Prepared by
M.Ganesh Murugan
• The purpose of cost estimating is to find
the cost of the manufacturing operations
and to assist in setting the price for the
product
 Cost estimating may be defined as the process of
determining the probable cost of the product
before the start of manufacture
 Important activity in engineering design and production
 It is forecasting the future cost
 Cost estimating & process planning are prominent activities
in the manufacturing system
 It considers all the expenditures involved like engineering,
administration, etc
 It requires high technical knowledge
 The only accurate estimating can enable the leaders to
make vital decisions such as manufacturing, selling policies
Case1
 If job is over estimated,
› The firm will not be able to compete with its competitors
 If the job is under estimated,
› The firm will face huge financial loss
 To establish the selling price of a product, so as to ensure
reasonable profit to the company
 To determine the most economical process
 To make/buy decisions
 To evaluate the alternate designs
 To prepare production budget
 To initiate the cost reduction in existing facilities
 To fix the selling price of the product
 To help the contractors to submit the accurate tenders
 To forecast the progress of production and cost
 To set the various Standards
 Design cost
 Drafting cost
 R & D cost
 Material cost
 Labor cost
 Inspection cost
 Cost of tools, jigs, fixtures, etc.
 Overhead cost
 Design cost of the product is estimated by ascertaining the
expected time for the design of that product
Estimated Design cost = Estimated design time x salary of the
designer per unit time
 Design time can be estimate on the basis of similar products
already designed or on the basis of good judgement of
designer
 If design done by outside agency, the total amount paid –
gives the cost of design
 When the design completed, the drawing will be prepared
by the draftsman
Drafting cost = Estimated draft time x salary of the draftsman
per unit time
 Considerable time and money has to be spent on research
and developmental work
 The estimated cost and time on it are decided by the
judgement or the past experience
 Following steps involved
› Prepare the list of all materials required to manufacture the product
› Estimate the weight of all the materials expected (the allowance for the
material wastage, spoilage and scrap are also added )
Estimated materials cost = Estimated weight of each part x
Estimated future price
› Finally, the estimated cost of all the parts is added to get the total
estimated material cost of the product
 Following steps involved
› To estimate the labour cost, the estimator should have the knowledge of
various operations, machines, sequence, tools & labour to be used.
Labour cost = Estimated labour time needed to the product x
Cost of the labour per hour
 During this stage, the estimator should consider the cost of
inspection equipments, gauges and wages to the inspectors
 During this stage, includes the estimated cost and
maintenance charges for the tools, jigs, fixtures, die etc.
required for production
 It considers their present prices, market trend and the
number of times a particular tool can be used during its life
time
 This can not be charged directly
 All expenses other than direct cost are known as overhead
cost or Indirect expenses, ex:- Administrative expenses, selling
and distribution expenses, etc.
 It can be estimated by referring the previous records
Step 1
 Study the cost estimation request thoroughly and understand it completely
Step 2
 Analyze the product and decide the requirements and specifications of the
product
Step 3
 Prepare the list of all the parts of the product and their bill of Materials
Step 4
 Take make or buy decisions and prepare a separate list of parts to be
purchased &manufactured
Step 5
 Estimate the materials cost for the parts to be manufactured in the plant
Step 6
 Determine the cost of the parts to be purchased from outside
Step 7
 Make a manufacturing process plan for the parts to be manufactured in the
plant
Step 8
 Estimate the machining time for each operations listed in the manufacturing
process plan
Step 9
 Determine the direct labour cost
Step 10
 Determine the prime cost by adding direct expenses, direct material cost,
and direct labour cost
prime cost = direct expenses + direct material cost + direct labour cost
Step 11
 Estimate the factory overheads, which include all indirect expenditure
incurred during production such as indirect material cost, indirect labour
cost, depreciation and expenditure on maintenance of the plant,
machinery, power, etc.
Step 12
 Estimate the administrative expenses
Step 13
 Estimate the selling and distribution expenses, which include packing and
delivery charges, advertisement charges, etc.
Step 14
 Now calculate the total cost of the product
Total cost = Prime cost + Factory overheads + Administrative expenses +
Selling and distribution expenses
Step 15
 Decide the profit and add the profit to the total cost to fix the selling price of
the part
Selling price = Total cost + Profit
Step 16
 Finally estimate the time of delivery in consultation with the production and
sales department
 After estimating all the elements of cost, these estimated data's entered into
an estimate form
Estimate Form
Description   Date  
Drawing No   Enquiry No  
Lot size  
___________ 
Components   Customer  
  Estimated by  
S.No. Item of Expenditure Total cost for the entire Lot Cost/ Component
1
Direct Material cost/Component
   
1
2
3
Total
2
Labour cost/component
   
1
2
3
Total
3 Other Direct Expenses    
4 Factory Expenses    
5 Administrative Expenses    
6
selling and distribution expenses
   
1 Packing
2 Advertising
3 Other alined expenses
Total
7 Total cost/component    
8 Profit    
  Usually as a% of total cost / component    
9 Total ( selling price / component )    
• Costing is the determination of an actual
cost of a component after adding
different expenses incurred in various
departments
• Costing may be defined as a systematic
procedure for recording accurately
every item of expenditure incurred on
the manufacture of a product by
different sections of any manufacturing
concern
Cost determination:-
 To determine the actual cost of each cost of each component and
cost of the final product
For fixing selling price:-
 To provide information to ascertain the selling price of the product
Cost control:-
 To analyze the expenses incurred in production, so that control can
be kept over them
Comparison with estimate:-
 To compare the actual cost with the estimated cost to know
whether the estimate had been realistic or not
Make or buy decisions:-
 To decide which of the components to be manufactured and
which parts to be purchased from outside
Wastage reduction:-
 To help in detecting the undesirable wastages and expenses, so
that corrective measures can be taken
Suggest changes in design:-
 To provide changes, if the cost of part is higher as compared to the
competing product
Profit & Loss:-
 To locate the reasons for the increase or decrease in profit or loss of
a company
Fixing the discount:-
 To help in determining the discount on catalogue or market price of
the product
Pricing policy:-
 To help in formulating the policies for changing/price of the product
Budject preparation:-
 To the enterprise to prepare its budget
Prepare quotations/tenders:-
 To facilitate preparation of estimate for submitting
quotations/tenders
Output targets:-
 To help in regulating, from time to time, the production of a job so
that the enterprise can earn more profits
Legal provisions:-
 To meet certain legal and government regulations, cost data is
necessary
Purchasing new one:-
 To provide information for economic consideration for purchasing
new plants/machines, etc.
Job/order costing:-
 Find the cost of the each individual job/contract
 The total cost of each order is obtained from the daily cost sheet
Example:- ship building, machine fabricarion, building, etc.
Batch costing:-
 Batch costing is a form of job costing
 Instead of costing each components, each batch of components is
taken
Example:- automobile switches, Plastic components, etc.
Process costing :-
 Employed for a product which involved a number of distinct process
performed in a definite sequence
 This method indicates the cost of a product at different stages as it
passes through various operations
 Example:- Oil refining, chemical, cement, paint, paper making
Departmental costing:-
 This method is adopted in determining the cost of the cost of the
output of each department separately
 In this method, the actual expenditure of each department on various
components is entered on a separate sheet
Example:- steel industry, automobile industry, etc.
Operating costing:-
 This method is used in firms providing utility services
Example:- water service, electricity board, transport services, etc.
Unit costing :-
 This method is adopted by the firms, which supply a uniform product
rather than a variety of products
Example:- mines, quarries, etc.
Multiple costing :-
 This method is adopted where manufacture of standardized products
having no relation to one another in cost, quality and process, etc.
S.no. Particular Estimating Costing
1 Nature of cost Probable cost Actual cost
2 Personnel High Technical knowledge Knowledge of accounts
3 Process duration Before the production Starts with issue of order
Ends with product
dispatched on sale
4 Organization
department
Planning Department Accounting department
M.Ganesh Murugan
9715447621

Contenu connexe

Tendances (20)

Classification of contracts
Classification of contractsClassification of contracts
Classification of contracts
 
Value Engineering
Value EngineeringValue Engineering
Value Engineering
 
BREAK-EVEN ANALYSIS
BREAK-EVEN ANALYSISBREAK-EVEN ANALYSIS
BREAK-EVEN ANALYSIS
 
Value analysis
Value analysisValue analysis
Value analysis
 
Cost Analysis and Control
Cost Analysis and ControlCost Analysis and Control
Cost Analysis and Control
 
Value Engineering
Value EngineeringValue Engineering
Value Engineering
 
Pert and CPM
Pert and CPMPert and CPM
Pert and CPM
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
 
Types of Cost in Projects
Types of Cost in ProjectsTypes of Cost in Projects
Types of Cost in Projects
 
094 Productivity Measurement
094 Productivity Measurement094 Productivity Measurement
094 Productivity Measurement
 
Elements of cost
Elements of costElements of cost
Elements of cost
 
Network Techniques
Network TechniquesNetwork Techniques
Network Techniques
 
Project monitoring and control & planning for monitoring
Project monitoring and control & planning for monitoringProject monitoring and control & planning for monitoring
Project monitoring and control & planning for monitoring
 
Estimating and Costing
Estimating and CostingEstimating and Costing
Estimating and Costing
 
Methods and techniques of Costing
Methods and techniques of CostingMethods and techniques of Costing
Methods and techniques of Costing
 
Construction scheduling & Cost control
Construction scheduling & Cost controlConstruction scheduling & Cost control
Construction scheduling & Cost control
 
Cost control and reduction
Cost control and reductionCost control and reduction
Cost control and reduction
 
Work study
Work studyWork study
Work study
 
ESTIMATING AND COSTING
ESTIMATING AND COSTINGESTIMATING AND COSTING
ESTIMATING AND COSTING
 
Pert & cpm project management
Pert & cpm   project managementPert & cpm   project management
Pert & cpm project management
 

En vedette

Tender Presentation ( Estimating )
Tender Presentation ( Estimating )Tender Presentation ( Estimating )
Tender Presentation ( Estimating )Lee Pei Gie
 
Construction Estimating
Construction EstimatingConstruction Estimating
Construction Estimatingmauinick
 
Sgp4813 measurement of quantities
Sgp4813 measurement of quantitiesSgp4813 measurement of quantities
Sgp4813 measurement of quantitiesalanchong88
 
Construction industry and estimating
Construction industry and estimatingConstruction industry and estimating
Construction industry and estimatingalanchong88
 
Taylor: Estimating uncertainty for continental scale measurements.
Taylor:  Estimating uncertainty for continental scale measurements.Taylor:  Estimating uncertainty for continental scale measurements.
Taylor: Estimating uncertainty for continental scale measurements.questRCN
 
Analysis of rates for labour and material
Analysis of rates for labour and materialAnalysis of rates for labour and material
Analysis of rates for labour and materialALI HYDER GADHI
 
Estimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction WorkEstimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction WorkDaniel Ross
 
Estimating Time & Costs
 Estimating Time & Costs Estimating Time & Costs
Estimating Time & Costsmairemic
 
Building estimation methods
Building estimation methodsBuilding estimation methods
Building estimation methodsSimarpreet Singh
 
Estimating and-costing book
Estimating and-costing bookEstimating and-costing book
Estimating and-costing bookThomas Britto
 

En vedette (15)

Tender Presentation ( Estimating )
Tender Presentation ( Estimating )Tender Presentation ( Estimating )
Tender Presentation ( Estimating )
 
Construction Estimating
Construction EstimatingConstruction Estimating
Construction Estimating
 
Estimating
EstimatingEstimating
Estimating
 
Cost Estimation
Cost EstimationCost Estimation
Cost Estimation
 
Sgp4813 measurement of quantities
Sgp4813 measurement of quantitiesSgp4813 measurement of quantities
Sgp4813 measurement of quantities
 
Construction industry and estimating
Construction industry and estimatingConstruction industry and estimating
Construction industry and estimating
 
Taylor: Estimating uncertainty for continental scale measurements.
Taylor:  Estimating uncertainty for continental scale measurements.Taylor:  Estimating uncertainty for continental scale measurements.
Taylor: Estimating uncertainty for continental scale measurements.
 
Analysis of rates for labour and material
Analysis of rates for labour and materialAnalysis of rates for labour and material
Analysis of rates for labour and material
 
Project Estimating
Project EstimatingProject Estimating
Project Estimating
 
The estimating process
The estimating processThe estimating process
The estimating process
 
Estimation
EstimationEstimation
Estimation
 
Estimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction WorkEstimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction Work
 
Estimating Time & Costs
 Estimating Time & Costs Estimating Time & Costs
Estimating Time & Costs
 
Building estimation methods
Building estimation methodsBuilding estimation methods
Building estimation methods
 
Estimating and-costing book
Estimating and-costing bookEstimating and-costing book
Estimating and-costing book
 

Similaire à Cost estimating & Costing

costestimating-110323025231-phpapp02.pptx
costestimating-110323025231-phpapp02.pptxcostestimating-110323025231-phpapp02.pptx
costestimating-110323025231-phpapp02.pptxRedhaElhuni
 
importance of estimation power point presentation
importance of estimation power point presentationimportance of estimation power point presentation
importance of estimation power point presentationniyatishah939575
 
Costestimating 110323025231-phpapp02
Costestimating 110323025231-phpapp02Costestimating 110323025231-phpapp02
Costestimating 110323025231-phpapp02hlksd
 
Presentation02
Presentation02Presentation02
Presentation02mukho4me
 
PPCE unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)
 PPCE  unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)  PPCE  unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)
PPCE unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION) TAMILMECHKIT
 
ppceunit3-211117103659 (1)-2-81 (3).pptx
ppceunit3-211117103659 (1)-2-81 (3).pptxppceunit3-211117103659 (1)-2-81 (3).pptx
ppceunit3-211117103659 (1)-2-81 (3).pptxmani617576
 
Process planning and cost estimation unit iii
Process planning and cost estimation  unit   iiiProcess planning and cost estimation  unit   iii
Process planning and cost estimation unit iiis Kumaravel
 
PPCE Unit-3.pptx
PPCE Unit-3.pptxPPCE Unit-3.pptx
PPCE Unit-3.pptxDJAGADEESH1
 
INTRODUCTION TO COST ESTIMATION
INTRODUCTION TO COST ESTIMATIONINTRODUCTION TO COST ESTIMATION
INTRODUCTION TO COST ESTIMATIONDJAGADEESH1
 
PPCE UNIT- 3.pptx
PPCE UNIT- 3.pptxPPCE UNIT- 3.pptx
PPCE UNIT- 3.pptxAravind Ra
 
Costing of Formal Shirt
Costing of Formal ShirtCosting of Formal Shirt
Costing of Formal ShirtAbhishek Raj
 
Cost Accounting
Cost AccountingCost Accounting
Cost Accountingashu1983
 
Process Planning & Cost Estimation
Process Planning & Cost EstimationProcess Planning & Cost Estimation
Process Planning & Cost EstimationPrabhu Bose
 

Similaire à Cost estimating & Costing (20)

costestimating-110323025231-phpapp02.pptx
costestimating-110323025231-phpapp02.pptxcostestimating-110323025231-phpapp02.pptx
costestimating-110323025231-phpapp02.pptx
 
importance of estimation power point presentation
importance of estimation power point presentationimportance of estimation power point presentation
importance of estimation power point presentation
 
Costestimating 110323025231-phpapp02
Costestimating 110323025231-phpapp02Costestimating 110323025231-phpapp02
Costestimating 110323025231-phpapp02
 
Presentation02
Presentation02Presentation02
Presentation02
 
UNIT-3.pptx
UNIT-3.pptxUNIT-3.pptx
UNIT-3.pptx
 
PPCE unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)
 PPCE  unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)  PPCE  unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)
PPCE unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)
 
ppceunit3-211117103659 (1)-2-81 (3).pptx
ppceunit3-211117103659 (1)-2-81 (3).pptxppceunit3-211117103659 (1)-2-81 (3).pptx
ppceunit3-211117103659 (1)-2-81 (3).pptx
 
Cost accounting ppt
Cost accounting pptCost accounting ppt
Cost accounting ppt
 
Process planning and cost estimation unit iii
Process planning and cost estimation  unit   iiiProcess planning and cost estimation  unit   iii
Process planning and cost estimation unit iii
 
PPCE Unit-3.pptx
PPCE Unit-3.pptxPPCE Unit-3.pptx
PPCE Unit-3.pptx
 
PPCE Unit-3.pptx
PPCE Unit-3.pptxPPCE Unit-3.pptx
PPCE Unit-3.pptx
 
INTRODUCTION TO COST ESTIMATION
INTRODUCTION TO COST ESTIMATIONINTRODUCTION TO COST ESTIMATION
INTRODUCTION TO COST ESTIMATION
 
PPCE UNIT- 3.pptx
PPCE UNIT- 3.pptxPPCE UNIT- 3.pptx
PPCE UNIT- 3.pptx
 
Unit 3
Unit 3Unit 3
Unit 3
 
Lec 1.pptx
Lec 1.pptxLec 1.pptx
Lec 1.pptx
 
Costing of Formal Shirt
Costing of Formal ShirtCosting of Formal Shirt
Costing of Formal Shirt
 
Cost Accounting
Cost AccountingCost Accounting
Cost Accounting
 
Cost accountingppt
Cost accountingpptCost accountingppt
Cost accountingppt
 
Cost accounting
Cost accountingCost accounting
Cost accounting
 
Process Planning & Cost Estimation
Process Planning & Cost EstimationProcess Planning & Cost Estimation
Process Planning & Cost Estimation
 

Plus de Ganesh Murugan

Writing-Professional-Emails.pdf
Writing-Professional-Emails.pdfWriting-Professional-Emails.pdf
Writing-Professional-Emails.pdfGanesh Murugan
 
Competency iceberg-model
Competency iceberg-modelCompetency iceberg-model
Competency iceberg-modelGanesh Murugan
 
Robots one day presentation
Robots one day presentationRobots one day presentation
Robots one day presentationGanesh Murugan
 
Goal setting & self motivation
Goal setting & self motivationGoal setting & self motivation
Goal setting & self motivationGanesh Murugan
 
Abrassive jet machining
Abrassive jet machiningAbrassive jet machining
Abrassive jet machiningGanesh Murugan
 
Compressor trouble shooting
Compressor trouble shootingCompressor trouble shooting
Compressor trouble shootingGanesh Murugan
 
Maintaenance and trouble shooting of hyd. system
Maintaenance and trouble shooting of hyd. systemMaintaenance and trouble shooting of hyd. system
Maintaenance and trouble shooting of hyd. systemGanesh Murugan
 
10 robotic manufacturing systems
10    robotic manufacturing systems10    robotic manufacturing systems
10 robotic manufacturing systemsGanesh Murugan
 
04 power transmission systems
04    power transmission systems04    power transmission systems
04 power transmission systemsGanesh Murugan
 
Nttf corp presentation 15 jan2015
Nttf corp presentation 15 jan2015Nttf corp presentation 15 jan2015
Nttf corp presentation 15 jan2015Ganesh Murugan
 
Quality control circle presentation
Quality control circle presentationQuality control circle presentation
Quality control circle presentationGanesh Murugan
 

Plus de Ganesh Murugan (20)

Writing-Professional-Emails.pdf
Writing-Professional-Emails.pdfWriting-Professional-Emails.pdf
Writing-Professional-Emails.pdf
 
Competency iceberg-model
Competency iceberg-modelCompetency iceberg-model
Competency iceberg-model
 
Robots one day presentation
Robots one day presentationRobots one day presentation
Robots one day presentation
 
Robot manipulator
Robot manipulatorRobot manipulator
Robot manipulator
 
Hydraulic actuators
Hydraulic actuatorsHydraulic actuators
Hydraulic actuators
 
Goal setting & self motivation
Goal setting & self motivationGoal setting & self motivation
Goal setting & self motivation
 
Model qcc nec
Model qcc   necModel qcc   nec
Model qcc nec
 
Encyclopedia of food
Encyclopedia of foodEncyclopedia of food
Encyclopedia of food
 
gd&t keyterms
gd&t keytermsgd&t keyterms
gd&t keyterms
 
Abrassive jet machining
Abrassive jet machiningAbrassive jet machining
Abrassive jet machining
 
1 gd&t alex
1 gd&t alex1 gd&t alex
1 gd&t alex
 
Compressor trouble shooting
Compressor trouble shootingCompressor trouble shooting
Compressor trouble shooting
 
Maintaenance and trouble shooting of hyd. system
Maintaenance and trouble shooting of hyd. systemMaintaenance and trouble shooting of hyd. system
Maintaenance and trouble shooting of hyd. system
 
Edm
EdmEdm
Edm
 
10 robotic manufacturing systems
10    robotic manufacturing systems10    robotic manufacturing systems
10 robotic manufacturing systems
 
Energy audit
Energy auditEnergy audit
Energy audit
 
04 power transmission systems
04    power transmission systems04    power transmission systems
04 power transmission systems
 
Hydraulic actuators
Hydraulic actuatorsHydraulic actuators
Hydraulic actuators
 
Nttf corp presentation 15 jan2015
Nttf corp presentation 15 jan2015Nttf corp presentation 15 jan2015
Nttf corp presentation 15 jan2015
 
Quality control circle presentation
Quality control circle presentationQuality control circle presentation
Quality control circle presentation
 

Dernier

NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...Amil baba
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxDr. Ravikiran H M Gowda
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSCeline George
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024Elizabeth Walsh
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and ModificationsMJDuyan
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxEsquimalt MFRC
 
Tatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsTatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsNbelano25
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfSherif Taha
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...pradhanghanshyam7136
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfDr Vijay Vishwakarma
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jisc
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Jisc
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structuredhanjurrannsibayan2
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsKarakKing
 
Philosophy of china and it's charactistics
Philosophy of china and it's charactisticsPhilosophy of china and it's charactistics
Philosophy of china and it's charactisticshameyhk98
 

Dernier (20)

NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Tatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsTatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf arts
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
Philosophy of china and it's charactistics
Philosophy of china and it's charactisticsPhilosophy of china and it's charactistics
Philosophy of china and it's charactistics
 

Cost estimating & Costing

  • 2. • The purpose of cost estimating is to find the cost of the manufacturing operations and to assist in setting the price for the product
  • 3.  Cost estimating may be defined as the process of determining the probable cost of the product before the start of manufacture
  • 4.  Important activity in engineering design and production  It is forecasting the future cost  Cost estimating & process planning are prominent activities in the manufacturing system  It considers all the expenditures involved like engineering, administration, etc  It requires high technical knowledge
  • 5.  The only accurate estimating can enable the leaders to make vital decisions such as manufacturing, selling policies Case1  If job is over estimated, › The firm will not be able to compete with its competitors  If the job is under estimated, › The firm will face huge financial loss
  • 6.  To establish the selling price of a product, so as to ensure reasonable profit to the company  To determine the most economical process  To make/buy decisions  To evaluate the alternate designs  To prepare production budget  To initiate the cost reduction in existing facilities
  • 7.  To fix the selling price of the product  To help the contractors to submit the accurate tenders  To forecast the progress of production and cost  To set the various Standards
  • 8.  Design cost  Drafting cost  R & D cost  Material cost  Labor cost  Inspection cost  Cost of tools, jigs, fixtures, etc.  Overhead cost
  • 9.  Design cost of the product is estimated by ascertaining the expected time for the design of that product Estimated Design cost = Estimated design time x salary of the designer per unit time  Design time can be estimate on the basis of similar products already designed or on the basis of good judgement of designer  If design done by outside agency, the total amount paid – gives the cost of design
  • 10.  When the design completed, the drawing will be prepared by the draftsman Drafting cost = Estimated draft time x salary of the draftsman per unit time
  • 11.  Considerable time and money has to be spent on research and developmental work  The estimated cost and time on it are decided by the judgement or the past experience
  • 12.  Following steps involved › Prepare the list of all materials required to manufacture the product › Estimate the weight of all the materials expected (the allowance for the material wastage, spoilage and scrap are also added ) Estimated materials cost = Estimated weight of each part x Estimated future price › Finally, the estimated cost of all the parts is added to get the total estimated material cost of the product
  • 13.  Following steps involved › To estimate the labour cost, the estimator should have the knowledge of various operations, machines, sequence, tools & labour to be used. Labour cost = Estimated labour time needed to the product x Cost of the labour per hour
  • 14.  During this stage, the estimator should consider the cost of inspection equipments, gauges and wages to the inspectors
  • 15.  During this stage, includes the estimated cost and maintenance charges for the tools, jigs, fixtures, die etc. required for production  It considers their present prices, market trend and the number of times a particular tool can be used during its life time
  • 16.  This can not be charged directly  All expenses other than direct cost are known as overhead cost or Indirect expenses, ex:- Administrative expenses, selling and distribution expenses, etc.  It can be estimated by referring the previous records
  • 17. Step 1  Study the cost estimation request thoroughly and understand it completely Step 2  Analyze the product and decide the requirements and specifications of the product Step 3  Prepare the list of all the parts of the product and their bill of Materials Step 4  Take make or buy decisions and prepare a separate list of parts to be purchased &manufactured Step 5  Estimate the materials cost for the parts to be manufactured in the plant Step 6  Determine the cost of the parts to be purchased from outside Step 7  Make a manufacturing process plan for the parts to be manufactured in the plant
  • 18. Step 8  Estimate the machining time for each operations listed in the manufacturing process plan Step 9  Determine the direct labour cost Step 10  Determine the prime cost by adding direct expenses, direct material cost, and direct labour cost prime cost = direct expenses + direct material cost + direct labour cost Step 11  Estimate the factory overheads, which include all indirect expenditure incurred during production such as indirect material cost, indirect labour cost, depreciation and expenditure on maintenance of the plant, machinery, power, etc. Step 12  Estimate the administrative expenses
  • 19. Step 13  Estimate the selling and distribution expenses, which include packing and delivery charges, advertisement charges, etc. Step 14  Now calculate the total cost of the product Total cost = Prime cost + Factory overheads + Administrative expenses + Selling and distribution expenses Step 15  Decide the profit and add the profit to the total cost to fix the selling price of the part Selling price = Total cost + Profit Step 16  Finally estimate the time of delivery in consultation with the production and sales department
  • 20.  After estimating all the elements of cost, these estimated data's entered into an estimate form
  • 21. Estimate Form Description   Date   Drawing No   Enquiry No   Lot size   ___________  Components   Customer     Estimated by   S.No. Item of Expenditure Total cost for the entire Lot Cost/ Component 1 Direct Material cost/Component     1 2 3 Total 2 Labour cost/component     1 2 3 Total 3 Other Direct Expenses     4 Factory Expenses     5 Administrative Expenses     6 selling and distribution expenses     1 Packing 2 Advertising 3 Other alined expenses Total 7 Total cost/component     8 Profit       Usually as a% of total cost / component     9 Total ( selling price / component )    
  • 22. • Costing is the determination of an actual cost of a component after adding different expenses incurred in various departments
  • 23. • Costing may be defined as a systematic procedure for recording accurately every item of expenditure incurred on the manufacture of a product by different sections of any manufacturing concern
  • 24. Cost determination:-  To determine the actual cost of each cost of each component and cost of the final product For fixing selling price:-  To provide information to ascertain the selling price of the product Cost control:-  To analyze the expenses incurred in production, so that control can be kept over them Comparison with estimate:-  To compare the actual cost with the estimated cost to know whether the estimate had been realistic or not Make or buy decisions:-  To decide which of the components to be manufactured and which parts to be purchased from outside
  • 25. Wastage reduction:-  To help in detecting the undesirable wastages and expenses, so that corrective measures can be taken Suggest changes in design:-  To provide changes, if the cost of part is higher as compared to the competing product Profit & Loss:-  To locate the reasons for the increase or decrease in profit or loss of a company Fixing the discount:-  To help in determining the discount on catalogue or market price of the product Pricing policy:-  To help in formulating the policies for changing/price of the product
  • 26. Budject preparation:-  To the enterprise to prepare its budget Prepare quotations/tenders:-  To facilitate preparation of estimate for submitting quotations/tenders Output targets:-  To help in regulating, from time to time, the production of a job so that the enterprise can earn more profits Legal provisions:-  To meet certain legal and government regulations, cost data is necessary Purchasing new one:-  To provide information for economic consideration for purchasing new plants/machines, etc.
  • 27. Job/order costing:-  Find the cost of the each individual job/contract  The total cost of each order is obtained from the daily cost sheet Example:- ship building, machine fabricarion, building, etc. Batch costing:-  Batch costing is a form of job costing  Instead of costing each components, each batch of components is taken Example:- automobile switches, Plastic components, etc. Process costing :-  Employed for a product which involved a number of distinct process performed in a definite sequence  This method indicates the cost of a product at different stages as it passes through various operations  Example:- Oil refining, chemical, cement, paint, paper making
  • 28. Departmental costing:-  This method is adopted in determining the cost of the cost of the output of each department separately  In this method, the actual expenditure of each department on various components is entered on a separate sheet Example:- steel industry, automobile industry, etc. Operating costing:-  This method is used in firms providing utility services Example:- water service, electricity board, transport services, etc. Unit costing :-  This method is adopted by the firms, which supply a uniform product rather than a variety of products Example:- mines, quarries, etc. Multiple costing :-  This method is adopted where manufacture of standardized products having no relation to one another in cost, quality and process, etc.
  • 29.
  • 30. S.no. Particular Estimating Costing 1 Nature of cost Probable cost Actual cost 2 Personnel High Technical knowledge Knowledge of accounts 3 Process duration Before the production Starts with issue of order Ends with product dispatched on sale 4 Organization department Planning Department Accounting department