SlideShare une entreprise Scribd logo
1  sur  24
FLOOR
PRESENTED BY
GAYATHRY SATHEESAN
1. Floors divide a building into different levels, one above the other for the
purpose of creating more accommodation within a limited space.
2. Depending upon the position of floors, floor can be divided into 3 types
3. Basement floor-below ground level
4. Ground floor-above ground level.
5. Sub floor : structural component which support floor covering.
6. Floor covering/floor: constructed over sub floor and is intended to provide a
hard, clean, smooth, impervious and durable surface to the floor
34
TYPES OF FLOORS
1. Timber floors
2. Composite floors
3. Choice of a particular type depends upon:
.Span
.Maximum load
.Speed required in construction
.Materials and labour available
TIMBER FLOORS
1. Basement or ground floor of timber
2. Single joist timber floors
3. Double joist timber floors
4. Framed or triple timber floors
1. Basement or ground floor of timber
• Sleeper walls of 1 brick or 1.5 brick thick are constructed at centre to centre distance
of 1.2 to 1.8m
• Wall plates are provided along the wall as well as sleeper walls-serve as end supports
• Bridging joists provided at centre to centre distance of about 30cm rests on wall-plates
• Floor boards are provided to finish up the floor
Precautions to be taken
• Soil below timber floor is covered with PCC of thickness 100mm to 150mm
• DPC are provided in the exterior walls and on top of sleeper walls
• Well-seasoned timber is used
• Hollow space between bottom concrete and floor level is filled up with selected earth
2. Single joist timber floors
•Consists of single strut placed below the floor boards
•Joists are placed at a centre to centre distance of 30cm to 45cm
•Joists are supported on wall plates at their ends
•When span exceeds 2.4m, herring bone strutting is given in which inclined timber pieces are
firmly fixed between joists and ends of these struts are nailed to the joist.
3. Double joist timber floors
•Intermediate supports known as binders are provided for the bridging joists
•Binders are placed at a centre to centre distance of 1.8m to 2.4m
•Suitable for spans of 3.6m to 7.5m
•To reduce the over all depth of floor, bridging joists are cogged to binders
Disadvantages:
•Weight of floor is thrown on few points in a wall
•Depth of floor is increased by the use of binders and accordingly the height of room is
decreased
4. Framed or triple joist timber floors
•Intermediate supports known as girders are provided for the binders.
•Girders are placed at centre to centre distance of 3m
•Binders have staggered connection to girders
•Suitable for spans greater than 7.5m
COMPOSITE FLOORS
•Floors composed of more than one material are known as the composite floors
•Advantages over the timber floors :
1.The composite floors resist fire in a better way and they are more sound proof
2.Composite floors can be easily cleaned and hence they possess better hygienic
properties than the timber floors
3.The composite floors can be conveniently adopted for greater span
1. Double flagstone floors
▪Flagstones are used in 2 layers
▪If span is about 4m, only RSJ are provided
▪If span exceeds 4m, a framework consisting of Rolled Steel Beams and joists is
formed.
▪Steel beams are placed at a distance of about 3m centre to centre and joists are
placed at right angles to the beams
▪Flagstones of about 40mm thickness and of suitable widths are fixed on the lower
flanges and upper flanges
▪Filling of selected earth or concrete is done in the space between 2 layers of the
flagstones
2. Filler joist floors
•Small sections of RSJ are placed in concrete
•Joists act as a reinforcement and are spaced at a centre to centre distance
of 60cm to 90cm
•Filter joist may either rest on wall or on longitudinal steel beam
•Concrete should completely surround the RSJ and beams
3. Jack arch floors
• Brick arches or cement concrete arches are constructed and these arches
rest on the lower flanges of mild steel joists
• Joists in turn rest either on wall or on beam
• Joists are placed at a distance of about 1 to 1.5m centre to centre
Disadvantage:
It does not give a plain ceiling surface
4. R.C.C Floors
•Widely used in modern construction
•Thickness of slab usually varies from 8-20cm depending on loads acting on it
and span
•RCC can be cast-in-situ or pre-cast
•Suitable flooring can be provided on the surface of an RCC floor
•RCC floors are less costly, durable, easy to construct and fire-proof.
6.Hollow block and rib floors
•Hollow blocks of clay or concrete are used to reduce the total weight of the
floor
•Blocks are placed 100mm apart and in this space, mild steel bars are placed
•Blocks are provided with rough or grooved surface so that they can develop
enough bond with the concrete
•Economical, fireproof and light in weight.
•Plumbing and electrical installations can be conveniently carried through
hollow blocks without affecting the appearence
Thank You..

Contenu connexe

Tendances

Tendances (20)

Details of lintels
Details of  lintelsDetails of  lintels
Details of lintels
 
FLOORING & ITS TYPE
FLOORING & ITS TYPEFLOORING & ITS TYPE
FLOORING & ITS TYPE
 
Tiles
TilesTiles
Tiles
 
Walls
WallsWalls
Walls
 
Flooring
FlooringFlooring
Flooring
 
Plastering
PlasteringPlastering
Plastering
 
Building finishes
Building finishesBuilding finishes
Building finishes
 
Floors
FloorsFloors
Floors
 
building finishes,architecture,building materials and construction
building finishes,architecture,building materials and constructionbuilding finishes,architecture,building materials and construction
building finishes,architecture,building materials and construction
 
Doors and Windows
Doors and WindowsDoors and Windows
Doors and Windows
 
Doors and windows
Doors and windowsDoors and windows
Doors and windows
 
Foundation
FoundationFoundation
Foundation
 
Floor finishes - flooring and finish types
Floor finishes - flooring and finish typesFloor finishes - flooring and finish types
Floor finishes - flooring and finish types
 
Partition & suspended ceiling
Partition & suspended ceilingPartition & suspended ceiling
Partition & suspended ceiling
 
Brick masonry and stone masonry
Brick masonry and stone masonryBrick masonry and stone masonry
Brick masonry and stone masonry
 
Wall types
Wall typesWall types
Wall types
 
Types of pitched roofs
Types of pitched roofsTypes of pitched roofs
Types of pitched roofs
 
Floors by chakamba john
Floors  by chakamba johnFloors  by chakamba john
Floors by chakamba john
 
Building suerface finishes
Building suerface finishesBuilding suerface finishes
Building suerface finishes
 
False ceiling
False ceilingFalse ceiling
False ceiling
 

Similaire à Floor

323415967-6-Floors-Upper-Floor-of-Timber-1.pdf
323415967-6-Floors-Upper-Floor-of-Timber-1.pdf323415967-6-Floors-Upper-Floor-of-Timber-1.pdf
323415967-6-Floors-Upper-Floor-of-Timber-1.pdf
ochiengtonny549
 
Type iv building construction
Type iv building constructionType iv building construction
Type iv building construction
Brianna Mason
 
Type iv building construction FINAL
Type iv building construction FINALType iv building construction FINAL
Type iv building construction FINAL
Brianna Mason
 
1.3_Basic Engineering_Day 5.pptx
1.3_Basic Engineering_Day 5.pptx1.3_Basic Engineering_Day 5.pptx
1.3_Basic Engineering_Day 5.pptx
Janak82
 
Chapter 5
Chapter 5 Chapter 5
Chapter 5
Est
 

Similaire à Floor (20)

323415967-6-Floors-Upper-Floor-of-Timber-1.pdf
323415967-6-Floors-Upper-Floor-of-Timber-1.pdf323415967-6-Floors-Upper-Floor-of-Timber-1.pdf
323415967-6-Floors-Upper-Floor-of-Timber-1.pdf
 
Partition wall
Partition wallPartition wall
Partition wall
 
Wooden flooring and repair
Wooden flooring and repairWooden flooring and repair
Wooden flooring and repair
 
Roof
RoofRoof
Roof
 
Building materials and construction Technology Roofs.pptx
Building materials and construction Technology Roofs.pptxBuilding materials and construction Technology Roofs.pptx
Building materials and construction Technology Roofs.pptx
 
Bmc timber flooring
Bmc timber flooringBmc timber flooring
Bmc timber flooring
 
Timber roofs
Timber roofsTimber roofs
Timber roofs
 
Roofing members
Roofing membersRoofing members
Roofing members
 
Type iv building construction
Type iv building constructionType iv building construction
Type iv building construction
 
Partition (1).pptx
Partition (1).pptxPartition (1).pptx
Partition (1).pptx
 
Brick partition walls
Brick partition wallsBrick partition walls
Brick partition walls
 
Type iv building construction FINAL
Type iv building construction FINALType iv building construction FINAL
Type iv building construction FINAL
 
Floors.pdf
Floors.pdfFloors.pdf
Floors.pdf
 
FLOORING
FLOORINGFLOORING
FLOORING
 
Chapter threesjjsjsjsjsjsjsjsjsjjsjsjssj
Chapter  threesjjsjsjsjsjsjsjsjsjjsjsjssjChapter  threesjjsjsjsjsjsjsjsjsjjsjsjssj
Chapter threesjjsjsjsjsjsjsjsjsjjsjsjssj
 
Partitionwall.pptx
Partitionwall.pptxPartitionwall.pptx
Partitionwall.pptx
 
1.3_Basic Engineering_Day 5.pptx
1.3_Basic Engineering_Day 5.pptx1.3_Basic Engineering_Day 5.pptx
1.3_Basic Engineering_Day 5.pptx
 
FLOORS AND FLOORING MATERIALS.pptx
FLOORS AND FLOORING MATERIALS.pptxFLOORS AND FLOORING MATERIALS.pptx
FLOORS AND FLOORING MATERIALS.pptx
 
Lintels
LintelsLintels
Lintels
 
Chapter 5
Chapter 5 Chapter 5
Chapter 5
 

Plus de gayathrysatheesan1

Plus de gayathrysatheesan1 (20)

Tourist places in ooti
Tourist places in ootiTourist places in ooti
Tourist places in ooti
 
Railways for urban transportation
Railways for urban transportationRailways for urban transportation
Railways for urban transportation
 
BENEFITS OF PLANING
BENEFITS OF PLANINGBENEFITS OF PLANING
BENEFITS OF PLANING
 
National capital region
National capital regionNational capital region
National capital region
 
CONCENTRIC ZONE MODEL THEORY
CONCENTRIC ZONE MODEL THEORYCONCENTRIC ZONE MODEL THEORY
CONCENTRIC ZONE MODEL THEORY
 
Tourist places in banglore
Tourist places in bangloreTourist places in banglore
Tourist places in banglore
 
Transit oriented development
Transit oriented developmentTransit oriented development
Transit oriented development
 
Kochi city as an organism
Kochi city as an organismKochi city as an organism
Kochi city as an organism
 
Garden city
Garden cityGarden city
Garden city
 
SUB DIVISION PRACTICE AND METRO REGION CONCEPT
SUB DIVISION PRACTICE AND METRO REGION CONCEPTSUB DIVISION PRACTICE AND METRO REGION CONCEPT
SUB DIVISION PRACTICE AND METRO REGION CONCEPT
 
Town development plan
Town development planTown development plan
Town development plan
 
Space standards for facility areas and utilites
Space standards for facility areas and utilitesSpace standards for facility areas and utilites
Space standards for facility areas and utilites
 
Precincts
PrecinctsPrecincts
Precincts
 
Multiple nuclei theory
Multiple nuclei theoryMultiple nuclei theory
Multiple nuclei theory
 
Classification of cost
Classification of costClassification of cost
Classification of cost
 
Roof and roof coverings
Roof and roof coveringsRoof and roof coverings
Roof and roof coverings
 
Zoning
ZoningZoning
Zoning
 
Scaffolding and formwork ppt
Scaffolding and  formwork pptScaffolding and  formwork ppt
Scaffolding and formwork ppt
 
Regional problems and their solutions ppt
Regional problems and their solutions pptRegional problems and their solutions ppt
Regional problems and their solutions ppt
 
Presentation skills ppt
Presentation skills pptPresentation skills ppt
Presentation skills ppt
 

Dernier

DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Dernier (20)

PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 

Floor

  • 2. 1. Floors divide a building into different levels, one above the other for the purpose of creating more accommodation within a limited space. 2. Depending upon the position of floors, floor can be divided into 3 types 3. Basement floor-below ground level 4. Ground floor-above ground level. 5. Sub floor : structural component which support floor covering. 6. Floor covering/floor: constructed over sub floor and is intended to provide a hard, clean, smooth, impervious and durable surface to the floor
  • 3.
  • 4. 34 TYPES OF FLOORS 1. Timber floors 2. Composite floors 3. Choice of a particular type depends upon: .Span .Maximum load .Speed required in construction .Materials and labour available
  • 5. TIMBER FLOORS 1. Basement or ground floor of timber 2. Single joist timber floors 3. Double joist timber floors 4. Framed or triple timber floors
  • 6. 1. Basement or ground floor of timber • Sleeper walls of 1 brick or 1.5 brick thick are constructed at centre to centre distance of 1.2 to 1.8m • Wall plates are provided along the wall as well as sleeper walls-serve as end supports • Bridging joists provided at centre to centre distance of about 30cm rests on wall-plates • Floor boards are provided to finish up the floor
  • 7.
  • 8. Precautions to be taken • Soil below timber floor is covered with PCC of thickness 100mm to 150mm • DPC are provided in the exterior walls and on top of sleeper walls • Well-seasoned timber is used • Hollow space between bottom concrete and floor level is filled up with selected earth
  • 9. 2. Single joist timber floors •Consists of single strut placed below the floor boards •Joists are placed at a centre to centre distance of 30cm to 45cm •Joists are supported on wall plates at their ends •When span exceeds 2.4m, herring bone strutting is given in which inclined timber pieces are firmly fixed between joists and ends of these struts are nailed to the joist.
  • 10.
  • 11. 3. Double joist timber floors •Intermediate supports known as binders are provided for the bridging joists •Binders are placed at a centre to centre distance of 1.8m to 2.4m •Suitable for spans of 3.6m to 7.5m •To reduce the over all depth of floor, bridging joists are cogged to binders Disadvantages: •Weight of floor is thrown on few points in a wall •Depth of floor is increased by the use of binders and accordingly the height of room is decreased
  • 12.
  • 13. 4. Framed or triple joist timber floors •Intermediate supports known as girders are provided for the binders. •Girders are placed at centre to centre distance of 3m •Binders have staggered connection to girders •Suitable for spans greater than 7.5m
  • 14. COMPOSITE FLOORS •Floors composed of more than one material are known as the composite floors •Advantages over the timber floors : 1.The composite floors resist fire in a better way and they are more sound proof 2.Composite floors can be easily cleaned and hence they possess better hygienic properties than the timber floors 3.The composite floors can be conveniently adopted for greater span
  • 15. 1. Double flagstone floors ▪Flagstones are used in 2 layers ▪If span is about 4m, only RSJ are provided ▪If span exceeds 4m, a framework consisting of Rolled Steel Beams and joists is formed. ▪Steel beams are placed at a distance of about 3m centre to centre and joists are placed at right angles to the beams ▪Flagstones of about 40mm thickness and of suitable widths are fixed on the lower flanges and upper flanges ▪Filling of selected earth or concrete is done in the space between 2 layers of the flagstones
  • 16.
  • 17. 2. Filler joist floors •Small sections of RSJ are placed in concrete •Joists act as a reinforcement and are spaced at a centre to centre distance of 60cm to 90cm •Filter joist may either rest on wall or on longitudinal steel beam •Concrete should completely surround the RSJ and beams
  • 18. 3. Jack arch floors • Brick arches or cement concrete arches are constructed and these arches rest on the lower flanges of mild steel joists • Joists in turn rest either on wall or on beam • Joists are placed at a distance of about 1 to 1.5m centre to centre Disadvantage: It does not give a plain ceiling surface
  • 19.
  • 20. 4. R.C.C Floors •Widely used in modern construction •Thickness of slab usually varies from 8-20cm depending on loads acting on it and span •RCC can be cast-in-situ or pre-cast •Suitable flooring can be provided on the surface of an RCC floor •RCC floors are less costly, durable, easy to construct and fire-proof.
  • 21.
  • 22. 6.Hollow block and rib floors •Hollow blocks of clay or concrete are used to reduce the total weight of the floor •Blocks are placed 100mm apart and in this space, mild steel bars are placed •Blocks are provided with rough or grooved surface so that they can develop enough bond with the concrete •Economical, fireproof and light in weight. •Plumbing and electrical installations can be conveniently carried through hollow blocks without affecting the appearence
  • 23.