SlideShare une entreprise Scribd logo
1  sur  59
HYDROLOGY
AND
WATER RESOURCES ENGINEERING
• Reservoir Types, Investigations, Site selection,
Zones of storage, Safe yield, Reservoir capacity,
Reservoir sedimentation and control.
Syllabus
Reservoir
• A Reservoir is a artificial lake or
impoundment from a dam which is used to
store water.
• Reservoirs may be created in river valleys
by the construction of a dam or may be built
by excavation in the ground or by
conventional construction techniques such as
brickwork or cast concrete.
Reservoir
Purpose of Reservoir
• The Storage reservoir is formed for the
following purpose:
• Flood Control
• Irrigation
• Water Supply
• Hydroelectric Power Generation
• Development of fishery
• Navigation
• Soil Conservation
Flood Control
Irrigation
Water Supply
Hydro Electric Power Generation
Fisheries
Navigation
Soil Conservation
Reservoir may be designated by.
• Single Purpose Reservoir: This type of reservoir
is formed mainly to serve a single purpose, such
as irrigation, flood control, water supply, etc.
• Multipurpose Reservoir: This type is formed to
serve many purpose such as,
• Irrigation and water supply.
• Irrigation water supply and flood control.
• Irrigation, water supply, flood control,
hydroelectric power generation, fishery, etc.
Reservoir
Classification of Reservoir
Storage Reservoir
• Storage Reservoir The storage reservoir is
formed by constructing a dam across a river
valley. The idea of constructing such a
reservoir is to store the excess water which
flows through the river during the high floods
or rainy season. This stored water is then utilized
for various purposes, such as irrigation, water
supply, fishery, hydroelectric power generation,
etc. Again the storage reservoir may be named
as single purpose reservoir or multipurpose
reservoir according to its utility.
Storage Reservoir
Classification of Reservoir
• Flood Control Reservoir: Flood control
reservoir are for are formed by constructing
dams at suitable places in the catchment area
or river valley to arrest the flood water
temporarily so that the downstream area may
not get damaged by sudden high flood
discharge. The arrested water is then allowed to
flow or released gradually without causing any
harm to the low lying area on the downstream
side. This type of reservoir is designated as
single purpose reservoir. The flood control
reservoir can be of two type:
Flood Control Reservoir
Classification of Reservoir
Detention Reservoir
• In this type of reservoir, the spill ways with adjustable
gates provided with the dam so that the flood water
may be detained for sometime and then released
according to the situation of the downstream area by
operating the gates of the spillways.
Retarding Reservoir
• In this type of reservoir spillways are provided with
the dam at such a level an capacity so that the flood
discharge is retarded and it takes long time for the
flood water to flow completely towards the downstream
area. The discharge stops when the water level falls below
the crest of the spillways.
Detention Reservoir
Classification of Reservoir
Distribution Reservoir:
• The distribution reservoir is not formed by
constructing a dam across a river or valley. It
is constructed by masonry work or concrete
work in the form of a rectangular or circular
tank at suitable places near the town or city.
The water from the river or lake is pumped into
this reservoir and stored there for supplying to the
consumers of the town or city. The water may be
supplied to consumers by pumping system or
gravity system.
Distribution Reservoir
Site Selection for Reservoir
• The following points should be remembered while
selecting a site for a reservoir.
• Stable foundation for the dam should be available
where the reservoir basin is proposed to be formed.
• At the selected site the river valley should be narrow
and well defined so that the length of the dam may be
short.
• The proposed reservoir basin should be watertight and
free from cracks, fissures, etc. so that there is no loss of
water due to percolation.
• The reservoir water should not submerge valuable land
or property.
Site Selection for Reservoir
• The tributaries which carry high content of sediment
should be avoided.
• The site should be such that a deep reservoir may
be formed with minimum surface area to control
the loss of water due to evaporation.
• The site should be easily accessible by road or
railway.
• The construction material for the dam and other
allied works should be available in the vicinity of
the site.
• Suitable area should be available for labour
colonies, staff quarters, godowns, stack yards etc.
Site Selection for Reservoir
Investigation works for the
Reservoir
• The following investigation should be carried out for
planning the storage reservoir.
• Engineering Survey
• The area of the dam site and reservoir basin should
be surveyed thoroughly to prepare topographical
map and contour map. From the contour map the
storage capacity of the reservoir should be fixed by
ascertaining the height of the dam. Thus, the valuable
land and properties which may get submerged in the
reservoir can be found out. So, the amount of
compensation to be paid to the owner can be
estimated. A detailed statement may be prepared for
the land acquisition.
Engineering Survey
Investigation works for the
Reservoir
• Geological Survey: It should be carried out to
determine the following informations:
• (i) Dam foundation: The sub-surface
exploration at the dam site should be carried
out to locate the cracks, fissures, etc, which are
responsible for the percolation loss. Necessary
measures can then be recommended for
percolation zones to control the losses.
Investigation works for the
Reservoir
• (ii) Characteristics of reservoir basin: The geological
survey of the basin should be carried out to locate the
cracks, fissures etc. which are responsible for the
percolation loss. Necessary measures can then be
recommended for percolation zones to control the losses.
• (iii) Availability of Construction Materials: Huge
quantity of materials like fine aggregate and coarse
aggregate are required for the construction of dam and
allied structures The place where these materials are
available should be located and they should preferably be
near the site. If the quarries and sand pits are situated
in the vicinity of the project, it reduces the cost of the
project.
Geological Survey
Investigation works for the
Reservoir
• Hydrological Survey: This survey includes
the collection of following data:
• River gauging: River gauging should be
carried out for the main river and its
tributaries in the catchment area and on the
upstream side of the site. This is to estimate
the probable discharge of the river
throughout the year.
Investigation works for the
Reservoir
• Rainfall records: The rainfall records from the rain
gauge stations in the catchment area for the past few
decades are collected and the runoff is estimated.
Then the hydrographs are prepared from the high flood
discharge for the previous decades. The probable
flood discharge for the future decades are
ascertained from the graphs.
• Determination of discharge from empirical formulae:
The peak flood discharge may also be determined by
empirical formulae like Ryve’s formulae, Dickens's
formulae, etc. The number and capacity of spillway are
determined according to the available highest flood
discharge from different observations.
Hydrological Survey
Yield of Reservoir
• Yield The yield of reservoir is defined as the
amount of water which is available in the
reservoir at a specified interval of time.
• Safe yield: It is the maximum quantity of
water available in the reservoir during critical
dry period.
Yield of Reservoir
Capacity of Reservoir
• Capacity The capacity of a reservoir is
defined as the total volume of water that can
be stored in it. The capacity of a reservoir
may be determined by the following methods.
• By Mass Curve
• By Actual Discharge
• By Empirical Formulae
Capacity of Reservoir
Zones of Storage Reservoir
• The storage capacity of a reservoir is designated by
several zones which are demarcated by certain pools.
• Normal Pool Level (N.P.L) It is the maximum
elevation of the water surface which is to be stored
in the reservoir during normal working period. The
water above this level will flow over the spillway crest.
This water level is also known as full reservoir level
(F.R.L)
• Maximum Pool Level (M.P.L) It is the maximum
elevation to which the water surface is allowed to
rise in the reservoir during the period of flood. This
level can be controlled by providing spillway gate
(M.W.L).
Zones of Storage Reservoir
Minimum Pool Level:
• It is the lowest elevation to which the water
level is allowed to drop in a reservoir. This
level is fixed by providing outlets in the dam.
In case of hydroelectric power generation, the
minimum head is essential. So, the water level
of the reservoir should not drop below the
minimum pool level (L.W.L).
The following are the various
Storage Zones:
• Dead Storage: The volume of water which is
stored below the minimum pool level of a
reservoir is known as dead storage. This water
cannot be utilized under normal operating
Condition.
• Live Storage: The volume of water stored in
the reservoir between normal pool level and
minimum pool level is known as useful storage
or live storage. This water can be used for
various purposes, such as irrigation, water
supplies, fisheries, hydroelectric power
generation.
The following are the various Storage
Zones:
• Surcharge Storage: The volume of water
stored in a reservoir between the normal
pool level and maximum pool level is known
as surcharge storage, this storage is not
meant for any work, but it is mainly for the
detention of flood water so that it may not
cause any danger on the downstream side.
The following are the various
Storage Zones:
• Valley Storage: The minimum volume of water
which flows through a river before the
construction of dam is known as valley storage.
This water may always be available from the river
even before the formation of reservoir. This water
may always be available from the river even
before the formation of reservoir.. So, the
effective storage capacity is given by.
• Effective Storage= (Live storage + Surcharge
Storage- Valley Storage).
Zones of Storage Reservoir
Causes of Sedimentation in
Reservoir
• In the catchment area the soil may get
eroded and rocks may get disintegrated due
to various reasons. The disintegrated rocks
and loose soil form the sediment which is
carried by the river and gets deposited on the
reservoir bed near the base of the dam. The
sediment mainly consists of sand and silt.
The process of deposition of sand and silt in
the reservoir is designated as reservoir
sedimentation.
Causes of Sedimentation in
Reservoir
The following are the causes of
sedimentation
• Characteristics of soil in Catchment area: If the catchment
area is composed of loose soil, then it may get easily eroded
and get carried away by the river. On the other hand, if the
soil of the catchment area is hard and rocky, the river would
not be able to carry sediment.
• Topography of the catchment Area: If the catchment area
consists of steep slope, then it will develop high velocity of
flow which will cause more erosion of the surface soil
thereby making the river carry a lot of sediment.
• Intensity of Rainfall in Catchment Area: If the intensity of
rainfall in catchment area is high, then it will increase the
rate of run-off and the river will carry more sediment.
The following are the causes of
Sedimentation
• Cultivation in Catchment Area: The intensive
cultivation in the catchment area will make the
soil loose and rain water will carry a lot of
sediment to the river.
• Vegetation cover in Catchment Area: If the
catchment area is covered with vegetation
cover like grass, plants, forest area, etc. then the
erosion of the soil will be controlled and the river
will not carry sediment. If there is no such
vegetal apron or cover, the soil may be easily
eroded and the river will carry much sediment.
Effect of Sedimentation
When the sediment laden water of the river
approaches the zone of reservoir, the velocity of flow
reduces gradually and thus the heavier particles are
settled down at the head of the reservoir, i.e.. starting
zone of reservoir. This zone is termed as delta. Most of the
sediments get deposited at this zone. The fine sediments
remain in suspension for a considerable time and are carried
towards the dam. These sediments are deposited at the foot
of the dam. The very fine particles are carried with water
as turbid flow and ultimately discharged through the
outlets. The floating debris is collected above delta. The
clear water circulates the middle portion of the reservoir.
Thus, the life of reservoir depends on the trend of the
sedimentation.
Effect of Sedimentation
Control of Sedimentation
• In order to increase the useful life of a reservoir, it is necessary
to control the phenomenon of sedimentation. The following
steps should be taken to control the deposition of sediment:
• Selection of a Reservoir Site The reservoir site should be
selected in such a way that so that load of sediment in the
flowing water from tributaries is considerably low. If it is
found that a tributary carries heavy sediment, the reservoir site
should be shifted towards the upstream to avoid the tributary.
• Design of Reservoir At the beginning the reservoir should not
be constructed to its full capacity. Initially a reservoir of less
capacity is constructed. When the reservoir gets silted, gradually
the capacity should be increased stage by stage, by increasing
the height of the dam.
• Sufficient outlets should be provided in the dam at different
elevations so that the water carrying heavy sediment may be
discharged to the downstream by opening the outlets.
Selection of a Reservoir Site
Control of Sedimentation
• Removal of Sediments The sediment already
deposited in the reservoir may be removed through
the scouring sluices provided at the bottom of the dam
by loosening the sediments by mechanical agitator.
• Afforestation New plantations should be planned in
the catchment to extend the forest area which serves
as a vegetal apron to reduce the soil erosion.
• Control of Deforestation The cutting of Trees, i.e.
deforestation in the catchment should be restricted
by the government so that the vegetal cover is not
destroyed. The deforestation may cause soil erosion
and this may cause soil erosion and this may impart
sedimentation load to river water.
Removal of Sediments
Control of Sedimentation
• Control of Cultivation: The intensive cultivation in the
catchment makes the soil loose which may then get easily
carried by the rainwater to the river. So the cultivation
should be done in a planned manner and necessary
measures should be taken to avoid the loose soil getting
carried away by the rain.
• Control of Grazing The grazing of cattle in the catchment
should be restricted and they should not be allowed in the
area where the soil can get easily eroded by their feet.
• Construction of Check Dams: If the tributaries of a river
are found to carry heavy sediment load, then check dams of
low height are constructed across the tributaries at different
stages to arrest the sediments just in the catchment area.
Here, the check dams serve the purpose of detention
reservoir where the heavy sediments get settled down.
Construction of Check Dams
Control of Sedimentation
• Construction of Contour Bunds: In hilly area contour
bunds are constructed on the slope of the catchment at
different elevations so that the heavy sediments are
arrested at the base of the bunds and comparatively less
turbid water passes over the bunds.
• Stabilization of Slips: Most of the tributaries of a river
obtain the sediments from the land slides which are
caused due to heavy rainfall in the hilly area. It is
generally composed of loose soil or permeable rock
formation. These slips should be stabilized by suitable
methods so that the debris may not be carried by flowing
water.
Construction of Contour Bunds
Reference
• Irrigation Engineering : N.N. Basak
• Irrigation Engineering & Hydraulic
Structures: S.K.Garg
• Internet Websites
Thanks…

Contenu connexe

Tendances (20)

Lined canal ppt
Lined canal ppt Lined canal ppt
Lined canal ppt
 
Canal headworks
Canal headworksCanal headworks
Canal headworks
 
Design of Hydraulic Structures
Design of Hydraulic StructuresDesign of Hydraulic Structures
Design of Hydraulic Structures
 
Hydrograph
HydrographHydrograph
Hydrograph
 
Lacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation EngineeringLacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation Engineering
 
TYPES OF RESERVOIR
TYPES OF RESERVOIRTYPES OF RESERVOIR
TYPES OF RESERVOIR
 
Stage measurement
Stage measurementStage measurement
Stage measurement
 
Reservior planning
Reservior    planningReservior    planning
Reservior planning
 
Canal alignment
Canal alignmentCanal alignment
Canal alignment
 
energy dissipator in hydraulic structure
energy dissipator  in  hydraulic structure energy dissipator  in  hydraulic structure
energy dissipator in hydraulic structure
 
Sewer Appurtenances
Sewer AppurtenancesSewer Appurtenances
Sewer Appurtenances
 
Stream Gauging
Stream GaugingStream Gauging
Stream Gauging
 
Design of Lined Canal and Canal Lining
Design of Lined Canal and Canal LiningDesign of Lined Canal and Canal Lining
Design of Lined Canal and Canal Lining
 
Cross Drainage Works
Cross Drainage WorksCross Drainage Works
Cross Drainage Works
 
Canal lining
Canal liningCanal lining
Canal lining
 
types of dam
types of damtypes of dam
types of dam
 
Diversion head works
Diversion head worksDiversion head works
Diversion head works
 
Hydraulic jump
Hydraulic jumpHydraulic jump
Hydraulic jump
 
Canal Regulation & Cross Drainage Works
Canal Regulation & Cross Drainage WorksCanal Regulation & Cross Drainage Works
Canal Regulation & Cross Drainage Works
 
Hyetograph and hydrograph analysis
Hyetograph and hydrograph analysisHyetograph and hydrograph analysis
Hyetograph and hydrograph analysis
 

En vedette

WATER POLLUTION - HUMAN IMPACT & REMEDIES (Benz Jr.)
WATER POLLUTION - HUMAN IMPACT & REMEDIES (Benz Jr.)WATER POLLUTION - HUMAN IMPACT & REMEDIES (Benz Jr.)
WATER POLLUTION - HUMAN IMPACT & REMEDIES (Benz Jr.)Aby Benz
 
Continuous & intermittent system of water supply
Continuous & intermittent system of water supplyContinuous & intermittent system of water supply
Continuous & intermittent system of water supplyParikshit Kumar
 
India; Bore Well Recharge Rainwater Harvesting - RainwaterClub
India;  Bore Well Recharge Rainwater Harvesting - RainwaterClubIndia;  Bore Well Recharge Rainwater Harvesting - RainwaterClub
India; Bore Well Recharge Rainwater Harvesting - RainwaterClubD5Z
 
desposal by dilution
desposal by dilutiondesposal by dilution
desposal by dilutionAnkit Gola
 
Reserviors its purpose and there main functions and uses
Reserviors its purpose and there main functions and usesReserviors its purpose and there main functions and uses
Reserviors its purpose and there main functions and usesammar gulzar
 
Rainwater harvesting in Chandigarh_Architect Surinder Bahga_August 19, 2015
Rainwater harvesting in Chandigarh_Architect Surinder Bahga_August 19, 2015Rainwater harvesting in Chandigarh_Architect Surinder Bahga_August 19, 2015
Rainwater harvesting in Chandigarh_Architect Surinder Bahga_August 19, 2015India Water Portal
 
Rain water harvesting ppt
Rain water harvesting pptRain water harvesting ppt
Rain water harvesting pptPalash Jain
 
Building Services :Drainage, Rain Water Disposal and Harvesting
Building Services :Drainage,  Rain Water Disposal and  HarvestingBuilding Services :Drainage,  Rain Water Disposal and  Harvesting
Building Services :Drainage, Rain Water Disposal and HarvestingSumit Ranjan
 
Waste water treatment processes
Waste water treatment processesWaste water treatment processes
Waste water treatment processesAshish Agarwal
 

En vedette (13)

WATER POLLUTION - HUMAN IMPACT & REMEDIES (Benz Jr.)
WATER POLLUTION - HUMAN IMPACT & REMEDIES (Benz Jr.)WATER POLLUTION - HUMAN IMPACT & REMEDIES (Benz Jr.)
WATER POLLUTION - HUMAN IMPACT & REMEDIES (Benz Jr.)
 
Continuous & intermittent system of water supply
Continuous & intermittent system of water supplyContinuous & intermittent system of water supply
Continuous & intermittent system of water supply
 
India; Bore Well Recharge Rainwater Harvesting - RainwaterClub
India;  Bore Well Recharge Rainwater Harvesting - RainwaterClubIndia;  Bore Well Recharge Rainwater Harvesting - RainwaterClub
India; Bore Well Recharge Rainwater Harvesting - RainwaterClub
 
Water pollution
Water pollutionWater pollution
Water pollution
 
desposal by dilution
desposal by dilutiondesposal by dilution
desposal by dilution
 
Reserviors its purpose and there main functions and uses
Reserviors its purpose and there main functions and usesReserviors its purpose and there main functions and uses
Reserviors its purpose and there main functions and uses
 
Rainwater harvesting in Chandigarh_Architect Surinder Bahga_August 19, 2015
Rainwater harvesting in Chandigarh_Architect Surinder Bahga_August 19, 2015Rainwater harvesting in Chandigarh_Architect Surinder Bahga_August 19, 2015
Rainwater harvesting in Chandigarh_Architect Surinder Bahga_August 19, 2015
 
Rain water harvesting ppt
Rain water harvesting pptRain water harvesting ppt
Rain water harvesting ppt
 
Septic Tank
Septic TankSeptic Tank
Septic Tank
 
Building Services :Drainage, Rain Water Disposal and Harvesting
Building Services :Drainage,  Rain Water Disposal and  HarvestingBuilding Services :Drainage,  Rain Water Disposal and  Harvesting
Building Services :Drainage, Rain Water Disposal and Harvesting
 
05 water supply system
05 water supply system05 water supply system
05 water supply system
 
Water distribution system
Water distribution systemWater distribution system
Water distribution system
 
Waste water treatment processes
Waste water treatment processesWaste water treatment processes
Waste water treatment processes
 

Similaire à Hydrology and Water Resources Engineering

Storage and distribution reservoirs
Storage and distribution reservoirsStorage and distribution reservoirs
Storage and distribution reservoirsfarooq husain
 
New geology of dams & reservoir unit v
New geology of dams & reservoir unit vNew geology of dams & reservoir unit v
New geology of dams & reservoir unit vDr.Anil Deshpande
 
Dams and Reserviors
Dams and ReserviorsDams and Reserviors
Dams and ReserviorsTarun kumar
 
Irrigation and hydraulic structures, reservoirs and types
Irrigation and hydraulic structures, reservoirs and typesIrrigation and hydraulic structures, reservoirs and types
Irrigation and hydraulic structures, reservoirs and typeskiran yadav
 
Sources and de mand and water supply
Sources and de mand and water supplySources and de mand and water supply
Sources and de mand and water supplydhara dattani
 
Elements of dam engineering
Elements of dam engineeringElements of dam engineering
Elements of dam engineeringchala hailu
 
Ce 413 hydraulic structures 8th
Ce 413 hydraulic structures 8thCe 413 hydraulic structures 8th
Ce 413 hydraulic structures 8thEngrHayatHussain
 
diversionheadworks-150327075328-conversion-gate01.pdf
diversionheadworks-150327075328-conversion-gate01.pdfdiversionheadworks-150327075328-conversion-gate01.pdf
diversionheadworks-150327075328-conversion-gate01.pdfShrutiLotliker
 
Diversionheadworks 150327075328-conversion-gate01
Diversionheadworks 150327075328-conversion-gate01Diversionheadworks 150327075328-conversion-gate01
Diversionheadworks 150327075328-conversion-gate01saibabu48
 
CROSS DRAINAGE WORKS _ MODULE III.pdf CROSS DRAINAGE WORKS _ MODULE III.pdf
CROSS DRAINAGE WORKS _ MODULE III.pdf CROSS DRAINAGE WORKS _ MODULE III.pdfCROSS DRAINAGE WORKS _ MODULE III.pdf CROSS DRAINAGE WORKS _ MODULE III.pdf
CROSS DRAINAGE WORKS _ MODULE III.pdf CROSS DRAINAGE WORKS _ MODULE III.pdfGOWTHAM14499
 
Presentation1 hydro;ogy-SKK.pdf
Presentation1 hydro;ogy-SKK.pdfPresentation1 hydro;ogy-SKK.pdf
Presentation1 hydro;ogy-SKK.pdfShrutiLotliker
 
Planning of reservoir
Planning of reservoirPlanning of reservoir
Planning of reservoirnumber113
 

Similaire à Hydrology and Water Resources Engineering (20)

Classification of Reservoirs.pptx
Classification of Reservoirs.pptxClassification of Reservoirs.pptx
Classification of Reservoirs.pptx
 
Dams
DamsDams
Dams
 
Storage and distribution reservoirs
Storage and distribution reservoirsStorage and distribution reservoirs
Storage and distribution reservoirs
 
New geology of dams & reservoir unit v
New geology of dams & reservoir unit vNew geology of dams & reservoir unit v
New geology of dams & reservoir unit v
 
Dams and Reserviors
Dams and ReserviorsDams and Reserviors
Dams and Reserviors
 
Irrigation and hydraulic structures, reservoirs and types
Irrigation and hydraulic structures, reservoirs and typesIrrigation and hydraulic structures, reservoirs and types
Irrigation and hydraulic structures, reservoirs and types
 
Lecture 5
Lecture 5Lecture 5
Lecture 5
 
Reservoir
ReservoirReservoir
Reservoir
 
Water harvesting
Water harvestingWater harvesting
Water harvesting
 
Sources and de mand and water supply
Sources and de mand and water supplySources and de mand and water supply
Sources and de mand and water supply
 
Elements of dam engineering
Elements of dam engineeringElements of dam engineering
Elements of dam engineering
 
Ch-3.pptx
Ch-3.pptxCh-3.pptx
Ch-3.pptx
 
Ce 413 hydraulic structures 8th
Ce 413 hydraulic structures 8thCe 413 hydraulic structures 8th
Ce 413 hydraulic structures 8th
 
Water harvesting and its technique
Water harvesting and its techniqueWater harvesting and its technique
Water harvesting and its technique
 
Diversion Headworks
Diversion HeadworksDiversion Headworks
Diversion Headworks
 
diversionheadworks-150327075328-conversion-gate01.pdf
diversionheadworks-150327075328-conversion-gate01.pdfdiversionheadworks-150327075328-conversion-gate01.pdf
diversionheadworks-150327075328-conversion-gate01.pdf
 
Diversionheadworks 150327075328-conversion-gate01
Diversionheadworks 150327075328-conversion-gate01Diversionheadworks 150327075328-conversion-gate01
Diversionheadworks 150327075328-conversion-gate01
 
CROSS DRAINAGE WORKS _ MODULE III.pdf CROSS DRAINAGE WORKS _ MODULE III.pdf
CROSS DRAINAGE WORKS _ MODULE III.pdf CROSS DRAINAGE WORKS _ MODULE III.pdfCROSS DRAINAGE WORKS _ MODULE III.pdf CROSS DRAINAGE WORKS _ MODULE III.pdf
CROSS DRAINAGE WORKS _ MODULE III.pdf CROSS DRAINAGE WORKS _ MODULE III.pdf
 
Presentation1 hydro;ogy-SKK.pdf
Presentation1 hydro;ogy-SKK.pdfPresentation1 hydro;ogy-SKK.pdf
Presentation1 hydro;ogy-SKK.pdf
 
Planning of reservoir
Planning of reservoirPlanning of reservoir
Planning of reservoir
 

Plus de GAURAV. H .TANDON

Suicide Prevention through Architecture (Building) and City Planning
Suicide Prevention through  Architecture (Building) and City PlanningSuicide Prevention through  Architecture (Building) and City Planning
Suicide Prevention through Architecture (Building) and City PlanningGAURAV. H .TANDON
 
Suicide Prevention through Architecture (Building) and City Planning
Suicide Prevention through  Architecture (Building) and City PlanningSuicide Prevention through  Architecture (Building) and City Planning
Suicide Prevention through Architecture (Building) and City PlanningGAURAV. H .TANDON
 
Digital Detoxing in Smart Cities
Digital Detoxing in Smart CitiesDigital Detoxing in Smart Cities
Digital Detoxing in Smart CitiesGAURAV. H .TANDON
 
Digital Detoxing in Smart Cities
Digital Detoxing in Smart CitiesDigital Detoxing in Smart Cities
Digital Detoxing in Smart CitiesGAURAV. H .TANDON
 
Crash for Cash-Organized Crime (COC).pptx
Crash for Cash-Organized Crime (COC).pptxCrash for Cash-Organized Crime (COC).pptx
Crash for Cash-Organized Crime (COC).pptxGAURAV. H .TANDON
 
Ecological Footprint (1).pptx
Ecological Footprint (1).pptxEcological Footprint (1).pptx
Ecological Footprint (1).pptxGAURAV. H .TANDON
 
The unethical practice of gift giving to doctors by pharma companies
The unethical practice of gift giving to doctors by pharma companiesThe unethical practice of gift giving to doctors by pharma companies
The unethical practice of gift giving to doctors by pharma companiesGAURAV. H .TANDON
 
Gamification of Smart Cities
Gamification of Smart Cities Gamification of Smart Cities
Gamification of Smart Cities GAURAV. H .TANDON
 
Collusion and Fraud Detection on Electronic Energy Meters
Collusion and Fraud Detection on Electronic Energy Meters Collusion and Fraud Detection on Electronic Energy Meters
Collusion and Fraud Detection on Electronic Energy Meters GAURAV. H .TANDON
 
Cyber Security in Smart Buildings
Cyber Security in Smart Buildings Cyber Security in Smart Buildings
Cyber Security in Smart Buildings GAURAV. H .TANDON
 

Plus de GAURAV. H .TANDON (20)

Suicide Prevention through Architecture (Building) and City Planning
Suicide Prevention through  Architecture (Building) and City PlanningSuicide Prevention through  Architecture (Building) and City Planning
Suicide Prevention through Architecture (Building) and City Planning
 
Suicide Prevention through Architecture (Building) and City Planning
Suicide Prevention through  Architecture (Building) and City PlanningSuicide Prevention through  Architecture (Building) and City Planning
Suicide Prevention through Architecture (Building) and City Planning
 
Digital Detoxing in Smart Cities
Digital Detoxing in Smart CitiesDigital Detoxing in Smart Cities
Digital Detoxing in Smart Cities
 
Digital Detoxing in Smart Cities
Digital Detoxing in Smart CitiesDigital Detoxing in Smart Cities
Digital Detoxing in Smart Cities
 
Premerital Sceening .pptx
Premerital Sceening .pptxPremerital Sceening .pptx
Premerital Sceening .pptx
 
Polymath(Renaissance man)
Polymath(Renaissance man)Polymath(Renaissance man)
Polymath(Renaissance man)
 
Crash for Cash-Organized Crime (COC).pptx
Crash for Cash-Organized Crime (COC).pptxCrash for Cash-Organized Crime (COC).pptx
Crash for Cash-Organized Crime (COC).pptx
 
Voting Age .pptx
Voting Age .pptxVoting Age .pptx
Voting Age .pptx
 
Ecological Footprint (1).pptx
Ecological Footprint (1).pptxEcological Footprint (1).pptx
Ecological Footprint (1).pptx
 
Urban Heat Island Effect
Urban Heat Island EffectUrban Heat Island Effect
Urban Heat Island Effect
 
Communication Skills
Communication SkillsCommunication Skills
Communication Skills
 
The unethical practice of gift giving to doctors by pharma companies
The unethical practice of gift giving to doctors by pharma companiesThe unethical practice of gift giving to doctors by pharma companies
The unethical practice of gift giving to doctors by pharma companies
 
Compassionate Cities
Compassionate CitiesCompassionate Cities
Compassionate Cities
 
Gamification of Smart Cities
Gamification of Smart Cities Gamification of Smart Cities
Gamification of Smart Cities
 
Anti-Microbial Copper
Anti-Microbial Copper Anti-Microbial Copper
Anti-Microbial Copper
 
Smart Forest City
Smart Forest City Smart Forest City
Smart Forest City
 
Smart forest cities
Smart forest cities Smart forest cities
Smart forest cities
 
Automotive Hacking
Automotive Hacking Automotive Hacking
Automotive Hacking
 
Collusion and Fraud Detection on Electronic Energy Meters
Collusion and Fraud Detection on Electronic Energy Meters Collusion and Fraud Detection on Electronic Energy Meters
Collusion and Fraud Detection on Electronic Energy Meters
 
Cyber Security in Smart Buildings
Cyber Security in Smart Buildings Cyber Security in Smart Buildings
Cyber Security in Smart Buildings
 

Dernier

Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Dernier (20)

Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 

Hydrology and Water Resources Engineering

  • 2. • Reservoir Types, Investigations, Site selection, Zones of storage, Safe yield, Reservoir capacity, Reservoir sedimentation and control. Syllabus
  • 3. Reservoir • A Reservoir is a artificial lake or impoundment from a dam which is used to store water. • Reservoirs may be created in river valleys by the construction of a dam or may be built by excavation in the ground or by conventional construction techniques such as brickwork or cast concrete.
  • 5. Purpose of Reservoir • The Storage reservoir is formed for the following purpose: • Flood Control • Irrigation • Water Supply • Hydroelectric Power Generation • Development of fishery • Navigation • Soil Conservation
  • 9. Hydro Electric Power Generation
  • 13. Reservoir may be designated by. • Single Purpose Reservoir: This type of reservoir is formed mainly to serve a single purpose, such as irrigation, flood control, water supply, etc. • Multipurpose Reservoir: This type is formed to serve many purpose such as, • Irrigation and water supply. • Irrigation water supply and flood control. • Irrigation, water supply, flood control, hydroelectric power generation, fishery, etc.
  • 15. Classification of Reservoir Storage Reservoir • Storage Reservoir The storage reservoir is formed by constructing a dam across a river valley. The idea of constructing such a reservoir is to store the excess water which flows through the river during the high floods or rainy season. This stored water is then utilized for various purposes, such as irrigation, water supply, fishery, hydroelectric power generation, etc. Again the storage reservoir may be named as single purpose reservoir or multipurpose reservoir according to its utility.
  • 17. Classification of Reservoir • Flood Control Reservoir: Flood control reservoir are for are formed by constructing dams at suitable places in the catchment area or river valley to arrest the flood water temporarily so that the downstream area may not get damaged by sudden high flood discharge. The arrested water is then allowed to flow or released gradually without causing any harm to the low lying area on the downstream side. This type of reservoir is designated as single purpose reservoir. The flood control reservoir can be of two type:
  • 19. Classification of Reservoir Detention Reservoir • In this type of reservoir, the spill ways with adjustable gates provided with the dam so that the flood water may be detained for sometime and then released according to the situation of the downstream area by operating the gates of the spillways. Retarding Reservoir • In this type of reservoir spillways are provided with the dam at such a level an capacity so that the flood discharge is retarded and it takes long time for the flood water to flow completely towards the downstream area. The discharge stops when the water level falls below the crest of the spillways.
  • 21. Classification of Reservoir Distribution Reservoir: • The distribution reservoir is not formed by constructing a dam across a river or valley. It is constructed by masonry work or concrete work in the form of a rectangular or circular tank at suitable places near the town or city. The water from the river or lake is pumped into this reservoir and stored there for supplying to the consumers of the town or city. The water may be supplied to consumers by pumping system or gravity system.
  • 23. Site Selection for Reservoir • The following points should be remembered while selecting a site for a reservoir. • Stable foundation for the dam should be available where the reservoir basin is proposed to be formed. • At the selected site the river valley should be narrow and well defined so that the length of the dam may be short. • The proposed reservoir basin should be watertight and free from cracks, fissures, etc. so that there is no loss of water due to percolation. • The reservoir water should not submerge valuable land or property.
  • 24. Site Selection for Reservoir • The tributaries which carry high content of sediment should be avoided. • The site should be such that a deep reservoir may be formed with minimum surface area to control the loss of water due to evaporation. • The site should be easily accessible by road or railway. • The construction material for the dam and other allied works should be available in the vicinity of the site. • Suitable area should be available for labour colonies, staff quarters, godowns, stack yards etc.
  • 25. Site Selection for Reservoir
  • 26. Investigation works for the Reservoir • The following investigation should be carried out for planning the storage reservoir. • Engineering Survey • The area of the dam site and reservoir basin should be surveyed thoroughly to prepare topographical map and contour map. From the contour map the storage capacity of the reservoir should be fixed by ascertaining the height of the dam. Thus, the valuable land and properties which may get submerged in the reservoir can be found out. So, the amount of compensation to be paid to the owner can be estimated. A detailed statement may be prepared for the land acquisition.
  • 28. Investigation works for the Reservoir • Geological Survey: It should be carried out to determine the following informations: • (i) Dam foundation: The sub-surface exploration at the dam site should be carried out to locate the cracks, fissures, etc, which are responsible for the percolation loss. Necessary measures can then be recommended for percolation zones to control the losses.
  • 29. Investigation works for the Reservoir • (ii) Characteristics of reservoir basin: The geological survey of the basin should be carried out to locate the cracks, fissures etc. which are responsible for the percolation loss. Necessary measures can then be recommended for percolation zones to control the losses. • (iii) Availability of Construction Materials: Huge quantity of materials like fine aggregate and coarse aggregate are required for the construction of dam and allied structures The place where these materials are available should be located and they should preferably be near the site. If the quarries and sand pits are situated in the vicinity of the project, it reduces the cost of the project.
  • 31. Investigation works for the Reservoir • Hydrological Survey: This survey includes the collection of following data: • River gauging: River gauging should be carried out for the main river and its tributaries in the catchment area and on the upstream side of the site. This is to estimate the probable discharge of the river throughout the year.
  • 32. Investigation works for the Reservoir • Rainfall records: The rainfall records from the rain gauge stations in the catchment area for the past few decades are collected and the runoff is estimated. Then the hydrographs are prepared from the high flood discharge for the previous decades. The probable flood discharge for the future decades are ascertained from the graphs. • Determination of discharge from empirical formulae: The peak flood discharge may also be determined by empirical formulae like Ryve’s formulae, Dickens's formulae, etc. The number and capacity of spillway are determined according to the available highest flood discharge from different observations.
  • 34. Yield of Reservoir • Yield The yield of reservoir is defined as the amount of water which is available in the reservoir at a specified interval of time. • Safe yield: It is the maximum quantity of water available in the reservoir during critical dry period.
  • 36. Capacity of Reservoir • Capacity The capacity of a reservoir is defined as the total volume of water that can be stored in it. The capacity of a reservoir may be determined by the following methods. • By Mass Curve • By Actual Discharge • By Empirical Formulae
  • 38. Zones of Storage Reservoir • The storage capacity of a reservoir is designated by several zones which are demarcated by certain pools. • Normal Pool Level (N.P.L) It is the maximum elevation of the water surface which is to be stored in the reservoir during normal working period. The water above this level will flow over the spillway crest. This water level is also known as full reservoir level (F.R.L) • Maximum Pool Level (M.P.L) It is the maximum elevation to which the water surface is allowed to rise in the reservoir during the period of flood. This level can be controlled by providing spillway gate (M.W.L).
  • 39. Zones of Storage Reservoir Minimum Pool Level: • It is the lowest elevation to which the water level is allowed to drop in a reservoir. This level is fixed by providing outlets in the dam. In case of hydroelectric power generation, the minimum head is essential. So, the water level of the reservoir should not drop below the minimum pool level (L.W.L).
  • 40. The following are the various Storage Zones: • Dead Storage: The volume of water which is stored below the minimum pool level of a reservoir is known as dead storage. This water cannot be utilized under normal operating Condition. • Live Storage: The volume of water stored in the reservoir between normal pool level and minimum pool level is known as useful storage or live storage. This water can be used for various purposes, such as irrigation, water supplies, fisheries, hydroelectric power generation.
  • 41. The following are the various Storage Zones: • Surcharge Storage: The volume of water stored in a reservoir between the normal pool level and maximum pool level is known as surcharge storage, this storage is not meant for any work, but it is mainly for the detention of flood water so that it may not cause any danger on the downstream side.
  • 42. The following are the various Storage Zones: • Valley Storage: The minimum volume of water which flows through a river before the construction of dam is known as valley storage. This water may always be available from the river even before the formation of reservoir. This water may always be available from the river even before the formation of reservoir.. So, the effective storage capacity is given by. • Effective Storage= (Live storage + Surcharge Storage- Valley Storage).
  • 43. Zones of Storage Reservoir
  • 44. Causes of Sedimentation in Reservoir • In the catchment area the soil may get eroded and rocks may get disintegrated due to various reasons. The disintegrated rocks and loose soil form the sediment which is carried by the river and gets deposited on the reservoir bed near the base of the dam. The sediment mainly consists of sand and silt. The process of deposition of sand and silt in the reservoir is designated as reservoir sedimentation.
  • 45. Causes of Sedimentation in Reservoir
  • 46. The following are the causes of sedimentation • Characteristics of soil in Catchment area: If the catchment area is composed of loose soil, then it may get easily eroded and get carried away by the river. On the other hand, if the soil of the catchment area is hard and rocky, the river would not be able to carry sediment. • Topography of the catchment Area: If the catchment area consists of steep slope, then it will develop high velocity of flow which will cause more erosion of the surface soil thereby making the river carry a lot of sediment. • Intensity of Rainfall in Catchment Area: If the intensity of rainfall in catchment area is high, then it will increase the rate of run-off and the river will carry more sediment.
  • 47. The following are the causes of Sedimentation • Cultivation in Catchment Area: The intensive cultivation in the catchment area will make the soil loose and rain water will carry a lot of sediment to the river. • Vegetation cover in Catchment Area: If the catchment area is covered with vegetation cover like grass, plants, forest area, etc. then the erosion of the soil will be controlled and the river will not carry sediment. If there is no such vegetal apron or cover, the soil may be easily eroded and the river will carry much sediment.
  • 48. Effect of Sedimentation When the sediment laden water of the river approaches the zone of reservoir, the velocity of flow reduces gradually and thus the heavier particles are settled down at the head of the reservoir, i.e.. starting zone of reservoir. This zone is termed as delta. Most of the sediments get deposited at this zone. The fine sediments remain in suspension for a considerable time and are carried towards the dam. These sediments are deposited at the foot of the dam. The very fine particles are carried with water as turbid flow and ultimately discharged through the outlets. The floating debris is collected above delta. The clear water circulates the middle portion of the reservoir. Thus, the life of reservoir depends on the trend of the sedimentation.
  • 50. Control of Sedimentation • In order to increase the useful life of a reservoir, it is necessary to control the phenomenon of sedimentation. The following steps should be taken to control the deposition of sediment: • Selection of a Reservoir Site The reservoir site should be selected in such a way that so that load of sediment in the flowing water from tributaries is considerably low. If it is found that a tributary carries heavy sediment, the reservoir site should be shifted towards the upstream to avoid the tributary. • Design of Reservoir At the beginning the reservoir should not be constructed to its full capacity. Initially a reservoir of less capacity is constructed. When the reservoir gets silted, gradually the capacity should be increased stage by stage, by increasing the height of the dam. • Sufficient outlets should be provided in the dam at different elevations so that the water carrying heavy sediment may be discharged to the downstream by opening the outlets.
  • 51. Selection of a Reservoir Site
  • 52. Control of Sedimentation • Removal of Sediments The sediment already deposited in the reservoir may be removed through the scouring sluices provided at the bottom of the dam by loosening the sediments by mechanical agitator. • Afforestation New plantations should be planned in the catchment to extend the forest area which serves as a vegetal apron to reduce the soil erosion. • Control of Deforestation The cutting of Trees, i.e. deforestation in the catchment should be restricted by the government so that the vegetal cover is not destroyed. The deforestation may cause soil erosion and this may cause soil erosion and this may impart sedimentation load to river water.
  • 54. Control of Sedimentation • Control of Cultivation: The intensive cultivation in the catchment makes the soil loose which may then get easily carried by the rainwater to the river. So the cultivation should be done in a planned manner and necessary measures should be taken to avoid the loose soil getting carried away by the rain. • Control of Grazing The grazing of cattle in the catchment should be restricted and they should not be allowed in the area where the soil can get easily eroded by their feet. • Construction of Check Dams: If the tributaries of a river are found to carry heavy sediment load, then check dams of low height are constructed across the tributaries at different stages to arrest the sediments just in the catchment area. Here, the check dams serve the purpose of detention reservoir where the heavy sediments get settled down.
  • 56. Control of Sedimentation • Construction of Contour Bunds: In hilly area contour bunds are constructed on the slope of the catchment at different elevations so that the heavy sediments are arrested at the base of the bunds and comparatively less turbid water passes over the bunds. • Stabilization of Slips: Most of the tributaries of a river obtain the sediments from the land slides which are caused due to heavy rainfall in the hilly area. It is generally composed of loose soil or permeable rock formation. These slips should be stabilized by suitable methods so that the debris may not be carried by flowing water.
  • 58. Reference • Irrigation Engineering : N.N. Basak • Irrigation Engineering & Hydraulic Structures: S.K.Garg • Internet Websites