE SCHEME Exhibit B – Schedule Of Prices Section6. HSEIncentive Scheme HSEProcedure:MM-YAD- 00-GUNA-020042 : INCENTIVESCHEME PROGRAM - AFC WU 10.2/13.4 HSETRAINING Exhibit L– HSE Requirements HSEProcedure:MM-YAD- 00-GUNA-020018 : HSE TRAINING PLAN - AFC
  • 15. 15 1 ID-SPA-ALL-2020-105010 PJC_SN2B&PCK7B_EPSC(1+2)_PRC_Scaffolding Procedure 2 ID-SPA-ALL-2020-105030 PJC_SN2B&PCK7B_EPSC(1+2)_PRC_CONTRACTOR Management Safety Tour Procedure 3 ID-SPA-ALL-2020-105040 PJC_SN2B&PCK7B_EPSC(1+2)_PRC_Work Permit System Procedure 4 ID-SPA-ALL-2020-105050 PJC_SN2B&PCK7B_EPSC(1+2)_PLN_Safety Risk Management 5 ID-SPA-ALL-2020-105060 PJC_SN2B&PCK7B_EPSC(1+2)_PLN_Environment Management Plan 6 ID-SPA-ALL-2020-105070 PJC_SN2B&PCK7B_EPSC(1+2)_PLN_Security Management Plan 7 ID-SPA-ALL-2020-105080 PJC_SN2B&PCK7B_EPSC(1+2)_PRC_Medical Check-up Control Procedure 8 ID-SPA-ALL-2020-105090 PJC_SN2B&PCK7B_EPSC(1+2)_PLN_Personal Protective Equipment Control Procedure 9 ID-SPA-ALL-2020-105100 PJC_SN2B&PCK7B_EPSC(1+2)_PLN_Driving Policy 10 ID-SPA-ALL-2020-105110 PJC_SN2B&PCK7B_EPSC(1+2)_PLN_HSE Training Plan Document TitleNo Technical Document number
  • 16. 16 Scheme 1 • WORKSITES AND CONSTRUCTION EQUIPMENT STANDARDS IMPROVEMENT (YARD) Scheme 2 • IMPROVEMENT ABOVE SPECIFICATION BASED ON COMPANY REQUEST (YARD & SITE/OFFSHORE) Scheme 3 • REMUNERATION BASED ON LEADING INDICATORS (YARD & SITE/OFFSHORE) Done In Progress
  • 18. 18 Cut Off Date January 24th, 2014
  • 19. 19 Foundblue Terpaulin at all Deckworkplace ProtectionUsingFire Blankets as HOTWORK Activities Foundcutters that usedbyworkers tocut cable andothers. Change withcuttingcable andsocialize howtouse cuttingcable correctly.
  • 20. 20 Cut Off Date January 24th, 2014
  • 21. 21 48% 1%1%7% 1% 11% 16% 4% 0% 11% 0% 0% Risk Situations Traffic Gestures/Postures/Tools PPE PermitTo work Lifting WorkOnPowered Systems ConfinedSpaces Excavation Works WorkingATHeight ChangeManagement Simultanous Operations and Co-activities COMPANY SAFETYHAZARDOBSERVATIONCARDCHART PERIOD: Jan'2012toJan 2014 52% 1% 2% 17% 1% 7% 15% 1% 0% 3% 0% 1% Risk Situations Traffic Gestures/Postures/Tools PPE PermitTo work Lifting Work On Powered Systems Confined Spaces Excavation Works WorkingAT Height Change Management Simultanous Operations and Co-activities CONTRACTOR SAFETY HAZARD OBSERVATION CARD CHART PERIOD : Jan'2012 toJan 2014
  • 22. 22
  • 23. 23
  • 24. 24 Distribution Panel & Extension Panel Inspection
  • 26. 26 Over the last 5 (five) years
  • 27. 27 Over the last 5 (five) years 12,250,874 5,143,427 2,592,608 11,265,450 668,017- 2,000,000 4,000,000 6,000,000 8,000,000 10,000,000 12,000,000 14,000,000 2010 2011 2012 2013 2014 HoursWorked (Including Company, Contractors andSubcontractors) LTI Cut Off Date January 31th, 2014
  • 28. 28 Over the last 5 (five) years Cut Off Date January 31th, 2014 FAT LTI LWDC RWDC + MTC FAC NMI ANOMALY/CeRMAT Manhours 0 3 13 2 42 108 1,873 31,920,376
  • 29. 29 0 1 2 3 4 5 6 7 8 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 PT GUNANUSA and World Wide TRIR Trends PTG WW World Wide data from The International Association of Oil & Gas Producers (OGP) Reports
  • 30. 30