SlideShare une entreprise Scribd logo
Tectona grandis – Financial Analysis Annex
Table of Contents
Basic variables...............................................................................................................................................................................................................3
Costs Table Variable definitions....................................................................................................................................................................................4
Scenario Matrix Table...................................................................................................................................................................................................6
Scenario Matrix Table Definitions................................................................................................................................................................................7
Tabulated results of NPV, NFV, IRR - 4 scenarios.....................................................................................8
Tabulated costs – applicable to all 4 scenarios..........................................................................................10
Graph 1: Wood at Mill yard & Land Lease Scenario................................................................................11
Graph 2: Wood at Millyard & Land Purchase Scenario............................................................................12
Graph 3: Stumpage & Land Lease Scenario.............................................................................................13
Graph 4: Stumpage & Land Purchase Scenario........................................................................................14
Basic variables
Species: Tectona grandis
Land Purchase Cost: 5000 per hectare
Land Lease Cost: 1000 per hectare
Interest Rate: 1% - 8% (-13%)
En patio: GWM harvests the timber and delivers it “at the millyard” (en patio de aserradero)
En pie: contractor harvests the timber and pays a price to GWM, called as “stumpage” and “stumpage price”
Timber price source: www.officinaforestal.cr
Variables calculated: Net Present Value ((NPV), Net Future Value (NFV), Internal Rate of Return (IRR)
Costs Table Variable definitions

Variable
AGE
Actions
Vtcc V (Vtree*N) THINNED (remaining)
V_12_UB REMAINING
REMOVED_Volume_Total
REMOVED_V_12cm_Top_Diameter (Rough)

Definition
The age of the plantation
Prescriptions and management tasks
(Volume total con corteza) Total volume without bark which is residual to the stand after a
thinning operation
Total volume without bark until a top minimum log diameter of 12 cm
Total Volume Removed (from a thinning or harvesting operation)
Removed Volume from an operation until a top minimum log diameter of 12 cm

N trees removed

Number of trees removed

Stumpage Price

The Stumpage price per cubic meter

Mill Yard Price

The Mill yard price per cubic meter

Stumpage income

The income from the specific Stumpage sale

Mill yard income

The income from the specific Mill Yard sale

STUMPAGE Thinning cost

The thinning cost for the stumpage sale
Variable
Thinning cost
Transport Thinned logs
Pruning cost
Maintenance and Management cost
Final harvest and transportation cost (for PATIO)
STUMPAGE costs
ENPATIO Costs
Land purchase cost
Land Lease cost
Seedling cost (included in the establishment cost)
Establishment Cost
PLUS-MINUS PATIO
PLUS-MINUS STUMPAGE

Definition
Thinning cost of the Mill Yard Sale Operation
Transport of thinned logs
Prunning Cost – usually at early ages, until 4-7 meters
Several re-occuring costs
The Final harvest and transportation cost applicable to the Mill Yard Operation
Total Stumpage Costs
Total At Mill Yard Costs
Per Hectare Land Purchase Cost
Per Hectare Land Lease Cost
As below
The cost of plantation establishment
(Income) Minus (Costs) for the At Mill Yard Management Option
(Income) Minus (Costs) for the Stumpage Management Option
Scenario Matrix Table
NPV, NFV, IRR analysis was done for each of the 4 scenarios below, using as input the growth of the Species Tech Report, and the price information
avaliable.
Land Lease
Land Lease x Wood at mill yard

Wood at mill yard

Land Purchase
Land Purchase x Wood at mill yard

VARIABLE

INTEREST RATE

VARIABLE

INTEREST RATE

NPV, NFV, IRR

1.00% - 13%

NPV, NFV, IRR

1.00% - 13%

Land Lease x Stumpage

Stumpage

Land Purchase x Stumpage

VARIABLE

INTEREST RATE

VARIABLE

INTEREST RATE

NPV, NFV, IRR

1.00% - 13%

NPV, NFV, IRR

1.00% - 13%
Scenario Matrix Table Definitions
Term used

Definition of term

Wood at mill yard

Wood is harvested and delivered to Mill Yard, receives a price at millyard
In spanish: “en patio de aserradero”

Stumpage

Wood is sold as standing trees, plantation owner receives a price for the
wood sold
In Spanish: “en pie”

Land Lease

Leasing of the plantation property

Land Purchase

Purchasing of the plantation property

NFV

Net Future Value

NPV

Net Present Value

IRR

Internal Rate of Return
Tabulated results of NPV, NFV, IRR - 4 scenarios
Tabulated costs – applicable to all 4 scenarios
Graph 1: Wood at Mill yard & Land Lease Scenario
Graph 2: Wood at Millyard & Land Purchase Scenario
Graph 3: Stumpage & Land Lease Scenario
Graph 4: Stumpage & Land Purchase Scenario

Contenu connexe

Similaire à Financial analysis tectona_grandis

Brocade200 E Metro Cluster Design
Brocade200 E Metro Cluster DesignBrocade200 E Metro Cluster Design
Brocade200 E Metro Cluster Design
bsdux
 
[Python入门指南].(Python.Tutorial).Guido.Van.Rossum.文字版
[Python入门指南].(Python.Tutorial).Guido.Van.Rossum.文字版[Python入门指南].(Python.Tutorial).Guido.Van.Rossum.文字版
[Python入门指南].(Python.Tutorial).Guido.Van.Rossum.文字版
gavin shaw
 
Py2 5 tut_cn
Py2 5 tut_cnPy2 5 tut_cn
Py2 5 tut_cn
wwwgzp
 
4 g americas developing integrating high performance het-net october 2012
4 g americas  developing integrating high performance het-net october 20124 g americas  developing integrating high performance het-net october 2012
4 g americas developing integrating high performance het-net october 2012
Zoran Kehler
 
Efm support user_guide_v1.01
Efm support user_guide_v1.01Efm support user_guide_v1.01
Efm support user_guide_v1.01
NavyEFMP
 
Not all XML Gateways are Created Equal
Not all XML Gateways are Created EqualNot all XML Gateways are Created Equal
Not all XML Gateways are Created Equal
CA API Management
 
Hfs to zfs migration
Hfs to zfs migrationHfs to zfs migration
Hfs to zfs migration
satish090909
 
Pc 811 transformation_guide
Pc 811 transformation_guidePc 811 transformation_guide
Pc 811 transformation_guide
Venkat Madduru
 
ENV-EPOC-GSP(2008)17-FINAL
ENV-EPOC-GSP(2008)17-FINALENV-EPOC-GSP(2008)17-FINAL
ENV-EPOC-GSP(2008)17-FINAL
Kelly de Bruin
 

Similaire à Financial analysis tectona_grandis (20)

GW Group Forestry Investment Financial Analysis astronium in Costa Rica
GW Group Forestry Investment Financial Analysis astronium in Costa RicaGW Group Forestry Investment Financial Analysis astronium in Costa Rica
GW Group Forestry Investment Financial Analysis astronium in Costa Rica
 
GW Group Technical Financial analysis terminalia_amazonia
GW Group Technical Financial analysis terminalia_amazoniaGW Group Technical Financial analysis terminalia_amazonia
GW Group Technical Financial analysis terminalia_amazonia
 
SMRP Best Practices 6th Edition
SMRP Best Practices 6th EditionSMRP Best Practices 6th Edition
SMRP Best Practices 6th Edition
 
Brocade200 E Metro Cluster Design
Brocade200 E Metro Cluster DesignBrocade200 E Metro Cluster Design
Brocade200 E Metro Cluster Design
 
[Python入门指南].(Python.Tutorial).Guido.Van.Rossum.文字版
[Python入门指南].(Python.Tutorial).Guido.Van.Rossum.文字版[Python入门指南].(Python.Tutorial).Guido.Van.Rossum.文字版
[Python入门指南].(Python.Tutorial).Guido.Van.Rossum.文字版
 
Py2 5 tut_cn
Py2 5 tut_cnPy2 5 tut_cn
Py2 5 tut_cn
 
4 g americas developing integrating high performance het-net october 2012
4 g americas  developing integrating high performance het-net october 20124 g americas  developing integrating high performance het-net october 2012
4 g americas developing integrating high performance het-net october 2012
 
110614-Unit Cost Approach to Estimating Operational Materials Budget
110614-Unit Cost Approach to Estimating Operational Materials Budget110614-Unit Cost Approach to Estimating Operational Materials Budget
110614-Unit Cost Approach to Estimating Operational Materials Budget
 
Efm support user_guide_v1.01
Efm support user_guide_v1.01Efm support user_guide_v1.01
Efm support user_guide_v1.01
 
Not all XML Gateways are Created Equal
Not all XML Gateways are Created EqualNot all XML Gateways are Created Equal
Not all XML Gateways are Created Equal
 
Navarro Phase 1 Joint Venture Prospectus (1)
Navarro Phase 1 Joint Venture Prospectus (1)Navarro Phase 1 Joint Venture Prospectus (1)
Navarro Phase 1 Joint Venture Prospectus (1)
 
Hfs to zfs migration
Hfs to zfs migrationHfs to zfs migration
Hfs to zfs migration
 
Pc 811 transformation_guide
Pc 811 transformation_guidePc 811 transformation_guide
Pc 811 transformation_guide
 
code-explanation-of-cnc-edm-machine.pdf
code-explanation-of-cnc-edm-machine.pdfcode-explanation-of-cnc-edm-machine.pdf
code-explanation-of-cnc-edm-machine.pdf
 
Icp
IcpIcp
Icp
 
MOEX_thesis_FINAL
MOEX_thesis_FINALMOEX_thesis_FINAL
MOEX_thesis_FINAL
 
ENV-EPOC-GSP(2008)17-FINAL
ENV-EPOC-GSP(2008)17-FINALENV-EPOC-GSP(2008)17-FINAL
ENV-EPOC-GSP(2008)17-FINAL
 
How to Change Hostname in CentOS 7 or RHEL 7
How to Change Hostname in CentOS 7 or RHEL 7How to Change Hostname in CentOS 7 or RHEL 7
How to Change Hostname in CentOS 7 or RHEL 7
 
Version 2 1 interface SIP FFTelecoms pour interconnexion voix (version clean)
Version 2 1 interface SIP FFTelecoms pour interconnexion voix (version clean)Version 2 1 interface SIP FFTelecoms pour interconnexion voix (version clean)
Version 2 1 interface SIP FFTelecoms pour interconnexion voix (version clean)
 
Evaluation Of The Administration & Delivery Of The Renewable Heat Incentive (...
Evaluation Of The Administration & Delivery Of The Renewable Heat Incentive (...Evaluation Of The Administration & Delivery Of The Renewable Heat Incentive (...
Evaluation Of The Administration & Delivery Of The Renewable Heat Incentive (...
 

Plus de Greenwood Management

Greenwood Management forestry investment report
Greenwood Management forestry investment reportGreenwood Management forestry investment report
Greenwood Management forestry investment report
Greenwood Management
 
Fazenda santa maria memoriais model
Fazenda santa maria memoriais modelFazenda santa maria memoriais model
Fazenda santa maria memoriais model
Greenwood Management
 

Plus de Greenwood Management (20)

Santa maria I site valuation
Santa maria I site valuation Santa maria I site valuation
Santa maria I site valuation
 
Greenwood Management Technical Forestry Report astronium_90dpi
Greenwood Management Technical Forestry Report astronium_90dpiGreenwood Management Technical Forestry Report astronium_90dpi
Greenwood Management Technical Forestry Report astronium_90dpi
 
Greenwood Management Technical Forestry Report Terminalia Amazonia
Greenwood Management Technical Forestry Report Terminalia AmazoniaGreenwood Management Technical Forestry Report Terminalia Amazonia
Greenwood Management Technical Forestry Report Terminalia Amazonia
 
Shared by (Greenwood Management) Coconut report embrapa
Shared by (Greenwood Management) Coconut report embrapaShared by (Greenwood Management) Coconut report embrapa
Shared by (Greenwood Management) Coconut report embrapa
 
Greenwood Management forestry investment report
Greenwood Management forestry investment reportGreenwood Management forestry investment report
Greenwood Management forestry investment report
 
Greenwood Management Forestry Investment Brazil Licenses vale do buriti
Greenwood Management Forestry Investment Brazil Licenses vale do buritiGreenwood Management Forestry Investment Brazil Licenses vale do buriti
Greenwood Management Forestry Investment Brazil Licenses vale do buriti
 
Greenwood Management Forestry Investment Brazil Licenses tropical
Greenwood Management Forestry Investment Brazil Licenses tropicalGreenwood Management Forestry Investment Brazil Licenses tropical
Greenwood Management Forestry Investment Brazil Licenses tropical
 
Greenwood Management Forestry Investment Brazil Licenses sta maria 1
Greenwood Management Forestry Investment Brazil Licenses sta maria 1Greenwood Management Forestry Investment Brazil Licenses sta maria 1
Greenwood Management Forestry Investment Brazil Licenses sta maria 1
 
Greenwood Management Forestry Investment Brazil Licenses esmeralda
Greenwood Management Forestry Investment Brazil Licenses esmeraldaGreenwood Management Forestry Investment Brazil Licenses esmeralda
Greenwood Management Forestry Investment Brazil Licenses esmeralda
 
Greenwood Management Forestry Investment Brazil Licenses buriti
Greenwood Management Forestry Investment Brazil Licenses buritiGreenwood Management Forestry Investment Brazil Licenses buriti
Greenwood Management Forestry Investment Brazil Licenses buriti
 
Greenwood Management Forestry Investment Brazil Licenses barrinhas2
Greenwood Management Forestry Investment Brazil Licenses barrinhas2Greenwood Management Forestry Investment Brazil Licenses barrinhas2
Greenwood Management Forestry Investment Brazil Licenses barrinhas2
 
Greenwood Management Forestry Investment Brazil Licenses barrinhas1
Greenwood Management Forestry Investment Brazil Licenses barrinhas1Greenwood Management Forestry Investment Brazil Licenses barrinhas1
Greenwood Management Forestry Investment Brazil Licenses barrinhas1
 
Greenwood Management eucalyptus forestry investment report
Greenwood Management eucalyptus forestry investment reportGreenwood Management eucalyptus forestry investment report
Greenwood Management eucalyptus forestry investment report
 
Greenwood Management independent wood price report
Greenwood Management independent wood price reportGreenwood Management independent wood price report
Greenwood Management independent wood price report
 
Greenwood Management forestry investment 120921 mapas de fertilidade gwp
Greenwood Management forestry investment 120921 mapas de fertilidade gwpGreenwood Management forestry investment 120921 mapas de fertilidade gwp
Greenwood Management forestry investment 120921 mapas de fertilidade gwp
 
Greenwood Management Fazenda Tropical construction plan,
Greenwood Management Fazenda Tropical construction plan,Greenwood Management Fazenda Tropical construction plan,
Greenwood Management Fazenda Tropical construction plan,
 
Fazenda tropical model
Fazenda tropical modelFazenda tropical model
Fazenda tropical model
 
Fazenda esmeralda model
Fazenda esmeralda modelFazenda esmeralda model
Fazenda esmeralda model
 
Faz barrinha i model
Faz barrinha i modelFaz barrinha i model
Faz barrinha i model
 
Fazenda santa maria memoriais model
Fazenda santa maria memoriais modelFazenda santa maria memoriais model
Fazenda santa maria memoriais model
 

Dernier

PPT- Chapter 5- Cost Allocation presentation pdf
PPT- Chapter 5- Cost Allocation presentation pdfPPT- Chapter 5- Cost Allocation presentation pdf
PPT- Chapter 5- Cost Allocation presentation pdf
Kalkaye
 
一比一原版UO毕业证渥太华大学毕业证成绩单如何办理
一比一原版UO毕业证渥太华大学毕业证成绩单如何办理一比一原版UO毕业证渥太华大学毕业证成绩单如何办理
一比一原版UO毕业证渥太华大学毕业证成绩单如何办理
yonemuk
 

Dernier (20)

Juspay Case study(Doubling Revenue Juspay's Success).pptx
Juspay Case study(Doubling Revenue Juspay's Success).pptxJuspay Case study(Doubling Revenue Juspay's Success).pptx
Juspay Case study(Doubling Revenue Juspay's Success).pptx
 
how to exchange pi coins for USD in 2024.
how to exchange pi coins for USD in 2024.how to exchange pi coins for USD in 2024.
how to exchange pi coins for USD in 2024.
 
how to sell pi coins in Canada, Uk and Australia
how to sell pi coins in Canada, Uk and Australiahow to sell pi coins in Canada, Uk and Australia
how to sell pi coins in Canada, Uk and Australia
 
is it possible to sell pi network coin in 2024.
is it possible to sell pi network coin in 2024.is it possible to sell pi network coin in 2024.
is it possible to sell pi network coin in 2024.
 
New Stratus Corporate Presentation May 2024
New Stratus Corporate Presentation May 2024New Stratus Corporate Presentation May 2024
New Stratus Corporate Presentation May 2024
 
The Advantages of Choosing Falcon Invoice Discounting
The Advantages of Choosing Falcon Invoice DiscountingThe Advantages of Choosing Falcon Invoice Discounting
The Advantages of Choosing Falcon Invoice Discounting
 
how do i convert pi coins to usdt easily.
how do i convert pi coins to usdt easily.how do i convert pi coins to usdt easily.
how do i convert pi coins to usdt easily.
 
Greek trade a pillar of dynamic economic growth - European Business Review
Greek trade a pillar of dynamic economic growth - European Business ReviewGreek trade a pillar of dynamic economic growth - European Business Review
Greek trade a pillar of dynamic economic growth - European Business Review
 
PPT- Chapter 5- Cost Allocation presentation pdf
PPT- Chapter 5- Cost Allocation presentation pdfPPT- Chapter 5- Cost Allocation presentation pdf
PPT- Chapter 5- Cost Allocation presentation pdf
 
Proposer Builder Separation Problem in Ethereum
Proposer Builder Separation Problem in EthereumProposer Builder Separation Problem in Ethereum
Proposer Builder Separation Problem in Ethereum
 
Monthly Market Risk Update: May 2024 [SlideShare]
Monthly Market Risk Update: May 2024 [SlideShare]Monthly Market Risk Update: May 2024 [SlideShare]
Monthly Market Risk Update: May 2024 [SlideShare]
 
where can I purchase things with pi coins online
where can I purchase things with pi coins onlinewhere can I purchase things with pi coins online
where can I purchase things with pi coins online
 
一比一原版UO毕业证渥太华大学毕业证成绩单如何办理
一比一原版UO毕业证渥太华大学毕业证成绩单如何办理一比一原版UO毕业证渥太华大学毕业证成绩单如何办理
一比一原版UO毕业证渥太华大学毕业证成绩单如何办理
 
how can i trade pi coins for Bitcoin easily.
how can i trade pi coins for Bitcoin easily.how can i trade pi coins for Bitcoin easily.
how can i trade pi coins for Bitcoin easily.
 
Bitcoin Masterclass TechweekNZ v3.1.pptx
Bitcoin Masterclass TechweekNZ v3.1.pptxBitcoin Masterclass TechweekNZ v3.1.pptx
Bitcoin Masterclass TechweekNZ v3.1.pptx
 
how do I get a legit pi buyer in the internet (2024)
how do I get a legit pi buyer in the internet (2024)how do I get a legit pi buyer in the internet (2024)
how do I get a legit pi buyer in the internet (2024)
 
Fintech Belgium General Assembly and Anniversary Event 2024
Fintech Belgium General Assembly and Anniversary Event 2024Fintech Belgium General Assembly and Anniversary Event 2024
Fintech Belgium General Assembly and Anniversary Event 2024
 
how can i make money selling pi coins in 2024
how can i make money selling pi coins in 2024how can i make money selling pi coins in 2024
how can i make money selling pi coins in 2024
 
Abhay Bhutada’s Plan to Boost Financial Growth in 2024
Abhay Bhutada’s Plan to Boost Financial Growth in 2024Abhay Bhutada’s Plan to Boost Financial Growth in 2024
Abhay Bhutada’s Plan to Boost Financial Growth in 2024
 
how can I sell my mined pi coins profitabily.
how can I sell my mined pi coins profitabily.how can I sell my mined pi coins profitabily.
how can I sell my mined pi coins profitabily.
 

Financial analysis tectona_grandis

  • 1. Tectona grandis – Financial Analysis Annex
  • 2. Table of Contents Basic variables...............................................................................................................................................................................................................3 Costs Table Variable definitions....................................................................................................................................................................................4 Scenario Matrix Table...................................................................................................................................................................................................6 Scenario Matrix Table Definitions................................................................................................................................................................................7 Tabulated results of NPV, NFV, IRR - 4 scenarios.....................................................................................8 Tabulated costs – applicable to all 4 scenarios..........................................................................................10 Graph 1: Wood at Mill yard & Land Lease Scenario................................................................................11 Graph 2: Wood at Millyard & Land Purchase Scenario............................................................................12 Graph 3: Stumpage & Land Lease Scenario.............................................................................................13 Graph 4: Stumpage & Land Purchase Scenario........................................................................................14
  • 3. Basic variables Species: Tectona grandis Land Purchase Cost: 5000 per hectare Land Lease Cost: 1000 per hectare Interest Rate: 1% - 8% (-13%) En patio: GWM harvests the timber and delivers it “at the millyard” (en patio de aserradero) En pie: contractor harvests the timber and pays a price to GWM, called as “stumpage” and “stumpage price” Timber price source: www.officinaforestal.cr Variables calculated: Net Present Value ((NPV), Net Future Value (NFV), Internal Rate of Return (IRR)
  • 4. Costs Table Variable definitions Variable AGE Actions Vtcc V (Vtree*N) THINNED (remaining) V_12_UB REMAINING REMOVED_Volume_Total REMOVED_V_12cm_Top_Diameter (Rough) Definition The age of the plantation Prescriptions and management tasks (Volume total con corteza) Total volume without bark which is residual to the stand after a thinning operation Total volume without bark until a top minimum log diameter of 12 cm Total Volume Removed (from a thinning or harvesting operation) Removed Volume from an operation until a top minimum log diameter of 12 cm N trees removed Number of trees removed Stumpage Price The Stumpage price per cubic meter Mill Yard Price The Mill yard price per cubic meter Stumpage income The income from the specific Stumpage sale Mill yard income The income from the specific Mill Yard sale STUMPAGE Thinning cost The thinning cost for the stumpage sale
  • 5. Variable Thinning cost Transport Thinned logs Pruning cost Maintenance and Management cost Final harvest and transportation cost (for PATIO) STUMPAGE costs ENPATIO Costs Land purchase cost Land Lease cost Seedling cost (included in the establishment cost) Establishment Cost PLUS-MINUS PATIO PLUS-MINUS STUMPAGE Definition Thinning cost of the Mill Yard Sale Operation Transport of thinned logs Prunning Cost – usually at early ages, until 4-7 meters Several re-occuring costs The Final harvest and transportation cost applicable to the Mill Yard Operation Total Stumpage Costs Total At Mill Yard Costs Per Hectare Land Purchase Cost Per Hectare Land Lease Cost As below The cost of plantation establishment (Income) Minus (Costs) for the At Mill Yard Management Option (Income) Minus (Costs) for the Stumpage Management Option
  • 6. Scenario Matrix Table NPV, NFV, IRR analysis was done for each of the 4 scenarios below, using as input the growth of the Species Tech Report, and the price information avaliable. Land Lease Land Lease x Wood at mill yard Wood at mill yard Land Purchase Land Purchase x Wood at mill yard VARIABLE INTEREST RATE VARIABLE INTEREST RATE NPV, NFV, IRR 1.00% - 13% NPV, NFV, IRR 1.00% - 13% Land Lease x Stumpage Stumpage Land Purchase x Stumpage VARIABLE INTEREST RATE VARIABLE INTEREST RATE NPV, NFV, IRR 1.00% - 13% NPV, NFV, IRR 1.00% - 13%
  • 7. Scenario Matrix Table Definitions Term used Definition of term Wood at mill yard Wood is harvested and delivered to Mill Yard, receives a price at millyard In spanish: “en patio de aserradero” Stumpage Wood is sold as standing trees, plantation owner receives a price for the wood sold In Spanish: “en pie” Land Lease Leasing of the plantation property Land Purchase Purchasing of the plantation property NFV Net Future Value NPV Net Present Value IRR Internal Rate of Return
  • 8. Tabulated results of NPV, NFV, IRR - 4 scenarios
  • 9.
  • 10. Tabulated costs – applicable to all 4 scenarios
  • 11. Graph 1: Wood at Mill yard & Land Lease Scenario
  • 12. Graph 2: Wood at Millyard & Land Purchase Scenario
  • 13. Graph 3: Stumpage & Land Lease Scenario
  • 14. Graph 4: Stumpage & Land Purchase Scenario