Accueil
Explorer
Soumettre la recherche
Mettre en ligne
S’identifier
S’inscrire
Publicité
Check these out next
T328
guestb85775
T328
performanceweb
10 tips for Chartering a Project
Glen Alleman
Enterprise Project Management and the US Armed Forces - EPC Group
EPC Group
01020 6 Ppde Webinar Slides
John Hall
Project management best practices
walkerswu
10 things to improve project management
Striking Group Pty Ltd
7 ways to improve your PMO performance
PlanningForce
1
sur
24
Top clipped slide
Performance based management in a nut shell (austin pmi)(notes)
15 May 2012
•
0 j'aime
5 j'aime
×
Soyez le premier à aimer ceci
afficher plus
•
1,893 vues
vues
×
Nombre de vues
0
Sur Slideshare
0
À partir des intégrations
0
Nombre d'intégrations
0
Télécharger maintenant
Télécharger pour lire hors ligne
Signaler
Business
Technologie
Successful project processes "in a nutshell"
Glen Alleman
Suivre
Agile Program, Planning, and Controls à Niwot Ridge, LLC
Publicité
Publicité
Publicité
Recommandé
5 immutable principles and 5 processes in 60 seconds
Glen Alleman
30.1K vues
•
8 diapositives
Lotti 2011
Referendo Org
374 vues
•
4 diapositives
Jpunch 02-16-2012
NASAPMC
14K vues
•
22 diapositives
You don’t need agile to avoid the seven deadly sins of pm
Glen Alleman
6K vues
•
27 diapositives
Kremer Executive
NIMA
516 vues
•
59 diapositives
Governance
Glen Alleman
5.3K vues
•
23 diapositives
Contenu connexe
Présentations pour vous
(20)
T328
guestb85775
•
291 vues
T328
performanceweb
•
258 vues
10 tips for Chartering a Project
Glen Alleman
•
607 vues
Enterprise Project Management and the US Armed Forces - EPC Group
EPC Group
•
358 vues
01020 6 Ppde Webinar Slides
John Hall
•
328 vues
Project management best practices
walkerswu
•
1.3K vues
10 things to improve project management
Striking Group Pty Ltd
•
42K vues
7 ways to improve your PMO performance
PlanningForce
•
1.4K vues
Macrosolutions Consulting Service: Projects accelerated planning through the ...
Macrosolutions SA
•
188 vues
Principia21 Overview And Example Case Studies
Craig B. DeLano
•
194 vues
IT Services Delivery - Program Management Office (PMO)
VSR *
•
8.1K vues
Iss 02
PMInstituteIndia
•
879 vues
Benefits realisation: Getting beyond the smoke and mirros
Association for Project Management
•
6.2K vues
DELTEK Maconomy IT Consulting Brochure
Jan Bultinck
•
864 vues
Impact of Project Portfolio Management on Project Success
Iman Baradari
•
8.9K vues
Lowering business costs: Mitigating risk in the software delivery lifecycle
IBM Rational software
•
548 vues
CGN Execution Model
CGN & Associates
•
208 vues
Building a Credible Performance Measurement Baseline
Glen Alleman
•
965 vues
Spi Cost Roi
Ram Srivastava
•
736 vues
Trn 11
PMInstituteIndia
•
706 vues
Similaire à Performance based management in a nut shell (austin pmi)(notes)
(20)
Performance-Based Project Management In A Nut Shell
Glen Alleman
•
2.3K vues
Performance based management in a nut shell (v5)
Glen Alleman
•
1.5K vues
Professional Business Results & Selected Accomplishments
mjleib
•
240 vues
Performance Ally
Pivot Software
•
353 vues
NuStratis Brochure
Adrian Arbelaez
•
193 vues
Salesforce CRM 7 domains of Success
Kevin Sherman
•
29.3K vues
10 tips for chartering a project (v2)
Glen Alleman
•
677 vues
Gurtu 2010
Referendo Org
•
435 vues
Successfully Integrating Agile and Earned Value
Glen Alleman
•
8K vues
Competencies that Count
Mason Holloway
•
1K vues
Balanced scorecard for effective project selection process
Abhinav Sabharwal- Business Analyst Mumbai
•
5.2K vues
Creating & Maturing a PMO
Syed Raashid
•
3.4K vues
i-nexus overview
Paul Steeples
•
147K vues
Org Mngmnt
Mahzad Pakzad
•
384 vues
ACT College Arlington Project Management and Company Performance Paper.docx
write22
•
2 vues
ACT College Arlington Project Management and Company Performance Paper.docx
write30
•
2 vues
Breaking the Project Failure Cycle
Glen Alleman
•
221 vues
If you dont know where you are going any road will do visioning for implement...
p6academy
•
225 vues
Ieee sw small_projects
manoharbalu
•
35 vues
Kashvi Consultants Technology SBU Profile
caharshalshah
•
395 vues
Publicité
Plus de Glen Alleman
(20)
Managing risk with deliverables planning
Glen Alleman
•
356 vues
A Gentle Introduction to the IMP/IMS
Glen Alleman
•
160 vues
Increasing the Probability of Project Success
Glen Alleman
•
179 vues
Process Flow and Narrative for Agile+PPM
Glen Alleman
•
193 vues
Practices of risk management
Glen Alleman
•
341 vues
Principles of Risk Management
Glen Alleman
•
205 vues
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
Glen Alleman
•
217 vues
From Principles to Strategies for Systems Engineering
Glen Alleman
•
556 vues
NAVAIR Integrated Master Schedule Guide guide
Glen Alleman
•
390 vues
Building a Credible Performance Measurement Baseline
Glen Alleman
•
118 vues
Integrated master plan methodology (v2)
Glen Alleman
•
257 vues
IMP / IMS Step by Step
Glen Alleman
•
372 vues
DHS - Using functions points to estimate agile development programs (v2)
Glen Alleman
•
204 vues
Making the impossible possible
Glen Alleman
•
160 vues
Heliotropic Abundance
Glen Alleman
•
142 vues
Capabilities based planning
Glen Alleman
•
144 vues
Process Flow and Narrative for Agile
Glen Alleman
•
275 vues
Building the Performance Measurement Baseline
Glen Alleman
•
212 vues
Program Management Office Lean Software Development and Six Sigma
Glen Alleman
•
125 vues
Policy and Procedure Rollout
Glen Alleman
•
207 vues
Dernier
(20)
7-L3-Time Value of Money.ppt
ssuser9bf7b6
•
0 vue
Buy Paypal Accounts.pdf
Reviewserviceusa
•
0 vue
Buy Verified CashApp Accounts.pdf
https://reviewserviceusa.com/product/buy-google-reviews
•
0 vue
Buy Verified Coinbase Accounts.pdf
Reviewserviceusa
•
0 vue
Loan Shark Solutions.pdf
Sourav Sikder
•
0 vue
Buy Verified Paxful Accounts.pdf
reviewserviceusa.
•
0 vue
Buy Verified Bittrex Accounts.pdf
Maria Mathis
•
0 vue
Buy Verified PayPal Accounts.pdf
Maria Mathis
•
0 vue
Buy Verified Bittrex Accounts.pdf
https://reviewserviceusa.com/product/buy-google-reviews
•
0 vue
Buy Verified Revolut Accounts.pdf
https://reviewserviceusa.com/product/buy-google-reviews
•
0 vue
Buy Verified Wise Accounts.pdf
reviewserviceusa.
•
0 vue
Buy Verified PayPal Accounts.pdf
Reviewserviceusa
•
0 vue
Buy Sendgrid Accounts.pdf
reviewserviceusa.
•
0 vue
Buy Verified Payoneer Accounts.pdf
reviewserviceusa.
•
0 vue
Are you prepared for the transition to the Expected Credit Loss model for banks?
BobitaBiswas
•
0 vue
Buy Verified PayPal Accounts.pdf
reviewserviceusa.
•
0 vue
Bathoom Mirror With Lights _ LED Mirror With Shaving Socket.pdf
PrinceDaniyal1
•
0 vue
Buy Verified Payoneer Accounts.pdf
Maria Mathis
•
0 vue
Buy Verified CashApp Accounts.pdf
Reviewserviceusa
•
0 vue
THE REAL BATMAN.pdf
Sourav Sikder
•
0 vue
Publicité
Performance based management in a nut shell (austin pmi)(notes)
Performance Based Management
in a Nutshell Performance Based Management provides 5 practice areas that measurably increase the probability of success for projects and programs in every technical and business domain. Performance Based Management provides step–by–step guidance to the management team and project stakeholders through 5 process areas needed for success. These process areas appear obvious, but the processes are many times skipped over during the “heat of the battle” to get the project out the door. By applying Performance Based Management the project team focuses their efforts on increasing the probability of success, not just measuring cost and schedule numbers. This notion of “increasing the probability of success” is significantly different than simply applying a method and thinking that positive results will be the outcome. If we do not have a calculated probability of a successful outcome, we can not determine if we will actually reach the end goal of the project – we can not determine what DONE looks like. Copyright ©, Glen B. Alleman, Niwotridge Consulting, 2011 1
Performance Based Management
in a Nutshell The Customer Bought Outcomes No matter the customer is, a commercial firm deploying and enterprise IT solution, to a government agency, it is the outcome of the project that was paid for. The work needed to produce this outcome, the materials that support the development of this outcome, all collateral activities from the project are not what the customer paid for. They paid for the beneficial outcome from their investment in the project. Performance Based Management starts with defining what that outcome is in terms of the capabilities provided by the project. These capabilities are the starting point for the project’s success. They are defined in Measures of Effectiveness. These Measures of Effectiveness (MoEs) are quantitative measures that provide some insight into how effectively a product or service is performing. MoE’s are derived from stakeholder expectation statements. MoE’s are deemed critical to the mission or operational success of the system. For example a MoE that defines a capability is: “95% of all work will be completed within 15 business days or the negotiated deadline.” This MoE is a description of what DONE looks like for the project. The project provided this capability. Copyright ©, Glen B. Alleman, Niwotridge Consulting, 2011 2
Performance Based Management
in a Nutshell The five immutable principles of project success are the mechanisms for increasing the probability of success. 1. Know where you are going by defining “done” at some point in the future. This may be far in the future – months or years from now. Or closer in the future days or weeks from now. 2. Have some kind of plan to get to where you are going. This plan can be simple or it can be complex. The fidelity of the plan depends on the tolerance for risk by the users of the plan. The plan answers the question how long are we willing to wait before we find out we are late? 3. Understand the resources needed to execute the plan. How much time and money is needed to reach the destination. This can be fixed or it can be variable. 4. Identify the impediments to progress along the way to the destination. Have some means of removing, avoiding, or ignoring these impediments. 5. Have some way to measure your planned progress, not just your progress. Progress to Plan must be measured in units of physical percent complete. Copyright ©, Glen B. Alleman, Niwotridge Consulting, 2011 3
Performance Based Management
in a Nutshell There are 11 practices needed to generate the data necessary to provide actionable information to the decision makers in Performance Based Management This information is connected to the 5 Immutable Principles of project management and the artifacts from the practices of the these principles. These 11 criteria are a subset of the 32 criteria of ANSI–748B Earned Value Management. While Earned Value is certainty not necessary for project success, some form of measuring physical progress to plan is. Without this ability, only measures of the passage of time and consumption of resources remains. Using these 11 practices, based on measures of physical percent complete, real progress to plan can be measured. This provides visibility into the final cost, schedule, and technical performance of the project needed to answer the question how long are we willing to wait before we fins out we are late? And provide sufficient time to take corrective actions to avoid being late, over budget, and non–compliant with the technical performance measures. Copyright ©, Glen B. Alleman, Niwotridge Consulting, 2011 4
Performance Based Management
in a Nutshell The connection between principles of Performance Based Management and the 11 Practices is shown to the left. The 5 Immutable Principles of Success must be connected with artifacts and outcomes of the 11 Practices that implement those principles. If any of the 11 Practices or the 5 Principles are missing the probability of success is measurably reduced. Each Principle and each Practice must be in place for the Probability of Project Success to increase. That is the goal of Performance Based Management – Increase the Probability of Project Success. Copyright ©, Glen B. Alleman, Niwotridge Consulting, 2011 5
Performance Based Management
in a Nutshell Projects exist in a Domain and a Context in that Domain. This can be a business of technical Domain and a Business or Technical Context in that domain No matter the Domain and the Context in that Domain, projects consist of a collection of problems to be solved and needs of the stakeholders each seeking to solution. Performance Based Management provides a framework for addressing each of these elements in a cohesive and consistent manner, while providing visibility to the project’s Performance in units of measure meaningful to the decision maker. Copyright ©, Glen B. Alleman, Niwotridge Consulting, 2011 6
Performance Based Management
in a Nutshell When we say outcome what do we mean? We certainly don’t mean the work effort or the cost absorbed during that work effort. We mean something tangible that benefits the customer. This tangible outcome must be assessed by the Measures of Effectiveness (MoE) that are quantitative measures that provide insight into how effectively a product or service is performing. This product or service must provide the customer with a capability to do something tangible, something measureable, something that benefits the business or mission. The outcome must be capable of being measured in some way as it moves from left to right in the schedule. As it increases in its maturity. The outcomes must be testable in some form. Testable Requirements are the starting point. The outcomes are produced through Work Packages – “units of work.” These Work Packages are resource loaded, have specific periods of performance, and produce a tangible, measureable outcome that can be traced to the requirements and further traced to the needed capabilities. Copyright ©, Glen B. Alleman, Niwotridge Consulting, 2011 7
1. Identify Needed
Capabilities that achieve the program objectives or the particular end state. Define these capabilities through scenarios from the customer point of view in units of Measures of Effectiveness (MoE) meaningful to the customer. 2. Define The Technical And Operational Requirements that must be fulfilled for the system capabilities to be available to the customer. Define these requirements in terms that are isolated from any implementation technical products. Only then bind the requirements with technology. 3. Build The Performance Measurement Baseline – describing the work to be performed, the budgeted cost for this work, the organizational elements that produce the outcomes from this work effort, and the Measures of Performance (MoP) showing this work is proceeding according to cost, schedule, and technical Performance plan. 4. Execute the PMB’s Work Packages in the planned order, assuring all Performance assessments are 0%/100% complete before proceeding. No rework, no transfer of activities to the future. Assure every requirement is traceable to work and all work is traceable to requirements. 5. Apply Continuous Risk Management for each Performance Based Management process area to Identify, Analyze, Plan, Track, Control, and Communicate programmatic and technical risk. Copyright ©, Glen B. Alleman, Niwotridge Consulting, 2011 8
Performance Based Management
in a Nutshell With these five process areas, the next level of detail is show to the left. These are a repeat of the Performance Based Management processes. A statement of intent is the starting point for the successful application of each process area. This statement is provided in the form of a question. 1. What are the needed capabilities? 2. What are the technical and operational requirements? 3. What is the cost and schedule? 4. What are the periodic measures of performance? 5. What are the impediments to progress? By asking and answering these questions at every juncture of the program, the participants gain visibility into the Performance of the program in ways not found in other approaches to program management. Copyright ©, Glen B. Alleman, Niwotridge Consulting, 2011 9
Performance Based Management
in a Nutshell Transforming the System Capabilities into System Requirements begins with the a narrative description of the needed Capabilities in some form meaningful to the customer. This sounds like a tautology – a Chicken or the Egg problem. But discovering the system requirements is difficult in the absence of some higher level description of the needed “Capabilities” of the desired system. The concept of a “Capability” is a capacity or potential: Provided by a set of resources and abilities. To achieve a measureable result. In performing a particular task. Under specific conditions. To specific Performance standards. The four steps here result in a Concept of Operations (ConOps) for the resulting system. The ConOps describes the systems application to the problem domain and how the system will produce measurable value to the user in that domain. The ConOps is the story of how the system will work when it is delivered to the customer. Copyright ©, Glen B. Alleman, Niwotridge Consulting, 2011 10
Performance Based Management
in a Nutshell Here are some examples of capabilities. They appear obvious. But in many instances this approach is missing. The requirements are many time the starting point for the solution. In the absence of the capabilities statement and the Concept of Operations the user community may have trouble envisioning how the system will benefit them when it becomes available. The tendency to start with the requirements should be avoided. Requirements need a home, a reason for being. These examples are from actual projects. They represent clear and concise statement about the need for the system, the use of the system for the business or mission purpose, and how the end user will benefit from the system. Copyright ©, Glen B. Alleman, Niwotridge Consulting, 2011 11
Performance Based Management
in a Nutshell Requirements are the necessary attributes defined for an item prior to the efforts to develop a design for the item. System requirements analysis is a structured, or organized, methodology for identifying an appropriate set of resources to satisfy a system need (the needed capabilities) and the requirements for those resources that provide a sound basis for the design or selection of those resources. Requirements elicitation acts as the transformation between the customer’s system needs and the design concept implemented by the organization’s engineering resources. The basic process decomposes a statement of the customer need through a systematic exposition of what that system must do to satisfy that need. This need is the ultimate system requirement which all other requirements and designs flow. There are two fundamental classes of requirements. The Process Performance Requirements define how the work processes are used to produce a beneficial outcome to the customer. The Product Performance Requirements define the product specifications and how they are related to the process requirements. Copyright ©, Glen B. Alleman, Niwotridge Consulting, 2011 12
Performance Based Management
in a Nutshell Poorly formed requirements have been shown to contribute as much as 25% to the failure modes of programs and projects. Requirements engineering can be decomposed into the activities of requirements elicitation, specification, and validation. Most of the requirements techniques and tools today focus on specification, i.e., the representation of the requirements. The Performance Based Management method concentrates instead on elicitation. This method addresses problems found with requirements engineering that are not adequately addressed by specification techniques. This Performance Based Management method incorporates advantages of existing elicitation techniques while addressing the activities performed during requirements elicitation. These activities include fact–finding, requirements gathering, evaluation and rationalization, prioritization, and integration. Copyright ©, Glen B. Alleman, Niwotridge Consulting, 2011 13
Performance Based Management
in a Nutshell The Performance Measurement Baseline (PMB) is the primary assessment document for assuring the credibility of a project plan. The PMB is the baseline of the cost, schedule and outcomes for each Work Package in the plan. Constructing the PMB requires knowledge of the business requirements, skill in developing the Work Packages that produce the outcomes for these requirements, and discipline in assembling the cost, schedule and relationships between the Work Packages. It is the discipline that requires the most focus for the planners and project controls staff. Without this discipline, the development of a credible baseline is simply not possible. The concept of a producing measureable outcomes is at the core of the Performance Measurement Baseline (PMB). Outcomes are the units of measure of progress to plan. Outcomes are what the customer has paid money for. Outcomes contain the business capabilities, the associated value that fulfill the requirements of the business plan Copyright ©, Glen B. Alleman, Niwotridge Consulting, 2011 14
Performance Based Management
in a Nutshell The critical success factor in building the Performance Measurement Baseline (PMB) is the decomposition of the system requirements into technical capabilities, then into outcomes that enable those technical capabilities, and finally into the Work Packages (WP)that produce those outcomes. Performance Based Management using WPs includes: Defining the decomposed outcomes from the needed system capabilities in a Work Breakdown Structure. This decomposition process MUST be iterative and incremental. Assessment of the validity of this decomposition requires thought. The first decomposition is likely not the best approach. Estimating the duration and work effort for each WP. Duration and effort estimating is iterative and incremental, it cannot be a one–time effort. The initial estimate MUST be assessed after the assembly of the WPs into the Activity Network with inter–work stream dependencies. Only then can they be considered credible. Copyright ©, Glen B. Alleman, Niwotridge Consulting, 2011 15
Performance Based Management
in a Nutshell With the Performance Measurement Baseline established, its execution becomes critically important. The execution process is called the “project rhythm.” this means the processes are performed in a repeated manner – at least on a monthly basis and many times on a weekly basis. This business rhythm must create actionable information for the program manager on a time scale that allows actions to be taken. These tangible, physical outcomes must be defined in the work packaged created during the Planning process of Performance Based Management. The measures of physical percent complete can be applied on weekly boundaries in a variety of ways: 1. Have weekly outcomes. 2. Have apportioned milestones for each week. 3. Have tasks that are one week long and record 0%/100% complete at the end of each week. In all cases, a measure of physical percent complete is mandatory if the program manager is to receive actionable information. Copyright ©, Glen B. Alleman, Niwotridge Consulting, 2011 16
Performance Based Management
in a Nutshell The focus of Performance Measurement Baseline execution steps is to physically assess the progress of the program in units reflecting the progress using the three independent variables: C,S,P Cost Schedule Performance both technical and programmatic The traditional Earned Value Management approach uses three data sources, the budget (or planned) expenditures (BCWS), the actual expenditures (ACWP), and the Earned Value (BCWP) captured from the Work Package Manager. The comparison of budget versus actual expenditures indicates what was planned to be spent versus what was actually spent at any given time. The use of Earned Value (BCWP) indicates what was produced for that expenditure. With this approach the use of physical percent complete for the amount of work performed is a starting point. It does not indicate anything about the conformance to specification of the work produced for the amount of money spent. By adding Technical Performance Measures (TPM) to the analysis of Earned Value Management, the program manager can assess the actual progress of the program. Non–compliance with the planned Technical Performance Measures dilutes the Earned Value proportionally. Copyright ©, Glen B. Alleman, Niwotridge Consulting, 2011 17
Performance Based Management
in a Nutshell Continuous Risk Management is based on the underlying principles, concepts, and functions of risk management and provides guidance on how to implement it as a continuous practice in projects and organizations. Risk management is used to continuously assess what can go wrong in projects, determine which of these risks are most important, and implement strategies to deal with these risks. These principles are based on proven practices confirmed through research, field testing, and direct work with clients. Copyright ©, Glen B. Alleman, Niwotridge Consulting, 2011 18
Performance Based Management
in a Nutshell Continuous Risk Management, when performed successfully, provides a number of benefits: Prevents problems before they occur – indentifies potential problems and deals with them when it is easier and cheaper to do so – before they are problems. Improves product or service quality – focuses on the project’s objectives and consciously looks for things that may effect quality throughout the project lifecycle. Enables better use of resources – allows the early identification of potential problems – proactive management – and provides input into management decisions regarding resource allocation. Promotes teamwork – involves personnel at all levels of the program. Copyright ©, Glen B. Alleman, Niwotridge Consulting, 2011 19
Performance Based Management
in a Nutshell Traditional project management methods are usually focused on the activities of the project management method. Process Groups and Knowledge Areas of PMBOK®. These Groups and Knowledge Areas are necessary for project success. But they may not be sufficient. Using these baseline processes, project management activities are guided by field proven examples. Copyright ©, Glen B. Alleman, Niwotridge Consulting, 2011 20
Performance Based Management
in a Nutshell Using traditional project management process groups and knowledge areas, Performance Based Management adds the concept of Capabilities. As well the integration of Cost, Schedule, and Technical Performance Measures (TPM) in the Performance Measurement Baseline (PMB). The Work Packages (WP) of the PMB contain the measures of Physical Percent Complete for the individual outcomes of each Work Package. Copyright ©, Glen B. Alleman, Niwotridge Consulting, 2011 21
Performance Based Management
is a comprehensive approach to managing cost, schedule, and technical performance of programs and projects by assessing the interaction between programmatic and technical processes. The method starts by capturing the technical and operational needs of the proposed system. These are stated in a Concept of Operations describing how the system operates, how it fulfills the stated mission, what major components comprise the system, and how they interact with each other. From the capabilities description of the Concept of Operation, technical and operational requirements are elicited. These requirements define the development progress of the outcomes captured in the Performance Measurement Baseline (PMB). This PMB is constructed from a collection of Work Packages, arranged in a logical network describing the increasing maturity of the products or services needed to deliver the stated capabilities. Measures of physical percent complete are used for each Work Package and the outcomes they produce. Performance Based Management is a Systems Engineering approach to program and project management [INCOSE], [Stevens]. Copyright ©, Glen B. Alleman, Niwotridge Consulting, 2011 22
This method incorporates
all three aspects of a program performance measurement process – Cost, Schedule, and Technical Performance Measures (TPM). Conventional approaches use the cost and schedule baseline and the variances generate the values for Earned Value. Performance Based Management, measures of Physical Percent Complete derived from pre–defined targets of Technical Performance. The Earned Value variables are augmented with adjustments from the Technical Performance compliance for each outcome to produce a true assessment of progress. Technical Performance Measures integrate technical achievement with earned value using risk assessments that provides a robust program management tool to identify early technical and programmatic disruptions to a program. [Pisano] TPMs: Provide an integrated view across all programmatic and technical elements. Support distributed empowerment implicit in the IPT approach, through interface definitions. Logically organizes data resulting from systems engineering, risk management, and earned value processes. Provide a "real time" indication of contract performance and future cost and schedule risk. Support the development of systems thinking within an integrated program model focused on the interface definitions. Copyright ©, Glen B. Alleman, Niwotridge Consulting, 2011 23
Performance Based Management
in a Nutshell Performance Based Management provides tools, processes, and training needed to increase the probability of success of a projects. This approach is unique in its integration of the critical success factors for projects, no matter the domain. Our approach answers the following 5 immutable principles: 1. Where are we going? Do we have a definitive description of the needed capabilities and the requirements needed to deliver those capabilities? 2. How do we get there? What is the sequence of the work efforts to achieve the plan? 3. Do we have enough time, resources, and money to get there? Are the resources properly allocated to the sequence of work activities? 4. What impediments will we encounter along the way? Have we captured the risks and their handling plans for all the critical work activities? 5. How do we know we are making progress? Can we measure progress to plan in units meaningful to the decision makers? Copyright ©, Glen B. Alleman, Niwotridge Consulting, 2011 24